Loading...
HomeMy WebLinkAbout20040936 Ver 1_COMPLETE FILE_20070831OF WA TF9 Michael F. Easley, Governor Q William G. Ross Jr., Secretary 01 ? North Carolina Department of Environment and Natural Resources j r Alan W. Klimek, P. E. Director 'i Coleen H. Sullins, Deputy Director 5 Division of Water Quality September 8, 2004 (Replaces Approval Issued on July 12, 2004) DWQ Project # 04-0936 Wake County Page 1 of 3 Brittchurch Corporation 9313 Ten-Ten Road Raleigh, NC 27603 Subject Property: Brittmore Sudbivision, Rand Road, Raleigh, NC UT to Swift Creek [03-04-02, 27-43-(8), C NSW] Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions To Whom It May Concern: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.05 acres of wetlands, 22 feet of soeams and 3,570 square feet (ft ) of protected riparian buffers for the purpose of constructing a sewer system, stormwater management and driveway at the subject property, as described within your application dated June 8, 2004 and received by the N.C. Division of Water Quality (DWQ) on June 9, 2004. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 18 or 39 when issued by the US Army Corps of Engineers (USACE). This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 213 .0233. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This approval shall replace the approval issued on July 12, 2004. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved - The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Plan Location or Reference (Units) N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) NCDM 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (htto://h2o.enr.state.nc.us/ncwetlands) Brittchurch Corporation / DWQ Project No. 04-0936 Page 2 of 3 September 8, 2004 Stream 22 (feet) Impact Site 1 (driveway crossing) 404 Wetlands 0.05 (acres) Impact Site 1 (fill for dry pond construction) Buffers 3,570 (square ft.) sewer & driveway 2. Buffer Mitigation (EEP) - You are required to mitigate for impacts to the protected riparian buffers. The required area of mitigation to compensate for impacts to the protected riparian buffers is 621 square feet as required under this Authorization Certificate and 15A NCAC 2B .0242(buffer mitigation rule). We understand that you wish to make a payment into the. Riparian Buffer Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. In accordance with 15A NCAC 2B .0242(7)(buffer mitigation rule), this contribution will satisfy our compensatory mitigation requirements under 15A NCAC 2B .0233(10)(buffer protection rule). Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5208 if you have any questions concerning payment into the Riparian Buffer Restoration Fund. You have one month from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Riparian Buffer Restoration Fund to compensate for 621 fe of required riparian buffer mitigation for impacts to 207 fe of protected riparian buffers; 03-04-02 river and subbasin, 27-43-(8), stream index number." 3. Diffuse Flow (Review) - An additional condition is that all constructed stormwater conveyance outlets shall be directed and maintained to flow in a diffuse manner at non-erosive velocities through the entire protected stream buffers without re-concentrating. If this is not possible it may be necessary to provide stormwater facilities that are considered to remove nitrogen. Additionally, a stormwater management plan for this project shall be provided to this Office before any of the impacts approved herein are conducted. The plan shall specify all stormwater discharge points, plan details, and calculations to indicate that diffuse flow through the protected buffers or nitrogen removal as described above will be achieved. The stormwater management plan shall be approved in writing by this Office before the impacts specified in this Certification occur. The DWQ has recently requested additional information of your stormwater plan dated May 17, 2004. Please note that the impacts approved in this letter shall not occur until you have received DWQ written approval of your stormwater management plan. 4. Erosion & Sediment Control Practices - Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. 5. No Waste, Spoil, Solids, or Fill of Any Kind - No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre- Construction Notification. All construction activities, including the design, installation, operation, Brittchurch Corporation / DWQ Project No. 04-0936 Page 3 of 3 September 8, 2004 and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 6. No Sediment & Erosion Control Measures w/n Wetlands or Waters - Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 7. Certificate of Completion - Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone John Dorney at 919-733-9646 or Bob Zarzecki at 919-733-9726. Sincere. Alan W. Klimek, P.E. AWK/bz Enclosures: GC 3402 Certificate of Completion cc: Will Buetow, S&EC, Inc., 11010 Raven Ridge Road, Raleigh, NC 27614 USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office File Copy Central Files Filename: 040936 A' NINA RCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor September 17, 2004 Brittchurch Corporation 9313 Ten-Ten Road Raleigh, NC 27603 Subject Property Brittmore Subdivision, Rand Road, Raleigh, NC APPROVAL of Stormwater Management Plans William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director DWQ Project # 04-0936 Wake County On September 9, 2004, the Division of Water Quality (DWQ) received the additional information we requested in order to review the stormwater management plan (Plan) prepared by your engineer, Mr. Russell Briggs, P.E. This Plan satisfies Condition 3 of the 401 Water Quality Certification issued to you on July 12, 2004. In accordance with 15A NCAC 2H .1008(c)(3), recorded drainage easement must be placed around each stormwater management facility. The stormwater management facilities must be constructed and operational and the stormwater management plan implemented. Stormwater control measures used for sedimentation and erosion control during the construction must be cleaned out and returned to their designated state. All other conditions of the Certification are still applicable and must be followed. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-9646 or Cynthia Van Der Wiele at 919.715-3473. Dorney, Wed s / 01 Unit JRD/cvdw cc: DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files. Russell Briggs, B&F Consulting, 2805 Tobermory Lane, Raleigh, NC 27606 Filename: 040936Brittmore(Wake)Storm.doc 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 One 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 NorthCarolina Phone: 919-733-1786 / FAX 919-733-68931 Internet: htto://h2o.enr.state.nc.us/ncwetiands Naturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper B&F CONSULTING RUSSELL BRIGGS, P. E. 919.618.0180 A M B E R F A R R E L L Y, P. E. 9 1 9. 3 8 9. 8 1 0 2 LETTER OF TRANSMITTAL SHEET 'I'O: PROM: Cynthia Van der Wiele Russell Briggs COMPANY: 1) Al Ii: NCDWQ 9/9/2004 ADDRkSS: PI IONIS NUM13FR: R1S: Brittmoore Subdivision ? URG1:N'1' ? FOR 1ZFN11;W X 1'1.I;AS1? COMMIiNT ? I'Ll?ASF 1ZF11LY ? YI,1?AS1; RVCYCLI? NO'ITS/CONIMI;NTS: Additional information requested September 9, 2004 from our submittal of July 14, 2004. W ET LANDS 1401 GRO( SEP 0 `? %?04 WATER QL1k1TYSEC110 N 2805 TOBERMORY LANE • RALEIGH, NC 27606 WETLANDS 1401 GROUP SEP 0 9 2004 OPERATIONS AND MAINTENANCE MANUAL Project: Brittmoore Subdivision BEST MANAGEMENT PRACTICES Garner, NC Property Owner /Responsible Party: ?j7Z)Tf!}{Lj , ice, r Prepared By: B&F Consulting, Inc. 2805 Tobermory Lane Raleigh, NC, 27606 (919) 618-0180 Date: 8 September, 2004 WATER QUALITY SECTION The maintenance of any Best Management Practice (BMP) installed to achieve nitrogen loading and/or flow attenuating requirements for a development shall be the responsibility of the property owner or other identified responsible party. In the case of residential or commercial subdivisions, Home Owners Associations or Merchants Associations must be established in order to identify the responsible party. This manual establishes general procedures for maintenance and operation of the allowed BMP types in accordance with the Town of Garner Stormwater Program for Nitrogen Control. It is important to note that only general maintenance tasks are identified here. All devices shall be maintained to original design standards. This agreement shall be signed and notarized by the responsible party to perform the tasks specified -in the plan, including inspections, operation, and any needed maintenance activities.. I. Background Identify the types of BMPs located on the site and give a brief description on their design. If you need additional space please attach separate pages to this document. Please see attached report II. Maintenance A. Riparian Buffers -- Extra land in addition to required riparian buffers that is used for nitrogen reduction should be left in an undisturbed condition. Only maintenance activities allowed by the buffer rules would be allowed. Any level spreaders used to diffuse flow into the buffer should be maintained as required in section II.B.2. B. Vegetated Filter Strips with Level Spreaders -- --- Maintenance requirements are as follows: Brittmoore Subdivision Page 2 1. At least once annually, remove deposited sediment, especially from the upstream edge, to maintain original contours and grading. 2. Repair channels that form and regrade the filter strip to ensure that the runoff flows evenly in a thin sheet over the filter strip. 3. Repair level spreader whose disrepair can cause the formation of channels in the filter strip. 4. Reseed and regrade the filter strip to maintain a dense growth of vegetation, especially if the strip has been used for sediment control. 5. Grassed filter strips shall be mowed at least twice annually to a minimum height of six inches. C. Open Channel. Practices Maintenance shall be performed as follows: 1. At least once annually, remove excess sediment, especially from the upstream edge, to maintain original contours and grading. 2. At least once annually, repair any erosion and regrade the swale to ensure that the runoff flows evenly in a thin sheet through the swale. 3. At least once annually, inspect vegetation and revegetate the swale to maintain a dense growth of vegetation. 4. Grassed swales shall be mowed at least twice annually to a minimum height of six inches. G. Retention Ponds Maintenance requirements are as follows: 1. Debris and litter control checks for inlet, outlet, and orifice obstruction after every storm producing runoff. 2. Provisions for routine vegetation management/mowing and a schedule for these activities. 3. Checks every 6 months, or more frequently, for: a. Sediment buildup and the need for removal. b. Erosion along the bank and the need for reseeding or stabilization and, if reseeding is necessary, a reseeding schedule. c. Erosion at the inlet and outlet and methods of stabilization. d. Seepage through the dam. e. Operation of any valves or mechanical components. I. Other BMPs Maintenance requirements will be based on the approved plans subject to North Carolina Division of Water Quality approval. The Town will inspect BMPs on an annual basis and forward a list of any required deficiencies or repairs to the property owner/responsible party. The property owner/responsible party will have 90 days to correct all deficiencies and make all repairs to the satisfaction of the Town Engineer. Failure to satisfactorily complete the repairs within the 90 days will cause the BMP to be declared a nuisance as provided for in Section 6-17 of the Garner Town Code. Abatement of the nuisance will proceed as provided for in Chapter 6, Article TI of the Garner Town Code. Brittmoore Subdivision STORMWATER BEST MANAGEMENT PRACTICES OPERATIONS AND MAINTENANCE AGREEMENT Property Owner/Responsible Party Sign. Print: F U R&A-A/ M. 0 ,0LjJU0.4 STATE OF NORTH CAROLINA Page 3 COUNTY OF WAKE a Notary Public for said County and State, do hereby certify that Jp ?( M C( ??((((?(-F personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official_ seal, this the day of (`' d . Official. Seal Notary Publ c My commission expires "7 - __ C Brittmore Stormwater Analysis and Design May 17, 2004 Prepared by B&F Consulting 2805 Tobermory Lane Raleigh, NC 27606 (919) 618-0180 Brittmore Stormwater Analysis and Design 2 Objective: The storm drainage infrastructure for Brittmore shall be designed and analyzed to provide diffuse flow into the Neuse River Buffer and detain the 1-year event to pre-development levels. Executive Summary: A dry detention pond provides the reduction in peak flow for the one-year event. The dry detention pond is constructed at the rear of lots 8 and 9. The outlet for the dry detention pond is a single 18" barrel. The dry detention pond also reduces the ten-year event to pre-development levels, and thus permits the discharge into the head of the Neuse River Buffer at the pre-development level. A level spreader is utilized at the end of the Honorable Place to effect diffuse flow into the Neuse River Buffer. Brittmore Stormwater Analysis and Design Analysis: Existing conditions: The existing site has impervious areas including drives, residence, tennis courts, and parking. The total impervious area is 1.02 acres and the total site area is 11.91 acres, for an 8.58% impervious ratio. The composite rational "C" is estimated as 0.40, with the impervious surface "C" assigned as 0.95, and the wooded terrain assigned as 0.35. Developed conditions: The drainage area for Basin 1 based on the proposed storm drainage conveyances is 6.0 acres. 0.32 acres are from off-site drainage. There are 13 full lots and approximately 2 lots with '/Z of the lot in the basin, for a total equivalent lot count of 14. Thus, the proposed density in the basin is 14 units / 6.0 acres, or 2.33 units per acre. The rational "C" for this density is estimated as 0.45. The drainage area at the end of the cul-de-sac that is undetained, but that will go through a level spreader to provide diffuse flow into the Neuse River Buffer is 1.37 acres. Four lots comprise this drainage area denoted as Basin 2, for a density of 2.9 units per acre. The rational "C" is estimated as 0.47 The drainage area for the lots that drain to the east of the property is 1.84 acres. This is denoted as Basin 3. The equivalent of six lots drain to the east, with an approximate density of 3.2 units per acre. The rational "C" is estimated as 0.5 The balance of the project is Basin 4, and it consists of the Neuse River Buffer and a single lot on the other side of the Neuse River Buffer. This equates to 3.01 acres, and the rational "C" is estimated as 0.4. The times of concentrations for the Basins were found by the Kirpich method. By inspection, Basin 1 has the largest area and longest flow path. Thus the time of concentration for this Basin will be the largest time of concentration of the Basins, and thus most conservative. The Kirpich method states that 3 0.385 L H T, _ 128 where T. = Time of Concentration, in minutes L = Length of mainstem, in feet H = Elevation drop, in feet Brittmore Stormwater Analysis and Design 4 The difference in elevation for Basin one is 47 feet (310 - 263) and the flow length is 660 feet. Thus, the time of concentration for Basin 1 is L3 0.385 (660 3 )0,385 T. = H = 47 = 3.2 minutes .'. use 5 minutes as default 128 128 The intensity for the one-year storm is given by the relationship: K t? +b where 1= Intensity, in inches per hour t,. =the time of concentration, in minutes K, b =Site -specific and storm -specific constants For the Garner area, the one-year, 24-hour storm is describe by the coefficients K = 104 and b = 18. Thus the intensity for a one-year, 24-hour storm with a five- minute time of concentration is K 104 = =4.5 t, +b 5+18 For the Garner area, the ten-year, 24-hour storm is describe by the coefficients K = 195 and b = 22. Thus the intensity for a ten-year, 24-hour storm with a five- minute time of concentration is K 195 = _72 t, +b 5+22 Brittmore Stormwater Analysis and Design 5 One Year Storm Analysis and Design Undetained Pre-Development Area (acres) TC (minutes) Intensity (in/hr) C Q, (cfs) Basin 1 5.98 5 4.5 0.40 10.8 Basin 2 1.37 5 4.5 0.40 2.5 Basin 3 1.84 5 4.5 0.40 3.3 Basin 4 3.01 5 4.5 0.40 5.4 Total: 22.0 Post-Development (undetained) Area (acres) TC (minutes) Intensity (in/hr) C Q, (cfs) Basin 1 5.98 5 4.5 0.45 12.1 Basin 2 1.37 5 4.5 0.47 2.9 Basin 3 1.84 5 4.5 0.50 4.1 Basin 4 3.01 5 4.5 0.40 5.4 Total: 24.6 Thus, Basin 1 must detain 2.6 cfs in the one-year, 24-hour storm for the post- development flow from the site to be less than or equal to the pre-development flow. The Post-development undetained flow is 12.1 cfs from Basin 1; the target release is 9.5 cfs (12.1-2.6). The routed storm (attached) shows a release of 4.5 cfs, which is well below the target release rate. Brittmore Stormwater Analysis and Design 6 Ten Year Storm Analysis and Design Undetained Pre-Development Area TC Intensity C Q10 (acres) (minutes) (in/hr) (cfs) Basin 1 5.98 5 7.22 0.40 17.3 Basin 2 1.37 5 7.22 0.40 4.0 Post-Development (undetained) Area TC Intensity C Q10 (acres) (minutes) (in/hr) (cfs) Basin 1 5.98 5 7.22 0.45 19.4 Basin 2 1.37 5 7.22 0.47 4.6 Basin 1 releases at the head of a Neuse River Buffer (NRB). Conversations with Bob Zarzeckli, Environmental Specialist with NC Division of Water Quality on May 11, 2004 indicate that at the head of a NRB, the flow may be discharged into the existing channel forming the NRB as long as the flow rate does not increase for the ten-year event. Thus, this detention needs to provide for a 2.1 cfs reduction in the ten-year event, based on pre to post-development flows, or a target release of 15.2 cfs (17.3 - 2.1). The routed storm (attached) shows a release of 13.0 cfs, which is well below the target release rate. The diffuse flow is a performance criteria, and thus the same stipulations apply to this release as to any diffuse flow mechanism (i.e. level spreader, plunge basin, etc). If the release creates a problem (i.e. erosion or degradation of the NRB), a remedy must be implemented. The basin provides a peak reduction of 7.4 cfs, which is well above that required. Basin 2 releases concentrated flow, and thus the need for a level spreader. The level spreader will be 13 X 4.6 = 60 feet in length. Basin 3 is far removed from the NRB and no diffuse flow mechanism is required. Basin 4 does not concentrate the flow (one single-family residence), and there is no diffuse flow mechanism required. DWQ Project No DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name Contact Person: Phone Number: (??Icr del Level Spreader ID: Level Spreader Length Drainage Area Impervious Area Maximum Filter Strip/Buffer Slope grass Max. Discharge from a 10 Year Storm Max. Discharge to Level Spreader Filter Strip/Buffer Vegetation Pre-treatment or Bypass Method II. REQUIRED ITEMS CHECKLIST ft. (perpendicular to flow) 1.3-7 ac. (on-site and off-site drainage to the level spreader) ac. (on-site and off-site drainage to the level spreader) % (6% for forested, leaf littler cover, 8% for thick ground cover)* ?. cfs ?. cfs (thick ground cover or grass, canopied forest with leaf litter groundcover) yefff?f. