HomeMy WebLinkAboutNCS000393_Gaston Co. ESC Ordinance_20191204Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
Soil Erosion and Sedimentation
Control Ordinance
For
Gaston County,
North Carolina
SOIL EROSION AND SEDIMENTATION
CONTROL ORDINANCE
FOR
GASTON COUNTY, NORTH CAROLINA
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
Section 1 Title
This Ordinance may be cited as the Gaston County Soil Erosion and Sedimentation
Control Ordinance.
Section 2 Purpose
This ordinance is adopted for the purposes of:
a. Regulating certain land -disturbing activity to control accelerated erosion and
sedimentation in order to prevent the pollution of water and other damage to
lakes, watercourses, and other public and private property by sedimentation; and
b. Establishing procedures through which these purposes can be fulfilled.
Section 3 Jurisdiction
The Gaston County Board of Commissioners hereby adopts this Ordinance. The
ordinance applies to all portions of Gaston County, except for that property within the city
limits of the incorporated municipalities of Gaston County. However, this Ordinance may
later be adopted to also apply within other regions upon proper resolution duly adopted
by the governing bodies of the respective regions and the Commissioners. Wherever
conflicts exist between federal, state, or local laws, ordinances, or rules, the more
restrictive provision shall apply.
Section 4 Definitions
As used in this ordinance, unless the context clearly indicates otherwise, the following
definitions apply:
a. Accelerated Erosion - means any increase over the rate of natural erosion as a
result of land -disturbing activity.
b. Act - means the North Carolina Sedimentation Pollution Control Act of 1973 and
all rules and orders adopted pursuant to it.
C. Adequate Erosion Control Measure, Structure, or Device - means one which
controls the soil material within the land area under responsible control of the
person conducting the land -disturbing activity.
d. Affiliate - a person that directly, or indirectly through one or more intermediaries,
controls, is controlled by, or is under common control of another person.
-2
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
e. Being Conducted - means a land -disturbing activity has been initiated and
permanent stabilization of the site has not been completed.
f. Borrow - means fill material, which is required for on -site construction and is
obtained from other locations.
g. Buffer Zone - means the strip of land adjacent to a lake or natural watercourse.
h. Final Certificate of Occupancy - means the document required by the North
Carolina State Building Code certifying that a new building shall not be occupied
or a change made in occupancy, nature or use of a building until after all required
building and services systems have been inspected for compliance with the
technical codes and other applicable laws and ordinances and released by the
Gaston County Code Enforcement Department.
i. Commission - means the North Carolina Sedimentation Control Commission.
j. Completion of Construction or Development - means that no further land -
disturbing activity is required on a phase of a project except that which is
necessary for establishing a permanent ground cover.
k. Department - means the North Carolina Department of Environment and Natural
Resources.
I. Director - means the Director of the Division of Land Resources of the North
Carolina Department of Environment and Natural Resources.
M. Discharge Point - means that point at which run-off leaves a tract of land.
n. District - means the Gaston Soil and Water Conservation District created
pursuant to Chapter 139, North Carolina General Statutes.
o. Energy Dissipater - means a structure or a shaped channel section with
mechanical armoring placed at the outlet of pipes or conduits to receive and
break down the energy from high velocity flow.
p. Erosion - means the wearing away of land surface by the action of wind, water,
gravity, or any combination thereof.
q. Gaston County Environmental Review Board - means the Gaston County
Environmental Review Board.
r. Ground Cover - means any natural vegetative growth or other material that
renders the soil surface stable against accelerated erosion.
S. High Quality Waters - means those classified as such in 15A NCAC 2B.0101 (e)
(5) - General Procedures, which is incorporated herein by reference to include
further amendments.
t. High Quality Water (HQW) Zones - means areas in the Coastal Counties that are
-3
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
within 575 feet of High Quality Waters and for the remainder of the state areas
that are within one mile and drain to HQW's.
U. Lake or Natural Watercourse - means any stream, river, brook, swamp, sound,
bay, creek, run, branch, canal, waterway, estuary, and any reservoir, lake or
pond, natural or impounded, in which sediment may be moved or carried in
suspension, and which could be damaged by accumulation of sediment.
