HomeMy WebLinkAbout20091216 Ver 1_Application_20091112 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLYPERDUE GOVERNOR U. S. Army Corps of Engineers Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 ATTN: Mr. Steve Lund NCDOT Coordinator of Np?, " tR 1 J9 'D syyagrFR ?9 GENE CONTI SECRETARY ®91216 Subject: Application for Section 404 Nationwide Permits 13, 23, 33 and Section 401 Water Quality Certification for the proposed replacement of Bridge No. 173 over Sailor's Branch on SR 1820 (Alexis-High Shoals Road) in Gaston County, Federal Aid Project No. BRZ-1820(3); Division 12; TIP No. B-4117 $240.00 debit WBS 33472.1.1 Dear Sir: The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 173 over Sailor's Branch on SR 1820. There.will be 67 feet of permanent surface water impacts, 74 feet of bank stabilization and 47 feet of temporary surface water impacts. Please see enclosed copies of the Pre-Construction Notification (PCN), Stormwater Management Plan, permit drawings and design plans. The Programmatic Categorical Exclusion (PCE) was completed in February 2009. Documents were distributed shortly thereafter. Additional copies are available upon request. This project calls for a letting date of May 18, 2010 and a review date of March 30, 2010; however, the let date may advance as additional funding becomes available. A note on the greensheet calls for a Schweinitz's sunflower survey prior to construction. A survey by NCDOT biologists was conducted on October 14, 2009. No specimens were found. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 2 769 9-1 548 November 2, 2009 TELEPHONE: 919.431-6680 FAX: 919-431-2002 WESSITE: WWW..N000T.ORG LOCATION: ENVIRONNENTAL RESOURCE CENTER 4761 ATLANTIC AVENUE. SUITE 116 RALEIGH NC 27604 A copy of this permit application will be posted on the NCDOT Website at: http://www.nedot.org/doh/preconstruct/pc/. If you have any questions or need additional information, please call Jeremy Leamer at (919) 431-6680. Sincerely F Gregory J. Thorpe, Ph.D. Environmental Management Director, PDEA w/attachment Mr. Brian Wrenn, NCDWQ (5 copies) Ms. Marla Chambers, NCWRC Ms. Marella Buncick, USFWS w/o attachment (see permit website for attachments) Dr. David Chang, P.E., Hydraulics Mr. Mark Staley, Roadside Environmental Mr. Victor Barbour, P.E., Project Services Unit Mr. Greg Perfetti, P.E., Structure Design Mr. Michael L. Holder, P.E., Division 12 Engineer Mr. Mark Davis, DEO Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Scott McLendon, USACE, Wilmington Mr. Hank Schwab, PDEA 020 WA rFq ? ? ti Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NW P) number: 13 23 33 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Replacment of Bridge 173 over Sailor's Branch on SR 1820 (Alexis- High Shoals Road) 2b. County: Gaston 2c. Nearest municipality / town: Dallas 2d. Subdivision name: not applicable 2e. NCOOT only, T.I.P. or state project no: B-4117 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if applicable): not applicable 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no.: (919) 431-6680 3g . Fax no.: (919) 431-2002 3h . Email address: jtleamer@ncdot.gov 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): not applicable 1b. Site coordinates (in decimal degrees): Latitude: 35.40357 Longitude: - 81.14817 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 3.0 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Sailor's Branch Creek proposed project: 2b. Water Quality Classification of nearest receiving water: WS-IV 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: SR 1820 is a two lane rural local route transecting a semi-rural area with mostly agricultural and residential development. 3b. List the total estimated acreage of all existing wetlands on the property: N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 300 3d. Explain the purpose of the proposed project: To replace bridge No. 173 which is considered structurally deficient and functionally obsolete. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a 41-foot bridge with a 23-foot, two-barrel reinforced concrete box culvert (RCBC) on the existing alignment with an off-site detour. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this properly / ? Yes ®No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. c 6. Future Project Plans 6a. Is this a phased project? ? Yes ®No 6b. If yes, explain. C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Type of impact Type of wetland Forested (Corps -404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T Site 1 ? P ? T ? Yes ? Corps ? No ? DWQ Site 2 ? P ? T ? Yes ? Corps ? No ? DWQ Site 3 ? P ? T ? Yes ? Corps ? No ? DWQ Site 4 ? P ? T ? Yes ? Corps ? No ? DWQ Site 5 ? P ? T ? Yes ? Corps ? No ? DWQ Site 6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts X Permanent X Temporary 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact length number - (PER) or jurisdiction stream (linear feet) Permanent (P) or intermittent (Corps - 404, 10 width Temporary (T) (INT)? DWQ - non-404, (feet) other) Site 1 ® P ? T RCBC Sailor's Branch ® PER ? INT ® Corps ? DWQ 8.5 67 Site 2 ® P ? T Bank Sailor's Branch ® PER ® Corps 8.5 74 stabilization ? INT ? DWQ Impacts Site 3 ? POT associated Sailor's Branch ® PER ® Corps 8.5 47 with culvert ? INT ? DWQ installation Site 4 ? P ? T ? PER ? Corps ? INT ? DWQ Site 5 ? P ? T ? PER ? Corps ? INT ? DWQ Site 6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary, impacts I 141 Perm 47 Temp 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number - waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts X Permanent X Temporary 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Excavat Flooded Filled ad Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ® Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T required? B1 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Currently the buffer rules administered by the DWQ within the Catawba River Basin only apply to the main stem of the Catawba River. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed structure will be in the same location as the existing structure with an off-site detour. The "do-nothing" alternative is not practicable due to the resulting elimination of the use of SR 1820 and closing or removing the bridge. The roadway grade will be the same as the existing structure. 3:1 fill slopes will be utilized where practicable. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Surficial bridge runoff will not be directed into Sailor's Branch via deck drains 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No If no, explain: Minimal impacts of 67 linear feet due to a culvert and 74 linear feet of bank stabilization which results in no "loss of waters". Sailor's Branch is not a trout stream, HQW or ORW. 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank El Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 7 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: if yes, see attached permit drawings. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? NIA 2b. Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached permit drawings. ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? not applicable ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HOW (check all that apply): ? ORW ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ? No F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ® Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 21-1.0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): . 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes additional development, which could impact nearby downstream water quality? ® No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ®No impacts? F1 Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Habitat assessment and survey by NCDOT biologists. NHP database check. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a . Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b . What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation S. Flood Zone Designation (Corps Requirement) 8a . Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b . If yes, explain how project meets FEMA requirements: NCDOT Hydraulics coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA Maps 11,0'07 Dr. Gregory J. Thorpe, Ph D ' Date ApplicanUAgent s Printed Name pplica UAgent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided ) 11 STORMWATER MANAGEMENT PLAN Project: B-4117 (33472.1.1) October 5, 2009 County: Gaston Hydraulics Project Manager: Galen Cail, PE ROADWAYDESCRIPTION The project involves the replacement of Br. No. 173 over Sailor's Branch on SR 1820. The overall length of the project is 0.10mi., and the existing 41'-long bridge is being replaced with a 2 @ IF x 9' reinforced concrete box culvert (RCBC) in-place. The