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. `//oro?C T%l. CJ Pre-Form Scour Holes are on flat slopes only No structures are located in protected buffers* If bypass method specified in the Draft Level Spreader Design Option Document: Bypass method is specified (if applicable) and plan details and calculations are provided Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. No structures are located in protected buffers. Plan details for the bypass and outlets are provided. The operation and maintenance agreement includes annual erosion and vegetation repair. The operation and maintenance agreement signed and notarized by the responsible party is provided. * Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. Britmore Detention Analysis B F Consulting 10-year 2805 Tobermory Lane Storm Drainage Outfall "B" Raleigh, NC (919) 618-0180 HYDROGRAPH PARAMETERS Item Existing Proposed Drainage Area Pervious [acres] 4.29 6.0 Ref: Topgraphic Impervious [acres] 0.0 2.29 Mapping Drainage Area [acres] 4.29 8.29 27.6% Rational C Composite Rational C 0.30 0.50 Time of Concentration, Tc Tc via Kirpich, with 1000 ' length of mai nstem, and 40' eleva tion difference, tc is 6 minutes TIC [min] 5.0 5.0 Intensities, I 2-year [in/hr] In, 406-year [in/hr] Peak Discharge, Qp 2-year [cfs] o 408-year [cfs] Curve Number, CN Soil Type Hydrologic Soil Group Pervious CN Impervious CN Composite CN S Precipitation Amount, P for 24 hour storm 2-year [inches] 10-year [inches] Volume of Runoff, V, from 24-h our storm 2-year [inches] 409-year [inches] [inches] 2-year [acre-feet] 1--l-00-year [acre-feet] Time-to-Peak, Tp (for use in routing) 2-year [minutes] 10-year [minutes] Time Interval for Routing 2-year [minutes] ioi-08-year [minutes] 5.56 5.56 7.22 7.22 7.2 23.0 9.3 29.9 Q=CIA B 59.0 59.0 99.0 98.0 59.0 69.8 6.9 4.3 3.6 3.6 5.6 5.6 0.53 1.06 v = ((p-.2S)^2)/(p+.8s) 2.44 0.38 0.87 8.6 Tp = V/(1.39*Qp) 15.2 2 2 for peak definition Britmore Detention Analysis B F Consulting 10-year 2805 Tobermory Lane Storm Drainage Outfall "B" Raleigh, NC (919) 618-0180 BASIN PARAMETERS Riser 18 3.3 266.00 = Dia. riser (inches) = Cw riser = Crest elev. riser Barrel 12 = Dia. barrel (inches) 0.59 = Cd barrel 263 = Invert elev. barrel Emergency Spillway 10 =Length 3.00 = Cw 269.8 = Crest elevation 4.0 = height outlet 1 [in.] 0.25 = length outletl [ft] Basin Geometry Description 0 = Cd outlet 1 15 Initial Basin parameter 0.00 = Invert outlet 1 30 Initial Basin parameter 0 = height outlet 2[in.] 10 multiplier for depth 0 = length outlet 2 [ft] 263.0 = Initial elev. water level 0 = Cd outlet 2 0 = Invert outlet 2 Results Event Pre-Development Post Development Post Development With Controls No controls Peak Volume Peak Peak Volume Peak Volume Discharge Discharge Elevation Discharge [cfs] [ac-ft] [cfs] [ac-ft] [cfs] [ac-ft] 2 7.2 6.8 266.82 23 10 9.3 9.1 269.54 29.9 100 Check of description of storage areas: Measured Actual Surface Elevation Area (s.f. ) Calculated Volume Predicted Above N.P. Elevation (c.f.) Delta Comments (ft) 263 903 452 263.62 0.62 264 1395 1,601 264.45 0.45 265 1898 3,247 265.23 0.23 266 2761 5,577 266.06 0.06 267 3769 8,842 266.96 -0.04 268 4840 13,146 267.93 -0.07 269 6001 18,567 268.94 -0.06 270 7276 25,205 270.00 0.00 Best fit in upper elevations, which is desireable Britmore Detention Analysis 10-year Storm Drainage Outfall "B" ROUTING AND ANALYSIS --2-year storm Time Inflow Storage Stage Outflow Surf. Area Q_barrel [min] [cfs] [cubic ft] [ft] [cfs] [sq.ft] 0 0.0 0 263.0 0.0 450 0.0 2 3.0 0 263.0 0.0 450 0.0 4 10.3 355 263.5 0.0 1026 1.4 6 18.3 111 263.2 0.0 651 0.5 8 22.8 111 263.2 0.0 651 0.5 10 21.5 2,847 265.1 0.0 4012 4.6 12 16.2 5,426 266.0 0.0 6777 5.9 14 12.0 7,368 266.6 6.5 8788 6.5 16 8.8 8,027 266.8 63 9462 6.7 18 6.5 8,283 266.8 6.8 9722 6.8 20 4.8 8,253 266.8 6.8 9692 6.8 22 3.6 8,020 266.8 6.7 9454 6.7 24 2.6 7,643 266.7 6.6 9069 6.6 26 1.9 7,167 266.5 5.9 8581 6.5 28 1.4 6,695 266.4 3.8 8096 6.3 30 1.1 6,413 266.3 2.7 7805 6.2 32 0.8 6,221 266.3 2.0 7605 6.2 34 0.6 6,079 266.2 1.5 7458 6.1 36 0.4 5,969 266.2 1.2 7344 6.1 38 0.3 5,882 266.1 0.9 7253 6.0 40 0.2 5,811 266.1 0.7 7180 6.0 42 0.2 5,754 266.1 0.6 7119 6.0 44 0.1 5,705 266.1 0.5 7069 6.0 46 0.1 5,665 266.1 0.4 7028 6.0 48 0.1 5,632 266.1 0.3 6992 6.0 50 0.1 5,603 266.1 0.3 6963 5.9 52 0.0 5,579 266.1 0.2 6938 5.9 54 0.0 5,559 266.1 0.2 6916 5.9 56 0.0 5,541 266.0 0.1 6898 5.9 58 0.0 5,526 266.0 0.1 6882 5.9 60 0.0 5,513 266.0 0.1 6868 5.9 62 0.0 5,502 266.0 0.1 6857 5.9 64 0.0 5,492 266.0 0.1 6846 5.9 66 0.0 0 263.0 0.0 450 0.0 68 0.0 0 263.0 0.0 450 0.0 70 0.0 0 263.0 0.0 450 0.0 72 0.0 0 263.0 0.0 450 0.0 74 0.0 0 263.0 0.0 450 0.0 76 0.0 0 263.0 0.0 450 0.0 78 0.0 0 263.0 0.0 450 0.0 0 266.82 6.8 < ==maximum 2-yr B F Consulting 2805 Tobermory Lane Raleigh, NC (919) 618-0180 Outlet Hydraulics Q_riser Q Q weir orifice em.spil outlet1 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.8 0 0.0 6.8 6.5 0 0.0 10.2 7.4 0 0.0 11.5 7.7 0 0.0 11.4 7.7 0 0.0 10.1 7.4 0 0.0 8.2 6.9 0 0.0 5.9 6.1 0 0.0 3.8 5.3 0 0.0 2.7 4.7 0 0.0 2.0 4.3 0 0.0 1.5 3.9 0 0.0 1.2 3.6 0 0.0 0.9 3.3 0 0.0 0.7 3.0 0 0.0 0.6 2.8 0 0.0 0.5 2.6 0 0.0 0.4 2.5 0 0.0 0.3 2.3 0 0.0 0.3 2.2 0 0.0 0.2 2.0 0 0.0 0.2 1.9 0 0.0 0.1 1.8 0 0.0 0.1 1.7 0 0.0 Britmore Detention Analysis 10-year Storm Drainage Outfall "B" ROUTING AND ANALYSIS -- 10-year storm Time Inflow Storage Stage Outflow Surf. Area Q_barrel [min] [cfs] [cubic ft] [ft] [cfs] [sq.ft] 0 0.0 0 263.0 0.0 450 0.0 2 1.3 0 263.0 0.0 450 0.0 4 4.8 151 263.3 0.0 716 0.7 6 10.1 728 263.9 0.0 1531 2.3 8 16.2 1,937 264.6 0.0 2989 4.0 10 22.0 3,875 265.5 0.0 5133 5.2 12 26.7 6,519 266.3 3.1 7914 6.3 14 29.4 9,358 267.1 7.0 10812 7.0 16 29.7 12,048 267.7 7.6 13509 7.6 18 27.5 14,704 268.2 8.1 16139 8.1 20 23.6 17,040 268.7 8.4 18434 8.4 22 19.9 18,853 269.0 8.7 20204 8.7 24 16.7 20,192 269.2 8.9 21507 8.9 26 14.1 21,136 269.4 9.0 22423 9.0 28 11.9 21,750 269.5 9.1 23018 9.1 30 10.0 22,089 269.5 9.1 23346 9.1 32 8.5 22,199 269.5 9.1 23453 9.1 34 7.1 22,119 269.5 9.1 23375 9.1 36 6.0 21,880 269.5 9.1 23145 9.1 38 5.1 21,511 269.4 9.0 22787 9.0 40 4.3 21,034 269.4 9.0 22324 9.0 42 3.6 20,468 269.3 8.9 21776 8.9 44 3.0 19,831 269.2 8.8 21156 8.8 46 2.6 19,136 269.0 8.7 20480 8.7 48 2.2 18,394 268.9 8.6 19757 8.6 50 1.8 17,617 268.8 8.5 18998 8.5 52 1.5 16,811 268.6 8.4 18210 8.4 54 1.3 15,986 268.5 8.3 17400 8.3 56 1.1 15,147 268.3 8.2 16576 8.2 58 0.9 14,299 268.2 8.0 15740 8.0 60 0.8 13,448 268.0 7.9 14898 7.9 62 0.7 12,597 267.8 7.7 14054 7.7 64 0.6 11,750 267.6 7.5 13211 7.5 66 0.5 10,910 267.4 7.4 12372 7.4 68 0.4 10,080 267.3 7.2 11540 7.2 70 0.3 9,263 2671 7.0 10716 7.0 72 0.3 8,462 266.9 6.8 9904 6.8 74 0.2 7,678 266.7 6.6 9105 6.6 76 0.2 6,914 266.5 4.7 8321 6.4 78 0.2 6,372 266.3 2.5 7762 6.2 80 0.1 6,091 266.2 1.5 7471 6.1 82 0.1 5,925 266.2 1.0 7298 6.1 84 0.1 5,816 266.1 0.7 7185 6.0 86 0.1 5,741 266.1 0.5 7106 6.0 88 0.1 5,686 266.1 0.4 7049 6.0 90 0.1 5,645 266.1 0.3 7006 6.0 92 0.1 5,612 266.1 0.3 6972 5.9 94 0.0 5,586 266.1 0.2 6945 5.9 96 0.0 5,565 266.1 0.2 6922 5.9 98 0.0 5,547 266.0 0.2 6904 5.9 100 0.0 5,532 266.0 0.1 6888 5.9 102 0.0 5,519 266.0 0.1 6875 5.9 104 0.0 5,508 266.0 0.1 6863 5.9 106 0.0 0 263.0 0.0 450 0.0 108 0.0 0 263.0 0.0 450 0.0 110 0.0 0 263.0 0.0 450 0.0 112 0.0 0 263.0 0.0 450 0.0 B F Consulting 2805 Tobermory Lane Raleigh, NC (919) 618-0180 Outlet Hydraulics Q_riser Q Q weir orifice em.spil outletl 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 3.1 5.0 0 0.0 17.6 8.9 0 0.0 34.4 11.1 0 0.0 52.1 12.7 0 0.0 68.0 13.9 0 0.0 80.5 14.7 0 0.0 89.7 15.3 0 0.0 96.3 15.6 0 0.0 100.5 15.9 0 0.0 102.9 16.0 0 0.0 103.6 16.0 0 0.0 103.1 16.0 0 0.0 101.4 15.9 0 0.0 98.9 15.8 0 0.0 Britmore Detention Analysis B F Consulting 10-year 2805 Tobermory Lane Storm Drainage Outfall "B" Raleigh, NC (919) 618-0180 114 0.0 0 263.0 0.0 450 0.0 116 0.0 0 263.0 0.0 450 0.0 118 0.0 0 263.0 0.0 450 0.0 120 0.0 0 263.0 0.0 450 0.0 122 0.0 0 263.0 0.0 450 0.0 124 0.0 0 263.0 0.0 450 0.0 126 0.0 0 263.0 0.0 450 0.0 128 0.0 0 263.0 0.0 450 0.0 130 0.0 0 263.0 0.0 450 0.0 132 0.0 0 263.0 0.0 450 0.0 134 0.0 0 263.0 0.0 450 0.0 136 0.0 0 263.0 0.0 450 0.0 138 0.0 0 263.0 0.0 450 0.0 140 0.0 0 263.0 0.0 450 0.0 142 0.0 0 263.0 0.0 450 0.0 144 0.0 0 263.0 0.0 450 0.0 146 0.0 0 263.0 0.0 450 0.0 148 0.0 0 263.0 0.0 450 0.0 150 0.0 0 263.0 0.0 450 0.0 152 0.0 0 263.0 0.0 450 0.0 154 0.0 0 263.0 0.0 450 0.0 156 0.0 0 263.0 0.0 450 0.0 158 0.0 0 263.0 0.0 450 0.0 160 0.0 0 263.0 0.0 450 0.0 162 0.0 0 263.0 0.0 450 0.0 164 0.0 0 263.0 0.0 450 0.0 166 0.0 0 263.0 0.0 450 0.0 168 0.0 0 263.0 0.0 450 0.0 170 0.0 0 263.0 0.0 450 0.0 172 0.0 0 263.0 0.0 450 0.0 174 0.0 0 263.0 0.0 450 0.0 176 0.0 0 263.0 0.0 450 0.0 178 0.0 0 263.0 0.0 450 0.0 180 0.0 0 263.0 0.0 450 0.0 182 0.0 0 263.0 0.0 450 0.0 269.54 9.1 -maximum maximum (10-yr) Brittmore Detention Analysis B F Consulting 1-year and 10year 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 HYDROGRAPH PARAMETERS Item Existing Proposed Drainage Area Pervious [acres] 5.98 4.2 Ref: Topgraphic Impervious [acres] 0.0 1.78 Mapping Drainage Area [acres] 5.98 5.98 29.8% Rational C Composite Rational C 0.40 0.45 Time of Concentration, Tc Tc [min] 5.0 5.0 Intensities, I 1-year [in/hr] 4.50 4.50 100-year [in/hr] 9.70 9.70 Peak Discharge, Qp Q = CIA 1-year [cfs] 10.8 12.1 100-year [cfs] 23.2 26.1 Curve Number, CN Soil Type Hydrologic Soil Group B Pervious CN 59.0 59.0 Impervious CN 99.0 98.0 Composite CN 59.0 70.6 S 6.9 4.2 Precipitation Amount, P 1-year [inches] 2.1 2.1 1r10-year [inches] 8.0 8.0 Volume of Runoff, V 1-year [inches] 0.07 0.30 v = ((p-.2S)^2)/(p+.8s) ?.y0-year [inches] 4.53 [inches] 1-year [acre-feet] 0.15 130-year [acre-feet] 2.26 Time-to-Peak, Tp (for use in routing) 1-year [minutes] 6.4 Tp = V/(1.39'Qp) 1,10-year [minutes] 45.2 Time Interval for Routing 1-year [minutes] 0.5 0 0-year [minutes] 2 for peak definition Brittmore Detention Analysis B F Consulting 1-year and 1Myear 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 BASIN PARAMETERS Riser 999 3.3 266.00 = Dia. riser (inches) = Cw riser = Crest elev. riser Barrel 18 = Dia. barrel (inches) 0.59 = Cd barrel 266 = Invert elev. barrel Emergency Spillway 20 =Length 3.00 = Cw 269.8 = Crest elevation 1.0 = height outlet 1 [in.] 1.00 = length outletl [ft] Basin Geometry Description 0.6 = Cd outlet 1 60 Initial Basin parameter 263.00 = Invert outlet 1 57 Initial Basin parameter 0 = height outlet 2[in.] 4 multiplier for depth 0 = length outlet 2 [ft] 266.0 = Initial elev. water level 0 = Cd outlet 2 0 = Invert outlet 2 Results Event Pre-Development Post Development Post Development With Controls No controls Peak Volume Peak Peak Volume Peak Volume Discharge Discharge Elevation Discharge [cfs] [ac-ft] [cfs] [ac-ft] [cfs] [ac-ft] 1 10.8 4.5 266.92 12.1 10t, 23.2 25.2 270.10 26.1 Check of description of storage areas: Measured Actual Surface Elevation Area (s.f. ) Calculated Volume Predicted Above N.P. Elevation (c.f. ) Delta Comments (ft) 266 2761 1,381 266.38 0.38 267 3769 4,646 267.17 0.17 268 4840 8,950 268.04 0.04 269 6001 14,371 268.98 -0.02 270 7276 21,009 269.98 -0.02 Best fit in upper elevations, which is desireable Brittmore Detention Analysis 1-year and 1Myear Basin 1 ROUTING AND ANALYSIS --1-year storm Outlet Hydraulics Time Inflow Storage Stage Outflow Surf. Area Q_barrel [min] [cfs] [cubic ft] [ft] [cfs] [sq.ft] 0.0 0.0 0 266.0 0.0 3420 0.0 0.5 0.2 0 266.0 0.0 3420 0.0 1.0 0.7 6 266.0 0.0 3422 0.0 1.5 1.6 111 266.0 0.2 3450 0.2 2.0 2.7 111 266.0 0.2 3450 0.2 2.5 4.1 188 266.1 0.3 3471 0.3 3.0 5.5 302 266.1 0.4 3502 0.4 3.5 7.0 455 266.1 0.6 3543 0.6 4.0 8.4 646 266.2 0.9 3595 0.9 4.5 9.7 873 266.2 1.2 3655 1.2 5.0 10.8 1,129 266.3 1.5 3723 1.5 5.5 11.6 1,407 266.4 1.9 3795 1.9 6.0 12.0 1,698 266.5 2.3 3871 2.3 6.5 12.1 1,991 266.5 2.6 3946 2.6 7.0 11.8 2,275 266.6 3.0 4019 3.0 7.5 11.2 2,541 266.7 3.3 4086 3.3 8.0 10.2 2,777 266.7 3.6 4145 3.6 8.5 9.2 2,978 266.8 3.8 4195 3.8 9.0 8.3 3,142 266.8 4.0 4236 4.0 9.5 7.5 3,273 266.9 4.1 4269 4.1 10.0 6.8 3,375 266.9 4.2 4294 4.2 10.5 6.1 3,451 266.9 4.3 4313 4.3 11.0 5.5 3,506 266.9 4.4 4326 4.4 11.5 5.0 3,540 266.9 4.4 4335 4.4 12.0 4.5 3,557 266.9 4.5 4339 4.5 12.5 4.1 3,559 266.9 4.5 4339 4.5 13.0 3.7 3,548 266.9 4.4 4337 4.4 115 3.3 3,525 266.9 4.4 4331 4.4 14.0 3.0 3,493 266.9 4.4 4323 4.4 14.5 2.7 3,451 266.9 4.3 4313 4.3 15.0 2.4 3,403 266.9 4.3 4301 43 15.5 2.2 3,348 266.9 4.2 4287 4.2 16.0 2.0 3,288 266.9 4.1 4272 4.1 266.92 4.5 < _= maximum 1-yr B F Consulting 2805 Tobermory Lane Raleigh, NC (919) 618-0180 Q_riser Q Q weir orifice em.spil outlet1 Brittmore Detention Analysis 1-year and 106year Basin 1 ROUTING AND ANALYSIS -- 10?year storm Outlet Hydraulics Time Inflow Storage Stage Outflow Surf. Area Q_barrel [min] [cfs] [cubic ft] [ft] [cfs] [sq.ft] 0 0.0 0 266.0 0.0 3420 0.0 2 0.1 0 266.0 0.0 3420 0.0 4 0.5 15 266.0 0.0 3424 0.0 6 1.1 73 266.0 0.1 3440 0.1 8 2.0 195 266.1 0.3 3473 0.3 10 3.0 398 266.1 0.6 3528 0.6 12 4.3 695 266.2 1.0 3608 1.0 14 5.7 1,094 266.3 1.5 3713 1.5 16 7.3 1,601 266.4 2.1 3846 2.1 18 8.9 2,217 266.6 2.9 4004 2.9 20 10.7 2,944 266.8 3.8 4187 3.8 22 12.5 3,778 267.0 4.7 4393 4.7 24 14.3 4,714 267.2 5.7 4620 5.7 26 16.1 5,745 267.4 6.8 4865 6.8 28 17.8 6,862 267.6 7.9 5126 7.9 30 19.5 8,056 267.9 8.9 5400 8.9 32 21.0 9,329 268.1 9.8 5686 9.8 34 22.3 10,675 268.4 10.6 5985 10.6 36 23.5 12,084 268.6 11.4 6292 11.4 38 24.5 13,541 268.8 12.1 6606 12.1 40 25.3 15,028 269.1 12.8 6922 12.8 42 25.8 16,526 269.3 13.4 7236 13.4 44 26.1 18,012 269.5 14.0 7544 14.0 46 26.1 19,462 269.8 14.5 7841 14.5 48 25.9 20,854 270.0 18.7 8124 15.0 50 25.4 21,718 270.1 24.0 8299 15.2 52 24.7 21,890 270.1 25.2 8334 15.3 54 23.7 21,833 270.1 24.8 8322 15.3 56 22.6 21,712 270.1 23.9 8298 15.2 58 21.4 21,555 270.1 22.9 8266 15.2 60 20.2 21,377 270.0 21.7 8230 15.1 62 19.1 21,194 270.0 20.6 8193 15.1 64 18.0 21,011 270.0 19.5 8156 15.0 66 17.0 20,827 270.0 18.5 8119 14.9 68 16.0 20,644 269.9 17.6 8082 14.9 70 15.1 20,457 269.9 16.7 8044 14.8 72 14.3 20,266 269.9 15.9 8005 14.8 74 13.5 20,068 269.8 15.3 7965 14.7 76 12.7 19,855 269.8 14.7 7922 14.6 78 12.0 19,616 269.8 14.5 7873 14.5 80 11.4 19,315 269.7 14.4 7811 14.4 82 10.7 18,945 269.7 14.3 7736 14.3 84 10.1 18,514 269.6 14.2 7647 14.2 86 9.6 18,031 269.5 14.0 7548 14.0 88 9.0 17,500 269.5 13.8 7438 13.8 90 8.5 16,930 269.4 13.6 7320 13.6 92 8.0 16,325 269.3 13.3 7194 13.3 94 7.6 15,692 269.2 13.1 7061 13.1 96 7.2 15,036 269.1 12.8 6923 12.8 98 6.8 14,363 269.0 12.5 6781 12.5 100 6.4 13,677 268.9 12.2 6635 12.2 102 6.0 12,984 268.8 11.8 6487 11.8 B F Consulting 2805 Tobermory Lane Raleigh, NC (919) 618-0180 270.10 25.2 < == maximum (ITyr) aq; 14' AdMMW?AWAUN?T. ___ A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director September 3, 2004 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Brittchurch Corporation 9313 Ten-Ten Road Raleigh, NC 27603 Subject Property: Brittmore Subdivision, Rand Road, Raleigh, NC REQUEST FOR MORE INFORMATION-Stormwater Management Plan DWQ Project # 04-0936 Wake County On July 14, 2004, the Division of Water Quality (DWQ) received the stormwater management plan prepared by your engineer, Mr. Russell Briggs, P.E., to comply with the conditions of the 401 Water Quality Certification issued on July 12, 2004. Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ)• A complete package includes all of the items listed below. ¦ Signed and notarized Operation and Maintenance Agreement for the Stormwater facilities. ¦ Completed worksheet for each BMP. ¦ Detailed narrative description of stormwater treatment/management. ¦ Plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919.733.6893 / Internet: htto://h2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarohna ;Vatmrally Brittmore Subdivision Page 2 of 2 September 3, 2004 Please respond within three weeks of the date of this letter by sending three (3) copies this information in writing. This letter only addresses the stormwater management plan review and does not authorize any impacts to wetlands or streams until the plans are approved. Please call Ms. Cynthia Van Der Wiele at 919-715-3473 or Mr. John Dorney at 919-733-1786 if you have any questions regarding this issue. Sincerely, JRD/cvdw U? orney, Wetlands / 401 U it cc: DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Russell Briggs, B&F Consulting, 2805 Tobermory Lane,\Raleigh, NC 27606 Filename: 040936Brittmore(Wake)Storm MoreInfo.doc SENDING CONFIRMATION DATE SEP-8-2004 WED 09:51 NAME DWQ-WETLANDS TEL 9197336893 PHONE : 98469467 PAGES : 4/4 START TIME : SEP-08 09:49 ELAPSED TIME : 01,001, MODE : ECM RESULTS : OK FIRST PAGE OF RECENT DOCUMENT TRANSMITTED... FMA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Alid,eol F Easley, Governor William G. Rosa, Jr., Secretary Alan W. Klimek, P.E., Director Wetlands/401 Certification Unit Street Address: 2321 Crabtree Boulevard Suite 250 Raleigh, NC 27604-2260 Malting Address: 1650 Mail Service Ccaiter Raleigh, NC 27699-1650 Contactfnformatium Phone #: 919-733-1786 Fax #: 919-733-6893 Fax To: Zddtt? p ?L/ !t{(e F.. #: Company: p Date: Number of pages indurding cover sheet: Notes or special blu tructions: b, va.me o.fnwmlan um , 690 W8.M 0e . Rregn Nat,afow ZrMP,MA 2221 Cnbw awwIfO. AAxPID, rbM:7ftn c>,.me Y]Bd Caro lA PWW 414738 Ilse lFPJCafP72Aat08t1tMrt __ *a, ra, o Grgr,. -mr, a.oRMrla%I4u 0- v.pw M ev.ro:t.f>r.q+sw..aa,f w..?? NCDENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor Division of Water Quality Wetlands/401 Certification Unit Street Address: 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604-2260 Mailing Address: 1650 Mail Service Center Raleigh, NC 27699-1650 Contact Information: Phone #: 919-733-1786 Fax #: 919-733-6893 Fax To: Company: Number of pages including cover sheet: Notes or special instructions: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733.68936 / Internet: hhtW://h2o.enr.state.nc.us/ncwetlands) An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Fax #: William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director Date: 9 x ? y NorthCarohna NaAwliff SENDING CONFIRMATION DATE SEP-8-2004 WED 08:36 NAME DWQ-WETLANDS TEL 9197336893 PHONE : 98469467 PAGES : 3/3 START TIME : SEP-08 08:35 ELAPSED TIME : 00'28" MODE : ECM RESULTS : OK FIRST PAGE OF RECENT DOCUMENT TRANSMITTED... *V NCDENR North Carolina Department of Environment and Natural Reaouroes Division of Water Quality NWxd F. Easley, Governor William G. Rose, Jr., Secretary Also W. Klimek, P,E, Ulreti.)r Wetlantls/401 Certif9cation Unit Street Address: 2321 Crubttee lloulevanl, Suite 250 Raleigh, NC 27604-2260 Mailing Address: 1650 Mail Service Center Raleigh, NC 27699-14550 Contactlnformatlon: Phone: 919733-1786 Fax #: 919-733.6893 Fax To: ..[ 1 x m F. #: 2 y?a 7 Company: S.' "•C-- - - Date: Number or pages Including cover sheet: 3 Notes or special instructions: Sera ,3 M? V- { - r k-e:- ry f,o ry1 1 1 C0 Z.•?. c. r, rrypn, ran c a.• erase use aae, a.pe» e.m.,a. er as e.r.tg,, nantww eta worse,e.nslMerFAxmaraawsrrr?emvab M Eqw opm*NW NnwN ?en0nw -M AKY*W10%eM sawn P w o aro ina Naturally Soil & Environmental Consultants, PA 11010 Raven Ridge Road ° Raleigh, North Carolina 27614 ° Phone: (919) 846-5900 ° Fax: (919) 846-9467 www.SandEC.com Transmittal ?i To: ©j r 2 eG I' lc Project Date: ` Project Name: 8- T ?^20 Q File: We Transmit to you Herewith: Under Separate Cover: ? Drawings ? For your information and files ? By mail Specifications For comment or approval By courier ? Brochures or photos Returned for correction, resubmit By express ? Correspondence ? Approved as noted ? As per your request No. Copies Document No. Date Description ire- f I(-- WETLANDS / 401 GROUP SECTION Remarks: T \?TU ce v` ? C wl l 1 i ©Q If enc osures are not as listed as above, kindly notify us at once. l ©_(t ?1 ?' l!J Luc Qd1 ??? 1 ;co L's "-c Yb \-k By: Sz c `? Akee C? Y\ C Charlotte Office: Greensboro Office: Hickory Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive 622 Coon Mountain Lane Concord, NC 28025 Greensboro, NC 27455 Taylorsvilie, NC 28681 Phone: (704) 720-9405 Phone: (336) 540-8234 Phone (828) 635-5820 Fax: (704) 720-9406 Fax: (336) 540-8235 Fax: (828) 635-5820 F Environmental Consultants, PA Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 L E Division of Water Quality Attention: Bob Zarzecki July 14, 2004 S&EC, PA Project # 8447.W1 Re: Questions about the Buffer and 401 Water Quality Certification approval letter dated 7/12/04 on the Brittmoore Subdivision Project (DWQ Project # 04-0936) Dear Mr. Zarzecki: Thank you for the Buffer and 401 Water Quality Certification approvals for the Brittmore Subdivision (DWQ Project # 04-0936 received 7/13/04). After reviewing the approval letter, a few items on the approval letter were different from the permit application that we had submitted. The 0.05 acre wetland impact for the proposed dry pond (Impact site 1) is listed on the approval letter as being a sewer impact when the impacts are resulting from the construction of a dry pond required by the Town of Garner. Also the stream impact (Impact site 1, 22 feet, crossing) is listed as also being a sewer crossing when it was proposed by the permit application for a driveway to access a lot. No sewer crossings are proposed on this project, however we did request parallel buffer impacts for the sewer line which you approved with mitigation. Please see the attached table below. This table is what the impact table should look like on the approval letterA Amount Approved Plan Location or Reference (units) Stream 22 (feet) Impact site 1 (driveway crossing) 404 Wetlands 0.05 (acres) Impact site 1 (fill for dry pond construction) Waters - (acres) - Buffers 3,570 (square feet) sewer and driveway Also attached you will find a copy of the stormwater plan as prepared by Russell Briggs as requested by the approval letter prior to impacts.If there are any stormwater plan Charlotte Office: Greensboro Office: HickoEy Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive 622 Coon Mountain Lane Concord, NC 28025 Greensboro, NC 27455 Taylorsville, NC 28681 Phone: (704) 720-9405 Phone: (336) 540-8234 Phone (828) 635-5820 Fax: (704) 720-9406 Fax: (336) 540-8235 Fax: (828) 635-5820 questions contact Mr. Briggs directly. Mr. Briggs stated to us that he previously discussed the issues related to the stormwater plan with you. If there are any other questions feel free to contact Will Buetow or Kevin Martin. Sincerely, Will Buetow N.C. Licensed Soil Scientist License # 1255 Brittmore Stormwater Analysis and Design May 17, 2004 WETLANDS / 401 GOUP SEP 0 7 2004 WATER QUALITYSECTION Prepared by 13&F Consulting 2805 Tobermory La Raleigh, NC 27601 (919) 618-0180 QTniznnfih JNRIE3NIDO NOWND Ifi OLOTZ996T6 YU W90 IOOZ/8Z/50 Brittmore Storrnw'ater Analysis and Design 2 Objective: The storm drainage infrastructure for Brittmore shall be designed and analyzed to provide diffuse flow into the Neuse River Buffer and detain the 1 year event to pre-development levels. Executive Summary: A dry detention pond provides the reduction in peak flow for the one-year even. The dry detention pond is constructed at the rear of lots 8 and 9. The outlet for the dry detention pond is a single 18" barrel. The dry detention pond also reduces the ten-year event to pre-development levels, and thus permits the discharge into the head of the Neuse }diver Buffer at the pre-development level. A level spreader is utilized at the end of the Honorable Place to effect diffuse flow into the Neuse River Buffer. The 100-year event was routed through the basin to ensure adequacy of the spillways - both principal and emergency. QTn/tnoFM 9HIUSHMIDNH HOWHOVIH OLOTZ996TS YU W90 VOOZ/9Z/90 Bzittmore Stozmwater Analysis and Deign Analysis: Existing conditions: The existing site has Impervious areas including drives, residence, tennis courts, and parking. The total impervious area is 1.02 acres and the total site area is 11.91 acres, for an 8.58% impervious ratio. The composite rational "C" is estimated as 0.40, with the impervious surface °C" assigned as 0.95, and the wooded terrain assigned as 0.35. Developed conditions: The drainage area for Basin 1 based on the proposed storm drainage conveyances is 6.0 acres. 