V. Land -Disturbing Activity - means any use of the land by any person in residential,
industrial, educational, institutional, or commercial development, highway and
road construction and maintenance that results in a change in the natural cover
or topography and that may cause or contribute to sedimentation.
W. Local Government - means any county, incorporated village, town, or city, or any
combination of counties, incorporated villages, towns, and cities, acting through a
joint program pursuant to the provisions of the Act.
X. May — means contingent upon the discretion of the Gaston Natural Resources
Department Director.
y. Natural Erosion - means the wearing away of the earth's surface by water, wind,
or other natural agents under natural environmental conditions undisturbed by
man.
Z. Parent - an affiliate that directly, or indirectly through one or more intermediaries,
controls another person.
aa. Person - means any individual, partnership, firm, association, joint venture, public
or private corporation, trust, estate, commission, board, public or private
institution, utility, cooperative, interstate body, or other legal entity.
bb. Person Conducting Land -Disturbing Activity - means any person who may be
held responsible for a violation unless expressly provided otherwise by this
Ordinance, the Act, or any other order adopted pursuant to this Ordinance or the
Act.
cc. Person Responsible for the Violation - as used in this Ordinance, and G.S.
113A-64, means:
the developer or other person who has or holds himself out as having
financial or operational control over the land -disturbing activity; or
the landowner or person in possession or control of the land when he
has directly or indirectly allowed the land -disturbing activity or has
benefited from it or he has failed to comply with any provision of this
Ordinance, the Act, or any order adopted pursuant to this Ordinance or
the Act as imposes a duty upon him.
dd. Phase of Grading - means one or two types of grading, rough or fine.
-4
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
ee. Plan - means an Erosion and Sedimentation Control Plan.
ff. Recurring Violation — means a violation that has not been corrected within the
time specified by the Gaston Natural Resources Department, or, a reoccurrence
of a violation from which a previous notice has been issued, not withstanding
natural occurrences exceeding design requirements.
gg. Sediment - means solid particulate matter, both mineral and organic, that has
been or is being transported by water, air, gravity, or ice from its site of origin.
hh. Sedimentation - means the process by which sediment resulting from
accelerated erosion has been or is being transported off the site of the land -
disturbing activity or into a lake or natural watercourse.
Shall — means a requirement.
jj. Storm Drainage Facilities - means the system of inlets, conduits, channels,
ditches, and appurtenances which serve to collect and convey storm water
through and from a given drainage area.
kk. Storm Water Run-off - means the surface flow of water resulting from
precipitation in any form and occurring immediately after rainfall or melting.
Subsidiary — an affiliate that is directly, or indirectly, through one or more
intermediaries, controlled by another person.
mm. Ten -Year Storm - means the surface run-off resulting from a rainfall of an
intensity expected to be equaled or exceeded, on the average, once in ten (10)
years, and of a duration which will produce the maximum peak rate of run-off,
from the watershed of interest under average antecedent wetness conditions.
nn. Tract - means all contiguous land and bodies of water being disturbed or to be
disturbed as a unit, regardless of ownership.
oo. Twenty -Five Year Storm - means the surface run-off resulting from a rainfall of an
intensity expected to be equaled or exceeded, on the average, once in twenty-
five (25) years, and of a duration which will produce the maximum peak rate of
run-off, from the watershed of interest under average antecedent wetness
conditions.
pp. Uncovered - means the removal of ground cover from, on, or above the soil
surface.
qq. Undertaken - means the initiating of any activity, or phase of activity, which
results or will result in a change in the ground cover or topography of a tract of
land.
rr. Velocity — means the average speed of flow through the cross-section of the
main channel at the peak flow of the storm of interest. The cross-section of the
main channel shall be that area defined by the geometry of the channel plus the
-5
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
area of the flow below the flood height defined by vertical lines at the main
channel banks. Overload flows are not to be included for the purpose of
computing velocity of flow.
ss. Waste - means surplus materials resulting from on -site land -disturbing activities
and being disposed of at other locations.
tt. Working Days - means days, exclusive of Saturday and Sunday during which
weather conditions or soil conditions permit land -disturbing activity to be
undertaken.
