Loading...
HomeMy WebLinkAboutWQ0040533_Other_20200103FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: City of Rockingham, NC PERMIT #: WQ0040533 i PROJECT: Roberdel Pump Station ISSUE DATE: December 20, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation, It should be submitted in a mannerthat documents the Division's receipt. Send the required documentation the Regional Supervisor, Water quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, a Professional Engineer below has provided applicable design/construction Information to the Per itte , t rmittee is prepared to operate & maintain the wastewater collection system pennitt he i or portio s thereof. Monty R. Crump, City Manager_ Printed Name, Title ENGINEER'S CERTIFICATION I fl 3 j Date I, Guy E. Slagle, Jr., PE as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (® perlodically, ❑ weekly, El full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: X❑ Final ❑ Partial (Include description) Certification Comments/Qualifiers (attach If necessary): NC DWR—Water Quality Regional Operations Section 225 Green St., Suite 714, Fayetteville, NC 28301 Fayetteville Regional Office Phone: (910)-433-3300 FAH: (910)-466-0707 CERTIFICATION CHECKLIST To be completed by the certifying engineer prior to operation of the permitted sew rs, per PA NNCACC002T.0116, Certifying Engineer: Guy E. Slagle, Jr., PE / Certification Review Date: Project Name: Roberdel Pump Station WQ00 40533 Project County: Richmond 1) Has permittee information changed since the permit was Issued (or last modified): change of mailing address, change of ownership, transfer from developer to HOA/POA, etc. ❑ Yes ❑ No • If yes, please provide either a change of ownership form or new contact information. Note that transfer of permits from the developer to the HOA/POA must occur with the first certification. 2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? ❑x Yes ❑ No 3) Final Engineering certification? Q Yes ❑ No If Partial Engineering certification, provide detailed narrative including what is being certified in the current phase, what was previously certified (if applicable), and what is left to be certified. 4) Adequate information related to sewer lines: 0 Yes ❑ No ❑ N/A • Three feet minimum coverhas been provided for all sewers unless ferrous pipe was Installed. • Minimum diameters for gravity sewers are 8-inches for public lines and 6-Inches for private lines. • Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all intersections, and at distances not greaterthan 425 feet; minimum diametershall be 4 feet (48-Inches). 5) Adequate information related to pump stations: 0 Yes ❑ No ❑ N/A • Ensure power reliability option was selected per 15A NCAC 02T.0305(h). 6) Was project construction completed in accordance with all of the following: E Yes ❑ No ❑ N/A • 15A NCAC 02T Minimum Design Criteria (MDC) for the permitting of Gravity Sewers (latest version), and MDC for the Permitting of Pump Stations and Force Mains (latest version)? If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b)priorto certification and operation. • Contact the Central Office to discuss the variance to determine a course of action. • Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other pertinent information to the Central Office (one hard copy, one digital copy). • The central office will review the variance request, and if approvable, specific language regarding the variance will be incorporated into the permit, eithervia a special condition or a supplementary letter, A copy of the reissued permit with variance language or the variance letter must be maintained with the original documents. 7) Does the project contains high priority lines (15A NCAC 02T.0402(2))? Q Yes ❑ No • If yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (a)(5). If the permit does not include this language, the Fast Track reviewer will reissue the permit with the appropriate language. 8) Are Permit modifications are required for any changes resulting in non-compliance with this permit (including but not limited to pipe length changes of 10%or greater, change inflow, pump station design capacity design change of 5% or greater, and/or change in the number/type of connections)? ❑ Yes x❑ No • If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified permit with revised certification must be issued prior to certification and operation. NC DWR—Water Quality Regional Operations Section 225 Green St., Suite 714, Fayetteville, NC 28301 Fayetteville Regional office Phone: (910)-433.3300 FAX: (910)-486-0707 DAVIS & FLOYD SINCE 1954 December 31, 2019 Mr. Trent Allen, Regional Supervisor NCDENR — Division of Water Resources Fayetteville Regional Office Water Quality Section 225 Green Street Suite 714 Fayetteville, North Carolina 28301-0594 via e-mail and Federal Express RECEIVED DEQ/ @f'✓ JAN 0 b r'B'.J Re: Fast Track Sewer Engineering Certification — Final Completion Roberdel PS Replacement, FM & Sewer Improvements — DENR Permit #WQ0040533 WORO's9 City of Rockingham, North Carolina FAQ -I trp D&F Project No. 040000.06 ni- A+nr. Dear Mr. Allen: The above referenced project has been completed in substantial compliance with the above referenced project and we are therefore requesting operational approval for this project. Once the approval to place the new pump station in operation is received, the City plans to abandon and close out the existing Roberdel pump station. Please find enclosed the enclosed documents for your review and approval: 1. Fast Track Sewer Engineering Certification signed by the City Manager and the Engineer 2. Engineer's Certification Checklist 3. Force Main Pressure Test Report 4. Low Pressure Air Testing for Gravity Lines 5. Mandrel Test Records on PVC Gravity Lines 6. Vacuum Tests for Manholes Ai, A2 & B 7. Pump Station Startup Report — Davis & F1oydPump Station Startup Report — EBARA 8. Generac Standby Generator Report 9. Original engineering calculations lo. One (1) Set of As -built drawings Please advise if you should need additional information to support this approval request. If you should have any questions, please feel free to contact us. Sincerely, Davis & Floyd, Inc. ( ds E. Reynolds, PE Project Manager Enclosures as Noted: Copies to: Larry Cobler, City of Rockingham with enclosures 7F1 Ii. Fr.; us alir.a. Hui to 2:1, BTC-105, Florenne, SC 29506 o. (848) 019-I05O :. (8.10) Cc4.2881 WWW.OAMFLOYO.00M Force Main Pressure Test Deport DAVIS & F L OY➢) rr�� SINCE 1954 rM Project: City of Rockingham -RoberdalPS, &sewerimp. Date: 14^fib~2 t DHEC Permit #: WC10040533 Test Duration: 2 hours SD Representative: Contractor: Tei ry's Plumbing & utilities, Inc. Contractor Representative: Engineering Firm: Davis & Floyd, Inc. Engineering Firm Representative: Allowable