0.32 acres are from off-site drainage. There are 13 full lots and approximately 2 lots with Y7 of the lot In the basin, for a total equivalent lot count of 14. Thus, the proposed density in the basin is 14 units / 6.0 acres, or 2.33 units per acre. The rational "C" for this density is estimated as 0.45. The drainage area at the end of the cul-de-sac that is undetained, but that will go through a level spreader to provide diffuse flow into the Neuse River Buffer is 1.37 acres. Four lots comprise this drainage area denoted as Basin 2, for a density of 2.9 units per acre. The rational "C" is estimated as 0.47 The drainage area for the lots that drain to the east of the property is 1.84 acres. This is denoted as Basin 3. The equivalent of six lots drain to the east, with an approximate density of 3.2 units per acre. The rational "C" is estimated as 0.5 The balance of the project is Basin 4, and it consists of the Neuse River Buffer and a single lot on the other side of the Neuse River Buffer. This equates to 3.01 acres, and the rational "C" is estimated as 0.4. The times of concentrations for the Basins were found by the Kirpich method. By inspection, Basin 1 has the largest area and longest flow path. Thus the time of concentration for this Basin will be the largest time of concentration of the Basins, and thus most conservative. The Kirpich method states that L' osas H T` 128 where T? Time of Concentration, in minutes L =Length of mainstem, in feet ,H' Elevation drop, in feet orniannrA DNIHHHNIDN3 NONEDVIM OLOTZ996T6 %V3 5V:90 VOOZ/SZ/50 Nittmore Stormwater Analysis and Design 4 The difference in elevation for Basin one is 47 feet (310 - 263) and the flow length is 660 feet- Thus, the time of concentration for Basin 1 is '0 0,385 6603 01385 47 T, _ ,ff _ 128 = 3.2 minutes .. use 5 minutes as default 128 The intensity for the one-year storm is given by the relationship: _ K I t? +b where I = Intensity, in inches per hour t, =the time of concentration, in minutes K, b = Site - specific and storm - specific constants For the Gamer area, the one-year, 24-hour storm is describe by the coefficients K = 104 and b = 18. Thus the intensity for a one-year, 24-hour storm with a five- minute time of concentration is I= K = 104 =4.5 t,+b 5+18 For the Gamer area, the ten-year, 24-hour storm is describe by the coefficients K = 195 and b = 22. Thus the intensity for a ten-year, 24-hour storm with a five- minute time of concentration is K = 195 =72 I`t?+b5+22 n Tnii,nnr% nNIHRRMIDNH NORMOV19 OLOTZ996T6 YVV3 5r':90 tOOZ/9"O Brittmore HYDROGRAPH PARAMMRS Item Drainage Area Pervious [acres] Impervious [acres] Drainage Area [acres] Rational C Composite Rational C Time of Concentration, To TC [min] Intensities, I 1 -year Fn/hr) 10-year (in/hrl Peak Discharge, Qp 1-year [mil 10-year [ofs] Curve Number, ON Soil Type Hydrologic Soil Group Pervious CN Impervious CN Composite CN S Precipitation Amount, P 1-year [inches] 10-year Finches] Volume of Runoff, V 1-year [inches] 10-year [inches] Cncheal 1-year [acre-feet] 10-year [acre-feet) Time-to-Peak, Tp (for use in routing) 1-year [minutes] 10-year [minutes) Time interval for Routing 1-Year [minutes) 10-year [minutes] -,t ,n nn rA, Detention Analysis B F Consulting 1-year and 10-year 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 EaOsting Proposed 5.98 4.2 Ref. Topgraphic 0.0 1.78 Mapping 5.98 5.98 29.8% 0.40 0.45 5.0 5.0 4.50 4.50 7.22 7.22 10.8 12.1 17.3 19.4 Q = CIA B 59.0 59.0 99.0 98.0 59.0 70.6 6.9 4.2 2.1 2.1 5.6 5.6 0.07 0.30 v = ((p-2Sr2)/(P+.Ss) 2.61 0.15 1.25 6.4 Tp = V/0.39'Qp) 33.7 0.5 2 for peak definition n9Tx99NThK9 MONNOV'Ifi OLOTZ996TS %V3 56:90 6002/8Z/50 Btittmore Detention Analysis B F Consulting 1-year and 10-year 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 BASIN PARAMETERS Barrel 18 = Dia. barrel (inches) 0:59 = Cd barrel 266 =Invert elev. barrel Emergency spillway 10 = Length 3.00 = Cw 269.8 =Crest elevation Basin Geometry Description 60 Initial Basin parameter 57 Initial Basin parameter 4 multiplier for depth 266.o = Initial elev. water level RESULTS Peak Volume Discharge left] [aatt] 1 10.8 10 17.3 Discharge Elevation [C) 4.5 266.92 13.0 269.18 Check of description of storage areas: Measured Calculated Actual Surface Volume Predicted Elevation Area Above N.P. Elevation (S.f.) (c-f-) 286 2761 1.381 266.38 267 3769 4,646 267.17 268 4840 8,950 268.04 269 6001 14.371 268.98 270 7276 21,009 269.98 Development Discharge [acct] [cfsl 12.1 19.4 lac-ftl Delta comments (ft) 0.38 0.17 0.04 -0.02 -0.02 Best fit in upper elevations, which is desireable „T„ , , - F-A, ` VTMWWWTnVq unwunvtA OLOTZ996T6 YM 5V : 90 VOOZ/9Z/50 Detention Analysis elittmore 1-year and 10-year Basin 1 ROUTING AND ANALYSIS -1-Year storm outlet Hydraulics Storage Stage outflow Surf. Area 0 -barrel Time [min] Inflow [cfs) [cubic It] [ft) [CM MA o 266.0 0.0 3420 0.0 0.0 0.0 0 266.0 0.0 3420 0.0 0.5 02 6 266.0 0.0 3422 0.0 1,0 1 5 0.7 1.6 111 266.0 0.2 3450 3450 0.2 0 2 . 210 2.7 111 188 266.0 266.1 0.2 0.3 3471 0.3 2.5 3 0 4.1 5.5 302 23-1 0.4 3502 3543 0.4 0.6 3.5 7.0 455 266.1 2 266 0.6 0.9 3595 0.9 4.0 8.4 646 873 . 266.2 1.2 5 6``' 3 1.2 4.5 5 0 9.7 10.8 1,129 266.3 1.5 3 2 7 3795 1.5 1 9 . 5.5 11.6 1.407 698 1 266.4 266.6 1.9 2.3 3 71 2.3 6 6.0 5 6 12.0 12.1 , 1.991 266.5 2.6 3946 4019 2. 3.0 . 7.0 11.8 2,275 1 266.6 266 7 3.0 3.3 4086 3 3 7.5 11.2 2 10 2,54 777 2 2 . 266.7 3.6 4145 3 6 3 8 8.0 8.5 . 9.2 , 2,978 266.8 3.8 0 4 4195 4236 . 4.0 9.0 8.3 3,142 273 3 266.8 266.9 . 4.1 4269 4.1 9.5 7.5 6 8 , 3 375 265.9 4 2 4294 42 4 3 10.0 10.5 . 6.1 , 3.451 266.9 4 3 4 4 4313 4313 . 4.4 11.0 5-5 3,506 3 540 266.9 266.9 . 4.4 4335 4.4 118 12 0 5.0 4.5 , 3.557 266.9 4.5 4339 4339 4.5 4.5 - 12.5 4.1 3,559 266.9 9 266 4.5 4.4 4337 4 4 13.0 3.7 3,548 525 3 . 265.9 4.4 4 31 4.4 4 13-5 3 3 0 3 , 3.493 266.9 4.4 4323 4. 3 4 14.0 14.5 . 2.7 3,451 266.9 4.3 3 4 4313 4301 . 4.3 15.0 2-4 3,403 348 3 266.9 266.9 . 4.2 4287 4.2 4 1 15.5 2.2 , 288 3 266.9 4.1 4272 . 16.0 2.0 , 266.92 4.5 < - maximum 1-Yr B F Consulting 2805 Tobermory Lane Raleigh, NC (919) 61 &p180 ornionnIi 9NIHMIJNa NONNOY la OLOTZ996T6 %Vd 5Y:90 i?OOZ/9Z/50 Detention Analysis B F Consulting Brittmore 2805 TobermoTY Lane 1-year and 1d-yea[ Raleigh, NC Basin 1 (919) 618-0180 ROUTING AND ANALYSIS - 10-Year storm Time Imin] 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 100 102 Inflow storage Stage Ids] [cubic ft] Ift] Outlet Hydraulics Outflow Surf. Area Q barrel Ids] iSCI•ft] 0 0 0 266.0 0.0 3420 00.0 0 . 0.2 0 266.0 0.0 0 0 3420 3426 . 0 0.7 20 97 266.0 266.0 . 0.1 3447 0 1.5 259 266.1 0.4 3490 0 4 2.6 3 9 525 266.2 0.7 3562 0,7 2 1 . 5.5 909 266.3 1 2 1 9 3665 3798 . 1.9 7.2 1,418 051 2 266.4 266.6 . 2.7 3961 2.7 9.0 10.8 , 2,803 266.7 8 4 4152 4365 3.6 4.6 12.5 3,664 266'9 2 267 6 5.6 4597 5.6 14.2 7 4,620 651 5 . 267.4 6.7 4843 6-7 15. 0 17 , 6,735 267.6 7.8 5 5097 097 7.8 7 8 . 18.1 7,849 267.8 8.7 5352 5608 . 9.5 18.9 8,977 268.0 3 268 9.5 10.3 5857 10.3 19.3 4 19 10.097 11,184 . 268.4 10. 6097 10.9 11 4 . 19.2 12,209 268.6 11.4 4 11 9 6319 6520 . 119 18.7 13,140 949 13 268.8 268.9 . 12.3 6693 12.3 17.8 16.6 . 14,608 269.0 12.6 6833 6936 12.6 12.8 15.4 15,095 269.1 1 269 12.8 12.9 7002 12.9 14,3 15,410 571 15 . 269.2 13.0 7036 13.0 132 12.2 , 15,597 269.2 13.0 7041 7022 13.0 13.0 11.3 15,503 269.2 1 269 13.0 12.9 6980 12.9 10.5 15.305 017 15 . 269.1 12.8 6919 12.8 9.7 9.0 . 14,649 269.0 12.6 6842 6749 112.6 24 8.3 14.215 269.0 12.4 122 6645 12.2 7.7 13.723 185 13 268.9 268.8 11.9 6530 11.9 7.1 6.6 , 12,600 268.7 11.6 6406 6275 1 1.6 11.3 6.1 12,003 268.6 11.3 11 0 6138 11.0 5.7 11,376 735 10 268.5 268.4 . 10 ? 5998 10.6 52 4.8 , 10,087 268.3 10.2 5855 5711 10.2 9.8 4.5 9,439 268.1 0 268 9.8 9.4 5567 9.4 4.2 8 3 8,797 168 8 . 267.9 8.9 5425 8 9 8 5 . 3.6 . 7,556 267.8 815 5286 5150 . 8 .0 3.3 6,967 406 6 267.7 267.5 7.6 5020 .5 7 3.0 2.8 , 5,878 267.4 6.9 4896 4760 6.9 6.4 2.6 5,365 267.3 6.4 5 9 4671 5.9 2.4 4,928 505 4 267.2 267.1 ' 5.5 4570 5.5 2.2 21 , 4,114 267.1 5.1 4475 4387 4.7 1.9 3,7`54 267.0 4.7 4 3 .3 4 1.8 3,423 266.9 8 266 . 4.0 5231 4.0 1.6 3,120 . 269.18 13.0 < = maximum (10-Yr) ..T.. ,,,,.., M. M:NVTN9gWT"KTR njnwxnvw OLOTZ996TS %V3 5V :90 VOOZ/9Z/50 Stormwater Analysis and Design 7 Brittmorc 100 Year Storrs Analysis and Design The attached routing shows the 100-year storm routed through the basin- The principal spillway discharges 15.1 cfs during the peak, and the emergency spillway discharges another 8.2 cfs. The length of the emergency spillway is set at 80 feet, and with this length, the emergency spillway has only one-tenth of a foot for the depth of flow. The system adequately passes the 100-year event. ^--,,,r..r.;. n1JTN99NT9N9 NOWX:)V'IH OLOTZ996T6 XVd 0:90 POOZ/9Z/50 Detention Analysis B F ConsAng Brittmore 100-year Routing 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 HYDROGRAP14PARAMETERS Item Drainage Area Pervious [acres] impervious (acres] Drainage Area [acres] Rational C Composite Rational C Time of Concentration, Tc TO (min] intensities, I 100-year Grdhr] Peak Discharge, Qp 100-year [cf3i Curve Number, CN Soil Type Hydrologic Soil Group Pervious CN impervious CN Composite CH S Precipitation Amount, P 100-year [inches] Volume of Runoff, V 100-year [inu] 100-year [amre-feet] Time-to-Peak Tp (for use In routing) 100-year [minutes] Time interval for Routing loo-year [minutes] Existing Proposed 5.98 42 0.0 1.78 5.98 5.98 29.8% 0.40 0.45 6.0 6.0 9.00 9.00 21.5 24.2 B 59.0 59.0 90.0 98.0 69.0 70.6 6.9 4.2 8.1 8.1 4.62 2.30 49.x' 2 for peak definition r%VT%TWrJATT"AT'7 KTnwv,)vTA Ref. ToP9raphic Mapping Q = CIA V = ((p--2S)"2Y(P4*.Bs) Tp = V/(1.3940p) nLnTZA96T6 %V3 5f:80 f00Z/9Z/90 • Brittmore Detention Analysis 1 Myear Routing Basin 1 BASIN PARAMETERS 18 = Dia, barrel (inches) 0.59 - Cd barrel 266 = Invert elev. barrel Geometry Description 60 Initial Basin parameter 57 Initial Basin parameter 4 multiplier for depth 266.0 = Initial elev. water level RESULTS 80 =Length 3,00 = Cw 270.0 = Crest E Peak Volume Peak reaK Volumes Vc- Dis atge [?ftl Discharge Elevation jao-ft] Discharge PS] [Cftl 100 21.5 23.3 270.10 24.2 Check of description of storage areas: Measured Calculated Actual Surface Volume Predicted Elevation Area Above N.P. Elevation (s.f.) (a.f.) 266 2761 1,381 266.38 267 3769 4,646 267.17 268 4840 81950 268.04 269 6001 14,371 258.98 270 7276 21,009 269.98 [aaftl B F Consulting 2805 Tobermory Lane Raleigh, NC (919) 618-0180 Delta Comments (ft) 0.38 0.17 ON -0.02 -0.02 Best 8t in upper elevations, which is desireable r ATTV'JrJK1T"KTW anwu?vrrA OLOTZ996T6 %V,3 W90 VOOZ/9Z/SO Detention Analysis B F Consulting Brittmore 100-year Routing 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 ROUTING AND ANALYSIS -100-Year storm Ouflet Hydraulics Time Inflow Storage stage outflow surf. Area Q_barrel [min] [cfs) [cubicftl [ft] [Csl [sq,tt] 0 0.0 0 266.0 0.0 3420 0.0 2 0 1 p 266.0 0.0 3420 0.0 4 . 0.4 12 266.0 0.0 3423 0.0 6 0 9 56 266.0 0.1 3435 0.1 8 . 1 5 150 266.0 0.2 3461 0.2 10 . 2.3 307 266.1 0.4 3503 0.4 0 7 12 3.3 537 266.2 2 0.7 2 1 3565 3648 . 1.2 14 4.4 7 5 847 242 1 266. 266.3 . 1.7 3752 1.7 16 18 . 7.0 , 1,724 266.5 2.3 3877 .3 2 3 0 20 8.6 2,295 266.6 3.0 3 8 4023 4189 , 3.8 22 10.0 11 5 2,953 3 696 266.8 267.0 . 4.6 4373 4.6 24 26 . 13.0 , 4,519 267.1 5.5 4573 5,5 5 6 2B 14.5 5,419 267.3 6.5 4788 . 7 4 30 1610 6,386 267.5 7.4 5015 5253 . 4 8 32 17.4 7,414 502 8 267.7 268.0 84 9.2 5501 . 9.2 34 36 18.7 0 20 , 9,649 268.2 10.0 5758 10.0 38 . 21.1 10,849 268.4 10.7 6023 6294 110 4 40 22.0 12,094 268.6 8 268 11.4 12 0 6570 . 12.0 42 22.8 23 5 13,371 668 14 . 269.0 . 12.6 6845 12.6 44 46 . 23.9 , 15,968 2892 13.2 7119 7387 13.2 13 7 48 24.2 17,255 269.4 6 269 13.7 14 2 7647 . 14.2 50 24.2 24 1 18,511 719 19 . 269.8 . 14.6 7894 14.6 52 54 . 23.8 , 20,860 270.0 15,0 23 3 8126 8339 15.0 15.3 56 23.3 26 21,917 909 21 270.1 270.1 . 232 8337 15.3 58 60 2 7 21 , 21,834 270.1 22.0 8322 15.3 62 . 20.7 21,799 270.1 21.5 8315 15.3 15 2 64 19.7 21,707 270.1 20.1 19 4 8297 8285 . 1512 66 68 18.7 17 7 21,651 21,566 270.1 27011 . 18,3 8268 15,2 70 . 16.8 21,495 270.0 17.5 16 7 8254 8238 15.2 1511 72 16.0 15 1 21,414 330 21 270.0 270.0 . 15.9 8221 15.1 74 76 . 14.4 , 21,237 270.0 15.3 8202 8179 15.1 15 0 78 1316 21,125 270.0 0 270 15.0 15 0 8145 . 15,0 80 82 12.9 12 3 20,956 711 20 . 269.9 . 14.9 8095 14.9 84 , 11.7 , 20,396 269.9 14.8 8032 1 4.8 14 7 86 11.1 20,018 269.8 8 269 14.7 14 5 7955 7866 . 14,5 88 10.5 0 10 19,584 101 19 . 269.7 . 14.4 7767 14.4 90 92 . 9.5 , 18,573 269.6 14.2 7659 7543 14.2 14 0 94 9.0 18,007 408 17 269.5 269.5 14.0 13.7 7419 . 13.7 96 8.5 8 1 , 780 16 269.4 13.5 7289 1315 98 100 . 7.7 , 16,130 269.3 13.2 7153 7013 13.2 13 0 102 7.3 15,462 269.2 13.0 . 270.10 23.3 < = ma)dmum (100-yr) ___ z r1kTT-JUUkTTr1A7S7 ATl1WV')V'7A ni.nT7.AART6 XVd 9Y:90 VOOZ19ZZ90 L 2S ... 24 P-3 l I ltr _ _ 1 i ? • r ? 1 =1 r- r ?l . 6 ; j % r \\ i\ 21 , qt-N • r t j t t 1 44 ?- 19 j ID.a ? V __: r I - - - ? SP.O 1' 16 I I ' 13 Basin 7 . • ?Ba. rin 4 14 o •r Q AjBQR G " kTTUlJlJKTTCl ATW nmwulvrra OLOTZ996T6 XVd 9P M VOOZ/9Z/90 27.2 Runoff Coefficient The runoff coefficient (C) is the variable of the rational method least susceptible to precise determination and requires judgment and - understanding on the part of the design engineer. While engineering judgment will always be requ€red In the selection of runoff coefficients. typical coefficients represent the integrated effects of many drainage basin parameters. Table 22 gives the recommended runoff coefficients for the rational method. Table 7-2 Recommended Runoff Coefficient Values (Sources: North Carolina Erosion and Sediment Control Manual and The City of Raleigh's Storm Drainage Desig, Description of Area KunoTT t.,a Woodlands 0.20-.025 Parks, cemeteries 0.25 Playgrounds 0.35 Lawns: Sandy soil, flat, 2% 0.10 Sandy soil, average, 2 - 7% 0.15 Sandy soil, steep, > 7% 0.20 Clay soil, flat, 2% 0.17 Clay soil, average, 2 - 7% 0.22 Clay soil. steep, > 7% 0.35 Graded or no Plant cover. Sandy soil, flat, 0 - 5% 0.30 Sandy soil, flat, 5 -10% 0.40 Clayey soil, flat, 0 - 5°/u 0.50 Clayey soil, average, 5 -10% 0.60 Residential; Single4amiiy (R - 4) 0.50 Single-family (R - 6) 0.55 Mutti-family (R - 10) 0.60 Mufti-family (R - 20) 0.70 Mutts-family, (R - 30) 0.75 Business: O & 1 (I, 11, 11D 0.85 11 & 12 0.85-0.95 Shopping Centers 0.85-0.95 Streets: Gravel areas 0.50 Drives, walks, and roofs 0.95 Asohalt and Concrete 0.95 -1.00 and Design 1989) C jarr<. City of Raleigh asr 39 &onmvater Design Manua! ° _ _ .___ z nATTV4411TnAT4 ?TnmvnvrtA n/.nT7AA6T6 XVd 911:90 VOOZ19Z/50 2-2.2 Runoff Coefficient The runoff coefficient (C) is the variable of the rational. method least susceptible to precise determination and requires judgment and - understanding on the part of the design engineer. While engineering judgment will always be required in the selection of runoff coefficients, typical coefficients represent the integrated effeds of many drainage basin parameters. Table 2.2 gives the recommended runoff coeWents for the rational method. Table 2.2 Recommended Runoff coefficient Values (Sources: North Carolina Erosion and Sediment Control Planning and Design Manual and The City of Raleigh's Storm Drainage Design Manual, 1989) Woodlands o20-025 Parks, cemeteries 0.25 Playgrounds 0.35 Lawns: Sandy soil, fiat, 20/6 0110 Sandy soil, average, 2 - 7% 0.15 Sandy soil, steep, > 7% 0.20 Clay soil. flat, 2% 0.17 Clay soil, average, 2 - 7% 0.22 Clay soil, steep, > 7% 0.35 Graded or no plant cover: Sandy soil, flat, 0 - 5% 0.30 Sandy soil, flat, 5 -10% 0.40 Clayey soil, flat, 0 - 5°/, 0.50 Clayey soil, average, 5 -10% 0.60 Residential: Single-family (R - 4) 0.50 Single-family (R - 6) 0.55 Muiti-famlly (R -10) 0.60 Multifamily (R - 20) 0.70 Multi-family (R - 30) 0.75 Business: O&1(1,11,111) 0.85 11 &12 0.85-0.95 Shopping Centers 0.85-0.95 treets: Gravel areas 0-50 Drives, walks, and roofs 0.95 A-kF ,I4 -anti rnnrrAtA 0.95 -1.00 Ja--y 2002 C6y of Raleigh Page 39 Srormwater t)erign Mwwal ___ ---- r nkTTVrJ4ATTrWrJ VnTQV'%WIU n/nT70QRTR Yv.j nb:Rn bnn7/A7/Cn Basin 4 3.01 5 4.5 0.40 5.4 Total: 22.0 Post-Development (undetained) Area TC Intensity C Q, (acres) (minutes) (in/110 (cfs) Basin 1 5.98 5 4.6 0.45 12.1 Basin 2 1.37 5 4.5 0.47 2.9 Basin 3 1.84 5 4.5 0.50 4.1 Basin 4 3.01 5 4.5 0.40 5.4 Total: 24.6 Thus, Basin 1 must detain 2.6 cfs In the one-year, 24-hour storm for the post- development flow from the site to be less than or equal to the pre-development flow. The Post-development undetained flow is 12.1 cfs from Basin 1; the target release is 9.5 cfs (12-1-2.6)- The routed storm (attached) shows a release of 4.5 cfs, which is well below the target release rate. Environmental Consultants, PA Road - Raleigh, North Carolina 27614 - Phone: (919) 846-5900 - Fax: (919) 846-9467 July 14, 2004 S&EC, PA Project # 8447.W1 Division of Water Quality Attention: Bob Zarzecki WETLANDS / 401 GROUP JUL 1 4 2004 WATER QUAL I TY SEC TION Re: Questions about the Buffer and 401 Water Quality Certification approval letter dated 7/12/04 on the Brittmoore Subdivision Project (DWQ Project # 04-0936) Dear Mr. Zarzecki: Thank you for the Buffer and 401 Water Quality Certification approvals for the Brittmore Subdivision (DWQ Project # 04-0936 received 7/13/04). After reviewing the approval letter, a few items on the approval letter were different from the permit application that we had submitted. The 0.05 acre wetland impact for the proposed dry pond (Impact site 1) is listed on the approval letter as being a sewer impact when the impacts are resulting from the construction of a dry pond required by the Town of Garner. Also the stream impact (Impact site 1, 22 feet, crossing) is listed as also being a sewer crossing when it was proposed by the permit application for a driveway to access a lot. No sewer crossings are proposed on this project, however we did request parallel buffer impacts for the sewer line which you approved with mitigation. Please see the attached table below. This table is what the impact table should look like on the approval letter:4 Amount Approved Plan Location or Reference (units) Stream 22 (feet) Impact site 1 (driveway crossing) 404 Wetlands 0.05 (acres) Impact site 1 (fill for dry pond construction) Waters - (acres) - Buffers 3,570 (square feet) sewer and driveway Also attached you will find a copy of the stormwater plan as prepared by Russell Briggs as requested by the approval letter prior to impacts.If there are any stormwater plan Charlotte Office: Greensboro Office: Hickory Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive 622 Coon Mountain Lane Concord, NC 28025 Greensboro, NC 27455 Taylorsville,i NC 28681 Phone: (704) 720-9405 Phone: (336) 540-8234 Phone (82) 635-5820 Fax: (704) 720-9406 Fax: (336) 540-8235 Fax: (82>) 635-5820 questions contact Mr. Briggs directly. Mr. Briggs stated to us that he previously discussed the issues related to the stormwater plan with you. If there are any other questions feel free to contact Will Buetow or Kevin Martin. Sincerely, Will Buetow N.C. Licensed Soil Scientist License # 1255 11 Brittmore WETLANDS/ 401 GROUP JUL 1 4 2004 WATER QUALIFY SECTION Stormwater Analysis and Design 9TO/Z00In May 17, 2004 Prepared by B&F Consulting 2805 Tobermory La Raleigh, NC 2760+ (919) 618-0180 OHI?IHaNjDNa HORXDVlq OLOTZ996T6 XVd rv:R0 rOOZ/8Z/50 Brittmore Stormwater Analysis and Design 2 Objective: The storm drainage infrastructure for Brittmore shall be designed and analyzed to provide diffuse flow into the Neuse River Buffer and detain the 1-year event to pre-development levels. Executive Summary: A dry detention pond provides the reduction in peak flow for the one-year event. The dry detention pond is constructed at the rear of lots 8 and 9. The outlet for the dry detention pond is a single 18" barrel. The dry detention pond also reduces the ten-year event to pre-development levels, and thus permits the discharge into the head of the Neuse River Buffer at the pre-development level- A level spreader is utilized at the end of the Honorable Place to effect diffuse flow into the Neuse River Buffer. The 100-year event was routed through the basin to ensure adequacy of the spillways - both principal and emergency. M/Coo a gNiaaaNiDNS NoxxDv iq OLOTZ996T6 %v3 W90 VOOZ/8Z/50 Brittmore Stormwater Analysis and Deign ,Analysis: Existing conditions: The existing site has impervious areas including drives, residence, tennis courts, and parking. The total impervious area is 1.02 acres and the total site area is 11.91 acres, for an 8.58% impervious ratio- The composite rational "C" is estimated as 0.40, with the impervious surface uC" assigned as 0.95, and the wooded terrain assigned as 0.35. Developed conditions: The drainage area for Basin 1 based on the proposed storm drainage conveyances is 6.0 acres. 