Loading...
HomeMy WebLinkAbout20070295 Ver 6_5.01 SCM A - Wet Pond Design_20191220Holding Village - North Lake STORMWATER CONTROL MEASURE A Maria Torres, E.I. RAP-19000 SSFxn Above NP Daniel Gunter 12.16.2019 STAGE -STORAGE FUNCTION -ABOVE NORMAL POOL Contour (feet) Stage (feet) Contour Area (SF) Average Contour Area (SF) Incremental Contour Volume (CF) Accumulated Contour Volume (CF) Estimated Stage w/ S-S Fxn (feet) 274.00 0.00 18,993 275.00 1.00 22,511 20752 20752 20752 1.00 276.00 2.00 24,354 23433 23433 44185 1.99 278.00 4.00 26,505 25430 50859 95044 3.98 280.00 6.00 28,243 27374 54748 149792 6.01 280.50 6.50 28,649 28446 14223 164015 6.52 Ks = 206S6 b = 1.1047 Holding Village - North Lake STORMWATER CONTROL MEASURE A RAP-19000 SSFxn Main Pool ION - MAIN POOL Maria Torres, E.I. Daniel Gunter 12.16.2019 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) i (CF) (CF) (feet) 267.50 -1.00 8,899 Sediment Storage 268.50 0.00 9,739 269.00 0.50 10,168 9954 4977 4977 0.51 270.00 1.50 11,051 10610 10610 15586 1.46 272.00 3.50 12,888 11970 23939 39525 3.44 273.50 5.00 14,331 13610 20414 59940 5.04 274.00 5.50 1 14,824 14578 7289 67,228 5.61 *surface area and volume used for avg. depth calculation Storage vs. Stage 80000 70000 60000 v 50000 40000 R 30000 C0 20000 10000 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage (feet) Ks = 10351 b = 1.0853 Holding Village - North Lake STORMWATER CONTROL MEASURE A Maria Torres, E.I. RAP-19000 SSFxn Foreboy Daniel Gunter 12.16.2019 REBAY Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn 270.50 -0.50 2,001 Sediment Storage 271.00 0.00 2,196 272.00 1.00 2,606 2401 2401 2401 1.00 273.50 2.50 3,268 2937 4406 6807 2.48 274.00 3.00 3,501 3385 1692 8499 3.02 Storage vs. Stage 9000 8000 y = 2398.2x'1462 7000 R2 = 0.9999 6000 LL v 5000 a 4000 0 in 3000 2000 1000 0 0.00 1.00 2.00 3.00 4.00 Stage (feet) Ks = 2398.2 b = 1.1462 Holding Village - North Lake STORMWATER CONTROL MEASURE A RAP-19000 Volume Calculation 67,228 cf Volume of Main Pool below Normal Pool= Volume of Forebay below Normal Pool= 8,499 cf Total Volume Below Normal Pool = 75,727 cf Total Volume Above Normal Pool= 164,015 cf Total Volume of Facility = 239,742 cf AGE OF PERMANENT POOL VOLUME Per NCDEQ Minimum Design Criteria, the forebay volume should equal approximately 15-20% of the main pool volume. Total Main Pool Volume = 67,228 cf Provided Forebay Volume = 8,499 cf Provided Forebay Volume % = 13% LVERAGE DEPTH OF MAIN POOL Main Pool Volume at Normal Pool = 67,228 cf Main Pool Area at Normal Pool = 14,824 sf Average Depth = 4.54 ft Maria Torres, E.I. Daniel Gunter 12.16.2019 Holding Village - North Lake STORMWATER CONTROL MEASURE A Maria Torres, E.I. RAP-19000 Surface Area Calculation Daniel Gunter 12.16.2019 WET DETENTION BASIN SUMMARY Enter the drainage area characteristics ==> Total drainage area to pond = 18.69 acres Total impervious area to pond = 10.31 acres Note The basin must be sized to treat all impervious surface runoff draining into the pond, not just the impervious surface from on -site development. Drainage area = 18.69 acres @ 55.2% impervious Estimate the surface area required at pond normal pool elevation ==> Wet Detention Basins are based on an minimum average depth of = 4.0 4.54 Lower Boundary => 50.0 1.51 Site % impervious => 55.2 1.64 1.51 Upper Boundary => 60.0 1.77 Therefore, SA/DA required = 1.51 Surface area required for main pool at normal pool = 12,333 = 0.28 Surface area provided for main pool at normal pool = 14,824 4.54 feet (Calculated) 5.0 1.31 1.40 1.49 ft2 acres ft2 Holding Village - North Lake STORMWATER CONTROL MEASURE A Maria Torres, E.I. RAP-19000 WQV Calculation Daniel Gunter 12.16.2019 VOLUME WQ v = (P)(R v)(A)/12 where, WQv= water quality volume (in acre-ft) Rv= 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total area, A = 18.69 acres Impervious area = 10.31 acres Percent impervious cover, I = 55.2 Rainfall, P = 1.00 inches Calculated values: Rv = 0.55 WQv= 0.85 acre-ft = 37068 cf. �ED DEPTH WQv= 37068 cf. Stage/Storage Data: Ks = 20656 b = 1.105 Zo = 274.00 Volume in 1" rainfall = 37068 cf. Calculated values: Depth of WQv in Basin = 1.70 ft 20.37 inches Elevation = 275.70 ft Holding Village - North Lake STORMWATER CONTROL MEASURE A RAP-19000 WQV Drowdown Calculation DESI D orifice = 3 inch # orifices = 1 Ks = 20656 b = 1.1047 Cd orifice = 0.60 Normal Pool Elevation = 274.00 feet Volume @ Normal Pool = 0 cf Orifice Invert = 274.00 feet WSEL @ 1" Runoff Volume = 275.70 feet WSEL (feet) Vol. Stored (cf) Orifice Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 275.70 37068 0.296 275.55 33499 0.282 0.289 3569 12358 275.40 29966 0.267 0.274 3533 12892 275.25 26472 0.250 0.259 3494 13516 275.10 23022 0.233 0.242 3451 14262 274.95 19620 0.215 0.224 3402 15177 274.81 16273 0.195 0.205 3347 16341 274.66 12990 0.172 0.183 3282 17895 274.51 9785 0.146 0.159 3205 20139 274.36 6678 0.114 0.130 3107 23854 274.21 3707 0.065 0.090 2972 33138 Drawdown Time = 2.08 days By comparison, if calculated by the average head over the orifice (assuming average head is one-third the total depth), the result would be: Average driving head on orifice = 0.524 feet Orifice composite loss coefficient = 0.600 Cross -sectional area of siphon = 0.049 sf Q = 0.1711 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 2.51 days Maria Torres, E.I. Daniel Gunter 12.16.2019