HomeMy WebLinkAboutNCG140418_MONITORING INFO_20190204STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
DOC TYPE
❑HISTORICAL FILE
MONITORING REPORTS
DOC DATE
❑
YYYYMMDD
ANNUAL SUMMARY DISCHARGE MONITORING
REPORT DMR — STORMWATER
SUBMIT TO CENTRAL OFFICE*
General Permit No. NCG140000
Calendar Year 2018
*Report ALL STORMWATER monitoring data on this form (include "No Flow"rNo Discharge" and Benchmark
Exceedances) from the previous calendar year to the DEQ by MARCH 1 of 0 'fNEI �If�-r-.,
Certificate of Coverage No. NCG140418
Facility Name: Thomas Concrete of Carolina — Knightdale Plant
County: Wake
Phone Number: 919 562-1909
Certified Laboratory ESC
Total no. of SDOs monitored 1
Lab # ENV 375
Lab #
FEB 0 4 2019
CEN1RAL FILES
DWR SECTION
Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No
Is this outfall currently in Tier 2 for any parameter? Yes ❑ No
Was this outfall ever in Tier 2 during the past year? Yes ❑ No ER
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑.
Yes, received approval from DEMLR to reduce monitoring frequency ❑
Other ❑
Outfall No.
001
Total Rainfall,
inches
Total
Suspended
Solids { }
m 1I
pH,
SU
Non -polar O&G
(EPA Method
m())SGT-HEM.
1664TSS, gll (VMA)
It applicable
New Motor Oil
Usage (gallmo.)
IfaFRficahle
Stormwater
Benchmarks
Indicate NO FLOW it
aRPlleabla
Circle Benchmark
100150
6.0-9.i)
15
�55 gallmo, Average requires TSS
and Non -polar 08Gmonitoring
Date Sample
Collected,
r
"'fir.i -
`�,°
4
x� -+
,,=�
v� �: �molddl
�, "ve'_
6130118
NO FLOW
12/14/18
0.41
520
6.83
NIA
NIA
Permit Date 8/1/2017 — 6/30/2022
Last Revised 8-22-2015
Certificate of Coverage No. NCG140418
CERTIFICATION
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fines and imprisonment for knowing violations."
[Required 6y 40 CFR §122.221
Signature
Date 1-
Mail Annual Summary Stormwater DMR to the NCDEQ Central Office:
Note the address is correct — Central Files is housed in DWR (Trot DEMLR)
N.C. Department of Environmental Quality (DEQ)
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, NC 27699.1617
Central Files Telephone (919) 807-6300
Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at:
(919) 707-9220
Permit Date 8/112017 — 6130/2022
Last Revised 8-22-2015
ANNUAL SUMMARY DISCHARGE MONITORING
REPORT (DMR) — WASTEWATER
SUBMIT TO CENTRAL oFAXE*
General Permit No. NCG140000
Calendar Year 2018
"Report ALL WASTEWATER monitoring data on this form (include "No Flow"Mo Discharge" and Limit Violations) from
the previous calendar year to the DEQ by MARCH 1 of each year.
Certificate of Coverage No. NCG14
WED
Facility Name: Thomas Concrete - Knightdale Plant _ FEB 0 4 mg
County: Wake CENTRAL FILES
Phone Number: (919 ) 562-1909 Total no. ofat'atfall 911�ttgrEd 1
Certified Laboratory ESC Lab # ENV 375
Lab #
Wastewater (WW) Discharge Outfall No. 001
Does this outfall discharge WW to SA waters? Yes ❑ No O
Does this outfall discharge WW to SIB or PNA waters? Yes ❑ No ❑✓
Does this outfall discharge WW to HOW or ORW waters? Yes ❑ No El
If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑
Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑✓
Were there any limit violations in the calendar year? Yes ✓❑ No ❑
Outfall No.
