Loading...
HomeMy WebLinkAboutSW4191202_17-042_C1.8 POND_1/20/2020EI DI CI 11111551111111111 M a- N LO M 0 N O I 0 Z 0 a- t>o U I 3 0 M U Z U) w rn1 I N O I i 0 i N O I N O J O1 C O a- ac O F- Q r O i a_ w Q Z CD Z 1 2 3 4 5 j/ ,EMERGENCY / c9.a / �,/ LLW - O�j .� - � � 814. 814.75' 0 R=818.68 8 9. 0 06. N DI AT �',•;,'''•' � � 3 � � Imo" ��� � • � �� C : it : � � 1 STORM POND PLAN Q SCALE: 1'=20' "s STM 3 / RIM=812.00 1 VN=806.48 (*) - fN`T14=806.30 (2) INV IN=804.48 (5) INV OUT=804.71 (1) 100 YR. FLOOD STAGE (815.36 L 10 YR. FLOOD STAGE 814.74 2 YR. FLOOD STAGEWRAIN 6' VEG. SHELF (6H/1 V) 6' 1 YR. FLOOD STAGE T/SHELF 812.50 SHELF TEMP. BAFFLES TO B/SHELF 811.50 PLACE DURING CONSTRUCTION 3 FOREBAY SEE PLAN I INSTALL AFTER ALL AREAS DRAINING �F INTO POND ARE STABILIZED CONSTRUCT DAM WITH IMPERMEABLE SOILS. COMPACTED TO 98% STD. PROCTOR DENSITY W/ A MOISTURE CONTENT OF -1% TO +3% OF OPTIMUM. SOILS SHALL BE UNIFORM IN CHARACTER & INSTALLED IN 8' MAXIMUM LIFTS. SOILS SHALL BE RISER - SEE DETAIL FREE OF ORGANICS & PARTICLES OF 2" OR GREATER. 10' 6' MIN. SHELF F�ql_. 816.50 1 EM ILL SPILLWAY 3 MAX.SLOPE 3 I 814.75 1 /8"x6' SQ. M 10' OC INV. OUT E 806.7 3' 3' 1 -FOREBAY 1' Q 42 PERM. W.Q. STORAGE ' 2 � RIPRAP OUTLET FROM PIPE -LRIA. SEDIMENT STORAGE TO BOTTOM OF POND 1 NOTE - VOLUME BELOW 8" 0 DRAIN PIPE NCDOT CLASS B STONE, 0 1 IS TO BE PUMPED OUT AT TIME OF 1' THK. NCDOT INSTALL DURING TRANSITION z 4) ANTI -SEEP PLATES AT CLEANING OR DURING MAINTENANCE. #57 STONE SHWT 1 FROM SED. BASIN TO WET I INV. 808.0 2' 2' FLANGE JOINTS WITH 803.0 DETENTION POND 1 2 NEOPRENE GASKETS THE SOIL IN THE POND BOTTOM WILL BE EVALUATED TO DETERMINE (1 FOR EACH SIDE) TO WHETHER A LINER IS REQUIRED. THE PERMANENT POOL ELEVATION TEMP. FAIRCLOTH SKIMMER, P 1. % ENSURE WATERTIGHT MUST BE MAINTAINED AT THE PROPOSED PERMANENT POOL ELEVATION i ATTACH TO 8" 0 DRAIN SEAL. TO INSURE THE SURVIVAL OF THE PLANTS ON THE VEGETATED SHELF. (TO BE REMOVED ON TRANSITION IF A LINER IS USED. A LINER SHALL BE CONSTRUCTED OR COMPACTED TO PERMANENT POND AND VALVE Q$HWT 2 CUT-OFF TRENCH SUCH THAT THE INFILTRATION RATE IS NO MORE THAN 0.01 IN./HR.. TO CLOSED OFF) 800.0 ACKFILL W/IMPERMEABLE SOIL FOR VEGETATION MUST BE PLACED ON TOP OF LINER. SOILS COMPACTED TO 95% STD. PROCTOR DENSITY WET DETENTION POND / SEDIMENT BASIN -NOTE- TEMPORARY SEDIMENT BASIN SHALL BE COMPLETELY CLEANED OF SEDIMENT AND UPGRADED TO FUNCTION AS PERMANENT DETENTION POND AFTER ALL PERMANENT EROSION