leakage calculations based on American Water Works Association (AWWA): L= 0,000007 x Sx DxVP Where: L = Allowable Leakage (gph) S = Length of Pipe Tested (ft) D = Nominal Diameter of Pipe (in) P = Average Test Pressure (psig) Allowable Time Pressure Diameter (in) Length (ft) Leakage (gph) Start /t9;a5 101 PSI 3 ed End a3 161 PSI 1-Hour Total Allowable Leakage, L1= 2-Hour Total Allowable Leakage, LZ = gal Actual Leakage= gal NPassed ❑ Failed Test Duration: 2 hours Force Main Pressure Test Report DAV I S & FLOYD SINCE 1054 Project: City of Rockingham-RobaMelPS, FM&Sewer Imp. Date: 113-25-261a DHEC Permit #: WQ0040533 SD Representative: Contractor: Terry's Plumbing & Utilities, Inc. Contractor Representative: Engineering Firm: Davis & Floyd, Inc. Engineering Firm Representative: Allowable leakage calculations based on American Water Works Association (AWWA): L = 0.000007 x Sx DxVP Where: L = Allowable Leakage (gph) S = Length of Pipe Tested (ft) D = Nominal Diameter of Pipe (in) P = Average Test Pressure (psig) Allowable Time Pressure Diameter (in) Length (ft) Leakage (gph) Startjd,ydA,A Its -PSI yri /01) Endj2:95f,,w 11,PSI 1-Hour Total Allowable Leakage, L1= gal 2-Hour Total Allowable Leakage, LZ = Actual Leakage = [Passed ❑ Failed T 4„ Frr� „s CA51.sc- F.,Z ca or v. 40"'W-r en R@ PIACe"" .Sl. Force Main Pressure Test Report DAVIS & FL OYD SINCE 1954 Project: Tv ofRoddngbam-Robordal PS, FM&Sewer Imp. Date: _ /D.-2-5-' gt7- DHECPermit#: W40040533 SD Representative: contractor: Terry's Plumbing & Utilities, Inc. Contractor Representative: Engineering Firm: Davis & Floyd, Inc. n.l I Engineering Firm Representative: Test Duration: 2 hours Allowable leakage calculations based on American Water Works Association (AW WA): L=0.000007xSxDx-P Where: L = Allowable Leakage (gph) S = Length of Pipe Tested (ft) D = Nominal Diameter of Pipe (in) P = Average Test Pressure (psig) Allowable Time Pressure Diameter (in) Length (ft) Leakage (gph) Start�a;��A `/6- PSI �'"' 166 End l), 9v M )(SPSI 1-HourTotai Allowable Leakage, Li= gal 2-Hour Total Allowable Leakage, LZ = gal Actual Leakage = gal 4 Passed ❑ Failed i TF�+ �Co¢c.nty i.cVC64,�D t-1 ISG Fvcz -Cmav- crc.>s8t,S4 2�-c�c..GrAf�C Mandrel and Air Pressure Test Report IDAV I S & FLOYD SINCf'1954 Project: city of Rockingham-RoberdelPS, Phh&Sewer Imp Date: 1�% _ olq Contractor: Terry's Plumbing & Utilities, Inc. Inspector: Ricky Ingram, D&P Tested Section: A --I to A vs Diameter (in) Material Length (ft) Time Pressure 8 4-T P c, 4+ ,;� Start /0.''I 3 A,pi PSI End /0, Mandrel Test: ❑Passed El Failed Air Test: Tested Section: h" � to V'q Psi ❑ Failed Diameter (in) Material Length (ft) Time Pressure & IPVC /Y% Start 911©q.Am .3,5-PSI End Mandrel Test: ❑Passed ❑Failed Air Test: '©BA,vw 3,5 PSI 'Passed ❑ Failed Tested Section: to Diameter (in) Material Length (ft) Time Pressure Start PSI End PSI Mandrel Test: []Passed ❑ Failed Air Test: ❑ Passed ❑ Failed Tested Section: to Diameter (in) Material Length (ft) Time Pressure Start PSI End PSI Mandrel Test: ❑ Passed ❑ Failed Air Test: ❑ Passed ❑ Failed Mandrel and Air Pressure Test -Report Project: cityof Rockingham-Roberdel PS,FM &Sewerimp Contractor: Terms Plumbing & UtilRles, Inc. DAVIS & FLOYD Date: /6-,2s " 20/1 Inspector: Rickyingram,D&F SINCE 1954 Tested Section: to Diameter (in) Material Length (ft) Time Pressure at � V C ' LI ,2 Start PSI Mandrel Tes Passed ❑ Failed Air Test: ❑ Passed ❑ Failed Tested Section: to Diameter (in) Material Length (ft) Time Pressure Start PSI PSI Mandrel Test: ❑ Passed ❑ Failed Air Test: ❑ Passed Tested Section: to Diameter (in) Material Length (ft) Time Pressure Start PSI End PSI Mandrel Test: ❑ Passed ❑ Failed Air Test: ❑ Passed ❑ Failed Tested Section: to Diameter (in) Material Length (ft) Time Pressure Start PSI End PSI Mandrel Test: ❑ Passed ❑ Failed Air Test: ❑ Passed ❑ Failed SINCE 1954 Manhole Vacuum Test Form Project City of Rockingham-Roberdel P5, FM & Sewer Imp. Date 16 . / - 2 o r,1 Nicholson Road - Roberdel Community tv Inspector Ricky Ingram, Davis &Floyd, Inc. Contractor Terry's Plumbing & Utilities, Inc. Weather C� G' I r Temp. MANHOLE INI+ORMATION Manhole Station A - Manhole Diameter �i feet Manhole Depth / d feet Minimum Test Time seconds (see table) TEST RESULTS Test Starting Time 19. M Gauge Reading / 0 (in.Hg) Test Ending Time-� I Gauge Reading /© (in. Hg) Final Result I e, s r Minimum Test Time for Various Manhole Diameters (Seconds) ------------------------------------------------------------------------------------------------------------------ (from ASTM C1244) Manhole Depth Manhole Diameter (ft) (ft) 4.0 45 50 55 60 Time (seconds) 8 20 23 26 29 33 10 25 29 33 36 41 12 30 35 39 43 49 14 35 41 46 51 57 16 40 46 52 58 67 18 45 52 59 65 73 20 50 53 65 72 81 22 55 64 72 79 89 24 59 64 78 87 97 26 64 75 85 94 105 28 69 81 91 101 113 SINCE 1954 Manhole Vacuum Test Form Project City of Rockingham-Roberdel PS, FM & Sewer Imp. Date I d - 2 5- - 2019 Location Nicholson Road - Roberdel Community Inspector Ricky Ingram, Davis & Floyd, Inc. Contractor Tem S Plumbing & utilities, Inc.Weather /� �l Temp.•) O C) MANHOLE INFORMATION Manhole Station --A - I Manhole Diameter L1 feet Manhole Depth 2 1 , feet Minimum Test Time 5' S seconds (see table) TEST RESULTS q Test Starting Time 0 5. PA I Gauge Reading _ / d (in.Hg) Test Ending Time cl J o v A, AA Gauge Reading q , S (in. Hg) Final Result al 1 Minimum Test Time for Various Manhole Diameters (Seconds) (from ASTM C1244) ------------------------------------------------------------------------------------------------------------------- Manhole Depth Manhole Diameter (ft) (ft) 4.0 4.5 5.0 5.5 6.0 Time (seconds) 8 20 23 26 29 33 10 25 29 33 36 41 12 30 35 39 43 49 14 35 41 46 51 57 16 40 46 52 58 67 18 45 52 59 65 73 20 50 53 65 72 81 22 55 64 72 79 89 24 59 64 78 87 97 26 64 75 85 94 105 28 69 81 91 101 113 DAVIS & FLOYD SINCE 1954 Manhole Vacuum Test Form Project 12o4xerr� ( PS Date L 2 - 20— t") Location �1�c4�.1s c2d. 2oGti4ttGham,1SG Inspector J• rtAa6S -p?F Contractor i�uru i Pt r� er P. C L,�d v Temp. ; e A1192nSrntkL1,&;IrAl 00 N%0. MANHOLE INFORMATION Manhole Station Manhole Diameter -F feet Manhole Depth 5.4-1 feet Minimum Test Time seconds (see t�dsle) See SPac S¢� nod 025GS, TEST RESULTS Vir zt-4 Test Starting Time 3.1"A f n *%D rrn Test Ending Time *4NS ra: 1 .rn Final Result %t 21hy lyf ZnA Gauge Reading to �0 (in.Hg) Gauge Reading (in. Hg) Minimum Test Time for Various Manhole Diameters (Seconds) (from ASTM C1244) 8 20 23 26 29 33 10 2 29 36 41 12 30 35 39 43 49 14 35 41 46 51 57 16 40 6 58 67 18 45 52 59 65 73 20 50 53 65 81 22 5 64 72 79 89 24 59 64 78 87 97 26 64 75 85 94 5 28 69 81 91 101 113 t : tE ; _ « ,lam=s! \ Customer Terry's Plumbing Pump Performance Datasheet EBQRQ parr r� Reference RoeberdelPS EbaraQuotation System 19.0.2 Rockingham NC 12-4-19 Start Up _ Results - Pump 1 Item number : 001 Product Description : 100DLMKFU618 Service' - Stages 1 Quantity 1 Based o6 curve number DLMK-C612-9203 Quote number p Date last saved : 18 Mar 2019 12:49 PM Operating Conditions Liquid Flow, rated 150.0 USgpm Liquid type : Water Head, rated (requested) : 131.0 it Additional liquid description Head, rated (actual) : 131.5 it Solids diameter, max : 0.00 in Suction pressure, rated / max : 0.00 / 0.00 psi.g Solids concentration, by volume : 0.00 % NPSH available : Ample Temperature : 68.00 deg F Frequency : 60 Hz Fluid density : 1.000 / 1.000 SG Performance Viscosity : 1.00 cP Speed : 1765 rpm Vapor pressure, rated : 0.00 psi.a Impeller dia. :12.09 in Material Impeller diameter, maximum : 12.09 in Material selected : Standard Impeller diameter, minimum : 11.06 in Pressure Data Efficiency : 30.80 % Maximum working pressure : 61.63 psi.g NPSH required / margin required : -/ 0.00 It Maximum allowable working pressure : N/A Ns (imp. eye flow) / Nss (imp. eye flow) : 1,620 / - US Units Maximum allowable suction pressure : N/A MCSF : 110.0 USgpm Hydrostatic test pressure : N/A Head max. : 142.4 it Driver & Power Data (@Max density) Head rise to shutoff : 8.28 % Driver sizing specification : Rated power Flow, best eff. point : 698.0 USgpm Margin over specification : 0,00 % Flow ratio, rated / BEP : 21.49 % Service factor : 1.15 (Fixed) Diameter ratio (rated / max) : 100.00 % Power, hydraulic : 4.98 hp Head ratio (rated dia / max dia) : 100.00 % Power, rated : 16.17 hp Cq/Ch/Ce/Cn [ANSI/HI 9.6.7-2010] : 1.00 / 1.00 / 1.00 / 1.00 Power, maximum : 25.14 hp Selection status : Acceptable Motor rating : 25.00 hp / 18.64 kW (Fixed) 32 L 24 ower 16 3 0 6 o Pump 1 Test - ° 188.2 gpm @ 200 135.6 ft head 100 -MCSF 180 90 160 80 140 70 0 120 rticiency so .D @ 100 U 50 dui 11. 0 66 in = 80 40 U W so 39 40 20 20 10 0 6 1,000 1,100 0 160 260 300 400 500 600 700 800 900 Flow - USgpm INTERSTATE UTILITY SALES INC Pumps Americas Corporation Page 5 P.O. BOX 473400, CHARLOTTE, NC 28247 USA Tel: 704-367-1970 Fax: 704-367-1690 lusinc.com Customer Terry's Plumbing Pump Performance Datasheet EBQR j� Reference Roeberdel PS Ebara Quotation System 19.0.2 s.ar� r� RockingbamNC 12-4-19 Start Up Results - Pum 2 p Item number : 001 Product Description 10ODLMKFU618 Service ." Stages 1 Quantity '. 1 .Based on curve number : DLMK-C612 9203 Quote number Date last saved : 18 Mar 2019 12:49.PM Operating Conditions Liquid Flow, rated : 150.0 USgpm Liquid type Water Head, rated (requested) : 131.0 it Additional liquid description Head, rated (actual) : 131.5 it Solids diameter, max : 0.00 in Suction pressure, rated / max : 0.00 10.00 psi.g Solids concentration, by volume : 0.00 % NPSH available : Ample Temperature : 68.00 deg F Frequency : 60 Hz Fluid density : 1.000 11.000 SG Performance Viscosity : 1.00 cP Speed - 1765 rpm Vapor pressure, rated : 0.00 psi.a Impeller dia. : 12.09 in Material Impeller diameter, maximum : 12.09 in Material selected :Standard Impeller diameter, minimum : 11.06 in Efficiency : 30.80 % NPSH required / margin required : - / 0.00 ft Ns (imp. eye flow) / Nss (imp. eye flow) : 1,620 / - US Units MCSF : 110.0 USgpm Head max. : 142.4 ft Head rise to shutoff : 8.28 % Flow, best eff. point : 698.0 USgpm Flow ratio, rated / BEP : 21.49 % Diameter ratio (rated / max) : 100.00 % Head ratio (rated dia / max dia) : 100.00 % Cq/Ch/Ce/Cn [ANSI/HI 9.6.7-2010] : 1.00 11.00 / 1.00 / 1.00 Selection status : Acceptable 32 L 24 16 3 O 8 a L "O 2 Pressure Data Maximum working pressure : 61.63 psi.g Maximum allowable working pressure : N/A Maximum allowable suction pressure : N/A Hydrostatic test pressure : N/A Driver & Power Data (@Max density) Driver sizing specification : Rated power Margin over specification :0.00% Service factor : 1.15 (Fixed) Power, hydraulic : 4.98 hp Power, rated : 16.17 hp Power, maximum : 25.14 hp Motor retire 25.00 hp / 18.64 kW 0 20 10 0 0 6 100 260 300 460 500 600 700 800 900 1,000 1,100 Flow - USgpm INTERSTATE UTILITY SALES INC Pumps Americas Corporation Page 5 P.O. BOX 473400, CHARLOTTE, NC 28247 USA Tel: 704-367-1970 Fax: 704-367-1690 iusinc.com REGISTER Nowl Protect Your Mission Critical Power System, Register Today and Receive Information About Extended Protection with ASI Mission Critical Care. On -Site Equipment Owner to complete I P.duct5erielNumber 1891999 re Pradua1 all the information below First Name Initial Date of Installation Last Name Title Company Name Street Address 1 Street Address 2 City Country Phone Email city rockingham roberdel ps 111 nicholson rd rockingham nc 28379 12-9-19 ASC® SERVICES 1.Alternate Power Source.[] Utility ® Engine Generator, if Engine Generator. please indicate manufacturerl generac 2.Which of the following best describe the industry at this location? 3 Which manufacturer's Automatic Transfer ❑Manufacturing []Transportation []Industrial ❑Entertainment Switch(s) are installed at this location? ❑Government []Telecommunications ORetail ❑Education ®ASCO❑Russell❑Zenith❑Onan❑Lakeshore [I Finance ❑Data Center ❑HealthCare❑Utility ❑Caterpillar❑C-H/West❑Kohler ❑Generac ❑ Other ❑Other You Can Also Register At : www.ascoservices.comlwarranties.html or call 1800.800-ASCO(2726) ext. 5 6211845001A surge protector is smoked, has been removed from service at this time GENERAC A0000347249 rev B Generac Auto -Fill Start-up Form Packet Without Loadbank Report Part No. A0000347249 rev. B / Printed in USA 10/17/19 9)2019 Generac Power Systems, Inc. All rights reserved. Specifications are subject to change without notice Start -Up Inspection For Generac Power Systems Industrial Product GE N E RAC Page 1 of 8 Dealer Information Technician Information Dealership Name Name national power corp j nance Account# Tech ID # 1000152 458850 Address Phone # 4541 preslyn dr 919-790-1672 city State Zip E-mail Address raleigh nc 27616 genservice@natpow.com Phone # Tech Signature 919-790-1672 j nance Owner Information Installing Contractor Information Company Name city of rockingham Company Name Name and Title of Individual Responsible for Equipment Project Manager/Site Supervisor E-mail Address E-mail Address Address 111 nicholson rd Address City State Zip rockingham nc 28379 city State Zip Phone # Phone # Site Information Site/Store # Site Name Utility Voltage roberdel ps 480 high leg Address Size of Utility Disconnect 111 nicholson rd City State Zip External Components rockingham nc 28379 (Transformers, UPS, Load Factor Correction, etc.) Yes []No If Yes, please list components: GPS Latitude GPS Longitude 34.97103 -79.74522 Application EIMPS 0 Prime Power Stand Alone Date of Start-up 12-9-19 Part No. 067377 rev. L / Printed in USA 08/23/19 ©2019 Generac Power Systems, Inc. All rights reserved. Spec! !cations are subject to change without notice Page 2 of 8 GENERATOR INFORMATION Generator Model # sd60 Hour Meter 1 Generator Serial # 3004612346 Number of Phases 3 Phase kW Rating 60 Engine Serial # 01621905 Fuel Type Diesel Alternator Serial # na Voltage 277/480 Inspect for the following: 0 No freight damage (components tight, straight, etc.) Reminder: Freight damage is the responsibility of the shipper and should have been noted on delivery. ❑✓ Manuals present 0 Unit secured to pad. 0 Remove fuse(s) from generator control panel. 