HomeMy WebLinkAbout20070295 Ver 6_4.03 Master Report_20191220TI MCADAMS
Subsection: Master Network Summary
Catchments Summary
Label Scenario Return Hydrograph Time to Peak Peak Flow
Event Volume (min) (ft3/s)
(years) (ac-ft)
Post - to Lake
Post 1 year
1
10.351
731.000
125.30
Post - to Lake
Post 2 year
2
14.541
731.000
175.84
Post - to Lake
Post 10 year
10
26.863
731.000
298.12
Post - bypass
Post 1 year
1
1.153
725.000
19.70
Post - bypass
Post 2 year
2
1.581
725.000
26.45
Post - bypass
Post 10 year
10
2.812
724.000
42.00
SUB-4 BYPASS
Post 1 year
1
0.247
726.000
3.58
SUB-4 BYPASS
Post 2 year
2
0.382
725.000
5.93
SUB-4 BYPASS
Post 10 year
10
0.816
724.000
12.22
SUB-4 POND A
Post 1 year
1
1.975
721.000
41.85
SUB-4 POND A
Post 2 year
2
2.708
721.000
56.12
SUB-4 POND A
Post 10 year
10
4.817
721.000
88.55
SUB-5 BYPASS
Post 1 year
1
0.097
726.000
1.14
SUB-5 BYPASS
Post 2 year
2
0.161
725.000
2.25
SUB-5 BYPASS
Post 10 year
10
0.377
724.000
5.53
SUB-5 POND B
Post 1 year
1
1.514
721.000
32.44
SUB-5 POND B
Post 2 year
2
2.046
721.000
42.59
SUB-5 POND B
Post 10 year
10
3.553
721.000
65.14
SUB-6 BYPASS
Post 1 year
1
0.080
725.000
1.11
SUB-6 BYPASS
Post 2 year
2
0.129
723.000
2.01
SUB-6 BYPASS
Post 10 year
10
0.290
723.000
4.60
SUB-7 BYPASS
Post 1 year
1
0.067
729.000
0.54
SUB-7 BYPASS
Post 2 year
2
0.117
728.000
1.30
SUB-7 BYPASS
Post 10 year
10
0.294
727.000
3.71
SUB-7 POND C
Post 1 year
1
1.050
721.000
22.38
SUB-7 POND C
Post 2 year
2
1.429
721.000
29.69
SUB-7 POND C
Post 10 year
10
2.511
721.000
46.11
Node Summary
Label Scenario Return Hydrograph Time to Peak Peak Flow
Event Volume (min) (ft3/s)
(years) (ac-ft)
POA-1
Post 1 year
1
1.153
725.000
19.70
POA-1
Post 2 year
2
1.657
725.000
26.45
POA-1
Post 10 year
10
3.548
724.000
42.00
J-4
Post 1 year
1
2.445
729.000
5.72
J-4
Post 2 year
2
4.270
755.000
11.15
J-4
Post 10 year
10
9.742
752.000
46.43
J-5
Post 1 year
1
1.427
728.000
2.69
J-5
Post 2 year
2
2.447
753.000
5.71
J-5
Post 10 year
10
5.481
751.000
24.75
J-6
Post 1 year
1
0.677
727.000
1.48
J-6
Post 2 year
2
1.142
752.000
3.24
J-6
Post 10 year
10
2.531
727.000
9.68
J-7
Post 1 year
1
0.599
783.000
1.17
J-7
Post 2 year
2
1.015
753.000
2.66
J-7
Post 10 year
10
2.244
754.000
7.76
Holding Village - North Lake J. Martin, PE
RAP 19000. ppc 12/16/2019
TJ MCADAMS
Subsection: Master Network Summary
Pond Summary
Label Scenario Return Hydrograph Time to Peak Peak Flow
Event Volume (min) (ft3/s)
(years) (ac-ft)
Maximum
Maximum
Water
Pond Storage
Surface
(ac-ft)
Elevation
(ft)
Proposed
Post year
1
10.351
731.000
125.30
(N/A)
(N/A)
Lake (IN)
Proposed
Post year
1
0.000
1,440.000
0.00
296.83
10.351
Lake (OUT)
Proposed
Post year
2
14.541
731.000
175.84
(N/A)
(N/A)
Lake (IN)
Proposed
Post 2 year
2
0.077
1,440.000
0.22
297.16
14.463
Lake (OUT)
Proposed
Post 10 year
10
26.863
731.000
298.12
(N/A)
(N/A)
Lake (IN)
Proposed
Post 10 year
10
0.736
1,440.000
0.93
298.05
26.127
Lake (OUT)
POND A (IN)
Post 1 year
1
1.975
721.000
41.85
(N/A)
(N/A)
POND A
Post 1 year
1
0.776
905.000
1.04
276.54
1.322
(OUT)
POND A (IN)
Post 2 year
2
2.708
721.000
56.12
(N/A)
(N/A)
POND A
Post 2 year
2
1.447
771.000
4.09
276.92
1.536
(OUT)
POND A (IN)
Post 10 year
10
4.817
721.000
88.55
(N/A)
(N/A)
POND A
Post 10 year
10
3.456
753.000
17.74
278.10
2.240
(OUT)
POND B (IN)
Post 1 year
1
1.514
721.000
32.44
(N/A)
(N/A)
POND B
Post 1 year
1
0.655
903.000
0.97
266.57
0.980
(OUT)
POND B (IN)
Post 2 year
2
2.046
721.000
42.59
(N/A)
(N/A)
POND B
Post 2 year
2
1.146
784.000
1.81
267.16
1.232
(OUT)
POND B (IN)
Post 10 year
10
3.553
721.000
65.14
(N/A)
(N/A)
POND B
Post 10 year
10
2.576
751.000
15.85
268.22
1.697
(OUT)
POND C (IN)
Post 1 year
1
1.050
721.000
22.38
(N/A)
(N/A)
POND C
Post 1 year
1
0.532
784.000
1.03
314.15
0.620
(OUT)
POND C (IN)
Post 2 year
2
1.429
721.000
29.69
(N/A)
(N/A)
POND C
Post 2 year
2
0.898
781.000
2.06
314.64
0.791
(OUT)
POND C (IN)
Post 10 year
10
2.511
721.000
46.11
(N/A)
(N/A)
POND C
Post 10 year
10
1.949
755.000
6.22
316.14
1.368
(OUT)
Holding Village - North Lake J. Martin, PE
RAP 19000. ppc 12/16/2019