Loading...
HomeMy WebLinkAbout20070295 Ver 6_4.01 Post-Hydrology Inputs_20191220Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 Summary of Results Daniel Gunter FYDROLOGY INPUT SUMMARY 12.16.2019 Sub -basin ID Onsite Area [acres] SCS CN Tc [min] 79 19.72 Impervious Open Wooded Pond Total Sub 1 to Lake 50.88 39.45 11.76 12.89 114.98 Sub 1 Bypass 1.63 7.30 2.00 0.00 10.92 82 9.89 4 Bypass 1.24 1.84 1.90 0.00 4.98 69 8.78 4 to SCM A 10.31 5.84 2.13 0.41 18.69 82 5.00 5 Bypass 0.34 0.96 1.55 0.00 2.85 64 8.17 5 to SCM B 7.90 3.27 1.55 0.27 12.98 84 5.00 6 0.40 0.52 1.08 0.00 2.00 66 6.89 7 to SCM C 5.07 3.98 0.00 0.40 9.45 83 5.00 7 Bypass 0.00 1 1.70 0.87 0.00 2.57 1 61 11.19 Totals = 77.76 64.86 22.84 13.97 179.43 Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 Sub 1 to Lake Daniel Gunter 12.16.2019 I. SCS CURVE NUMBERS Assume: HSG Impervious Open Wooded 1/8 ac lots 1/4 ac lots Commercial Industrial A 98 39 30 77 61 89 81 B 98 61 55 85 75 92 88 C 98 74 70 90 83 94 91 D 98 80 77 92 87 95 93 HSG 'A' = 10.5% HSG'B'= 66.4% HSG 'C' = 0.0% HSG'D'= 22.9% Cover Condition SCS CN Comments Impervious 98 Open 63 Assume good condition Wooded 57 Assume good condition Residential 1/8 ac) 86 Assume 1/8 acre lots Residential 1/4 ac) 76 Assume 1/4 acre lots Commercial 92 Industrial 88 North Lake South Lake ;ontributing Area # of Units Area / Unit e 'A' Total Imp. 39.5 3658 ype 'B'Total Imp. 34 3214 e'C'TotalImp. 6 3384 Type 'D'Total 5 3028 Type 'E'Total 10 1 2406 Contributing Area # of Units Area / Unit Total Area 24-ft (TH) Lot Impervious 58 1,600 92,800 2.13 34-ft Lot Impervious 45.5 2,460 111,930 2.57 40-ft Lot Impervious 28 3,030 84,840 1.95 50-ft Lot Impervious 15 3,580 53,700 1.23 55-ft Lot Impervious 0 4,005 0 0.00 75-ft Lot Impervious 0 6,355 0 0.00 Right-of-way Impervious - - 314,287 7.22 Amenity (10%) 4,931 0.11 Apartments (80%) - 144,305 3.31 Totals 146.5 806,793 18.52 II. POST -DEVELOPMENT A. Watershed Breakdown South Lake Contributing Area SCS CN Area [sfj Area acres Comments Impervious 98 466,557 10.71 Open 63 1,103,421 25.33 Assume good condition Wooded 57 512,053 11.76 Assume good condition Pond 100 561,526 12.89 - Residential (1/8 ac) 86 0 0.00 Assume 1/8 acre lots Residential (1/4 ac) 76 395,974 9.09 Assume 1/4 acre lots Commercial 92 62,580 1.44 Industrial 88 484,466 11.12 North Lake Contributing Area SCS CN Area [sf] Area [acres] Comments Impervious 98 806,793 18.52 Open 63 615,096 14.12 Assume good condition Wooded 57 0 0.00 Assume good condition Pond 100 0 0.00 Commercial 92 0 0.00 Industrial 1 88 1 0 1 0.00 Total area = Composite SCS CN = 114.98 acres 5,008,466 sq. ft 79 Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 Sub 1 to Lake Daniel Gunter 12.16.2019 B. Time of Concentration Information Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Length = Height = Slope = Manning's n = P (2-year/24-hour) = Segment Time = Segment 3: Channel Flow Length = Height = Slope = Manning's n = Flow Area = Wetted Perimeter= Channel Velocity= Segment Time = 100 ft 3 ft 0.0300 ft/ft 0.24 dense grasses 3.45 inches (Wake Forest, NC) 11.69 minutes 1485 ft 54 ft 0.0364 ft/ft 0.045 Natural Channel 4.00 sf (Assume 2' x 2' Channel) 6.00 ft (Assume 2' x 2' Channel) 4.82 ft/sec minutes Segment 2: Concentrated Flow Length = 680 ft Height = 40 ft Slope = 0.0588 ft/ft Paved ? = No Velocity = 3.91 ft/sec Segment Time = 2.90 minutes Time of Concentration = 19.72 minutes SCS Lag Time = 11.83 minutes (SCS Lag = 0.6* Tc) Time Increment = 3.43 minutes (= 0.29*SCS Lag) Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 Sub 1 Bypass Daniel Gunter 12.16.2019 Assume: HSG Impervious Open Wooded 1/8 ac lots 1/4 ac lots Commercial Industrial A 98 39 30 77 61 89 81 B 98 61 55 85 75 92 88 C 98 74 70 90 83 94 91 D 98 80 77 92 87 95 93 HSG 'A' = 0.0% HSG 'B' = 0.0% HSG 'C' = 0.0% HSG 'D' = 100.0% Cover Condition SCS CN Comments Impervious 98 Open 80 Assume good condition Wooded 77 Assume good condition Residential 1/8 ac) 92 Assume 1/8 acre lots Residential 1/4 ac) 87 Assume 1/4 acre lots Commercial 95 Industrial 93 II. POST -DEVELOPMENT _ A. Watershed Breakdown ;ontributing Area # of Units Area / Unit ype'A'TotalImp. 5 3658 e'B'TotalImp. 3 3214 ype 'C'Total Imp. 0 3384 Type 'D'Total 0 3028 Type 'E'Total 0 2406 Contributing Area SCS CN Area sf Area acres Comments Impervious 98 70,794 1.63 Open 80 317,776 7.30 Assume good condition Wooded 77 87,295 2.00 Assume good condition Pond 100 0 0.00 - Residential (1/8 ac) 92 0 0.00 Assume 1/8 acre lots Residential (1/4 ac) 87 0 0.00 Assume 1/4 acre lots Commercial 95 0 0.00 Industrial 93 0 0.00 Total area = Composite SCS CN = 10.92 acres 475,865 sq.ft 82 Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY RAP-19000 Sub 1 Bypass B. Time of Concentration Information Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 ft Length = 251 ft Height = 9 ft Height = 25 ft Slope = 0.0900 ft/ft Slope = 0.0996 ft/ft Manning's n = 0.24 dense grasses Paved ? = No P (2-year/24-hour) = 3.45 inches (Wake Forest, NC) Velocity= 5.09 ft/sec Segment Time = 7.53 minutes Segment Time = 0.82 minutes Segment 3: Channel Flow Length = Height = Slope = Manning's n = Flow Area = Wetted Perimeter= Channel Velocity = Segment Time = 512 ft 36 ft 0.0703 ft/ft 0.045 Natural Channel 2.00 sf (Assume 2' x 1' Channel) 4.00 ft (Assume 2' x 1' Channel) 5.53 ft/sec 1.54 minutes Time of Concentration = 9.89 minutes SCS Lag Time = 5.94 minutes (SCS Lag = 0.6* Tc) Time Increment = 1.72 minutes (= 0.29*SCS Lag) Maria Torres, E.I. Daniel Gunter 12.16.2019 Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 4 to SCM A Daniel Gunter 12.16.2019 I. SCS CURVE NUMBERS HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 Assume: II. POST -DEVELOPMENT A. Impervious Breakdown HSG 'A' = 38.6% HSG'B'= 0.0% HSG 'C' = 28.6% HSG'D'= 32.8% Cover Condition SCS CN Comments Impervious 98 Open 62 Assume good condition Wooded 57 Assume good condition Contributing Area # of Units Area / Unit Area [sf] Area [ac] 24-ft (TH) Lot Impervious 0 1,946 0 0.00 W 