001
Daily Flow Rate,
cfs
pH,
SU
TSS,
m911
SS,
mill
it epplicabro
Non -Polar O$G (EPA Method 1664
(SGT-HEM)), mgll
Effluent
Limitations
Daily Maximum
OOWorORIN
50% of 7Q10
Indicate NO FLOW 7f
applicable
freshwater
6.0-9.0
saltwater
�. 8-p. a5
v
Standard
30
How
20
HOW l ORIN nO Tr, or
10
HOW. ORW.SA,
SB,PNA.orany
Trout
5
No Limit
Samples above Benchmark
subject to Tiered Responses
15
Date
Sample
Collected,
molddl r
6/30/18
NO DISCHARGE SEMI ANNUAL 1
12/14/18
13.46
54.4
NIA
NIA
Permit Date 8/112017 — 6/30/2022
Last Revised 8-22-2017
Certificate of Coverage No. NCG14 ®® 1❑®
CERTIFICATION
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fines and imprisonment for knowing violations."
[Required by 40 CFR §122.22)
Sigm,
Date
Mail Annual Summary Wastewater DMR to the NCDEQ Central Office:
Note the address is correct- Central Files is housed in DWR (not DEMLR)
N.C. Department of Environmental Quality (DEQ)
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
Central Files Telephone (919) 807-6300
Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at:
(919) 707-9220
Permit Date 811/2017 — 6130/2022
Last Revised 8-22-2017
ANNUAL SUMMARY DISCHARGE MONITORING
REPORT DMR—STORMWATER
SUBMIT TO CENTRAL OFFICE*
General Permit No. NCG140000
Calendar Year 2017
"Report ALL STORMWATER monitoring data on this form (include "No Flow" 1"No Discharge",and Benchmark
Exceedances) from the previous calendar ,year to the DEQ by MARCH 9 of each•year1+it lyp[)
Certificate of Coverage No. NCG 140418 ~'" 10 U L eJ I iJCENT
,c F;LC-s
Facility Name: Thomas Concrete of Carolina — Knightdale Plant DWR SECTloij
County: Wake
Phone Number: (919) 562-1909 Total no. of SDOs monitored 1
Certified Laboratory ESC Lab # ENV 375
Lab #
Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No
Is this outfall currently in Tier 2 for any parameter? Yes ❑ No
Was this outfall ever in Tier 2 during the past year? Yes ❑ No
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑
Yes, received approval from DEMLR to reduce monitoring frequency ❑
Other ❑
Outfall No.
Total Rainfall,
inches
Total
Suspended
Solids (TSS),
m II
pH,
SU
Non -polar O8,G
(EPA Method
1664 SGT-HEM
( ))'
mg/i (VMA)
!f applicable
New Motor Oil
Usage (gallmo.)
lfapplicable
Storm water
Benchmarks
Indicate NO FLOWS
applicable
Circle Benchmark
100150
6.0-9.0
15
>55 gallmo. average requires Tss and
Non-polarOaG monitoring
Date Sample
Collected,=M=
molddl r
No discharge recorded during
first or second semi-annual stormwater monitoring interval.
Permit Date 8/1/2017 — 6/30/2022
Last Revised 8-22-2015
Certificate of Coverage No. NCG140418
Additional Outfall Attachment (make copies as needed for additional outfalls)
Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑
Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑
Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑
Yes, received approval from DEMLR to reduce monitoring frequency ❑
Other ❑
Outfall No.
Total Rainfall,
inches
Total
Suspended
Solids (TSS),
mg/1
pH,
SU
Non -polar O&G
(EPA Method
1664 (SGT-HEM)),
mgll (VMA)
n applicable
New Motor Oil
Usage (gallmo.)
If applicable
Stormwater
Benchmarks
Indicate NO FLAW it
applicable
Circle Benchmark
1 O 5 V
V V
0-9. V
7 V
.�
>55 gNon-p average requires T$$ and
Non -polar 08G monitoring
Date Sample
Collected,
mo/dd/ r
Permit Date 8/1/2017 -- 6/30/2022
Last Revised 8-22-2015
Certificate of Coverage No. NCG140418
Additional Ouffall Attachment (make copies as needed for additional outfalls)
Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑
Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑
Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑
Yes, received approval from DEMLR to reduce monitoring frequency ❑
Other ❑
Outfall No.
Total Rainfall,
inches
Total
Suspended
Solids {TSS},
mg/1
PHA
SU
Non -polar O&G
{EPA Method
1664 )}
mgll (VMA)SGT-HEM
New Motor Oil
Usage {gallmo.}
Stormwater
Benchmarks
Indicate NO FLOW it
applicable
Circle Benchmark
160150
V
/�
6. U-9. V
1 �
>55 gNon-p average requires TSS and
Non -polar monitoring
Date Sample
Collected,
molddl r
Permit Date 8/1/2017 - 6/30/2022
Last Revised 8-22-2015
Certificate of Coverage No. NCG 140418
CERTIFICATION
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fines and imprisonment for knowing violations."
[Required by 40 CFR §122.22] R
Signature \... '
Date 7k VA -
Mail Annual Summary Stormwater DMR to the NCDEQ Central Office:
Note the address is correct - Central Files is housed in DWR (not DEMLR)
N.C. Department of Environmental Quality (DEQ)
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
Central Files Telephone (919) 807-6300
Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at:
(919) 707-9220
Permit Date 8/1/2017 - 6/30/2022
Last Revised 8-22-2015
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14140418
FACILITY NAME: _Thomas Concrete of Carolina- Knightdale Plant
PERSON COLLECTING SAMPLES: Kevin Kelt
CERTIFIED LABORATORY:_ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2017
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec
COUNTY: Wake
PHONE NO. (_704 _) 853-9437
ADD TO LISTSERVE? OYES ®NO EMAIL:_
DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other
OPTIONAL INFO:
[Dian -March ❑April -June
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
(VE, RM, MID)'
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HEM'
(mg/L)
Duration
(minutes)
Total Flow
�
{gallons/day}
-
-
-
6-93,4
3035
53
(15)6
-
-
01
NO DISCHARGE,
,
V E D
17
0celwrr-
DWR ,
��' tJ
1"RA
L FILES
yr
Yi'CU
LION
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
3/31/2017
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140418
FACILITY NAME: Thomas Concrete of Carolina-Knightdale Plant
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375�
Lab #
OPTIONAL INFO: March Monitoring Event
Part A: Stormwater Monitorine Reauirements
SAMPLE COLLECTION YEAR: 2017
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (704) 853-9437
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other,
Outfall No.
Date Sample Collected
[mo/dd/yr OR
NO FLOW)1
PH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling"
-
-
6-9
100 '
-
-
-
-
001
NO FLOW
n
NA
Click here to
enter text.
Click here to
enter text.
�,i
a C 1 V E D
Click here to
enter text.
Click here to
enter text.
Click here to
enter text.
PP 17 2017
Click here to
enter text.
Click here to
enter text.
CENTRAL
FILES
'�
L.Pvr.
14
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page i of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)
pH
(standard
Units)
TPH using m
1664A SGT HFM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2ethod
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling2
6-9
15
100 ,
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail OriOnal and one copv of this DMR (includine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorine period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, !North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date:7/1/2011-60/30/2015
3/31/2017
(Date)
Last Revised 7/13/11
Page 3 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCO140000
CERTIFICATE OF COVERAGE NO. NCG 140418
FACILITY NAME: Thomas Concrete of Carol ina-Knightdale Plant
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: August Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 460-5317
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other,
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
PH
[Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
z
2 Sampling
-
-
6-9
100 '
-
-
-
-
001
NO FLOW
n
NA
Click here to
enter text.
Click here to
enter text.
a r
R E C E� V
E D
Click here to
enter text.
Click here to
enter text.
Click here to
enter text.
JAN 12 2
f7
Click here to
enter text.