Section 5 Scope and Exclusions
This Ordinance shall not apply to the following land -disturbing activities:
a. activities, including the breeding and grazing of livestock, undertaken on
agricultural land for the production of plants and animals useful to man, including,
but not limited to:
1. forages and sod crops, grains and feed crops, tobacco, cotton, and
peanuts.
2. dairy animals and dairy products.
3. poultry and poultry products.
4. livestock, including beef cattle, llamas, sheep, swine, horses, ponies,
mules, and goats.
5. bees and apiary products.
6. fur producing animals
b. activities undertaken on forestland for the production and harvesting of timber and
timber products and conducted in accordance with Best Management Practices set
out in "Forest Practice Guidelines Related to Water Quality," as adopted by the
Department. If land -disturbing activity undertaken on forestland for the production
and harvesting of timber and timber products is not conducted in accordance with
"Forest Practice Guidelines Related to Water Quality," the provisions of this
Ordinance shall apply to such activity and any related land -disturbing activity on the
tract; and
c. activities for which a permit is required under the Mining Act of 1971, Article 7 of
Chapter 74 of the General Statutes.
d. land -disturbing activity over which the State has exclusive regulatory jurisdiction
as provided in G.S. 113A-56. (a). The Commission shall have jurisdiction, to the
exclusion of local governments, to adopt rules concerning land -disturbing activities
that are: (1) conducted by the State; (2) conducted by the United States; (3)
conducted by persons having the power of eminent domain; (4) conducted by local
governments; or (5) funded in whole or in part by the State or the United States.
e. for the duration of an emergency, activities essential to protect human life.
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
Section 6 General Requirements and Objectives
a. Plan Required - No person shall initiate any land -disturbing activity which
uncovers one (1) acre or more, or projects less than one acre that are part of a
larger common plan of development or sale, without having an Erosion and
Sedimentation Control Plan approved by the Gaston County Natural Resources
Department, and in borrow and waste areas covered by Section 11 with a
disturbed area one (1) acre or greater. In determining the area lands under one
or diverse ownership being developed as a unit will be aggregated.
b. Compliance - Person who submits a Plan to the Gaston County Natural
Resources Department shall comply with the provisions of Section 18 of this
Ordinance.
C. Protection of Property - Persons conducting land -disturbing activity shall take all
reasonable measures to protect all public and private property from
sedimentation siltation caused by such activity.
d. More Restrictive Rules Shall Apply - Whenever conflicts exist between federal,
state, or local laws, ordinances, or rules, the more restrictive provision shall
apply.
Section 7 Basic Control Objectives
A Plan may be disapproved pursuant to Section 18 of this Ordinance if the Plan fails to
address the following control objectives:
a. Identify Critical Areas - On -site areas, which are subject to severe erosion, and
off -site areas, which are especially vulnerable to severe erosion and/or
sedimentation are to be identified.
b. Limit Time of Exposure - All land -disturbing activity is to be planned and
conducted to limit exposure to the shortest feasible time.
C. Limit Exposed Areas - All land -disturbing activity is to be planned and conducted
to minimize the size of the area to be exposed at any time.
d. Control Surface Water- Surface water run-off originating upgrade of exposed
areas shall be controlled to reduce erosion and sediment loss during the period
of exposure.
e. Control Sedimentation - All land -disturbing activity is to be planned and
conducted so as to prevent off -site sedimentation damage to the extent required
by the Act.
f. Manage Storm Water Run-off - When the increase in the velocity of storm water
run-off resulting from a land -disturbing activity is sufficient to cause accelerate
erosion of the receiving watercourse, plans are to include measures to control
-7
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
the velocity at the point of discharge so as to minimize accelerated erosion of the
site and to decrease sedimentation to any lake or natural watercourse.
