HomeMy WebLinkAboutNC0003425_Rox_Appendix Q_20191231Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant APPENDIX Q SynTerra BORING AND WELL CONSTRUCTION LOGS TABLE 1 MONITORING WELL CONSTRUCTION INFORMATION ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Well ID Date Installed Monitoring Zone Material Diameter (Inches) Northing (Ft-NAD 83) Easting (Ft-NAD 83) Measuring Point TOC Elevation (Ft-NAVD 88) Ground Surface Elevation (Ft-NAVD 88) SurfaceMeasured Casing Depth' (Ft-BGS) Well Depth (Ft-BTOC) 1 Screened Interval (Ft-BGS) Top of Screen Elevation (Ft-NAVD 88) Bottom of Screen Elevation (Ft-NAVD 88) ABMW-7BRLL 3/5/2019 Bedrock PVC 2 993673.13 1980969.04 482.80 479.37 330 389.7 370 385 108.1 93.1 HWMW-1BR 1/10/2019 Bedrock PVC 2 992773.06 1977616.68 429.10 425.58 49 105.0 91 101 334.1 324.1 MW-1BRL 3/5/2019 Bedrock PVC 2 994427.00 1983006.23 508.75 505.41 110 219.9 201 216 303.8 288.8 MW-34BR 4/3/2019 Bedrock PVC 2 994726.80 1980865.84 446.40 443.61 59 87.4 74 84 369.0 359.0 MW-34D 4/3/2019 Transition Zone PVC 2 994734.01 1980860.00 445.37 442.76 NA 55.4 42 52 400.0 390.0 MW-35BR 4/3/2019 Bedrock PVC 2 994483.49 1980977.85 446.35 444.04 48 100.7 88 98 355.6 345.6 MW-35D 4/3/2019 Transition Zone PVC 2 994482.87 1980982.00 446.42 444.08 NA 43.7 31 41 412.8 402.8 MW-35S 4/3/2019 Shallow PVC 2 994489.16 1980985.70 446.18 443.97 NA 20.3 8 18 435.9 425.9 MW-36BR 4/3/2019 Bedrock PVC 2 994694.39 1981188.42 446.16 443.98 48 84.0 71 81 372.2 362.2 MW-36D 4/3/2019 Transition Zone PVC 2 994701.78 1981190.01 446.32 443.84 NA 41.2 28 38 415.2 405.2 MW-37BR 4/3/2019 Bedrock PVC 2 994558.31 1981176.85 449.89 447.51 50 93.7 81 91 366.2 356.2 MW-37D 4/3/2019 Transition Zone PVC 2 994560.98 1981185.59 450.23 447.85 NA 45.2 32 42 415.0 405.0 MW-37S 4/3/2019 Shallow PVC 2 994564.28 1981192.72 450.23 448.09 NA 20.3 8 18 440.0 430.0 MW-38BR 11/14/2019 Bedrock PVC 2 986202.64 1979132.27 512.13 509.88 55 113.9 95 110 413.2 398.2 MW-38D 9/11/2019 Transition Zone PVC 2 986199.40 1979127.69 512.71 510.32 NA 56.4 49 54 461.3 456.3 MW-39BR 4/4/2019 Bedrock PVC 2 986807.19 1981242.65 516.13 513.84 55 213.2 195 210 318.0 303.0 MW-39D 4/2/2019 Transition Zone PVC 2 986807.68 1981236.52 515.89 513.77 NA 51.8 39 49 474.1 464.1 MW-108BRL 3/19/2019 Bedrock PVC 2 993898.24 1983391.19 522.76 519.70 103 159.5 146 156 373.3 363.3 MW-108BRLL 3/19/2019 Bedrock PVC 2 993878.96 1983378.98 523.60 520.20 230 406.4 393 403 127.2 117.2 MW-205BRL 3/19/2019 Bedrock PVC 2 991841.38 1976472.18 479.68 476.30 116 173.7 160 170 316.0 306.0 MW-205BRLL 3/5/2019 Bedrock PVC 2 991831.53 1976473.82 480.35 476.95 200 234.4 221 231 256.0 246.0 MW-205BRLLL 3/19/2019 Bedrock PVC 2 991823.39 1976476.03 480.85 477.85 300 417.9 400 415 78.0 63.0 MW-208BRL 3/6/2019 Bedrock PVC 2 990536.20 1976783.24 473.76 470.55 100 166.6 153 163 317.1 307.1 MW-208BRLL 3/6/2019 Bedrock PVC 2 990527.17 1976786.72 473.95 470.55 200 236.5 223 233 247.4 237.4 MW-208BRLLL 3/19/2019 Bedrock PVC 2 990515.27 1976790.87 474.10 470.70 300 385.5 372 382 98.6 88.6 Notes: Monitoring well construction table summarizes wells installed in 2019 to support the Corrective Action Plan Update * - Well over 200 ft, total depth estimated 1 - Values measured during well installation BGS - Below ground surface BTOC - Below top of casing Ft - Feet NA - Not applicable NAD 83 - North American Datum 1983 NAVD 88 - North American Vertical Datum 1988 PVC - Polyvinyl chloride Prepared by: KTL Checked by: CDE Page 1of1 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: ABMW-7BRLL PROJECT NO: 1026.107 STARTED: 12/06/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993673.13 EASTING: 1980969.04 DRILLING METHOD: HSA/Air Rotary/Hammer G.S. ELEV: 479.37 M.P. ELEV: 482.80 BOREHOLE DIAMETER: 16,10,8,5.5 IN DEPTH TO WATER: 20.84 ft TOC TOTAL DEPTH: 401 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 8.0 W ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.00 0.03 w o (9 ) a O.OHPF-PPumping 0.8 c Own)po u. gpo 10 15 20 25 30 35 40 45 50 4.1 40 Fill: Silty SAND as FILL, medium density, coarse grained, dark grayish brown (10YR 4/2), dry, non -plastic, noncohesive, some coarse gravel Ash: Ash as poorly graded SAND, medium grained, V V V black (10YR 2/1), moist, non -plastic, noncohesive V V V - see logs ABMW-7/-7BR/-7BRL for detailed uvv lithologic description V V V V vVVV vVVV v v' Ash: Ash as sandy SILT, fine to medium grained, v VI very dark gray (10YR 3/1), wet, fluid cuttings with v v intermittent recovery v. Cement Grout 8" Surface Casing (0'-97' bgs) 6" Surface Casing (0'-330' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 1 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: ABMW-7BRLL PROJECT NO: 1026.107 STARTED: 12/06/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993673.13 EASTING: 1980969.04 DRILLING METHOD: HSA/Air Rotary/Hammer G.S. ELEV: 479.37 M.P. ELEV: 482.80 BOREHOLE DIAMETER: 16,10,8,5.5 IN DEPTH TO WATER: 20.84 ft TOC TOTAL DEPTH: 401 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 8.0 W ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.00 0.03 w o (9 ) a HPF-Pumping 0.0 0.8 c Own)po u. gpo-1111 60 W, 70 75 80 RR 90 VKI 100 105 110 115 Cement Grout 8" Surface Casing (0'-97' bgs) 6" Surface Casing (0'-330' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 2 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: ABMW-7BRLL PROJECT NO: 1026.107 STARTED: 12/06/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993673.13 EASTING: 1980969.04 DRILLING METHOD: HSA/Air Rotary/Hammer G.S. ELEV: 479.37 M.P. ELEV: 482.80 BOREHOLE DIAMETER: 16,10,8,5.5 IN DEPTH TO WATER: 20.84 ft TOC TOTAL DEPTH: 401 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 8.0 W ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.00 0.03 w o (9 ) a HPF-Pumping 0.0 0.8 c Own)po u. gpo-1111 120 125 130 135 140 145 150 155 160 165 170 175 Biotite GNEISS, gray, ocassisional small rock fragments, pulverized rock cuttings as dust Biotite GNEISS, dark gray, pulverized rock cuttings as dust At 159'-160' apparent fracture (fractures based on percussion hammer frequency) with water yield (-1 GPM), coarser cuttings, fragments of biotite schist / GNEISS GNEISS with chlorite and biotite minerals, some hornblende schist fragments Cement Grout 6" Surface Casing (0'-330' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 3 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: ABMW-7BRLL PROJECT NO: 1026.107 STARTED: 12/06/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993673.13 EASTING: 1980969.04 DRILLING METHOD: HSA/Air Rotary/Hammer G.S. ELEV: 479.37 M.P. ELEV: 482.80 BOREHOLE DIAMETER: 16,10,8,5.5 IN DEPTH TO WATER: 20.84 ft TOC TOTAL DEPTH: 401 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 8.0 W ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.00 0.03 w o (9 ) a HPF-Pumping 0.0 0.8 c (9�) po u. gpo-1111 180 185 190 195 200 205 210 215 220 225 230 235 Biotite schist / GNEISS with plagioclase minerals At 190' increase in K-feldspar minerals At 200' apparent fracture, no observable increase in water yield Biotite schist / GNEISS with few discernible fragments, primarily rock flour At 215' increase in K-feldspar minerals Occasional quartz minerals, increase in K-feldspar minerals, dark gray to black Biotite schist / GNEISS, chlorite fragments, green to black Cement Grout 6" Surface Casing (0'-330' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 4 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: ABMW-7BRLL PROJECT NO: 1026.107 STARTED: 12/06/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993673.13 EASTING: 1980969.04 DRILLING METHOD: HSA/Air Rotary/Hammer G.S. ELEV: 479.37 M.P. ELEV: 482.80 BOREHOLE DIAMETER: 16,10,8,5.5 IN DEPTH TO WATER: 20.84 ft TOC TOTAL DEPTH: 401 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 8.0 W ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.00 0.03 w o I9 I a HPF-Pumping 0.0 0.8 c Own)po u. gpo-1111 240 245 250 255 260 265 270 275 280 285 290 At 235' increase in plagioclase minerals At 240' increase in plagioclase and K-feldspar minerals At 245' some epidote minerals on faces of fragments Biotite schist / GNEISS, chlorite fragments, green to black At 290' intervals with increased mafic minerals, very fine cuttings, difficult to discern Cement Grout 6" Surface Casing (0'-330' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 5 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: ABMW-7BRLL PROJECT NO: 1026.107 STARTED: 12/06/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993673.13 EASTING: 1980969.04 DRILLING METHOD: HSA/Air Rotary/Hammer G.S. ELEV: 479.37 M.P. ELEV: 482.80 BOREHOLE DIAMETER: 16,10,8,5.5 IN DEPTH TO WATER: 20.84 ft TOC TOTAL DEPTH: 401 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 8.0 W ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.00 0.03 w o I9 I a O.OHPF-PPumping 0.8 c Own)po u. gpo 295 I=Biotite schist / GNEISS, chlorite fragments, green to black 300 305 At 305' rock fragments with increase mafic minerals, some chlorite 310 A Diabase: DIABASE-basalt or meta -basalt, black, AAAAAA accessory minerals of K-feldspar, some green A^A^A^ feldspar A^A^A^ 315 A^A^A^ ^AAAAA ^AAAAA ^AAAAA ^^A^A^ At 320' coarse grained, occasional K-feldspar 320 nAnAnA minerals, some plagioclase A^A^ _AA AAAAA' ^�^�^ AAA At 325' apparent fracture, no observable increase 325 . in water yeild Gneiss: Biotite GNEISS, increased in felsic -;j minerals, some chlorite 330 335 jr�N At 335' dark gray, pulverized rock cuttings as dust 340 345 At 345'-346' apparent fracture with increased water yield (cumulatively —5-10 GPM) At 351' apparent fracture, no observable increase in water yield 350 Biotite-hornblende GNEISS, dark gray Cement Grout 6" Surface Casing (0'-330' bgs) 2" PVC Riser Bentonite Seal 41011 SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 6 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: ABMW-7BRLL PROJECT NO: 1026.107 STARTED: 12/06/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993673.13 EASTING: 1980969.04 DRILLING METHOD: HSA/Air Rotary/Hammer G.S. ELEV: 479.37 M.P. ELEV: 482.80 BOREHOLE DIAMETER: 16,10,8,5.5 IN DEPTH TO WATER: 20.84 ft TOC TOTAL DEPTH: 401 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 8.0 W ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.00 0.03 w o I9 I a O.OHPF-PPumping 0.8 c Own)po u. gpo 355 At 354' apparent fracture, no observable increase in water yield M-L-L Biotite-hornblende GNEISS, dark gray 360 At 361' apparent fracture with increased water yield (cumulatively -10-15 GPM) 365 370 Granite: Meta -GRANITE with K-feldspar and quartz minerals 375 , At 372' apparent fracture with increased water yield (cumulatively -20 GPM) 380 385 At 387-390' less resistance, very fine cuttings, soft interval 390 395 % \ % \ At 395' 397' less resistance, very fine cuttings, soft interval 400 I= Borehole terminated at 401' BGS 405 Bentonite Seal 2" PVC Riser Sand Pack (364'-391') 2" Pre -Pack Well Screen (370'-385') Bentonite Backfill 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 WTerra Phone: 864-421-9999 PAGE 7 OF 7 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: HWMW-1 BR PROJECT NO: 1026.107 STARTED: 12/4/18 COMPLETED: 1/10/19 DRILLING COMPANY: Geologic Exploration NORTHING: 992773.06 EASTING: 1977616.68 DRILLING METHOD: Air Hammer G.S. ELEV: 425.58 ft M.P. ELEV: 429.10 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 11.11 ft TOC TOTAL DEPTH: 101.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawin 2 w U = ILO DESCRIPTION LU J g > OU o cn OJ a s 0 �v m0 �¢ Locking Cap CL Silty CLAY grading to clayey SILT, loose, brown, dry, low ML plasticity to non -plastic, cohesive, some organics and rock fragments 5 a ..• .' ML SILT as SAPROLITE, loose, brown, dry, some partially weathered rock with relict gnessic rock structure 10 : Neat Cement Grout 15 6" SCH 40 PVC Surface Casing (0'-49') PWR PARTIALLY WEATHERED ROCK (PWR), brown, with silt, some subrounded gravel pebbles 2 0 — — — — — — — — — — — — — — — — — — — — — — — — — 2" SCH 40 PVC Riser PWR PWR, gray to light brown, some phyllitic schist, decomposed with prevalent iron staining 2 5 — — — — — — — — — — — — — — — — — — — — — — — — — 30 PWR PWR, light brown, some phyllitic schist, decomposed with prevalent iron staining, wet rock cuttings 35 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: HWMW-1 BR PROJECT NO: 1026.107 STARTED: 12/4/18 COMPLETED: 1/10/19 DRILLING COMPANY: Geologic Exploration NORTHING: 992773.06 EASTING: 1977616.68 DRILLING METHOD: Air Hammer G.S. ELEV: 425.58 ft M.P. ELEV: 429.10 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 11.11 ft TOC TOTAL DEPTH: 101.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawin 2 w U = ILO DESCRIPTION LU J g > O0 o cn OJ a s p C� �v m0 PWR PWR, light brown, some phyllitic schist, decomposed with prevalent iron staining, wet rock cuttings (continued) Neat Cement Grout 45 SCHIST, slightly decomposed with iron staining, fine /Mica to medium grained, grading to competent / sound rock RK At 44-45' bgs apparent fracture (fractures based on percussion hammer frequency) 6" SCH 40 PVC Surface — — — — — — — — — — — — — — — — — — — — — — — — — Casing (0'-49') 50 2" SCH 40 PVC Riser 55 60 SCHIST, medium to dark gray, fresh, with quartz and 65 RK K-feldspar minerals, occasionally alternating between dark, aphanitic mafic intervals 70 75 �— Bentonite Seal CLIENT: Duke Energy Progress, LLC. SynTerra �� 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC GreenvCarolina 29601 SynTerra Phone:l864 421- 9PAGE 2 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: HWMW-1 BR PROJECT NO: 1026.107 STARTED: 12/4/18 COMPLETED: 1/10/19 DRILLING COMPANY: Geologic Exploration NORTHING: 992773.06 EASTING: 1977616.68 DRILLING METHOD: Air Hammer G.S. ELEV: 425.58 ft M.P. ELEV: 429.10 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 11.11 ft TOC TOTAL DEPTH: 101.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawin 2 U = Q O U) DESCRIPTION w J > 0 0 vJa u) Ow Q p <�0 C� 2" SCH 40 PVC Riser SCHIST, medium to dark gray, fresh, with quartz and RK K-feldspar minerals, occasionally alternating between dark, 85 aphanitic mafic intervals (continued) �— Bentonite Seal / At 85' bgs apparent fracture, no observable water production RK Granitic GNEISS, bluish gray, fresh, fine to medium 90 (8 Sand Filter Pack 8'-102') grained, with prevalent K-feldspar and quartz minerals 95 — — — — — — — — — — — — — — — — — — — — — — — — — Granitic GNEISS, bluish gray, fresh, medium grained with - ' RK prevalent K-feldspar minerals At 95' and 97' bgs, soft zones with water production — — — — — — — — — — — — — — — — — — — — — — — — 2" Pre -Packed Well Screen (91'-101') 100 - RK Granitic GNEISS, light gray, fresh, medium grained with _ prevalent K-feldspar minerals Bottom of boring 102' bgs 105 110 115 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 3 OF 3 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-01BRL PROJECT NO: 1026.107 STARTED: 01/08/2019 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 994427.00 EASTING: 1983006.23 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 505.41 M.P. ELEV: 508.75 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 56.42 ft TOC TOTAL DEPTH: 220 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 6.0 (n) 6.5 w ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.01 0.01 w o (g ) a O.OHPF-PPumping 0.5 a Own)po u. gpo 10 15 20 25 30 35 40 01.1 50 55 T T : T T T -6 . T T ' Silty Sand: Silty SAND as SAPROLITE, firm, grayish brown, dry- see log MW-0113R for detailed lithologic description Sandy Silt: Sandy SILT as SAPROLITE, firm, light yellowish brown (2.5Y 6/3), dry PWR: Sandy SILT as PARTIALLY WEATHERED ROCK, gray (2.5Y 6/1), dry At 26' cuttings become light gray (2.5Y 7/2), some very fine rock fragments, softer intervals At 30' cuttings become light gray (5Y 7/1), some granite/meta-granite fragments At 33.5' cuttings become brown, softer At 34.5' firm, dark grayish brown (2.5Y 4/2), wet, fragments of granitic schist Gneiss: Biotite GNEISS, blue -black with white plagioclase minerals, competent, wet Biotite GNEISS, blue -black with white plagioclase minerals, competent, wet Cement Grout 8" Surface Casing (0'-50' bgs) 6" Surface Casing (0'-110' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 1 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-01BRL PROJECT NO: 1026.107 STARTED: 01/08/2019 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 994427.00 EASTING: 1983006.23 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 505.41 M.P. ELEV: 508.75 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 56.42 ft TOC TOTAL DEPTH: 220 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 6.0 (n) 6.5 w ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.01 0.01 w o (g ) a O.OHPF-PPumping 0.5 a Own)po u. gpo 60 110 Biotite GNEISS, blue -black with white plagioclase minerals, competent, wet At 105' fragments of felsic granite-metagranite Cement Grout 6" Surface Casing (0'-110' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 2 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-01BRL PROJECT NO: 1026.107 STARTED: 01/08/2019 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 994427.00 EASTING: 1983006.23 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 505.41 M.P. ELEV: 508.75 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 56.42 ft TOC TOTAL DEPTH: 220 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 6.0 (n) 6.5 w ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.01 0.01 w o (g ) a O.OHPF-PPumping 0.5 a Own) po u. gpo 115 �"Biotite GNEISS, blue -black with white plagioclase minerals, competent, wet 120 J[-L At 119' cuttings become gray, increase in plagioclase minerals, phaneritic 125 nnnnnn Diabase: Diabase, greenish -black, soft nnnnnn nnnnnn nnnnnn 130 nnnnnn nnnnnn nnnnnn nnAt 132' apparent fracture (fractures based on nnnn percussion hammer frequency), minor water yield 135 nnnnnn nnnnnn nnnnnn At 136' softer zone nnnnnn nnnnnn At 138' apparent fracture, no observable increse in 140 nnnnnn water yield n n n nnnnnn nnnnnn nnnnnn nnnnnn 145 nnnnnn At 144' apparent fracture, no observable increse in nnnnnn water yield nnnnnn nnnnnn nnnnnn n A n A n 150 nnnnnn nnnnnn nnnnnn nnnnnn nnnnnn 155 nnnnnn nnnnnn nnnnnn n n n n n n n n n At 157apparent 160' arent fractures, no observable nnnnnn increse in water yield 160 nnnnnn nnnnnn nnnnnn nnnnnn nnnnnn 165 nnnnnn nnnnnn nnnnnn nnnnnn nnnnnn nnnnnn 170 nnnnnn nnnnnn Cement Grout 2" PVC Riser 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 3 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-01BRL PROJECT NO: 1026.107 STARTED: 01/08/2019 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 994427.00 EASTING: 1983006.23 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 505.41 M.P. ELEV: 508.75 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 56.42 ft TOC TOTAL DEPTH: 220 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 6.0 (n) 6.5 w ^ _ a DESCRIPTION > (A 0 j F WELL CONSTRUCTION HPF-Ambient 0.01 0.01 w o (g ) a O.OHPF-PPumping 0.5 a Own)po u. gpo nnnnnn n n n AAAAAA Diabase, greenish -black, soft 175 nnnnn^ .A.A. ' Gneiss: Biotite GNEISS, light gray 180 185 190 �L� At 188' apparent fracture, no observable increse in water yield 195 - nnnn Diabase: DIABASE, greenish -black, softer drilling nnnn nnnnn nnnnnn AAAAAA 200 � AAAAA At 205'-206' apparent fracture (water yield —1 nnnnnn GPM) nnnnn 205 nnnnn At 207-208' apparent fractures with increased nnnnn yield (cumulatively —4 GPM) nnnnn nnnnn nnnnn At 212' apparent fracture, no observable increase 210 nnn nn in water yield nnnnn At 214' quartz and plagioclase in cuttings At 215'-220' apparent fractured zone with increase 215 in water yield (cumulatively —7 GPM) Gneiss: Biotite GNEISS, light gray 220 ��Diabase: DIABASE, black to greenish black, harder drilling At 220' borehole terminated 225 Cement Grout 2" PVC Riser Bentonite Seal Sand Pack (195'-220') 2" Pre -Pack Well Screen (201'-216') 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 4 OF 4 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-34BR PROJECT NO: 1026.107 STARTED: 3/26/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994726.802 EASTING: 1980865.835 DRILLING METHOD: Air Hammer G.S. ELEV: 443.609 ft M.P. ELEV: 446.395 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 26.25 ft TOC TOTAL DEPTH: 84.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 w U = Q O DESCRIPTION LU J g > OU o cn OJ a s p < �v m0 "� *7 OL Topsoil/organics Lockin Ca g p SC Sandy CLAY, yellowish brown (10YR 5/6), moist, low CL plasticity, noncohesive CL Silty CLAY, yellowish brown to very dark gray (10YR 5/6 to 5 ML 3/1), moist, high plasticity, cohesive, trace medium graine SM sand — Silty SAND as SAPROLITE, very dark gray to white (10YR_ .::' ' \ 3/1 to 8/j), moist, low�lastic y noncohesive / SM Silty SAND as SAPROLITE, yellowish brown to dark gray .o ,.. (10YR 5/8 to 3/1), dry, non -plastic, noncohesive 10 41 ..•.' SM Silty SAND as SAPROLITE, brown (10YR 5/3), dry, 15 non -plastic, noncohesive 20 Neat Cement Grout PWR Sandy SILT with GRAVEL as PWR, grayish brown (2.5Y 5/2), dry, non -plastic, noncohesive 25 30 — PWR ------------------------ PWR, brown to gray (7.5YR 4/4 to 5/1), highly 6" SCH 40 PVC Surface Casing (0'-59') decomposed rock with abundant iron staining Silty SAND, weak red to dark reddish gray (2.5Y 5/2 to PWR 4/1), wet, non -plastic, noncohesive, some weathered rock 35 fragments 2" SCH 40 PVC Riser - RK GNEISS, medium gray (N5), highly decomposed to slightly _ decomposed, abundant iron staining, relatively fine grained CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-34BR PROJECT NO: 1026.107 STARTED: 3/26/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994726.802 EASTING: 1980865.835 DRILLING METHOD: Air Hammer G.S. ELEV: 443.609 ft M.P. ELEV: 446.395 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 26.25 ft TOC TOTAL DEPTH: 84.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 U = Q LU J > 0oOw OO v cn aDESCRIPTION s p <�0 C� GNEISS, medium gray (N5), highly decomposed to slightly RK decomposed, abundant iron staining, relatively fine grained 45 - (continued) Neat Cement Grout 50 — — — — — — — — — — — — — — — — — — — — — — — — — _ - _ 6" SCH 40 PVC Surface GNEISS, medium gray (N5), highly decomposed to slightly Casing (0'-59') RK decomposed, abundant iron staining, relatively fine _ - grained, with feldspar minerals 55 — ------------------------ 2" SCH 40 PVC Riser - RK GNEISS, dark gray (N3), fresh to slightly decomposed, - - — occasional foliation observed in rock cuttings ------------------------ 60 - �— Bentonite Seal 65 _'- RK Granitic GNEISS, grayish black (N2), fresh 70 - _ % At 71' to 73' bgs soft zone 71 At 75' bgs apparent fracture (fractures based on percussion hammer frequency) 75 At 76.5' bgs apparent fracture, cumulative water yield during drilling —2 GPM —#2 Sand Filter Pack (71'-86') 2" Pre -Packed Well Screen - (74'-84') CLIENT: Duke Energy Progress, LLC. ra 48 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 2 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-34BR PROJECT NO: 1026.107 STARTED: 3/26/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994726.802 EASTING: 1980865.835 DRILLING METHOD: Air Hammer G.S. ELEV: 443.609 ft M.P. ELEV: 446.395 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 26.25 ft TOC TOTAL DEPTH: 84.