CONTROL METHODS ARE ESTABLISHED AS INDICATED ON FINAL SITEWORK PACKAGE DRAWINGS. EL. 814.75 INLET ORIFICE ALUMINUM STRAPS 1 1 1 /2 VENT WITH GREEN TIP SUSPENDING INLET 3 2 1 /2"PVC FLOAT 29" PROFILE EMERGEN ;,,SPILLWAY 1 1 /2" SCH. 40 SOLID PVC BARREL OR "ARM" SUPPLIED BY USER (\\ . so ^n, , A 2 1 /2" INLET EXTENSION) `CENTER OF INLET 1 1 /2" HOSE, SS CLAMPS AND ORIFICE 2" THREADED MALE PATENT #5,820,751 NIPPLE ON OUTLET END 2 1 /2" FAIRCLOTH SKIMMER DETAIL NOT TO SCALE SECTION - EMERGENCY SPILLWAY CREST EMERGENCY SPILLWAY (100 YEAR DESIGN STORM) DETAIL NO SCALE EL. 814.75 EL. 808.00 EL. 807.00 NO SCALE FLOODWATER STORAGE TOP OF RISER EL. 813.75 0 rn )NORMAL POND LEVEL EL. 812.00 SUPPORT TEMP. FAIRCLOTH SKIMMER, BRACKET, AT TACH TO 8"0 DRAIN SEE DETAIL TO BE REMOVED ON TRANSITION 24" 0 PERMANENT POND AND VALVE CAP POND \ pSED OFF NV. 808.0 NE 8"b DRAIN EL. 808.00 SEDIMENT LEVEL 1.0' EL. 807.00 ALUM. EXPANDED METAL TRASH GUARD TOP #4 ® 6" O.C. E.W. 9- 1 /A" THK ANTI-VORTFY HELICAL ALUM. 14 GAGE PIPE 1I IL NV. 808.00 Q10=8.84 CFS EL. 806.00 FILL W/ CONC TO INV ELEV M FLANGE JOINTS WITH 3/8" NEOPRENE NOTE - VOLUME BELOW 8"0 DRAIN PIPE GASKET IS TO BE PUMPED OUT AT TIME OF CLEANING OR DURING MAINTENANCE. 4' 3.5'x3.5' FROM TOE OF DAM ANCHOR INTO CONC. POND RISER (OUTLET CONTROL) (10 YEAR DESIGN STORM) (1 REQUIRED) DETAIL NO SCALE Q WET DETENTION POND CALCULATIONS TOTAL DESIGN FOREBAY PROPOSED FUTURE BUILT -UPON AVG. PERM. POND TEMP. W.Q. TEMP. W.Q. PERMANENT PERMANENT MAIN POOL VOLUME FOREBAY POND DRAINAGE FUTURE TOTAL BUILT -UPON BUILT -UPON DRAINAGE W.Q• POND AREA AREA STORAGE STORAGE SEDIMENT SEDIMENT VOLUME REQUIRED VOLUME W.Q. W.Q. RELEASE WEIR No. AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA AREA STORAGE DEPTH SA/DA REQUIRED PROVIDED REQ D. PROVIDED STORAGE REQUIRED STORAGE PROVIDED (15-20%) PROVIDED OUTLET TIME RISER BARREL LENGTH 1 3.38 AC. 0.00 AC. 3.38 AC. 2.49 AC. 0.00 AC. 2.49 AC. 3.32 FT (AVG.) 2.52 3710 SF 3747 SF 8748 CF 11370 CF 6" 12" 10959 CF 1644-2192 CF 3168 CF 1.0"o 3.79 DAYS 24"0 12"0 12' ALUM. ALUM. SKIMMER BASIN #1 CALCULATIONS DIAMETER DIAMETER BASIN DRAINAGE DISTURBED SURFACE AREA SURFACE AREA SED. STORAGE SED. STORAGE DESIGN DEWATER FAIRCLOTH SKIMMER WEIR No. AREA AREA REQUIRED PROVIDED REQUIRED PROVIDED OUTLET FLOW (Q10) TIME SKIMMER ORIFICE LENGTH 1 3.02 AC. 1.97 AC. 3480 SF 3800 SF 3546 CF 11424 CF 10" 10.71 CFS 3 DAYS 2.5" 2.0"0 24" RISER HIGH MARSH I Plant requirement = 50/ 