0.32 acres are from off-site drainage. There are 13 full lots and approximately 2 lots with '/2 of the lot in the basin, for a total equivalent lot count of 14. Thus, the proposed density in the basin is 14 units / 6.0 acres, or 2.33 units per acre. The rational "C" for this density is estimated as 0.45. The drainage area at the end of the cul-de-sac that is undetained, but that will go through a level spreader to provide diffuse flow into the Neuse River Buffer is 1.37 acres- Four lots comprise this drainage area denoted as Basin 2, for a density of 2.9 units per acre. The rational °C" is estimated as 0.47 The drainage area for the lots that drain to the east of the property is 1.84 acres. This is denoted as Basin 3. The equivalent of six lots drain to the east, with an approximate density of 3.2 units per acre. The rational "C" is estimated as 0.5 The balance of the project is Basin 4, and it consists of the Neuse River Buffer and a single lot on the other side of the Neuse River Buffer. This equates to 3.01 acres, and the rational "C" is estimated as 0.4. The times of concentrations for the Basins were found by the Kitpich method. By inspection, Basin 1 has the largest area and longest flow path. Thus the time of concentration for this Basin will be the largest time of concentration of the Basins, and thus most conservative- The Kirpich method states that L3 0.385 _ H T` 128 where T? = Time of Concentration, in minutes L = Length of mainstem, in feel H Elevation drop, in feet STO/tool] 9HI2iaaNjDN3 H03gXDVIg OLOTZ996T6 YVd 56:90 POOZ/8Z/50 Brittmore Stormwater Analysis and Design The difference in elevation for Basin one is 47 feet (310 - 263) and the flow length is 660 feet- Thus, the time of concentration for Basin 1 is L3 0,385 6603 0.385 _ X 47 = 32 minutes.,. use 5 minutes as default K 128 128 The intensity for the one-year storm is given by the relationship: _ K I t? +b where I =Intensity, in inches per hour t, =the time of concentration, in minutes K, b =Site -specific and storm -specific constants 4 For the Gamer area, the one-year, 24-hour storm is describe by the coefficients K = 104 and b = 18. Thus the intensity for a one-year, 24-hour storm with a five- minute time of concentration is I= K _ 104 =4.5 t.7+b 5+18 For the Gamer area, the ten-year, 24-hour stone is describe by the coefficients K = 195 and b ^ 22_ Thus the intensity for a ten-year, 24-hour storm with a five- minute time of concentration is I= K = 195 =72 t,+b 5+22 9TO/S000 DNIMMIDNa NONXDVIH OLOTZ99OT6 %V3 9t:90 I009/9Z/50 Brittmore HYDROGRAPH PARAMETERS Item Drainage Area Pervious [acres] Impervious [acres] Drainage Area [acres] Rational C Composite Rational C Time of Concentration, Tc TC [min] Intensities, l 1-year (in/hr] 10-year (in/hr] Peak Discharge, Qp 1-year [cfs] 10-year Ids] Curve Number, ON Soil Type Hydrologic. Soil Group Pervious CN Impervious CN Composite CN S Precipitation Amount, P 1-year [inches] 10-year Finches] Volume of Runoff, V 1-year [inches] 10-year (inches] [inches] 1-year [acre-feet] 10-year (acre-feet] Time-to-Peak, Tp (for use in routing) 1-year [minutes] 10-year [minutes] Time Interval for Routing 1-year [minutes] 10-year [mine] 9TO/9001A Detention Analysis B F Consulting 1-year and 10-year 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 F)ftting Proposed 5.98 4.2 Ref: Topgraphic 0.0 1.78 Mapping 5.98 5.98 29.8% 0.40 0.45 5.0 5.0 4.50 4.50 7.22 7.22 10.8 12.1 17.3 19.4 Q = CIA B 59.0 59.0 99.0 98.0 59.0 70.6 6.9 4.2 2.1 2.1 5.6 5.6 0.07 0.30 V = ((p--2S)^2)/(p+.8s) 2.51 0.15 1.25 6.4 Tp = V/(i .39`Qp) 33.7 0.5 2 for peak definition gKjH3311IJKH NORXDVlq OLOTZ996T6 YVa W80 VOOZ/8Z/SO Brittmore Detention Analysis S F Consulting 1-year and 10-year 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 6180180 BASIN PARAMETERS Barrel 18 = Dia, barrel (inches) 0.59 = Cd barrel 266 = Invert elev_ barrel Emergency Spillway 10 = Length 3.00 = Cw 269.8 = Crest elevation Basin Geometry Description 60 Initial Basin parameter 57 Initial Basin parameter 4 multiplier for depth 266.0 = Initial elev. water level RESULTS ent >=v evelo m®nt Pce-p "'::. _ x ?: ,:- P,;.ostiY?e eRt4 ' =i Post Deveopment c; ' No controls Peak Volume Peak Peak Volume Peak Volume Discharge Discharge Elevation Discharge [cts) PC-% [&Sl [ac-ft] [cfsl (ao ttl 1 10.8 4.5 266.92 12.1 10 17.3 13.0 269.18 19.4 Check of description of storage areas: Measured Actual surface Elevation Area (s.f.) Calculated Volume Predicted Above N.P. Elevation (c.f.) Delta Comments (ft) 266 2761 1.381 266.38 0.38 267 3769 4,646 267.17 0.17 268 4840 8,950 268.04 0.04 269 6001 14,371 268.98 9 98 -0.02 which is desireable 02 Best fit in upper elevations 0 270 7276 21,009 . 26 , . - STO/L00 z DNIaHaNION8 NOKHDvrlg OLOTZ996T6 XVa st:90 tOOZ/9Z/50 Detention Analysis 13rittmore 1_year and 10-year Basin 1 ROUTING AND ANALYSIS -1-year storm outlet Hydraulics Time Inflow Storage Stage Outflow f Surf, Area 0-barrel [sq ft] [min] [cfs] [cubic ft] [ft] s] [c - 0.0 0.0 0 266.0 0.0 0 0 3420 3420 0.0 0.0 0.5 0-2 p 6 266.0 266-0 . 0.0 3450 0.0 1,0 5 1 0.7 1 6 111 266.0 0.2 3450 0.2 0 2 . 2.0 . 2.7 111 266.0 0.2 0 3 3450 3471 - 0.3 2.5 4.1 188 302 266.1 266.1 . 0.4 3502 0.4 3 0 3 5 5-5 7 0 455 266.1 0.6 3543 0.6 0 9 - 4 0 . 8.4 646 266.2 0.9 2 1 595 3 3655 - t .2 4.5 9.7 873 1 129 266,2 266.3 . 1.5 3723 1.5 5.0 5.5 1018 11.6 , 1.407 266.4 1.9 2 3 3795 3871 1.9 2.3 6.0 12.0 1 ,698 991 1 266 .6 266.5 . 2.6 3946 2.6 6.5 7 0 12.1 11.8 , 2,275 266.6 3-0 4019 4086 3-3 . 7.5 11.2 2,541 266.7 266 7 3.3 3.6 4145 3.6 8.0 10-2 2,777 2 978 . 266,8 3.8 4195 3-8 8.5 9 0 9.2 3 8 , 3,142 266.8 4.0 4236 69 4.0 1 4 . 9.5 . 7.5 3,273 266.9 266 9 4.1 4 2 42 4294 . 4.2 10.0 618 3,375 451 3 . 266.9 . 4.3 4313 4.3 10.5 11 0 6.1 5.5 , 3,506 266.9 4.4 4326 4335 4 4 4.4 . 11.5 5.0 3,540 266.9 9 266 4'4 4 5 4339 4.5 12-0 4.5 3,557 559 3 , 266.9 . 4.5 4339 4.5 12-5 13 0 4.1 3-7 , 3,548 266.9 4.4 4337 4331 4-4 4,4 . 13.5 3.3 3,525 266.9 9 266 4.4 4 4 4323 4.4 14.0 3,0 3,493 451 3 . 266.9 . 4,3 4313 4.3 14.5 15 0 2.7 4 2 , 3,403 266.9 4.3 4301 4 3 4 2 . 15,5 - 2,2 3,348 266.9 4.2 4 1 4287 4272 . 4-1 16.0 2.0 3,288 266.9 266.92 . 4.5 < ?- maximum 1-yr B F Consulting 2805 Tobermory Lane Raleigh, NC (919) 61 &0180 9TO/9001j ONIHEIMIDNa HONIDV'IH OLOTZ996T6 YVd 56:90 IOOZ/9Z/50 Detention Analysis B F Consulting Srittmore 2805 Tobermory Lane 1-year and 10-year Raleigh, NC Basin 1 (919) 618-0180 ROUTING AND ANALYSIS - 10-year storm Outlet Hydraulics Time Inflow Storage Stage Outflow Surf. Area C_bdrrel [min] [cis] [cubic ft] Ift] Icf5] [sq.ft] 0 0.0 0 266.0 0.0 3420 00.0 0 2 0.2 0 266.0 0.0 3420 . 0 0 4 0.7 20 266.0 0.0 1 O 3426 3447 - 0-1 6 1.5 97 259 266.0 266.1 . 0.4 3490 0.4 8 10 2.6 3 9 525 266.2 0.7 3562 0.7 1 2 12 . 5.5 909 266.3 1.2 1 9 3665 3798 . 1.9 14 7,2 0 1,418 051 2 266.4 266.6 . 2.7 3961 2.7 1s 18 9. 10 8 , 2,803 266.7 3.6 4152 43.6 6 20 . 12.5 3,664 266.9 4.6 6 5 4365 4597 . 5.6 22 14.2 7 4,620 5 651 267.2 267.4 . 6.7 4843 6.7 24 15. 0 17 , 735 6 267.6 7.8 5097 7.8 26 28 . 18.1 , 7,849 267.8 8.7 5352 5608 8.7 9.5 30 18.9 8,977 268.0 268 3 9.5 10 3 5857 10.3 32 19.3 10.097 184 11 . 268.4 . 10.9 6097 1 0.9 34 36 19.4 19 2 , 12,209 268.6 11.4 6319 11.4 11 9 38 . 18.7 13,140 268.8 11.9 12 3 6520 6693 . 12,3 40 17.8 6 13.949 608 14 268.9 269.0 . 12.6 6833 12.6 42 44 16. 4 15 , 15,095 269.1 12.8 6936 12.8 12 9 46 . 1,4,3 15.410 269.1 12.9 13 0 7002 7036 . 13.0 48 132 15,571 597 15 269.2 269.2 . 13.0 7041 13.0 50 52 12.2 11.3 , 15,503 269.2 1 3.0 7022 13.0 12 9 54 10.5 15.305 269.1 12.9 12 8 6980 6919 . 12.8 56 9.7 15.017 649 14 269.1 269.0 . 12.6 6842 12.6 58 60 9.0 8.3 , 14.215 269.0 12.4 6749 6645 12.4 12 2 62 7.7 13,723 268.9 8 268 12.2 11.9 6530 . 11.9 64 7.1 6 6 13,185 608 12 . 268.7 11.6 6406 11.6 66 68 . 6 1 , 12,003 268.6 11.3 6275 11.3 0 11 70 . 5,7 11,376 268.5 11.0 10 6 6138 5998 . 10.6 72 5.2 10,735 087 10 268.4 268.3 . 9 1,2 ?8 5 10 .2 74 4.8 4 5 , 9 439 268.1 8 ; .8 9 76 78 . 4 2 , 8,797 268.0 9.4 5567 9.4 8 9 80 . 3.8 8.168 267.9 8.9 8 5 5425 5286 . 8.5 82 3-6 7,556 967 6 267.8 267.7 . 8.0 5150 8.0 84 3,g 3 0 , 406 6 267.5 7.5 5020 7,5 86 88 . 2 8 , 5,878 267.4 6.9 4896 6.9 4 6 90 2.6 5,385 267.3 6.4 5 9 4780 4671 . 5.9 92 2.4 4,928 4 505 267.2 267.1 ' 5.5 4570 5.5 94 96 2.2 2 1 , 4,114 267.1 5.1 4475 7 4 98 . 119 3,754 267.0 4.7 4 3 4306 . 4.3 100 1.8 3,423 266.9 8 266 . 4.0 4231 d.0 102 1.6 3,120 . 269.18 13.0 < = maximum (10-yr) 9TO/6001(] gNis33Nma moxxovu OLOTZ996T6 M 56:90 POOZ/SZ/50 Brittmore Stormwater Analysis and Design 7 100-Year storm Analysis and Design The attached routing shows the 100-year storm routed through the basin. The principal spillway discharges 15:1 cfs during the peak, and the emergency spillway discharges another 8.2 cfs. The length of the emergency spillway is set at 80 feet, and with this length, the emergency spillway has only one-tenth of a foot for the depth of flow. The system adequately passes the 100-year event. 8TO/OTOIM 9HINEMIDu3 NONNoV'Ig OLOTZ996T6 XV3 St:90 tOOZ/8Z/50 Brittmore Detention Analysis B F Consulting 100-year Routing 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 HYDROGRAPH PARAMETERS Item Drainage Area Pervious (acres) impervious [acres] Drainage Area [acres] Rational C Composite Rational C Time of Concentration, Tc Tc (min] Intensities, I 100-year [in/hrl Peak Discharge, Op 100-year [cf3] curve Number, CN Soil Type Hydrologic Soil Group Pervious CN Impervious CN Composite CAI S Precipitation Amount, P 100-year [inches] Volume of Runoff, V 100-year [inches] 100-year [acre-feet) Time-to-Peak, Tp (for use In routing) 100-year [minutes] Time interval for Routing 100-year [minutes) Existing Proposed 5.98 42 0.0 1.78 5.98 5.98 29.8% 0.40 0.45 5.0 5.0 9.00 9.00 21.5 242 B 59.0 59.0 99.0 98.D 59.0 70.6 6.9 4.2 B.1 8.1 4.62 2.30 49.7 2 for peak definition Ref: Topgraphic Mapping Q = CIA V = ((p-.2S)12)/(p+-85) Tp = V/(1.39'Qp) PTO/TTOIA 9NIHHaNIDXH NOKXDVIH OLOTZ996T6 XV4 5t:90 VOOZ/8Z/50 Brittmore Detention Analysis B F Consulting 100-year Routing 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 BASIN PARAMETERS 18 = Dia, barrel (inches) 0.59 = Cd barrel 266 = Invert elev. barrel Basin Geometry Description 60 Initial Basin parameter 57 Initial Basin parameter 4 multiplier for depth 266.0 = Initial elev. water level RESULTS Peak Discharge [CIF-I 100 21.5 Volume Peak Peak Discharge Elevation [a ft] [cfs] 23.3 270.' Check of description of storage areas: Measured Calculated Actual Surface Volume Predicted Elevation Area Above N.P. Elevation (s.f.) (c.f.) 266 2761 1,381 266.38 267 3769 4.646 267.17 268 4840 8,950 268.04 269 6001 14,371 268.98 270 7276 21,009 269.98 Emergency 5pilfway 80 =Length 3.00 Cw Iyn n T rrp-zt r No Volume Peak Discharge (ao-ft] [cfS] 24.2 [aaftl Delta Comments (ft) 0.38 0.17 0.04 -0.02 _0.02 Best fit in upper elevations, which is desireable 9T0/ZT0[1 9NIHHaNI9KE1 NOWHOV'IH OLOTZ996T6 %V3 gt:: O VOOZ/8Z/50 Brittmore Detention Analysis B F Consulting 100-year Routing 2805 Tobermory Lane Basin 1 Raleigh, NC (919) 618-0180 ROUTING AND ANALYSIS -100-Year storm outlet Hydraulics Time Inflow Storage stage outflow surf. Area 0-barrel [min] [cfs] [cubic ft] [ft] Icfsl [sq•ft] 0 0.0 0 266.0 0.0 3420 0.0 2 0.1 0 256.0 0.0 3420 0.0 4 0-4 12 266.0 0.0 3423 0.0 6 0 9 56 266.0 0,1 3435 0.1 8 . 1.5 150 266.0 0.2 3461 0.2 10 2.3 307 266.1 0.4 3503 0.4 12 3.3 537 266,2 0.7 3565 0.7 14 4.4 847 266.2 1,2 3648 1.2 16 5.7 1,242 266.3 1.7 3752 2.3 18 7 0 1,724 266.5 2.3 3877 20 . 8.5 2,295 266.6 3.0 4023 3,0 22 10.0 2,953 266.8 3.8 4189 3.8 4 6 24 11.5 3,696 267.0 4.6 4373 . 26 13.0 4,519 267.1 5.5 4573 5.5 28 14.5 5,419 267.3 6.5 4788 6.5 30 16.0 6,386 267.5 7.4 5015 7.4 32 4 17 7,414 267.7 8.4 5253 8.4 34 . 18,7 8,502 268.0 9.2 5501 9.2 36 20.0 9,649 268.2 10.0 5758 10.0 38 21,1 10,849 268,4 10.7 6023 10.7 40 22.0 12,094 268.6 11.4 6294 11.4 42 22.8 13,371 268.8 12.0 6570 12.0 44 23.5 14,668 269.0 12.6 6845 12.6 46 23.9 15,968 289.2 13.2 7119 132 48 24.2 17,255 269.4 13.7 7387 13.7 50 24.2 18,511 269.6 14.2 7647 14.2 52 24.1 19,719 269.8 14.6 7894 14.6 54 23.8 20,860 270.0 15.0 8126 15.0 56 23.3 21,917 270.1 23.3 8339 15,3 58 226 21,909 270.1 23.2 8337 1513 60 21.7 21,834 270.1 22.0 8322 15.3 62 20.7 21,799 270.1 21.5 8315 15.3 64 19.7 21,707 270.1 20.1 8297 15.2 66 18.7 21,651 270.1 19.4 8285 15.2 68 17.7 21,566 270.1 18.3 8268 15.2 70 16.8 21,495 270.0 17.5 8254 15.2 72 16.0 21,414 270.0 16.7 8238 15.1 74 15.1 21,330 270.0 15.9 8221 15.1 76 4 14 21,237 270.0 15,3 8202 15.1 78 . 13.6 21,125 270.0 15.0 8179 15.0 80 12.9 20,956 270.0 15.0 8145 15,0 82 12.3 20,711 269.9 14.9 8095 14.9 84 11.7 20,396 269.9 14.8 8032 14.8 86 11 1 20,018 269.8 14.7 7955 14.7 88 . 10.5 19,584 269.8 14.5 7866 14.5 90 10.0 19,101 269.7 14.4 7767 14.4 92 9 5 18,573 26916 14.2 7659 14.2 94 . 9 0 18,007 269,5 14.0 7543 14.0 96 . 8.5 17,408 269.5 13.7 7419 13.7 98 8.1 16,780 269.4 13.5 7289 13.5 100 7 7 16,130 269.3 13.2 7153 13.2 102 . 7.3 15,462 269.2 13.0 7013 13.0 270.10 23,3 < ma)dmum (100-yr) 9TO/CTO12j O11IUSaNION3 KOKNa V'IH OLOTZ996T6 M 9V:90 IOOZ/9Z/50 P-5 \\ 24. 2 P-3 i f I ? ^r 4?? ?\1 Ali 21 1Ji qc?y• 44 t i r I , ? ?t•: I m l 8A / 1.7 i I s.ycl ? ? ? ??? ? ? lb l ?u I , I 12 I g:: (Ba in 1S :f. 1.4 14 t I I _ Basin 4 A gRPgR ? --? L \ cReeNF DRr? P ti 9TO/%TOIA DMIUMNIOUE1 HONX)V'IH OLOTZ996T6 %V3 W RO 600Z/9Z/90 22.2 Runoff Coefficient The runoff coefficient (C) is the variable of the rational method least susceptible to precise determination and requires judgment and - understanding on the part of the design engineer. While engineering judgment will always be required in the selection of runoff coefficients, typical Goefficients represent the integrated effects of many drainage basin parameters. Table 2.2 gives the recommended runoff coefficients for the rational method. Table 22 Recommended Runoff Coefficient Values (Sources: North Carolina Erosion and Sediment Control Planning and Design Manual and The City of Raleigh's Stone Drainage Design Manual, 1989) Area Woodlands 0.20-.025 Parks, cemeteries 0.25 Playgrounds 0.35 Lawns: Sandy soil, flat, 2% 0.10 Sandy soil, average, 2 -7% 0.15 Sandy soil, steep, > 7% 0.20 Clay soil, flat, 2% 0.17 Clay soil, average, 2 - 7°/u 0.22 Clay soil, steep, > 7% 0.35 Graded or no plant cover. Sandy soil, flat, 0 - 5% 0.30 Sandy sail, flat, 5 - 101/6 0.40 Clayey soil, flat, 0 - 5% 0.50 Clayey soil, average, 5 -10% 0.60 Residential; Single-family (R - 4) 0.50 Single-family (R - 6) 0.55 Multi-family (R - 10) 0.60 Multi-family (R - 20) 0.70 Multi-family (R - 30) 0.75 Business: O & 1 (I, II, 11D 0.85 11 &12 0.85-0.95 Shopping Centers 0.85-0-95 Streets: Gravel areas 0.50 Drives, walks, and roofs 0.95 Asnhalt and Concrete 0.95-1 C Cary ofRaieigh January 0001 Stormwater Design Maft gal Page 39 PTO/STO0 DISIHEIaKIDNEI NONNOV119 OLOTZ996T6 XYd 9V:90 VOOZ/8Z/SO 222 Runoff Coefficient The runoff coefficient (C) is the variable of the rational method least susceptible to precise determination and requires judgment and - understanding on the part of the design engineer. While engineering judgment nnll always be required in the selection of runoff coefficients, typical coefficients represent the integrated effects of many drainage basin parameters. Table 2.2 gives the recommended runoff coefficients for the rational method. Table 2.2 Recommended Runoff Coefficient Values (Sources: North Carolina Erosion and Sediment Control Planning and Design Manual and The City of Raleigh's Storm Drainage Design Manual, 1989) of Woodlands 0.20 - 025 Parks, cemeteries 0.25 Playgrounds 0.35 Lawns: Sandy soil, flat, 2% 0.10 Sandy soil, average, 2 - 7% 0.15 Sandy soil, steep, > 7% 0.20 Clay soil, flat, 2% 0.17 Clay soil, average, 2 - 7% 0.22 Clay soil, steep, > 7% 0.35 Graded or no plant cover: Sandy soil, flat, 0 - 5% 0.30 Sandy soil, flat, 5 - 10% 0.40 Clayey soil, flat, 0 - 5% 0.50 Clayey soil, average, 5 - 10% 0.60 aesi?en tiay Single-family (R - 4) 0.50 Single-family (R - 6) 0.55 Multifamily (R - 10) 0.60 Multi-family (R - 20) 0.70 Mufti-family (R - 30) 0.75 Business: O & I (l, it, 11D 0.85 11 &12 0.85-0.95 Shopping Centers 0.85-0.95 treets: Gravel areas 0.50 Drives, walks, and roofs 0.95 Asohalt and Concrete _ 0.95 - 1 Cry of Rakigh Jarnrary 2002 Stormwarer Design Marrunl Page 39 9TO/9TOIn f)NJH39IQI0118 HOKXDVlq OLOTZ996T6 XV3 9f:80 VOOZ/8Z/90 Basin 4 3.01 5 4.5 0.40 5.4 Total: 22.0 Post-Development (undetained) Area TC Intensity C Q, (acres) (minutes) (in/hr) (cis) Basin 1 5.98 5 4.5 0.45 12.1 Basin 2 1.37 5 4.5 0.47 2.9 Basin 3 1.84 5 4.5 0.50 4.1 Basin 4 3.01 5 4.5 0.40 5.4 Total: 24.6 Thus, Basin 1 must detain 2.6 cfs in the one-year, 24-hour storm for the post- development flow from the site to be less than or equal to the pre-development flow- The Post-development undetained flow is 12.1 cfs from Basin 1; the target release is 9.5 cfs (12.1-2.6). The routed storm (attached) shows a release of 4.5 cfs, which is well below the target release rate. STO/LTO[n 9HI?I3aNj!DN3 NOWN0V'Ig OLOTZ996T6 YU LV:90 b00Z/8Z/50 tGF W ATFR p Michael F. Easley, Governor William G. Ross Jr., Secretary G North Carolina Department of Environment and Natural Resources j r Alan W. Klimek, P. E. Director - I Coleen H. Sullins, Deputy Director p Division of Water Quality July 12, 2004 Brittchurch Corporation 9313 Ten-Ten Road Raleigh, NC 27603 Subject Property: Brittmore Sudbivision, Rand Road, Raleigh, NC UT to Swift Creek [03-04-02,27-43-(8), C NSW] DWQ Project # 04-0936 Wake County Page 1 of 3 Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions To Whom It May Concern: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.05 acres of wetlands, 22 feet of streams and 3,570 square feet (ft) of protected riparian buffers for the purpose of constructing a sewer system and driveway at the subject property, as described within your application dated June 8, 2004 and received by the N.C. Division of Water Quality (DWQ) on June 9, 2004. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 18 or 39 when issued by the US Army Corps of Engineers (USACE). This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 213 .0233. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project,.you must.notify.us.and you may be required to send-us a-new application. If the. property is_sold,.- the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved - The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (http://h2o.enr.state.nc.us/ncwetiands) /1.._._..___ -.1__ - . 097 - -AO Brittchurch Corporation / DWQ Project No. 04-0936 Page 2 of 3 July 12, 2004 Amount Approved (Units) Plan Location or Reference Stream 22 (feet) Impact Site 1 (sewer) 404 Wetlands 0.05 (acres) Impact Site 1 (sewer) Waters - (acres) - Buffers 3,570 (square ft.) sewer & driveway 2. Buffer Mitigation (EEP) - You are required to mitigate for impacts to the protected riparian buffers. The required area of mitigation to compensate for impacts to the protected riparian buffers is 621 square feet as required under this Authorization Certificate and 15A NCAC 2B .0242(buffer mitigation rule). We understand that you wish to make a payment into the Riparian Buffer Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. In accordance with 15A NCAC 2B .0242(7)(buffer mitigation rule), this contribution will satisfy our compensatory mitigation requirements under 15A NCAC 2B .0233(10)(buffer protection rule). Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5208 if you have any questions concerning payment into the Riparian Buffer Restoration Fund. You have one month from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Riparian Buffer Restoration Fund to compensate for 621 fe of required riparian buffer mitigdttion for impacts to 207 fe of protected riparian buffers; 03-04-02 river and subbasin, 27-43-(8) stream index number." 