HomeMy WebLinkAbout20070295 Ver 6_8.01 Culvert Hydrology_20191220HOLDING VILLAGE POST -DEVELOPMENT HYDROLOGY MARIA TORRES, El
RAP19000 Culvert 10/29/2019
Assume:
HSG
Impervious
Open
Wooded
A
98
39
30
B
98
61
55
C
98
74
70
D
98
80
77
HSG 'A' =
51.9%
HSG'B'=
45.3%
HSG'C'=
0.0%
HSG'D'=
2.8%
II. FUTURE -DEVELOPMENT r
A. Zoning Breakdown*
Contributing Area
Area (sf)
Max Density % **
Impervious Area sf
Residential Mixed -Use
294,255
65
191,266
Neighborhood Mixed -Use
399,610
85
339,669
Urban Residential
0
65
0
Rural Holding District
0
20
0
Light Industrial
0
72
0
General Residential 3
0
30
0
General Residential 5
0
53
0
Nei hborhood Business
0
85
0
Totals
693,865
530,934
B. Watershed Land Use Breakdown
Total area= 15.93 acres
693,865 sf
Composite SCS CN = 87
% Impervious = 76.5%
*Zoning areas were taken
from the Town of Wake
Forest current official
**Max densities were taken
from the Zoning Map and
the TR-55
HOLDING VILLAGE
RAP19000
C. Time of Concentration Information
Time of concentration is calculated using the SCS Segmental Approach (TR-55).
Segment 1: Overland Flow
POST -DEVELOPMENT HYDROLOGY
Culvert 1
Length =
100
ft
Top Elev =
380.00
ft
Bot Elev =
370.00
ft
Height=
10
ft
Slope =
0.1000
ft/ft
Manning's n =
0.40
wooded/dense underbrush
P (2-year/24-hour) =
3.45
inches (Wake Forest, NC)
Segment Time =
10.86
minutes
Segment 3: Channel Flow
Length =
407
ft
Top Elev
356.00
Bot Elev =
326.00
Height =
30
ft
Slope =
0.0737
ft/ft
Manning's n =
0.045
natural channel
Flow Area =
1.00
sf (assume V x 1' channel)
Wetted Perimeter =
3.00
If (assume V x 1' channel)
Channel Velocity =
4.32
ft/sec
Segment Time =
1.57
minutes
Segment 5: Channel Flow
Length =
190
ft
Top Elev
310.00
Bot Elev =
302.20
Height =
7.8
ft
Slope =
0.0411
ft/ft
Manning's n =
0.045
natural channel
Flow Area =
4.00
sf (assume 2' x 2' channel)
Wetted Perimeter =
6.00
If (assume 2' x 2' channel)
Channel Velocity =
5.12
ft/sec
Segment Time =
0.62
minutes
Segment 2: Concentrated Flow
Length =
169
ft
Top Elev =
370.00
ft
Bot Elev =
356.00
ft
Height=
14
ft
Slope =
0.0827
ft/ft
Paved ? =
No
Velocity=
4.64
ft/sec
Segment Time =
0.61
minutes
Segment 4: Pipe Flow
Length =
266
ft
Top Elev =
326.00
Bot Elev =
310.00
Height=
16
ft
Slope =
0.0602
ft/ft
Manning's n =
0.130
RCP pipe
Pipe Diameter=
5.00
ft
Flow Area =
19.63
sf
Wetted Perimeter =
15.71
If (3.5 ft ID pipe)
Channel Velocity=
3.26
ft/sec
Segment Time =
1.36
minutes
Time of Concentration = 15.02 minutes
SCS Lag Time = 9.01 minutes (SCS Lag = 0.6* Tc)
Time Increment = 2.61 minutes (=0.29*SCS Lag)
MARIA TORRES, El
10/29/2019
HOLDING VILLAGE POST -DEVELOPMENT HYDROLOGY MARIA TORRES, El
RAP19000 Culvert 10/29/2019
Assume:
HSG
Impervious
Open
Wooded
A
98
39
30
B
98
61
55
C
98
74
70
D
98
80
77
HSG 'A' =
36.9%
HSG'B'=
19.5%
HSG'C'=
2.4%
HSG'D'=
41.2%
II. FUTURE -DEVELOPMENT r
A. Zoning Breakdown*
Contributing Area
Area (sf)
Max Density % **
Impervious Area sf
Residential Mixed -Use
691,854
65
449,705
Neighborhood Mixed -Use
929,611
85
790,169
Urban Residential
0
65
0
Rural Holding District
638,559
20
127,712
Light Industrial
0
72
0
General Residential 3
459,815
30
137,945
General Residential 5
3,883
53
2,058
Nei hborhood Business
478,377
85
406,620
Totals
3,202,099
1,914,209
B. Watershed Land Use Breakdown
61 1,287,890
Total area = 73.51
3,202,099
Composite SCS CN = 83
%Impervious= 59.8%
acres
sf
*Zoning areas were taken
from the Town of Wake
Forest current official
**Max densities were taken
from the Zoning Map and
the TR-55
HOLDING VILLAGE
POST -DEVELOPMENT HYDROLOGY
RAP19000
Culvert 2
C. Time of Concentration Information
Time of concentration is calculated using the SCS Segmental Approach (TR-55).