proposed roadway utilizes shoulder section throughout. This is the only major crossing. ENVIRONMENTAL DESCRIPTION The project is located in the Catawba River Basin. Sailor's Branch has a best usage classification of WS-IV (aquatic life, secondary recreation, salt; nutrient sensitive waters). There are no wetland areas impacted by this project. There are permanent surface water impacts on the project. The impact is less than 150 feet of permanent impacts. BEST MANAGEMENT PRACTICES Best Management Practices (BMPs) and measures used on the project to reduce stormwater impacts are listed below. All stormwater being discharged through the buffers is either diffuse flow or has been treated prior to entering Sailor's Branch. The banks were stabilized to prevent channel erosion. PROPERTY OWNERS NAMES AND ADDRESSES PARCEL NO. NAMES ADDRESSES Oj Mr. and Mrs. Hicks P.O. Box 406 Stanley, NC 28164 O Mr. and Mrs. Jones 738 Alexis HIT Shoals Rd. C 28034 Dallas, N O Ms. Broome Dallas, NC s28034 Shoals Rd. O Ms. Stambaugh P.O. Box 332 Palm Beach, FL 33480 Permit Drawing sneer 5 of lp_ NCD®T DIVISION OF HIGHWAYS GASTON COUNTY WSB:33472.1.1 (B-4117) REPLACE BR #173 OVER SAILORS BRANCH SHEET 1 OF 1 6/11/09 m E c z m rn O z Q < Z N O F F o o r alN .y.. s a W < W ?' ymnEr v ?' _ m T U' x F c 7 F 5 0 z . C L L E u . p N O z N Z , d OI N . Z Z y v W :.. c N N r o 7 y d `? Q L E E m r F? ? L w U- a 5 o 3 w ? 5 U LL w E m o ° ° z a ~ > j F E ° z U m ? c C N ? m E- m U) u 16 ° ° ° ° tq Ern E o o H - U a IL rn D F d-m ? U 3 W a o w ? O m C 'C 2 p Z g = d N wo F U a 3 s o a z 5 3 w W 3 m ° a= c E d F LL > C N N 'O C C C N = t0 ? E LL 3 CL U c o N N m m U d d 1 m N ?? o X Z Z. E n r m Y E co N ? 0 m Permit Drawing Sheet _ of O J J J O C O W m W N + 0 + N ++ N J E jT) Z F 6 tsh.dgn CONTRACT. C202374 0 0 0 , {T A O N N N N AAA... ? O S y N 20 A Z Z? i P w y ?f 1 SOX 1 ° ° 0 ( ? A 05m Z L l?rl Z _ 0 o Z Z N O g g p=A ? H N N b C1 o ?z ; s 64 CA II II in II 0 II x = O A v N A o o w :5 m b a r m 3 aR X aR ° ° .y Zm m 2 ? +?+nm I T N Z m 1 Im m m ? m a 2 , Z + z z m 0 0 0 S c 1 -i H m Z I to A m m ?^ ) p O v r ? 0 j b 1 m C ` R1 m w y I m m m m m V V M = V n II ° v 0 0 o 0 .°p = U th O m G1 ? o ? e H B Q? s i R 4 A y a H 14 kMJ? ¢ ? ? n k ? C m u ? 6 a x ? F y b to $ • tix a a Qy h TIP PROIBCT: B-4117 x x? o ° MJ w b +b W y n ? h y COD O c1 0 Z O_ _ N n _ N 0 - r rp Wo q`, r It IN a (DID =!R 1a o _rdy_tsh.dgn CONTRACT: C202374 TIP PROJ CT: B-4117 0 0 0 _ - ,o u p m N , ? ? = m n O r N ? . . C) OZ Z O Opp ?1 i y o 0 c c OQP z Z? _ -4 p- o ••? o - l o NpAZ rrV ?6-e+? ,, n b ME- _ g g m A y? IN m ?i 0 `R n u n if n n x =Zp A ? 0? Q N y Q w>$ o N o a m3? o ..\ ` 2R 2e Je O a m Z m m 2 LaRa Lim T N m r m r m ppN zm a Z Z O°m m m z O CA mN ? iC v 3 p < b ai 0 m O I v y y r m 0 `mm m j v N 2 O II I II I II ° o O ? O O - O . N N .p O b a o g ;o? b Z ? A M j ? M m g44 ? ! i Y ?y ®$ u m s? Xb N • '. bx $r xz bb A ?$ a ro r ,n zy 0 x Do x O w V? b y h a .°b n h 'H C) CO) 0 z 0 0 z 0 C? a n ? i ' 8 a W d°d T a g V b I? v N _` Z Y• D 3 O v J OO m O cl ^Z V• J, D ? r 9 N m m O Z ri ^A 1 A O C Z O c 1 m N m .+ v N o ? ca w w w n ? < 5D9 < 9 ? yy?y9 .{p 9D9 y D9 -? D9 y9 w D (1 il0 O O+a °y <a my S 0 O 9 ? 19 n D9 0 y T 9 D9 m, z. O O T S > D 9 <> < 9 < 9 y y O a T 09 yy ws>a O p 9 2ma T9 T9 m T o m y S ma zny- o a a- as as < v a m n 0 m K ?00 oJ0( C% > m -? j O m a sa t D• e >O <mm m• m• r 1 T T' q Zm H y N a r z y I z> y N 0 S D > S < S ? 9 a?> w> Sy> ?P zm> m - ma m T A mOV y09 OD O 3 -1 T 2 r Z •T P Z a m S DD < 0 T 2 T m T> m -1. 2 r m? 0 D T9 p ? 9 9 rn 0 ar a2 j w ZDy Q DD r KO Vy J)/ Z T < 0 0n m y m y n y T qTa -O p a 010 Q Q i az z roz yn m m z n m z m ma i 9 n ma m p D o m m o m- a ro mz r n mQ N y om am mom m? m m mn mz C y y y m 09y a O r 0. m< mm O iD't' O y mm Ya m a m m yOq m >rw T T _ 0 mm m m m Z m > Yq2 N 0 C -M n a m a T 01m11 pmm q2 2- T 0 0C 00 2 T S a y p ? I?9 v a n a m 9 i r T O< T O -1 O O • 0 .0. > T 2 r m l 9 9 9 mC y O m O r m ?0 O 2mD O 0 Z90 - m o r O Z MOT m ny pw TC n a? y O m_ m- T y as O n •a• m yp m 0 SC O MM y >Sl y t T<n a w ... S m m S.c Do nm m Oy m ?O o 9 m c m K T• m m amm <a ym N wmP N P paw Om S 0 p9 y < zm• 0 o a v? m yT m m m 9 0 m i p O O m ?Om OT 0 m SmH H m T D r O Q D ns M > D 2 2 0 to P T ? o a c s rF) n ? is 0 ? D 8 e' c '^ 00 0L 0 1 O ?+ D K 2} r- N ' m ' Z ' Z O 0 }}m ii N u C? ?g gg0 BL?gz p?S?O D VAT ? 8+ 88 - .F1 i 8 7 r z m