0 Proper belt alignment and tensions. 0 Governor rod/throttle movement and clearance. 0 Fluid levels (oil, coolant, battery(ies), governor, etc.). ❑ Connect a gas manometer to the inlet side (1/8" pipe plug) of the secondary regulator for monitoring purposes. 0 Correct fuel and exhaust plumbing (see installation manual for sizing/connections). ❑ Remove cable tie from rain cap. 0 Adequate air flow and ventilation. 0 Correct AC wire sizes and connections (verify with electrician). ❑ Correct DC and communication wire sizes and connections (verify with electrician) (Routed separately from AC wires per manufacturer recommendation). 0 Proper size battery(ies) per customer order. 0 Block heaters, battery charger, etc, properly matched with utility supply voltage per customer order. 0 Verify electrical connections made at battery charger & block heater. 0 Verify remote start Wires 0 & 183 are pulled and connected inside lower control panel of generator and inside transfer switch. ❑ Verify communications wires (RS-485), and power wires (for RAP/ RRP) are pulled and terminated correctly inside control panel, remote annunciator, and transfer switch. WARNING: reversed polarity of DC power lines to annunciator will cause damage to annunciator and/or engine control panel... NOT WARRANTABLE! 0 Verify the AUTO/OFF/MANUAL switch is in "OFF" position. 0 Connect battery(ies) - positive cable first, then negative. 0 Re-insert the generator control panel fuse(s). 0 Using Genlink-DCP & RS232 download XML file and save to your computer. 0 Grounding rod installed. 0 Close the AC circuit breaker to block heater and battery charger. 0 Block heater is operational (feel heater discharge hose for heat, and listen). 0 Battery charger is operational (refer to WIB06-8-S) 0 Visually inspect entire area looking for loose papers, plastic wrappings, leaves, anything that may blow around and get caught in radiator or alternator and remove them. 0 Verify all AC electrical connections are tight at the circuit breaker and transfer switch. ❑✓ Battery charge DC voltage present. 13.8 VDC 0 Battery charge DC amperage present. 4.1 Amps ❑ Inspect louvers; check mechanical linkages, verify proper operation (open/close manually). Ensure properly wired to engine run relay to ensure louvers open when unit starts. 0 Check all hoses, clamps, fittings for leaks or damage. 0 Check all electrical connections on the generator; wiring, wire ties, clamps, terminal ends, connectors; tighten or repair as necessary. 0 Check all electrical plugs throughout the generator. Ensure each plug is seated correctly and fully inserted into its receptacle. ❑ MPS System: Verify panel type in Genlink-DCP under "Regulator Settings Configuration menu' (i.e. PM -PC, PM -GC, PM -SC, etc.) Enable Manual Backup Mode. ❑ MPS System: PLS Installed? 117-1 Yes No If YES, Enable Automatic with PLS Backup Mode. PREPARATION FOR START-UP 0 Using Genlink-DCP save the units configuration (.xml) file. ❑ Inside the transfer switch set the maintenance disconnect switch to "MANUAL" position. 0 Bleed the fuel system of air (prime diesel system). 0 Open the generator's main line circuit breaker. ❑ Gaseous Unit: Record the inlet static gas pressure at the secondary regulator with a manometer. Invert Digital Output Channel 2 (Run Circuit) through the operators interface. Gaseous Static fuel pressure: na Inches W.C./PSI Part No. 067377 rev. L / Printed in USA 08/23/19 ©2019 Generac Power Systems, Inc. All rights reserved. Specifications are subject to change without notice Page 3 of 8 Overcrank Check: 0 Test the overcrank circuit. Gaseous Units: Disable both the run and cold start fuel system. Disconnect the run circuit (wire 141219) at the fuel solenoids; disconnect the crank circuit (wire 56) at the cold start fuel solenoid. Diesel Units: Non-CANbus Units - Disconnect the Governor driver (in the connection box). CANbus Units — Disconnect both the Cam and Crank sensors (disconnect the plugs). With the fuel system disabled, place the AUTO/OFF/MANUAL switch in the "AUTO" mode. Close the 2-wire start circuit (Wires 0 (178) and 183) at the transfer switch connections to make the unit complete its full crank/rest cycle and latch out on a "Shutdown Overcrank" condition. Number of crank cycles completed 3 RUNNING CHECKS ❑ Cranking fuel pressure na Inches W.C./PSI ❑. Running WITHOUT load fuel pressure: na Inches W.C./PSI 0 Check DC alternator output Volts: 0 Record Actual No-load HZ: it 14.6 Amps: nm 0 Calibrate Generator AC output voltage. No-load voltage before calibration: Actual (meter) A-B (A/N) 480 B-C (B/N) 480 GA(A/B) 480 Display A-B (A/N) 480 B-C (BIN) 480 C-A(A/B) 480 No-load voltage after calibration: Actual (meter) A-B (A/N) na B-C (B/N) na GA(A/B) na Display A-B(A/N) na B-C (B/N) na C-A(A/B) na 0 Test ALL automatic shutdowns (low oil pressure, low coolant level, high coolant temperature, and overspeed). 0 Engine coolant temperature (hot running): 175 degrees ❑✓ Engine oil pressure (hot running): 71 PSI ✓❑ Check for coolant, fuel, oil, and exhaust leaks and open louvers. Complete the following: Current Calibration is required on MPS units to ensure accurate load sharing between units on the common bus. On Industrial standalone units it is highly recommended to ensure accurate kW and kW Hour readings. It is desirable to calibrate the current in the 25% to 75% load range of each unit. This can be accomplished by using the customer/building load and/or load banks as needed. ❑✓ Close the generator's main line circuit breaker. ❑✓ Check for proper voltage and phase rotation at (each) transfer switch. 