34-ft Lot Impervious 16 2,850 45,600 1.05 Q 40-ft Lot Impervious 11 3,400 37,400 0.86 J = 50-ft Lot Impervious 2 3,850 7,700 0.18 C55-ft Lot Impervious 4 3,850 15,400 0.35 2 75-ft Lot Impervious 1.5 5,850 8,775 0.20 j Right-of-way Impervious - - 103,474 2.38 = Apartments 80%) - 230,661 5.30 Totals 34.5 449,010 10.31 B. Watershed Breakdown * Apartments assumed 80% impervious Contributing Area SCS CN Area sf Area acres Comments Impervious 98 449,010 10.31 Open 62 254,186 5.84 Assume good condition Wooded 57 92,891 2.13 Assume good condition Pond 100 18,040 0.41 C. Time of Concentration Information Time of concentration is assumed to be 5 minutes. Total area = 18.69 acres 814,127 sq. feet Composite SCS CN = 82 Impervious = 55.2% Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) Time Increment = 0.87 minutes (= 0.29*SCS Lag) Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 4 Bypass Daniel Gunter 12.16.2019 I. SCS CURVE NUMBERS Assume: HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 HSG 'A' = 38.6% HSG 'B' = 0.0% HSG 'C' = 28.6% HSG 'D' = 32.8% Cover Condition SCS CN Comments Impervious 98 Open 62 Assume good condition Wooded 57 Assume good condition JJW-DEVELOPMEN A. Impervious Breakdown Contributing Area # of Units Area Unit Area [sf] Area ac 24-ft TH Lot Impervious 0 1,946 0 0.00 w 34-ft Lot Impervious 0 2,850 0 0.00 >z g 40-ft Lot Impervious 0 3,400 0 0.00 = 50-ft Lot Impervious 7 3,850 26,950 0.62 55-ft Lot Impervious 2.5 3,850 9,625 0.22 Z 75-ft Lot Impervious 3 5,850 17,550 0.40 > Ri ht-of-wayImpervious - - 0 0.00 = Other - 0 0.00 Totals 12.5 54,125 1.24 B. Watershed Breakdown Contributing Area SCS CN Areas Area acres Comments Impervious 98 54,125 1.24 Open 62 80,090 1.84 Assume good condition Wooded 57 82,777 1.90 Assume good condition Pond 100 0 0.00 Total area = Composite SCS CN = % Impervious = 4.98 acres 216,992 sq. feet 69 24.9% Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 4 Bypass Daniel Gunter 12.16.2019 C. Time of Concentration Information Time of concentration is assumed to be 5 minutes. Segment 1: Overland Flow Length = Top Elev= Bot Elev= Height = Slope = Manning's n = P (2-year/24-hour) = Segment Time = 59 270.00 246.00 24 0.4068 0.40 3.45 4.06 ft ft ft ft ft/ft wooded Inches (Wake Forest, NC) minutes Segment 2: Channel Flow Length = 589 Top Elev= 246.00 BotElev= 242.00 Height = 4 Slope = 0.0068 Manning's n = 0.045 Flow Area = 4.00 Wetted Perimeter = 6.00 Channel Velocity = 2.08 Segment Time = 4.71 Time of Concentration = 8.78 minutes SCS Lag Time = 5.27 minutes (SCS Lag = 0.6* Tc) Time Increment = 1.53 minutes (= 0.29*SCS Lag) ft ft/ft natural channel sf (assume 2'w x 2'h channel) If (assume 2' x 2' channel) ft/sec minutes Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 5 to SCM 8 Daniel Gunter 12.16.2019 I. SCS CURVE NUMBERS HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 Assume: II. POST -DEVELOPMENT A. Impervious Breakdown HSG 'A' = 38.6% HSG'B'= 0.0% HSG 'C' = 28.6% HSG'D'= 32.8% Cover Condition SCS CN