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 U = O U) w J > 0 u) Ow Q DESCRIPTION 0 vJ Q p C� <�0a �—#2 Sand Filter Pack - (71'-86') = ; ' RK Granitic GNEISS, grayish black (N2), fresh (continued) 2" Pre -Packed Well Screen (74'-84') 85 Bottom of boring 86' bgs 90 95 100 105 110 115 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 3 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-34D PROJECT NO: 1026.107 STARTED: 3/27/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994734.009 EASTING: 1980860 DRILLING METHOD: Air Hammer G.S. ELEV: 442.759 ft M.P. ELEV: 445.372 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 24.57 ft TOC TOTAL DEPTH: 52.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 w U = Q O DESCRIPTION LU J g > OU o cn OJ a s p < �v m0 "� *7 OL Topsoil/organics Lockin Ca g p SC Sandy CLAY, yellowish brown (10YR 5/6), moist, low CL plasticity, noncohesive 0, - — -- CL — — — — — — — — — — — — — — — — — — — — — — — — Silty CLAY, yellowish brown to very dark gray (10YR 5/6 to - 5 ML 3/1), moist, high plasticity, cohesive, trace medium graine SM sand — Silty SAND as SAPROLITE, very dark gray to white (10YR_ 3/1 to 8/j), moist, low�lastic y noncohesive / SM Silty SAND as SAPROLITE, yellowish brown to dark gray .o ,.. (10YR 5/8 to 3/1), dry, non -plastic, noncohesive 10 41 ..•.' Ij SM Silty SAND as SAPROLITE, brown (10YR 5/3), dry, 15 -' non -plastic, noncohesive Neat Cement Grout 20 PWR Sandy SILT with GRAVEL as PWR, grayish brown (2.5Y 5/2), dry, non -plastic, noncohesive 25 2" SCH 40 PVC Riser 30 — PWR — — — — — — — — — — — — — — — — — — — — — — — — PWR, brown to gray (7.5YR 4/4 to 5/1), highly PZdecomposed rock with abundant iron staining Silty SAND, weak red to dark reddish gray (2.5Y 5/2 to PWR 4/1), wet, non -plastic, noncohesive, some weathered rock 35 fragments RK GNEISS, medium gray (N5),highly decomposed to slightly Bentonite Seal decomposed, abundant iron staining, relatively fine grained CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 2 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-34D PROJECT NO: 1026.107 STARTED: 3/27/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994734.009 EASTING: 1980860 DRILLING METHOD: Air Hammer G.S. ELEV: 442.759 ft M.P. ELEV: 445.372 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 24.57 ft TOC TOTAL DEPTH: 52.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 U = Q O U) DESCRIPTION w J > 0 0 u) Ow Q p <�0a vJ C� 2" SCH 40 PVC Riser GNEISS, medium gray (N5), highly decomposed to slightly RK decomposed, abundant iron staining, relatively fine grained #2 Sand Filter Pack - (continued) (40'-53') 45 - 2" Pre -Packed Well Screen — ----------------------- — (42' 52') _ 50 _ GNEISS, medium gray (N5), highly decomposed to slightly RK decomposed, abundant iron staining, relatively fine ' grained, with feldspar minerals Bottom of boring 53' bgs 55 60 65 70 75 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 2 OF 2 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-35BR PROJECT NO: 1026.107 STARTED: 3/27/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994483.489 EASTING: 1980977.849 DRILLING METHOD: Air Hammer G.S. ELEV: 444.044 ft M.P. ELEV: 446.354 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 8.77 ft TOC TOTAL DEPTH: 98.0 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler 2 w U = Q O DESCRIPTION Lu J g > OU o cn OJ a s 0 W < �v m0 Locking Cap SC Clayey SAND as FILL, yellowish brown to dark grayish — brown (10YR 5/6 to 2.5Y 4/2), dry, low plasticity, cohesive ------------------------ SC Clayey SAND as FILL, dark grayish brown (2.5Y 4/2), moist, low to medium plasticity, cohesive CL Silty CLAY, very dark gray to dark grayish brown (2.5Y 3/1 5 ML to4/21, wet, high plasticity, cohesive CL — Silty CLAY, yellowish brown (10YR 5/8), wet, high -- ML plasticity, cohesive SM Silty SAND as SAPROLITE, yellowish brown to very dark gray (10 YR 5/6 to 2.5Y 3/1), dry, non -plastic, noncohesive 10 15 Neat Cement Grout Silty SAND with GRAVEL as PARTIALLY WEATHERED PWR ROCK (gneissic rock fragments), olive brown (2.5Y 4/4), dry, non -plastic, noncohesive 20 6" SCH 40 PVC Surface Casing (0'-48') 25 - _ RK GNEISS, grayish black (N2), slightly decomposed, occasional iron staining 30 — ------------------------ 2" SCH 40 PVC Riser ; RK Granitic GNEISS with K-feldspar, grayish black to white (N2 to N9), fresh 35 - _ - - - - - - - - - - - - - - - - - - - - - - - - - i' - _ RK Granitic GNEISS with K-feldspar, grayish black to white (N2 to N9), slightly decomposed, abundant iron staining CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-35BR PROJECT NO: 1026.107 STARTED: 3/27/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994483.489 EASTING: 1980977.849 DRILLING METHOD: Air Hammer G.S. ELEV: 444.044 ft M.P. ELEV: 446.354 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 8.77 ft TOC TOTAL DEPTH: 98.0 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler 2 w U = Q O DESCRIPTION Lu J g > OU o cn OJ a s p �v m0 C� - _ Neat Cement Grout Granitic GNEISS with K-feldspar, grayish black to white RK (N2 to N9), slightly decomposed, abundant iron staining 2" SCH 40 PVC Riser - (continued) 45 - 6" SCH 40 PVC Surface - — — — — — — — — — — — — — — — — — — — — — — — — — Casing (0'-48') _ - - At 49' bgs apparent fracture with water yield —3 GPM (fractures based on percussion hammer frequency) 50 - _ RK GNEISS, black (1\11) to white (N9), fresh, occasional iron 55 staining 60 SCHIST, very light gray (N8) to yellowish gray (5Y 8/1), RK slightly decomposed, some K-feldspar, occasional iron 65 staining - Packer Test 66'-77' bgs / (recharge rate: 0.03 GPM) 70 �, ; ' RK GNEISS, black (1\11), fresh 75 SCHIST, very light gray (N8) to yellowish gray (5Y 8/1), RK slightly decomposed, some K-feldspar, occasional iron staining CLIENT: Duke Energy Progress, LLC. SynTerra �� 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 2 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-35BR PROJECT NO: 1026.107 STARTED: 3/27/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994483.489 EASTING: 1980977.849 DRILLING METHOD: Air Hammer G.S. ELEV: 444.044 ft M.P. ELEV: 446.354 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 8.77 ft TOC TOTAL DEPTH: 98.0 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler 2 U = Q DESCRIPTION w >0O 0 u) Ow Q p <�O vJa C� RK Bentonite Seal 85 - _ - Packer Test 86'-100' bgs -' (recharge rate: 0.25 GPM) - �—#2 Sand Filter Pack -' (85'-100') 90 IRK Granitic GNEISS, black (N1) to white (N9), fresh to slightly - " - decomposed, some K-feldspar ' 2" Pre -Packed Well Screen (88'-98') 95 - _ At 96' and 99' bgs apparent fractures with increased water yield during drilling (cumulatively —5 GPM) 100 Bottom of boring 100' bgs 105 110 115 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 3 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-35D PROJECT NO: 1026.107 STARTED: 3/27/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994482.873 EASTING: 1980982 DRILLING METHOD: Air Hammer G.S. ELEV: 444.077 ft M.P. ELEV: 446.421 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 5.04 ft TOC TOTAL DEPTH: 41.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 w U = Q O DESCRIPTION Lu J g > OU o cn OJ a s 0 W < �v m0 Locking Cap SC Clayey SAND as FILL, yellowish brown to dark grayish brown (10YR 5/6 to 2.5Y 4/2), dry, low plasticity, cohesive — SC ------------------------ Clayey SAND as FILL, dark grayish brown (2.5Y 4/2), - moist, low to medium plasticity, cohesive CL Silty CLAY, very dark gray to dark grayish brown (2.5Y 3/1 5 ML to4/21, wet, high plasticity, cohesive CL — -- Silty CLAY, yellowish brown (10YR 5/8), wet, high ML plasticity, cohesive SM Silty SAND as SAPROLITE, yellowish brown to very dark gray (10 YR 5/6 to 2.5Y 3/1), dry, non -plastic, noncohesive 10 Neat Cement Grout 15 2" SCH 40 PVC Riser Silty SAND with GRAVEL as PARTIALLY WEATHERED PWR ROCK (gneissic rock fragments), olive brown (2.5Y 4/4), dry, non -plastic, noncohesive 20 Bentonite Seal 25 - _ RK GNEISS, grayish black (N2), slightly decomposed, occasional iron staining 30 — — — — — — — — — — — — — — — — — — — — — — — — — RK Granitic GNEISS with K-feldspar, grayish black to white (N2 to N9), fresh #2 Sand Filter Pack (26'-43') 35 — — — — — — — — — — — — — — — — — — — — — — — — ::•:•. �`�•'�•� 2" Pre -Packed Well Screen (31'41') - _ RK Granitic GNEISS with K-feldspar, grayish black to white (N2 to N9), slightly decomposed, abundant iron staining CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 2 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-35D PROJECT NO: 1026.107 STARTED: 3/27/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994482.873 EASTING: 1980982 DRILLING METHOD: Air Hammer G.S. ELEV: 444.077 ft M.P. ELEV: 446.421 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 5.04 ft TOC TOTAL DEPTH: 41.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 U = O U) w J > 0 u) Ow Q DESCRIPTION 0 vJa Q p C� <�m0 2" Pre -Packed Well Screen Granitic GNEISS with K-feldspar, grayish black to white -- (31'41') -RK (N2 to N9), slightly decomposed, abundant iron staining - (continued) Bottom of boring 43' bgs 45 50 55 60 65 70 75 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 2 OF 2 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-35S PROJECT NO: 1026.107 STARTED: 3/28/17 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994489.157 EASTING: 1980985.695 DRILLING METHOD: Air Hammer G.S. ELEV: 443.971 ft M.P. ELEV: 446.179 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 2.3 ft TOC TOTAL DEPTH: 18.0 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler 2 wQ U = O U) U) DESCRIPTION w J 2 > 0U u) � OJ — Q p o < �v m0 17 C� --FIF- Prr)fi-rt0\1(-. \A/Oth Locking Cap SC Clayey SAND as FILL, yellowish brown to dark grayish — brown (10YR 5/6 to 2.5Y 4/2), dry, low plasticity, cohesive ---- ------------------- Neat Cement Grout SC Clayey SAND as FILL, dark grayish brown (2.5Y 4/2), moist, low to medium plasticity, cohesive Bentonite Seal CL Silty CLAY, very dark gray to dark grayish brown (2.5Y 3/1 5 ML to4/21, wet, high plasticity, cohesive CL — -- Silty CLAY, yellowish brown (10YR 5/8), wet, high ML plasticity, cohesive ° 2" SCH 40 PVC Riser SM Silty SAND as SAPROLITE, yellowish brown to very dark �o gray (10 YR 5/6 to 2.5Y 3/1), dry, non -plastic, noncohesive 10 #2 Sand Filter Pack (6-19') 2" Pre -Packed Well Screen (8 18 ) Silty SAND with GRAVEL as PARTIALLY WEATHERED PWR ROCK (gneissic rock fragments), olive brown (2.5Y 4/4), 15 dry, non -plastic, noncohesive Bottom of boring 19' bgs 20 25 30 35 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 1 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-36BR PROJECT NO: 1026.107 STARTED: 3/26/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994694.385 EASTING: 1981188.421 DRILLING METHOD: Air Hammer G.S. ELEV: 443.982 ft M.P. ELEV: 446.162 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 6.83 ft TOC TOTAL DEPTH: 81.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 wQ U = O U) U) DESCRIPTION w J > OU u) � OJ — Q 0 < �` m00 FILL GRAVEL as FILL Locking Cap SM Silty SAND as SAPROLITE, strong brown (7.5YR 5/6), drynon�lastic, noncohesive, little clay — — — — — — ° Silty SAND as SAPROLITE, dark yellowish brown (10YR "•. SM 4/4) to yellowish brown (10YR 5/8), dry, non -plastic, — cohesive, micaceous F 7 Silty SAND with GRAVEL as SAPROLITE, very dark gray 5 .:.,' SM (10YR 3/1) to yellowish brown (10YR 5/6), wet, ' nor T astic, noncohesive SM — — — — — Silty SAND as SAPROLITE, very dark grayish brown (2.5Y 3/2), nonelastic, noncohesive — — — — — — — — — v .:•:'' Silty SAND as SAPROLITE, grayish brown (2.5Y 5/3), dry, SM non -plastic, noncohesive, granular coarse grained, 10 ° gneissic rock fragments 15 SM Silty SAND as SAPROLITE, very dark grayish brown (2.5Y u •' 3/2), moist, non -plastic, noncohesive 20 PWR Silty SAND with GRAVEL as PARTIALLY WEATHERED ROCK, dark gray (2.5Y 5/1), dry, non -plastic, noncohesive 6" SCH 40 PVC Surface 25 : " RK GNEISS, grayish black (N2), slightly decomposed, some Casing (0'-48') " iron staining 14 Neat Cement Grout PWR Silty SAND with GRAVEL as PARTIALLY WEATHERED ROCK, olive brown (2.5Y 4/3), non -plastic, noncohesive 30 NRK SCHIST, yellowish gray (5Y 7/2) to medium gray (N6) " 35 2" SCH 40 PVC Riser = ; ' RK GNEISS, grayish black (N2), moderately decomposed, some iron staining, thin foliations on rock cuttings CLIENT: Duke Energy Progress, LLC. ra 48 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-36BR PROJECT NO: 1026.107 STARTED: 3/26/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994694.385 EASTING: 1981188.421 DRILLING METHOD: Air Hammer G.S. ELEV: 443.982 ft M.P. ELEV: 446.162 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 6.83 ft TOC TOTAL DEPTH: 81.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 U = Q U DESCRIPTION LU J 0- > OO 0 o cn Ow as p C� LUv m0 _ RK RK GNEISS, grayish black (N2), highly decomposed, iron " staining, thin foliations on rock cuttings "= — — — — — — — — — — — — — — — — — — — — — — — — — Neat Cement Grout 45 RK GNEISS, grayish black (N2), slightly decomposed to fresh, some iron staining, thin foliations on rock cuttings 6" SCH 40 PVC Surface - Casing (0'-48') 50 55 2" SCH 40 PVC Riser / At 57' to 58' bgs softer zone, rock cuttings light gray to white (N7 to N9) with occasional iron staining RK SCHIST, very light gray (N8), pulverized rock cuttings 60 At 61' to 63' softer zone Bentonite Seal 65 At 67.5' bgs apparent fracture (fractures based on percussion hammer frequency) 70 s'' —#2 Sand Filter Pack / At 70.5' bgs apparent fracture (68'-83') At 71' to 73' bgs apparent fractured zone 75 i RK Granitic GNEISS, grayish black (N2), fractured, some iron - - staining At 75' and 76.5' bgs apparent fractures, cumulative water yield during drilling —2 GPM 2" Pre -Packed Well Screen - (71'-81') CLIENT: Duke Energy Progress, LLC. ra 48 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 2 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-36BR PROJECT NO: 1026.107 STARTED: 3/26/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994694.385 EASTING: 1981188.421 DRILLING METHOD: Air Hammer G.S. ELEV: 443.982 ft M.P. ELEV: 446.162 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 6.83 ft TOC TOTAL DEPTH: 81.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 U = Q O U) DESCRIPTION w J > 0 0 u) Ow Q p <�0 vJa C� 2" Pre -Packed Well Screen = RK Granitic GNEISS, grayish black (N2), fractured, some iron ;': (71'-81') - _ - staining (continued) —#2 Sand Filter Pack 68'-83' ) Bottom of boring 83' bgs 85 90 95 100 105 110 115 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 3 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-36D PROJECT NO: 1026.107 STARTED: 3/27/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994701.778 EASTING: 1981190.01 DRILLING METHOD: Air Hammer G.S. ELEV: 443.835 ft M.P. ELEV: 446.323 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 4.94 ft TOC TOTAL DEPTH: 38.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: Z. Deibler CHECKED BY: K. Lawin 2 U = Q O U) U) DESCRIPTION u1 J > OU u) 1­-w OJ — Q 0 < �` m00 FILL GRAVEL as FILL Locking Cap SM Silty SAND as SAPROLITE, strong brown (7.5YR 5/6), dry, non -plastic, noncohesive, little clay — — — — — — ° Silty SAND as SAPROLITE, dark yellowish brown (10YR 0, - "•. SM 4/4) to yellowish brown (10YR 5/8), dry, non -plastic, — cohesive, micaceous Silty SAND with GRAVEL as SAPROLITE, very dark gray 5 ° ' ;'RSM__3,/2). SM (10YR 3/1) to yellowish brown (10YR 5/6), wet, 'noa:pastic, noncohesive — — — — —Silty SAND as SAPROLITE, very dark grayish brown (2.5Y nonelastic, noncohesive — — — — — — — — — Silty SAND as SAPROLITE, grayish brown (2.5Y 5/3), dry, SM non -plastic, noncohesive, granular coarse grained, 10 ° gneissic rock fragments --------------------------- Neat Cement Grout 2" SCH 40 PVC Riser 15 SM Silty SAND as SAPROLITE, very dark grayish brown (2.5Y u •' 3/2), moist, non -plastic, noncohesive 20 . PWR Silty SAND with GRAVEL as PARTIALLY WEATHERED ROCK, dark gray (2.5Y 5/1), dry, non -plastic, noncohesive Bentonite Seal 25 : " RK GNEISS, grayish black (N2), slightly decomposed, some " iron staining PWR Silty SAND with GRAVEL as PARTIALLY WEATHERED ROCK, olive brown (2.5Y 4/3), non -plastic, noncohesive 30 #2 Sand Filter Pack (25'-40') RK SCHIST, yellowish gray (5Y 7/2) to medium gray (N6) 2' Pre -Packed Well Screen (28'-38') 35 " ` = RK GNEISS, grayish black (N2), moderately decomposed, ," some iron staining, thin foliations on rock cuttings -' Bottom of boring 40' bgs CLIENT: Duke Energy Progress, LLC. ra 48 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 1 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-37BR PROJECT NO: 1026.107 STARTED: 3/26/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994558.314 EASTING: 1981176.852 DRILLING METHOD: Air Hammer G.S. ELEV: 447.514 ft M.P. ELEV: 449.887 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 3.93 ft TOC TOTAL DEPTH: 91.0 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler 2 w U = Q O DESCRIPTION LU J g > OU o cn OJ a s 0 < �v m0 FILL Coarse Gravel as FILL Locking Cap _ SC Clayey SAND as FILL, very dark grayish brown (10YR 3/2), medium dense, moist, low plasticity, cohesive CL Silty CLAY, brownish yellow (10YR 6/6) to reddish brown ML (2.5YR 2.5/1), very stiff, moist, medium plasticity, cohesive, blocky texture ° SM Silt with SAND as SAPROLITE, very dark grayish brown 5 (10YR 3/2), very dense, moist, low plasticity, cohesive Silty SAND with GRAVEL as SAPROLITE, brown (7.5YR SM 4/4) to dark grayish olive (5GY 4/2), moist, non -plastic, noncohesive SM Silty SAND with GRAVEL as SAPROLITE, olive gray (5YR :'. •. 4/2), wet, non -plastic, noncohesive 15 SM Silty SAND as SAPROLITE, light olive brown (2.5Y 5/3), moist, non -plastic, noncohesive 20 "' D 25 In 6" SCH 40 PVC Surface ;- Casing (0'-50') - IRK Granitic GNEISS, medium dark gray (N4) to white (N9), - - moderately decomposed, with iron staining 30 Neat Cement Grout Silty SAND as PARTIALLY WEATHERED ROCK, gray SM (2.5Y 5/1) to light yellowish brown (2.5Y 6/3), some gneissic rock fragments 35 2" SCH 40 PVC Riser RK CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-37BR PROJECT NO: 1026.107 STARTED: 3/26/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994558.314 EASTING: 1981176.852 DRILLING METHOD: Air Hammer G.S. ELEV: 447.514 ft M.P. ELEV: 449.887 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 3.93 ft TOC TOTAL DEPTH: 91.0 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler 2 w U = Q O DESCRIPTION LU J g > O0 o cn OJ a s p �v m0 C� 2" SCH 40 PVC Riser - Granitic GNEISS, dark gray (N3), slightly decomposed, iron staining RK Neat Cement Grout 45 - _ — — — — — — — — — — — — — — — — — — — — — — — — — _ - _ 6" SCH 40 PVC Surface -' Casing (0'-50') 50 RK Granitic GNEISS, dark gray (N3), slightly decomposed to - - fresh, occasional iron staining, slightly aphanitic 55 ;' — — — — — — — — — — — — — — — — — — — — — — — — — 2" SCH 40 PVC Riser Granitic GNEISS, grayish black (N2) to pink (5RP 8/2), '- RK slightly decomposed, some iron staining, abundant - ' — K-feldspar — — — — — — — — — — — — — — — — — — — — — — — — 60- - _ 65 " - - RK Granitic GNEISS, grayish black (N2) to pink (5RP 8/2), _ fresh, some iron staining, with K-feldspar 70— 71 Bentonite Seal 75 - _ - ' —#2 Sand Filter Pack -' (77'-91') CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 2 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-37BR PROJECT NO: 1026.107 STARTED: 3/26/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994558.314 EASTING: 1981176.852 DRILLING METHOD: Air Hammer G.S. ELEV: 447.514 ft M.P. ELEV: 449.887 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 3.93 ft TOC TOTAL DEPTH: 91.0 ft BGS NOTES: Drill Max 2400 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler 2 U = Q DESCRIPTION w >0O 0 u) Ow Q p <�0a vJ C� At 81' bgs apparent fracture, cumulative water yield during drilling —0.5 GPM (fractures based on percussion hammer _ - frequency) r �—#2 Sand Filter Pack -' (77'-91') 85 - _ RK Granitic GNEISS, grayish black (N2) to pink (5RP 8/2), 2" Pre -Packed Well Screen (81'-91') - " - fresh, some iron staining, with K-feldspar (continued) 90 - At 91' bgs apparent fracture with slight increase in water yield s; Bottom of boring 93' bgs 95 100 105 110 115 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 3 OF 3 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-37D PROJECT NO: 1026.107 STARTED: 3/28/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994560.977 EASTING: 1981185.589 DRILLING METHOD: Air Hammer G.S. ELEV: 447.854 ft M.P. ELEV: 450.234 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 1.38 ft TOC TOTAL DEPTH: 42.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler 2 o_ U = a 0 DESCRIPTION LU J g > OU o cn OJ a CL y pv �v to0 UJ < �— FILL Coarse Gravel as FILL Locking Cap SC Clayey SAND as FILL, very dark grayish brown (10YR 3/2), medium dense, moist, low plasticity, cohesive CL Silty CLAY, brownish yellow (10YR 6/6) to reddish brown ML (2.5YR 2.5/1), very stiff, moist, medium plasticity, cohesive, blocky texture ° SM Silt with SAND as SAPROLITE, very dark grayish brown 5 (10YR 3/2), very dense, moist, low plasticity, cohesive Silty SAND with GRAVEL as SAPROLITE, brown (7.5YR SM 4/4) to dark grayish olive (5GY 4/2), moist, non -plastic, noncohesive SM Silty SAND with GRAVEL as SAPROLITE, olive gray (5YR :'. •. 4/2), wet, non -plastic, noncohesive Neat Cement Grout 15 u. ` 2" SCH 40 PVC Riser SM Silty SAND as SAPROLITE, light olive brown (2.5Y 5/3), moist, non -plastic, noncohesive 20 • D 25 ' - - RK Granitic GNEISS, medium dark gray (N4) to white (N9), - - moderately decomposed, with iron staining Bentonite Seal 30 Silty SAND as PARTIALLY WEATHERED ROCK, gray #2 Sand Filter Pack SM (2.5Y 5/1) to light yellowish brown (2.5Y 6/3), some '. (29'43') gneissic rock fragments 35 2" Pre -Packed Well Screen (32'-42') RK CLIENT: Duke Energy Progress, LLC. Synra 10 48 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 2 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-37D PROJECT NO: 1026.107 STARTED: 3/28/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994560.977 EASTING: 1981185.589 DRILLING METHOD: Air Hammer G.S. ELEV: 447.854 ft M.P. ELEV: 450.234 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 1.38 ft TOC TOTAL DEPTH: 42.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler 2 U = Q O U) DESCRIPTION w J > 0 0 u) Ow Q p <�0 vJa C� -' - Granitic GNEISS, dark gray (N3), slightly decomposed, 2" Pre -Packed Well Screen _ RK iron staining (32'-42') Bottom of boring 43' bgs 45 50 55 60 65 70 75 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 2 OF 2 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-37S PROJECT NO: 1026.107 STARTED: 3/28/19 COMPLETED: 4/3/19 DRILLING COMPANY: Geologic Exploration NORTHING: 994564.282 EASTING: 1981192.72 DRILLING METHOD: Air Hammer G.S. ELEV: 448.088 ft M.P. ELEV: 450.232 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 0.96 ft TOC TOTAL DEPTH: 18.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: Z. Deibler U Q O DESCRIPTION w C) u) O —w a p W 7) < vJ 0 .— FILL Coarse Gravel as FILL Locking Cap SC Clayey SAND as FILL, very dark grayish brown (10YR Neat Cement Grout 3/2), medium dense, moist, low plasticity, cohesive CL Silty CLAY, brownish yellow (10YR 6/6) to reddish brown ML (2.5YR 2.5/1), very stiff, moist, medium plasticity, cohesive, blocky texture ° SM Silt with SAND as SAPROLITE, very dark grayish brown 5 Bentonite Seal (10YR 3/2), very dense, moist, low plasticity, cohesive Silty SAND with GRAVEL as SAPROLITE, brown (7.5YR SM 4/4) to dark grayish olive (5GY 4/2), moist, non -plastic, 2 SCH 40 PVC Riser noncohesive SM Silty SAND with GRAVEL as SAPROLITE, olive gray (5YR 4/2), wet, non -plastic, noncohesive 10 • .