Click here to
enter text.
t;ENTRAL FI
ES
:5EC I I
JN
E
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
1554
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
2 If a'value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
a TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
Part-B.- Vehicle Maintenance Activity Monitoring Requirements for facilities using > SS gal of new motor oil/month —averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Samplingz
6-9
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one cores of this DMR (including all "No Flow" & "No Discharee" reoortsl within 30 days of receipt of samDle for at end of monitoring Deriod
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date:7/1/2011-60/30/2015
8/20/2016
(Date)
Last Revised 7/13/11
Page 3 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL. PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140418
FACILITY NAME: Thomas Concrete of Carolina-Knightdale Plant
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: April Monitoring Event
Part A: Stormwater Monitorine Reauirements
SAMPLE COLLECTION YEAR: 2016
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 460-5317
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: [-]SA ❑HQW ❑PNA []Trout ®Other
Out#all No.
Date Sample Collected
(mo/dd/yr OR
NO FLOW)1
PH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling2
-
-
6-9
100-
001
NO FLOW
n
NA
Click here to
enter text.
Click here to
enter text.
,_„ „
,^
Click here to
enter text.
Click here to
enter text.
Click here to
enter text.
r-%Jz%4F.I 'l
CL,d
Click here to
enter text.
Click here to
enter text.
L&N I FZAL F
ILES
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
If a•value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
Part•B:*•Vehicle Maintenance Activity Monitoring Requirements for facilities using> 55 gal of new motor oil/month —averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)1
PH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Samplingz
6-9
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES [:]NON
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
c—)eZOL- 2G% 4/20/2016
(Signature of Permit -tee) 61 (Date)
Permit Date:7/1/2011-60/30/2015
Last Revised 7/13/11
Page 3 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
w / 69
CERTIFICATE OF COVERAGE NO. NCd14 4041$
GENERAL PERMIT NO. NCG140000
5
FACILITY NAME: Thomas Concrete of Carolina- Knightdale Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY: ESC Lab # ENV375_
Q4 Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec Dian -March ❑April -June
COUNTY: Wake
PHONE NO. (_919 _)557-3144
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HQW
OPTIONAL INFO:
❑PNA ❑Trout ®Other
Outfall No.
Date Sample
Collected'
(mm/dd/yr)
Type of Wastewater
z
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HEW
(mg/L)
Duration
(minutes)
Total Flow
,
(gallons/day)
-
-
-
6-93.4
303'5
53
(15)r'
-
-
01
NO DISCHARGE
41-1
17%I k_.1 t:. V
CI`.a
.111 .k
i
�G1
�"
f
CENTRAL F
LE S
(7),
An h
DWR SECT
ON
FV%
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR
AT END OF MONITORING PERIOD IN_C_A_ SE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)907-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
12/31/2016
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCC3140000
CERTIFICATE OF COVERAGE NO. NCGi14140418
FACILITY NAME: _Thomas Concrete of Carolina- Knightdale Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY: ESC Lab # ENV375_
Q3 Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A. Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June
COUNTY: Wake
PHONE NO. (_919 _) 557-3144
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)'
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HFM6
(mg/L)
(minutes)
Total Flow
7
(gallons/day )
-
-
-
6-93,4
303 s
53
(15)6
-
01
NO DISCHARGE
Ear wii:ierN
1 v L_ LP+
vvv �
=i,i iviv
' If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
9/30/2016
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14140418 SAMPLE COLLECTION YEAR: 2016
FACILITY NAME: Thomas Concrete of Carolina- Knightdale Plant SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June
