Loading...
HomeMy WebLinkAbout20070295 Ver 6_6.04 SCM B - Rip Rap Outlet Protection_20191220DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project Holding Village - North Lake Date 12.16.2019 Project No. RAP-19000 Designer DJG Outlet ID SCM B Flow, Q10_yr 15.9 cfs Slope, S 1.67 % Pipe Diameter, Do 36 inches Pipe Diameter, Do 3.0 feet Number of pipes 1 Pipe separation 0 feet Manning's n 0.013 FiLmre 8.06.b.1 25 20 one U 15 zone 5 ° 10 Zen? 4 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Zone from graph above = 2 Outlet pipe diameter 36 in. Length = 18.0 ft. Outlet flowrate 15.9 cfs Width = 9.0 ft. Outlet velocity 9.3 ft/sec Stone diameter = 6 in. Material = Class B Thickness = 22 in. Zone Material I Diameter I Thickness I Length I Width 1 2 3 Class A Class B Class 1 3 6 13 9 22 22 4 x D(o) 6 x D(o) 8 x D(o) 3 x D(o) 3 x D(o) 3 x D(o) 4 Class 1 13 22 8 x D(o) 3 x D(o) 5 Class 11 23 27 10 x D(o) 3 x D(o) 6 7 Class 11 23 27 10 x D(o) Special study required 3 x D(o) 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full -flow velocity SCM - Rip Rap Outlet Protection Design12/16/2019