882_ SF nts provided 221 I HERBACIOUS SCHEDULE Scientific Name Common Name Size uantit Carex Tenera Quill Sedge 1 qt 73 Eupatoriadelphus Fistulosus Joe Pye Weed 1 qt 73 Rhyynnchospora Coforata Starrush Whitetop 1 qt 75 LOW MARSH _824 SF Plant requirement = 50/200 sf. Plants provided 206 HERBACIOUS SCHEDULE Scientific Name Common Name Size uantit .i Iris Virginica Blue Flag Iris 1 qt 68 Juncus Effusus Soft Rush 1 qt 69 Sagittaria Latifolia Duck Potato 1 qt 69 Note - Plant count approximate. Contractor responsible for verifying quantities. LANDSCAPING CONSTRUCTION SEQUENCE 1. All work is to meet or exceed Town of Kernersville Standards. 2. Obtain soil test and add recommended nutrients. 3. Rip vegetated shelf a minimum of 6" deep. 4. Add 1' topsoil. 5. Lime soil media to a Ph of 6.0 and rototill. 6. Install plants and water in well. 7. Maintain per Maintenance Schedule. 8. Install Vegetation as indicated on the landscape plan detail. 9. Maintain and replace dead plants for two years. STORM POND LANDSCAPE PLAN SCALE: 1'=20' DAM 6 SEDIMENT TRAP AND SEDIMENT BASIN MAINTENANCE NOTES 1. INSPECT TEMPORARY SEDIMENT TRAPS AND SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (x" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. 2. WHEN SEDIMENT REACHES ONE-HALF THE DESIGN DEPTH OF THE TRAP OR BASIN, REMOVE SEDIMENT AND RESTORE TRAP OR BASIN TO ITS ORIGINAL DIMENSIONS. PLACE SEDIMENT THAT IS REMOVED IN A DESIGNATED DISPOSAL AREA. 3. REPLACE ANY PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. 4. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FEET BELOW THE LOW POINT OF THE EMBANKMENT. 5. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. 6. ANY RIP -RAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. STORMWATER NOTES 1. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL PLAT OF E CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. 2. THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER CONTROL ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF THE CITY OF MEBANE. 3. THE CITY OF MEBANE AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL FOR INSPECTIONS OR MAINTENANCE, AS NECESSARY. 4. ALL NECESSARY APPROVALS HAVE BEEN/WILL BE OBTAINED FROM THE STATE/CORPS FOR ANY WETLAND DISTURBANCE, STREAM CROSSING/DISTURBANCE. 