3. Diffuse Flow (Review) - An additional condition is that all constructed stormwater conveyance outlets shall be directed and maintained to flow in a diffuse manner at non-erosive velocities through the entire protected stream buffers without re-concentrating. If this is not possible it may be necessary to provide stormwater facilities that are considered to remove nitrogen. Additionally, a stormwater management plan for this project shall be provided to this Office before any of the impacts approved herein are conducted. The plan shall specify all stormwater discharge points, plan details, and calculations to indicate that diffuse flow through the protected buffers or nitrogen removal as described above will be achieved. The stormwater management plan shall be approved in writing by this Office before the impacts specified in this Certification occur. You are required to submit this plan within one month of the date of this letter. 4. Erosion & Sediment Control Practices - Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. 5. No Waste, Spoil, Solids, or Fill of Any Kind - No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre- Construction Notification. All construction activities, including the design, installation, operation, } Brittchurch Corporation / DWQ Project No. 04-0936 Page 3 of 3 July 12, 2004 and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 6. No Sediment & Erosion Control Measures w/n Wetlands or Waters - Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 7. Certificate of Completion - Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification, (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone John Dorney at 919-733-9646 or Bob Zarzecki at 919-733-9726. Sincerely, 1?Alan W. Klimek, P.E. AWK/bz Enclosures: GC 3402 Certificate of Completion cc: Will Buetow, S&EC, Inc., 11010 Raven Ridge Road, Raleigh, NC 27614 USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office File Copy Central Files Filename: 040936 ?OF W ATF Michael F. Easley, Governor William G. Ross Jr., Secretary ?O 6 North Carolina Department of Environment and Natural Resources r Alan W. Klimek, P. E. Director -I Division of Water Quality p '< Coleen H. Sullins, Deputy Director Division of Water Quality NORTH CAROLINA DIVISION OF WATER QUALITY 401 WATER QUALITY CERTIFICATION & AUTHORIZATION CERTIFICATE SUMMARY OF PERMITTED IMPACTS AND MITIGATION REQUIREMENTS In accordance with 15A NCAC 2H .0500 and 2B.0233, Brittchurch Corporation has permission as outlined below and within the General Water Quality Certification (WQC) Number 3402 w/ additional conditions for the purpose(s) of constructing the proposed Brittmore Subdivision. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached certification transmittal letter. THIS CERTIFICATION AND AUTHORIZATION CERTIFICATE ARE NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENT ECOSYSTEM ENHANCEMENT PROGRAM (EEP) DWQ Project No.: 040936 Date: July 12, 2004 LOCATION: Raleigh COUNTY: Wake BASIN/SUBBASIN: 03-04-02 (rive r/subbasin); 27-43-(8) (stream index no.) As required by 15A NCAC 2H .0506 and 2B.0233 and the conditions of WQC No. 3402 w/ additional conditions, you are required to compensate for the above impacts through the restoration, creation, enhancement or preservation of wetlands, surface waters and/or buffers as outlined below prior to conducting any activities that impact or degrade the waters of the state. [Note: Acreage requirements proposed to be mitigated through the EEP must be rounded up to one-quarter acre increments according to 15A NCAC 2R .0503(b).] 0 acres of Class W L wetlands 0 acres of riparian wetland 0 acres of non-riparian wetland 0 feet of stream channel 621 square feet of stream buffers One of the options you have available to satisfy the compensatory mitigation requirements is through the payment of a fee to the Wetlands Restoration Fund per 15A NCAC 2R .0503 and to the Riparian Buffer Restoration Fund per 15A NCAC 2B .0233. If you choose this option, please sign this form and mail it to the EEP at the address listed below. An invoice for the_ appropriate amount of.payment will be sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU HAVE RECEIVED NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE EEP. Signature ECOSYSTEM ENHANCEMENT PROGRAM (EEP) NC DIVISION OF WATER QUALITY 1619 Mail Service Center Raleigh, NC 27699-1619 (919) 733-5208 Date North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 401 ISSUED rit f GOP Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) Fax: (919) 846-9467 www.SandEC.com W06S / 401 GROUP (),40936 JUN 0 9 2004 WATER QUALITY SECTION The proposed project consists of perpendicular sewer line impacts to 446 square feet of Zone 2 Buffer and 433 square feet of Zone 1 Buffer. Also, 207 square feet of Zone 1 parallel buffer impacts are for proposed sewer line connection. A perpendicular stream crossing (driveway) to access a single lot will impact 855 square feet of Zone 2 buffer and 1,629 square feet of Zone 1 buffer and 22 linear feet of stream. The slope stabilization and construction of the proposed dry pond will impact 0.05 acres (2,042 square feet) of wetlands under NWP 39. The wetland and stream impacts for the pond and driveway are below threshold for notification (0.05 acres) to DWQ. This is a courtesy 401 notification F,. however the parallel impacts from the proposed sewer connection will require notification to DWQ and mitigation for 207 square feet of Zone 1 Buffer. The stream crossing requires .. V: notification to the Corp for NW 39. Since no 401 is required, no check is attached. June 8, 2004 US Army Corps of Engineers Raleigh Regulatory Field Office 6508 Falls of the Neuse Road, Ste. 120 Raleigh, North Carolina 27615 NCDENR - DWQ Parkview Building 2321 Crabtree Boulevard Raleigh, North Carolina 27604 Attn: Ms. Jennifer Burdette RE: Proposed Brittmoore Subdivision Raleigh, Wake County, North Carolina S&EC Project #: 8447.W1 Dear Ms. Burdette and Mr. Dorney: Attn: Mr. Bob Zarzecki On behalf of Brittchurch Corporation, we request authorization from the US Army Corps of Engineers (USACE) to use Nationwide Permit (NWP) 39 for the proposed project to cover stream impacts (wetland impacts are below notification threshold). We also request written concurrence from the NC Division of Water Quality (NCDWQ) that the project complies with the Neuse River Basin (NRB) Buffer Rules. A Pre-construction Notification Application (PCN) is attached, which includes an agent authorization form. The proposed project consists of perpendicular sewer line impacts to 446 square feet of Zone 2 Buffer and 433 square feet of Zone 1 Buffer. Also, 207 square feet of Zone 1 parallel buffer Charlotte Office: Greensboro Office: Hickory Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive 622 Coon Mountain Lane Concord, NC 28025 Greensboro, NC 27455 Taylorsville, NC 28681 ,....,, -1 n? e. P1141 cAn Q)' 2A Phnne (979) 615-5970 June 8, 2004 S&EC Project #: 8447. W1 Page 2 of 3 impacts are for proposed sewer line connection. A perpendicular stream crossing (driveway) to access a single lot will impact 855 square feet of Zone 2 buffer and 1,629 square feet of Zone 1 buffer and 22 linear feet of stream. The slope stabilization and construction of the proposed dry pond will impact 0.05 acres (2,042 square feet) of wetlands under NWP 39. The wetland and stream impacts for the pond and driveway are below threshold for notification (0.05 acres) to DWQ. A site meeting with NCDWQ was conducted on February 18, 2004 and determined that the stream feature on-site within the drained pond and is subject to the Neuse River Riparian Buffers (DWQ# 04-0196). The stream start point was determined and flagged within the upper portion of the drained pond. A site meeting with USACE was conducted on June 8, 2004 and confirmed our wetland delineation. A letter will be sent by the USACE confirming our determination. S&EC conducted a detailed wetland delineation and stream buffer determination to avoid and minimize any impacts to wetlands or stream buffers. Originally, the proposed sewer line was placed predominately within the Zone 1 buffer and there were 26 lots in the subdivision. The design was changed remove 1 lot to reduce impacts and to place the proposed sewer line out of the buffers except where necessary to tie into to the existing sewer line. The required sewer impacts were minimized by making it perpendicular and resulted in the loss of one lot. A small portion of the impacts are parallel in order to tie into the existing sewer line. The temporary sewer impacts will be minimal and the area will be re-vegetated as required. The sewer line will be necessary to service the proposed 25 lot subdivision. The 2,042 square feet of wetland impact are needed fro slope stabilization and the construction of a dry pond for stormwater treatment. The wetland impacts will be below the threshold (.05 acres) for notification. The USACE's current policy requires applicants to avoid and minimize wetland and stream impacts to the maximum extent practicable and compensatory mitigation to offset unavoidable losses of waters of the US when impacts exceed requirements for notification (0.10 acres). The proposed sewer line, stormwater pond and stream crossing are necessary for the proposed 25 lot subdivision. Because the applicant has minimized the wetland impacts below the threshold (0.05 acres), S&EC does not believe that compensatory mitigation should be required by USACE. NC-DWQ's current policy requires written concurrence for stream impacts other than exempt activities in the Neuse River basin. Since the stream impacts are below this threshold (22 feet) and the stream crossing is a perpendicular exempt crossing to access high ground, and the wetland impacts for the drained pond bank stabilization and dry pond construction are below the threshold (0.05 acres) for notification, we believe that no mitigation will be necessary for these proposed impacts. However, in order to hook up to the existing sewer line off property, a parallel Zone 1 impact is required to provide sewer service. Therefore the client proposes to pay to the EEP fund for mitigation for the 207 square feet of parallel zone 1 buffer impact (ie. 621 ft2 of buffer mitigation). June 8, 2004 S&EC Project #: 8447. W1 Page 3 of 3 Sincerely, SOIL AND ENVIRONMENTAL CONSULTANTS Will Buetow Soil Scientist In Training Attachments: Pre-construction (PCN) notification form Site Location Map (Figure 1) Wake Co. Soil Survey Map (Figure 2) Impact Map Two Data Forms NCDWQ Buffer Subjectivity Letter (2/18/2004) c: Blackmon Engineering Attn: Doby Blackmon Office Use Only: ?(?! 0 3 Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ® Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification ti 2. Nationwide, Regional or General Permit Number(s) Requested:' 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information Owner/Applicant Information Name: Brittchurch Corporation Mailing Address: 9313 Ten-Ten Road Raleigh N.C. 27603 Telephone Number: (919) 427-4245 E-mail Address: Fax Number: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Will Buetow Company Affiliation: Soil & Environmental Consultants. PA Mailing Address: 11010 Raven Ridge Road Raleigh NC 27614 Telephone Number: (919)846-5900 Fax Number: (919)846-9467 E-mail Address: wbuetow(a),SandEC com Page 5 of 14 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Brittmoore 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): 1619238420 4. Location County: Wake Nearest Town: Raleigh Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): The site is located south of Rand Road (SR 2728) at a point approximately 2,000 feet west from the intersection of Rand Road and Benson Road (Highway 50). 5. Site coordinates, if available (UTM or Lat/Long): 17 07 15 402E, 39 48 178N (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): The property is approximately 12 acres in size. 7. Nearest body of water (stream/river/sound/ocean/lake): UT of Swift Creek. 8. River Basin: Neuse (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site currently has an unoccupied house with other vacant buildings onsite. Page 6 of 14 10. Describe the overall project in detail, including the type of equipment to be used: The overall project consists of the construction of a sewer crossing, driveway crossing and impacts from the rg ading of a side slope from a drained pond for slope stabilization and the construction of a dry pond for the proposed 25 lot subdivision. The proposed sewer impacts will temporarily impact 446 square feet of Zone 2 Neuse Riparian Buffer and 433 square feet of Zone 1 as perpendicular and 207 square feet of Zone 1 as parallel. The proposed stream crossing for a driveway will impact 855 square feet of Zone 2 buffer and 1,629 square feet of Zone 1 buffer and 22 linear feet of stream. As courtesy notice, this project will impact 2,042 square feet (.05 acres) of wetlands from the stabilization of the drained pond bank and construction of a dry pond. Typical equipment associated with g lading and sewer easement construction will be used. 11. Explain the purpose of the proposed work: The purpose of the work is to provide sewer service side slope stabilization and construction of a dry pond for a proposed 25 lot subdivision and a single lot access for lot 13 to the subdivision road. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. A site meeting with NCDWQ was conducted and determined that the stream feature on-site is subject to the Neuse River Riparian Buffers (DWQ# 04-0196). The stream start point was also determined and flagged within the upper pprtion of the drained pond. A site meeting was also conducted with Ms. Jennifer Burdette of the USACE to confirm the wetland delineation. A letter will be sent from Ms. Burdette confirming the delineation. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future plans are proposed at this time. Page 7 of 14 VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Provide a written description of the proposed impacts: The proposed sewer line will impact 446 square feet of Zone 2 buffer, 433 square feet of Zone 1 as perpendicular and 207 square feet of zone I as parallel. The proposed stream crossing for a driveway will impact 855 square feet of Zone 2 buffer and 1,629 square feet of Zone 1 buffer. The bank stabilization of the drained pond and construction of the dry pond will impact 2,042 square feet (.05 acres) of wetlands. 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** I fill .05 no 50 Headwater Emergent * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 0.37 acres (16,265 square feet) Total area of wetland impact proposed: .05 acres (2,042 square feet) 3. Individually list all intermittent and perennial stream impacts below: Page 8 of 14 Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) 1 crossing 22 UT of Swift Creek 3' Intermittent * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mWguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 22 feet 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A N/A N/A N/A N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, areagmg, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A Page 9 of 14 VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Per the client's request S&EC conducted a detailed wetland delineation and stream buffer determination to avoid and minimize any impacts to wetlands or stream buffers. The wetland impacts associated with the slope stabilization and the construction of the proposed dry pond (impact 1) are needed to control the erosion off of the site. These impacts are below the threshold (.05 acres) for notification. Originally, the proposed sewer line (impact 2) was placed predominately within the Zone 1 buffer and the subdivision was planned with 26 lots. This was changed to place the proposed sewer line out of the Zone 1 and Zone 2 buffers except where necessary to tie into to the existing sewer line. This resulted in a loss of one lot in the subdivision The required sewer buffer impacts were minimized by making it perpendicular. Parallel impacts could not be avoided because the existing sewer line ends off property within zone 1 buffer. The temporary sewer impacts will be minimal and the area will be re-vegetated as required The sewer line will be necessary to service the proposed 25 lot subdivision. The crossing impact (impact 3) is a perpendicular crossing that is necessary in order to access lot 13 from the proposed road. This lot is isolated by the intermittent stream from the rest of the property. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. Page 10 of 14 If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/stringide.html. I. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. The USACE's current policy requires applicants to avoid and minimize wetland and stream impacts to the maximum extent practicable and compensatory mitigation to offset unavoidable losses of waters of the US when impacts exceed requirements for notification (0.10 acres The proposed sewer line is necessary for the proposed 25 lot subdivision. Because the applicant has minimized the wetland impacts below the threshold (0.05 acres), S&EC does not believe that compensatory mitigation should be required by USACE. NC-DWQ's current policy does not require written concurrence for exempt stream impacts as long as they are less than 150 linear feet of stream length per project. Since the stream impacts are below this threshold (22 feet) and the stream crossing is a perpendicular exempt crossing to access high ground and the wetland impacts for the drained pond bank stabilization and dry pond construction are below the threshold (0.05 acres) for notification, we believe that no mitigation will be necessary fro these proposed impacts. However, in order to hook up to the existing sewer line off property, a parallel zone 1 impact is required for sewer service. Therefore the client proposes to pay to the NCEEP fund for mitigation for the 207 square feet of parallel zone 1 buffer impact (621 ft1 mitigation). 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): 621 (207*3) Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Page 11 of 14 Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 (perpendicular) 2,062 0 0 1 (parallel) 207 3 621 2 1,301 0 0 Total 3,570 621 Gone I extends out 3U feet perpendicular from near bank of channel; Gone Z extends an additional 20 feet froin the edge of Zone 1. Page 12 of 14 4r If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213.0242 or.0260. For the sewer easement a majority of the sewer line impacts are perpendicular to the stream except for the parallel impact (207 square feet) required to tie into the existing sewer line located within zone 1 of the buffer. The client proposes to pay into NCEEP for 621 square feet of buffer mitigation XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. The impervious surface is 19% below the threshold for a detailed stormwater plan. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater will be disposed of by use of sanitary sewer. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Page 13 of 14 O'k 0 6 / D /U Applicant/4ent's Signatur Date (Agent's signature is vali only if an authorization letter from the applicant is provided.) Page 14 of 14 4 . J Garner Quad Mgr.: .Wt i^_2000 Figure 1- USGS Quad t Date: Map sc Brittmoore Blackmon Engineering Raleigh, Wake County Soil & Environmental Consultants, PA 11010 Raven Ridge Rd.- Raleigh, NC 27614 (919) 846-5900 • (919) 846-9467 Web Page: www.SandEC.com 419104 7 V 1 Project Scale: #:8447MI ,°=1320' Figure 2 - Soil Surevy Project Date: Map Mgr.: SC 419104 Brittmoore Blackmon Engineering Raleigh, Wake County Soil & Environmental Consultants, PA 11010 Raven Ridge Rd.- Raleigh, NC 27614 (919) 846-5900 • (919) 846-9467 Web Page: www.SandEC.com Wetland Delineation Performed By: Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, North Carolina 27614 (919) 846-5900 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Brittmoore / S&EC Project # 8447.W l Date: 5/3/04 Applicant/Owner: Blackmon Engineering County: Wake Investigator: WB State: N.C. Do Normal Circumstances exist on the site? X Yes _ No Community ID: Headwater Emergent Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: @ WI Flag 12A (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Juncus effuses Herb. OBL 9. 2. Impatients capensis Herb. FACW 10. 3. Eu/alia viminea Herb. FAC+ 11. 4. 12. 5. 13. 6. 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 100% Remarks: There vegetation meets the criteria ( ?50% OBL, F ACW or FAC) for hydrophytic vegetation. HYDROLOGY _ Recorded Data (Describe in Remarks): Stream, Lake or Tide Gauge _ Aerial Photographs _ Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: Inundated X Saturated in Upper 12 Inches Sediment Deposits X Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: 0 (in.) Water-Stained Leaves Local Soil Survey Data Depth to Free Water in Pit: 2 (in.) _ FAC-Neutral Test Other (Explain in Remarks) Depth to Saturated Soil: 0 (in.) Remarks: There were sufficient field indicators present to indicate wetland hydrology. 