0 Load Generator against Load Bank and/or building load. 0 Calibrate Current Channels at 25% to 75% load. Current readings before calibration: Actual (meter) A 64 B 64 C 64 Display A 64 B 64 64 C Current readings after calibration: na na na Actual (meter) A B C Display Ana B na na C MPS Units: ❑ Calibrate Bus voltage. Bus voltage before calibration: Actual (meter) A-B na _B-Cna —C A na Display A-B na B-Cna C A na Bus voltage after calibration: Actual (meter) A-B na B-C na C A na Display A-B na B-C na C A na Run Unit against Load Bank and/or customer load to 25% to 75% load. Record load voltage. A-B (A/N) na B-C (B/N) na C A(A/B) na na Target voltage: _ Part No. 067377 rev. L / Printed in USA 08/23/19 ©2019 Generac Power Systems, Inc. All rights reserved. Specifications are subject to change without notice Page 4 of 8 Record Load Current (amperage): A na B na C na Unit Rated Current- na kVA na P.F. ❑ Record kW in display: na kW ❑ Record kVA in display: na kVA ❑ Record WAR in display: na WAR n na Power Factor against Load Bank and/or customer load: na ❑ Loaded frequency: na ❑ Loaded Engine RPM: na Hz 22UT Note: Record the fuel pressure at the greatest available load (up to the rating on the unit). Load can be provided by a load bank and/or customer load. The intent here is to verify that the fuel supply piping will provide adequate fuel flow at full _ rated load. If the fuel pressure drops below the minimum allowed for the unit then the fuel system will need to be checked against the requirements for the unit. ❑ Gaseous or Bi-fuel Units: Record fuel pressure at Regulator inlet: Load (kW): na na Inches W.C./PSI If the unit requires adjustment to the PIDs for either Governor or Volt- age record the changes here. Governor P.I.D. settings prior to adjustment: KP na KI na KD na Governor P.I.D. settings after adjustment: KP na KI na KD na AVR P.I.D. settings prior to adjustment: KP na KI na KD na AVR P.I.D. settings after adjustment: KP na KI ne KD na MPS Units Synchronizing P.I.D. Settings Before adjustment Kip na KI na KD na GAIN na MPS Units Synchronizing P.I.D. Settings After adjustment Kip na KI na KD na GAIN na Other Configuration Settings Regulator Settings: AVR Dump Improve ❑Yes ❑ No Governor Settings: Dump Enable ❑ No Dump Dump n Dump and Hold ❑ De -synch offset: na Hz ❑ Using Genlink-DCP & RS232, use the reports menu and save the following files: Alarm Log; Event Log, Configuration Settings ❑ Using Genlink-DCP save the units configuration (.xml) file. Part No. 067377 rev. L / Printed in USA 08/23/19 02019 Generac Power Systems, Inc. All rights reserved. Specifications are subject to change without notice Page 5 of 8 Transfer Switch Information LTA57@ M 10 Serial #: Complete the following: Q With both sources disconnected, manually transfer the switch a number of times to each position: check for smooth, non -binding operation. 0 Check for proper voltage and phase rotation in transfer switch. Voltage: A-B (A/N) 497(246) B-C (BIN) 501(434) C-A (A/B) 493(246) Load amperage: A 0 B 0 Phase rotation: Generator: Cw Utility: meter will not read C 0 GTS/CTTS type Transfer Switches: ❑ Check for proper dip switch settings in transfer switch. ❑ Check the 2-wire start connection. ❑ Set all timers and sensors and record below. ❑ Set the Exercise Time/Day — record below. ❑ Calibrate Utility Voltage Sensing Board. HTS/NITS Transfer Switches: ❑ Check communication wire (RS485) and/or 2-wire start. Note: Verify the RS485 and/or 2-wire start wires are run in separate conduit. 485 Communication NO Parity TWO Stop Bits Control Panel — MASTER — Baudrate Switch — Baudrate Slave Address ❑ MPS System MTS Switch(es) — ensure 120Vac Power from service panel to switch. ❑ Using Genlink set all timers, sensors, etc. TRANSFER SWITCH TIMER & SENSOR SETTINGS Voltage Pickup (UVB): Voltage Dropout (UVB): Line Interrupt Delay (UVB): Engine Warm-up Time: Eng. Minimum Run Time: Return to Utility Delay Time: Engine Cool -down Time: Standby Voltage (GTS) Load Accept Voltage (HTS): Standby Frequency (GTS) Load Accept Frequency (HTS): Signal Before Transfer Time: Time Delay Neutral Time: Switch Voltage/Phase (HTS): Allowable Deviation (HTS): + Hysteresis Exercise Day(s): mons Time of Day: 9:OOam under load AM/PM FUNCTIONAL TEST OF GENERATOR & TRANSFER SWITCH SYSTEM ❑✓ Place the Generator and Transfer Switch in Auto ❑✓ Close the generator MLCB ❑✓ Open the Utility Disconnect Time to start generator and transfer to customer Load under 15 seconds ❑ Check control panel — record values against customer load Customer Load: 27 kW na kVA WAR PF Voltage against Customer Load: A-B (A/N) 490 B-C (BIN) 490 C-A (A/B) 490 Current against Customer Load: A 48 B 48 C 48 ❑ Functional test of Generac supplied accessories (i.e. — remote annunciator, remote relay panel, Genlink, modem, etc.) Part No. Utl7377 rev. L / Printed in USA O8/23119 ©2019 Generac Power Systems, Inc. All rights reserved. Specifications are subject to change without notice Page 6 of 8 MPS System Controller Information na Model Number: Serial Number: na Inspect for the following; use the applicable/appropriate wiring and schematic diagrams: ❑ Proper mounting of SC (NEMA 3R outdoors, NEMA 1 indoors). ❑ 120 VAC power source from service panel on emergency side of supply to the SC and to any MTS switch(es). ❑ 24 VDC backup power (wire 220F) from two generators to SC (and PLS if installed). ❑ Two -wire start connections between System Controller (SC) and all transfer switches. ❑ Two -wire start between SC and Lead Generator IF NO PLS Installed. ❑ Two -wire start between SC and all generators IF PLS IS installed. ❑ Load shed and permissive connections between applicable transfer switches and SC, and SC and PLS if PLS installed. ❑ IRS 485 Communication wires from SC to Generators and MTS switches. NOTE: Ensure all communication wiring and other control wiring is run in separate conduit from the AC power leads. ❑ Dedicated analog phone line run to SC: Number na ) na - na ❑ All equipment must be grounded per NEC Article 250. Verify ground lug within the SC. Close AC circuit breaker to SC/Connect battery, block heater and charger on the PM -PC. Make sure that all generators in the system are already configured for communication with the System Controller (see the training guide). ❑ Ensure the light for the battery charger is on by toggling the battery charger reset switch. ❑ Verify the SC touch screen displays the SC menu options. ❑ Touch the system status 'button" and record the Firmware version. na Connect to the SC using Genlink-DCP and RS-232 serial cable (P/N OF7707): ❑ Save the System Controller Configuration (.xml) file. ❑ Verify the System Controller Panel Type in the Regulator Settings Configuration Menu; Enable Manual Backup Mode. If the system has a PLS enable the Automatic with PLS backup mode. ❑ Configure the "Generators" in the System Controller; enter kW, WAR (.75 times the kW), and verify the correct slave address for each generator. ❑ Verify that each generator communicates with the SC. ❑ Program the SC for the proper system voltage in the "System Settings" screen. ❑ Configure the "System" "Permissive" and "Load Shed" values. Perform Generator and Bus Voltage and Current Calibration on Each PM -PC ❑ Ensure all generators are in OFF ❑ Place System Controller Switch in MANUAL ❑ Calibrate each generator by placing