Loading...
HomeMy WebLinkAboutNC0034452_Authorization to Construct_20191218 4,02X'Llty ROY COOPER tA Governor pe MICHAEL S.REGAN Secretary . * LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality December 18, 2019 Mr. Michael A. Melton Engineering Manager Aqua North America, Inc 4163 Sinclair Street Denver, North Carolina 28037 SUBJECT: Authorization to Construct A to C No. 034452A03 Aqua North America, Inc Willow Creek Subdivision WWTP NPDES Permit No. NC0034452 Dear Mr. Melton: A Permit Application package for an Authorization to Construct (ATC) Permit was received October 11 2019,by the Division of Water Resources (Division). This Authorization to Construct Permit is issued based solely upon the North Carolina Licensed Professional Engineer's certification and the Applicant's certification of the ATC Permit Application package. The Division has waived the technical review of the plans, specifications, calculations and other supporting documentation included in the subject ATC Permit Application package. Note that the ATC Permit Application package may be subject to a Division audit. This ATC results in no increase in design or permitted capacity of the existing 0.08 MGD Willow Creek Subdivision WWTP and is hereby issued for the construction of the following specific modifications: Demolition of existing 0.04 MGD steel package treatment system, equalization tank, sludge holdingtank, aeration basin, final clarifier; relocation of existingstorage shed, storage rack and g g sampler; replacement of existing chlorine contact chamber with re-aeration and water effluent pump station consisting of two (2) 195 GPM 3 HP submersible pumps; construction of new 0.04 MGD concrete package wastewater treatment plant consisting of one (1) new mechanical bar screen with capacity of 1.26 MGD at peak hourly flow, one (1) 20,426 gallons flow equalization basin (EQ) with two (2) 195 GPM 3 HP submersible EQ pumps and one (1) 5 HP rotary lobe PD blower capable of providing 82 SCFM of air, one(1) new 50,385 gallons aeration basin with two (2) 40 HP rotary lobe PD blowers capable of providing 632 SCFM of air, one (1) 144 square feet rectangular secondary clarifier,one(1)21,788 gallons sludge holding basin with two(2)3 HP NORTHD_EQ�� �1.North Carolina Department of Environmental Quality I Division of Water Resources S12 North Salisbury Street 11611 Mail Service Center I Raleigh,North Carolina 27699-1611 010 7l17 14111 Mr.Michael A. Melton,Engineering Manager December 18,2019 Page 2 of 3 rotary lobe PD blowers capable of providing 30 SCFM of air;installation of new sodium hydroxide feed system consisting of 55 gallons tank, one (1) pump at 20 psig; installation of all required piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0034452 issued effective June 1,2019,and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0034452. It is the Owner's responsibility to ensure that the as-constructedpr oject ty p oject meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number(336) 776-9800, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Page 2 of 3 Mr.Michael A.Melton,Engineering Manager December 18, 2019 Page 3 of 3 Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act,and when applicable,the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes,rules,regulations,or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Qais Banihani at telephone number(919) 707-3607. Sincerely, inda Cul'8-1 e Director, Division of Water Resources With Engineer's Certificate attached: cc: DWR Winston-Salem Regional Office, Water Quality Programs Central Files ecopy: David F. Schrader, P.E. Howard K. Bell Consulting Engineers, Inc. Email: dschrader@hkbell.com NPDES File Without Engineer's Certificate attached: cc: Davidson County Health Page3of3 Aqua North America, Inc. Willow Creek Subdivision WWTP Authorization to Construct No. 034452A03 Issued December 18,2019 NPDES Permit No.NC0034452 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina,having been authorized to observe(periodically/weekly/full time)the construction of the modifications and improvements to the Willow Creek Subdivision Wastewater Treatment Plant,located in Davidson County,hereby state that,to the best of my abilities,due care and diligence was used in the observation of the following construction: Demolition of existing 0.04 MGD steel package treatment system,equalization tank,sludge holding tank, aeration basin, final clarifier; relocation of existing storage shed, storage rack and sampler; replacement of existing chlorine contact chamber with re-aeration and water effluent pump station consisting of two(2) 195 GPM 3 HP submersible pumps; construction of new 0.04 MGD concrete package wastewater treatment plant consisting of one(1)new mechanical bar screen with capacity of 1.26 MGD at peak hourly flow, one (1) 20,426 gallons flow equalization basin (EQ) with two (2) 195 GPM 3 HP submersible EQ pumps and one (1) 5 HP rotary lobe PD blower capable of providing 82 SCFM of air, one (1) new 50,385 gallons aeration basin with two (2) 40 HP rotary lobe PD blowers capable of providing 632 SCFM of air, one (1) 144 square feet rectangular secondary clarifier, one (1) 21,788 gallons sludge holding basin with two (2) 3 HP rotary lobe PD blowers capable of providing 30 SCFM of air; installation of new sodium hydroxide feed system consisting of 55 gallons tank, one (1) pump at 20 psig; installation of all required piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans,specifications,and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date Mail this Certification to: Attn: Min Xiao SEAL Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh,NC 27699-1617