11 Wetland Delineation Performed By: Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, North Carolina 27614 (919) 846-5900 Project/Site: Brittmoore Plot ID: @ WI Flag 12A SOILS Map Unit Name Drainage Class: well (Series and Phase): Appling Field Observations Taxonomy (Subgroup): Typic Kanhapludult Confirm Mapped Type? Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) ( Munsell Moist) Abundance/Contrast Structure, etc. 0-3 A 10YR 4/1 Loam sand 3-12 B 10YR 5/1 Sand loam Hydric Soil Indicators: _ Histosol Concretions _ Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils Aquic Moisture Regime Listed on Local Hydric Soils List _ Reducing Conditions Listed on National Hydric Soils List X Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: The soils meet the criteria for a hydric soil. WETLANDS DETERMINATION Hydrophytic Vegetation Present? X Yes No Is this sampling point within a wetland? Wetland Hydrology Present? X Yes No X Yes No Hydric Soils Present? X Yes No Remarks: This area is a jurisdictional wetland. Wetland Delineation Performed By: Soil & Environmental Consultants, PA 110 TO Raven Ridge Road Raleigh, North Carolina 27614 (919) 846-5900 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Brittmoore / S&EC Project # 8447.W l Date: 5/3/04 Applicant/Owner: Blackmon Engineering County: Wake Investigator: WB State: N.C. Do Normal Circumstances exist on the site? X Yes No Community ID: Headwater Emergent Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: 50' up from WI Flag Is the area a potential Problem Area? Yes X No Plot ID: 12A If needed, explain on reverse. VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Acer rubrum Tree FAC 9. 2. Vaccinium corymbosum Shrub FACW 10. 3. Oxydendrum arboreum Sapling NI 11. 4. Quercas rubra Tree FACU 12. 5. Ilex opaca Tree FAC- 13. Rhododendron 6. periclymenoides Shrub FAC 14. 7. Vitis rotundifolia Vine FAC 15. 8. 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 67% Remarks: There vegetation meets the criteria (>50% OBL, FACW or FAC) for hydrophytic vegetation. HYDROLOGY Recorded Data (Describe in Remarks): Wetland Hydrology Indicators: _ Stream, Lake or Tide Gauge Primary Indicators: Aerial Photographs Inundated Other _ _ Saturated in Upper 12 Inches X No Recorded Data Available _ Sediment Deposits Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: N/A (in.) - Water-Stained Leaves ` Local Soil Survey Data Depth to Free Water in Pit: >14 (in.) FAC-Neutral Test Other (Explain in Remarks) Depth to Saturated Soil: >14 (in.) Remarks: There were insufficient field indicators present to indicate wetland hydrology. Wetland Delineation Performed By: Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, North Carolina 27614 (919) 846-5900 Project/Site: Brittmoore Plot ID: 50' up from WI Flag 12A SOILS Map Unit Name Drainage Class: well (Series and Phase): Appling Field Observations Taxonomy (Subgroup): Typic Kanhapludult Confirm Mapped Type? Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-11 A 10YR 4/2 Loam sand 11-14 Bt 10YR 5/6 Sand clay loam Hydric Soil Indicators: Histosol Concretions _ Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils _ Aquic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: The soils do not meet the criteria for a hydric soil. WETLANDS DETERMINATION Hydrophytic Vegetation Present? X Yes No Is this sampling point within a wetland? Wetland Hydrology Present? Yes X No Yes X No Hydric Soils Present? Yes X No Remarks: Due to a lack of wetland hydrology and a lack of hydric soil, this area is not a jurisdictional wetland. , Brltchurch Corp. Page 2 of 2 2/18/04 This letter only addresses the applicability to the buffer rules and does not approve any activity within the buffers. Nor does this letter approve any activity within Waters of the United States or Waters of the State. If you have any additional questions or require additional information please myself at (919) 733-9646 or Debbie Edwards at (919) 733-9584. Sincerely, I ;ka. mek,P.E. irector OF WATER Michael F. Easley, Governor Q William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources cow 6 r Alan W. Klimek, P. E. Director V J 1 Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality February 18, 2004 DWQ # 04-0196 Wake County Page 1 of 2 Brittchurch Corporation 9310 Ten Ten Road Raleigh, North Carolina 27603 Subject Property: Brittmoore (Rand Road (SR2728) west of Benson Road (Hwy 50) UT of Swift Creek On-Site Determination for Applicability to the Neuse River Riparian Area Protection Rules (15A NCAC 2B.0233), DWQ Express Review Program Dear Brittchurch Corporation: On February 18, 2004, at your request I conducted an on-site determination to review 1 feature located on the subject property for applicability to the Neuse Buffer Rules (15A NCAC 26 .0233). The feature is labeled as "A" on the attached maps. The Division of Water Quality (DWQ) has determined that the surface water labeled as' "A" on the attached maps is an intermittent feature and is subject to the Neuse Buffer Rule. The origin of feature A has been delineated and flagged by a pink S&EC pin flag at the upper portion of the drained pond. This stream and its associated buffers should be identified on any future plans for this property. The owner (or future owners) should notify the DWQ (and other relevant agencies) of this decision in any future correspondences concerning this property. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o John Dorney, DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-2260. Individuals that dispute a determination by the DWQ or Delegated Local Authority that "exempts" a surface water from the buffer rule may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60-day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision. DWQ recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This determination is final and binding unless you ask for a hearing within 60 days. North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919.733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc,us/ncwetlands/ <c,v•r I to c -5 -+ Rm P. e2 00/00/10o4 14:23 PAX rd oo2 Addreas: Phone: Profect Name/Description: -- TL- 2e2 KL '2e Department of the Army U,S. Army COrPr, of Bngiwgrs, Wilmington District P,O, Box 1890 Wilmington, NC 28402 Attn: Pield Office: Re: Wetlands Related Consulting and Pernutting To Whom It :44y Gorlcem: I, the current gjo2erty ..r owner, hereby designate and authorize Soli & knvirormnental Corr muttants, PA to act in my behalf as nay agent in the proccssing of perimit applications, to furnish upon request supplements infoxmQ n in support of appbcahms, etc. from diis day forward, The day of This notilication supersedes any previous rorreapondence conaarning the agent for thi3 project. NOTICE: This authorization, for liability and lrrbfassionAl courtesy reasons, is valid only for government effidals to enter the properly when -mccompmWed by S&EC staff. You should call S&EC to aly"Se a site meeting prior to vialting the site. ?11T ? Co2t?rra-rro?_ D 4 Prutt Property owner's Nasr? tertY •? __._.Owner's Signature cc: Mr. John Dorney cc: Mr, Sean Clark NCDENR - DWQ 50il & Environmental Consaltants, P.A 2921 Crabtree Boulevard Raleigh, NC 27604 396 Le?PhllNp C?oun. suite c 0mambern t? rte; u r otf egg 3817.8 ono, Lawndale Drive 2 CVVn Mountain Laiic Concord, NC 28423 (3reengboro NC r4!5 627, Phoas: (704; 720-9403 TxYlemAlle. NC 26456 i >tax, (704) 720-9406 phone; (336) 14"224 PI»na (?^.tl X15-SC2d Fwu 1336) 940-82« l?NC, (d2bi 533.5820 -v--nvjLrvnmentat (;onsultants, PA Ro11d • R111619h, North Carol+,04 27614 . Phono: (919) 546-4000 - pax! (919) 6469467 www,SandEC.com ? !1,-/- 1 C Z AGENT ALMiORIZATION FORM All Bla ks To F Fled in Dv Thg Qn=.L=&wner Name: lTr,, tl.,tr;i1.1 - , 4p/Bb/90 :3LY0 'B'H3 -AS NFAVW 00L=.L --TWOS 1 sHOS?a 1 C13 O O mm i c ?z: r u D wZ w ? 0 I 0 ? D 0 n O 6 O D O z n 0 w 3nl11Q - n N 091'10" E 148.08' 20 ter-- /i?/ ?71 •A?. v . ??00. gum ,38.66 2 E 249.17 N 07`•SB \1 }$\, S; N III}Y- h 1 I I 1+ s amw cut am IMMUD 1 was f 1 ? N / > 'i i' ? y ? r p / o r -? S 005750" E 1085.15' S 00'2331" W 253.46' } ? L 3 z aR Y G r ,001 = r L :3lVOS ON 00 L 0 o5 00 L tTl 679 L E1N O8 7Z 8N LOZ (laiip-mod) lZ 8N ?Z 8N qty Z7 ?N Z -- 1 "? -C1Nb' HO) --- -- NO11d? (? ENO-??? ?du ddi Lj NdNNl7 Zi Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. 0 Print your name and address on the reverse so that we can return the card to you. ¦ Attach this card to the back of the mailpiece, or on the front if space permits. Article Addressed to: . ± 1 i C'I Brittchurch Corporation 9313 Ten-Ten road Raleigh, NC 27603 DWQ# 04-0936 - Wake A. Signature X 'r. B. Received by (Printed Name) ? Agent C. Date of Deliver D. Is delivery address different from Item 1? ? Yes If YES, enter delivery address below: ? No 3. Service Type Certified Mail ? Express Mail Registered QkReturn Receipt for Merchandise ? Insured Mail ? C.O.D. 4. Restricted Delivery? (Extra Fee) ? Yes ?. Article Number 7004 1160 0002 2706 5779 (transfer from service label) ?e c , QRi i eeti. - onnn n e??t De+,,... D---1-+ _...,_,c. UNITED STATES POSTAL SERVICE 111111 USPS • Sender: Please print your name, address, and ZIP+4 in this box • NC DENR Division of Water Quality Wetlands/401 Certification Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604 First-Class Mail Postage 8? Fees Paid Permit No. G-10 ?1 I??1?11???i?ll??li?t??l??l??1?1??1?I?11????Il??l?I?il??,??11?1 54~ BividS ROAD 5TE i(t2 fib, NC 27529 9i9-772.82fl5 be~h.bi~ci~t~n~ia verizon.net f r. ' ea ea i i ~p i P~,, JOSEPN WEBER KW-73-51iN J05EPN WEEIER ww.~-sew 10NE R-17 RESIDENCE ZGNE R-I~ RESIDENCE ,W,,.'^w~iwM...r ~ i ~ F~~ ~ ~ ~ r~ - ~ ~ ~ ~ ~ es I '41 I W o ~ I I G ~ . . - - w r µr~ y~ SIGNED ~ ~ • , # , f _ I WEBER - ~ . t • ¦ a • s • • • • • a ¦ • ~ • • ¦ ¦ ¦ ¦ ¦ ¦ ¦ ¦ • ¦ ¦ • . KW-1f ~q RESIOEW 7 f r I 1 WAKE cauNrT eDARo aAUe cauNrY E+DARD ov eaxAT~a, O 1~~ 1' Iv ZDNE R~bn59t ~ I r eARNEe RAND ROAD ELEMENT/ ww-ns-ssw zoHE a-n I ~R~70 LAND RDAD ELEMENTARY SLNDOL ~ • • t'.• t ¦ • • ¦ 1 f r: • 1 • } t ~ i s y 1 r a a • ¦ ~ ¦ . a • • • • • • ¦ • • • ? i I RESIDd1CE r * Vif e pp. V RK,KfT TNORNE Kt9.73-55L5 I Zplf R-17 r RESIDENCE I N ~ ~ THE NEW FORT16 CORP, ~ Kp-7s-s1u zau R-a ~ vAwwT E ~ ~ #s i~t N~ e~ ~ 'a I ~ r syst~n ~ shown on 0 clru~ors ' ,sad #4r ctn'Rform to the i C ty s Pubs ~,~se9t ~ tend $if~p#i~'ts: ~ I ~ s~: ~ ~ U ARBOR 6REBN K19-~-~43 E- 11~ ~cE '~i .M ~ ~ ~ ~ ~ 1= 1 Oll Qst~,t ~ ~t~, ~ , ~ ~ t3 to the 'ti~Ctio~1 k ext ~ ~S w~d+' S s#~m Ds Shtfwn ~ fly ~ C~lr~n ~rsed fry a ea~rforr~ to t#~e Cit ~ pu~+i~ 1 Y ~ 'tls cad 9~Ci#tt8; ~ ~~~ti. cr, ~ Pmt i~t'r ~V TLNY 9PENCCR ~ ww- - ' ~a ~ TGNY 9PENCCR ww-aa-a~ ~ RI ~E R-12 DENCE ICNF R-n ~ RESIDENCt y ~ CALVIN $TRKK , JR. KM~?!-IRA5 ~T ~ + ~ ZONE R-17 V r~~r~ W Ra ~ RESIDENCH KEN RANKIN i K19-?7-59@7 ZONE R-17 ~ RESIDENCE ROBERT ADAMS ~7L1AL~: K,p-~-~ THE NEW FORT CORD ZONE R-I7 KW-~-~ E NEW f (7 NG GG~'tb~.~~ ~t i.. 6r r aaT coaP. ~ 4n OCtc~r ~~bi~ fvr e~i~ of +.uater P~/~ RESDENCE PAGE GOUGN, ZONE R-17 ~ K19-~-~ RESIDENCE +-n-ieae NE a-.a df , ~ 'f3+t~ in tp'1~9~ , i5 r~spt~rtsi#~(~ F~x- SIDENCE ~ C~: ~ ZONE R-17 ~ RESIDENC! DENT MODI - ""'~D ~ I KW-?2-7555 IpiE R-q lJti# Get at. ~ y ~ DRA'GVVN at lit ~ ~ RESIDENCE TN[ NEW FORT CORP. K19-?7-5513 prier to b ir~-i cm aF 'teir c.~nstruction. E.H.$. ' ~ ~ ~ rr' N ~ m ~ 10NE R-17 RESIDENGE ~ z t~ ~catiF bath Gt ~rr~ts i~ ~ Y Y ~ of beg~nnrng ~ o AAT~: JOSEPH WERE ~ \ KW73-ODDI ~r~~,i~r°+, utifl result i~ the. i~se of fines and ~ A 20NE R-17 VACANT w~tc~[Itat+ ~ ~ ~ ; ~ ~ ~ ~ v 3126 Y s~eu,er ivtEes rb#, mg~cted cn ~ ~'+u~t ~f this nntifi~c~tic~rt f~lure. R~ Q e . ~~T Folly to colt for Inspection, Ind oll d Dowr*ream c ~ Plug, have Plows on the, Jd lte, or any other V ion of City of CO VTPR MaWah 5 ca will resiAt in ra ' from 'ut t rk in the City of Rdsi 'h. W 99, zv oF WON .._.___„r_____ . 'r'+sa^a~r+rsrrrs~~aemrs =eerr~--rnnara-^---r-^•-, _ , _ o .i 0.. ~ p I- u a wwm~ Q~ w ~ 0 ~ ~ p~, mN ; w w U U~ w ~Ow Ip~~ U ~ r m w W Nw F a~.a~ N Q w d ~w F-mW w + as d tL m~ w p z l q > I,_ nn 0- - I U fY r~+'g its ~ w~ w WU ~ ]62Q Q ~ ~'~w 0~ ~ m N w to 3~4NU WZI-_ ~O ~-t~ s`%Y zQ ~ I AWN] 0_NO I w~ cA~ •o z Ztn I ~ ~~1 wW~ = I OCW F-ll-Zm U LY WQON W3 (L~- (Lm w WW- 'N 06pW SB-2 w' (YW w QK1 WNW ~ fY~ n O V Z ~9 ~ ~~N~ ZN ~ P 547 BE SO N N ROAD STE 102 a \ FILTER Q' Z~ Q Q 1' Q N , OUTLET ~ Q W 3 N w ~ W ~ ° hP~ GARNER, NC 27529 I~ZW 3~' ~ 0 919-772-8205 E--NOC 8 ,9b'~5Z M „l~,~z.00 S beth.blackmon@verizon.net ~ \ ,SI'Sg01 3 „05,LSo00 S ~ \ ~ R ~~\I~1~ 111111/l ' N FILTER \ / / / ~ LL' SIL FE • • OUTLET ~ \ ~ / / Q / r` ~ 7"` N ~ ~ .ry O Q . . _ N ~ Z' ti ' \ ~ .i \ ~ / ~ /I r SEAL r; f / _ ~ R I GE A E T _ r o ~ ~ 0293 1 -y' ~ SGY ~ / N o ~i I ~ b ~ v . ~ ~ N ~~c'y .GINS. ii R ~ ~ is ~ ~ (n =f i \ ~ , /B I RY ~ h ~ N. 9~ 1~~ / ERS I~ ! II ~~IfliNlill~~,, N o N m ~ ~ T M Q~ - TEM Y - ~ ltl DIYEPR~9SRIOgN~ H IDrTG FL " \ ~ 10`-PGBLI TR ~l i 12+ TREE EASEM N + m- . WO - IN 55' 1 RI T F WAY ~ I 3ON FONSTRUCTION ANCE ~ / 15 I I ~ zmp~z WN Q ~ IW ~ i 6zu t -pQ a ~ 13+00 14+ I' a i 'l~N~ 12+~ ~ ti 0 ~ U i F- ~ _ ~ ~ / ~ OQ v ~ I ~ IL u-~NW N w 3~,~ ~ y ' s 43Stl8-1b5 / TEM T F / ~ / W I ~W N - zNWC~ I AH1Ntl~ / /P~ 31~tl~ DIVER51 DITCH Q ; ~ W ~ Z ttl ~ ~ 6~ / k \ / / ~ ~ z_OW ~ - I'-~N~ ~ O ~T R ~ 1 - cd J a ~ ~ / , ~ / ~ DAIAE ~ O / \ \ - 7AL"E O pi(t Q - 09 F~ ~'~U ~ N ~ o / N m ~ N - / ~ x IN m~ ~ ~ ~ NNW ~ z ~ ~ ROTL~TION N ROTL~TI n ~ i- r ~ U ~ ON ~ i \ z l ~w ° p(p / . ~ w N ~ - DR INAG AREA TO P N / - ( ) ~ / . o / ~ / N ~ ~ V ~ I w ~ o ~I A i ~ w N 3.8 C ES S E / I - / / ~ z a ~ - ~5T f 6 BFRf'1 E IAOIDAL tiv Z~ 0 W H~ 6 ~PL E --N(Y ~ 3 lP 91~' 'ih~T LCD D~91 , ~ ~ v~, _ \ ~y so o \ AL1.,18" ~ ~ _ ~ .llAi I C NEL ~ I ~ ti ~ f 2 rn ~ , ~ `~1Z 3' BpTT ~ ~ cd Y 3d^31DE E ~ ~ N W ~ 0.75 ~ ~ - U ~ ~ \ ~ I \Q .~F ~ ~ 0 ~ ,LO N L.1 1 Q W ~ I M „I~~g~ ~ I bbz ~ ~ iFOND DAM HA BEEN ~ N ~ W 'Cl TS ~ t 1 1 1 QJ 3 1 RIDGELIN 0 ~ REMOVED BY PREVIOUS ~ W N ~ ~ ~ ~ Cu IW- ~rny Oh9~tER. AREA L BE ~ Z ~ Z .d NG t t t N E%15TI iii.. ~ww ~ ~ ~ ~ - RESHAPED t RE GETA AJ ~ W ~ > ~ Nfiia• Nk'f~VE GRA 5 i ~ Q ~ p O ~ ~ .ii.i m w ~ / ~~I-nw ~ /1411141 i1 (n V1 •L ~ \ ll) n--N~ H ~ ~ I+ r , T Y TRAPI~DAL ~ V~ ~ d' ~ i~~l T /L~OZWANNEL ~ 'Q ~ H O O O a ~ ; ~~"'~F. ~ TEAR STORM ~ ~ O 00 M t , 1 , . - -zv~ N ~ ~ T'ocL QdJNw Q ~~C QOz- N w ,..,,.r+*,.,~- n ~ 3al DE 111- l) ~ et V7 1p fi'~ 0.5 PTN ~ I ~ ~ I z ~ o 0 0 w~OQ z z ou~~' W N ~ ~ a w- W W Qo W ~ NN111 (n6 ~ ' Ht~E FILTER BERM tJJ N 6 z to W~9 ~~9Nw Z O - =W ~Nw ~-U ~m U SB-I 'Q0~ TE Y INITII APPROVAL k x ~a` /F 1 O-0W t • ~ ~ ~ ~ oR JAR V~A~ss»~ ~ w 3N-u ~-IIZ 0~ ~ m~ I I Z Jm~W =tl1NW ~ . ~ ;r ~ Ft ' . . ~ , ' ~ CORPS Al~l}/OR DWO ~ _ N ~ 3 N~ =maw OCN ~ F-,O ~ U ~ ~ n~ WN ~ W I w_ I Z ~ ~~.w Y / W~= ~Z~ w6 w wN 0 Om '8~ ~,8 / ~ ~ r,, -pw ~Iw- tL- 1~N~ (O-N~ D.Z~ VN F Z ~-1 =y ~ _N U- O w 3 N ~ RE IRECT 4 N OL W I Q/ F' F-SITE 5' 8 F-SITE ~ ~ ~ I Z I Z N Z WATER WATER 0 .g Y Q ~ W Z ~ a! r~ v~, bw ~ NWO 0 IWQ W6~U Z ~ ' / ~ ~ I - =COQ I--N~ W ~ _ - Z ~ Z Ul m w w- p w W~ U Y`9N~ TREE P R TE TI N E a {Y rfl N Q -M"" ~ Z - Q (TO BE INSTALLED BY DEVELOPER) " I U ~ m 4 to 3 . ~ w m a p N +g0~ ~ _ ~ ~ [06Zw ~~Ol,l~,b0 U ~~Oa N ~Q W ~ v, Q_NO Fn NQ~U 0 TREE PR - TE TI FE E N w i l Z ~ M W ZN~W W (TO BE INSTALLED BY BUII,DER) ~ W~ ow ~NW~ ~ LL a V J ~ N ~ 6zN QQ~ Q~Ow y U b ~ Nw~ ~-N~ ~ z fY 6 C~ P E a A WQ6 ~ ~ W ~ CONSTRUCTION ENTRANC H E ~ ~ ~ a DETENTION POND DETAIL SCALE" I"=20' A b o H CONSTRUCTION SEQUENCE INLET PROTECTION X ~ I, OBTAIN AN APPROVED EROSION rt SEDIMENTATION PLAN 4 LAND DISTURBING PERMIT FROM WAKE COUNTY. o oao SEDIMENT BASIN ~ F e.o ~ U1 0 ~ 0 2. SCHEDULE A PRECONSTRUCTION CONFERENCE WITH THE ENVIRONMENTAL ENGINEER,______________. N 3. INSTALL GRAVEL CONSTRUCTION PAD, TE~1PORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS OR TEMPORARY DIVERSION DITCH I~ ~ F a7o ~ d M N ~ U ~ OTHER MEASURES AS SHOWN ON THE APPROVED PLAN, CLEAR ONLY AS NECESSARY TO INSTALL THESE EMERGENCY SPILLWAY 269.7 m N DEVICES. SEED TEMPORARY DIVERSIONS, BERMS ~ BASINS IMMEDIATELY AFTER CONSTRUCTION, a SILT FENCE b x~ ~ H 4. HORSESHOE DAM MUST BE IN PLACE PRIOR TO REMOVAL OF POND DAM AND RESTORATION OF CHANNEL. x ~ O o ~ LOCATION IS TEMPORARY UNITL APPROVAL FOR DRIVEWAY CROSSING FROf1 ARMY COE AND/OR NCDWQ. 3 C7 INVERT, 263 'z, U 5. CALL FOR AN ONSITE INSPECTION BY THE ENVIRONMENTAL ENGINEER TO OBTAIN A NOTE; ALL SEDIMENT BASINS SHALL REMAIN IN PLACE 266 ~ ~ !8" PV r..l ~ U ~ CERTIFICATE of CoMPLIANCE• DURING THE NOME CONSTRUCTION PHASE OF THE --1-~.~`4, 711 x ~ ~ PROJECT AND REMOVED ONLY WITH APPROVAL OF A ° b, BEGIN CLEARING Q GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE. WA U r*'' ~ KE COUNTY ENVIRON~1ENTAL ENGINEER. DETENTI( DETENTION POND DETAIL 7, INSTALL STORM SEWER, IF SHOWN, E PROTECT INLETS WITH BLOCK 4 GRAVEL INLET CONTROLS, , ~ SEDIMENT TRAPS OR OTHER APPROVED MEASURES AS SHOWN ON THE PLAN, BEGIN CONSTRUCTION, SEDIMENT BASIN CALCULATIONS-2YEARSTORM ~ 3 BUILDING, ETC. POND D~ POND DESIGN INFO A ti OPTION 1 a 8. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRAD WITH VEGETATION, PAVING, DITCH THEORETICAL ACTUAL BOTTOM BOTTOM ELEV=266 x s SCALE: ~ DRAINAGE THEORETICAL WEIR STORAGE LENGTH WIDTH DEPTH STORAGE SURFACI ~ LININGS, ETC. SEED ~ f1ULCH pENUDED AREAS WITHIN FIFTEEN (15) DAYS OF COMPLETION OF ANY PHASE BASIN AREA Qz WEIR LENGTH LENGTH ~ A , SURFACE AREA=2761 SF iQ / 1 -50 c OF CONSTRUCTION. (AC) (Fl') (FT) AREA (FT) (FT) (FT) AREA O -0'' ~ ° (cu FT) (cu FTi TOP OF 9. WHEN CONSTRUCTION IS COMPLETE ~ ALL AREAS ARE STABILIZED COMPLETELY, CALL SURFACI TOP OF DAM ELEV=270 ~ x S A SURFACE AREA=7276 SF ~ DRAWN BY: D FOR AN INSPECTION BY THE ENVIRONMENTAL ENGINEER. SB-1 4.24 10.99 10.E 12.00 7632.00 71.00 36.00 3.0 0 7668.00 10. IF SITE IS APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS, ETC., ~ SEED SB-2 3.19 8.27 7.80 10A0 5742.00 64.00 30.00 3.00 5760.00 ~i E.H.B. d x OUT OR STABILIZED ANY RESULTING BARE AREAS. ALL REMAINING PERMANENT STORMWATER d EROSION 2 7 / ~ CONTROL DEVICES SUCH AS VELOCITY DISSIPATERS LEVEL SPREADERS SHOULD NOW B IN TA ~ , E S LLED. Intensity for 2 year storm is 5.76 inlhr x PJ DATE: X ~ ~ II, WHEN VEGETATION HAS BECOf1E ESTABLISHED CALL FOR A FINAL SITE INSPECTION BY THE C value of 0.45 per MaICOm charts 03/29/04 x x x x o ENVIRONMENTAL ENGINEER OBTAIN A CERTIFICAT F M I Storage area =1800 cu ft x Drama Area ac ° E 0 CO PLET ON. ~ ) 9e ( ) ~ ~ Q SHEET GRAPHIC ENVIRONMENTAL ENGINEERS (OFFICE LEVEL SPREADER DESIGN; GRAPHIC SCALE x x x " BRYON BRADY (qlq-856-b1g5) 50 100 200 MART QIO X 13 LF/CFS = LF LEVEL SPREADER so o 25 so I A COX (q q-856-7558) KALE LEMA5TER (01{01-856-61018) FES q, o DAVE PARNELL (01101-856-75401) mlmi~~ A-1 C 1 DANIEL ROWE 01{01-856-74501 01=4.(o CFS PEAK OUTFLOW ( IN FEET) x x x \ \ \ J / OF JAKE TAYLOR ( _ ) LF LEVE = ( IN FE L SPREADER 60 LF 1 inch = 1 inch = 50 (t. YI91.41 PUBLIC PUBLIC Sewer Collection/Extension System Water Di ri i sf but on/Extension System The City of Raleigh consents to the connection and extension of the City's public sewer system os shown on The Cit of Ralei h consents to the connection an n ' ' ' . this plan. The material and construction methods used for this ro'ect shall conform to the it ' P it y g d exte slop of the City s public water system lic water system os shown on p) C y s ub c this plan, The moteriol and construction methods used for Phis ro'ecf shall conform to the Utilities Handbooks standards and specifications: Utilities Handbook's n r p ~ sto da ds and specifications onform to the City's Pubilc City of Raleigh Cit of Ralei h aa Public Utilities De ortment Permit y g ' O p ~ Public Utilities De arfinent Permit P Construction Approval Z Con r i n 0 st uct o Approval A t= ~ 547 BENSON ROAD, STE 102 w GARNER, NC 27529 Dote Dote ~ D Q J 0 U ~ Z i 919-772-8205 \ o u w ~ ~ beth.blackmon@verizon.net \ NOTE r ~ °a o. ppNn 0 ~ PLOWABLE FILL BACKFILL IS REQUIRED A Q T UTILITY i Q'I~N ~ CROSSINGS WI-SERE A UTILITI' TO BE I UTILITY ~ N ; ~ Z NSTALLED Q~ w CROSSES UNDER A PR I LLED + - Zo ~I~tl~lll// EV OUSLY INSTALLED UTILITY ONN~ UTILITY, ~ NRe ENCROACHMENT 0 w ~ , ,Rp W 15 EXEflPT BECAUSE OF U o . a $ ' ' ~~i 1 dl N ; w EX15 ING CONDITIONS x ~ w0 Z ` 0, ~E S/ uQ z N - .o ti.y~ w ~ }.mew N U w ~ m w WQ-N I- ~ ,4 Z ~ w ~ - ` = A L ~r' $o Q m~ z +Zp > w ~M a w w~NW Q Q rL- I z ~ oa = 0193 1 I ~ n . o- U1 N 3N-U ~0 N_cD 1 i +z O_NO N('N~W ~ wave ~ m D Nw ~~~N °z~ z Q Z m~ w ~ U ~ ELEMENTARY SCHOOL NAS w Q 0 1 w3 W W Q a N ~ LOTS FRONTING ON RAND W EX15TlNG SANITARY w w N li a gC - W I W - ~ ~ SEWER SERVICE lY (Y ~ ~ ~ 3 I Z ' Q N O ~ ~~G\\\ a O~ W N S a o Q N. 911~i ~-NrY ZN z~~° illlllllll a 0 Q m N ~ z ~ ROAD ABOVE SCHOOL SITE NAVE Z ~ ~ 0" O W EXISTING SEPTIC SYSTEMS. Q Q Q N i w_ a- ~ w6.Ztn o.w 1 ~ ~ ~ N ~ BECAUSE OF THE TOPOGRAPNI', \ 3 ~ • SANITARY 5EWER = ~ 0 w w fxn? ~ a J SANITARY SEWER SERVICE WOULD a ~ ~ ~ MOST EASILY P I rc BE ROV DED OUTFACE "D" ~ - N ~ ~ ~n~ FROM THE SCHOOL SITE a ' a~ y,2V ti4~ b I N . 