Comments Impervious 98 Open 62 Assume good condition Wooded 57 Assume good condition Contributing Area # of Units Area / Unit Area [sf] Area [ac] 24-ft (TH) Lot Impervious 10 1,846 18,460 0.42 W 34-ft Lot Impervious 19 2,750 52,250 1.20 Q 40-ft Lot Impervious 9 3,300 29,700 0.68 J = 50-ft Lot Impervious 7 3,750 26,250 0.60 C55-ft Lot Impervious 0 3,750 0 0.00 z 75-ft Lot Impervious 0 5,750 0 0.00 j Right-of-way Impervious - - 119,960 2.75 = Apartments (70%) - 97,469 2.24 Totals 45 344,089 7.90 B. Watershed Breakdown Contributing Area SCS CN Area sf Area acres Comments Impervious 98 344,089 7.90 Open 62 142,341 3.27 Assume good condition Wooded 57 67,375 1.55 Assume good condition Pond 100 11,625 0.27 C. Time of Concentration Information Time of concentration is assumed to be 5 minutes. Total area = 12.98 acres 565,430 sq. feet Composite SCS CN = 84 Impervious = 60.9% Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) Time Increment = 0.87 minutes (= 0.29*SCS Lag) Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 5 Bypass Daniel Gunter 12.16.2019 I. SCS CURVE NUMBERS HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 Assume: II. POST -DEVELOPMENT A. Impervious Breakdown HSG 'A' = 38.6% HSG'B'= 0.0% HSG 'C' = 28.6% HSG'D'= 32.8% Cover Condition SCS CN Comments Impervious 98 Open 62 Assume good condition Wooded 57 Assume good condition Contributing Area # of Units Area / Unit Area [sf] Area [ac] 24-ft (TH) Lot Impervious 0 1,946 0 0.00 W 34-ft Lot Impervious 0 2,850 0 0.00 Q 40-ft Lot Impervious 0 3,400 0 0.00 J = 50-ft Lot Impervious 1.5 3,850 5,775 0.13 C55-ft Lot Impervious 1.5 3,850 5,775 0.13 z 75-ft Lot Impervious 0 1 5,850 1 0 1 0.00 j Right-of-way Impervious - - 3,354 0.08 = Other - 0 0.00 Totals 3 14,904 0.34 B. Watershed Breakdown Contributing Area SCS CN Area sf Area acres Comments Impervious 98 14,904 0.34 Open 62 41,881 0.96 Assume good condition Wooded 57 67,375 1.55 Assume good condition Pond 100 0 0.00 Total area = Composite SCS CN = Impervious = 2.85 acres 124,160 sq. feet 64 12.0 Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY RAP-19000 5 Bypass C. Time of Concentration Information Time of concentration is assumed to be 5 minutes. Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 ft Length = 24 ft Top Elev = 302.00 ft Top Elev = 266.00 ft Bot Elev = 266.00 ft Bot Elev = 258.00 ft Height = 36 ft Height = 8 ft Slope = 0.3604 ft/ft Slope = 0.3333 ft/ft Manning's n = 0.24 dense grasses Paved ? = No P (2-year/24-hour) = 3.45 inches (Wake For Velocity = 9.32 ft/sec Segment Time= 4.32 minutes Segment Time= 0.04 minutes Segment 3: Channel Flow Length = 906 ft Top Elev = 258.00 Bot Elev = 245.00 Height = 13 ft Slope = 0.0143 ft/ft Manning's n = 0.045 natural channel Flow Area = 8.00 sf (assume 4'w x 2'h channel) Wetted Perimeter = 8.00 If (assume 4' x 2' channel) Channel Velocity= 3.97 ft/sec Segment Time= 3.81 minutes Time of Concentration = 8.17 minutes SCS Lag Time = 4.90 minutes (SCS Lag = 0.6* Tc) Time Increment = 1.42 minutes (= 