Loading...
HomeMy WebLinkAbout20070295 Ver 6_4.03 Master Report_20191220TI MCADAMS Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) Post - to Lake Post 1 year 1 10.351 731.000 125.30 Post - to Lake Post 2 year 2 14.541 731.000 175.84 Post - to Lake Post 10 year 10 26.863 731.000 298.12 Post - bypass Post 1 year 1 1.153 725.000 19.70 Post - bypass Post 2 year 2 1.581 725.000 26.45 Post - bypass Post 10 year 10 2.812 724.000 42.00 SUB-4 BYPASS Post 1 year 1 0.247 726.000 3.58 SUB-4 BYPASS Post 2 year 2 0.382 725.000 5.93 SUB-4 BYPASS Post 10 year 10 0.816 724.000 12.22 SUB-4 POND A Post 1 year 1 1.975 721.000 41.85 SUB-4 POND A Post 2 year 2 2.708 721.000 56.12 SUB-4 POND A Post 10 year 10 4.817 721.000 88.55 SUB-5 BYPASS Post 1 year 1 0.097 726.000 1.14 SUB-5 BYPASS Post 2 year 2 0.161 725.000 2.25 SUB-5 BYPASS Post 10 year 10 0.377 724.000 5.53 SUB-5 POND B Post 1 year 1 1.514 721.000 32.44 SUB-5 POND B Post 2 year 2 2.046 721.000 42.59 SUB-5 POND B Post 10 year 10 3.553 721.000 65.14 SUB-6 BYPASS Post 1 year 1 0.080 725.000 1.11 SUB-6 BYPASS Post 2 year 2 0.129 723.000 2.01 SUB-6 BYPASS Post 10 year 10 0.290 723.000 4.60 SUB-7 BYPASS Post 1 year 1 0.067 729.000 0.54 SUB-7 BYPASS Post 2 year 2 0.117 728.000 1.30 SUB-7 BYPASS Post 10 year 10 0.294 727.000 3.71 SUB-7 POND C Post 1 year 1 1.050 721.000 22.38 SUB-7 POND C Post 2 year 2 1.429 721.000 29.69 SUB-7 POND C Post 10 year 10 2.511 721.000 46.11 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) POA-1 Post 1 year 1 1.153 725.000 19.70 POA-1 Post 2 year 2 1.657 725.000 26.45 POA-1 Post 10 year 10 3.548 724.000 42.00 J-4 Post 1 year 1 2.445 729.000 5.72 J-4 Post 2 year 2 4.270 755.000 11.15 J-4 Post 10 year 10 9.742 752.000 46.43 J-5 Post 1 year 1 1.427 728.000 2.69 J-5 Post 2 year 2 2.447 753.000 5.71 J-5 Post 10 year 10 5.481 751.000 24.75 J-6 Post 1 year 1 0.677 727.000 1.48 J-6 Post 2 year 2 1.142 752.000 3.24 J-6 Post 10 year 10 2.531 727.000 9.68 J-7 Post 1 year 1 0.599 783.000 1.17 J-7 Post 2 year 2 1.015 753.000 2.66 J-7 Post 10 year 10 2.244 754.000 7.76 Holding Village - North Lake J. Martin, PE RAP 19000. ppc 12/16/2019 TJ MCADAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) Maximum Maximum Water Pond Storage Surface (ac-ft) Elevation (ft) Proposed Post year 1 10.351 731.000 125.30 (N/A) (N/A) Lake (IN) Proposed Post year 1 0.000 1,440.000 0.00 296.83 10.351 Lake (OUT) Proposed Post year 2 14.541 731.000 175.84 (N/A) (N/A) Lake (IN) Proposed Post 2 year 2 0.077 1,440.000 0.22 297.16 14.463 Lake (OUT) Proposed Post 10 year 10 26.863 731.000 298.12 (N/A) (N/A) Lake (IN) Proposed Post 10 year 10 0.736 1,440.000 0.93 298.05 26.127 Lake (OUT) POND A (IN) Post 1 year 1 1.975 721.000 41.85 (N/A) (N/A) POND A Post 1 year 1 0.776 905.000 1.04 276.54 1.322 (OUT) POND A (IN) Post 2 year 2 2.708 721.000 56.12 (N/A) (N/A) POND A Post 2 year 2 1.447 771.000 4.09 276.92 1.536 (OUT) POND A (IN) Post 10 year 10 4.817 721.000 88.55 (N/A) (N/A) POND A Post 10 year 10 3.456 753.000 17.74 278.10 2.240 (OUT) POND B (IN) Post 1 year 1 1.514 721.000 32.44 (N/A) (N/A) POND B Post 1 year 1 0.655 903.000 0.97 266.57 0.980 (OUT) POND B (IN) Post 2 year 2 2.046 721.000 42.59 (N/A) (N/A) POND B Post 2 year 2 1.146 784.000 1.81 267.16 1.232 (OUT) POND B (IN) Post 10 year 10 3.553 721.000 65.14 (N/A) (N/A) POND B Post 10 year 10 2.576 751.000 15.85 268.22 1.697 (OUT) POND C (IN) Post 1 year 1 1.050 721.000 22.38 (N/A) (N/A) POND C Post 1 year 1 0.532 784.000 1.03 314.15 0.620 (OUT) POND C (IN) Post 2 year 2 1.429 721.000 29.69 (N/A) (N/A) POND C Post 2 year 2 0.898 781.000 2.06 314.64 0.791 (OUT) POND C (IN) Post 10 year 10 2.511 721.000 46.11 (N/A) (N/A) POND C Post 10 year 10 1.949 755.000 6.22 316.14 1.368 (OUT) Holding Village - North Lake J. Martin, PE RAP 19000. ppc 12/16/2019