1 SS ~ ~ 0 ~ 3 ~ ~ I I N N ~ ~ 1a 1 I I I I I I I I I I ~ 1 1 I II I I I v I I I I ~ W N 17 1 I I I I I I I I I 1 1 I I I I I I I I o _ O _ N I ~ U Jj ~ ~ 1 1 I I I I I I I I I - 1 1 I I I w l I I I I I I N ~ u. ~ I N ~ N N ~ 1 I I I I ~ I I I I - 1 1 1 I N I N I I ~ I ~ I I 0 3 _ I I I I I - Q t.. w - L I N , ~ ~ m 1 I I C~ N I N I I I I Q I I I r 1 ~ ~ ~ J - - I - ~ ~ Z \ ~ - Na- I N~" N Nm I 01 I N ~ 1 1 N~ i I v I m l I ~ I I N I r I ~ ~ ~ - - ~ 1 6' 1 1 I I N I ~ I I to I I I I I i ~ / ~ ~ STORM ~"~T $ ~ 1 - I I I I I I I I ~ 1 ~ 1 II II III II _ ~ AGE ~~2 v~ a 1 I I I I I l l s uJ~ 1 1 1 I I I I I II I ~„y OI~YFALL ~Ce ~ 1 I I lo~ Pu I T I II I I V ? I?+ao . 1 1 I EIL C REST L - - - - J - - - _.,1 I I / / ~ I _ 1 JRfiE E~1~EN i?+ I°° w ~ ~ x W ~ 10 _ I ao Nt ~ m - a a~ 1 1 J ~ ~ I to \ - q / IN 55 PUBLIC RI T OF WA 2 BB / - hIN q ~ ia+ ~ , W O ~ J ~ _ _ _ \ / ~ - CJS 15 9 ~ • I tYP' y '~r / / 9E~ ~ ~ ~ ~ ~ =m~Z a m V ,tP' a m' - . ~ a N W W Q M ~ ~ / / i ~rv ~ 1p+°o n f 8 ft S / i a I ~0 ~ \ 8 ~ d I 0 '1-N~ - - U ~ !6 ~ , I 1 H I ~ ~ ~ 1 1P - \ r ~ . ~ ~ ~ ~ a~ 3 • ~ ~ a, ~ I 1 ~ ~ ~ ~ m \ ~ O m ~ ~ ~ t w Q w a~i _ ~ - ~ \ ~ ~ ~ \ h, c0 N I, a35r8-}lOS F - - - -r - _ _ _ r ~ ~~x A W v. ~ ~ c0 ~ V O ~ ~ W I Z 3iaaia alurlr / ~ I ~ 1 1 I N _ r I I III I i I ~ H I N - ~ ~ ZN~W v, I ~ lL 7 :.y N b b ~ Q ~ 6/ . I I . ~1 I I I I I I ~I ° ~ I I I Q ~ n; ~ W - ~ ~ ~ ~I N / W (11 rn u, i ~ ~ ~ ~1 1 1 I l i ~ I~ V I I I I I ~ U Jl =6ZW Z O - -NtY Q 1 l 1 I \ I I I 1 I cn I I I \ STORM ~9 / z ~ , ~ _ H a ~ 1 1 I I I ~ I $ \ w I ~ I ~ N I ~ - DRAINAGE ~ ~ V~ c}• OUTFACE O / -,.~;,n ~ O N B O O ~ - ~T ~ a \ 1 1 N ? ~ I ~ rt \ ~ N m l m l N I I ( / w \ / / tANw w 0 ` 1 v _ -Q i \ 1 1 I I ~ I I I rt-- m 1 mss. EIORE t JACK N 1 1'~ u1 N N N I ~{j o ~ NfTART SEWER \ 3o LF IB' CASING ~ ~ 1 1 - I I - I I I I - I / Y OUTFACE 'A' 1 o I II I m ~ W \ ? ~ / / ~ N ~ ~ ~ i 1 I I i I I I - ~ ~ N 1 I I I i 1 _ 1 I ~ ~ ~ ~ ~ 7 ~ IW- ~ / 1 I I i I I I I I gyp'` 1 I I I E a* 1 i 1 I J L ~ I I A _ ~ r rJTOR gE 1 I J I 1` I DRAINAGE 6 6 gE ~ ~ + / Z`~NOC / r 1 1 ~ ~ I o I I / - - - I O OdITFALL 'B' ~ / ILOT ul3 SANITARY a N I I / L--- ~ - _ / ~ • ~ 1; i~ , ~ /SEWER WILL BE / - /PUMPED TO SEWER ~ +A 1 - ~ ' I I ~ / / ` x SERVICE PROVIDED !~T a0 N w / r ~ I ~ / o~u~ 1 r I ~ _ ~ EDGE OF RIGHT OF MIA O - U :d~.. k S.:» / I I Z Ocl1QU I ~ ~ f / IY03 J I i Ilwt' I N ~ W 11J _ / / Q-Ow c000W ~ w ~ I ~ ~r ~ l to a ~ N ~ ~Q/_W w QLL; ~ N= 4~ Uw I ~ mIL ~ l7 1 Q~J1 ~ ~ , / ~ :-0~., Y. -zu w- 1 1°, ~ 1 ~ ..l I- W2 ~ V/ ~ ert'"M1 ¦ .err' / ~ ~ ~n ' ` Q dJ a~ OZ- 0~ N w ` ~ w~,OQ 3_ 1 z z / / ~ ~ ~ QtANW } 4, - ouul-. Ox W N ~ ~ I ¦ r + r * * s R., , l In U * ~ ' ? j I I Z W_ W JW d I Q. . N t11 ~ W O W 6 Q O ~ W I Q/ + + ? y kk * * t+ +f o- dk a/N~W f+ + + ~ * * ? w * fi * i. ~ I w~ f W Z 0 ~ + ? + y =W wZJ ~ ~NW NNU ~m ~ u ~+w+3+;~~*M.++ + ~ w- ~ m ~ Q M f1' - ~ e ~ + + z I J = W ~ + + + * + r 3 O~w N~ _ ~w ~mlYw GNU _ + k , + + * ~ ~ ~ ~ N b ~ x F.. ~ n o ~ m W N ~ 1- t11 I F- r M WwQ ~ WNW IW- I Z ~ ~ W~2 I N >tszN y-rn~w r + r m U a 3 ~ U16zW w-pw wN ~ Om O~gO Ifl~N~ ~ Y I W'- WQN ` t~3 N / z Y * + { W ~ . + * ~ + N ~ ? N w .C F I 1-N~ U6ZW RE IRECT 6 / ~(~NV a, 4 ~ - ~ ~ I 3 + + F-SITE I (Y-N~ W~p/z WATER 0 ~n 'a~ 0 ~ ZIIz ~ _ ~ QNOCw I ZN S c I +wQ o I ~ I wg-zU z ~ ~ z-OQ wm ~o I"~N> ~ W6- z 1 I w - w / ~ Z6zN / a ~ a ri, ° ~ I ~ Rl N w6 w w-Ow o ~R1NV _ l Y~Noc / ~ a ~ QI O I Id ~ Q 3 ~ ~ 0~ Q/rf1~ ~ ~n - ~ ~ ~m ~-J / ~ F APPROXIMATE ` ~ N W ~ LaATION E " m O N z Y V1 a [O I w w u 0 c, C ~ X SAN SEWER + Q/ 6 z ~6Za a~ N o Q ~ ~ ~ '1~ Q - N 00 ~ ' Q~NO H6Nw / ~ ' - ~v-U i-~ U M n ZN~W oq _ LL . ~ I w - b 6Z QQl(1 Q-pw z U cP w U N (Y ~ ~ ~ ` ~ a U o " ~ ~ UTILITY CROSSING NOTE ~ w ~ U S ~ ~ ~ ~ ~ ~ When installing a water main, the horizontal separation between water ~ and sewer shall be ten feet. IF this separation cannot be maintained due ARBOR GREENE SUBDIVISION O C7 ~ ~ ~ HAS EXISTING SANITARY b to xi in A TTENT/DN e st aanaltlan CONTRA s the and varla i CTDRS ~ 5EWER LOCATED IN A se rte gr n y ton allowed is the water main in a U po a tech with the elevation of the water main at least 18 inches above the top of the sewer and must be approved by the Public Utilities The Construction Contractor res onsible for the extension ~ THE PUBLIC SCALE: w Director. All distances are measured From outside diameter to outside p of water RIGHT OF WAY water ~ 1 -50 ° dicwneter. and sewer, as appproved in these plans, is responsible for in E ~ the Central Engineering Department at 831-6810, and the in ~ When a water main crosses over a sewer main, there must be eighteen Public Utilities Depc~-tment at Sg0_3400 at least DRAWN BY: ~ inches of vertical separation, IF the water main must o under the se r n r h r riot g we .Cue y ou ou s p to beginning any of their construction. main, both these lines must be of ductile iron for o distance of ten feet on either side of the crossing with atwelve-inch vertical separation. The Failure to notif both Cit De artm n i n• E.H.B. ~ cro55in of oth r n Y Y p e is n advance of be innin g e u derground pipe requires a minimum of twelve inches g g ng DATE: 0 of vertical separation, Any changes in these clearances must be construction, will result in the issuance of monetary fines, and nd ~ approved by the Public Utilities pirector, All crossings within these regyire reinstallation of any luater or sewer facilities not inspected spected 03/29/04 o° vertical clearances shall be Filled with tt67 stone. Al! distances are as a result of this notification failure. measured from outside diameter to outside diameter. GRAPHIC SC ~ ALE . SHEET ve 50 o is so Ioo sao m when a water line or o sewer main oas,vs ,,,,p,- „r ~,,,,~m,- „ ~+,,,.m ~o,,,e.- Failure to call for Inspection, Install a Downstream Plug, have i i ~ ~ vertical separation of 18 inches shall be e maintained unless bothV lines are of r'ermltted f tans on the Jobsite or any other Violation of City of ty of $ ductile iron or encased in concrete. A ai concrete pad shall be poured Raleigh Standards will result in a Fine and Possible Exclusion from from o between the two. Distances are measured from outside diameter to future work in the City of Raleigh. ,a outside diameter. ( IN FEET ) W 1 C~2 inch = 50 ft. ~ OF 8l F i i a ~ MOST EASILY BE PROVIDED FROM THE SCHOOL SITE ~ ~+g ~ti ry .F,I ~ _ ( T ~ ~ 1 ( I I I r I ( I I F}"~ ~ ~ r ~ s I ~ U ~ ~'l ~l', I L~', o~ I I ~ ~ 1 I ! I I I r f ~ w i Q r- ~ 1 ~ ~ s 547 BENSON ROAD S , TE 102 N N N ~ N ~ ~ N r ,i y , ~ ~ x ~ / , ; , ° ~ ' ; ; W GARNER, NC 27529 1 N • ~ ~ ~ a~ ~ ' ' 919-772-8205 ~ ~GF~"~ STORM ~P ~ I i I ~ 1 I I L ~ + RAIN ~ ~y~r ~ beth.blackmon@verizon.net D AGE ~°a a + ,r h P ® OUTFACE 1 I / / W ~ i I I ~ , .2+~ w ,t. 'C' ~ -i I 10' PUBLIC 5TREET ~ / I - 4 j I 'N rlu to 1 TREE EASEMEN - w W I oo w " ~ ~ ~ LO - a I I A 7q B/B IN 55 PUBLIC RI T OF W Y ~q _ MH q W O L ~LL~ I4+ ~ ~ ' i N x -LIB ~ ~ . 3 ~ - ~ / SS ~t 9 ~5 , I I a IR . r. / / C; I~~~ a tllllll 1 e ~ _ 1._._ - I w I w Q ~ AR p /~i a Vii/ I ~ Y / u o - o Q , a, ~ ,y a M I-- M ~ u - P `ice'-"' M 0 31- ~ e ~ ~ _ 6*w ~ _ _ / I- ~ \ r k~ - ~ ~ 0 m ~~i 1. ~p N W lllllJlll ~ fV ~ 1 . ~-U I 31 Iz ' l~ WNW 435YB-BIOS r ~ d ~ 1 _ 3lOalO ANINVO ~ 0. P ' ZN O - ~ (i W _ Q w ~ ~ ~ H 1t ~ ~ ( I ~ ( - - I l7 w ~ w IW ~ ~-~N~ 1 o I I 1 ( \ ~ I I 5 a N ~ - ~ ~ 1 \ 0 D STORM ~ " ~ ~ ' - DRAINA ~ 10 GE I- T A . 4 ' Q OUFLL C~ 'Cfi I ~ \ yc N N w o, i' ~ i ) NNW t0 ? ~ ~ ~ ~ ANITARY 5EWER \ ~ ~-r-U N Z I I Z BORE t ,LACK N I ? ouTFALL 'A' 30 LF IS' CASING ( ( \ ~ \ a: ~ WNOCW ~ ~ ~ N ~ ~ I ? \ ~ f I w - ~ 1 I I e i I ( ,SSE S STOR ~ ~.a~'` ' Z- W 'E z ~ Z~9~ O 1 ~ a ~ DRAINAGE i ~ - ~ ~ --N~ ' ~ OUTFACE uB' w LOT ttl3 SANITARY ~ * ~ SEWER WILL BE 4- PUMPED TD SEWER = s _ l7 1 ~ ~ / SERVICE PROVIDED AT N W ~~-U ~9 ? DUI ~ ~ `yam / EDGE OF RIGHT OF WA 0 I I Z y / ~ Qw-lu o~Q ~ ( , fi I t W ~ ~ , W I - ~03~ n ~ ~76z~1 ~ . ~ww I I I m0~w Wo wQu; n t t` + Q-OW + , ~ ~ AA,, ~ ~ U w + ~1 , m~ ~ ~ 1 Qa~ , * x { t O Vj QZUw w~ IgZ ~ ~ ~ O Z- 0~ W- N w ~ +t + QdJNW Q G ~ * ~-U ~ w-OQ 3- ~ z z I ~ + + 0 UE" 0X w N DC ~ ~ ~ ~ i ~ w Jw I w Qo w p( 1 I + + + + e: ~ + s ~ a r i t e c w l w- ~ y ~H ATTENTION NT TOR CO RA S C v ~ ~ GRAPHi~, SCALE F I ~ y PVI 5TA IIa50.26 - 50 p 25 50 ~ F The Construction Contractor responsible for thr extension of water PVI ELEV .290.62 ~ ~ ~ A.KD. _ pp-9.00 II I ~H ~ryr Qa ~glilgtr q~ aggqq0?ig Iq gig q aqE le ce~•oonsible for in K € IN I .y .y 1 and the ( IN r construction. 1 inch an sewer, as appprove in t ese plans, is re the Central En ineerin De artment at S I- I „e of beginning I =1.3 9 9 p ate, , Public Utilities Department at 9 - 4 at lea # 80300 O ~ ~ 165.00' VG EET) H ~ ~ wen Y our urs prior to beginning any of th. 50 t ~ ~ f . O O ono Failure to notify both City Departments in adva ~ P pN fdtJSr W ~ ~ cons ruction, will result in the issuance of monetary fines, and ~ = 29B reL~ire reinstallation of any water or sewer facilities not Inspected - . . CITY ~~F ~ ~ ~ Rp/, ..W as a result of this notification failure. ~ ~ ~ ~ pJ o O~ ~ , . . O c~ J~ Z~ ~ al ure to call for Inspection, Install a Downstream Plug, have I Q pw I=*1 ~ Permitted Plans on the Jobsite, or an other Vlolatlon of Clt of - ~ y y W Z D r•-1 y Raleigh Standards well result in a Fine and Possible Exclusion from ~ . . ~ 0 future work in the City of Raleigh, II _ I ~'~'1 . J 290 . ~ W -V b. GV m. N ~D 290 Iy F f PVI STA 13+00 bx PVI ELEV =303.73 A.D. _ -Ebb - w > _ Q+ I K . 30.Ib I w r ~ Qn. a' 50.00' Va ~ 310 ~ysry,~ . ~ ~ m 310 r + 0' F NZ 15TA - 13175, p ~ ry VI _ ~3? A. D. • 4.00 . U w m PVI STA , .Ib+3 .47 . w M Q ~ R am". f' A.Q. _ =3:0 . - I"'I R. R W y o~ ~ N U H I I ~ ~ ~ .-..T. g . 75.00 ,VC 280 Cd yU 1' f11N ~ DRAINAGE. ' le IN L F_ . a _ ~ .r ~ ~ ~ y m . Oh r N ,P ~ + r t~ L. -w Q ~ ~ ua ? ~ C - 300 m ~ 'd o~ - - td ~ E" 177 .Ib L -3q~. mm. ~ o p ~ a ~ ~ 6. A 0. ~ a U1 + ry N U H q ?NF O 1 Q~N h~l 1 ~ ~ ~ ~ Q U ~ ` ~ _ ~ 270 . 270 M O 6 ~,w, S ~tnOf? ~ U ~ ~ ~ ap. \ NZ.p a ~ Q 0 o z~ 'ti 290 ~ m 0 t GV `D ~E.~ . a 290 ~ o ~ 'Xb' ~ =E PVC RE ER. go x UTILITY CROSSING NOTES H ~ 0 0 b'XB:X6' FIRE. x S? FIRE' When installing a water main, the horizontal seporation NY T m s N e between water and sewer shall be ten feet. IF this 6 M separation conrlot be maintained due to existin conditions W C7 ~ , 6 GV ~ -p~2~ ~q. ~A . m4• t . 9 , the only variation allowed is the water main in a separate 3 = -z 2bo z=.~. N . trench with the elevotion of the water main at leost l8 b ~nOC _ z A ~ ~ ~ ~ 26o inches above the top of the sewer and must be o roved pp ' by the Public Utilities Director, All i CAE' U d stances a-e measured p,~= ° • From outside diameter to outside diameter. 1"-5~' 6,4~ . 8 ~ ~ LE m When a water moin crosses over a sewer main, there g$~m _ ~ must be eighteen inches of verticol separation. If the DRAWN BY: ' water main must go under the sewer moin, both these ~ 280 ~ ~ + $o Imes must be of ductile iron For i E.H.B. a zz. g.c$; . ei r i a d stance of ten Feet on the s de of the crossing with a twelve inch verticol L zz2' `~cvz~ . separation, The crossing of other underground pipe requires MN ~ E STING CENTE LINE PROPD ED' CENTERL' I E" STA Ib+94.1a 23 63 ~ EX STING CE a minimum of twelve inches of vertical separation. Any DATE' EX STING CENTE LfNE PROPO ED CENTERLI E' I'~z~ chonges in these cleorances must be aooroved by the n2l~nrnn GRADE.( YPj., GRADE TYP _ INV IN=278.44 M 7 TO MN 6 t~~N ul~HV~ r.r) CzKAUt (.I Tt'). . . . . . . . . . . . . -r Public Utilities Director. All crossings within these vertical 0 DATUM ELEV 2m 00 DATUM ELEV clearances shall be filled with #67 stone. All distances are SHEET 250.00 250 measured from outside diameter to outside diameter. v v v m m m AN co When a water line or a sewer main posses over or under m P°~ mr mg NN Nm "'o "m 4°p m~ ~n ss °.m mo mQ ~yp m~ ov oom oN - 6~p 6r ?N ~m QN_ p~ mN m Q= Qo rtl tt1 m ~KI mil ~rt1 ~pp NP N N N P N N Q 6 t "co 0 P6 QQ 6 Ift N NN N N °Qm Co m~m ~LO C14. Is s; T? _ m a storm sewer, vertical separation of 18 inches shall be 6 N $ (No L(4 o r to O N N N 6 N N i~ N" N" ~ry m" "n n n N maintained unless both lines ore of ductile iron or encased C~ C, C4 C4 C4 " " in concrete. A concrete pad shall be poured between the Q two. Distances are measured from outside diameter to W 10+50 11+00 11+50 12+00 12+50 13+00 3+50 14+00 14+50 5+00 15+50 6+00 16+50 17+00 0+00 10+50 11+00 outside diameter. OF 7 11+00 11+50 12+00 12+50 13+00 13+50 14+00 IA+50 15+00 ism r a Wq ~ ~ /S NR P fkF MUS l ~ s w W ~ eki hA~c o~ ~ Q ~ryW Srr ~R0'1c ~ G~ IT OM S qN,r 2 qRr ~ ~ r ~ U ~ ~fNT Q' 2 ~J J~ IL Y p F ~v~ Q 1 R or ~ ~ p 0 ~P n °~rF sFw ~ ~ ry~~ r~ ~ ~ ~ T~~ q4 ,FR 2 ~ ~ / 0 Z~;WO ~ o ,o 4.2 moa ~ o ~0 ~ ~ / i. ~ e ~ ~l 6 I WL T ~ o:a N QO m 2 M~ tie N Z D Q ~e h 2 2~ ~ ~ 1C ~ ye~ ~ 3~ ~ry ~ a~a 547 BENSON ROAD, STE 102 3~ to y^ ~M CJ ~ ,y ~ N , ~ o ~ ~ ~ W , r ~ A 2 GARNER, NC 27529 9~' 2 ~ ~ v `'ry 919-772-8205 h ~ .S' , ~ $ ?`w Esz ry ryo'~ ~f'IICt~&CAiLC~ S'! tij 4~ ~ W Q = e~ beth.blackmon@verizon.net c A S i I ` ~ i"1~ ~i ~Z ~ ~ O ~ y Q~4 ~ ~ ` V oQ~~~W Q II ~ O ~ (p Y\ ~ M r + P CAS ii r~, e fit'.,., ~ h s D~ S qz~ ~ P ~ ~ • S r ~ 6,, ~ x1 L.~, 4,F' ; O. ~ {r i • i . o S ~ ~ AL r; N oR sro q~Nq Rh 029337 ~ SS °~rF GF • q~C ~,1q,GIN~. o ~i CM x ~ GRAPHIC SCALE ~ieF ~ • • ~ eo o z5 sa goo zao ~~1j11111141~ + lia ~ ira2 ' z ~ ~ 2 11+2 p ~,P r~~ ` h Ph ~ Q C' ~ (IN FEET ) 6b ~ ~ ~ ~ o W ~ l inch = 50 ft. ~ gNlr Q' ~~/b~ qR>• a! UTILITY CROSSING NOTES ot,T sF ~ 0 W ~6 Fq~ WFR ~ s ~ T U (,l N ~ o o sro 8 c4, ~ ro ~R ~ Q a When installing a water main, the horizontal separation between water ~ and sewer shoU be ten feet. If this separation cmnot be maintoined due W oc,T Rq~N R q O,pq RM SE N FqC qGF ~ ~Nq Q , ~ 0` ~ ~ " " TFq GF war ~ t + ; t, ~ to existing conditions, the only variation ollowed ~s the water main m a ~ ~ a << M try RvK . + t 3~c 2 0~ F ~ ~ + } y . " • ; ~ separate trench with the elevation of the water main at leost IB inches " * t " ~ ~ above the to of the sewer cnd must be a roved b the Public Utilities ~~ry41 ry + Z ~ 1 V ~ rrP p pP Y ` tU p Q Director, All distances are measured From outside diameter to outside Mn' SEWER ~ ~ ~ ' } Q•~/ K 2 Q O SERVICE ~ O ~ 3 ~ ~ dicvneter. ~ ~ W N W inn ~ ry ry err ~ Q m Q, ~ ~ When a water main crosses over o sewer main, there must be eighteen ~~~Otu ~ ~ U H . ~ ~ ~ r~2 per. 9 Wry t~ inches of vertical se ation, If the water main must o under the sewer N m4~ ~ 'Q' ~ N W Z / y ~ ~ ~ ~ Q 0`~ Q ~ main, both these lines must be of ductile iron for a distmce of ten feet on ~ ~ ~ V a~ either side of the crossing with atwelve-inch vertical separation. The ~Q.'tu4 ~ ,ti q W~ Z~ O ~n 2 ~ ~ ti) e crossing of other underground pipe regyrires o minimum of twelve inches of vertical separation. Any changes in these clecx-ances must be in Qi + m_ ~ f V 0 Q' approved by the Public Utilities Director, All crossings within these ~ m vertical clearances shall be filled with tt(,7 stone. All distmces are qQp n1 = U m ~ P measured from outside diameter to outside diameter. hgTF V D! W Q m 3~':~~u W l r U When a water line or o sewer main passes over or under a storm sewer, a~ qri ~ \ 0 Q! fY ~p + Z N(Y ~ vertical separation of 18 inches shall be maintoined unless both lines are of ~ ry W c~ Q4 ~l y + Fk Q' ~ O. + ~ + t tUO, l~ Q ductile iron or encased in concrete. A concrete pad shall be poured S4 ~ tCm ~ , NSF a o + } + ~ Z ~ between the two. Distances ore measured From outside diameter to Q ~ ~ ~ ~ outside diameter, m V //yy~~r ~ V y + t + + + + + t + y~ tt}} y ~ ~ ti ~ ~ ~ "I + y y + t + + + } 0 STORMWATER CALCULATIONS -10 YEAR STORM - BRITTMOORE o~ STRUCTURE STRUCTURE REFERENCE REFERENCE INVERT INVERT DEPTH DEPTH LENGTH SLOPE DIAMETER PIPE RATIONAL INTENSITY AREA Q 0 Tt QiN qP THEORETICAL LET IPE DIAMETER ~ ~ FROM TO TYPE TYPE ELEVATION FROM '"~T aive FROM TO FROM ELEVATION TO FROM TO (FT) TO (FTj (FT) (IN.) TYPE C (IN1HR) (AC) (CFS) (CFS) (CFS) (CFS) (IN) I I I I y ATTENTION CONTRACTORS 5 4 YI JB 285.00 287.71 282.00 281.80 3.00 5.91 40.00 0.50 15 CPP 0.45 7.22 1.74 5.65 5.65 3~~ 5.65 5.65 16.23 4 3 J8 B 287.71 287.31 281.60 281.05 6.11 6.26 110.79 0.50 15 CPP 0.45 7.22 0.00 0.00 5.65 0.00 5.65 16.25 ~ The Construction Contractor responsible for the extension of water 3 2 B JB 287.31 275.00 280.85 267.00 6.46 8.00 154.14 8.99 15 CPP 0.90 7.22 0.53 3.44 9.10 3.44 9.10 11.29 ~ ' and sewer, as appproved in these plans, is responsible for in 2 1 JB FES 275.00 264.00 266.80 264.00 8.20 0.00 33.90 8.26 15 CPP 0.45 7.22 0.00 0.00 9.10 II I ~ 0.00 9.10 11.47 y y the Central Engineering Department at 831-6810, and the bbb ~ N ~ ~ Public Utilities Department at ~q0-3400 at least 8 7 B B 279.53 279.71 273.60 273.47 5.93 6.24 25.04 0.52 15 CPP 0.45 7.22 129 4.19 4.19 4.19 4.19 14.41 Z twenty four hours prior to beginning any of their construction, 7 6 B FES 279.71 253.00 27327 253.00 6.44 0.00 223.48 9.07 15 CPP 0.45 7.22 0.16 0.52 4.71 0.52 4.71 8.80 y y y Q Failure to notify both City Departments in advance of beginning 11 10 8 JB 265.73 263.00 261.00 259.00 4.73 4.00 30.64 6.53 15 CPP 266 I a ~ a construction, will result in the issuance of monetary fines, and osD 7.22 o.7a a.a1 a.a1 10 9 J8 FES 263.00 257.50 258.80 257.50 4.20 0.00 95.78 1.36 15 CPP 0.45 7.22 0.00 0.00 4.81 4.81 4.81 9.44 ~ ~ ~ ~ 1~+1 O O O rec~ire reinstallation of any water or sewer facilities not inspected 0.00 4.81 12.87 ~ ~ ~ ~ O oo M as a result of this notification failure. 15 14 JB B 311.50 309.33 307.45 305.53 4.05 3.80 139.02 1.38 18 RCP 0.45 7.22 0.00 0.00 0.00 w d'v~~ o.oo o.oo o.oo ~ 0 0 0 Failure to call For Inspection, Install a Downstream Plug, have 14 13 B 8 309.33 304.40 305.33 300.60 4.00 3.80 278.14 1.60 18 RCP 0.90 7.22 0.05 0.32 0.32 0.32 0.32 4.47 v (F Permitted Plans on the Jobsite, or any other Violation Of City Of 13 12 B FES 304.40 300.30 300.40 300.30 4.00. 0.00 20.00 0.91 18 RCP 0.90 7.22 0.05 0.32 0.65 0.32 0.65 6.45 Rolei h Standords will result in a in i i from Notes: g eon oss e x u on 260 • Future work in the City of Raleigh, RCP is Reinforced ConreOe Pipe, ASTM C-76, Type 3 Type A i~ Grated Inlet Cp 0 For pipe with less than 2 feet of cover to subgrade use ASTM G76,Type 4 Type 8 is Curb Inlet HDPE is High Density Polyethylene FES is Flared End Section. 1 6 CMP is Bituminous Coated Corrugated Steel Pipe Depth is hom Reference Elevation to lowest invert. H W CPP is Corrugated Plastic Pipe ADS n-12 or approved equal Reference Elevation is Top of Casting for Type A inlet FES is to be RCP at all outlets & lasterred to CPP wl manufacturers Reference Elevation is Top of Curb for Type B inlet H 0 recommended couplings I I I I .F--. ~ s ~ mp C II II II I g r 1= W U L • s~ -QL • + • - Z II - ~Z~. Q~ ~ 250 ~zz ~ ? ~ a 2ao 290 270 290 _ ~ ~ . LL O m ^~I~ W M 0'F ~ ~ mm DATUM 8LE'V p~ t` m ~ 215.00 N ~ U ~ 0 m Z s N q ~ s ~ ~ F~ =~C _ 2 40.00 LF 'N' s .N9 s ~ ~i E +P1~ N N N N N L a =L Op~ w k W Q • ray N ~ f-p O ~ a - ^ f6 15 LPP A b = a _ - to+ao lo.so n+oo - 280 d ~ L C = 280 1 ~ ° ~ i E = 2B0 w 'LS E ~ ~ N?~ p gg~ 260 .63 8., ~ a 0 =~L» rQQn PVC a r N _ 0 0 r ~ a m ~ N r ~ ~ ~i w ~ Q ~ V Q~ Q u--~ S ~ I_NZ L u- i 0.i 4)6 3 XF-- mm F-i z ~ ~ a F" O L ~-~,ZZZ EF-. L> O ~ a= w iYz z ~ LW F,y~ N C" y z. o- 'N Q- 280 ^ M ~ E FN Sw N . Q> M O Lp O > N iL pH N . w ~ Z ?~i Cn ~ > -.N m F' p, N~ . ~ z •m~ • ~ A 0,50 a ~ ai 4~• _ CZ . ±nZ W/ 0 ~ ~ b4 ~N. =Q- ~6ry O ~ _ Q _ F Z v .b 270 .r A L R??. ay.n~ ~ 270 270 U rl ~ VIy 00 250 - nz p mg ~Fi .4" - N p `9Q i5. GPP i C u- ~ a ~ S• ~ ~ ~ . 0 ~ M q3 ~ -zz _ NK-- -z - o Q> Z i ~ SEWER 8' SAN - 270 0 SCALE: 3 c b A U m ~LL 1"=50' o~ o 0 m DRAi~N BY: 260 v~ 260 260 • uN E.H.B. 240 N QRI. • ~ 6 Oi l-C • - , 6 ; ~ DATE: ~ - . .O 0 03/29/04 - aaa ~ DATUM ELEV DdTUN ~tev DATUM F,LEV SHEET ~ DATUN Bl,EV 255.00 0 255 OD ~ ass. o0 255.00 DATUV 6L8V 11 I 280.00 'C n r n s m ~ r s N o s - s - m 6 - n c c s N N v m r ~ ~ m m v O 6 ~ _ _ _ ~ R '.~L Q' n Q N m S m N N V r m Q Q N O O N Q Q co N 0 r 0 N 6 m N m p - Q m m co m r r r r r r r r r _ N N N N N N N N N N N N N N N N N N r O F- O O O 6 r 0 m O 47 S 0 co r r r r r N m r v O _ co m co co co m co dD co m r r r r 6' ~~pp Q Q 0' co S N N N N N N N N N N N N N N N co N N ry ry (N N r N N h N V S r N r n n S S S 19 19 0 0 0 Q Q N N N N N N N N N N N N N N N 0 N 10+ (7a 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 OF 10+00 10+50 11+00 11+50 12+00 ~ rr r 1 11 i ...I. if END 15" RCP INVERT 304,0 CON AB OVER PIPE O 547 BENSON ROAD, ST'E 102 ..