PERSON COLLECTING SAMPLES: Susan Bostian COUNTY: Wake
CERTIFIED LABORATORY:_ESC Lab # ENV375__
June WW Sampling —Lab #
LIMIT VIOLATIONS? YES []NO
Part A: Wastewater Monitoring Requirements
PHONE NO. (_919 _)557-3144
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: []SA ❑HQW ❑PNA []Trout ®Other
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)'
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
S (mg/LM"
Duration
(minutes)
Total Flow
�
{gallons/day)
-
-
-
6-93'4
303'S
53
(15)6
-
-
01
NO DISCHARGE
r. �..-rr. n l r•1
rn
V L.IV I IVti 1 1_♦_V
htihrT'] CCf-`7
rlAl
1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
s TSS I"smits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis_
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
17-j4fi 6/30/2016
Permit Date: 7/1/2010-06/30/2015 61 Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14140418 SAMPLE COLLECTION YEAR: 2016
FACILITY NAME: _Thomas Concrete of Carolina- Knightdale Plant SAMPLE QUARTER: []Jul -Sept []Oct -Dec ®Jan -March ❑April -June
PERSON COLLECTING SAMPLES: Susan Bostian COUNTY: Wake
CERTIFIED LABORATORY:_ESC Lab # ENV375_
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
PHONE NO. (_919 _) 557-3144
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD]Z
pH
(standard]
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
5GT-HEM6
(mg/L)
Duration
(minutes)
Total Flow
(gallons/day)7
-
-
-
6-93,4
303.5
53
(15)5
-
-
01
NO DISCHARGE
1 3 MIS
CENTRALMAY
FILES
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cieanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 1 of 2
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFIG4 TION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
, Ca,k*&
(Signature of Permittee)
Permit Date:7/1/2010-06/30/2015
4/30/2016
(Date)
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000 F�LE
CERTIFICATE OF COVERAGE NO. NCG140418 SAMPLE COLLECTION YEAR: 2015
FACILITY NAME: Thomas Concrete of Carolina-Knightdale Plant_ SAMPLING PERIOD: ® July -December ❑ January -June
PERSON COLLECTING SAMPLES Susan Bostian - COUNTY Wake
CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 217-2946
Lab # ADD TO LISTSERVE? DYES ®NO EMAIL:
OPTIONAL INFO: DISCHARGING TO CLASS: ®SA ❑HQW
Part A: Stormwater Monitoring Requirements
❑PNA ❑Trout [-]Other
Outfall No.
Date Sample Collected
(mo/dd/yr OR
NO FL0W)1
pH
(Standard
units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
,
Rainfall
(in)
In Tier 2
Monthly
Monitoring)
(y/n)
# of Months in Tier
2 Samplingz
-
6-92
100 .
-
-
-
-
001
No Discharge
0
N
016
C
DWR S
ECTION
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 T55 benchmark values are 100 mg/!, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l.
"For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfali
No.
Date Sample
Collected
{mo/dd/yr)1
pH
(Standard
Units)
TPH using method
16b4ASGT--HEM
(mg/LJ
Total Suspended
Solids
{mg/LJ
Event
Duration
{minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
z
Sampling
6-9
15
100 '
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including all "No Flow" & "No Discharae" renortsl within 30 days of receipt of sample for at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Pe►mittee)
Permit Date: 7/1/2011-60/30/2015
1/31/2016
(Date)
Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
NCC-I'fd�I S
CERTIFICATE OF COVERAGE NO. 18---�
FACILITY NAME: Thomas Concrete of Carolina- Knightdale Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY: ESC Lab # ENV375_
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLE QUARTER: ❑Jul -Sept ®Ott -Dec ❑Jan -March ❑April -June
COUNTY: Wake a^
PHONE NO. (_919 _)557-3144 ��
ADD TO USTSERVE? [—]YES ®NO EMAIL: r" o
DISCHARGING TO CLASS: [:]SA❑HQW ❑PNA [:]Trout ®Other r"
OPTIONAL INFO:
Date Sample
Total Suspended Settleable TPH using Discharge
Flow ,
T-HEIVT�
1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE"] WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO. -
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
L
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: ;
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to -
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or .