0.29*SCS Lag) Maria Torres, E.I. Daniel Gunter 12.16.2019 Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 Sub 6 Daniel Gunter 12.16.2019 Assume., HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 HSG 'A' = 38.6% HSG 'B' = 0.0% HSG 'C' = 28.6% HSG 'D' = 32.8% Cover Condition SCS CN Comments Impervious 98 Open 62 Assume good condition Wooded 57 Assume good condition A. Impervious Breakdown Contributing Area # of Units Area / Unit Area [sf] Area [ac] 24-ft (TH) Lot Impervious 0 1,946 0 0.00 w 34-ft Lot Impervious 0 2,850 0 0.00 >z g 40-ft Lot Impervious 0 3,400 0 0.00 = 50-ft Lot Impervious 4.5 3,850 17,325 0.40 55-ft Lot Impervious 0 3,850 0 0.00 Z 75-ft Lot Impervious 0 5,850 0 0.00 > Right-of-way Impervious - - 0 0.00 = Other 0 0.00 Totals 4.5 17,325 0.40 B. Watershed Breakdown Contributing Area SCS CN Areas Area acres Comments Impervious 98 17,325 0.40 Open 62 22,822 0.52 Assume good condition Wooded 57 47,146 1.08 Assume good condition Pond 100 0 0.00 Total area = Composite SCS CN = % Impervious = 2.00 acres 87,293 sq. feet 66 19.8% Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 Sub 6 Daniel Gunter 12.16.2019 C. Time of Concentration Information Time of concentration is assumed to be 5 minutes. Segment 1: Overland Flow Length = Top Elev = Bot Elev = Height = Slope = Manning's n = P (2-year/24-hour) = Segment Time = 63 ft 305.50 ft 298.00 ft 7.5 ft 0.1190 ft/ft 0.24 wooded 3.45 inches (Wake Forest, NC) 4.65 minutes Segment 2: Channel Flow Length = 801 Top Elev = 298.00 BotElev = 266.00 Height = 32 Slope = 0.0400 Manning's n = 0.045 Flow Area = 6.00 Wetted Perimeter = 7.00 Channel Velocity= 5.97 Segment Time = 2.24 Time of Concentration = 6.89 minutes SCS Lag Time = 4.13 minutes (SCS Lag = 0.6* Tc) Time Increment = 1.20 minutes (= 0.29*SCS Lag) ft ft ft/ft natural channel sf (assume 3'w x 2'h channel) If (assume Tx 2' channel) ft/sec minutes Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 7 to SCM C Daniel Gunter 12.16.2019 I. SCS CURVE NUMBERS HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 Assume: II. POST -DEVELOPMENT A. Impervious Breakdown HSG 'A' = 38.6% HSG'B'= 0.0% HSG 'C' = 28.6% HSG'D'= 32.8% Cover Condition SCS CN Comments Impervious 98 Open 62 Assume good condition Wooded 57 Assume good condition Contributing Area # of Units Area / Unit Area [sf] Area [ac] 24-ft (TH) Lot Impervious 0 1,946 0 0.00 W 34-ft Lot Impervious 17.5 2,850 49,875 1.14 Q 40-ft Lot Impervious 4 3,400 13,600 0.31 J = 50-ft Lot Impervious 10 3,850 38,500 0.88 C55-ft Lot Impervious 3 3,850 11,550 0.27 z 75-ft Lot Impervious 0 5,850 0 0.00 j Right-of-way Impervious - - 105,212 2.42 = Amenity (10%) - 2,032 0.05 Totals 34.5 220,769 5.07 B. Watershed Breakdown Contributing Area SCS CN Area sf Area acres Comments Impervious 98 220,769 5.07 Open 62 173,522 3.98 Assume good condition Wooded 57 0 0.00 Assume good condition Pond 100 17,453 0.40 C. Time of Concentration Information Time of concentration is assumed to be 5 minutes. Total area = 9.45 acres 411,744 