<,<'" ; GARNER, NC 27529 P/F P /P 9 9-77 -8 0 ~ : 1 2 2 5 beth,blackmon@ venzon.net 1 ~~11111 I I II!! f/ w J U CAR fig UJ ~ ~ (y~ /t? CaE A ~ 0 v DRA Q ~ 2 END 15 RCP q~ =m 1 /P INV OUT 302.29 02933 ~ _ r ~ , o _0 ~ r~A Qo WELL . F ~'y , pZ. °rn Ucn q D~ ,o iif ~ H. 6L ~ OPEN SPACE f!l?I??li~~~~ ND zn A A / RE ' A I/2 OF 41 B/B ROD - 3 14q S.F. k ~ SECTION PROPOSED JOSEPH WEBER WITH 5 CONC. SIDEWALK 1(olq-23 5~~q SEE DETAIL SHEET C-~ ~ / ZONE R-12 2 5 REMOVE BLOWOFF 0 RESIDENCE ~ / EXTEND EXISTIN G WATERLINE wv Q 0 0 WV I V 306 q O INV IN Oki o ~ /P 1 P ~ 5 RC G i ~5 ~ o ~~A U - ~ ~ z 18 RCP END 18" FES EX. CB INV OUT 307.45 / TOP 312.61 ~a~H I / FH INV OUT 308,15 GRAPHIC SCALE 0 o OPEN SPACE ~~~.u o ,5 ~ so ,zo ~ ~ ~ z WV TIE PROPOSED SIDEWALK INTO AREA EXIST SIDEWALK ~ U „dbbb 2 283 S.F. EXIST ~ ~ a~ ~ a~ a~ (IN FEET) Z SIDEWALK 1 inch = 30 tt ~ ~ ~ ~ N N ~ + H rx rx ~ ~ ~ `o 0 -o V~ ~~~M ~ o000 0 O o0 ~0 M ELE d' ~n ~ ~ ~ (,E O O O O G~ PEA E~ R~ OP ~ ~P „ 15 R END 15 RCP ti~ 4 + - ,~a INVERT 30 .0 / V,1 CONs,/51..AB OVE PIPE P /P ~ P /P w J ~ ~ p„ U w END 15" RCP } m ~ I /P INV OUT 302.29 m Z J •s",,, Q O LL U U1 O,p N ~ U OPEN SPACE ~ / z AREA ~ / I' RDAD - a 12 OF 4 B/B / 3 14q S,F. SECTION PROPOSED / x 0 ~ ~ i JOSEPH W EBER WITH 5 CONC. SIDEWALK o~ o 3 ~ - - x H SEE DETAIL SHEET C-~ I(olq 23 5~(oq ~ o a ~ o ZONE R-12 H a i ~ ~ ~ i RESIDEN ~ CE a N ~ ~ 4 ~ M ~ ~ U~ i x ~ o ~ N / I d~ / ~ x~ b o0 z v Of! 3 b 310 x~ ~ v b ~ °o ~ 6 o ~ - ~ k ~ `'~q ~ O P „ I N 1p k o ' / 15 RCP ~ / 3~0 ~ i SCALE: , ~5 q I U 1 "=30' w $ 18" RCP , "'1 I DRAWN BY. •C ND 18 FES - E.H.B. ~ INV OUT 307,45 ~ E TOP 312.61 ~ i DATE: INV OUT 308.15 ' .o i 03/29/04 OPEN SPACE AREA SHEET GRAPHIC SCALE i. I I L 1 L V . 1 ~ / ' 1 - u~ 1LU / I y ~ N ~i ~ + O 1 IN FEET 0 7 Ccl O 1 inch = 30 OF f t. r REACTIpN BEARING AREAS FpR HpRIZpNTAL WAT I W ]RIZDNTAL WATER PIPE BENDS j ~ W a W ~ .TRANSITION CHANNEL I ASED ON TEST PR R F P. , . B ESSU E D 200 SI FINISHED GRADE PROPERTY KL AREAS G1vEN IN SQIARE FEET. SSURE DF Z00 P.S.I. ~ j w~ ~ ~ x ? w E MiN1MUM 36' HOR]ZONTAL CLEARANCE ~ LINE FROM ANY OBJECT. ~ T' •,A ' ,q ~ IN SQUARE F[[T. Y a W q ~ n ~ ~ U q Q~ U K~~ W m ~ 0 y ~ 4 Q' 0~ ! i o z q°> ~ a J~ W ? u y yTRANSIT10N e ti h Q~ QO u J° a a a> W ~ J TAT ~ W W ) W ~ Y a ~ VEGE ED SECTION TO Ox y y a ~ a u Z H = w y ~ W°° DIVERSION y y r? GRADE (20' LENGTH) FiRE HYDRANT, PUMPER NOZZLE TD -I;4. ~r R. ~ ~ Qti ~ , BE POINTED PERPENDICULAR TD STREET. • r '4.'•~ 0~ q ~ OP Qx x 2 .o . V Px Vx ~ r ~h Q'~.' 4• CW ~ ~ ~~O:Z y a y y ~ 2~4 Q~ ~ ~ ~ ~ 2 ur7 ~ W°° , I ~Y v: .•'q•'p'. 4 q 1•r ~t~"y\ v y ~ y\ a, y1 p?h` `vti TRAFFIC FLANGE BETWEEN - 2 e ~ ~ 1 ~ 1 o Q~ti ~ of 16' uWO :.awe y a y y W ~y ~0 ~y ~ ~y yP \o° ~ O: 03 3 ~ o a ~ X ° Z Z y y y y 2' 6' ABOVE GRADE s •.•A• ~ 2 0 ° •.~•.3'•=0'•:;:%' UND]STURBED SOIL - 2 • ~ o o '0 0 W ~ o ~ti 4 ~Q 0~ o° o° Qe b°o ~ o° Q o° __2//0° , o o h o C+~ v op ~ ~ y o: g ~ ° y y y STABILIZED ~o° Q ~o° ~o° oSyoo ~~o i qW ~ ~ ~ a C. ~ n sLOPE 541 BENSON ROAD, STE 102 M1N:'d:"• 5' 3'_6• s y 0 y 4 2 P Z ~ 0~ m ~a i SIDEWALK CURH AND GUTTER W = ~ • PAVEMENT 6. N LA \ W MNZa w 'Y W , x N a y y y y GARNER, NC 21529 BACKFILL :r° Y q`+•+i' - N ~ - (IP rA ° Il I/4 1,108 1 1 I I 1 l "c 3~ I I 2 I ~ J N w W y y 9I9-112-82OS ~ Z ~t _ 0! z VALVE BO 6' GATE VALVE - , A';'7j,• ? 22 2,207 1 2 2 I 1 1 I o° .;,r W ° r q y y y y y beth.blackmon@velizon,net I I 3 I ! FM U > W y D • 4 45 4,32@ 2 3 3 l 1 2 m COMPACTED BACKFILL j I CONC. THRUST - •P':• •R • N W W O ~ H L,j w w y y 1 2 5 1 as J • (TAMPED IN 6' L]FTS) K s- j'~ ~,~'.;•~T•:,~ q 90° 7,996 2 4 5 1 1 2 E BLOC _ ~ T•'Y:a 1 P e I W o: u a~ i y y w y r N~ J a~ w W y y o ' Z ";,;F ~..,,.g•;(..;,.,,•,.; ~ W PLUG 5,655 2 3 4 1 1 2 f , GD ice;: 6' MIN, BRANCH PIPE z o W 1 2 6 1 ! ~ a3 u mQ y y y r y y ° ~ STABLE UNDISTURBED %'i•, MAIN 9y J 8" - 15:;;,~•;at• I Y as o L7 111/4° 1,970 I I 2 1 1 1 c ` ° ~ a i OUTLET y y y LEVEL SPREADER W D% AT APPRO%IMATELY 1 1 2 1 I H h M- N I O y W y .r b y y J~ U1 ~ ~.~.•<'a U ~ a 22 l/ 3,922 1 2 3 1 I 1 4 :;kff' I ~ ^ 0 45° 7 694 4 5 m ~ y W ~ ~ ExISTMG GRADE I 1 4 1 N a N W Ua W N U W y y ? ? y y y CONC. SETTING SLAH 3/4' HDT DIPPED I,- 0, J ~ N ~ 2 1 ] 2 E 1 2 B ( ~ ~ W ~ y U d' LANDSCAPE TMNERS, y y y W ' 1'-3'x t'-3'x 4' THICK ALVANiZED BRIDLE ~ 90° 14,215 4 B 9 2 2 4 1' ROD MAY BE COUPLED. PLUG 10,053 3 5 6 2 2 3 11 ~ a ~ a ~ o: a ° RAAAOAD nEs 2 4 15 2 i z g q W a ~ oR a• GONG woo 2 3 10 1 ~ 4 m = 3 a a Q t o euR1ED AND raLED waTM W67 STONE /MINIARA SiDE 3000 P.S.I. CONCRETE 7 CU FT. CRUSHED ~ 5 12' ° u Y q ~ i° a>~ a cA ~Illilif F-a ~Y N U~ W ZS \ I,~~ WHEN ROCK 6' .D. OF PIP 6' CLE NCE I THRUST BLOCKING STONE MIN. ~ ° pR WATER IS NOTES: NDISTURBED EARTH. ~ ~ 11 I/4° 4,433 2 3 3 1 1 2 1 z s 1 ~ Z ~ ~ ~ ~ _ ~ a ~ H ~ ~ S o[•wr CARP ~i,/ I 4 W N q a C: Z U I W a N W % W~ mwtT H ~\O" •G•~'.7 M//~',.•'~~~ f 221/ 8,@26 3 5 6 2 2 3 9 ENCOUNTERED ~ ~ 1, flRE HYDRANT SHALL 8E A$ YANUFACIURED: MUELLER, AMERICAN DARLING, KENNEDY, Y t H, _ ~ 45° 17,312 5 9 I1 3 3 5 i' 2 3 9 1 ZW J W W m~ O a ° aW l7° ~ a~ i~ V 1 WAlEROUS GLOW, OR AVK, ~ - yl 2 BLANCH PoPE SHAD BE DUCTKE IRON AWWA Ct50-96. Z ~ y B 7 90° 31,983 B 16 19 4 4 @ 3 3 5 18 2 ° q ~ a W~ a q za flrv-',j ,D Iy i 0:, W a W I Fa ~ O ~W a OC IIZ `r rA~ • 4 B 32 4 ~ o:a~ l~ ~ 3 ° u~ ~ - J. 8' CATS VALVE SHALL BE AWWA CS00-86 OPEN LEFT. ? ~ ~[3 u PLUG 22,619 6 12 14 3 3 6 2 3 6 23 3 I ~ I W J N J N D O u Q~ a O y ~ U N ~~$TGNE BED (OP11a1A1) 3 • + NOTES I 4, STEEL RODS ANO BOLTS SHALL BE 3/4' NOT DIPPED GALYANIIED. U B ~ rl~-d I6' I h rln n r Gin din n I n h 11 s. FIRE HYDRANTS WILL BE INSTALLED N TRUE VERTICK POSTION, ~ s~ k' t• Trrnchrs rrqulrng s o g a d b a g, r so s s a br W ~ o V~J m ~ .J.4 W ~ °Q a° q am° taken Iron the Inside Face Of the Shoring and bracing. 6. MEGALUGS MAY BE USED ON FIRE HYDRANT BRANCH LEGS FOR RODDNC, IF YORE /RAN ONE N ~ ~b ~~0~~ ~ ll 1/4 7,881 2 4 5 1 l 2 8 ROD COUPLING IS E%CEEDED. a. ~ l 2 8 I asq.re. o « uJ IW- a x~ uQ a a~ • e~ °W= . J . a. ~ ° = Zq LEVEL SPREADER DETAIL 2 4 16 2 i H-ma m woo v ~J ,O m~ F °W //e •e ~ 2. No rocks ar boulders 4' or I 7. FIRE HYDRANTS TO BE LOCATED IN ROW OR Z FOOT EASEMENT ADJACENT TO ROW. W W °M~°; D 22 1/~ 15,691 4 6 !0 2 2 4 11 k.~« ~ z larger to be used in bock Fill. 4 B. HYDNANT NOZZLES TO HAVE NAINFIK STANDARD THREADS ~ H g ~ ~ ° H d ~ W ~ 4 45° 30,179 B 16 19 4 4 @ 3 Z W ~ ~ . z ~ " E ~ DIMENSIONS //i H. 4 e 31 4 ~ y F w ~ z~~ w o: q o /~~lf I Ilt}}}~`. 'I 'Z-' W `i,~;Wb'~~t'a 90° 56,861 IS 29 35 8 @ ]5 5 3. All backfitl naterial shall be W a ~ ~ W `f' y ° m W ENTRANCE END DEPTH LENGTH e 15 s7 6 0 3° a H• : J 3~ W a o: WIDTH WIDTH W 4 ~ b d ~ tl PLUG 40,213 suitable native notarial. i ~ 4 W 10 21 25 5 5 10 4 s 10 41 5 I 3 3' 0' MIN. TYP_ z ni ~ v „ t D' 3' 6" 1 D' 4. Hackiill shall be tnnped in 6' CITY pF RALEIGH I CITY pF RALEIGH ' ~ CITY pF RALEIGH R[AEnON KMINO AREAS ARE IN sawn[ F[n lifts MYTDIE SIZE WORK, COMSTRUC110N, ROAD MORN, N[ASlHFO IN A vERTICK PLANE IN TIT( CITY OF RA DEPARTMENT DF PUBLIC UTILITIES OR Mr o1NER WORK CNANtzs THE GRADE a DEPARTMENT ~ PUBLIC UTILITIES - .•4' 4 DEPARTMENT OF PUBLIC UTILITIES TRENCH SIK AT M ANTAC ff ~ rD THE TNRIST DEPARTMENT OF PUB a Level S reader Construction S ecifications DITY DF RALEIGH ~ ~ CITY DF RALEIGH P P 1. Level spreaders are to be installed following installation of rip rap energy dissipotors. 5. Achieve 95% conpoctton in ME FTRE HYDRANT, THE PERSON RESPpASNILE • • ' •d ' bnCkFill. TREi~H BDTipN DIMENSIONS 6 BACKFILLING f FaR THE WORK Is RESPON56lE FOR AOAlSTNG STANDARD FIRE HYDRANT THRUST BLpCKI DEPARTMENT DF PUBLIC UTILITIES DEPA,RiNENT OF PUBLIC UTILITIES p, Construct 20' transition section t0 fit Width and de th of s reader inSUfin thOt I V I THRUST BL(JCKING DESIGN STANDARD 3/4' & 1` P P g e e THE FILE HYDRANT TO STAY Mt11WA CaYPLIANCE. '0 STANDARD THRUST BLOCK]NG VIEWS USE A• • ~ KND vKU[ FpR NYDRMTS rpl REQUIREMENTS FDR DUCTILE IRON ; INSTALLAT1pN DETAIL ='4f.' ' " ADDnITNK sAiFrY FACtpA . ,w QUANTITY TABL spreader weir is place in undisturbed ground with weir being along a flat grade. )UANTITY TABLE WATER SERVICE INSTALLATION 3. Di de ressed ores u stream of weir er s ecificoti n n fl .REV SIGNS DAT R ViS DATE .REVISIONS AT R V DATE .REVISION DAT REVISIONS DATE . N . EVISIONS AT R ' H - 1-00 f - 12-DI-BI - RRH - .W.C. -23-9 9 P P P P o s o d at footing for block weir. ]NS AT R VISIONS DATE ! R T R N DATE 4. Install continuous wall of Ion Im r r Ilr " " -i'3-9 i _ _B _ dscope i be s, o ood ties or B xlti block providing a W-3 W-4 7-1-s W-9 W-10 W-~I r..A, _ H ' - weir length per the specifications. Optional gravel moy be used in footing to facilitate - - ~ levelin . 9 5. Backfill upstream side of weir and fill block cells with soil. I W ~ NEV NANHCIES USE M APPROVED NTWINWS MANHpLE FRAME AND COVER o IN F z q 6. Immediately seed and mulch oil disturbed area. BASE SEKMT TIMT SNKL K APPLIFI Tp FINISHED GRADE SEE Cull. STMDMD 5-23 TIE Tff ff iiE CDE SECTION TD PID)VIK ~ ~ lyp' : , , FDR NUIIaE TRUE AND CDVCA A YMTER TIGHT SEK. 1 7/@, COVER 120 L85~ MINIMUM ii MI~,, • , , , ac W W O Z W ~i ° Z O: m ~ , $ INp ?a f I. F Z ~ jMINN , a oa i= ~~io / i ~a Fwa Qa.`. ciu xau zaq . > •Wxu mzz as xrra 'Oja 24" MAN a e:! : r a ~ uu A. FINAL ir:' i p HORSESHOE FILTER BERM BACKFILL / p N'.. . J IolagcwK r<r o I j " :c a• a~A''.. ,p ~ ;P' CCCENTRIC MR CAE IwY 23 1/2' 1 I~, H C1A55 I PIP gAP(SEF SECTION THRU BA9N BELOW) - ~ q UNDISTURBED SOIL K uu0 a tr , ID• AND ~ F W IN ; r 1 IB' SCVER NA]Ni COQ W ; N w+lNl~ , ' • ' d i ~ ~ t- 6 1 I/7-1' ~ ~ 7 ~ raP [Ln. tx SIORWMTCR I fW~. = ra MU?RE CDIE ANO BARREL ~ w ¢ Z a INN... ~ a ~ d d ~ ~ YMrlHtD S101t ~ IP RAP HEADWALL a ~ • i q6 , / 0 SECTIDA SHALL K AS PER Q > ~ I'' V I W I • ASIN STANDARDS a W I p Ci , a a ~ I tV ° i wAERr aPE V W W'~ W ~ I - / W a, 0 N td.• 4: U W , . = / Q 0 ' I 'A REQUIRED ~ :R ' o v.. ~ u INITIAL ;.i'. ~ a ~ H a r r , I a z W : a z W V ~ . ~ W ° ~ 1NAf[S ~1 Rp RN L ~ti Y a Z~ a W / V BACKFILL y" • ~ 'O' RING SEAL ~ ~ ~r'~, ' 4 a ~ L7 W F O J SPRING LINE N67 STp , : ~ > DR RAM-NECK m W m •,'j• . a a ~ a ~ F, U NE 4 a'4 27/@ ~ ZjQ .Y. •J~~W7W as Kd'4;~f, Zma[T > A.•. ;a i / ~ I W W o FLOW „3 Q .a > a.•. ~ q ~ .0 HAUNCHING PIPE GRADE J • ~ ` °C ~ • r • = u a o = o u 3 z ° BBER BOOT a u ~ > ' , a ~ < °z a z w ~ . ' o u 3 z, a Q i [nsnrG uo•[ ~ Vi IC Z JqN ~ ' < it W a 2 I? YAR[S 4~ ~5 WASHED STp1E. I'IHICI(r 3' HIGH WN. ~ ti ~ ; 4' BEDDING • • ~ LATERK IIYERt 91ALL MOT a C u Z ~ a o a z • a wwW Wz~w z a.. .•Dt~ Q':;' 1ti K LOWER THAN YAW SPRNG- 25 1/4' W a J a J 3 :p,•, - Z IF H J U ? y ~ f ~ NFJCIW AID WsRH OErLRW1E6 Wr SEIwuENi STORAGE AREA N ~ H I INIE. ' : YANIIOLE NEEDS 10 K I U O ~ •1 ..I • q••~ .'..,,;'V ABOVE IoYEMROODPUN ~--23 3/4• I o H N ~ a W zioa ? I to ~ ~ W i t/t' - 1' ~YEN1 STORAw[ ¦AIMk0. ~ TAMP WELL UNDER MINIMUM SIDE ' . e. , r J W = N • / I P • ' ' „•A, • t? 1 ' • 4', 6' 100 YEM FLOOD PUNY` Z U Z W ~j " 2 ~ • BOTTOM HALF 6' D.D. DF PIPE 6 CLEARANCE I q. t.A.t :r • 1 W W a v m o ' • NNCN YANMO,E TOPS MEN f0 Z x I y1 VI 0: ~ • ~ l~ .N. ~ \ . ~ G: J N ~ IsMp M RA1 REY RII IIV NIa M OW _ _ I O K ° 3 O . VI ..9 la sYM.W1pL ~ '1rl DF PIPE EKCESS ff J' ABOVE dtAOE. ) ~ m ~ ~ 2 ~ G W C] 9' PROYTOEDS SCE STANDARD 7 1 /2' a - • . • y 3 CD F'W w o o ~ ; . f- W ° W W a ~ 1. ;,.;i 12 J N J N ~ ~ ~ 'fiy'' ~5 WW4D STON[ SECII01 1Ntl1 eAgA iiT[R MD OA.VERi 7/L III/ Vl V1 SECTION A-A r S-tD FOR S1FP DELUI. N Wm 1 y (rY'j J1= W ~ a I NON mAFYM AREAS TOP ff 22 I / 4' ~ W ~ J U1 tr D) N FRAYS AND COYER 9MAll BE I' 1 Z 4 ~ a - ~ ~ DIYENT STdtAGE O TYPICAL TRENCH BOTTpM DIMENSIpNS FpR ' wsrALLmAYw.aF1ABOYE y ~~wNno ~ AREAS TO BE dSNRBEO W I FLOOD STgtACE 2pIE PIPE INVERT ~ 1 I (CUT,FiIt,ETC.) ~ d. r~ Z ~ I' AIP RAP HEADWALL RA TY P P Fe?91ED alaxn wRFACC. L ~ w , a° z . SDR 35 PVC G VI I E I ••!~~•f%•Y~~,, ttcKVERKSIaucna izz~3 NOTES ~ W ~ I H 0 Q rin ri r i inen ion h ll ~ ' • u m a °w ~ 1. For trenches requl g sho n0 and b ac ng, d s s s n I A A 24 3/4' z a w a. e WK 9' CDIPACTEO 167 SIDE W W J p p Y N a I O ~ ~ z tow r 1/ x \ NATURAL GROUND rT~ be token iron the inside face of the shoring and bracing. ~ ~ w W Tw5[ TO K INSTKLCD 33' U ~ W a 2. No rocks or boulders 4' or larger to be used in initial backfitl. ' uNK1 ISM NANILLE. 5/8"X3" LAGSHIEL IN HOL .l a a a FLOW ~ ~ f FRAME 162 LBS. 3. All backfitl notarial shall be suitable native notarial. ! 1N t01-TRAFFIC ARIAS, to+ ff DRILLED INTO CONE OR Z ~ i ~ Zmu ~u ' CLASS I mP AAP 4. BaCkfBl Shall be tan ed in 6' lifts in traffic areas, 12' in J FRAIE AND CDV[a DIKL K LAGSHIELOS ONLY MAY BE USED RING WITH ANCHOR SUNK TO ~ <4' w w ~ ~ q ~ ~ p INSTAU[D A MIN ff I' ApVC DESIGN DEPTH, AND 5 8X3 N IN ROADWAY APPUCA?IONS. / I- W ~ ~ vI vI a non-traffic areas. FIAILEDfAIOW SIfiACF. HOT DIPPED GALVANIZED 0_ ` ~ z ~ m a~~~v, N a CHECK L1AM ~ v1 - qs wASHm STONE d.'. : P ? LAG @OLT AND WASHER, s,: , ' W%. $EDIYEHT OLPTN (CLEAN OUT POINT) i CITY OF RALEIGH CITY DF RALEIGH CITY DF RALEIGH w Z a CITY OF RAl DEPARTMENT DF PUBLIC UTILITIES DEPARTMENT DF PUBLIC UTILITIES DEPARTI~NT PUBLIC UTILITIES L•I a DEPARTMENT DF PUBI CITY OF RALEIGH TRENCH BOTTOM DIMENSIONS AND BACKFILLING ~ STANDARD PRECAST SANITARY W TYPICAL SANITI EPARTMENT DF PUBLIC UTILITIES i YPICAL SANITARY SEWER REQUIREMENTS FOR PVC GRAVITY SEWER MAiN I SEWER MANHpLE STANDARD MANHpLE COVER ~ ATERAL C~NNECTI~N ' .REVISIONS AT R N DATE I .REVISIONS DAT R V N DATE EV1S Q LATERAL CONNE ID I IONS DATE R V S ON DATE 0. .REVISIONS DATE REV S-5 TD NOTES -1-8 .W.C. -3-99 I 5-20 ~ FKT IASC vHD rtA. u-a•IZ _ 3-l-BT -1-@7 3-1-@7 Y.C.I NS DATE REVS N DATE 3-1-B7 Y.C.A. 6-92 - - RRH -30-00 3.1Hp RRN 3-30-OD S 25 RRH S-3D RH 3-3 -0 SEEDING SCHEDULE TOP Of EERY 1' MN 2' YN N000T f 5 OR 1157 WASHED STONE SWILL QT~; B• OC YAX ~l l -I (REMSEo- I-I-eB) I, FRtEBaY+o ~ K USED. PAD Tp R BO't % 2oW % B" a, MACHINE COMPACTION OF KL FILL IS REOWREO.OrvERSWNS r D AT A YMWRIY. SUFFICIENT TO DIRECT KL SEDMENT- IADFN STORYWATER 1) TOTK DRAINAGE MEA FLOMWG NFO A SEDIMENT CONTROL DEYK:E MUST BE NSiKLED PRIOR 70 FENCE WY NOT EKCEED t ACRE, E shouiaer:, sine Ditches, slopes (MaA J:T) 55' RIGHT OF IYAY ~LaY TOP ELEVA1pN OF STORY WATER b. 1LtRtING MOWR SUFFTC[M TO CLFARNK) AND CRUBBNG OF THE MEA (OR IN CONARACTK)N 1) SILT FENCES SHOULD NOT BE ylt FEWC CE DATE T14E PLANTING RATE FLOOD STORAGE ZONE ~ -I J, ~ II/IDE TRUCKS IS TO BE IWTrIH15 oPERATKRI a $EpYENT CONTROLS ANp DNERSIONB USED Ai PIPE WTlETS OR N TARP ~ AREebiALLEO K EACH CRrtICAI POLAR IS RGCHED). MEAT OF CONCENTRATED FLOW I IIII FL( I I I I I,T FLOw of wArER Aug Is -Nor , rMl Fe«ae BOO iN/«n g' S' S' 14.5' 29' B/B 14.5' 13' a 4' ~ J' SEDIMENT STOWIOE ZONE t c. ENTTrINCE(S) SNOLID BE LOCATED TD b. DAEMSK7N5 SHOULD BE LOGTCD TO MWIWIC DAWGES BY (CREEKS, gTCNlINES, SWKES III (1 ( 1 Y PRDIKE FOR YA%M!Y UiW1Y BY All ETCJ I fAT lam Pd Na I - Yar I Tell Fescw 300 la/«n I CONSiM)CIgN YEI11ClES. CONSTIWlCTK)N OPERATIONS. I 9~ y 1.5' MAx SEBIYEM DEPTH OM SE~"- 0. MUST BE YApTANEOIN A COMOrt10N c. DNERSN]NS SNOIAD BE SEEDED ANp IWICHED E 1MEY ARE TOREYUN k ADruai Rye 25 Ibe/acre Ydr , -Apr Ib Taw Fescw wo R"/«n SIDENALK SHOULDER ~ L TRAP p1CND5 i0 TOE WNK71 WU PREYEM TRACKING OR N PLACED OdR JO DAYS. LEVE OF SEDWLENT COLL[CTED ff BApI fIBR DIRECT FLOW OF MUD ONTO $TR[ETS I D~ CLEAN BASW WHEN iHti LEVEL IS 4 Apr 15 -Jun ]0 HuINd Common &rmudogrep 25 Ws/«n Jul I - Aug 15 ToN Feuw oM fpp N"/«n PCRgOK /OPORESSING WITH STOME 0, CHECK OEMCE LITER EACH RUN, BUT ONCE A WEEK REOARDLE55. REACHED D' PYC RSER B YN SLL BE NECESSARY; KEEP SOME IwDr. •••Brownlop Yolk x, IW/«n GRASS STRI M TO INCRrASE STORAGE CAPACITY AND "•or 5«ghum-Sudan Hyprgs 7O bs/«n MATH I/4' NOTES NECESSARY' TO INCREASE STORAGE Q ~5 WASHED STONE ANY WTEAUIL WANCH STILL MMES rt PROIONG~THE L PROLONG THE LeE OF THE SILT FENCE, IT K GENERALLr ADMSABLE tO DIG A Slopes 3:1 to 2:1 G ~ FILTER p1T0 ME ROAD OUST BE CLEANED UP ~ 1t' ~ ~ SEDMENT PR IN FROM WY[DNTELY. SEdMENT PR IN FRONT di YOUR UST ( ) FENCE WHENEVER POSSIBLE. ~ 1 ~ SECTION TMRU BASIN AND FILTER ~ 2:!~ ~ Z Y~° FENCE WHENEVER POS .~C NA7URK GROUtq - ~ / 4or I - Jun I 5«ic« Lespedeta (seafi,Idl 50 IDs/«n U A r OR FTLL OR CN z (Mar I -Apr 151 Add Tow FI«ue 12o Mt/«n I, - TDP OF OW ION' SLOPES ,~I COIpACTED FILL 17 GAUGE A•7(a' OR i'xa' WELDED WIRE w (Yw I -Jun 70) a Aqd Weeping Lorpraa To gs/oen 3:1 MAX. ELDED WIRE Yar I -Jun !0 Or Add HuN« Common B« r > CHANNELS ON ( ) ^lu~q n Ibs/acn , ~ 18" ? * J' pd" BERM ~ ED ONTO PREFaeYED CHANNELS ON F' TRAP PROTECMpI D E (MM tB~ T~ ? * 1' J' WOOD POSTS W/~ND.B SFARESCEDYt OR ED TO CEDAR OR Jun I - SIp i ••'7011 Fs«w ord 120 Me/ane ,.,,I APLES. •••Brawnlop Lmlel 1s Ibe/«r• 1/2"PER FT. 70' WDE 'AMT i I TH ~ 1B" YIN 1~0w ~ D WE R LENG ~ 7y Jb. ~ ULTRAVIOLEt RESISTANT (BLACK) YKOFI '••or Sorghum-Sudan Ilybrldl ]0 ro./«n 3:1 MAX R FT. L~ " ~ 9 ND~ yM' FABRIC OR EOUNKENT SECURED TO WIRE RACK) YdeFl S« 1 - Mar 1 5ericeo Lespeder0 (unhuRlO-url«oriliy) 70 bl/acn 4 CURB & ~ ECURED TO WIRE aid tow Fescw ILO We/eve F NOTES; 77 W/ YETK Gloms oR WIRE AT B• aFF TARP CENTER. Ar B• OFF (Nor , - Mdr I) Add ALvw:i Rye as Rie/«n 2" I-2 ASPHALT GUTTER 0 p4 ComuH Conservolion Englns« or Soil Cons«vdtbn Serria la 8 CABC ~ ~ 1. Drawdown riser shall be 6° SCH 40 PVC with clean out cop and ~ DITCH a 1 /a" holes. PERSPECTAff VIEW S. ~ J` oddinonol mTOmgtion dorlcwninq otn« on«nodwe ror wgelolbn of z denuded areas. Thor oboro wgelol'an roles ore Ihdse which do wew under L, a0 2. The Corp used la protect the weir shall be the width specified. MAx. SEpYENT SrORACE LEVEL. REMOVE O The length of lore shall be according to available supply. If multiple te' 41N SEONIENT WREN IRIS LEVEL I$ REACHED OR F4 ~ .EVEL. REMOVE local corMitiom: olh« seeding role combiralions we possible. ~ p.~ ~ E.j tarps ore used Then tarps shall be overlapped at least 12 inches. FLOW AS DRtECTED BY CONSERVATION INSPECTOR, In Upstream tarp shall overtop downstream corp. The tarp shall be 50 mil heavy duty It' WN / EL IS REACHED OR O IATION INSPECTOR, L "'Temporary -Reseed otcading to optimum season fa desired permonenl C^ ~ silver tarpaulins for sun resistance. NCDOT !5 OR +57 WASIffD STONE regelolion. Oo not albw lempadry cover to grow over IY in heigAl Mlae mowing, ananise leuw moy a enoded out. M O NTS U M SEEDING SCHEDULE 4 CUSTOM BASIN/ SEDIMENT BASIN DETAIL N NOTES: APPLICABLE AT Kl POINTS OF ~ ~ 8 ~ ~ INGRESS g EGRESS UMIL SRE IS ^ ~ - iRENCH, COVER W/ SOR ? TAMP BACKFILL. STABILRED, FREOUEM CHECKS ff i` - _ - _ _ ; THE DEVICE MD TIMELY @ERY/DITCH SHEET DRAINAGE (ONLY) 60' RIGHT OF WAY r 500. a TAMP BACNFILL. aj TNLr) t,) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES O 0 tA1D)ARD METAL PASTS Y-D' N GWAAO YUNTENMCE MUST BE PROVIDED. - b0 DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. y U 3 tuvwa0 - - - - - - - - - - - " - wITURK GRADE T? HMOWMD MME T _ CARRY MPRO%.1 y" OF FABRIC IN10 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH. aF FABRIC INTO 3.) REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS ' ' ' z0.5~ 4I' B B 20.5r 9.5~ al U Yp [KIENDS ro f~~$, •d TOP a eoK pO51TNE CRADF MUST BE PROVIDED TO ASSURE DRAINAGE. ? s U F SLOPE EKCEEDS 2K, SEED AND MULCH DNERSgN. TRY LEAVING SURFACE REASO Y TH 1 5 3.5 / 'TAI NABL SM00 ANO UN60RM. v NOT TO E%CEEO Sf (HIGH VELOCITIES RELUST). W%WlW ~ CMRY 6' OF WIRE INTO TRENCH. 00 D. A - S ACRES WITHOUT SUPPORTING CKCS.. INTO TRENCH. 4,) APPLY AGRICULTURAL LIME, FERTILIZER, AND SUP[RPHOSPHATE ~ U UNIFORMLY AND MIX WITH SOIL (SEE BELOW'). SHOULDER ~ _ ONERSIOtIS AT iNE 70P OF SLOPES MUST EMPTT' INTO AN ~ 4ETK, CEOM OR a'%a' TREATED W000 POSTS AT 10'O.C. MA%.. CEWA 6: W000 APPROVED SLOPE DRUM. BERM/pTCH R MOSTCOMMONLY t15ED. rE~RTEd ~ DEWAL 't; 5.) CONTINUE TILLAGE UNTIL AWELL-PULVERIZED, FIRM A rh ~ - POSTS SHOULD ~ J' DEEP Yrl. - e TEMPORARY CONSTRUCTION ENTRANCE /EXIT TEMPORARY DNERSKRI BERM/DITCH a' DEEP wN. REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 61NCHE5 DEEP. PLANT V SILT FENCE FOR SMALL DRAINAGE AREA LESS THAN ONE I LESS THAN ONE ACRE 6.) SEED ON A FRESHLY PREPARED SEEDBED AND COVER STRIP SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULIIPACK AFTER SEEDING. SCALE: 3 ~ CONSTR~TION SPECIFIGTIONS 7J MULCH IMMEDUUELY AFTER SEEDING ANDANCHOR MULCH. A ~ O~ N/A ~ I. UY OHE BLOCK ON EACH SIDE OF THE STRUCTURE _ ° _ s~ ON ITS SIDE ON THE BOTTOM ROW TO KIOW POOL 0 DkIINAGE. THE FWNDATION SHOULD BE E%CAVATED ~ B.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARYREPAIRS OR RESEEDINGS WITHIN THE PUNTING SEASON, IF POSSIBLE.IF 0 AT LEAST 2 INCH BELOW TXE CREST OF THE S10RY - DkIIN. PLACE THE BOTTOM ROW OF THE BLOCK AGAINST THE EDGE OF THE STORM DRNN FOR LITERAL SUPPORT 157 MASxED STONE PULED t0 A STAND SHOULD BE OVER 60X DAMAGED, REESTABLISHFOLLOwINC DRAWN BY. MD TO AYDIO WASHOUTS WHEN OVERFLOW OCCURS. ~ ~rpy7'-II' MDL ABOAE IF NEEDED, CNE UTERK SUPPORT TO SUBSEOUEM ORIGINAL LIME, FERTILZER AND SEEDING RATES. iu7D ROWS 6Y PUCNG 2.a WOOD STUDS THROUGH y BLOCK OPEMNGS PARE SCREEN 9J CONSULT CONVERSATION INSPECTOR ON MAINTENANCETREATMENT 3:1 MAX, E.i1.D. AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. T. CAREFULLY Fli HARDWARE CLOTH OR CONPARABIE TEMPORARY SEDWENI YORE MESH WITH I/7-INCH OPEWNC OVER ALL p00i BLOCK OPENRIG TO HOLD GRAVEL N PUCE. DEWATEtKNG ).USE CLEAN CRAVELJ/a-TO I/2-INCH IN ' APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ ACRES (J TONS/ 3:1 MAX. n 1/2"PER FT. DATE: ACRE IN CLAY SOILS) PER FT. DMUETER, PULED 2 NCHES BELOW THE TOP ~ OF THE BLOCK ON A Z:1 SLOPE DR FLITTER MD I'MIN. i(!iaS~Frc;:....,:::.~"..~.' 1D FERTILIZER - 1,000 lbs. /ACRE -10-10-10 03/29/04 30 CURB & SUPERPHOSPHATE- 500 Ibs> /ACRE -20X ANALYSIS ~ SMOOTH rt TO M EVEN GRADE. DOt +57 WASHED STONE K RECOYYENDEO. 1'W% , - MULCH -1 TONS /ACRE -SMALL GRAIN STRAW n GUTTER SHEET 0 I ANOTHER -ASPHALT EMULSION 0300 GALS./ ACRE 2 1/2 I-2 ASPHALT r. - SEEDBED PREPARATION Bed CABC _ _ _ III III ~I~I I I SEaNENT U N 0 41' B/B STREET SECTION I C-6 BLOCK AND GRAVEL DROP INLET PROTECTION W OF 7 NTS