Segment 1: Overland Flow
Segment 2: Concentrated Flow
Length =
100
ft
Length =
396
ft
Top Elev =
408.00
ft
Top Elev =
396.00
ft
Bot Elev =
396.00
ft
Bot Elev =
376.00
ft
Height=
12
ft
Height=
20
ft
Slope =
0.1200
ft/ft
Slope =
0.0505
ft/ft
Manning's n =
0.24
dense grasses
Paved ? =
No
P (2-year/24-hour) =
3.45
inches (Wake Forest, NC)
Velocity=
3.63
ft/sec
Segment Time =
6.71
minutes
Segment Time =
1.82
minutes
Segment 3: Channel Flow
Segment 4: Pipe Flow
Length =
581
ft
Length =
36
ft
Top Elev
376.00
Top Elev
372.00
Bot Elev =
372.00
Bot Elev =
370.00
Height =
4
ft
Height =
2
ft
Slope =
0.0069
ft/ft
Slope =
0.0556
ft/ft
Manning's n =
0.030
roadside ditch -grass
Manning's n =
0.024
CMP pipe
Flow Area =
8.00
sf (assume 4' x 2' channel)
Pipe Diameter=
2.00
ft
Wetted Perimeter =
8.00
If (assume 4' x 2' channel)
Flow Area =
3.14
sf
Channel Velocity =
4.12
ft/sec
Wetted Perimeter =
6.28
If (2 ft ID pipe)
Segment Time
2.35
minutes
Channel Velocity=
9.22
ft/sec
Segment Time =
0.07
minutes
Segment 5: Channel Flow
Segment 6: Lake
Length =
1045
ft
*Segment 6 assumed to have segment
time of 0 min.
Top Elev
370.00
Bot Elev =
328.00
Height =
42
ft
Slope =
0.0402
ft/ft
Manning's n =
0.045
natural channel
Flow Area =
2.00
sf (assume 2' x 1' channel)
Wetted Perimeter =
4.00
If (assume 2' x 1' channel)
Channel Velocity =
4.18
ft/sec
Segment Time =
4.16
minutes
Segment 7. Channel Flow
Length =
230
ft
Top Elev
328.00
Bot Elev =
296.57
Height =
31.43
ft
Slope =
0.1367
ft/ft
Manning's n =
0.045
natural channel
Flow Area =
2.00
sf (assume 2' x 1' channel)
Wetted Perimeter =
4.00
If (assume 2' x 1' channel)
Channel Velocity=
7.71
ft/sec
Segment Time =
0.50
minutes
Time of Concentration = 15.61 minutes
SCS Lag Time = 9.37 minutes (SCS Lag = 0.6* Tc)
Time Increment = 2.72 minutes (=0.29*SCS Lag)
MARIA TORRES, El
10/29/2019
HOLDING VILLAGE POST -DEVELOPMENT HYDROLOGY MARIA TORRES, El
RAP19000 Culvert 10/29/2019
Assume:
HSG
Impervious
Open
Wooded
A
98
39
30
B
98
61
55
C
98
74
70
D
98
80
77
HSG 'A' =
1.6%
HSG'B'=
9.6%
HSG'C'=
19.1%
HSG'D'=
69.7%
II. FUTURE -DEVELOPMENT r
A. Zoning Breakdown*
Contributing Area
Area (sf)
Max Density % **
Impervious Area sf
Residential Mixed -Use
0
65
0
Neighborhood Mixed -Use
0
85
0
Urban Residential
103,138
65
67,040
Rural Holding District
0
20
0
Light Industrial
699,071
72
503,331
General Residential 3
0
30
0
General Residential 5
0
53
0
Nei hborhood Business
0
85
0
Totals
802,209
570,371
B. Watershed Land Use Breakdown
Total area= 18.42 acres
802,209 sf
Composite SCS CN = 92
% Impervious = 71.1%
*Zoning areas were taken
from the Town of Wake
Forest current official
**Max densities were taken
from the Zoning Map and
the TR-55
HOLDING VILLAGE POST -DEVELOPMENT HYDROLOGY
RAP19000 Culvert 3
C. Time of Concentration Information
Time of concentration is calculated using the SCS Segmental Approach (TR-55).
Segment 1: Overland Flow
Segment 2: Concentrated Flow
Length =
100
ft
Length =
572
ft
Top Elev =
374.00
ft
Top Elev =
368.00
ft
Bot Elev =
368.00
ft
Bot Elev =
326.00
ft
Height=
6
ft
Height=
42
ft
Slope =
0.0600
ft/ft
Slope =
0.0734
ft/ft
Manning's n =
0.24
dense grasses
Paved ? =
No
P (2-year/24-hour) =
3.45
inches (Wake Forest, NC)
Velocity=
4.37
ft/sec
Segment Time =
8.86
minutes
Segment Time =
2.18
minutes
Segment 3: Channel Flow
Length =
486
ft
Top Elev
326.00
Bot Elev =
307.36
Height =
18.64
ft
Slope =
0.0383
ft/ft
Manning's n =
0.030
roadside ditch -grass
Flow Area =
1.00
sf (assume V x V channel)
Wetted Perimeter =
3.00
If (assume V x 1' channel)
Channel Velocity =
4.67
ft/sec
Segment Time =
1.73
minutes
Time of Concentration = 12.77 minutes
SCS Lag Time = 7.66 minutes (SCS Lag = 0.6* Tc)
Time Increment = 2.22 minutes (=0.29*SCS Lag)
MARIA TORRES, El
10/29/2019