sq. feet Composite SCS CN = 83 Impervious = 53.6% Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) Time Increment = 0.87 minutes (= 0.29*SCS Lag) Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 7 Byposs Daniel Gunter 12.16.2019 W*41Nltl,tl401111JA104 11 HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 Assume: TM201.1 dr];ktl4[i11JAl4'1Y i A. Impervious Breakdown HSG 'A' = 38.6% HSG'B'= 0.0% HSG 'C' = 28.6% HSG'D'= 32.8% Cover Condition SCS CN Comments Impervious 98 Open 62 Assume good condition Wooded 57 Assume good condition Contributing Area # of Units Area / Unit Area [sf] Area [ac] 24-ft (TH) Lot Impervious 0 1,946 0 0.00 W 34-ft Lot Impervious 0 2,850 0 0.00 Q 40-ft Lot Impervious 0 3,400 0 0.00 J = 50-ft Lot Impervious 0 3,850 0 0.00 C55-ft Lot Impervious 0 3,850 0 0.00 z 75-ft Lot Impervious 0 1 5,850 1 0 1 0.00 j Right-of-way Impervious - - 0 0.00 = Other - 0 0.00 Totals 0 0 0.00 B. Watershed Breakdown Contributing Area SCS CN Area sf Area acres Comments Impervious 98 0 0.00 Open 62 74,031 1.70 Assume good condition Wooded 57 37,863 0.87 Assume good condition Pond 100 0 0.00 Total area = Composite SCS CN = Impervious = 2.57 acres 111,894 sq. feet 61 0.0 Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY RAP-19000 7 Bypass III. TIME OF CONCENTRATION INFORMATION Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Length = 100 Top Elev = 328.00 Bot Elev = 310.00 Height = 18 Slope = 0.1800 Manning's n = 0.40 Z-year/24-hour) = 3.45 Segment Time = 8.59 Time of Concentration = SCS Lag Time = ft ft ft ft ft/ft wooded inches (Wake Forest, NC) minutes Segment 2: Channel Flow Length = 656 Top Elev = 310.00 Bot Elev = 297.00 Height = 13 Slope = 0.0198 Manning's n = 0.045 Flow Area = 6.00 Wetted Perimeter= 7.00 Channel Velocity = 4.21 Segment Time = 2.60 11.19 minutes 6.71 minutes (SCS Lag = 0.6* Tc) Maria Torres, E.I. Daniel Gunter 12.16.2019 ft ft/ft natural channel sf (assume 3'w x 2'h channel) If (assume 3' x 2' channel) ft/sec minutes Holding Village - North Lake POST -DEVELOPMENT HYDROLOGY Maria Torres, E.I. RAP-19000 Reach Daniel Gunter 12.16.2019 Reach 1: Channel Flow Length = 587 ft Top Elev = 245.00 Bot Elev = 241.00 Height = 4 ft Slope = 0.0068 ft/ft Manning's n = 0.045 natural channel Flow Area = 12.00 sf (assume 4'w x 3'h channel) Wetted Perimeter = 12.00 If (assume 4' x 3' channel) Channel Velocity= 2.73 ft/sec Segment Time = 3.68 minutes Reach 2: Channel Flow Length = 1002 ft Top Elev = 266.00 Bot Elev = 245.00 Height = 21 ft Slope = 0.0210 ft/ft Manning's n = 0.045 natural channel Flow Area = 8.00 sf (assume 4'w x 2'h channel) Wetted Perimeter = 8.00 If (assume 4' x 2' channel) Channel Velocity= 4.79 ft/sec Segment Time = 3.48 minutes Reach 3: Channel Flow Length = 985 ft Top Elev = 297.00 Bot Elev = 266.00 Height = 31 ft Slope = 0.0315 ft/ft Manning's n = 0.045 natural channel Flow Area = 6.00 sf (assume 3'w x 2'h channel) Wetted Perimeter = 7.00 If (assume Tx 2' channel) Channel Velocity= 5.30 ft/sec Segment Time = 3.10 minutes