•.: — — — — — — — — — — — — — — — — — — — — — — — — — #2 Sand Filter Pack (6-19') v 2" Pre -Packed Well Screen ' SM Silty SAND as SAPROLITE, light olive brown (2.5Y 5/3), 15 u moist, non -plastic, noncohesive �o Bottom of boring 19' bgs 20 25 30 35 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 1 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-38BR PROJECT NO: 1026.107 STARTED: 9/10/2019 COMPLETED: 11/13/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 986199.40 EASTING: 1979127.69 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 510.32 M.P. ELEV: 512.71 BOREHOLE DIAMETER: 8 and 6 IN DEPTH TO WATER: 28.91 ft TOC TOTAL DEPTH: 110 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 2.5 (n) 6.6 w ^ _ OJ DESCRIPTION > c� j WELL CONSTRUCTION SPF-Ambien 0.00 013 Lu C (9 ) (A 0 V 0 O.00HPF-PPuumPing0.02 Own) po u. gpo I. E 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 Clayey Sand: Clayey Sand (10YR 5/6), medium dense, nonplastic, dry, some gravel T. T.T T . Silty Sand: Silty Sand/Saprolite with rock T -F. fragments, density increasing with depth. T T' Granite: PWR, light brownish gray (10YR 6/2) moderate strength, dry, small rock fragments of N meta -granite PWR, light yellowish brown (10YR 6/4), dry, quartz and Meta -Granite present. Schist: PWR, light gray (10YR 7/1), chips of meta Granite -Granitic Schist w/ Biotite, Muscovite present, minor K-Spar Pyroxene: Pyroxene/ Amphibole Schist with chlorite, dark greenish gray (5GY 4/1), very strong, aphanitic, foliated, moist Granite: Biotite Granite/ Meta -Granite, gray (10YR 6/1), phaneritic, foliated, wet, K-Spar present, dust is pinkish gray Schist: Seam of Chlorite/ Pyroxene/Amphibole Schist, dark greenish gray Granite: Biotite Granite/ Meta -Granite, gray (10YR 6/1), phaneritic, foliated, wet, increase in Biotite content in Meta -Granite Granite: Biotite Meta -Granite/ Granite Schist/ Gneiss Schist: Seam of Chlorite/ Pyroxene/Amphibole Schist, dark greenish gray Granite: Increase in Chlorite minerals Cement Grout 6" PVC Sch 40 Casing 2" PVC Sch 40 Casing Bentonite Seal 2" Pre -Pack Well Screen (95'-110' bgs) .,yam Sand Pack (90'-125' bgs) 41011 SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 1 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-38BR PROJECT NO: 1026.107 STARTED: 9/10/2019 COMPLETED: 11/13/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 986199.40 EASTING: 1979127.69 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 510.32 M.P. ELEV: 512.71 BOREHOLE DIAMETER: 8 and 6 IN DEPTH TO WATER: 28.91 ft TOC TOTAL DEPTH: 110 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 2.5 (n) 6.6 w ^ _ OJ DESCRIPTION > c� j WELL CONSTRUCTION SPF-Ambien 0.00 013 Lu C (9 ) (A 0 V 0 O.00HPF-PPuumPing0.02 Own) po u. gpo 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 Biotite Meta -Granite/ Granite Schist/ Gneiss Dust is Dark Gray, meta-gabbro rock chips, very dark bluish gray (Gray 2 3/1013), very strong, porphyrytic, fine grained mafic matrix with plagioclase grains, foliated Meta -Granite, very strong, matrix, gray (Gray 1 6/N) phaneritic, foliated Meta -Granite, very strong, matrix, Gray (Gray 1 6/N) phaneritic, foliated, occasional K-Spar grains Schist: Chlorite/ Pyroxene/ Amphibole Schist, very strong, dark greenish gray (5GY 4/1), aphanitic, foliated Biotite Meta -Granite/ Granitic Schist, gray (10YR 6/1), very strong, phaneritic, foliated Amphibole/ Pyroxene Schist, dark gray (Gray 1 4/N), very strong, aphanitic, foliated Chlorite/ Amphibole/ Pyroxene Schist, dark greenish gray (5GY 4/1), very strong, aphanitic, foliated Bentonite Backfill Cement Grout 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 2 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-38BR PROJECT NO: 1026.107 STARTED: 9/10/2019 COMPLETED: 11/13/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 986199.40 EASTING: 1979127.69 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 510.32 M.P. ELEV: 512.71 BOREHOLE DIAMETER: 8 and 6 IN DEPTH TO WATER: 28.91 ft TOC TOTAL DEPTH: 110 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 2.5 (n) 6.6 w ^ _ OJ DESCRIPTION > c� j WELL CONSTRUCTION SPF-Ambien 0.00 013 Lu C i9 ) (A 0 V 0 O.00HPF-PPuumping0.02 Own) po u. gpo 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 355 360 365 370 375 380 Cement Grout 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 3 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-38BR PROJECT NO: 1026.107 STARTED: 9/10/2019 COMPLETED: 11/13/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 986199.40 EASTING: 1979127.69 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 510.32 M.P. ELEV: 512.71 BOREHOLE DIAMETER: 8 and 6 IN DEPTH TO WATER: 28.91 ft TOC TOTAL DEPTH: 110 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 2.5 (n) 6.6 w ^ _ OJ DESCRIPTION > c� j WELL CONSTRUCTION SPF-Ambien 0.00 013 Lu C (9 ) (A 0 V 0 O.00HPF-PPuumPing0.02 Own) po u. gpo Granite: Meta-Biotite/Hornblende Granite, dark 385 gray matrix (10YR 4/1) very strong, w/ Black mafic , minerals, pink K-Spar grains, phaneritic, weakly 390 ' foliated, wet rock cuttings 395 400 405 410 Schist: Chlorite/ Pyroxene/ Amphibole Schist, very 415 strong, dark greenish gray (5GY 4/1), aphanitic, foliated 420 Granite: meta-Biotite/Hornblende Granite, dark gray matrix (10YR 4/1) very strong, w/ black mafic 425 ` ` minerals, pink K-Spar grains, phaneritic, weakly foliated, wet rock cuttings 430 � ` � ` 435 Biotite/Hornblende Meta -Granite 440 Biotite/Hornblende Meta -Granite increase in felsic, 445 ` less Biotite/Hornblende 450 Biotite/Hornblende Meta -Granite 455 460 465 470 475 480 Schist: Chlorite/ Pyroxene/ Amphibole Schist, very strong, dark greenish gray (5GY 4/1), aphanitic, 485 foliated, greenish gray dust 490 K-Spar minerals increased, cuttings very fine, few 495 rock fragments, pinkish -gray dust 500 505 Chlorite/ Amphibole/ Pyroxene Schist, dark greenish gray (5GY 4/1) 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 4 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-38BR PROJECT NO: 1026.107 STARTED: 9/10/2019 COMPLETED: 11/13/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 986199.40 EASTING: 1979127.69 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 510.32 M.P. ELEV: 512.71 BOREHOLE DIAMETER: 8 and 6 IN DEPTH TO WATER: 28.91 ft TOC TOTAL DEPTH: 110 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 2.5 (n) 6.6 w ^ _ OJ DESCRIPTION > c� j WELL CONSTRUCTION SPF-Ambien 0.00 013 Lu C (9 ) (A 0 V 0 O.00HPF-PPuumping0.02 Own) po u. gpo 510 515 Black Schist 520 Chlorite/ Amphibole/ Pyroxene Schist, dark greenish gray (5GY 4/1), very strong, aphanitic, 525 foliated, greenish black rock fragments 530 535 540 545 550 555 560 565 570 575 580 Chlorite/ Amphibole/ Pyroxene Schist, dark 585 greenish gray (5GY 4/1), very strong, aphanitic, foliated, greenish black rock fragments 590 595 At 600' bgs - borehole terminated 600 Cement Grout 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 5 OF 5 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-38D PROJECT NO: 1026.107 STARTED: 9/10/19 COMPLETED: 9/19/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986202.641 EASTING: 1979132.272 DRILLING METHOD: Air Rotary G.S. ELEV: 509.88 ft M.P. ELEV: 512.132 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 30.15 ft TOC TOTAL DEPTH: 54.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberley CHECKED BY: K. Lawin 2 w U = ILO DESCRIPTION LU J g > OU o cn OJ a s p Q w m0 0 U U .—Protective Casing with oc ing ap SW Clayey SAND, yellowish brown (10YR 5/6), medium SC dense, dry 5 —Neat Cement Grout 8M Silty SAND as SAPROLITE 10 u .. ° ----------------------- 2" SCH 40 PVC Riser 15 SM Silty SAND as SAPROLITE, white (10YR 8/1), with quartz, u •' increased resistance with depth 20 PARTIALLY WEATHERED ROCK, light yellowish brown PWR (10YR 6/4), some quartz and biotite meta -granite 25 fragments 30 PARTIALLY WEATHERED ROCK, pinkish gray (5YR PWR 7/1), fragments of meta -granite w/ K-spar, strong, phaneritic, foliated, dry 35 Bentonite Seal PWR PARTIALLY WEATHERED ROCK, dark gray (10YR 6/1), dry CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 2 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-38D PROJECT NO: 1026.107 STARTED: 9/10/19 COMPLETED: 9/19/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986202.641 EASTING: 1979132.272 DRILLING METHOD: Air Rotary G.S. ELEV: 509.88 ft M.P. ELEV: 512.132 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 30.15 ft TOC TOTAL DEPTH: 54.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberley CHECKED BY: K. Lawin 2 w U = Q O DESCRIPTION LU J g > O0 o cn OJ a s p �v m0 C� PWR PARTIALLY WEATHERED ROCK, light yellowish brown f Bentonite Seal (10YR 6/4), few fragments of biotite meta -granite, moist 45 PWR PARTIALLY WEATHERED ROCK, pinkish gray (5YR 7/1), fragments of meta -granite w/ K-spar Ix ' —#2 Sand Pack (46'-54') PWR PARTIALLY WEATHERED ROCK, yellowish brown (10YR 5/4), very small chips of biotite-granite/meta-granite 50 Fine silt as PARTIALLY WEATHERED ROCK, dark PWR greenish gray (5GY 4/1), small chips of mafic, 2" Pre -Packed Well Screen amphibole/pyroxene/chlorite schist, aphanitic, foliated (49'-54') PWR PARTIALLY WEATHERED ROCK, fragments of amphibole/pyroxene/chlorite schist, and granitic/mica-schist, gray (10YR 5/1 55 Boring Terminated at 54' bgs 60 65 70 75 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 2 OF 2 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-39BR PROJECT NO: 1026.107 STARTED: 4/1/19 COMPLETED: 4/4/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986807.19 EASTING: 1981242.65 DRILLING METHOD: Air Hammer G.S. ELEV: 513.84 ft M.P. ELEV: 516.13 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 62.02 ft TOC TOTAL DEPTH: 210.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: B. Spillane 2 U = Q DESCRIPTION LU J > O UoOw cn as p < LUv m06 >' • % OL Topsoil/ organics Locking Cap Clayey SAND with gravel as SAPROLITE, yellowish brown : SC (10YR 5/6), medium grained, moist, non -plastic, ° noncohesive : — — — — — — — — — — — — — — — — — — — — — — — — — Neat Cement Grout 10 u Silty SAND as SAPROLITE, dark yellowish brown (10YR SCH 40 PVC Riser >y2" :. SM 4/9) to very pale brown (10YR 7/3), dry, non -plastic, noncohesive, some weathered rock fragments 15 ' 20 Silty SAND as SAPROLITE, yellowish brown (10YR 5/9) to SM pale brown (10YR 6/3), dry, non -plastic, noncohesive, some weathered rock fragments 25 Silty SAND as PARTIALLY WEATHERED ROCK, light SM gray (10YR 7/2), moist, non -plastic, noncohesive, some 30 weathered rock fragments 6" SCH 40 PVC Surface Casing (0'-55') Granitic GNEISS as PARTIALLY WEATHERED ROCK, RK medium light gray (N5) to white (N9), highly decomposed, 35 relic rock structure on weathered chips, abundant iron staining Silty SAND as SAPROLITE, yellowish brown (10YR 5/9), SM non plastic, noncohesive, wet Alternating residual soil and PWR CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 1 OF 7 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-39BR PROJECT NO: 1026.107 STARTED: 4/1/19 COMPLETED: 4/4/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986807.19 EASTING: 1981242.65 DRILLING METHOD: Air Hammer G.S. ELEV: 513.84 ft M.P. ELEV: 516.13 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 62.02 ft TOC TOTAL DEPTH: 210.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: B. Spillane 2 U = Q DESCRIPTION Lu 0> OO o v cn Ow as p W < 0 0 Silty SAND as SAPROLITE, yellowish brown (10YR 5/9), SM non plastic, noncohesive, wet 45 a Alternating residual soil and PWR (continued) Neat Cement Grout - _ 50 2" SCH 40 PVC Riser Granitic GNEISS, medium light gray (N6) to grayish black RK (N2), with K-feldspar, slightly decomposed, abundant iron " staining ' 6" SCH 40 PVC Surface =' Casing (0'-55') 55_ — — — — — — — — — — — — — — — — — — — — — — — — — - - At 57' to 58' bgs soft zone 60 - ' At 61' to 62' bgs apparent fractures (fractures based on % percussion hammer frequency) dry rock cuttings with iron - - staining 65 RK Granitic GNEISS, light gray (N7) to pale pink (5RP 8/2) " with black (1\11), fresh, dry pulverized rock cuttings At 67' to 68' apparent fractures, dry rock cuttings with iron - " - staining, soft zone 70 %' At 70' to 71' bgs, fresh, competent - At 71' bgs apparent fracture, suspend drilling for 5 minutes dry QUARTZITE, very light gray (N8), brown weathered rock RK cuttings preceding and following apparent vein, dry :.:..: pulverized rock cuttings Granitic GNEISS, very light gray (N8) to pale pink (5RP RK 6/2), fresh to slightly decomposed, with K-feldspar and quartzite, occasional iron staining CLIENT: Duke Energy Progress, LLC. ra 48 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River Greenville, l864 999aro1ina 29601 Phone: 421- PAGE 2 OF 7 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-39BR PROJECT NO: 1026.107 STARTED: 4/1/19 COMPLETED: 4/4/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986807.19 EASTING: 1981242.65 DRILLING METHOD: Air Hammer G.S. ELEV: 513.84 ft M.P. ELEV: 516.13 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 62.02 ft TOC TOTAL DEPTH: 210.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: B. Spillane 2 U = Q DESCRIPTION LU J > OO 0 o v cn Ow as 0 W < 0 0 At 81' apparent fracture with black (N1) mafic rock cuttings ' Granitic GNEISS, very light gray (N8) to pale pink (5RP RK 6/2), fresh to slightly decomposed, with K-feldspar and - - quartzite, occasional iron staining (continued) 85 - —Neat Cement Grout RK Mafic rock cuttings, black (1\11), very soft, dry pulverized rock cuttings 90 ,= ; ' 2" SCH 40 PVC Riser RK Granitic GNEISS, very light gray (N8) to pale pink (5RP 6/2), fresh, with K-feldspar and quartzite 95 RK Mafic rock cuttings, black (1\11), very soft, dry pulverized rock cuttings RK Granitic GNEISS, very light gray (N8) to pale pink (5RP 100 ,= ; ' 6/2), fresh, with K-feldspar and quartzite RK Mafic rock cuttings, black (1\11), very soft, dry pulverized rock cuttings 105 - - At 109' to 111' bgs soft zone 110 _ Granitic GNEISS, very light gray (N8) to pale pink (5RP - _ RK 6/2), fresh, with K-feldspar and biotite, thin banding / foliations observed on rock cuttings 115 - _ CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 3 OF 7 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-39BR PROJECT NO: 1026.107 STARTED: 4/1/19 COMPLETED: 4/4/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986807.19 EASTING: 1981242.65 DRILLING METHOD: Air Hammer G.S. ELEV: 513.84 ft M.P. ELEV: 516.13 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 62.02 ft TOC TOTAL DEPTH: 210.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: B. Spillane 2 U = Q DESCRIPTION LU J > 0 o OO v cn Ow as p W < 0 0 At 120' to 121' bgs soft zone At 124' bgs suspend air for 17 minutes - dry 125 —Neat Cement Grout _ Granitic GNEISS, very light gray (N8) to pale pink (5RP - _ RK 6/2), fresh, with K-feldspar and biotite, thin banding / foliations observed on rock cuttings (continued) 130 2" SCH 40 PVC Riser 135 Mafic rock cuttings, black (1\11), very soft, moist pulverized rock cuttings RK At 138' bgs suspend air for 15 minutes - water yield following restart —0.1 GPM 140 - _ Granitic GNEISS, very light gray (N8) to pale pink (5RP RK 6/2), fresh, with K-feldspar and biotite, thin banding / ' foliations observed on rock cuttings 145 RK Mafic rock cuttings, black (1\11), very soft, dry pulverized rock cuttings 150 Granitic GNEISS, very light gray (N8) to pale pink (5RP RK 6/2), fresh, with K-feldspar and biotite, thin banding / - foliations observed on rock cuttings 155 CLIENT: Duke Energy Progress, LLC. ra 48 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 4 OF 7 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-39BR PROJECT NO: 1026.107 STARTED: 4/1/19 COMPLETED: 4/4/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986807.19 EASTING: 1981242.65 DRILLING METHOD: Air Hammer G.S. ELEV: 513.84 ft M.P. ELEV: 516.13 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 62.02 ft TOC TOTAL DEPTH: 210.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: B. Spillane 2 U = Q DESCRIPTION LU J > OO 0 o v cn Ow as p W < 0 C� 165 —Neat Cement Grout - _ Granitic GNEISS, very light gray (N8) to pale pink (5RP RK 6/2), fresh, with K-feldspar and biotite, thin banding / ' foliations observed on rock cuttings (continued) 170 2" SCH 40 PVC Riser 175 RK Mafic rock cuttings, black (N1), very soft, dry pulverized rock cuttings 180 - _ Granitic GNEISS, very light gray (N8) to pale pink (5RP �— Bentonite Seal = ; ' RK 6/2), fresh, with K-feldspar and biotite, thin banding / 185 - - foliations observed on rock cuttings - - At 185' bgs soft zone 190 RK Mafic rock cuttings, black (N1), very soft, dry pulverized rock cuttings —#2 Sand Filter Pack =- (190'-217') - _ Granitic GNEISS, very light gray (N8) to pale pink (5RP RK 6/2), fresh, with K-feldspar and biotite, thin banding / ' foliations observed on rock cuttings 195 - — ------------------------ c. 2" Pre -Packed Well Screen 95 _ Granitic GNEISS, dark gray (N3) to dark reddish brown - _ RK (1 OR 3/4), slightly decomposed, iron staining on larger rock chips CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 5 OF 7 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-39BR PROJECT NO: 1026.107 STARTED: 4/1/19 COMPLETED: 4/4/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986807.19 EASTING: 1981242.65 DRILLING METHOD: Air Hammer G.S. ELEV: 513.84 ft M.P. ELEV: 516.13 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 62.02 ft TOC TOTAL DEPTH: 210.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: B. Spillane 2 U = Q O U) DESCRIPTION w J > 0 0 vJ u) Ow Q p <�0a C� ' Granitic GNEISS, medium dark gray (N3) to dark greenish = ; ' RK grey (5G 4/1), slightly decomposed, moist pulverized rock - - cuttings, with quartzite At 203' suspend drilling and circulate air -water yield 205 - —0.25 GPM 2" Pre -Packed Well Screen -' (195'-210') RK Mafic rock cuttings, black (1\11), very soft, dry pulverized rock cuttings 210 ; '#2 Sand Filter Pack -' (190'-217') 215 220 Granitic GNEISS, very light pale gray (N8) with pale pink _'- RK (5RP 8/2), fresh, with biotite and K-feldspar, thin banding / ' foliations observed on rock cuttings 225 ' At 225' bgs apparent fracture - no observable increase in - - water yield 230 - _ % At 231' to 233' bgs soft zone, more K-feldspar in cuttings 235 � % I —Bentonite BackfiII at Bottom - of Boring (217'-250') CLIENT: Duke Energy Progress, LLC. Synra 114rip 48 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 6 OF 7 0 c� m Q J H N Q V Q P H N H Z PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-39BR PROJECT NO: 1026.107 STARTED: 4/1/19 COMPLETED: 4/4/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986807.19 EASTING: 1981242.65 DRILLING METHOD: Air Hammer G.S. ELEV: 513.84 ft M.P. ELEV: 516.13 ft BOREHOLE DIAMETER: 6/10 IN DEPTH TO WATER: 62.02 ft TOC TOTAL DEPTH: 210.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: B. Spillane 2 U = Q DESCRIPTION LU J > OO 0 o cn Ow as p W �v 0 C� Granitic GNEISS, very light pale gray (N8) with pale pink 245 _ RK (5RP 8/2), fresh, with biotite and K-feldspar, thin banding Benton ite BackfiII at Bottom foliations observed on rock cuttings (continued) of Boring (217'-250') At 247' bgs soft zone 250 Bottom of boring 250' bgs 255 260 265 270 275 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 7 OF 7 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-39D PROJECT NO: 1026.107 STARTED: 4/2/19 COMPLETED: 4/2/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986807.68 EASTING: 1981236.52 DRILLING METHOD: Air Hammer G.S. ELEV: 513.77 ft M.P. ELEV: 515.89 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 29.70 ft TOC TOTAL DEPTH: 49.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: B. Spillane 2 U = Q O DESCRIPTION LU J > O U o cn Ow as p < v 0 >' • % OL Topsoil/ organics Locking Cap Clayey SAND with gravel as SAPROLITE, yellowish brown : SC (10YR 5/6), medium grained, moist, non-plastic,0, ° noncohesive 5 :.; — — — — — — — — — — — — — — — — — — — — — — — — — 10 u Silty SAND as SAPROLITE, dark yellowish brown (10YR :. SM 4/9) to very pale brown (10YR 7/3), dry, non -plastic, noncohesive, some weathered rock fragments Neat Cement Grout 15 '• 2" SCH 40 PVC Riser 20 Silty SAND as SAPROLITE, yellowish brown (10YR 5/9) to SM pale brown (10YR 6/3), dry, non -plastic, noncohesive, some weathered rock fragments 25 Silty SAND as PARTIALLY WEATHERED ROCK, light SM gray (10YR 7/2), moist, non -plastic, noncohesive, some 30 weathered rock fragments At 31' to 32' bgs soft zone _M<� Bentonite Seal Granitic GNEISS as PARTIALLY WEATHERED ROCK, RK medium light gray (N5) to white (N9), highly decomposed, 35 relic rock structure on weathered chips, abundant iron staining Silty SAND as SAPROLITE, yellowish brown (10YR 5/9), #2 Sand Filter Pack SM non plastic, noncohesive, wet (37'-49') Alternating residual soil and PWR 2" Pre -Packed Well Screen (39'-49') CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenvlle, SouthSynTerra 999aro1ina 29601 Phone:l864 421- PAGE 1 OF 2 PROJECT: Roxboro Steam Electric Plant WELL / BORING NO: MW-39D PROJECT NO: 1026.107 STARTED: 4/2/19 COMPLETED: 4/2/19 DRILLING COMPANY: Geologic Exploration NORTHING: 986807.68 EASTING: 1981236.52 DRILLING METHOD: Air Hammer G.S. ELEV: 513.77 ft M.P. ELEV: 515.89 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 29.70 ft TOC TOTAL DEPTH: 49.0 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: K. Lawing CHECKED BY: B. Spillane 2 w U = Q O DESCRIPTION Lu J g > O0 o cn OJ a s p o �v m0 C� b Silty SAND as SAPROLITE, yellowish brown (10YR 5/9), #2 Sand Filter Pack SM non plastic, noncohesive, wet (37'-49') 45 a Alternating residual soil and PWR (continued) 2" Pre -Packed Well Screen (39'-49') - RK Granitic GNEISS, medium light gray (N6) to grayish black (N2), with K-feldspar, slightly decomposed, abundant iron staining 50 55 60 65 70 75 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC 1ina 29601 erPhone:864 421-99 s)mTraGreenville, 9PAGE 2 OF 2 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRL PROJECT NO: 1026.107 STARTED: 11/27/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993898.24 EASTING: 1983391.19 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 519.7 M.P. ELEV: 522.76 BOREHOLE DIAMETER: 12,8,5.5 IN DEPTH TO WATER: 39.68 ft TOC TOTAL DEPTH: 200 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 6.0 (n) 7.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 10 15 20 25 30 35 40 01.1 50 55 T T : T T silty sand: Silty SAND as SAPROLITE, dense, medium grained, olive brown (2.5Y 4/3), dry, non -plastic, noncohesive ------------------------------' PWR: Silty SAND as PARTIALLY WEATHERED ROCK, dense, medium grained, olive brown (2.5Y 4/3), dry, non -plastic, noncohesive At 10' very dense, olive gray (5Y 4/2) gneiss: Biotite-hornblende GNEISS, medium dark gray (N4) to white (N9), moderately decomposed with abundant Fe staining, dry pulverized rock cuttings At 45' apparent fracture (fractures based on percussion hammer frequency) cuttings remain dry At 50' slightly decmoposed, infrequent Fe staining Cement Grout 8" Surface Casing (0'-30' bgs) 6" Surface Casing (0'-103' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 1 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRL PROJECT NO: 1026.107 STARTED: 11/27/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993898.24 EASTING: 1983391.19 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 519.7 M.P. ELEV: 522.76 BOREHOLE DIAMETER: 12,8,5.5 IN DEPTH TO WATER: 39.68 ft TOC TOTAL DEPTH: 200 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 6.0 (n) 7.