its switch in AUTO. It should start and close the parallel contactor to the bus. With your LOAD BANK connected to the common bus you can now calibrate each generators voltage, bus voltage and current channels. ❑ Check phase rotation at the generator bus and the transfer switch(es); compare to the utility at each transfer switch. ❑ Repeat the previous steps for each generator. ❑ Complete necessary start-up forms on each PM -PC generator set. ❑ Complete necessary start-up forms for each MTS/GTS switch. ❑ Once all generators phasing is correct and all are calibrated, place all in AUTO and turn the SC key -switch to MANUAL. ❑ Verify that all generators parallel to the bus and record the total time to get all on the bus - na seconds ❑ Record load shed and permissive settings. Load Shed Permissive (ATS) Critical na kW Critical na kW Load 1 na kW Load 1 na kW Load 2 na kW Load 2 na kW [Load 3 na kW I Load 3 na kW ❑ Program PLS controller with the same Generator, Load Shed, Permissive, and transfer delay settings as the SC. Part No. 067377 rev. L / Printed in USA 08/23/19 ©2019 Generac Power Systems, Inc. All rights reserved. Specifications are subject to change without notice Page 7 of 8 OPERATIONAL SYSTEM TEST With all generators in AUTO and the SC in AUTO, disconnect Utility at each transfer switch. When all generators are paralleled to the Bus and all switches have transferred, begin testing the Load Sheds and Permissives by shutting down and re -starting generators as needed. Verify operation of PLS (per the study guide) ❑ Return utility to all switches and verify that all units cool down, disconnect and shut down normally. Using Genlink-DCP save the SC configuration (.xml) file ❑ Set up a system exercise using either one (1) transfer switch or the SC -Command Configuration menu. Recommended Items: ❑ verify operation of system RAP/RRP and/or individual unit RAP/ RRP. PartNo. 067377 rev. - / Printed in USA 08/23/19 ©2019 Generac Power Systems, Inc. All rights reserved. Specifications are subject to change without notice Page 8 of 8 Part No. 067377 rev. L / Printed in USA 08/23/19 ©2019 Generac Power Systems, Inc. All rights reserved. Specifications are subject to change without notice Generac Global Enterprise Solutions Account (GES) Acceptance Test Plan For Date of Startup Acceptance Testing:12-9-19 Site/Install Generator Location Generator Model: sd60 Serial Number: 3004612346 Site Name: roberdel ps Site/Store Number: Site Address: 111 nicholson rd City: rockingham State: nc Zip: 28379 Generac Strategic National Accounts Program Dealer Information GES Dealership Name: national power Corp GES Dealership Account Number: 1000152 Technician Name:j nance Technician Signature:j nance Phone Number:919-790-1672 Load Bank Requirements Retail Accounts — 2 Hour Building Load Test Note: Record the following in 20 minute intervals - kW, amps, voltage, coolant temp, frequency, oil pressure. Simulate power failure including operation of transfer switch, automatic starting cycle and automatic shutdown and return to normal. Test alarm and shutdown by simulating conditions. Menards — 2 Hour Load Bank Whole Foods — 2 Hour Load Bank Time Warner Cable — 4 Hour Load Bank CVS Caremark-4 Hour Load Bank Load Bank Requirements AT&T Exercise Times: Remote Alarms Wired Cell sites with an even FA code — Weekly Mondays 10:00 am Eastern Standard Time 2 Hour Load Bank Cell sites with an odd FA code — Weekly Tuesdays 10:00 am Eastern Standard Time Generator test run is to last 1 hour [60 minutes] inclusive or stabilizing on startup Remote Alarms Programmed Alarm and 5-minute cool down Automatic Transfer Switch is to be programmed to transfer Provide AT&T OPS Acceptance form to AT&T the building load to the generator during the testing period Motorola — ATS Transfer Test 15 Minute Introduction to Control Panel American Tower ATC Guidelines ATC Guidelines Under Generac GenLink software setup, Under GenLink HTS Setup, apply the correct HTS Current Transformer set the High Fuel Alarm Point to 110% Yes ❑ ratio. The default is often 600:1 or 800:1. The correct value is typically 300:1 Yes ❑ Set the exercise time to 11:00 AM Eastern Time Make sure that the GenLink baud rate is left at 9600 baud. Yes ❑ on Wednesdays Yes❑ Under GenLink HTS Setup, uncheck all four HTSs where it says Power up the Kentrox unit, and plug its serial cable back "These switches will actuate on remote start" Yes ❑ onto the generator diagnostic port Yes ❑ KTX approval testing is completed and monitor website Call Kentrox at 888-773-4122 opt. #3 and ask for American Tower tech is receiving correct data. Yes ❑ support. They will walk through a few basic tests to confirm data and operation. Yes ❑ Keys for Distribution Panel and ATS are placed in All Warranty & Start-up Forms Complete (attached if needed) Yes ❑ lockbox and combo for lock is reset. Yes ❑ Part Number 10000003728 rev L 10/10/19 Load Bank Requirements Verizon These tests most be completed at final site and NOT at other facility Dealer -Distributor's Tecchnician Observe 1 Hour Load Bank Test Completed at Final Site (at generator's full rated load) Yes El NoIs NSS installed by others on Generator Feed? Yes r3 No Manufacturer's Start-up Tests Complete at Final Site (attached if needed) Yes❑ No[] Is NSS installed by others on Utility Feed? Yes No All Warranty Start-up Forms Complete (attached if needed) YesEl NorIs SSD or NSS installed by others on Alarm Wiring? Yes No E] Is SSD or NSS installed by others on 2-wire start? Yes No E Verizon Wireless Required Factory Testing VzWApproved generator manufacturer certifies that these tests have been completed at the factory UL142 Listed Tank (diesels only) Yes VzWs Frame Temp Test per VzW Specification - Completed at Factory Yes VzWs 2-Hour Stepped Test per VzW Specification - Completed at Factory Yes Activation of Manufacturer's 5-year Extended Parts Labor Limited Warranty Yes VzWs Fluid Temp Recording per VzW Specification - Completed at Factory Yes Manufacturer's Standard Tests - Completed at Factory Yes No signature required - These items are required per Verizon Wireless generator specifications Initial each item upon satisfactory completion and acceptance Generac Dealer Tech Authorized Employee Start-up Form Complete (initials) (initials) Warranty Forms Complete (initials) (initials) Transfer Switch Form Complete (initials) (initials) - Hour Load Bank Complete (initials) (initials) ATS Start-up Form ATC Complete (If Applicable) (initials) (initials) ATS Start -Up Complete (If Applicable) (initials) (initials) Per NFPA 110 (Ahold Account Only) (initials) (initials) Second Site Training Visit Scheduled (If Applicable) (initials) (initials) This form may be executed by facsimile signature or electronic signature and such