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and „ .R
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
I�,�
(Signature of Permittee)
Permit Date: 7/1/2010-06/30/2015
12/28/2015
(Date)
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140418
FACILITY NAME: Thomas Concrete of Carolina-Knightdale Plant_
PERSON COLLECTING SAMPLES Susan Bostian
CERTIFIED LABORATORY ESC Lab # ENV 375�
Lab #
OPTIONAL INFO: July Sampling Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLING PERIOD: ® July -December
COUNTY Wake
PHONE NO. (919) 217-2946
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ®SA ❑HQW
RECEIVED
SEP 17 2015
January -June
CENTRAL FILES
DWR SECTION
❑PNA ❑Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
Rainfall a
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in z Tier
2 Sampling
-
-
6-9
100 ,
-
-
-
-
001
No Discharge
0
N
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l.
`For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
'S A
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
pH
(Standard
units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfall4
(in)
New Motor Oil
Usage
(gal/month)
2 Tier
In InTier#
Monthly
Monitoring?
(y/n)
of Months
in Tier 2
Sampling2
6-9
15
100 '
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitorine period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware thjere are significant�penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
9/9/2015
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/201S Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
t `• GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14140418 SAMPLE COLLECTION YEAR: 2015 r�
FACILITY NAME: _Thomas Concrete of Carolina- Knightdale Plant SAMPLE QUARTER: []Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June r1
PERSON COLLECTING SAMPLES: Click here to enter text. COUNTY: Harnett C'
CERTIFIED LABORATORY:_ESC Lab # ENV375 PHONE NO. (_919 _) 557-3144
Lab #
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
LIMIT VIOLATIONS? YES ❑ NO ® DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [—]Trout ®Other_m4
OPTIONAL INFO:
Part A: Wastewater Monitoring Requirements
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
z
(VE, RM, MD}
pH
{standard}
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
6
SGT-HEM
(mg/L)
Duration
{minutes}
Total Flow
7
{gallons/day}
-
-
-
6-93.4
303.5
53
(15)6
-
-
01
NO DISCHARGE
1 If wastewater systems have not discharged in this quarter — report "No Flow" of "No Discharge" here. Please make sure to mark the sample quarter above.
Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
31f an effluent limit is exceeded twice in a row, the perrnittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flo:,jr�te can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANYINFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. i am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations." _
(Signature of Permittee)
Permit Date:7/1/2010-06/30/2015
3/31/2015
(Date)
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL. PERMIT NO. NC6140000
CERTIFICATE OF COVERAGE NO. NCG140418
FACILITY NAME: Thomas Concrete of Carol ina-Knightdale Plant_
PERSON COLLECTING SAMPLES Susan Bastian
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: August Sampling Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 217-2946
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA
❑Trout
mllloi
01M
[]Other C=
C.A
Outfall No.
Date Sample
Collected
( mo/dd/yr OR
NO FLOW);
pH
{Standard
Units)
TSS
(mg/L)
Event
Duration
{minutes)
Total
4
Rainfall
(in)
In Tier 2
Monthly
�
Monitoring.
(y/n)
# of Months in Tier
z
2 Sampling
-
-
6-9
100 '
-
-
-
001
No Discharge
0
N
n r r7
CENTRAL
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are SO mg/I.
"For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
I"
W .j
LAM
VED
2015
=ILES
TION
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
f-
• :r
Out#all
No.
Date Sample
Collected
(mo/dd/yr}1
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
{mg/L}
Total Suspended
Solids
{mg/L}
Event
Duration
(minutes) -
Total
Rainfalla
[in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Month) y
Monitoring?
[y/n)
# of Months
in Tier Z
z
Sampling
6-9
15
100 '
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE DUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES [—]NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that theM are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
_ �p� c - Ga9/9/2015
(Signature of Permittee) 0 (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT N� NCGIAnn n RECEIVED
N
CERTIFICATE OF COVERAGE NO.