5. IN ACCORDANCE WITH GS-143-215.25A AND 143-215.26 OF THE NC DAM SAFETY LAW AND ADMINISTRATIVE CODE 15A NCAC 2K.0200, THE STATE DAM SAFETY OFFICE HAS BEEN/WILL BE CONTACTED FOR DETERMINATION Of THE HAZARD CLASSIFICATION OF THE PROPOSED DAM. CONSTRUCTION SEQUENCE FOR WET POND 1. CLEAR AREA FOR POND AND POND DAM. 2. BEGIN CONSTRUCTION OF POND DAM BEGINNING WITH THE INSTALLATION OF THE DAM's CUT OFF TRENCH AS SHOWN ON C2.1 OF THE APPROVED DRAWINGS. 3. CONTINUE WITH THE DAM CONSTRUCTION AND INSTALL THE DAM'S RISER AND BARREL KIT AND ANTI SEEP PLATES AS THE GRADING PROGRESSES. COMPACT SOILS WITHIN DAM AND AROUND BARREL AS INDICATED WITHIN THE POND DETAILS AND WET POND CONSTRUCTION NOTES. 4. INSTALL OUTLET STABILIZATION DEVICE AT THE POND BARREL OUTLET AS INDICATED ON THE PLANS AND STABILIZE. 5. ONCE THE POND DAM IS CONSTRUCTED AND THE POND AREA HAS BEEN EXCAVATED AS INDICATED ON THE PLANS, STABILIZE DISTURBED AREAS AND DAM FACE WITHIN 14 DAYS OF REACHING FINISHED GRADE. 6. SET UP POND AS A TEMPORARY SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. 7. AS GRADING ON SITE PROGRESSES AND STORMDRAIN NETWORK IS INSTALLED, INSTALL THE REQUIRED OUTLET STABILIZATION STRUCTURES WITHIN THE POND AS INDICATED ON THE PLANS. 8. ONCE BUILDING CONSTRUCTION IS COMPLETE AND ALL AREAS DRAINING TO POND HAVE BEEN STABILIZED WITH PERMANENT VEGETATION, CLEAN OUT WET POND AND FINE GRADING MAKING SURE POND BOTTOM, SHELF, AND DAM ARE AT THE ELEVATIONS AS INDICATED ON THE APPROVED DRAWINGS. 9. INSTALL STONE FOREBAY BAFFLE AND REMOVE E&SC BAFFLES FROM POND. 10. CLEAN ALL RIP RAP ENERGY DISSIPATERS INTO POND AND BELOW POND DAM OF ANY SEDIMENT, REPLACING RIP RAP IF REQUIRED. D 11. DISPOSE OF THE SEDIMENT REMOVED FROM THE POND BOTTOM WITHIN AN APPROVED LOCATION. 12. CLOSE 8" DRAIN VALVE AND REMOVE SKIMMER FROM POND. 13. PLANT VEGETATED SHELF AS REQUIRED. 14. ALLOW POND TO FILL TO NORMAL POOL ELEVATION FROM STORM RUNOFF. WET DETENTION POND OPERATION & MAINTENANCE A. THE FOLLOWING TASKS SHALL BE PERFORMED AFTER EVERY RUN-OFF PRODUCING RAINFALL EVENT, OR MONTHLY AS A MINIMUM. 1. REMOVE DEBRIS FROM TRASH RACK. 2. CHECK/CLEAR OBSTRUCTIONS FROM ORIFICE OUTLET. 3. CHECK POND SIDE SLOPES AND DAM EMBANKMENT. REMOVE TRASH AND REPAIR ERODED AREAS. 4. CHECK SEDIMENT LEVELS BEHIND BAFFLES. REMOVE SEDIMENT WHEN DEPTH REACHES 1/2 BAFFLE HEIGHT. B. THE FOLLOWING TASKS SHALL BE PERFORMED EVERY THREE MONTHS. 1. INSPECT STORMWATER COLLECTION SYSTEM (PIPING, STRUCTURES, SWALES) FOR PROPER OPERATION. REMOVE TRASH, SEDIMENTS & OBSTRUCTIONS FROM SYSTEM. 2. INSPECT RIPRAP ENERGY DISSIPATERS FOR EROSION AND UNDERCUTTING. REPAIR AS REQUIRED. 