signatures shall constitute an original for all purposes. Accepted by:. Authorized Employee Name: Authorized Signature: Address:111 nicholson Ind City: rockingham State: nc zip: 28379 Phone: Mobile: Part Number 10000003728 rev L 10/10/19 GES/MSG Warranty Acknowledgment Form GENERAL' 2C, 3C, 5C, 7C, 10C Limited Warranty for Industrial Liquid -Cooled Standby Power Systems NOTE: ALL UNITS MUST HAVE THE START-UP INSPECTION PERFORMED BY AN AUTHORIZED GENERAC SERVICING DEALER Start-up Dealer# 1000152 Start-up Dealer Name national power Corp Address 4541 preslyn dr City raleigh State nc Zip 27616 Phone 919-790-1672 Start-up performed by j nance Type Of Warranty Registration (check one) 0 2C (0J4299) 0 3C (TBD) 0 5C (0J4301) Genset Model Number sd60 Genset Serial Number 3004612346 Transfer Switch Model Number Transfer Switch Serial Number Owner Name city of rockingham Address 111 nicholson rd City rockingham State nc Zip 28379 Phone Start-up Date 12-9-19 0 7C (01-2350) 01OC (01-2381) NOTE: Secondary transfer switches not covered under generator warranty. Must be purchased separately. This form, a copy of the startup paperwork and the acceptance form must be returned to the Managed Services Group (MSG) within ten (10) DAYS OF INITIAL START-UP. This warranty is for Generac Power Systems Industrial Products National Accounts Division liquid -cooled units only. TO THE CUSTOMER: This acknowledgment form is your certificate that the Liquid -Cooled Standby Generac Power Systems, Inc. Model/Unit indicated is covered by the indicated applicable warranty. You are entitled to coverage against DEFECTS IN MATERIALS or WORKMANSHIP in certain parts of the Liquid -Cooled Generator/Unit beyond the end of the standard published Generac Power Sys- tems. Inc. Standby Warranty. Such protection is specified on the 2C (0J4299), 3C (TBD), 5C (OJ4301), 7C (01-2350), or 10C (012381) Warranty Statement. I HEREBY CERTIFY I HAVE READ AND UNDERSTOOD THE PROVISIONS OF THE STANDARD PUBLISHED STANDBY WARRANTY AND THE TERMS AND CONDITIONS OF THE APPLICABLE WARRANTY PROGRAM. This form may be executed by facsimile signature or electronic signature and such signatures shall constitute an original for all purposes. Customer Signature Date TO THE DEALER: The start-up dealer is responsible for the completion and submittal of the applicable Warranty Acknowledgment Form to the Generac Power Systems, Inc. MSG Department. Start-up dealer is also responsible for providing the customer (end -user) their copy of this form and the terms and conditions of coverage. This form may be executed by facsimile signature or electronic signature and such signatures shall constitute an original for all purposes. Dealer Signature national power carp Date 12-9-18 GENERAL POWER SYSTEMS, INC. • P.O. BOX 8 - Waukesha, W, USA 53187 Part Number 10000043827 rev B 08/22/19 Ph: (888) GENERAC (436a722) • Fax: (252) 5444851 National Power Corp. 4541 Preslyn Dr., Raleigh, NC 27616 Load Test Certification Customer: city rockingham Tested By: J Nance Date: 12/9/2019 Order# 204091 Model#: sd60 Serial#: 3004612346 Load Bank y Resistive: y Reactive: n Building Load: n Engine: iveco Model#: f4ge9455a Serial#: 1621905 Fuel: d Governor: a Cooling: w RPM 1800 KW: 60 KVA: 75 P.F.: 0.8 Volts: 480 Frequency: 60 Phases: 3 Pre - Start Check List Lube Oil Level : x Exhaust Connect: x Unit Mounts: X Water Level • x Electrical Connect: x Battery Connect: x Fuel Connect: x Air Cooling Ducts : x Transfer Switch : x Comments : Time Gen Amps Gen Volts KW KVA %Load P.F. Freq. Amb. Temp Oil Press. Oil Temp Water Temp Batt Vdc 10:30 64 490 54 54 91% 1.0 60 45 68 na 170 14.5 10:45 64 490 54 54 91% 1.0 60 45 64 na 177 14.5 11:00 64 490 54 54 91% 1.0 60 45 63 na 172 14.5 11:15 64 490 54 54 91% 1.0 60 45 63 na 175 14.5 11:30 64 490 54 54 91% 1.0 60 45 1 63 na 178 14.5 11:45 64 490 54 54 91% 1.0 60 45 62 na 180 14.5 12:00 64 490 54 54 91% 1.0 60 45 62 na 175 14.5 12:15 64 490 54 54 91% 1.0 60 45 62 na 180 14.5 12:30 64 490 54 54 91% 1.0 60 45 62 na 173 14.5 12:45 64 490 54 54 91% 1.0 60 45 62 na 176 14.5 13:00 64 490 54 54 91% 1.0 60 45 62 na 174 14.5 13:15 64 490 54 54 91°% 1.0 60 45 62 na 179 14.5 13:30 64 490 54 54 91% 1.0 60 45 62 na 175 14.5 13:45 64 490 54 54 91% 1.0 60 45 62 na 173 14.5 14:00 64 490 54 54 91% 1.0 60 45 62 na 179 14.5 14:15 64 490 54 54 91% 1.0 60 45 62 na 176 14.5 14:30 64 1 490 1 54 54 91% 1.0 60 45 62 na 175 14.5 Mechanical Checks after Test Run Lube Oil Leaks: none Fuel Leaks: none Belts: good Water Leaks: none Exhaust Leaks: none Charger: good Heaters: good Comments: 54 kw is max that I can put on load test, next step on load bank takes load to 65 kw which is overloaded Technician : '�? %7.ee Date Test Approved By: Date: 12/9/2019 w l N V1 > n 0 O N N Q U O m Z ti O. 1 O� o0 3 m n Cc: z O.' a m � x Q a m E g m a 3 > > F m z L o L m O u 00 O OcuK N Y L O O Q Z a C 0) E O- W d W "' u i h E 3>> w z p O a v 0 a o u° v o E z o my .. 4 O v m O� Z v CL za o .'w O E O Y t, c_ c Li C U Z C \tl9 GW C O E N ¢ Q m E o p c o o E O z z a g w N j m i u v � v �= vvQ QO m z �_ ax o za �w _ m ova O F m. m z E a c .a E u v. �o v N 2 i LM > N u r u m e N C o U U. V fa f6 V�I o f O 01 O u b v C s L a j u u L u t-I o F `, E 12 Q vi Z u: m a � w< m SP rc w a c a a E 2 U � Oe 0: z Ve O m Ln a vso m � ;� � a a�v O1 z L 0 z� a p V c 0pl uu 3 00 0 N O N O I!1 > N 'i M t0 O1 O y m y < a`o .. O .. M y N N u O w 00 0 tO 3 g° m a r � � s 0 �n a m E Orm .. a c o c E V' U" a a w w �n v 3 0 u E y� ❑ a u z¢ u DAVIS & FLOYD SINCE 1954 Design Calculations for Roberdel Pump Station Replacement, Force Main & Sewer Improvements For City of Rockingham OWNER: City of Rockingham 514 Rockingham Rd. Rockingham, NC 28379 PREPARED BY: Davis & Floyd, Inc. 181 East Evans Street Suite 23 / BTC 105 Florence, SC 295o6 (843) 519-1050 October 2oi8 JOB NO.040000.o6 lot"\N CAROM O,Q�y:• CARC(i°% �� : Q�ipF ESS DAVIS & %. FLOYD, INC - _ ' e eNNo. 14773i No.F-0244 OF A�,�'' lot Job No. ©4000o,Oro Phase Oi ©2 Sheet _ of VIS & FLOYD Project 5'43cleon w.s. Client 42a4m loll n ,Ives SINCE 1954 Subject J�G1mO Sr✓i E/71 erg/ [mmRKy Calculated by Z-1/p Date ! o ld r 116 Checked by -tZ Date OT�c�I�E %fit€ DG?lCcT7rie o� /�iii12 zdcc? ir iYJo/� �oc3�a2r�Z PWW2,1 77P/J OUP- Goo cr}, l T ffitd F`�oJEn -7W-� J7-4itVAJ ,�3fr-��c�xr"7, /&ry , 3tio, Gl"WILI, (!✓orzrr, 7p _ F%P✓, CLC-`/F{�rotJ F ZCI m %J ope-on-:t) 7v J IGr: / G// G0.NNEGT To EKM� \V ,�. Ca•S. -W/ N6GV i, CXt,SIhVfi i,7NaiflOZE �s� co6HcGlS6 JR,rp-scoPS. J. Aso; •.S� -/f7hH F�in/T P2oa ¢� Eheln(V 7DH EXlSTInX PS. PoIi✓T mn7e Fi/mvov�ctcVi /�S.DD J50-C�Fh'i - . r>%G EZEV 20/. SO '7OP E-4v+"'18i.SO 2t69.6fo' O.L. P, oF: .✓ 24" •SnRa CA41Nl S q5 _ F/nrvir:S (300 C ��� = ZZ SLID Cry PD l� �Wdi /✓orE . VIC 7T , ?IF 16'�i4_r"y h/* yeCUGr/JUG AN RP�2cFRr � r� star'»v �c2 (fGff SI�I iLG �Lor✓ /SD 61M GLor✓ W!