FACILITY NAME: Thomas Concrete of Carolina- Knightdale Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY:_ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES [:]NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec
COUNTY: Wake
PHONE NO. (_919 _J 557-3144
ADD TO LISTSERVE? ❑YES ®NO EMAIL: _
AUG 0 7 2015
CENTRAL FILES
jWR SECfiTIC
Jan -Marc April -June
DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other
OPTIONAL INFO:
Outfall No.
Date Sample
Collected 1
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)2
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SG (mgg/L}/L)16
Duration
(minutes)
Total Flow
(gallons/day)'
-
-
-
6-9a,4
303,5
53
(15)6
_
-
01
NO DISCHARGE
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
'if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date:7/1/2010-06/30/2015
Last Revised 07/13/11
r*t
Page 1 of 2
e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
8"VA"ttn: DWQ Central Files
617 Mail Service Center
Raleigh, North Carolina 27699-1617
U. 919) 807-6379
C.
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
vielatinns_"
(Signature of Permittee)
Permit Date:7/1/2010-06/30/2015
7/31/2015
(Date)
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140418
FACILITY NAME: Thomas Concrete of Carolina-Knightdale Plant_
PERSON COLLECTING SAMPLES Andrew Rodak
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO:
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2014
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 217-2946
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA
❑Trout []Other.
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
i
NO FLOW)
pH
(Standard
Units)
TSs
(mg/L)
Event
Duration
(minutes)
Total 4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
Wn)
# of Months in Tier
2 Sampling=
-
6-9
100
-
-
-
-
001
No Discharge
0
N
A
MAR 18 2015
(PhITPAI
K I
WR SECTION
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
If a value is in excess of the benchmark, or outside the benchmark range {for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l.
For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
V
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yrj'
PH
(Standard
Units)
TPH using method
2664A SGT HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
.
Rainfall
(in)
New Motor Oil
Usage
{gal/month}
In Tier 2
Monthly
Monitoring?
iy/n}
ti of Months
in Tier 2
2
Sampling
6-9
15
lo0
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one cony of this DMR {including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that tAre ar,p-;ignifi an penalties fpr submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
3/10/2015
(Date)
Permit Date:7/1/2011-60/30/2015
Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14140418
FACILITY NAME: Thomas Concrete of Carolina- Knightdale Plant
PERSON COLLECTING SAMPLES: Click here to enter text.
CERTIFIED LABORATORY:_ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2014
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec
COUNTY: Harnett
PHONE NO. (_919 _)557-3144
ADD TO LISTSERVE? DYES ®NO EMAIL:_
RECEIVED
JUL 07 r. u j=
CENTRAL FILEC
DWQ/BOG
❑Jan -March ®April -June
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)'
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HEA4'
(mg/L)
Duration
(minutes)
Total Flow
,
(gallons/day)
-
-
-
6-93'4
303,5
53
(1S)r,
-
-
01
NO DISCHARGE
e
f"gMTRAU
Fill c
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
" pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
a Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE"] WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations." A
(Signature of Permittee)
Permit Date: 7/1/2010-06/30/2015
6/30/2014
(Date)
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG1'4041$'
FACILITY NAME: Thomas Concrete of Carolina-Knightdale Plant_
PERSON COLLECTING SAMPLES Andrew Rodak
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO:
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2014
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 217-2946
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS, ®SA ❑HQW ❑PNA
RECEIVED
JUL 07 2014
CENTRAL FILES
DWQ/BOG
❑Trout ❑Other,
Outfall No.
Date Sample
Collected
[mo/dd/yr OR
NO FLOW)'
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring
(Y/n)
# of Months in Tier
2
2 Sampling
-
-
6-9
100 ,
-
-
-
001
No Discharge
0
N
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l.
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date:7/1/2011-60/30/2015
Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)1
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
z
Sampling
6-92
15 2
1002
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including ail "No Flown' & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that tore areAnificar�enalties fWr s4mitting false information, including the possibility of fines and imprisonment for knowing violations."
V1
{Signature of
Permit Date:7/1/2011-60/30/2015
6/30/2014
(Date)
Last Revised 7/13/11
Page 2 of 2