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 Biotite GNEISS, medium dark gray (N4) to white 60 (N9), moderately decomposed with abundant Fe Cement Grout staining, dry pulverized rock cuttings 6" Surface 65 ' ' Casing (0'-103' At 66'-68' fractured zone with quartzite, Fe staining bgs) on gneissic fragments, dry pulverized rock cuttings ' ' 70 2" PVC Riser 75 80 85 At 84' apparent fracture, dry pulverized rock cuttings nAAAAA diabase: DIABASE, black (N1), fresh, aphanitic 90 ^n^n^ ' n^n^n^ n^n^n^ n^n^n^ n^n^n^ 95 n^n^n^ n^n^n^ n^n^n^ n^n^n^ n^n^n^ n n n 100 AAAAAA n^n^n^ gneiss: Biotite GNEISS, black (N1) to white (N9), 105 fresh, dry pulverized rock cuttings 110 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 2 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRL PROJECT NO: 1026.107 STARTED: 11/27/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993898.24 EASTING: 1983391.19 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 519.7 M.P. ELEV: 522.76 BOREHOLE DIAMETER: 12,8,5.5 IN DEPTH TO WATER: 39.68 ft TOC TOTAL DEPTH: 200 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 6.0 (n) 7.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 115 120 125 130 135 140 145 150 155 160 165 170 Biotite GNEISS, black (N1) to white (N9), fresh, dry pulverized rock cuttings At 148' apparent fracture with water yield (-0.6 GPM) Cement Grout 2" PVC Riser Bentonite Seal Sand Pack (141'-161') 2" Pre -Pack Well Screen (146-156) 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 3 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-108BRL PROJECT NO: 1026.107 STARTED: 11/27/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993898.24 EASTING: 1983391.19 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 519.7 M.P. ELEV: 522.76 BOREHOLE DIAMETER: 12,8,5.5 IN DEPTH TO WATER: 39.68 ft TOC TOTAL DEPTH: 200 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 6.0 (n) 7.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 175 180 185 190 195 200 205 Bentonite Backfill 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 4 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993878.96 EASTING: 1983378.98 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 520.2 M.P. ELEV: 523.60 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 64.52 ft TOC TOTAL DEPTH: 430 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 10 15 20 25 30 35 40 01.1 50 55 60 T T : T T silty sand: Silty SAND as SAPROLITE, dense, medium grained, olive brown (2.5Y 4/3), dry, non -plastic, noncohesive PWR: Silty SAND as PARTIALLY WEATHERED ROCK, dense, medium grained, olive brown (2.5Y 4/3), dry, non -plastic, noncohesive At 10' very dense, olive gray (5Y 4/2) gneiss: Biotite-hornblende GNEISS, medium dark gray (N4) to white (N9), moderately decomposed with abundant Fe staining, dry pulverized rock cuttings Cement Grout 8" Surface Casing (0'-30' bgs) 6" Surface Casing (0'-230' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 1 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993878.96 EASTING: 1983378.98 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 520.2 M.P. ELEV: 523.60 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 64.52 ft TOC TOTAL DEPTH: 430 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 RR 70 75 80 RR 90 W7 100 105 110 115 120 Cement Grout 6" Surface Casing (0'-230' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 2 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993878.96 EASTING: 1983378.98 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 520.2 M.P. ELEV: 523.60 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 64.52 ft TOC TOTAL DEPTH: 430 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 125 130 135 140 145 150 155 160 165 170 175 180 Cement Grout 6" Surface Casing (0'-230' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 3 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993878.96 EASTING: 1983378.98 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 520.2 M.P. ELEV: 523.60 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 64.52 ft TOC TOTAL DEPTH: 430 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 185 n^^^^ ` —AA ^^^A ^^A^A^ At 188'-189' significant fracture (water yield —5 GPM) 190 nAAAAA A^A^A^ DIABASE, black to greenish black A A A A A A A A A A A A 195 AAAAAA Cement Grout A A A A A A A A A A A A A A A �A�A�A 6"Surface 200 A A A A A A Casing (0'-230' A^A^A^ bgs) A^A^A^ AAAAAA AAAAAA 205 2" PVC Riser gneiss: Biotite-hornblende GNEISS 210 215 220 th 225 At 225' solfteKzonespar 230 granite: Meta -GRANITE, dark greenish gray (5G 4/1), with K-feldspar, fresh, phaneritic, dry pulverized rock cuttings 235 240 gneiss: Granitic GNEISS, grayish black (N2), with K-feldspar, grayish black (N2), fresh, weak foliations observed on larger chips 245 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 4 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993878.96 EASTING: 1983378.98 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 520.2 M.P. ELEV: 523.60 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 64.52 ft TOC TOTAL DEPTH: 430 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 I �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 250 255 260 265 270 275 280 285 290 295 300 305 At 254' apparent fracture, increase in felsic minerals, initial water production (-0.5 GPM) following 6" drill -out Granitic GNEISS, grayish black (N2), with K-feldspar, grayish black (N2), fresh, weak foliations observed on larger chips gneiss: Biotite GNEISS, black (N1) to white (N9), fresh, thin foliations observed on larger chips Cement Grout 2" PVC Riser 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 5 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993878.96 EASTING: 1983378.98 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 520.2 M.P. ELEV: 523.60 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 64.52 ft TOC TOTAL DEPTH: 430 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 310 315 At 314' cuttings appear aphantic Biotite GNEISS, black (N1) to white (N9), with 320 plagioclase minerals, fresh, thin foliations observed on larger chips 325 330 �LXXJ SCHIST: Gneissic -SCHIST, dark greenish gray (5G 335 4/1), K-feldspar and thin foliations observed in larger chips 340 345 350 ------------------------------ SCHIST: SCHIST, very light gray (M8) to pale pink (5RP 3/2), increase in plagioclase and quartz 355 At 357' softer zone, no significant increase in yeild (� 1 GPM) 360 - 365 At 367' some Fe staining observed on chips Cement Grout 2" PVC Riser 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 6 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-1O8BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 993878.96 EASTING: 1983378.98 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 520.2 M.P. ELEV: 523.60 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 64.52 ft TOC TOTAL DEPTH: 430 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: W. Wimberly CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 I �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 370 SCHIST, very light gray (M8) to pale pink (5RP 375 3/2), increase in plagioclase and quartz gneiss: Biotite GNEISS, black (N1) to white (N9), 380 thin foliations observed in larger chips At 381' softer zone, no significant increase in water 385 yield (cumulatively —1 GPM) 390 395 At 397' softer zone, yield increases (cumulatively —3 GPM) 400 405 410 415 420 425 At 425' softer zone, no significant increase in yield (cumulatively —3 GPM) 430 At 430' borehole terminated Bentonite Seal Sand Pack (386'-408') 2" Pre -Pack Well Screen (393-403) Bentonite Backfill 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 7 OF 7 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRL PROJECT NO: 1026.107 STARTED: 11/28/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991841.38 EASTING: 1976472.18 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 476.3 M.P. ELEV: 479.68 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 46.62 ft TOC TOTAL DEPTH: 173 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 10 15 20 25 30 35 40 45 50 T T : T T T T T T T' silty sand: Silty SAND as SAPROLITE, dense, medium to coarse grained, olive yellow (2.5Y 6/6), dry, non -plastic, noncohesive, some quartz fragments PWR: Silty SAND w/ gravel as PARTIALLY WEATHERED ROCK, very dense, medium to coarse grained, light olive brown (2.5Y 5/4), dry, non -plastic, noncohesive ------------------------------ PWR: Silty SAND w/ gravel as PARTIALLY WEATHERED ROCK, very dense, light gray (2.5Y 7/2) to brownish yellow (10YR 6/6), dry, non -plastic, noncohesive, some gneissic rock fragments gneiss: GNEISS, grayish black (N2) to dark yellowish orange (10YR 6/6), moderately decomposed, dry pulverized rock cuttings At 35' weak, decomposed with Fe staining, light gray to brown rock cuttings Cement Grout 8" Surface Casing (0'-35' bgs) 6" Surface Casing (0'-116' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 1 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRL PROJECT NO: 1026.107 STARTED: 11/28/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991841.38 EASTING: 1976472.18 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 476.3 M.P. ELEV: 479.68 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 46.62 ft TOC TOTAL DEPTH: 173 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a O DESCRIPTION > U j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 4. 60 W, 70 75 80 EE 90 W7 100 Cement Grout 6" Surface Casing (0'-116' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 2 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRL PROJECT NO: 1026.107 STARTED: 11/28/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991841.38 EASTING: 1976472.18 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 476.3 M.P. ELEV: 479.68 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 46.62 ft TOC TOTAL DEPTH: 173 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 Granitic GNEISS with mafic minerals, gray, low 7low dust, moist rock cuttings 105 At 103' quartz, K-feldspar, and plagioclase present, dust, moist rock cuttings 110 -Ik-L�-q I _ I i i i i i1 HV,1 �,iN— Cement Grout 6" Surface 115 Casing (0'-116' T bgs) ^"n"x" diabase: Mafic with biotite schist, gray, slightly 120 n^n^n^ aphanitic ; 2" PVC Riser ^^^^^^ n^n^n^ n^n^n^ ^^^^^^ ^n^n^n 125 n^n^n^ n^n^n^ At 123' and 128' some granitic gneiss, thin nAnAnAfoliations on rock chips, dry pulverized rock ^n^n^n cuttings 130 A AAAA ^^^^^ ^n^ n n gneiss: GNEISS, with K-feldspar, schistose texture, 135 fresh - ------------------------------ gneiss: Biotite GNEISS, gray, some mica schist, 140 schistose texture, slightly aphanitic At 143' greenish gray 145 At 147' apparent fracture with no significant increase in water yield Bentonite Seal schist: SCHIST, gray 150 At 151' softer zone 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 3 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRL PROJECT NO: 1026.107 STARTED: 11/28/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991841.38 EASTING: 1976472.18 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 476.3 M.P. ELEV: 479.68 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 46.62 ft TOC TOTAL DEPTH: 173 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 155 160 165 170 175 Bentonite Seal Sand Pack (155'-173') 2" Pre -Pack Well Screen (160'-170') 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 4 OF 4 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991831.53 EASTING: 1976473.82 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 476.95 M.P. ELEV: 480.35 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 47.40 ft TOC TOTAL DEPTH: 261 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 10 15 20 25 30 35 40 45 50 T T : T T T T T T T.' silty sand: Silty SAND as SAPROLITE, dense, medium to coarse grained, olive yellow (2.5Y 6/6), dry, non -plastic, noncohesive, some quartz fragments PWR: Silty SAND w/ gravel as PARTIALLY WEATHERED ROCK, very dense, medium to coarse grained, light olive brown (2.5Y 5/4), dry, non plastic, noncohesive ------------------------------ PWR: Silty SAND w/ gravel as PARTIALLY WEATHERED ROCK, very dense, light gray (2.5Y 7/2) to brownish yellow (10YR 6/6), dry, non -plastic, noncohesive, some gneissic rock fragments gneiss: GNEISS, grayish black (N2) to dark yellowish orange (10YR 6/6), moderately decomposed, dry pulverized rock cuttings At 35' weak, decomposed with Fe staining, light gray to brown rock cuttings Cement Grout 8" Surface Casing (0'-37' bgs) 6" Surface Casing (0'-200' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Greenville, South Carolina 29601 symTerra Phone: 864-421-9999 PAGE 1 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991831.53 EASTING: 1976473.82 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 476.95 M.P. ELEV: 480.35 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 47.40 ft TOC TOTAL DEPTH: 261 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 55 60 W, 70 80 RKI 90 VKI 100 105 Cement Grout 6" Surface Casing (0'-200' bgs) 2" PVC Riser 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 2 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991831.53 EASTING: 1976473.82 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 476.95 M.P. ELEV: 480.35 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 47.40 ft TOC TOTAL DEPTH: 261 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 110 115 120 125 130 135 140 145 150 155 160 Cement Grout 6" Surface Casing (0'-200' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 3 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991831.53 EASTING: 1976473.82 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 476.95 M.P. ELEV: 480.35 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 47.40 ft TOC TOTAL DEPTH: 261 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 165 170 175 180 185 190 195 200 205 210 Biotite SCHIST, with K-feldspar, gray to light gray, aphanitic At 173' some gneissic rock chips At 178' dark, mafic minerals, appears intensely foliated, fresh At 183' gray to light gray, felsic minerals including K-feldspar and plagioclase, thin foliations of rock chips At 188' dark, mafic minerals, ocassional K-feldspar At 198' dark, mafic minerals, ocassional quartz and K-feldspar, thin foliations on rock chips, some Fe staining Cement Grout 6" Surface Casing (0'-200' bgs) 2" PVC Riser Bentonite Seal 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Greenville, South Carolina 29601 symTerra Phone: 864-421-9999 PAGE 4 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLL PROJECT NO: 1026.107 STARTED: 12/14/2018 COMPLETED: 03/05/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991831.53 EASTING: 1976473.82 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 476.95 M.P. ELEV: 480.35 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 47.40 ft TOC TOTAL DEPTH: 261 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 215 'X�'I aiotite c HIST, with K-feldspar, gray to light gray, 220 225 11�lk9l At 224' and 226' apparent fractures (cumulative water yield —0.5 GPM) 230 �h6% At 228.5' apparent fracture (cumulative water yield —8 GPM) concurrent with quartz 235 At (cu234.5' and mul twater war fractures yield —10 GPM) 240 Jj��V4 At 239' and 240' apparent fractures (cumulative water yield —18 GPM) 245 250 At 250' apparent fracture with no significant increase in yield 255 Biotite SCHIST, with K-feldspar, gray to light gray, aphanitic At 259' and 260' apparent fractures (cumulative 260 water yield —25 GPM) 10 At 261' borehole terminated Bentonite Seal Sand Pack (215'-236') 2" Pre -Pack Well Screen (221'-231') Bentonite Backfill 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 5 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991823.39 EASTING: 1976476.03 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 477.85 M.P. ELEV: 480.85 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 50.41 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo 10 15 20 25 30 35 40 01.1 50 T T : T T T T T T silty sand: Silty SAND as SAPROLITE, dense, medium to coarse grained, olive yellow (2.5Y 6/6), dry, non -plastic, noncohesive, some quartz fragments PWR: Silty SAND w/ gravel as PARTIALLY WEATHERED ROCK, very dense, medium to coarse grained, light olive brown (2.5Y 5/4), dry, non -plastic, noncohesive ------------------------------ PWR: Silty SAND w/ gravel as PARTIALLY WEATHERED ROCK, very dense, light gray (2.5Y 7/2) to brownish yellow (10YR 6/6), dry, non -plastic, noncohesive, some gneissic rock fragments gneiss: GNEISS, grayish black (N2) to dark yellowish orange (10YR 6/6), moderately decomposed, dry pulverized rock cuttings At 35' weak, decomposed with Fe staining, light gray to brown rock cuttings Cement Grout 8" Surface Casing (0'-39' bgs) 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 1 OF 9 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991823.39 EASTING: 1976476.03 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 477.85 M.P. ELEV: 480.85 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 50.41 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 55 60 RR 70 75 80 RKI 90 VKI 100 105 Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 2 OF 9 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991823.39 EASTING: 1976476.03 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 477.85 M.P. ELEV: 480.85 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 50.41 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 110 I=Granitic GNEISS with mafic minerals, gray, low dust, moist rock cuttings 115 Arun diabase: Mafic with biotite schist, gray, slightly 120 A^A^A^ aphanitic ^AAAAA A^A^A^ A^A^A^ A^A^A^ ^AAAAA 125 A^A^A^ ^AAAAA At 123' and 128' some granitic gneiss, thin on rock chips, dry pulverized rock nAAAAAfoliations cuttings ^^^^^^ A^A^A^ 130 A^A^A^ A^A^A^ A^A^A^ A^A^A^ gneiss: GNEISS, with K-feldspar, schistose texture, 135 fresh 140 Tugneiss: Biotite GNEISS, gray, some mica schist, , schistose texture, slightly aphanitic At 143' greenish gray 145 At 147' apparent fracture with no significant increase in yield schist: SCHIST, gray 150 At 151' softer zone diabase: Mafic with schist and gneiss, gray 155 160 1%, A light gray, aphanitic schist: Biotite ST, with K feldspar, gray to Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 ynTerra Phone: 864-421-9999 PAGE 3 OF 9 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991823.39 EASTING: 1976476.03 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 477.85 M.P. ELEV: 480.85 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 50.41 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 165 170 175 180 185 190 195 200 205 210 215 Biotite SCHIST, with K-feldspar, gray to light gray, aphanitic At 173' some gneissic rock chips At 178' dark, mafic minerals, appears intensely foliated, fresh At 183' gray to light gray, felsic minerals including K-feldspar and plagioclase, thin foliations of rock chips At 188' dark, mafic minerals, ocassional K-feldspar At 198' dark, mafic minerals, ocassional quartz and K-feldspar, thin foliations on rock chips, some Fe staining Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 symTerra Phone: 864-421-9999 PAGE 4 OF 9 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991823.39 EASTING: 1976476.03 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 477.85 M.P. ELEV: 480.85 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 50.41 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 I �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 Biotite SCHIST, with K-feldspar, gray to light gray, aphanitic 220 225 230 235 240 245 250 255 260 265 270 Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 5 OF 9 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991823.39 EASTING: 1976476.03 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 477.85 M.P. ELEV: 480.85 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 50.41 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 275 280 285 290 295 300 305 310 315 320 Biotite SCHIST, with K-feldspar, gray to light gray, aphanitic At 273' gray, gneissic texture, aphanitic At 288' increase in K-feldspar minerals At 288' with K-feldspar and quartz minerals, fine to medium grained, intermittent Fe staining At 300' with K-feldspar, quartz, and pyrite minerals, fresh, some Fe staining At 303' dark, with mafic minerals and pyrite, some gneissic rock fragments, fresh, aphanatic At 305' apparent fracture, dry (fractures based on percussion hammer frequency) At 316' apparent fracture, dry At 323' gray, some gneissic rock fragments, dry pulverized rock cuttings, fresh Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 6 OF 9 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991823.39 EASTING: 1976476.03 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 477.85 M.P. ELEV: 480.85 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 50.41 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 I �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 325 330 335 340 345 350 355 360 365 370 375 Biotite SCHIST, with K-feldspar, gray to light gray, aphanitic At 325' apparent fracture, dry At 330', 336', and 342' apparent fractures (initial water yield —0.5 GPM) At 350' apparent fracture with no significant increase in water yield At 353' some intermittent Fe staining At 358' gray, with quartz and some gneissic rock fragments, fresh At 365' apparent fracture with no significant increase in water yield At 368' dark, with mafic minerals, some gneissic rock fragments At 373' gray, with quartz and some gneissic rock fragments, fresh Cement Grout 2" PVC Riser 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 7 OF 9 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991823.39 EASTING: 1976476.03 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 477.85 M.P. ELEV: 480.85 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 50.41 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo 380 I���� aiotite c HIST, with K-feldspar, gray to light gray, 385 390 At 393' gray, with mafic minerals and quartz, fresh 395 400 At 399' apparent fracture with increase in water yield (cumulatively —1 GPM) At 403' dark, with mafic minerals, some gneissic 405 rock fragments 410 �L14k7j gneissic 408' brown gray to black, mafic minerals, some rock fragments, fresh � kV4 At 413' apparent fracture with pyrite and increase 415 water yield (cumulatively —2 GPM) gneiss: Biotite GNEISS, gray, schistose texture, 420 fresh, medium grained At 421' apparent fracture with increase in water yield (cumulatively —3 GPM) 425 schist: SCHIST, gray, with gneissic rock fragments, Fe staining 430 Cement Grout Bentonite Seal Sand Pack (395'-420') 2" Pre -Pack Well Screen (400'-415') Bentonite Backfill 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 8 OF 9 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-205BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 991823.39 EASTING: 1976476.03 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 477.85 M.P. ELEV: 480.85 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 50.41 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.0 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 I �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 435 440 22M 450 gneiss: Biotite GNEISS, gray, schistose texture schist: SCHIST, gray, with K-feldspar minerals and gneissic rock fragments At 439' and 446' apparent fractures with no significant increase in water yield (cumulatively —3 GPM) At 448' borehole terminated \\EEN Bentonite Backfill 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 9 OF 9 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRL PROJECT NO: 1026.107 STARTED: 11/29/2018 COMPLETED: 03/06/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990536.20 EASTING: 1976783.24 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.55 M.P. ELEV: 473.76 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.12 ft TOC TOTAL DEPTH: 170 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 7.0 W ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 10 15 20 25 30 35 40 45 50 55 fill: SILT with sand as FILL, loose, brown -dark to 40 � gray, dry, some organics present and weathered :' ' rock fragments 40 o �Q. fill: Clayey SILT as FILL, orange brown to brown, moist, low to medium plasticity, cohesive 40 o Clay and Silt: Clayey SILT as SAPROLITE, loose, olive brown to dull brown, moist, cohesive, low plasticity, some weathered rock fragments ------------------------------ silt: SILT as SAPROLITE, loose, olive gray, moist, some weathered rock fragments, intermittent hammering At 23' gneissic rock chips ------------------ silt: SILT with sand as SAPROLITE, loose, fine to medium grained, brownish gray to light brown, moist silt: SILT as SAPROLITE, loose, olive gray, moist, some weathered rock fragments pwr: Silty SAND as PARTIALLY WEATHERED ROCK, brown to gray, wet gneiss: Biotite GNEISS, olive -gray, with Fe staining, phyllitic Cement Grout 8" Surface Casing (0'-55' bgs) 6" Surface Casing (0'-100' bgs) 2" PVC Riser 41011 SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 1 OF 3 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRL PROJECT NO: 1026.107 STARTED: 11/29/2018 COMPLETED: 03/06/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990536.20 EASTING: 1976783.24 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.55 M.P. ELEV: 473.76 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.12 ft TOC TOTAL DEPTH: 170 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 7.0 W ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own) po LL gpo 60 I®Biotite GNEISS, olive -gray, with Fe staining, phyllitic 65 diabase: Mafic, with minor biotite gneiss, schistose, Cement Grout m� olive -bluish gray, dry pulverized rock cuttings A^A^A '- AAAAA. 