Loading...
HomeMy WebLinkAbout20070295 Ver 6_7.01 SCM C - Wet Pond Design_20191220Holding Village - North Lake STORMWATER CONTROL MEASURE C Maria Torres, E.I. RAP-19000 SSFxn Above NP Daniel Gunter 12.16.2019 STAGE -STORAGE FUNCTION - ABOVE NORMAL POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area rera` ' t.iQA Volume Volume w/ S-S Fxn (feet) (feet) (SF) (CF) (CF) (feet) 312.00 0.00 10,254 313.00 1.00 12,376 11315 11315 11315 1.02 314.00 2.00 14,624 13500 13500 24815 1.96 316.00 4.00 17,821 16223 32445 57260 3.95 318.00 6.00 21,243 19532 39064 96324 6.11 Storage vs. Stage 120000 100000 y=11112x1.1936 80000 R2 = 0.9994 U 60000 ;a 0) 40000 20000 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Stage (feet) Ks = 11112 b = 1.1936 Holding Village - North Lake STORMWATER CONTROL MEASURE C Maria Torres, E.I. RAP-19000 SSFxn Main Pool Daniel Gunter 12.16.2019 STAGE -STORAGE FUNCTION - MAIN POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 306.50 -0.50 2,823 Sediment Storage 7 307.00 0.00 3,162 308.00 1.00 3,898 3530 3530 3530 1.01 310.00 3.00 5,602 4750 9500 13030 2.90 311.50 4.50 7,035 6319 9478 22508 4.52 312.00 5.00 1 7,528_1 7282 3641 1 26149 1 5.10 *surface area and volume used for avg. depth calculation Storage vs. Stage 30000 25000 y = 3485.7x1 z373 R2 = 0.999 LL 20000 U 15000 ;a 0) 10000 5000 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage (feet) Ks = 3486 b = 1.2373 Holding Village - North Lake STORMWATER CONTROL MEASURE C Maria Torres, E.I. RAP-19000 SSFxn Foreboy Daniel Gunter 12.16.2019 REBAY Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn 308.50 -0.50 623 Sediment Storage 309.00 0.00 794 310.00 1.00 1,193 994 994 994 1.00 311.50 2.50 1,918 1556 2333 3327 2.48 312.00 3.00 2,170 2044 1022 4349 3.02 Storage vs. Stage 5000 4500 4000 y = 991.31 x1.3358 R2 = 0.9998 3500 U 3000 2500 `0 2000 1500 1000 500 0 0.00 1.00 2.00 3.00 4.00 Stage (feet) KS = 991.3 b = 1.3358 Holding Village - North Lake STORMWATER CONTROL MEASURE C RAP-19000 Volume Calculation TOTAL VOLUME OF FACILITY Volume of Main Pool below Normal Pool= 26,149 cf Volume of Forebay below Normal Pool= 4,349 cf Total Volume Below Normal Pool = 30,497 cf Total Volume Above Normal Pool= 96,324 cf Total Volume of Facility = 126,821 cf FOREBAY PERCENTAGE OF PERMANENT POOL -VOLUME Per NCDEQ Minimum Design Criteria, the foreboy volume should equal approximately 15-20% of the main pool volume. Total Main Pool Volume = 26,149 cf Provided Forebay Volume = 4,349 cf Provided Forebay Volume % = 17% AVERAGE DEPTH OF MAIN POOL Main Pool Volume at Normal Pool = 26,149 cf Main Pool Area at Normal Pool = 7,528 sf Average Depth = 3.47 ft Maria Torres, E.I. Daniel Gunter 12.16.2019 Holding Village - North Lake STORMWATER CONTROL MEASURE C Maria Torres, E.I. RAP-19000 Surface Area Calculation Daniel Gunter 12.16.2019 WET DETENTION BASIN SUMMARY Enter the drainage area characteristics =_> Total drainage area to pond = 9.45 acres Total impervious area to pond = 5.07 acres Note The basin must be sized to treat all impervious surface runoff draining into the pond, not just the impervious surface from on -site development. Drainage area = 9.45 acres @ 53.6% impervious Estimate the surface area required at pond normal pool elevation ==> Wet Detention Basins are based on an minimum average depth of = 3.47 3.0 3.47 4.0 Lower Boundary => 50.0 1.79 1.51 Site % impervious => 53.6 1.90 1.76 1.60 Upper Boundary => 60.0 2.09 1.77 Therefore, SA/DA required = 1.76 Surface area required for main pool at normal pool = 7,243 ft2 = 0.17 acres Surface area provided for main pool at normal pool = 7,528 ft2 feet (Calculated) Holding Village - North Lake STORMWATER CONTROL MEASURE C RAP-19000 WQV Calculation DETERMINATION OF WATER QUALITY VOLUME WQ v = (P)(R v)(A)/12 where, WQv= water quality volume (in acre-ft) Rv= 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total area, A = 9.45 acres Impervious area = 5.07 acres Percent impervious cover, I = 53.6 % Rainfall, P = 1.00 inches Calculated values: Rv= 0.53 WQV= 0.42 acre-ft = 18273 cf. ASSOCIATED DEPTH IN POND WQV= 18273 cf. Stage/Storage Data: Ks = 11112 b = 1.194 Zo = 312.00 Volume in 1" rainfall = 18273 cf. Calculated values: Depth of WQv in Basin = 1.52 ft = 18.20 inches Elevation = 313.52 ft Maria Torres, E.I. Daniel Gunter 12.16.2019 Holding Village - North Lake STORMWATER CONTROL MEASURE C Maria Torres, E.I. RAP-19000 WQV Drawdown Calculation Daniel Gunter 12.16.2019 DRAWDOWN ORIFICE DESIGN D orifice = 2.25 inch # orifices = 1 Ks = 11112 b = 1.1936 Cd orifice = 0.60 Normal Pool Elevation = 312.00 feet Volume @ Normal Pool = 0 cf Orifice Invert = 312.00 feet WSEL @ 1" Runoff Volume = 313.52 feet WSEL (feet) Vol. Stored (cf) Orifice Flow (cfS) Avg. Flow (cfS) Incr. Vol. (cf) Incr. Time (sec) 313.52 18273 0.158 313.39 16425 0.151 0.155 1848 11952 313.26 14609 0.143 0.147 1815 12341 313.13 12830 0.135 0.139 1779 12792 313.00 11090 0.126 0.131 1740 13322 312.87 9393 0.117 0.122 1697 13960 312.74 7745 0.107 0.112 1648 14751 312.61 6152 0.095 0.101 1593 15776 312.48 4624 0.082 0.089 1528 17192 312.35 3174 0.067 0.075 1449 19369 312.22 1827 0.047 0.057 1347 23541 Drawdown Time = 1.79 days By comparison, if calculated by the average head over the orifice (assuming average head is one-third the total depth), the result would be: Average driving head on orifice = 0.474 feet Orifice composite loss coefficient = 0.600 Cross -sectional area of siphon = 0.028 sf Q = 0.0916 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 2.31 days