Loading...
HomeMy WebLinkAbout20070295 Ver 6_6.01 SCM B - Wet Pond Design_20191220Holding Village - North Lake STORMWATER CONTROL MEASURE B Maria Torres, E.I. RAP-19000 SSFxn Above NP Daniel Gunter 12/16/2019 - BOVE NORMAL POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 264.00 0.00 13,491 265.00 1.00 16,556 15024 15024 15024 1.00 266.00 2.00 18,086 17321 17321 32345 2.00 268.00 4.00 19,303 18695 37389 69734 4.00 270.00 6.00 20,501 19902 39804 109538 6.01 KS = 15012 b = 1.1086 Holding Village - North Lake STORMWATER CONTROL MEASURE B Maria Torres, E.I. RAP-19000 SSFxn Main Pool Daniel Gunter 12/16/2019 N - MAIN POOL Estimated Average Incremental Accumulated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 257.00 -0.50 4,791 Sediment Storage 257.50 0.00 5,088 258.00 0.50 5,392 5240 2620 2620 0.51 260.00 2.50 6,779 6086 12171 14791 2.38 262.00 4.50 8,253 7516 15032 29823 4.44 264.00 6.50 9,855 j 9054 18108 47,931 6.78 Isurtace area and volume used for avg. depth calculation Ks = SS82 b = 1.1237 Holding Village - North Lake STORMWATER CONTROL MEASURE B Maria Torres, E.I. RAP-19000 SSFxn Foreboy Daniel Gunter 12/16/2019 STAGE -STORAGE FUNCTION - FOREBAY Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn 258.00 -0.50 713 Sediment Storage 258.50 0.00 842 260.00 1.50 1,254 1048 1572 1572 1.52 262.00 3.50 1,966 1610 3220 4792 3.38 264.00 5.50 2,950 2458 4916 9708 5.62 Storage vs. Stage 12000 10000 y = 880.13x13902 8000 R2 = 0.998 LL U 6000 r CO 4000 2000 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage (feet) Ks = 880.1 b = 1.3902 Holding Village - North Lake STORMWATER CONTROL MEASURE B RAP-19000 Volume Calculation 47,931 cf Volume of Main Pool below Normal Pool= Volume of Forebay below Normal Pool= 9,708 cf Total Volume Below Normal Pool = 57,639 cf Total Volume Above Normal Pool= 109,538 cf Total Volume of Facility = 167,177 cf AGE OF PERMANENT POOL VOLUME i Per NCDEQ Minimum Design Criteria, the forebay volume should equal approximately 15-20% of the main pool volume. Total Main Pool Volume = 47,931 cf Provided Forebay Volume = 9,708 cf Provided Forebay Volume % = 20% LVERAGE DEPTH OF MAIN POOL Main Pool Volume at Normal Pool = 47,931 cf Main Pool Area at Normal Pool = 9,855 sf Average Depth = 4.86 ft Maria Torres, E.I. Daniel Gunter 12/16/2019 Holding Village - North Lake STORMWATER CONTROL MEASURE B Maria Torres, E.I. RAP-19000 Surface Area Calculation Daniel Gunter 12/16/2019 "WET DETENTION BASIN SUMMARY Enter the drainage area characteristics ==> Total drainage area to pond = 12.98 acres Total impervious area to pond = 7.90 acres Note The basin must be sized to treat all impervious surface runoff draining into the pond, not just the impervious surface from on -site development. Drainage area = 12.98 acres @ 60.9% impervious Estimate the surface area required at pond normal pool elevation ==> Wet Detention Basins are based on an minimum average depth of = 4.0 4.86 Lower Boundary => 60.0 1.77 Site % impervious => 60.9 1.80 1.55 Upper Boundary => 70.0 2.09 Therefore, SA/DA required = 1.55 Surface area required for main pool at normal pool = 8,791 = 0.20 Surface area provided for main pool at normal pool = 9,855 4.86 feet (Calculated) 5.0 1.49 1.52 1.80 ft2 acres ft2 Holding Village - North Lake STORMWATER CONTROL MEASURE B Maria Torres, E.I. RAP-19000 WQV Calculation Daniel Gunter 12/16/2019 VOLUME WQ v = (P)(R v)(A)/12 where, WQv= water quality volume (in acre-ft) Rv= 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total area, A = 12.98 acres Impervious area = 7.90 acres Percent impervious cover, I = 60.9 Rainfall, P = 1.00 inches Calculated values: Rv = 0.60 WQv= 0.65 acre-ft = 28163 cf. �ED DEPTH IN POND WQv= 28163 cf. Stage/Storage Data: Ks = 15012 b = 1.109 Zo = 264.00 Volume in 1" rainfall = 28163 cf. Calculated values: Depth of WQv in Basin = 1.76 ft 21.17 inches Elevation = 265.76 ft Holding Village - North Lake STORMWATER CONTROL MEASURE B RAP-19000 WQV Drowdown Calculation DESI D orifice = 2.5 inch # orifices = 1 Ks = 15012 b = 1.1086 Cd orifice = 0.60 Normal Pool Elevation = 264.00 feet Volume @ Normal Pool = 0 cf Orifice Invert = 264.00 feet WSEL @ 1" Runoff Volume = 265.76 feet WSEL (feet) Vol. Stored (cf) Orifice Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 265.76 28163 0.211 265.61 25445 0.201 0.206 2718 13186 265.46 22756 0.190 0.196 2689 13737 265.30 20097 0.179 0.185 2659 14380 265.15 17473 0.167 0.173 2624 15144 264.99 14887 0.154 0.161 2586 16075 264.84 12344 0.140 0.147 2543 17249 264.68 9851 0.125 0.133 2492 18797 264.53 7420 0.107 0.116 2431 20992 264.38 5065 0.085 0.096 2355 24501 264.22 2816 0.056 0.071 2249 31824 Drawdown Time = 2.15 days By comparison, if calculated by the average head over the orifice (assuming average head is one-third the total depth), the result would be: Average driving head on orifice = 0.553 feet Orifice composite loss coefficient = 0.600 Cross -sectional area of siphon = 0.034 sf Q = 0.1221 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 2.67 days Maria Torres, E.I. Daniel Gunter 12/16/2019