6" Surface A A A A A 70 i At 66' apparent fracture (fractures based on f Casing (0'-100' ^AAAA ' percussion hammer frequency) bgs) ^AAAA - ------------------------ - - - - -- ^AAAA diabase: Mafic, some biotite schist fragments, A A -- blue -greenish gray, schistose 75 ^ ^ A^^^^ 2" PVC Riser A A A A A AA diabase: Mafic, minor gneissic zones with quartz, AAAAAA. black, fresh, fine-grained 80 AAAAAA AAAAAA At 79' some plagioclase and quartz minerals, salt A^A^A^ and pepper appearance A A A A A A 85 AAAAAA A^A^A^ A A A A A A A A A A A A AAAAAA A^A^A^ 90 A^A^A^ A A A A A A AAAAAA A^A^A^- A A A A Ak 95 A A A AA AAAA AAAAA AA AAA 100 gneiss: Biotite GNEISS, bluish gray, thin foliations observed, shistose, salt and pepper appearance, medium to coarse grained 105 110 115 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 symTerra Phone: 864-421-9999 PAGE 2 OF 3 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRL PROJECT NO: 1026.107 STARTED: 11/29/2018 COMPLETED: 03/06/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990536.20 EASTING: 1976783.24 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.55 M.P. ELEV: 473.76 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.12 ft TOC TOTAL DEPTH: 170 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 7.0 W ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo gneiss: Biotite GNEISS with thin phyllitic zones and 120 schist, light gray, dry pulverized rock cuttings 125 130 gneiss: Biotite GNEISS with phyllitic zones, some garnets, light gray, thin foliations obserrved, dry 135 140 145 150 155 160 At 160' and 161' apparent fractures with no significant increase in yield At 163' some schist 165 At 170' borehole terminated 170 Cement Grout Bentonite Seal Sand Pack (148'-173') 2" Pre -Pack Well Screen (153-163) 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 symTerra Phone: 864-421-9999 PAGE 3 OF 3 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLL PROJECT NO: 1026.107 STARTED: 12/12/2018 COMPLETED: 03/06/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990527.17 EASTING: 1976786.72 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.55 M.P. ELEV: 473.95 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.26 ft TOC TOTAL DEPTH: 263 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 10 15 20 25 30 35 40 01.1 50 fill: SILT with sand as FILL, loose, brown -dark to 40 � gray, dry, some organics present and weathered :' ' rock fragments 40 o �Q------------------------------ fill: Clayey SILT as FILL, orange brown to brown, .46 Cmoist, low to medium plasticity, cohesive 40 o Clay and Silt: Clayey SILT as SAPROLITE, loose, olive brown to dull brown, moist, cohesive, low plasticity, some weathered rock fragments ------------------------------ silt: SILT as SAPROLITE, loose, olive gray, moist, some weathered rock fragments, intermittent hammering _- At 23' gneissic rock chips ------------------------------ silt: SILT with sand as SAPROLITE, loose, fine to medium grained, brownish gray to light brown, moist ----------------------------- silt: SILT as SAPROLITE, loose, olive gray, moist, some weathered rock fragments pwr: Silty SAND as PARTIALLY WEATHERED ROCK, brown to gray, wet gneiss: Biotite GNEISS, olive -gray, with Fe staining, phyllitic Cement Grout 8" Surface Casing (0'-54' bgs) 6" Surface Casing (0'-200' bgs) 2" PVC Riser 41011 SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 1 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLL PROJECT NO: 1026.107 STARTED: 12/12/2018 COMPLETED: 03/06/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990527.17 EASTING: 1976786.72 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.55 M.P. ELEV: 473.95 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.26 ft TOC TOTAL DEPTH: 263 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo 55 Biotite GNEISS, olive -gray, with Fe staining, phyllitic 60 65 n^n^n^ diabase: Mafic, with minor biotite gneiss, schistose, n^n^n^ olive -bluish gray, dry pulverized rock cuttings n^n^n^ n^n^n n^n^n t 66' apparent fracture (fractures based on n n n 70 nnnnn AAA I percussion hammer frequency) n n n^n^n - diabase: Mafic, some biotite schist fragment-- s--, ^n^n^ blue -greenish gray, schistose ^^^ n^n^n 75 , n^n^n LA n^n^n diabase: Mafic, minor gneissic zones with quartz, AAAAA black, fresh, fine-grained 80 n n n nnnnnn At 79' some plagioclase and quartz minerals, salt ^n^n^n and pepper appearance n^n^n^ n^n^n^ 85 n^n^n^ ^n^n^n n^n^n^ n^n^n^ n^n^n^ n^n^n^ 90 ^^^^^^ n^n^n^ n^n^n^ n^n^n^ n^n^n^ n^n^n^ 95 ^^^^^ n^n^n^` n^n^n^ n^n^n^ n^n^n 100 gneiss: Biotite GNEISS, bluish gray, thin foliations j observed, shistose, salt and pepper appearance, - medium to coarse grained 105 Cement Grout 6" Surface Casing (0'-200' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 symTerra Phone: 864-421-9999 PAGE 2 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLL PROJECT NO: 1026.107 STARTED: 12/12/2018 COMPLETED: 03/06/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990527.17 EASTING: 1976786.72 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.55 M.P. ELEV: 473.95 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.26 ft TOC TOTAL DEPTH: 263 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-1111 110 115 120 125 130 135 140 145 150 155 160 Biotite GNEISS, bluish gray, thin foliations observed, shistose, salt and pepper appearance, medium to coarse grained gneiss: Biotite GNEISS with thin phyllitic zones and schist, light gray, dry pulverized rock cuttings gneiss: Biotite GNEISS with phyllitic zones, some garnets, light gray, thin foliations obserrved, dry At 160' and 161' apparent fractures with no significant increase in yield Cement Grout 6" Surface Casing (0'-200' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 3 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLL PROJECT NO: 1026.107 STARTED: 12/12/2018 COMPLETED: 03/06/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990527.17 EASTING: 1976786.72 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.55 M.P. ELEV: 473.95 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.26 ft TOC TOTAL DEPTH: 263 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo-111111 165 Biotite GNEISS with phyllitic zones, some garnets, light gray, thin foliations obserrved, dry At 163' some schist 170 1 1 i i i i i1 4: Ok— Cement Grout 6" Surface 175�0 Casing (0'-200' ' bgs) 185 190 195 200 205 At 209.5' and 211' apparent fractures with increase in water yield (-8 GPM) ------------------------- - -- - -' 210 gneiss: Biotite GNEISS, some mafic minerals, gray, fresh, dry pulverized rock cuttings Bentonite Seal diabase: Mafic, blueish green, fresh with ocassional 215 Fe staining 41011 SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 4 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLL PROJECT NO: 1026.107 STARTED: 12/12/2018 COMPLETED: 03/06/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990527.17 EASTING: 1976786.72 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.55 M.P. ELEV: 473.95 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.26 ft TOC TOTAL DEPTH: 263 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.5 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 I �_ HPF-Pu�mpin9 0.0 0.5 Own)po LL gpo At 216.5' apparent fracture with increase in water 220 yield (cumulatively —9 GPM) gneiss: Biotite GNEISS, gray 225 j�L� At 220' apparent fracture with increase in water yield (cumulatively —10 GPM) ^^^^^^ diabase: Mafic, dark gray to black, some biotite 230 ^ ^ ^ n^n^nn gneiss, fresh A AnAn At 232' apparent fracture with increase in water ^^^^^/1 yield, some quartz minerals ^^^^^ 235 ^^^^^ ^^^^ All At 236' apparent fracture with increase in water ^^^^^- yield schist: SCHIST, bluish -gray 240 gneiss: Biotite GNEISS, with quartz, phaneritic (cumulative yield —20 GPM) 245 250 �r� At 248' apparent fracture with no significant increase in water yield 255 ]gneiss: Biotite GNEISS, pinkish gray, accessory 260 minerals include pyrite, thin foliations observed on rock chips ]7­1 At 260' apparent fracture with increase in water 265 At (cumulatively —25 GPM) At 263' borehole terminated Bentonite Seal Sand Pack (218'-238') 2" Pre -Pack Well Screen (223-233) Bentonite Backfill 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 3ynTerra Phone: 864-421-9999 PAGE 5 OF 5 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990515.27 EASTING: 1976790.87 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.7 M.P. ELEV: 474.10 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.55 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo 10 15 20 25 30 35 40 01.1 50 55 fill: SILT with sand as FILL, loose, brown -dark to 40 � gray, dry, some organics present and weathered :' ' rock fragments 40 o �Q. fill: Clayey SILT as FILL, orange brown to brown, moist, low to medium plasticity, cohesive 40 o Clay and Silt: Clayey SILT as SAPROLITE, loose, olive brown to dull brown, moist, cohesive, low plasticity, some weathered rock fragments ------------------------------ silt: SILT as SAPROLITE, loose, olive gray, moist, _ -_ some weathered rock fragments, intermittent - hammering - At 23' gneissic rock chips ------------------------------ silt: SILT with sand as SAPROLITE, loose, fine to medium grained, brownish gray to light brown, moist ------------------------------ silt: SILT as SAPROLITE, loose, olive gray, moist, some weathered rock fragments pwr: Silty SAND as PARTIALLY WEATHERED ROCK, brown to gray, wet gneiss: Biotite GNEISS, olive -gray, with Fe staining, phyllitic Cement Grout 8" Surface Casing (0'-59' bgs) 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 1 OF 8 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990515.27 EASTING: 1976790.87 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.7 M.P. ELEV: 474.10 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.55 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo �= Biotite GNEISS, olive -gray, with Fe staining, 60 phyllitic 65 - n ^nn n ^n^n diabase: Mafic, with minor biotite gneiss, schistose, ^n^n^n olive -bluish gray, dry pulverized rock cuttings n^n^n n^n^n A.A. 70 t 66' apparent fracture (fractures based on n^n^n ^A^A^ percussion hammer frequency) n n n -A-- --, n^n^n diabase: Mafic, some biotite schist fragment-- s ^^^^^ blue -greenish gray, schistose n n n n^n^n 75 n^n^n n n AAAAA diabase: Mafic, minor gneissic zones with quartz, n^n^n black, fresh, fine-grained 80 ^^^^^ n^n^n n^n^n At 79' some plagioclase and quartz minerals, salt n^n^n and pepper appearance n^n^n n^n^n^ 85 n^n^n^ n^n^n^ n^n^n^ n^n^n^ n^n^n^ 90 n^n^n^ ^n^n^n n^n^n^ n^n^n^ n^n^n^ n^n^nh 95 ^n^n^A. n^n^n^ n^n^n^ ^^^^^^, n^n^n 100 gneiss: Biotite GNEISS, bluish gray, thin foliations observed, shistose, salt and pepper appearance, medium to coarse grained 105 110 8" Surface Casing (0'-59' bgs) Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41011 SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 symTerra Phone: 864-421-9999 PAGE 2 OF 8 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990515.27 EASTING: 1976790.87 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.7 M.P. ELEV: 474.10 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.55 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 115 120 125 130 135 140 145 150 155 160 Biotite GNEISS, bluish gray, thin foliations observed, shistose, salt and pepper appearance, medium to coarse grained gneiss: Biotite GNEISS with thin phyllitic zones and schist, light gray, dry pulverized rock cuttings gneiss: Biotite GNEISS with phyllitic zones, some garnets, light gray, thin foliations obserrved, dry At 160' and 161' apparent fractures with no significant increase in yield - —�\ At 163' some schist 165 170 Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 3 OF 8 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990515.27 EASTING: 1976790.87 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.7 M.P. ELEV: 474.10 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.55 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 175 180 185 190 195 200 205 210 215 220 225 Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 4 OF 8 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990515.27 EASTING: 1976790.87 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.7 M.P. ELEV: 474.10 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.55 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.0 w ^ _ a O DESCRIPTION > U j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 230 235 240 245 250 255 260 265 270 275 280 285 Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 5 OF 8 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990515.27 EASTING: 1976790.87 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.7 M.P. ELEV: 474.10 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.55 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 290 295 300 305 310 315 320 325 330 335 340 SCHIST, dark gray, with quartz and plagioclase minerals, fresh At 302' apparent fracture, moist rock cuttings schist: SCHIST, gray, some mafic minerals, relatively aphanitic, fresh At 319' and 322' apparent fractures (cumulative yield —0.25 GPM) Cement Grout 6" Surface Casing (0'-300' bgs) 2" PVC Riser 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 6 OF 8 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990515.27 EASTING: 1976790.87 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.7 M.P. ELEV: 474.10 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.55 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 I �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo 345 350 355 360 365 370 375 380 385 390 395 400 SCHIST, gray, some mafic minerals, relatively aphanitic, fresh At 346' and 347' apparent fractures with no significant increase in water yield At 363' apparent fracture with green staining/mineralization on rock cuttings, sligth increase in water yield At 375.5'and 383' apparent fractures with no significant increase in water yield (cumulative 2 GPM) schist: SCHIST, gray, with K-Feldspar minerals, fresh, thin foliations observed on rock chips At 389' and 391' apparent fractures with slight increase in water yield (cumulative 3 GPM) At 396' apparent fracture with no significant increase in water yield Cement Grout Bentonite Seal Sand Pack (367-387) 2" Pre -Pack Well Screen (372'-382') Bentonite Seal 41P SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 7 OF 8 PROJECT: Roxboro Steam Electric Plant WELL/BORING NO: MW-208BRLLL PROJECT NO: 1026.107 STARTED: 12/19/2018 COMPLETED: 03/19/2019 DRILLING COMPANY: Geologic Exploration, Inc. NORTHING: 990515.27 EASTING: 1976790.87 DRILLING METHOD: Air Rotary/Hammer G.S. ELEV: 470.7 M.P. ELEV: 474.10 BOREHOLE DIAMETER: 10,8,5.5 IN DEPTH TO WATER: 16.55 ft TOC TOTAL DEPTH: 448 ft BGS NOTES: Geoprobe 3230 Drill Rig LOGGED BY: G. Khang CHECKED BY: K. Lawing Caliper V 5.5 (n) 6.0 w ^ _ a 0 DESCRIPTION > V H j F WELL CONSTRUCTION 1iPF-Ambient -0_0 0.02 w (9 1 �_ HPF-Pu�mpin9 0.0 0.2 Own)po LL gpo-1111 SCHIST, gray, with K-Feldspar minerals, fresh, thin foliations observed on rock chips 405 410 schist: SCHIST, gray, some garnets 415 ���791 At 415' and 421' apparent fractures with slight 420 increase in water yield (cumulative —3 GPM) 425 430 435 At 435' and 436' apparent fractures with increase in water yield (cumulative —5 GPM) 440 445 jh'k� At 442' and 445' apparent fractures with increase in water yield (cumulative —6 GPM) At 448' borehole terminated 450 Bentonite Seal 41p SynTerra CLIENT: Duke Energy Progress, LLC 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 s)mTerra Phone: 864-421-9999 PAGE 8 OF 8 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use UNLY: 1. Well Contractor Information-. BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable Ire// construction permits (i.e. Coun4,, State, Variance, etc.) 3. Well Use (check well use): ❑Agricultural ❑Municipal/Public ❑Geothermal (Henting/Cooling Supply) ❑Residential Water Supply (single) ❑Inclustrial/Commercial ❑Residential Water Supply (shared) ❑Irrigation Non -Water Supply Well: hJMonitoring ❑Recovery ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Heatiniz/Cooling Return) ❑Other (explain under #21 I 4. Date well(s) Completed: 03/05/19 well ID# ABMW-7BRLL 5r. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (if -applicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if well field, one lat/long is sufficient) 360 28' 48.26" N 790 03' 52.36" NV 6. Is (are) the well(s): ©Permanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or IDNo ff thi.v is it repair, fill oat known bell c•onstruclion inlorniation and explain the mature of the repair under `21 rentarks section or on the hack i fhi.s fimn. 1 la. WATER ZONES FROM TO DESCRIPTION ft. ft. 15. OUTER CASING for multi -cased wells OR LINER ifa licable FROM TO DIAMETER THICKNESS III ER1AL 0.0 ft• 97 0 ft' 1 8.0 in SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM I TO I DIAMETER I THICKNESS MATERIAL 0.0 ft. 370.0 fr, 1 2.0 in SCH 40 1 PVC 0.0 ft. 330.0 ft' 6.0 in' I SCH 80 PVC 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 370.0fr' 385.0 ft' 2.0 in. .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft' 349.0 ft' PORTLA DBENTONITE SLURRY 0.0 ft. 330.0 ft. RDRR OBENTONITE SLURRY 0.0 ft' 97.0 ft' PORT4WDBENTONITE SLURRY 19. SAND/GRAVEL PACK(if applicable) FROM TO MATERIAL EMPLACEM ENT METHOD 364.0 ft• 391.0 ft• 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soil(mck type, rain sin, etc.) 0.0 rr. 79.0 rr. ASH 79.0 ft• 85.0 ft• TAN SILTY SAND 85.0 tr. 94.0 rr. PWR 94.0 ft• 401.0 ft. ROCK ft. ft. fr. ft. ff. ft. 21. REMARKS BENTONITE SEAL FROM 349.0 TO 364.0 FT & 391.0 TO 401.0 FT ***U-PACK SCREEN*** 22. Certification: Signature of Certified Well Contractor 03/26/19 Date Hy signing dii.s.1brm, I herehv cerlijy that the Ire//(v) was (were) conviraeled in accordance with 15A NCAC 01C .0100 or 15A NC'AC (RC .0200 Well C'onrmuc•tion Smndards and that a copy af7his record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: construction details. You may also attach additional pages if necessary. For nuthiple injection or non-trater supply bells ONI. i' u•idt die .same construction. oft can submit one fimnt. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 385.0 (fL) For inaiople wells list all depths ifdillcrent (example- 3 a hill' and 1 n 101 10. Static water level below top of casing: 21.0 (fL) ll'u•atcr lerel is ahore coving, icse "! .. 11. Borehole diameter: 16.0/6.0/7.875/10.0 (in.) AUGER/AIR 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For lniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: construction to the following: (i.e. ringer, rotary, cable, direct push, etc.) Division of Hater Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Witter Supply & lniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form CiW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jar. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells 1. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable bell construction pernios (i.e. Coung5 State, Variance, eta) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irrl ation Non -Water Supply Well: (DMunitoring ❑Recovery Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Heating/CoolingReturn) ❑Other (explain under #21 Remarks) 4. Date Well(s) Completed: 01/10/19 well ID# HWMW-1 BR Sa. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (if applicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (il'well field, one fat/long is sufficient) 360 28' 55.63" N 790 03' 27.98" NY 6. Is (are) the wcll(s): Permanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or ONo l/'diis is a repair, Jill out known hell constriction ii Jbrnation and explain the nature of die repair under ii2/ remarks section or on the back of dii.s Jiirnt. 8. Number of wells constructed: 1 hor inulliple injection or non -hater supply ive/ls ONLY with die same construction, You can submit one firm. 9. Total well depth below land surface: 101.0 (ft ) hor nuthiple ire//.r list all depths /l d fluent (eraniple- 3 tt 200' and 2 a 100') 10. Static water level below top of casing: 11.0 (ft) if water level is above casing, use "- I I. Borehole diameter: 6.0/7.875/10.0 (in.) For Internal Use ONLI': 14. WATER ZONES FROM TO DESCRIPTION I.S. OUTER CASING for multi -cased wells) OR LINER if r licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 ff• 49.0 ff• 6.0 i" SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 fL 91.0 fL 2.0 in. SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 91.0 ft' 101.0 ff• 2.0 in. .010 SCH 40 PVC* ft. ff. