Loading...
HomeMy WebLinkAboutNCS000393_Gaston Co. Post Construction Permit_20071115il Gaston County Natural Resources Department Gaston Soil and Water Conservation District 1303 Cherryville Highway — Dallas, North Carolina 28034 Phone: (704) 922-4181 — Fax:(704)922-2158 November 15, 2007 Bojangles Restaurants, Inc. Attn: Claude Clark 9432 Southern Pine Boulevard Charlotte, NC 28273 Subj: BOJANGLES POST CONSTRUCTION STORMWATER PERMIT # 5 Dear Bojangles Restaurants, Inc., 1. Gaston Natural Resources Department received a complete Stormwater Control Plan Application Bojangles on November 15, 2007. Staff review of the plans and specifications determined that the project, as proposed, will comply with Gaston County's Stormwater Ordinance. This Stormwater Permit is Approved, contingent upon submission of the following documents: a) A surety performance bond for 125% of the total construction costs of the system and devices. A bond may be funded through an insurance company, as a letter of credit from a bank, or cash. Construction estimates are required from three independent parties. One must be a Professional Engineer, a General Contractor, and a second Professional Engineer or General Contractor. The highest bid amount should be bonded, payable to Gaston County, with a term set to expire twenty- four months following the completion of construction. b) An electronic file of the stormwater outfalls that is readable by GIS systems, geo-referenced to the NC State Plane 1983 (Feet) or latitude and longitude of outlet structure. 2. Your Stormwater Permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein. Please pay special attention to your Operation and Maintenance requirements. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. 3. Section 11, As -built Plans and Specifications, of the Stormwater Ordinance shall be validated at completion of the project. Note that a Certificate of Compliance or Occupancy will not be issued without as -built plans or certification of previously submitted plans. 4. Be advised of the annual inspection report, maintenance agreement/restrictive covenant, and record easements for access, maintenance, and inspections required under Section 18, Assurance that Improvements will be Maintained, in Gaston County's Stormwater Ordinance. 5. If any parts, requirements, or limitations contained in this permit are unacceptable, or you need additional information concerning this permit, please contact Gaston Natural Resources Stormwater Division at (704) 922-4181. We look forward to working with you throughout this project. Sincerely, AV Joseph D. Alm Stormwater Administrator cc: Brian Upton, PE