%J S�LP27eo © mYi19rG!/ EXI,5771v¢ �1/�%✓ Goi✓pjncntl l/'ICCGils,7 ��fd f ✓02/GlNlx 2/�ulE /50 � / GrIT/2�W /rVFG9 INV 4/cT�' CrYGGC 7//'i2G-`I G,< Cd•9cF/ �5 C�PraJ /ivl`4C� l 'See P�777-?7-CbMJ/1r_a-7 3. Ga 1 �✓nl2 �J/VG� fnl�i -76Fi 44 V/UT -f Cp CYGLG T/6aQG 2 0. `/ t�'iNvi (Go, Z erV J /D, Z ' aGr> 2rsr i�T 14J Jt6-AJ AV 6'77,V:rL-//,a %'�i{r%y�'Jy!%%/`/✓ ;. �ES(rjrV cfhc`G: , Ar-. 7HE;�CF�,�'�_ G-5'�Y�w'! F'Ltrrlr� /aD �c✓rlrcFU 1�18 1S ScLE"f<.rFn Job No. 0°/092. 0& Phase Sheet 0 G of r. DAVIS & FLOYD Project Ps' Client ,ve SINCE 1954 Subject RIMI-Y SC/6Gr/01,1 lAr✓mAgx� Calculatedby GNP Date /0 0/ /F Checked by JDate 1`DA2 hCt;' 6-- -Z CW4,17L � KHSC of _ no 4cliimz- %EJ /a Cn %CAS J&XvZ ij / FIN U i/TrC Tf%C CYC66 %WC Zo .7 M,'A(S , CZ . 2 ow r _ l 8 , 5 o Fes) �orz GohrsE2✓�rivE r� S�/2� �N� 7-P 771E f&17� Ta H7?/uaLE pv,rKsT FLVw 5'ce--n/A2.1v rog min v Jrl9�r�/V ©LGTr-cav✓,Z�i 4-eZaZ a/nI;�-, %a �S �P� /n/FLOvI// S SHvc✓)V /N SOiN-ncw 110wcvtk/ iH4" Waelei M 12/�, /q' wr)4,4Ilv6 2/�-1✓(7C;....-/-D ff4lvo4E G�lRiec-N7 GvNJ/. '77aalJ'/ WIM 7# /i /L I / ry L xP No i/v 771C F617L(,eC= 777 �- W'041G/IU6 3,611 IY17-11 /d C%66-' %/,rI,; O- 2D,,V i?vin/s ((o.z on/, /0.7 S�cEc-/M-6> P°rmtp WILL PC- OFS16 CP 77 T:NrvP 5;V Eby) ,//C �/L/%(l/Yt cfC!/i�/h.! v✓I.LC t'i'G �i.l l��C�tf��,0/,5 //We-97- IN &I- wlwle _ 4zrA,-ki, = I (o. 90 - LIAG Rime tint + 0,10 L196_ lq/M/' C)A/ 146. 90 = LEWD PUMP 00 + 0, 5 0 LC li P6Irmo I :1 6, 30 = &nl?s oFF'+ 14 pvwj OF,G 1-74 , 9 f.. o, �N� N w 3c�caF a; vi O N M V O IO -v r M C) NN N M M M M M M� CY N (V cV N N N N N N N N U 0 N LP C d U C U PUMP STATION DESIGN it Length Roberdel Pump Station Hazen -Williams Equation: Hf = 0.2083(100/C)"1.85 `( q"1 Hf = Friction loss (per 100 ft in the above equation) q = flow in gpm d = inside dia. of pipe in inches no. each eq. length ea. total EL ea. 2 11 ) 22 1 22 22 2 5 10 1 25 25 1 14 14 40 If 3 11 33 0 5 0 1 6 6 5 - - -- 5 25 - 1493 total equilavent length piping 1557 If Station Piping F.M. Dia. _ �_. _ _ _ 4; in F.M. Length = 133 ft (est.equiv. Fumed setting, subject to adjustment C Factor = [ 110 ;umed setting, subject to adjustment Wetwell influent elev. - - 179.5 ft ;umed setting, subject to adjustment Pumps off elev 174.9 ft ;umed setting, subject to adjustment High point in f.m. elev 2691 ft ;umed setting, subject to adjustment Static head, ft at pump off 94.1 ft increment FLOW STATIC FRICTION _- 10__ J HEAD HEAD, ft gpm gpm ft station ft/s 10 94.1 0.02 1 20 94.1 0.07 1 30 94.1 0.15 1 40 94.1 0.25 50 94.1 0.38 60 94.1 0.53 70 94.1 0.71 80 94.1 0.91 90 94.1 1.13 100 94.1 1.37 110 94.1 1.63 120 94.1 1.92 130 94.1 2.23 140 94.1 2.55 150 94.1 2.90 160 94.1 3.27 170 94.1 3.66 180 94.1 4.06 190 94.1 4.49 200 94.1 4.94 210 94.1 5.40 220 94.1 5.89 230 94.1 6.39 240 94.1 6.92 250 94.1 7.46 260 94.1 8.02 270 94.1 8.60 PUMP STATION DESIGN wETWELL INSIDE DIR. Access HnicR ol,.. IEIWELL TOP OF W WE ELc, 0 LED THICKNESS, in \\/ WATER TABLE ELEV, SOIL \\i \\/ WALL THICKNESSn. O HOPPER \\/ LT FRILL �CRO \/ aonOe of wErwELL - Eity. El I� ansE rHlcxrvess, m. a© .11 0 WETWELL BUOYANCY CALCULATION FOR CONCRETE STRUCTURES om Interior of Wetwell, elevation, "B 175 ft well Inside Diameter, "C" 6 ft unit weight of concrete 150 pcf Thickness,")" 6 in Thickness,"E" 8 in unit weight of soil 100 pcf e Thckness, "F" 8 in e Diameter, "G" 8.33 ft (6 ft Ella. and larger wetwell utilize 8 inch extended base) ass Hatch, "H" x "1" 36 in. X 48 in. for ballast layer thickness 10 in ;ide bottom elevation of wetwell 173.50 ft rail structure height 31.50 ft er Table Elevation, "J" 204.9 ft Interior Volume or Wetwell 829.38 cu it (neglects hopper bottom grout fill and pumps) Total Volume of Structure 1222.97 cu It (includes total volume to exterior surfaces of structure) Concrete Volume, Structure 385.59 cu ft (neglects hopper bottom grout fill, removes volume for hatch) Weight of Structure 57838.1 Ibs. (volume of concrete x unit weight of conc.) (neglect weight of pumps, rails, & hopper bottom conc. fill) Buoyant Uplift 76071A Ibs. (volume of displaced water x unit M. of water, neglects concrete of extended base, since unit v4 concrete I unit wt water & no net uplift can occur until water level rises above top of base) Weight of Soll Above Extended 18715.7 Its. ((volume of soil x unit wt. of sail) -(submerged volume Base of Wetwell of soil x (unit wt. soil - unit wt. water))) Net Buoyancy -482.71bs. (uplift-wt of concrete-wt ofsoil) NETDOWNLIFT-OK 0 r. N O O O 6) 6) U CC o r^y M w IL d .Fl O � � O +� w � a o 0 x A a M � O N O O O O O O O O O O O O O O O O CD CD O O O O O O O O O O O O ad `PtaH Customer Pump Performance Datasheet EBARA Reference Ebara Quotation System 18.3.5.0 -Item number :. 005 Product Description :100DLMKFU618:- ': Service Stages : 1 Quantity 1 Based on curve number : DLMK-C612-9203. Quote number : 765018 Date last saved 25 Sep 2018 1:32 PM Operating Conditions ------------- Liquid Flow, rated --------- : 150.0 USgpm — --------------- Liquid type :Water Head, rated (requested) : 131 ft Additional liquid description Head, rated (actual) : 131 ft Solids diameter, max : 0 in Suction pressure, rated / max : 0.00 10.00 psi.g Solids concentration, by volume : 0.00 % NPSH available : Ample Temperature : 68.00 deg F Frequency : 60 Hz Fluid density : 1.000 / 1.000 SG Performance Viscosity : 1.00 cP- Speed 1765 rpm Vapor pressure, rated : 0.00 psi.a Impeller dia. : 12 in Material Impeller diameter, maximum : 12 in Material selected :Standard Impeller diameter, minimum : 11 in Pressure Data Efficiency : 30.87 % Maximum working pressure : 11.38 psi.g NPSH required / margin required : -/ 0.00 ft Maximum allowable working pressure : N/A Ns (imp. eye flow) / Nss (imp. eye flow) : 1,620 / - US Units Maximum allowable suction pressure : N/A MCSF : 109.7 USgpm Hydrostatic test pressure : N/A Head max. : 142 ft Driver & Power Data (@Max density) Head rise to shutoff : 8.23 % Driver sizing specification : Rated power Flow, best eff, point : 696.5 USgpm Margin over specification : 0.00 % Flow ratio, rated / BEP : 21.53 % Service factor : 1.15 (Fixed) Diameter ratio (rated / max) : 100.00 % Power, hydraulic : 5.0 hp Head ratio (rated dia / max dia) : 99.64 % Power, rated : 16.1 hp Cq/Ch/Ce/Cn [ANSI/HI 9.6.7-2010] : 1.00 / 1.00 / 1.00 / 1.00 Power, maximum : 25.0 hp Selection status : Acceptable Motor rating : 25.0 hp / 18.6 kW (Fixed) 32 24 16 O 8 d c— i a) 200 180 160 140 120 100 80 60 40 20 — MCSF 12 in Iclency 11 in 0 100 200 300 400 500 600 700 800 900 1.000 1.1r Flow - USgpm 100 90 80 70 60 50 40 30 20 10 0 T U c �U W INTERSTATE UTILITY SALES INC Pumps America Corporation P.O. BOX 473400, CHARLOTTE, NC 28247 USA Tel: 704-367-197n Fax: 704-367-1690 iu�inr..cnm