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT 0.0 ft' 64.0 It' MRTL DBENTONITE SLURRY 0.0 ft. 49.0 ft- PORTU DDENTONITE SLURRY ft. fr. 19. SAND/GRAVEL PACK if applicable FROM TO MATERIAL I EMPLACEMENT METHOD 88.0 ff• 102.0 ff. 20-40 FINE SILICA SAND 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soil/rock type, grain siu, etc.) 0.0 ft. 1.0 ft. GRAVEL 1.0 ff• 17.0 ff• RED SILTY SAND 17.0 ff• 40.0 ff• TAN SILTY SAND 40.0 rt. 45.0 rt• P W R 45.0 ff• 102.0 ff• ROCK ft. ft. rf. rr. 21. REMARKS BENTONITE SEAL FROM 64.0 TO 88.0 FEET ***U-PACK SCREEN- 22. Certification: Signature of Certified Well Contractor By signing this Jima, I herehv certJi, that the ire//(s) was(irere) constructed in accordance frith 15A NCAC 02C.0100 or 15A AfCAC 02C .0200 Well Conriruction Standards and that a copy aJ'llii.s record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e anger, rotary, cable, direct push, etc ) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. field (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form G W-I North Carolina Department of Envoo nient and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This lurm can be used for single or multiple wells For Internal Use UNLY I. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List till applicahle well construction permits (i.e. County, Slate, Variance, etc.) 3. Well Use (check well use): ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/COmmerc ial ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) Non -Water Supply Well: O Monitoring ❑ Recovery Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (lieating/Cooling Return) ❑Other (explain under 921 Remarks) 4. Date well(s) Completed: 03/05/19 Well ID# MW-1 BRL 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ]DO (if applicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No (PIN) Sb. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (il"well field, one tat/long is sufficient) 360 28' 55.63" N 790 03' 27.98" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or ElNo //'this is it repair, fill out known well construction itybri ation and explain lire nature r f the repair under fill remarks sec lion or on the hack r f this fnrnn. 8. Number of wells constructed: 1 hor athiple injection or non-uwt•rsupply iru:/Ls ONLY iNih the .sane construction, you can submit oue.fonu. 9. Total well depth below land surface: 216.0 (ft.) har multiple ire/ls list all depths ij'd///ereni (exantple- 3 n 2W' and 1 tt 1001 10. Static water level below top of casing: 56.0 ll'vaier level is above caving, use " � " 11. Borehole diameter: 6.0/7.875/10.0 (in.) 12. Well construction method: _ (i.e. auger, rotary, cable, direct push, etc ) 14. WATER ZONES FROM TO DESCRIPTION ft. ft. rt. ft. 15. OUTER CASING for multi-cused wells OR LINER if u licable) FROM TO DIAMETER Tf11CKNESS MATERIAL 0.0 fr• 50.0 ft' 8.0 i" SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loin FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft. 201.0 ft. 2.0 in. SCH 40 PVC 0.0 ft. 110.0 ft. 6.0 in. SCH 40 PVC 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 201.0ft• 216.0 ft' 2.0 in. .010 SCH 40 PVC' ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft' 181.0 ft" PORTL DBENTONITE SLURRY 0.0 ft. 110.0 ft- PORTVNOBENTONITE SLURRY 0.0 ft' 50.0 ft' MRTA DBENTONITE SLURRY 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL Eh1PLACEMENTMETHOD 195.0 ft' 220.0 ft' 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM 7'D DESCRIPTION color, hardness, suittruck type, rain size, etc.) 0.0 ft. 1.0 ft. GRAVEL 1.0 ft. 18.0 ft. RED SILTY SAND 18.0 ft- 34.0 ft. TAN SILTY SAND 34.0 ft. 45.0 ft' PWR 45.0 ft. 220.0 ft. ROCK ft. ft. ft. ft. 21. REMARKS BENTONITE SEAL FROM 181.0 TO 195.0 FEET "'U-PACK SCREEN"' 22. Certification: Signature of Certified Well Contractor 03/26/19 Date By signing this frnrnt, l herehy cerli/y that the we//(sJ it -as (here) constructed in accordance with 15.4 NCAC 01C .0100 or 15.4 NC'AC 02C .1200 Well Construction Standards and that u copy ofthi.s record has been provided is lire ire// owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Nluil Service Center, Raleigh, NC 27699-1636 13a. field (gpm) Method of test: 24c. For Water Sunoly & Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the count)' health department of the county where constructed. AIR Form Ci W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan 2013 WELL CONSTRUCTION RECORD This loan can he used for single or multiple wells For Internal Use ONLY I. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List rill applicable Well construction permits (i.e. County, State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial ❑Irrigation Nun -Water Supply 1Vell: MMonitoring Injection Well: ❑Aquifer Recharge ❑Aquiter Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling Return) 4. Date Well(s) Completed: ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 1 03/19/19 WellID# MW-108BRL Sa. 1Vell Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapphcable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (d'well field, one lat+long is sufficient) 360 28' 50.17" N 790 03' 23.58" NV 6. Is (are) the well(s): CaPermanent or ❑Temporary 7. Is this a repair to an existing well: 01'es or ElNo // thus is a repair. fill out known well con.riruc•Iion i tbrntation and erplain the nature u f'the repair tinder - 2I remarks vecnon or on the hack (J'Ihi.s fi)rnt. 8. Number of wells constructed: 1 h•or nntlnple injection or non-u ater supply irc/ls ONLY iNih the same construction, you can vubmrtoneform 9. Total well depth below land surface: 156.0 I -'or multiple a cl/_v livi all depths f d!flerew (example- 9 a 200' and 2 a 100') 10. Static waiter level below top of casing: 35.0 //barer level is above casing, use " • '• 11. Borehole diameter: 6.0/7.875/10.0 (in.) 14. WATER ZONES FROM TO I DESCRIPTION ft. ft. rt. rr. 15. OUTER CASING for multi -cased wells OR LINER if a liS.ble) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 30.0 ft• 10.0 i" SCH 40 PVC 16. INNER CASING OR TUBING eothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft' 146.0 ft- 2.0 in. SCH 40 PVC 0.0 ft' 103.0 ft' 6.0 in. SCH 40 PVC 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL 146.0ft- 156.0 f' 2.0 in. .010 SCH 40 PVC' ft. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENTMETHOD&AMOUNT 0.0 ft' 126.0 ft' PORTL DBENTONITE SLURRY 0.0 ft. 103.0 ft- PORTIANOBENT"NITE SLURRY 0.0 ft- 30.0 ft' POFMANDBENTONITE SLURRY 19. SAND/GRAVEL PAC T+ if a licable FROM TO MATERIAL EMPLACEMENT METHOD 141.0 ft• 161.0 ft- 20-40 FINE SILICA SAND rr. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION (color, hardness, soil/mck type, Cmin sin, etc.) 0.0 ft. 1.0 fr. GRAVEL 1.0 fr- 17.0 ft' RED SILTY SAND 17.0 ft. 40.0 fr• TAN SILTY SAND 40.0 ft' 45.0 ft' PWR 45.0 ft. 200.0 fr- ROCK ft. ft. e. rr. 21. REMARKS BENTONITE SEAL FROM 126.0 TO 141.0 FT 8, 161.0 TO 200.0 FT "'U-PACK SCREEN"' 22. Certification: Signature ofCenifted Well Contractor 03/26/19 Date By signing Ibis form, I hereby c•ertlfj, that the well(.I) u•a.s (were) coustruc•ted in accordance with 15A NCAC 02C.0100 or 15.4 NC'AC 02C .0200 Well Construction Standards and that a copy of ihi.v record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft.) Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc) Division of Water Quality, Underground Injection Control 1'rogranl, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a, field (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount completion of well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jaw. 2013 WELL CONSTRUCTION RECORD This loan can be used fbr single or multiple wells For Internal Use ONLY 1. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: Litt till applicable well construction permits (i.e. County, State, Variance, etc.) 3. Well Use (check well use): ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commerc ial ❑Irrigation Non -Water Supply Well: ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (1-leating/Cooling 4. Date Well(s) Completed: ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 1 03/19/19 WcIIID# MW-108BRLL 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON Counts Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field, one lit/long is sufficient) 360 28' 50.17" N 790 03' 23.58" W 14. WATER ZONES FROM TO DESCRIPTION ft. ft. 15. OUTER CASING for multi -creed wells OR LINER if r licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 30.0 ft 8.0 i" SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft' 393.0 ft. 2.0 in. SCH 40 PVC 0.0 ft. 230.0 ft' 6.0 in. SCH 80 PVC 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 393.0ft- 403.0 ft' 2.0 "' .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD &AMOUNT 0.0 ft' 371.0 ft' PORTLME)BENTONITE SLURRY 0.0 ft- 230.0 ft- PORT DBENTONITE SLURRY 0.0 ft' 30.0 ft' PORTUNBBENTMITE SLURRY 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 386.0 ft. 408.0 ft' 20-40 FINE SILICA SAND rt. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soil/mck type, rain sim, etc. 0.0 ft. 1.0 ft. GRAVEL 1.0 ft' 17.0 ft' RED SILTY SAND 17.0 ft' 40.0 ft. TAN SILTY SAND 40.0 ft. 45.0 ft' PWR 45.0 ft. 430.0 ft• ROCK ft. ft. H. D. 21. REDIARKS BENTONITE SEAL FROM 371.0 TO 386.0 FT & 408.0 TO 430.0 FT ***U-PACK SCREEN*** 22. Certification: !:2/ sn:7- Signature of Certified Well Contractor 03/26/19 Date 6. Is (are) the well(s): ©Permanent or ❑Tempurary �. (� HJ � signing this �• ornr, l herehv c•ern v that the u•ell.r was here ronrtructed in ac•c•tirdanee frith 15A NCAC 02C .0100 or 15A NC'AC02C .0100 Well Construction Standards and that a 7. Is this a repair to an existing well: ❑Yes or IZ)No copy of this record has been prorided to the well owner. 117hi.r is a relxrir, fill out known well construction hybrnration andexplain the nantre ofthe r•eftair under ii21 renrar/a section or on the back r fthis firm. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. hor multiple Injection or non-u•aer supply rre//s• ONLY with the same construction, _ton con subnn/t one fimn. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 403.0 (ft ) For auhiple we//.r list all depdov /fdl[Jerent (exannple- 3 1100' and 2 a /till') 10. Static water level below top of casing: 64.0 g'irater /ere/ is ahore casing, use - t " 11. Borehole diameter: 6.0/7.875/10.0 (in.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24.1 above, also submit a copy of this form within 30 days of completion oi' well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: amount completion of well construction to the county health department of the county where constructed. Form GW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY. I. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable irel/ construction permits (i.e. County, State, Variance, etc.) 3. Well Use (check well use): ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irrl atlon Nun -Water Supply Well: OMonitorinf; ❑Recovery ❑Aquiter Recharge ❑Aquiter Storage and Recovery ❑Aquiter Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under 921 1 4. Date Well(s) Completed: 03/05/19 Well ID# MW-205BRL 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (dapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 14. WATER ZONES FROM TO DESCRIPTION ft. ft. rt. rt. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 rt 35.0 ft' 8.0 i"• SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER I THICKNESS MATERIAL 0.0 rt 160.0 ft 2.0 "' I SCH 40 PVC 0.0 fr 116.0 fr 6.0 in. SCH 40 PVC 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 160.0"' 170.0 "' 2.0 in. .010 SCH 40 PVC` ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT 0.0 ft' 140.0 ft' PORT 0BENTONITE SLURRY 0.0 ft. 116.0 ft. PORT DBENTONITE SLURRY 0.0 ft' 35.0 ft' voaneaDBENTaMTE SLURRY 19. SAND/GRAVEL PACK if appliciable FROM I TO I MATERIAL I EMPLACEMENTMETHOD 155.0 ft 173.0 fr 20-40 FINE SILICA SAND fr. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soii1mck type, grain sin, etc. 0.0 ft 1.0 ft GRAVEL 1.0 rt. 7.0 rt. RED SILTY SAND 7.0 ft 18.0 ft TAN SILTY SAND 18.0 ft• 31.0 ft' PWR 31.0 ft 173.0 ft' ROCK ft. ft. e. e. 21. REMARKS BENTONITE SEAL FROM 140.0 TO 155.0 FEET ***U-PACK SCREEN*** 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22. Certification: (ifwell field, one lat/long is sufficient) �!'� C4h }1^�i�-- 360 28' 30.13" N 790 04' 47.84" 11, � 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: 01'es or ZINo lfthiv is a repair. fill ow known re// construction oifiumanon and explain the nature ofihe repair under all remarks section or on the back rJ'ihi.s fbrm. 8. Number of wells constructed: 1 bur multiple injeclion or non-iraier.sopply wells ONLY with the saute construction, you can submit one. fbrm. 9. Total well depth below land surface: 170.0 (ft.) har multiple cells list all depths ifd/(Jerent (erantplD- 3 u 200' and 3(ci,100) 10. Static water level below top of casing: 49.0 (ft.) l/\rarer level is above caving, use " 11. Borehole diameter: 6.0/7.875/10.0 (in.) Signature of Certified Well Contractor 03/26/19 Date By signing this./ban, l hereby cenifi, that the uell(r) wav (were) constructed in accordance with 15A NCAC 02C.0/00 or 15A NC'AC 02C .0200 Well C'anstrucvion Standards and that a copy o/7his record has been provided to the hell owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For lniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the fallowing: (i a auger, rotary, cable, direct push, etc.) Division ofWater Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 On. field (gpm) Method of test: 24c. For Waiter Supply & lniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form G W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jam 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells 1. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Cenitication Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable ire/1 c•onstruc•tion perimis (i.e. County. State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irri ation Non -Water Supply Well: loMonitorine ❑Recovery ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 1 4. Date Well(s) Completed: 03/05/19 well ID# MW-205BRLL 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (tfapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) For Internal Use ONLY 14. WATER ZONES FROM TO I DESCRIPTION rt. rt. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if applicable) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 1 37.0 ft- 1 8.0 in SCH 40 PVC 16. INNER CASING OR TUBING eothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft' 221.0 ft• 2.0 in. SCH 40 PVC 0.0 fL 200.0 ft• 6.0 in. SCH 80 PVC 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 221.Oft' 231.0 ft' 2.0 in. .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD& AMOUNT 0.0 ft' 205.0 ft' v RT 13SENTONITE SLURRY 0.0 ft- 200.0 ft- PORK DBENTONITE SLURRY 0.0 ft' 37.0 ft• MftrL [)DENTONITE SLURRY 19. SAND/GRAVEL PACK if applicable) FROM I TO I MATERIAL EMPLACEMENT METHOD 215.0 ft• 236.0 ft- 1 20-40 FINE SILICA SAND ft. I ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION (color, hardness, suilfrock type, gmin sirs, etc. 0.0 ft. 1.0 ft. GRAVEL 1.0 ft. 7.0 ft' RED SILTY SAND 7.0 ft' 18.0 ft' TAN S I LTY SAND 18.0 ft' 31.0 ft' PWR 31.0 ft- 261.0 ft. ROCK ft. ft. ft. I ft. 21. REMARKS BENTONITE SEAL FROM 205.0 TO 215.0 FT & 236.0 TO 261.0 FT `"'U-PACK SCREEN"" 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22. Certification: (il'well field, one hat/long is sufficient) �"� (L� ^�7�- (J1 36' 28' 30.13" N 790 04' 47.84" W �� 6. Is (are) the well(s): (OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or EINo Ij'ihi.v is a repair. Jill out known ire// construction i» lbrnmtion andexplain the nature oj'ihe relwir under r 2/ renmrkv section or on the hack olthi.v Jbrun. 8. Number of wells constructed: 1 For multiple injection or non -hater supply ire//.v ONLY frith the s'arne construction, You can suhmlt one.1i rnh. 9. Total well depth below land surface: 231.0 For mtilliple ire/h list all depth.v ifdilferenl (example- 3 rr 200' and 2 cc 100') 10. Static water level below top of curing: 49.0 ll'u•ater level is above casing, use •' . " 11. Borehole diameter: 6.0/7.875/10.0 (in.) Signature of Certified Well Contractor 03/26/19 Dale Rr.Tuning this./grin, l hereby certify that the wel(s) was (mere) c•anstruc•ted in acc•arrlouce with 15A NCAC 02C .0100 or 15A NCAC 02C . r1200 Well Cnnstruc•tiohr .57unrlardv and that o copy ofthis record has been prorided to the Krell owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft.) Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the billowing: (i.e. auger, rotary, cable, direct push, etc.) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 dlail Service Center, Raleigh, NC 27699-1636 13a. field (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above. also submit one copy of this form within 30 days of 13b. Disinfection type: Amount completion of well construction to the county health department of the county where constructed. Form G W-I North Carolina Deparinient of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be Used for single or multiple wells For Internal Use ONLY I. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well con.slrticlion permits (i.e. County, State, Variance, etc.) 3. Well Use (check well use): ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑lrri ation Non -Water Supply Well: OMonituring ❑Recovery ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling OGroundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under 921 I 4. Date 11'ell(s) Completed: 03/19/19 Well ID# MW-205BRLLL 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (iftytplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Paicel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field, one fat/long is suflicient) 360 28' 30.13" N 790 04' 47.84" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing is -ell: 01'es or EINo lt'ihis is a repair, Jill out known well construction ittfilrinalion and explain the naitire a/'the repair under N,2I retuarkv seviton or on the hack c f this Jimnt. 8. Number of wells constructed: 1 bar nnihiple injection or noir-water stipply yells ONLY will; the scone construction, you can submit one./brit. 9. Total well depth below land surface: 415.0 (ft.) For multiple wells list all depths ifdiJJirem (example- 3 a 200' and 2 a 1001 10. Static water level below top of casing: 49.0 //lrater level is above casing. use "* - 11. Borehole diameter: 6.0/7.875/10.0 (in.) 14. WATER ZONES FROM TO DESCRIPTION ft. ft. rr. fr. 1.5. OUTER CASING for multi -cased wells OR LINER if a livable FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 39.0 ft 8.0 i" SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM I TO DIAMETER THICKNESS MATERIAL 0.0 fL 400.0 ft. 2.0 i"' SCH 40 PVC 0.0 ft• 300.0 ft• 6.0 in. SCH 80 PVC 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 400.0ft' 415.0 ft' 2.0 "' .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT P]ETROD&ADIOUNI- 0.0 ft' 380.0 ft' PORTI OBENTONITE SLURRY 0.0 ft. 300.0 fl. MRTLMOBENTONITE SLURRY 0.0 ft' 39.0 ft' MRu DBENTONITE SLURRY 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENTIIIETHOD 395.0 ft' 420.0 ft. 20-40 FINE SILICA SAND rt. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soil/mck type, gritin sins, etc. 0.0 ft. 1.0 ft. GRAVEL 1.0 1- 7.0 ft• RED SILTY SAND 7.0 ft' 18.0 ft• TAN SILTY SAND 18.0 Ir. 31.0 rr. P W R 31.0 ft• 448.0 ft• ROCK ft. ft. 21. REMARKS BENTONITE SEAL FROM 380.0 TO 395.0 FT & 420.0 TO 448.0 FT ***U-PACK SCREEN*** 22. Certification: ' -act`'` 0, 03/26/19 Signature ofCertifted Well Contractor Hy signing this,16mr, l hereby ceriijj, that the irell(s) was (here) constructed in uccorclance with ISA NCAC 02C .11I00 or 15A NCAC 02C .0200 Well Construction Standards and that it copy oJUtis record has been provided to the well ow/ler. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Iniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc.) Division of 11'ater Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. field (gpm) N9ethod of test: 24c, For Water Supply & Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form GW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jam 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY: I. Well Contractor Information: BRIAN THOMAS Well Conlractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable bell c•onstnic•tion permits (i.e. Coungl, State, Variance. etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial ❑ Irrigation Non -Water Supply Well: OMonitoring Injection Well: ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling Return) ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) ❑Recovery ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under 421 I 4. Date Well(s) Completed: 03/06/19 Well 1D# MW-208BRL 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (if applicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 14. WATER ZONES FROM TO I DESCRIPTION fr. rt. 15. OUTER CASING for multi -cased wells OR LINER if a licable) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 55.0 ft' 1 8.0 i" SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 153.0 ft• 2.0 in. SCH 40 PVC 0.0 ft• 100.0 ft. 6.0 in. SCH 40 PVC 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 153.Oft• 163.0 ft' 2.0 "' .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD g AMOUNT 0,0 ft' 133.0 ft' PORTL DBENTONITE SLURRY 0.0 ft. 100.0 ft- PORTLP DBENTONITE SLURRY 0.0 ft' 55.0 ft' PORTU DBENTONITE SLURRY 19. SAND/GRAVEL PACK if a licable FROM TO MATERIAL EMPLACEMENTItIETHOD 148.0 ft' 170.0 ft' 20-40 FINE SILICA SAND (r. e. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION (color, hardness, soil/rock type, grain sim etc.) 0.0 ft. 1.0 (t• GRAVEL 1.0 ft. 10.0 ft. RED SILTY SAND 10.0 ft' 24.0 ft' TAN SILTY SAND 24.0 ft' 50.0 (t' PWR 50.0 ft• 170.0 ft' ROCK ft. ft. ft. I ft. 21. REMARKS BENTONITE SEAL FROM 133.0 TO 148.0 FEET ***U-PACK SCREEN*** 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22• Certification: (il'well field, one IatMong is sufficient) (4i.. ^�-- 360 28' 31.33" N 790 04' 42.34" W �h 6. Is (are) the well(s): [OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or E]No Il'tluv rs a repair, ill out known well c•onviruction htibrmation and evplam the nature c f the relwhr under • 21 remarks section or on the back s flhi.s Jonn. 8. Number of wells constructed: 1 Nor nnttlhple ulec•tion or non-irater.iupph, hells ONLY with vubrnit one fiirnn. Signature o f Cert i fted Well Contractor 03/26/19 Date By signing this fin, I hereby c•erti& that the iiell(s) was (were) constructed at accordance with l5A NC•AC 02C .I1100 or I5A NCAC 02C .0200 Well Conctruc•tion Standards and that it copy c f this record has been provided to the hell owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details You may also attach additional pages if necessary. same construction, you care SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 163.0 (fL) I•irr nnillnple it ells list all depths f dijjeran (e.caniple- 3@2I111' and 2 t l all') 10. Static water level below top of casing: 14.0 (ft ) li hater level is above casing, use "{ " 11. Borehole diameter: 6.0/7.875/10.0 (in.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For lniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc.) Division ofWater Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & lniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form G W-I North Carolina Department of Ens ironment and Natural Resources - Division of Water Quality Revised Jan 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY: 1. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Namc 2. Well Construction Permit #: List all applicable irell construction permits (i.e. County. State, Variance, etc) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irrl ation Nun -Water Supply Well: OMonitorine ❑Recovery ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (FleatinPWoolina ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under 421 1 4. Date Well(s) Completed: 03/06/19 well ID# MW-208BRLL 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) Sb. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (it'well field, one lat/long is sutlicient) 360 28' 31.33" N 790 04' 42.34" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑l'es or ONo if this is a repair,,/ill out knower ire// construction ihVimitalion and erplain the nature q/7he repair under d:2/ remarks section or on the back c flhi.r.fornl. 8. Number of wells constructed: 1 I•ihr inrttiple igieclion or non -water supp/t' wells ONL I' with the same construction, you can suhinit one frtrm. 9. Total well depth below land surface: 233.0 I•iir anthiple ire//r list all depths tfd!/lereni (example- 3 a 200' and 2 a 100') 10. Static water level below top of casing: 14.0 //looter level is above caring, u.re " u " 11. Borehole diameter: 6.0/7.875/10.0 (in.) 14. WATER ZONES FROM TO DESCRIPTION fr. ft. rr. rt. 15. OUTER CASING for Itwells OR LINER ifr licrble FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 54.0 ft. 1 8.0 i" SCH 40 PVC 16. INNER CASING OR TUBING eothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft' 223.0 ft. 2.0 in. SCH 40 PVC 0.0 ft' 200.0 ft' 6.0 in' SCH 80 PVC 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 223.Oft• 233.0 ft. 2.0 "' .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM I To MATERIAL EMPLACEMENTMETHOD&AMOUNr 0.0 ft' 203.0 fr. PORn DBENTONITE SLURRY 0.0 ft. 200.0 ft. PORTVNDBENTONITE SLURRY 0.0 ft' 54.0 ft' PORnANDBENTONITE SLURRY 19. SAND/GRAVEL PACE if applicable) FROM TO MATERIAL EMPLACEMENTMETHOD 218.0 ft' 238.0 fL 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soillrock type, gmin sin, etc. 0.0 fr. 1.0 ft. GRAVEL 1.0 ft. 10.0 ft. RED SILTY SAND 10.0 ft' 24.0 ft. TAN SILTY SAND 24.0 ft' 50.0 ft' PWR 50.0 ft. 263.0 ft' ROCK ft. ft. rt. ft. 21. REMARKS BENTONITE SEAL FROM 203.0 TO 218.0 FT & 238.0 TO 263.0 FT ***U-PACK SCREEN'** 22. Certification: 03/26/19 Signature of Certified Well Contractor Hy signing this Jinn, I hereby certify that the tru/lO was (were) cointrucied in accordance with 15A NCAC 02C .0100 or 15A NCAC02C .0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft.) Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e auger, rotary, cable, direct push, etc) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. field (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(esI above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Fmm G W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells I. Well Contractor Information: BRIAN THOMAS Well Contractor Name A-2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable urll construction permits (i.e. CounrY, Sate. Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑lrri ation Non -Water Supply Well: Monitoring ❑Recovery ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling Return ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 1 4. Date Well(s) Completed: 03/19/19 Well ID# MW-208BRLLL Sa. Well Location:. ROXBORO STEAM PLANT Facility/Owner Name Facility IDff (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON Countv Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if\well field, one lat/long is sufficient) 360 28' 31.33" N 790 04' 42.34" N,, 6. Is (are) the well(s): [OPermanent or ❑Temporary 7. Is this it repair to an existing well: ❑Yes or IZJNo ffifus is a repair. fill out known well con.siruclion iglbrination and explain the nature r f7he repair ander °21 remarks seclion or on the back (V'this fornr. 8. Number of wells constructed: 1 For muhiple injection or non -water supply wells ONL P with the same construction. You can submit one /ornr. 9. Total well depth below land surface: 382.0 har multiple wells list all depths ifdilferent (exantple- 3@200' and 2 a 100') 10. Static water level below top of casing: 13.0 l/Enter level is above casing, use "+" 11. Borehole diameter: 6.0/7.875/10.0 (in.) 12. Well construction method: _ (I a auger, rotary, cable, direct push, etc ) For Internal Use ONLY. 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER ifr licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 59.0 ft• 1 8.0 in SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 fr' 372.0 ft. 2.0 in. SCH 40 PVC 0.0 fr• 300.0 fL 6.0 in. SCH 80 PVC 17. SCREEN FROM I TO I DIAMETER I SLOTSIZE THICKNESS MATERIAL 372.0ft' 1382.0 ft• 1 2.0 in. 1 .010 SCH 40 PVC* ft. I ft. I in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 fr• 352.0 ft' PORTV DBENTONITE SLURRY 0.0 e• 300.0 ft- PORTLMDBENTONITE SLURRY 0.0 fr' 59.0 ft' PORTvwDBENTONITE SLURRY 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 367.0 fr• 387.0 e• 2040 FINE SILICA SAND 20. DRILLING LOG attach additional sheets ifnecessary) FROM TO DESCRIPTION (color, hardness, soil/ruck type, grain sin, etc.) 0.0 ft. 1.0 ft. GRAVEL 1.0 ft. 10.0 ft. RED SILTY SAND 10.0 ft' 24.0 ft' TAN SILTY SAND 24.0 fL 50.0 fL PWR 50.0 ft• 448.0 ft• ROCK ft. ft. ft. ft. 21. REMARKS BENTONITE SEAL FROM 352.0 TO 367.0 FT & 387.0 TO 448.0 FT ***U-PACK SCREEN*** 22. Certification: G, 03/26/19 Signature ot'Certified Well Contractor Date HY signing this fornr, l hereby cerilfj, that the we/1(i) "'as (here) cointruc•ted in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 We// Constnrciion Standards and that a cane of7his record has been provided to to irell ouvrer. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this Ibrm within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 i•lail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 lylail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. OLZ Form GW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 20l 3 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY. 1. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A - 4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction pernhits (i.e. County, State, Variance, etc.) 3. Well Use (check well use): ter ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial ❑Irrigation Non -Water Supply Well: ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) Injection Well: ❑Aquifer Recharge ❑Groundwater Remediahon ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Heating/Cooling Return) ❑Other (explain under #21 Remarks) 4. Date Well(s) Completed: 04/03/19 Nell ID# MW-34BR 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 14. WATER ZONES FROM TO I DESCRIPTION rr. rr. 1.5. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 it• 59.0 it• 1 6.0 i" SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 it. 74.0 it. 2.0 i"' SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 74.0 ft' 84.0 ft. 2.0 "' .010 SCH 40 PVC* ft. ft. I in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT 0.0 ft' 57.0 ft- PORTU DBENTONITE SLURRY 0.0 it• 59.0 ir' PORR DBENTONITE SLURRY 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 71.0 it• 86.0 it• 20-40 FINE SILICA SAND tt. rr. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, suit/nick type, zt-ain sin, etc. 0.0 it• 10.0 ft RED/TAN SILTY CLAY 10.0 it• 26.0 it• TAN SILT 26.0 it• 53.0 fL WEATHERED ROCK 53.0 ft, 86.0 f' ROCK ft. ft. rr. rr. 21. REMARKS BENTONITE SEAL FROM 57.0 TO 71.0 FEET ***U-PACK SCREEN*"* 5b. Latitude and Longitude in degrees/minutes/seconds ordecimaldegrees: 22• Certification: (ifwell field, one fat/long is sufficient) 36 28 58.59 N 790 03 54.31 Signature of Certified Well Contractor 04/05/19 Date 6. Is (are) the well(s): I2]Permanent or ❑Temporary I } J) O ( ) Hv signing this arnt, l hereby c•eru that the ur// .c u•ar were c•ona7nrc•!ed in nccurdahhc•e irith 15A NCAC 02C .0100 or 15A NC'AC 02C .0200 Well Construction Standards and that a 7. Is this a repair to an existing well: ❑Yes or EINo copy oJ'ihis record has been provided to the well owner. ?fihi.v is a repair, Jill out known well construction information and explain the nature oJ'!he repair under 421 remarks section or on the hack q/'1ho.V /itrnh. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. Vor multiple h yeelion or non-irater supply wells ONLY with the same construction. you can saburitone.1brni. SUBMITTAL INSTUCTIONS 9.'Total well depth below land surface: 84.0 1-}w multiple wells list all depths fdijjireni (example- 3 rt 200' and 2 a /001 10. Static water level below top of casing: 22.0 if water level is ahore caving, use I 11. Borehole diameter: 6.0/10.0 12. Well construction method: _ I t e. auger, rotary, cable, direct push, etc.) AIR ({t•) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft.) Division of Water Quality, Information Processing Unit, 1617 Flail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form CiW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jaii. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells 1. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A - 4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction permits (i.e. Counttt State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑Industrial/Commercial ❑Irrigation Non -Water Supply Well: QMonitoring Injection Well: ❑Aquit'er Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heat ine/Coolins Return) 4. Date Well(s) Completed: ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) u ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under 421 I 04/03/19 WeI11D# MW-34D 5•r. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field, one lat/long is sufficient) 36' 28' 58.69" N 790 03' 54.32" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or ElNo 1Jlhis is a repair, fill out known well construction infitrmation and erplain the nature gfi e repair under °21 remarks section or on the back t f this firm. 8. Number of wells constructed: 1 For multiple injection or non- it -titer supply wells ONLY with the .same construction, You can submit one.fibrin. 9. Total well depth below land surface: 52.0 (ft.) hfir multiple wells list till depths ifdi(ferent (example- 3@200' and 2 a l ilt') 10. Static water level below top of easing: 22.0 (ft.) 1f ureter level is abore casing, use "- " 11. Borehole diameter: 6.0 (in.) For Internal Use ONLY la. WATER ZONES FROM TO DESCRIPTION ft. fi- ft. ft. 15. OUTER CASING for multi -cased wells OR LINER ifr licable FROM TU DIAMETER Tf11CKNE55 MATERIAL ft. H. in. 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft. 42.0 ft- 2.0 '"' SCH 40 PVC ft. ft. in. 17.SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL 42.0 ft' 52.0 ft. 2.0 ' .010 SCH 40 PVC' ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEM ENT METHOD& AMOUNT 0.0 ft. 35.0 ft' PonrtwoerNTONirE SLURRY ft. ft. rr. rt. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 40.0 ft• 53.0 ft' 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soillmck type, grain size, etc.) 0.0 fr• 10.0 ft- RED/TAN SILTY CLAY 10.0 ff• 26.0 ft BROWN/TAN SILT 26.0 ft• 53.0 ft• WEATHERED ROCK ft. ft. ft. e. ft. ft. rr. rt. 21. REMARKS BENTONITE SEAL FROM 35.0 TO 40.0 FEET "'U-PACK SCREEN"' 22. Certification: A , �A7� 1- /���jJ��/. 04/05/19 Signature of Certified Well Contractor Date RY signing this Jinn. I hereby certifj, that the well(+) was (were) constructed in accordance with 15A NCAC 02C .0100 or 15A NCAC 02C .0200 Well ('onrtruciion bYnndardv and that it cops' (J'this record has been provided to the irel/ owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. anger, rotary, cable, direct push, etc.) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c, For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form GW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLI 1. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A - 4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction pernnits (i.e. County, State, Variance, etc.) 3. Well Use (check well use): ❑Agricultural ❑Geothermal (Fleating/Cooling Supply) ❑Industrial/Commercial ❑Irrigation Non -Water Supply Well: ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Fleating/Coolmg ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 G 4. Date Well(s) Completed: 04/03/19 well ID# MW-35BR 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility 1D# (if npplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (it'well field, one lat/long is sufficient) 360 28' 56.26" N 790 03' 52.84" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or E]No li'dtis is a repair, fill out known tee// construction h formation and explain the nature t f the repair under "21 reworks section or an the back of this form. S. Number of wells constructed: 1 h or nnthiple iu/ec•tion or non -water supply wells ONLY with the sane construction, you can .submit one,/form. 9. Total well depth below land surface: 98.0 P or naitiple we//s list all depths if d JJirent (c.rannple- 3 a 200' and ? a 100') 10. Static water level below top of casing: 2•0 (ft.) l/'wxner level is above casing, use ••, " 11. Borehole diameter: 6.0/10.0 (in.) 12. Well construction method: _ (i.e. auger, rotary, cable, direct push, etc ) AIR la. WATER ZONES FROM TO DESCRIPTION ft. ff. 15. OUTER CASING for multi-cosed wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft 48.0 ft 6.0 in.SCH 40 PVC 16. INNER CASING OR TUBING eothermal closed -loop) FROM TO DIAMETER THICKNESS 11fATER1AL 0.0 ft 88.0 ft. 2.0 in. SCH 40 PVC ft. ff. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 88.0 ft' 98.0 rf 2.0 in. .010 SCH 40 PVC* ft. ff. in. 18. GROUT FROM TO MATERIAL EMPLACEM ENT METHOD &AMOUNT 0.0 ft' 733.0 ft' PORT DBENTONITE SLURRY 0.0 ft. 48.0 ft- PORTIAHDBENTONITE SLURRY ft. ft. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 89.0 ft 100.0 ft 20-40 FINE SILICA SAND R. I ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soil/mck lvpe, grain sir, etc.) 0.0 ft. 10.0 ft. RED/TAN SILTY CLAY 10.0 ft' 26.0 ft• TAN SILT 26.0 ft' 43.0 ft' WEATHERED ROCK 43.0 ft• 100.0 ft- ROCK ft. m ft. ft. rt. rt. 21. REMARKS BENTONITE SEAL FROM 73.0 TO 85.0 FEET ***U-PACK SCREEN*** 22. Certification: A , A/ Signature ofCenifted Well Contractor Date Rv signing this Jornt, 1 herehv c•eriyj, that rite uell(s) Ira.T (were) constructed in accordance with 15A NCAC 02C ./1100 or 15A NCAC 02r • .0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form G W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 201 , WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY: I. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A-4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well cots rtruciion permits (i.e. Cotnryt State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Fleating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑irrl ation Non -Water Supply Well: 12)Monitorine ❑Recovery ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling 4. Date Well(s) Completed: 04/03/19 5a. Well Location: ROXBORO STEAM PLANT ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 Well ID# MW-35D Facility/Owner Name Facility ID# (inapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON Count% Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (dwell field, one Iatilong is sufficient) 360 28' 56.26" N 790 03' 52.82" W 6. Is (are) the well(s): l2lPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or [ZINo l/'ihis is a repair, Jill our launrn nrell con.str u•lion in/iirnmiinu and rrplain the nature oj'dhe repair under t, 2l renuhrkv section or on the hack nj'this frhnn. 1 14. WATER ZONES FROM TO DESCRIPTION ft. ft. rt. ft. IS. OUTER CASING for multi -cased wells OR LINER if a livable FROM TO DIAMETER THICKNESS MATERIAL ft. I ft. I in. 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 fr, 31.0 ft• 2.0 in- SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL 31.0 ft• 41.0 ft• 2.0 in. .010 SCH 40 PVC' ft. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD 3i AMOUNT 0.0 fr. ft. 22.0 MRTLP DaENTONnE SLURRY 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENTMETHOD 26.0 fr• 43.0 fr• 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soillrock type, grain sim, etc.) 0.0 ft• 10.0 ft. REDITAN SILTY CLAY 10.0 fL 26.0 ft- TAN SILT 26.0 fr• 43.0 fr• WEATHERED ROCK ft. ft. ft. rt. ft. ft. rr. fr. 21. REMARKS BENTONITE SEAL FROM 22.0 TO 26.0 FEET "'U-PACK SCREEN"' 22. Certification: 'AWIA%% �� 04/05/19 Signature of Certified Well Contractor Date By signing this limn, I hereby cert!/i, that the well(s) nrac (here) constructed in accordance u•ilh 15A NCAC 02C .11lllll or 15A NCAC 02C .0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well S. Number of wells constructed: construction details. You may also attach additional pages if necessary. For nwhiple injection or non-nrater supply wells ONLY with the same construction, you can submil one jorni. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 41.0 (ft.) l•br hnulnple a c/A• hst all depduv it' dijjemnt (example- 3 tt 200' and 2 a 100') 10. Static water level below top of casing: 2.0 (ft.) 1/lraier level is above casing, use "i " 11. Borehole diameter: 6.0 (in.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For lniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc.) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Nlethod of test: 24c. For Water Supply & lniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form G W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells 1. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A - 4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction permits (i.e. County, State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irrigation Non -Water Supply Well: OMonitoring ❑Recovery Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑L-xperimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Fleatine/Coolinp Return) ❑Other (explain under #21 Remarks) 4. Date Well(s) Completed: 04/03/19 Nell ID# MW-35S 5a. Well Location: ROXBORO STEAM PLANT Facility/owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (itwell field, one lat/long is sufficient) 360 28' 56.29" N 790 03' 52.80" W 6. Is (are) the well(s): ©Permanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or ElNo if this is a repair, fill out known well construction it lbrtnation and explain the nature of ilte repair under # 21 renwrkr section or on the back tJ'dtis form. 8. Number of wells constructed: 1 l•itr nwhiple injection or non -water supply wells ONLY with the sante construction, you can suhnni one fitrin. 9. Total well depth below land surface: 18.0 (ft.) hor nwhiple wells list all depths ifdiJJerew (example- 3 a 200' and 2 a 1011') 10. Static water level below top or easing: 2.0 ?f irater level is above casing, use " * " 11. Borehole diameter: 6.0 (in.) 12. Well construction method: _ (i.e. auger, rotary, cable, direct push, etc.) AIR For Internal Use UNLY: 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if a licrble FROM TO DIAM1IETER THICKNESS MATERIAL (t. ft. in. 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 rr. 8.0 ft- 2.0 in. SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL 8.0 rt' 18.0 "' 2.0 "' 1 .010 SCH 40 PVC' ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METIIOD&AMOUNT 0.0 ft' 3.0 ft. PORTv DeEaTONiTE SLURRY fr. ft. ft. ft. 19. SAND/GRAVEL PACK if upplicable FROM TO MATERIAL EMPLACEMENT METHOD 6.0 rt 19.0 rt' 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessa FROM TO DESCRIPTION (color, hardness, soii/rock type, grain sin, etc. 0.0 ft. 10.0 ft. RED/TAN SILTY CLAY 10.0 It. 19.0 ft. TAN SILT ft. rt. ft. ft. 13. rt. rt. rt. rr. rt. 21. RENIARKS BENTONITE SEAL FROM 3.0 TO 6.0 FEET "`U-PACK SCREEN- 22. Certification: Signature of Certified Well Contractor 04/05/19 Date Hy signing this form, 1 hereht' certify that the we//(s) was (were) constructed in accordance with 15A NCAC 02C .0100 or 15A NCAC 02C .0200 Well Construction Standards and that a caps ty'this record has been prorided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For lniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water SunvIv & Injection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form G W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan 201 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use UNLY: 1. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A - 4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction pennies (i.e. County, Slate, flariance, etc.) 3. Well Use (check well use): ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) Non -Water Supply Well: m Monitorine ❑ Recovery ❑Aquifer Recharge ❑Aquiter Storage and Recovery ❑Aquiter Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling 4. Date Well(s) Completed: ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 04/03/19 Well ID# MW-36BR 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field, one lat/long is sufficient) 360 28' 57.95" N 790 03' 50.52" W 14. WATER ZONES FROM TO DESCRIPTION ft. ft. rt. rr. 15. OUTER CASING for multi -cased wells OR LINER if a licablc FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 48.0 rr• 1 6.0 i" SCH 40 PVC 16. INNER CASING OR TUBING eothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 fr• 71.0 a, 2.0 in. SCH 40 PVC ff. fr. in. 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL. 71.0 rr. 81.0 rr• 2.0 "' 1 .010 SCH 40 PVC* ft. ff. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 f. 54.0 rt' PORn DaENTONITE SLURRY 0.0 rr• 48.0 rt• PORTUNOeENTONITE SLURRY fr. fr. 19. SAND/GRAVEL PACK if a licable FROM TO MATERIAL EMPLACEMENTMETHOD 68.0 ft- 83.0 rr• 20-40 FINE SILICA SAND rt. rt. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soil(mck type, %min sim, etc. 0.0 rr• 10.0 a• RED/TAN SILTY CLAY 10.0 rr• 26.0 rt• TAN SILT 26.0 rr• 40.0 rr• WEATHERED ROCK 40.0 rr• 83.0 rr. ROCK rr. rt. ft. ft. ft. ft. 21. REMARKS BENTONITE SEAL FROM 54.0 TO 68.0 FEET '"U-PACK SCREEN"' 22. Certification: '11411A, V/ 04/05/19 Signature of Certified Nell Contractor Date 6. Is (are) the well(s): ❑Permanent or ❑Temporary 1 �• �. O (were) H � signing this ortn, l herehr c•eru v that the Ire// .c was were e•onctriratud in accordance u iih 15.4 NCAC 02C .0100 or 15A NCAC 02C .0200 Well and that a 7. Is this a repair to an existing well: ❑Yes or EINo copy of this record has been provided to the ire// owner. lJ'dii.v is a repair, fill out known urll construction hiijbi- Canon and explain the nature oJ7he repair under ±:21 remarks section or on the hack ajt/u.s Jornt. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constricted: 1 construction details. You may also attach additional pages if necessary. For nmhiple igiec lion or non-irater supphv wells ONLY with the sane construction, you con vubnot one fiinn. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 81.0 For nn0iple hells list all depths tfdWcrent (example- 3 rt 200' and 2@100') 10. Static water level below top of casing: 2.0 1/lrater level is above casing, use •'i " 11. Borehole diameter: 6.0/10.0 12. Well construction method: _ (i.e. auger, rotary, cable, direct push, etc ) AIR (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the Hallowing: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form Ci W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use UNLY. I. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A - 4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable a•el/ consirticHon permits (i.e. Coun(v. Slate, 6nrianc•e, etc.) 3. Well Use (check well use): ❑Agricultural ❑Municipal/Public ❑Geothermal (Fleating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irn ation Non -Water Supply Well: IOMonitoring ❑Recovery ❑Aquiter Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heat ing/CoolIng ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 1 4. Date Well(s) Completed: 04/03/19 Well ID# MW-36D 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility 1D# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 14. WATER ZONES FROM TO DESCRIPTION ft. ft. rt. 1r. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL ft. ft. in. 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 f' 28.0 fr 2.0 i"' I SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE I THICKNESS MATERIAL 28.0 38.0 t' 2.0 t"J .010 SCH 40 PVC* in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD& AMOUNT 0.0 f' 21 0 tt PORTA DBENTONITE SLURRY ft. ft. ft. ft. 19. SAND/GRAVEL PACK if a licable FROM TO MATERIAL EMPLACEMENT METHOD 25.0 f' 40.0 f' 20-40 FINE SILICA SAND Ir. tt. 20. DRILLING LOG attach additional sheets if necessa FROM TO DESCRIPTION (color, hardness, soidrvck type, grain sim, etc. 0.0 t' 10.0 f' RED/TAN SILTY CLAY 10.0 f' 26.0 f' TAN SILT 26.0 f' 40.0 t' WEATHERED ROCK It. tr. ft. ft. rt. rt. 21. REMARKS BENTONITE SEAL FROM 21.0 TO 25.0 FEET ""`U-PACK SCREEN"' Sb. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22. Certification: (ifwell field, one hit/long is sufficient) 36 28 58.03 N 790 03 50.51 W 04/05/19 Signature ofCenifted Well Contractor Date 6. Is (are) the w•ell(s): [OPermanent or ❑Temporary Hv signing this Jiirni, l herehv c•ertJv that the ire//(�) was (were) constructed in ncc•ordnncu iivth 15A NCAC 02C .0/00 or 15A NC'AC 02(' .0200 IVell Consiruc•tion Standards and than a 7. Is this a repair to an existing well: ❑Yes or EINo cow ofdiiv record has heen prorided to the well owner. /J'thi.c is a repair. till out known well c•onsirtic•tion inlbrn ation and erplain the nature oJ'Ihe repair ander'21 remarks section or on the hack aJ7liis firm. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. lvir nnthiple injection or non-irater supply hells ONLY frith the sane construction, you can rubittoonefauni. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface. 38•0 hoe nwhiple irehs list all depih.r /fdiJJerent (example- 3 a 200' and 2 a.1001 10. Static water level below top of casing: 2•0 //'eater level is above easing, use " 11. Borehole diameter: 6.0 ft.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft.) Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Iniection Wells: In addition to sending the form to the address in 24a above. also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc ) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. (in.) Form G W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jail. 2013 For Internal Use ONLY: WELL CONSTRUCTION RECORD This form can be used for single or multiple wells la. WATER ZONES FROM TO DESCRIPTION ft. ft. 15. OUTER CASING for multi cased wells) OR LINER if a livable FROM TO DIAMETER THICKNESSMATERIAL 0.0 fr• 50.0 ft• 6.0 i" SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft' 81.0 ft. 2.0 in. SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 81.0 fL 91.0 ft• 2.0 "' .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD& AmouNr 0.0 ft. 63.0 ft' roRn DurNTONiTe SLURRY 0.0 ft- 50.0 ft. aoanutoorrvroNiTe SLURRY R. ft. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL I EMPLACEMENT METHOD 77.0 ft' 93.0 ft- 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets ifnecessary) FROM TO DESCRIPTION (color, hardness, soil/mck type, ruin sim, etc. 0.0 ft. 10.0 ft. RED/TAN SILTY CLAY 10.0 f" 26.0 ft. TAN SILT 26.0 ft' 43.0 ft• WEATHERED ROCK 43.0 fr• 93.0 fr• ROCK ft. ft. ft. ft. ft. rt. 21. REMARKS BENTONITE SEAL FROM 63.0 TO 77.0 FEET ***U-PACK SCREEN*** 22. Certification: W/ P/A_ Signnture ofCertified Well Contractor 04/05/19 Rv signing this forin, l herehi, cerii& that the wet/O was (here) constructed in accordance u-rth I5A NCAC 02C.I1/00 or ISA NCAC 02C.02r111 II/ell Convtruc•lioti Stmtdctrds and than it copy gl'thi.s record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: construction details. You may also attach additional pages if necessary. For tiuihiple injection or non-irater supply irel/s ONLY it•ah the .same cvntetruction, You can submit one Joan. SUBMITTAL 1 NSTUCTIONS 9. Total well depth below land surface: 91.0 her in"ltiple irells list all depths 1df/ereni (example- 30200' and 2 a -/illy) 10. Static water level below top of casing: 2.0 I/'irater lerel is above cashkq, a.ve '• , .. 11. Borehole diameter: 6.0/10,0 I. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A - 4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all cgrplicahle well construction permits (i.e. County. State, Variance, eic•.) 3. Well Use (check well use): Water Supply Well: - ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irrl ation Non -Water Supply Well: O Monitori ne ❑ Recovery ❑Aquifer Recharge ❑Aquiter Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer Return) ❑Other (explain under #21 4. Date Well(s) Completed: 04/03/19 WellID# MW-37BR 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if well field, one lat/long is sufficient) 360 28' 57.00" N 79e 03' 50.55" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or E)No Y'dory is a repair. fill out known irell construction ii fbrnation and explain the nature a f ilie repair under , 2I reinarkv section or nit the hack c f This farm, 1 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft.) Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc ) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c, For Water SuDDIv & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. (in.) Form GW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY: I. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A - 4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable ircH construction permits (i.e. Coun(a State, Variance, etc.) 3. Well Use (check well use): ter ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial ❑Irrigation Non -Water Supply Well: ❑Aquifer Recharge ❑Aquiter Storage and Recovery ❑Aquiter Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling 4. Date Well(s) Completed: ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) U ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 1 04/03/19 well ►D# MW-37D Sa. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 14. WATER ZONES FROM TO I DESCRIPTION ft. ft. rr. ft. 15. OUTER CASING for multi -cased wells OR LINER ifr licable FROM TO DIAMETER THICKNESS MATERIAL ft. ft. in. 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft' 32.0 fr. 2.0 "' I SCH 40 PVC ft. ff. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 32.0 fr, 42.0 ff• 2.0 in. .010 SCH 40 PVC* ft. ff. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD& AMOUNr 0.0 ft' 25.0 ft' RORrrnuoeEurounE SLURRY ft. ft. ft. ft. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 29.0 ft' 43.0 ft' 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessa FROM TO DESCRIPTION (color, hardness, soittmck type, min size, etc. 0.0 fr• 10.0 fr• RED/TAN SILTY CLAY 10.0 f' 26.0 a• TAN SILT 26.0 ff• 43.0 fr• WEATHERED ROCK ft. ft. ft. ft. ft. ft. ft. ft. 21. REMARKS BENTONITE SEAL FROM 25.0 TO 29.0 FEET ***U-PACK SCREEN*** 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22. Certification: �jJ // (if well Held, one lit. long is sufficient) /d�C/A /,�/i /�/ _ 36 28 57.03 N 79 03 50.47 W (//`�' �!/J 6. Is (are) the well(s): 171'ermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or EINo 4'this is a repair, fillout known well construction h ybrnnation and explain the nature t f the repair under 1121 remarks .section or on the hack cfthis fin in. 1 Signature ol'Certitied Well Contractor 04/05/19 Date Hip signing this frtrrn, l hereb,v certify that the well(s) it-as(were) constructed in ac•c•or&o1ce frith 15A NCAC 02C .0100 or 15A NC'AC 02C .0200 Well Construction Standards and that it cagy oJ'dnis record has been provided to the tre// ouvner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: construction details. You may also attach additional pages if necessary. Por multiple injection or non-water.supply ire/is ONLY with the sane construction, you can submit one./nrnn. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 42•0 l•irr nahiple wells list all depths lfdifJerent (example- 3 a ?IN)' and 2 a 100') 10. Static water level below top of casing: 2•0 l% water level is above easing, use "+ " 11. Borehole diameter: 6.0 (in.) 12. Well construction method: _ (i.e. auger, rotary, cable, direct push, etc.) AIR 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 1llail Service Center, Raleigh, NC 27699-1617 24b. For lniection Wells: In addition to sending the form to the address in 24,1 above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. field (gpm) Method of test: 24c. For Water Supply & lniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b, Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form GW-I North Carolina Department of Environment mid Natural Resources - Division of Wnter Quality Revised Jan. 201 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY: 1. Well Contractor Information: NICHOLAS HAYES Well Contractor Name A - 4121 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction pernil.v (i.e. County, State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑industrial/Commercial ❑Residential Water Supply (shared) ❑Irri ation Non -Water Supply Well: 12IMonitoring ❑Recovery ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling 4. Date Well(s) Completed: ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 04/03/19 WellID# MW-37S Sa. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) Sb. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if well field, one latllong is sufficient) 360 28' 57.04" N 790 03' 50.42" W 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if a licuble FROM TO DIAMETER THICKNESS MATERIAL ft. ff. in. 16. INNER CASING OR TUBING eothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft- 8.0 ft- 2.0 in. SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 8.0 rr 18.0 D. 2.0 "' .010 SCH 40 PVC' ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft' 3.0 ft. MRTuuoaENTMITE SLURRY ft. ft. ft. ft. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 6.0 ft 19.0 1r, 20-40 FINE SILICA SAND 20. DRILLING LOG faultch additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soillrock type, %min sim, etc.) 0.0 ft. 10.0 ft. RED/TAN SILTY CLAY 10.0 ft. 19.0 rr TAN SILT ft. ft. ft. ft. ft. ft. t3. rr. 21. RENIARKS BENTONITE SEAL FROM 3.0 TO 6.0 FEET "`U-PACK SCREEN""" 22. Certification: Signature of•Certified Well Contractor 04/05/19 Date 6. Is (are) the well(s): OPermanent or ❑Temporary By signing this frmnt, / hereby certyi, that the well(s) was (here) constructed in accordance frith I5A NCAC 02C .0100 or I5A NC'AC 02C.0200 Well Construction Standards and that a 7. Is this a repair to an existing well: ❑Yes or ONo cope ofdiis record has been provided to the well owner. If this is it repair, Jill out known we/1 construction igltbrnation and explain the nature t f the repair under rill renurks section or on the hack a fdiiv /nrn. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well S. Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. For undnple ugeclion or non-irater sapply wells• ONLY with the sane construction. you can subnutone./orin. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 18.0 (fL) 24a. For All Wells: Submit this form within 30 days of completion of well hor nnihiple hells her all depdiv t/ different (example- 3@200' and 2 tr I00 1 construction to the following: 10. Static water level below top of casing: 2•0 (ft.) Division of Water Quality, Information Processing Unit, /f ❑mer level is above caving, use "{." 1617 Mail Service Center, Raleigh, NC 27699-1617 11. Borehole diameter: 6.0 (in.) 24b. For lniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i e. auger, rotary, cable, direct push, etc.) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Injection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form Ci W-I North Carolina Department of Environment and Natural Resources - Division ofWater Quality Revised Jar 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY I. Well Contractor Information: BRIAN THOMAS Well Contractor Nnme A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable %tell construction permits (i.e. ('aunty. State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) Non -Water Supply Well: C Injection wen: ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Heating/Cooling Return) ❑Other (explain under 421 Remarks) 4. Date Well(s) Completed: 04/04/19 Well ID# MW-39BR 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical .Address, City, and Zip PERSON County Parcel Identification No. (PIN) Sb. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (itwell field, one [it/long is sufficient) 360 27' 41.31 " N 790 03' 50.44" NN, 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or EINo /f this is a repair, fill out known irell c•onsiruc•rion in/irrin anion and explain the nanire o/the repair tinder 42/ ranarkv section or on dre hack r f dri.x firm. 1 14. WATER ZONES FROM TO DESCRIPTION ft. ft. rt. rt. 15. OUTER CASING for multi-cused wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 rL 55.0 ft• 6.0 i" SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed-loo FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft. 195.0 fL 2.0 "' I SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL 195.0ft• 210.0 ft' 2.0 "' .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft. 177.0 ft' PORTUWDBENTONITE SLURRY 0.0 f. 55.0 ft- PORTL-DBENTONITE SLURRY ft. ft. 19. SAND/GRAVEL PACK if a licable FROM I TO I MATERIAL EMPLACEMENTMETHOD 190.0 ft. 1217.0 ft• 1 20-40 FINE SILICA SAND rt. I ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION (color, hardness, soil/rock type, %min sim, etc. 0.0 ft. 1.0 rt• GRAVEL 1.0 ft, 8.0 ft. BROWN SILTY SAND 8.0 ft' 18.0 ft. TAN SILTY SAND 18.0 ft' 50.0 ft' PWR 50.0 ft- 250.0 ft. ROCK ft. ft. ft. ft. 21. REAIARKS BENTONITE SEAL FROM 177.0 TO 190.0 FT & 217.0 TO 250.0 FT ***U-PACK SCREEN*** 22. Certification: Signature of Certified Well Contractor 04/05/ 19 Date By signing dri.x firm, I hereby cerlyj, that the ire/l(v) u•ax (were) constructed in accordance with 15A NCAC 02C .0100 or I5A NC'AC 02C .0200 Nell C'onrtruc•tinn Smndnrd+ and that a copy of this record has been provided io the hell owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: construction details. You may also attach additional pages if necessary. For nialtiple injection or non-n•atersupply hells ONLY with the same construction. poi can suhnni one f,rnr, SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 210.0 (ft.) l�br inulople u•e/h list all deptlix %/'different (example- 3 «200' and 2@100') 10. Static water level below top of casing: 62.0 (ft.) //'water level is ahore caving, use "' " 11. Borehole diameter: 6.0/8.0 (in.) 12. Well construction method: _ (i.e auger, rotary, cable, direct push, etc.) AIR 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Iniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Nlethod of test: 24c. For Water Sunniv & Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form G W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan 201 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use UNLY. 1. Well Contractor Information: BRIAN THOMAS Well Contractor Name A-2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable irell construction perinits (i.e. CounrY, State, Variance, etc.) 3. Well Use (check well use): ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑lrri gation Non -Water Supply Well: IOMonitoring ❑Recovery ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 I 4. Date Well(s) Completed: 04/02/19 Well ID# MW-39D Sa. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (d'well field, one lat/long is sufficient) 360 27' 41.31 " N 790 03' 50.44" NY 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS I MATERIAL fr. ft. I in. 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS I MATERIAL 0.0 rt. 39.0 rt. 2.0 i"• SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAI. 39.0 "' 49.0 rt• 2.0 in. .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD &AMOUNT 0.0 ft. 27.0 ft' PORTVNDBENTONITE SLURRY rt. rt. ft. ft. 19. SAND/GRAVEL PACK if a licable FROM TO MATERIAL EMPLACEMENT METHOD 37.0 fL 50.0 ft. 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soil/mck type, Cmin sin, etc. 0.0 13• 1.0 rt GRAVEL 1.0 rt• 8.0 rt• BROWN SILTY SAND 8.0 rt• 18.0 rt• TAN SILTY SAND 18.0 rr. 50.0 f" PWR fr. ft. ft. ft. ft. fr. 21. REMARKS BENTONITE SEAL FROM 27.0 TO 37.0 FEET ***U-PACK SCREEN*** 22. Certification: Signature of Certified Well Contractor 04/05/19 Date 6. Is (are) the well(s): [OPermanent or ❑Temporary Hi, signing dti.v fnnu. l hereby c•ertiJ,i, that the hell(+) was (were) constructed in ac•e•nrdnnce Whit 15A NCAC02C . ill00 or ISA NCAC 02C .0200 We// Construction 5tandardv and that it 7. Is this it repair to an existing well: ❑Yes or ONo copy rflhi.s record has been provided to the we// owner. It'llav Is a repair, fill our known well construction h1lbrntation and explain the nature of the repair under a2/ renrarkv section or on the hack of this.1brin. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: 1 construction details You may also attach additional pages if necessary. For "tultiple it!iec•lion or non-i aler supply hells ONLY irith the same construction,You can submit one form. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 49.0 For muhiple ire//v list all depths ifi# ferenl (example- 3 @200• and 2 ci)J00'1 10. Static water level below top of casing: 28.0 //barer level is abore casing, ave " - " 11. Borehole diameter: 6.0 (in.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e auger, rotary, cable, direct push, etc I Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form GW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells I. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction permits (i.e. County, State, Variance, etc.) 3. Well Use (check well use). ter ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial Non -Water Supply Well: ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) injection weu: ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal(Closed Loop) ❑Tracer ❑Geothermal (Heating/Cooling Return) ❑Other (explain under #21 Remarks) 4. Date Well(s) Completed: 09/11/19 Well ID# MW-38D 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field, one lattlong is sufficient) 360 28' 57.03" N 790 03' 50.47" W 6. Is (are) the well(s): 911"ermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or DNo It'dus is a repair, fill out known well construction tnfarntation and explain the nature ofthe repair under 21 remarks section or on the back ofthi.s firm. 8. Number of wells constructed: 1 Pbr multiple injection or non-uwler.supply wells ONLY with the same construction, you can subnut one farm. 9. Total well depth below land surface: 54•0 (ft.) 1•itr mtrlliple wells list all depths if different (example- Sea 200' and 2 a 100') 10. Static water level below top of casing: 31.0 (ft.) //'water level is above easing, use "+ " 11. Borehole diameter: 7.875 (in.) For Internal Use ONLY: 14. WATER ZONES FROM TO I DESCRIPTION ft. I ft. ft. I ft. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL ft. ft. in. 16. INNER CASING OR TUBING(geothermal closed-Ioo FROM TO DIAMETER THICKNESS I MATERIAL 0.0 rt' 49.0 ft- 2.0 "" I SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 49.0 rt• 54.0 ft• 2.0 "' .010 SCH 40 PVC* ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD 8t AMOUNT 0.0 ft. 38.0 ft- PORTIA 09ENTONITE SLURRY ft. ft. ft. ft. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 46.0 It" 54.0 ft. 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION fcolor, hardness, soil/rock type, grain sin, etc. 0.0 rt• 4.0 ft BROWN SILTY SAND 4.0 rt• 18.0 rt• TAN SILTY SAND 18.0 rt' 54.0 rt• PWR ft. ft. rt. rt. ft. ft. ft. ft. 2L REMARKS BENTONITE SEAL FROM 38.0 TO 46.0 FEET ***U-PACK SCREEN*** 22. Certification: !:2 S ow - Signature 12/17/19 Date By signing ihis /ornt, / hereby certify that the well(s) svac (trere) constructed in accordance with 15A NCAC 02C .0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc.) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Injection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form GW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY: 1. Well Contractor Information: BRIAN THOMAS Well Contractor Name A - 2581 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction permits (i.e. County, State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑industrial/Commercial ❑Residential Water Supply (shared) ❑Irri ation Non -Water Supply Well: O Monitoring ❑Recovery ❑Aquiter Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling Return ❑Groundwater Remediation OSalinity Barrier ❑Stormwater Drainage ❑Subsidence Control OTracer ❑Other (explain under #21 F 4. Date Well(s) Completed: 11/14/19 well ID# MW-38BR 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 55.0 ft- 6.0 i"' SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft• 95.0 ft. 2.0 i"' SCH 40 PVC ft. I ft. in. 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL 95.0 ff• 110.0 ft' 2.0 in. .010 SCH 40 PVC* ft. I ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft. 50.0 ft' MRTL DBENTONITE SLURRY 0.0 ft. 55.0 ft- PORTLPNDBENTONITE SLURRY 147.0 ft. 600.0 ft. PORTL-DBENTONITE SLURRY 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 90.0 ft. 124.0 "' 1 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION (color, hardness seillnck type, grain size, etc. 0.0 ft. 8.0 ft. BROWN SILTY SAND 8.0 a. 45.0 ft. TAN SILTY SAND 45.0 f" 50.0 fr• PWR 50.0 ft' 600.0 ft. ROCK ft. ft. ft. ft. ft. ft. 21. REMARKS BENTONITE SEAL FROM 50.0 TO 90.0 FT & 124.0 TO 147.0 FT ***U-PACK SCREEN*** 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22. Certification: (if well field, one lat/long is sufficient) e�''""���� _ 360 28' 57.03" N 790 03' 50.47" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or ONo 117hi.s is a repair, Jill out known well construction iglarmotion and explain the nature of the repair under ..21 remarks section or on the hack (?/'this farm. 1 Signature of Certified Well Contractor 12/17/19 Dale By signing this farnt, l hereby cerq& that the tred(c) was (here) constructed in accordance with 15A NCAC 02C .0100 or 15A NCAC 02C .0200 Well Construction Standards and that a copy q/'this record has been prorided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: construction details. You may also attach additional pages if necessary. 1•br multiple injection or non-u-trier supply wells ONLY with the same construction, you can submit one form. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 110.0 hirr ninhiple wells list all depths ifdiyPrent (example- 3 cc 200' and 2 a 100') 10. Static water level below top of casing: 20•0 (ft.) If water level is above casing, use " 11. Borehole diameter: 7.875 (in.) 12. Well construction method: _ (i.e. auger, rotary, cable, direct push, etc.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Iniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form G W-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013