Section 8 Mandatory Standards for Land -disturbing Activity
No land -disturbing activity subject to the control of this Ordinance shall be undertaken
except in accordance with the following mandatory standards:
a. Buffer Zone
1. No land -disturbing activity during periods of construction or improvement to
land shall be permitted in proximity to a lake or natural watercourse unless a
Buffer Zone is provided along the margin of the watercourse of sufficient
width to confine visible siltation within the twenty-five percent (25%) of the
buffer zone nearest the land disturbing activity. The minimum width of the
buffer zone shall not be less than ten feet (10'). Visible siltation must not
discharge through the Buffer Zone. This subdivision shall not apply to a
land -disturbing activity in connection with the construction of facilities to be
located on, over, or under a lake or natural watercourse.
2. Unless otherwise provided, the width of a Buffer Zone begins and is
measured at least ten feet (10') from the edge of the top of the bank of the
watercourse to the nearest edge of the disturbed area with the 25 percent of
the strip nearer the land -disturbing activity containing natural and or artificial
means of confining visible siltation. Natural or artificial means of confining
visible siltation must be placed, constructed or installed outside the
undisturbed Buffer Zone.
b. Graded Slopes and Fills - The angle for graded slopes and fills shall be no
greater than the angle that can be retained by vegetative cover or other adequate
erosion -control devices or structures. In any event, slopes left exposed will,
within 21 calendar days of completion of any phase of grading, be planted or
otherwise provided with temporary or permanent ground cover, devices, or
structures sufficient to restrain erosion.
C. Fill Material. Unless a permit from the Department's Division of Waste
Management to operate a landfill is on file for the official site, acceptable fill
material shall be free of organic or other degradable materials, masonry,
concrete and brick in sizes exceeding twelve (12) inches, and any materials
which would cause the site to be regulated as a landfill by the State of North
Carolina.
d. Ground Cover - Whenever land -disturbing activity that will disturb one or more acres
is undertaken on a tract the person conducting the land -disturbing activity shall install
such sedimentation and erosion control devices and practices as are sufficient to
retain the sediment generated by the land -disturbing activity within the boundaries of
the tract during construction upon and development of said tract, and shall plant or
otherwise provide a permanent ground cover sufficient to restrain erosion after
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
completion of construction or development. Except as provided in Section 9(b) (5) of
this Ordinance, provisions for a ground cover sufficient to restrain erosion must be
accomplished within fifteen (15) working days or ninety (90) calendar days
(whichever period is shorter), following completion of construction or development.
e. Prior Plan Approval - No person shall initiate any land -disturbing activity that will
disturb one or more acres on a tract unless, thirty (30) or more days prior to initiating
the activity, a Plan for the activity is filed with the Gaston County Natural Resources
Department. Should the Plan be filed, approved and a Certificate of Approved Plan
issued in less than thirty (30) days from the filing of the Plan, the land -disturbing
activity may commence.
f. Plan Compliance — The land -disturbing activity shall be conducted in accordance
with the approved erosion and sedimentation control plan.
g. Self -inspections — The person(s) conducting land -disturbing activity shall perform an
inspection of the area covered by the plan after each phase of the plan has been
completed and after establishment of temporary ground cover. Such inspection
reports shall be maintained and made available on -site. Any deviation from the plan
shall be documented. Records shall be maintained until permanent groundcover has
been established.
h. The person(s) (developer or other person who has or holds himself out as having
financial or operational control over the land -disturbing activity) conducting land -
disturbing activity or an agent of that party shall contact the Gaston County
Natural Resources Department at least 48 hours before commencement of the
land -disturbing activity.
The Gaston County Natural Resources Department may require an onsite
meeting with the person(s) conducting land -disturbing activity, or an agent of that
party, to review and discuss the approved Plan before commencement of the
land -disturbing activity.
Section 9 Design and Performance Standards
a. Except as provided in Section 9 (b) (2) of this Ordinance, erosion and sedimentation
control measures, structures, and devices shall be so planned, designed, and
constructed as to provide protection from the calculated maximum peak rate of run-
off from the ten-year storm.