3. REPAIR ERODED AREAS AND RESEED BARE SPOTS THROUGHOUT, TO REDUCE SEDIMENT GENERATION. 4. INSPECT POND OUTLET DEVICES AND CHANNEL DOWNSTREAM OF DAM. REPAIR UNDERCUTTING OR DAMAGE TO CHANNEL LINING. 5. CHECK DOWNSTREAM DAM FACE FOR EVIDENCE OF SEEPAGE OR OVERTOPPING. C. THE FOLLOWING TASKS SHALL BE PERFORMED EVERY SIX MONTHS. 1. INSPECT INTERIOR OF OUTLET STRUCTURE. REMOVE ACCUMULATED SEDIMENTS OR OBSTRUCTIONS. 2. CHECK POND DEPTH AT VARIOUS LOCATIONS. REMOVE ACCUMULATED SEDIMENTS IF DEPTH IS LESS THAN 3/4 SPECIFIED. 3. CLEAR TREES AND SAPLINGS FROM DAM EMBANKMENT. D. GENERAL 1. MOW POND SIDES REGULARLY TO MAINTAIN MAXIMUM GRASS HEIGHT OF 6". 2. REMOVE VEGETATION WHICH GROWS WITHIN POND, EXCEPT WETLAND GRASSES ALONG PERIMETER. C 3. MONITOR POND DRAWDOWN TIME. IF DRAWDOWN EXCEEDS TABULATED TIME, REMOVE OBSTRUCTIONS FROM RISER ORIFICE. 4. INSPECT EMERGENCY SPILLWAY. REPAIR ERODED AREAS AND REMOVE OBSTRUCTIONS. WET POND CONSTRUCTION NOTES 1. ANTI -SEEP COLLARS SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NORTH CAROLINA STORMWATER MANUAL. 2. ALL AREAS LOCATED ALONG AND ABOVE THE POND BENCH SHALL RECEIVE A MINIMUM OF 4 INCHES OF TOPSOIL AND BE PERMANENTLY SEEDED. SOIL STABILIZATION BLANKET SHALL BE APPLIED TO ALL AREAS WITH A FINISHED GRADE OF 6/1 OR GREATER. ALL METHODS AND MATERIALS FOR SOIL STABILIZATION BLANKET SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENTATION CONTROL MANUAL. SODDING MAY BE SUBSTITUTED IN PLACE OF SOIL STABILIZATION BLANKET. 3. THE BOTTOM OF THE BASIN AND THE SIDE SLOPE UP TO 18 INCHES ABOVE THE WATER SURFACE ELEVATION SHALL BE OVER EXCAVATED BY A MINIMUM OF 12 INCHES AND REPLACED WITH A LAYER OF SILTY CLAY (CL) UNLESS OTHERWISE DIRECTED BY THE GEOTECHNICAL ENGINEER. THE SILTY CLAY LAYER SHALL BE PLACED ON APPROVED SUBGRADES IN MAXIMUM 8 INCH LOOSE LAYER LIFTS AND SHALL BE COMPACTED TO AT LEAST 90 PERCENT OF THE STANDARD PROCTOR COMPACTION. COMPACTION SHALL BE ON THE WET SIDE OF THE OPTIMUM MOISTURE CONTENT. 4. ALL BASINS SHALL FUNCTION AS A TEMPORARY SEDIMENT BASIN DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION, THE BASINS SHALL BE CLEANED OF SEDIMENT AND CONVERTED TO A STROMWATER MANAGEMENT FACILITY. 5. THE CONTRACTOR SHALL ENGAGE THE SERVICES OF A STATE REGISTERED LAND SURVEYOR TO PROVIDE AN AS -BUILT AND VOLUME COMPUTATIONS OF THE STORMWATER MANAGEMENT FACILITY AND SHALL PROVIDE THE AS -BUILT TO THE OWNER AND ENGINEER. 