Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20191686 Ver 1_Shoreline Stabilization_20191210
State of North Carolina Department of Environment and Natural Resources Division of Water Resources D R W, 15A NCAC 02H .0500 - Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: 1 Division of Water Resources 401 & Buffer Permitting Unit 1627 Mail Service Center Raleigh, NC 27699-1617 Applicant Information [15A NCAC 02H .0502(a)] Owner I Name: Mailing DEC 10 2019 Wwor wurces Telephone Number: ' C J��� " ISO Fax Number: � � � - q� E-mail Address: G r� Lr e_ 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www saw usace army mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 s. a=. . � � , � ��. ",� ,.,;; etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location oftheproperty (where work is to be conducted) `` County: �J '(.lC�S © n Nearest Town: ` i✓n V I ( te.. Subdivision name or site address (include phase/lot number): ,�, as r7 FP_ n lei[ Fores-4 Tr I Directions to site - please include road names and numbers, landmarks, etc.: Ii c Latitude (in decimal degrees) 5• I �� Ongitude (decimal degrees) — 0 3 g tea• b.� �' � 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): 02S4CACrrh cd 6. Property size (acres): s .�i ACY'e5 7. Lake/ river/ ocean adjacent to property: (--�k5e C 4e�nv ll 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): re-D Q 1 r Q.�C( S-H h4 W a--( I 9. Will work be conducted from land? []� From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet 0.Y llandward to be impacted (number of trees, for instance):�63jhmc\im Q i' 2 aeA we —cc �-' ��CUVC lr` / [,t siz s (�—D 1� (, C L-11-6 .Lt _ 'z- I cf Owner/Agent's Signature* [15A NCAC 02H .0502(f)] Date `Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 La ke (At Full Pond/Normal Water Level) L Full Pond/ 0 Normal Water Level 1 SI Dom. I i✓V/C C6h Ci � Y- Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation PJVII 3. Location of rip rap or fill to be placed below t e Full Pond/ Normal Water Level elevation r 4. Location of any proposed structures s�'as bui s, retaining walls, dg<etcct-��tjl �onc �6$'1e, Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors may- \Dr o v6rty FORM: SSGP 10-2013 Page 3 of 3 t1c N S� � f � �0 /Qg• �. 4, m O3688 4698 662tf C ►A; SJ I , c• 7667 I 2668 _g� tad 3 4 6312 D' 2.•TIA 854a 0500 (1.5a) .' �.3487 g too s 03221C top $39 u+4393 '� 7 �3, L� PC9 SL 462 $• 3246 9AI 74 P. 021.49a 0199 � 8190 P4 , �V (i098 6.33A�C� • 9919 4976 d� l.lig a' LosA ; o �/ �Z845 96 1 14 2646 ?, loA • . y�zj we 8890 `jJ 0543 21 0362 398 7305 Q ....................... - / nn to a7 it .�r991 -- \ .n '¢ \ ♦\ p \ I.r613 MOrpy »u .r lid we1,y la[ Ilea '�.r\�`�` �� `✓ t1 Z113,ed +v1103:)f1A A 0MO :. 1o>to 3b0003H1 N 36N3A SIlIH7 Ili yr q *" " � ,i >. '� C, < IRA, �: a # E sue, �' 1 t � ♦� � `�' d _• ,�'t �'i" 1 r � ��- is ° Y 1 N6 � �t 'd � �`; ,Yq.� } D -,...e�'Y, -- s _ 1Pe�-;.�j,g+khra n.�i` °N .,,.,+.."IA 3s .� '' • � �i7� gym A.. � �T 3a" * � f i