HomeMy WebLinkAboutNCC193304_NOI Application_20200103Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 12/19/2019 11:38:23 AM (NCG01 NOI Submission)
Approve by Farkas, Jim J 12/20/2019 1:30:19 PM (Review- Construction NOI 19780)
• The task was assigned to Farkas, Jim J by round robin distribution 12/19/2019 11:38 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 23, 2019 5:00
PM 12/19/2019 11:38 AM
Submit by McCoy, Suzanne 1/3/2020 7:12:07 AM (Payment Verification for NCC193304)
* John D Cox.
• McCoy, Suzanne assigned the task to McCoy, Suzanne 1/3/2020 7:11 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 31, 2020 5:00 PM
12/20/2019 1:30 PM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
1. Project Name * Ingles #137- Airport Road
2. County* Buncombe
3. Highway or Street 352 Airport Road
Address * Street narre only is acceptable if no address number assigned yet
4. City or Township* Asheville
5. State * NC
6. Zip Code * 28704
7. Latitude * Enter the latitude in decimal degrees
35.4500
8. Longitude* Enter the longitude in decimal degrees (M. ST be negative)
-82.5310
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
01/06/2020
Estimated Construction Project Start Date
10. Date to End*
12/31/2020
Estimated Construction Project End Cute
11. SIC (Primary)*
Commercial (1542)
Standard Industrial aassification for Developrrent
12. Acres to be
7.50
disturbed*
(including off -site borrow and waste areas)
13. Total site area
7.50
(acres) *
14. Post-
5.80
construction
(Estimated)
impervious area
(acres) *
NCC Project
NCC-BUNCO-2020-Ingles #137- Airport Road
Tracking ID
Assigned autorTatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Unnamed Tributary to French Broad River
Wate rbody* Klarre of waterbody into which storrrwater runoff will discharge
15b. Waterbody 6-57-22-2
Index No.* NCWaterbody Index Ninber
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Ingles Markets, Inc.
Name *
2. First Name* Randy
IF Corporation, enter Fbgistered Agent First Barre
3. Last Name* Jameson
If Corporation, enter Faegistered Agent Last %rre
3b. Title VP of Real Estate
4. Permitee E-mail rjameson@ingles-markets.com
Address *
5. Permittee 828-669-2941
Telephone No.*
6. Permittee Mailing Street Address
Address* P.O. Box6676
Address Line 2
city
State / Frovince / Faegion
Asheville
NC
Fbstal / Zip Code
Country
28816
USA
Check box if the r Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address* 2913 U.S. 70
Address Line 2
City
State / Frovince / Fbgion
Black Mountain
NC
Fbstal / Zip Code
Country
28711-9103
US
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Type of
Non -Government
Ownership *
2. Primary Site
Preston
Contact - First
Name *
3. Primary Site
Kendall
Contact - Last
Name *
4. Title
Construction Manager
5. Site Contact E-
pkendall@ingles-markets.com
mail Address*
6. Site Contact
8287683992
Telephone No.*
7. Organization
Ingles Markets, Inc.
Name
8. Site Contact
Street Address
Mailing Address*
P.O. Box6676
Address Line 2
City
Asheville
Fbstal / Zip Code
28816
9. Consultant Name
(Optional)
John Cox
First and Last narre
10. Consultant E-
john@lpa-inc.net
mail
This person will be copied on all correspondence.
11.Consultant
864-242-6072
Telephone No.
State / Rovince / Fbgion
NC
Country
USA
D. E&SC Plan
Part D. ^
Erosion& Sediment Control (E&SC) Ran Approval Information............................................................................................................................................................................................................................................................................................................................__
1. Date E&SC Plan 04/02/2019
Approved *
2. E&SC Plan Project 16-10138PZ
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* City of Asheville
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan 16-10138_Airport Rd_GR&SW Approval Letter.pdf 1.49MB
Approval Wst be RDFfornat
letter/documentation
6. NOI Certification 137 NCG01 Cert Form Signed 12-19-19.pdf 87.52KB
Form Mist be R7Ffornat
This is an Express F No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
IT Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name* Preston Kendall
Title Construction Manager
Organization Ingles Markets, Inc.
Date * 12/19/2019
F. Tracking and COC Info
NOI Tracking No. 19780
NC Reference No. NCG01-2019-3304
Uses 'count number' variable (incremrented by SP)
Certificate of NCC193304
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 3304
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2019
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)