6. THE BERMS AROUND THE POND(S) SHALL BE CONSTRUCTED OF COMPACTED STRUCTURAL FILL CLASSIFIED AS SM, SM-SP, SP, SC OR BETTER CONTAINING LESS THAN 30% BY WEIGHT SILT OF CLAY AND FREE OF DEBRIS. THIS MATERIAL SHALL BE PLACED ON APPROVED SUBGRADES AND IN HORIZONTAL LIFTS NOT EXCEEDING 8 INCHES IN LOOSE THICKNESS MOISTURE CONDITIONED TO WITHIN -1% TO +3% OF OPTIMUM MOISTURE CONTENT AND COMPACTED TO MINIMUM OF 95% OF THE MAXIMUM DENSITY OBTAINED IN ACCORDANCE ASTM D698 STANDARD PROCTOR METHOD. SOILS SHALL BE FREE OF ORGANICS AND ANY PARTICLES LARGER THAN 2" IN DIAMETER. EACH LIFT OF BERM SHALL BE SCARIFIED PARALLEL TO THE BERM CREST AXIS TO A DEPTH OF 3 INCHES BEFORE PLACEMENT OF THE COMPACTED STRUCTURAL FILL. STRUCTURAL FILL SHALL BE ANALYZED AND APPROVED BY THE PROJECT GEOTECHNICAL ENGINEER PRIOR TO USE ON EMBANKMENT. AT ALL TIMES DURING THE CONSTRUCTION OF BMP EMBANKMENT, THE CONTRACTOR SHALL ENSURE THAT THE GEOTECHNICAL INSPECTOR IS PRESENT AND OBSERVING THE INSTALLATION. 7. BEFORE THE PLACEMENT OF THE COMPACTED STRUCTURAL FILL FOR THE BERM THE SUBGRADES SHALL BE INSPECTED BY A GEOTECHNICAL ENGINEER. UNSUITABLE SOILS CONTAINING BUILDING RUBBLE AND OTHER DEBRIS SHALL BE REMOVED FORM THE BERM AREA. SUITABLE, COMPACTED BERM FILL SUBGRADE SHALL BE SCARIFIED PARALLEL TO THE BERM CREST AXIS TO A DEPTH OF 3 INCHES BEFORE PLACEMENT OF THE COMPACTED STRUCTURAL FILL. 8. THE GEOTECHNICAL ENGINEER SHALL DETERMINE MATERIALS SUITABLE FOR STRUCTURAL FILL. 9. SEED ALL SIDE SLOPES AND EMBANKMENTS PER THE SEEDING SCHEDULE SHOWN ON SHEET C2.1 B 10. STABILIZE SIDE SLOPES AND EMBANKMENTS GREATER THAN 3/1 PER THE NCDENR EROSION AND SEDIMENTATION CONTROL MANUAL. 11. INSTALLATION SHALL BE IN GENERAL CONFORMANCE WITH NCDENR STATE STORMWATER MANUAL LATEST EDITION. 1 2 3 4 5 6 ."T 1W triaddesigngroup Architecture I Engineering I Interior Design Triad Design Group, P.C. 4807-C Koger Boulevard Greensboro, NC 27407 Telephone 336-218-8282 Facsimile 336-218-8010 www.triad-designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C-1108 �11111111�� 0 R4 L/ _�= SEAL CAR , 1994 �IIIIIIII�� °°00000a0000a0 p°o o � o Q � ° P 0 0 ° o 0 a P o ! N Eby °D0� o�0000nao°° DECEMBER 19, 2019 PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. Z 0 1 U W Q LL 1 CW G I..L 0 U V ) Z LU m O co � U w / L 0CD0 Z C'/) W L J LU 00 � _U N rn V / 1 11-04-19 NCDEQ COMMENTS Mk Date Description Revisions STORM POND & STORM POND LANDSCAPE PLAN & DETAILS Date: AUGUST, 2019 Drawn: Check: LAH Job Number: 17-042 Sheet: CIA