Run-off rates can be calculated using the rational method, the Natural Resources
Conservation Service (NRCS) peak discharge method, or other acceptable methods.
b. In High Quality Water Zones (HQW) the following design standards shall apply:
1. Uncovered areas in HQW zones shall be limited at any time to a
maximum total area within the boundaries of the tract of twenty (20)
acres. Only this section shall govern the portion of the land -disturbing
activity within a HQW zone. Larger areas may be uncovered with the
written approval of the Director.
we
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
2. Erosion and sedimentation control measures, structures, and devices
within HQW zones shall be so planned, designed and constructed to
provide protection from the run-off of the twenty-five (25) year storm
which produces the maximum peak rate of run-off as calculated
according to procedures in the USDA, Natural Resource Conservation
Service's "National Engineering Field Manual for Conservation
Practices," or according to procedures adopted by any other agency of
this state or the United States or any generally recognized organization
or association.
Sediment basins within HQW zones shall be designed and constructed
such that the basin will have a settling efficiency of at least seventy
(70%) percent for the 40 micron (0.04 mm) size soil particle transported
into the basin by the run-off of that two-year storm which produces the
maximum peak rate of run-off as calculated according to the procedures
in the USDA, Natural Resources Conservation Service's "National
Engineering Field Manual for Conservation Practices" or according to
procedures adopted by any other agency of this state or the United
States or any generally recognized organization or association.
4. Newly constructed open channels in HQW zones shall be designed and
constructed with side slopes no steeper than two (2) horizontal to one (1)
vertical if a vegetative cover is used for stabilization unless soil
conditions permit a steeper slope or where the slopes are stabilized by
using mechanical devices or other acceptable ditch liners. In any event,
the angle for side slopes shall be sufficient to restrain accelerated
erosion.
Ground cover sufficient to restrain erosion must be provided for any
portion of a land -disturbing activity in a HQW zone within fifteen (15)
working days or sixty (60) calendar days following completion of any
phase of construction or development, whichever period is shorter.
Section 10 Storm Water Outlet Protection
a. Persons shall prepare a Plan that designs the post construction velocity of the
10-year storm run-off in the receiving watercourse to the discharge point that
does not exceed the greater of:
the velocity established by the table in Paragraph (d) of this section; or,
the velocity of the 10-year storm run-off in the receiving watercourse
prior to development.
If conditions one (1) or two (2) of this Paragraph cannot be met, then the
receiving watercourse to and including the discharge point shall be designed and
constructed to withstand the expected velocity anywhere the velocity exceeds the
"prior to development" velocity by ten (10%) percent.
-10
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
b. Acceptable Management Measures - Measures applied alone or in combination
to satisfy the intent of this section are acceptable if there are no objectionable
secondary consequences. The Commission recognizes that the management
of storm water run-off to minimize or control downstream channel and bank
accelerated erosion is a developing technology. Innovative techniques and
ideas will be considered and may be used when shown to have the potential to
produce successful results. Some alternatives are to:
1. avoid increases in surface run-off volume and velocity by including
measures to promote infiltration to compensate for increased run-off
from areas rendered impervious,
2. avoid increases in storm water discharge velocities by using vegetated
or roughened swales and waterways in lieu of closed drains and high
velocity paved sections,
3. provide energy dissipaters at outlets of storm drainage facilities to reduce
flow velocities to the point of discharge. These may range from simple
rip -rapped sections to complex structures,
4. protect watercourses subject to accelerated erosion by improving cross
sections and/or providing erosion -resistant lining.
5. Upgrade or replace the receiving device, structure or watercourse such
that it will receive and conduct the flow to a point where it is no longer
subject to degradation from the increased rate of flow or increased
velocity.
C. Exceptions - This rule shall not apply where it can be demonstrated that storm
water discharge velocities will not create an erosion problem in the receiving
watercourse.
d. The following is a table for maximum permissible velocity for storm water
discharges: Units are in feet per second (FPS) and meters per second (MPS).
Material Maximum Permissible
Velocities
F.P.S. M.P.S.
Fine sand (non -colloidal) 2.5 0.8
Sandy loam (non -colloidal) 2.5 0.8
Silt loam (non -colloidal) 3.0 0.9
Ordinary firm loam 3.5 1.1
Fine gravel 5.0 1.5
Stiff clay (very colloidal) 5.0 1.5
Graded, loam to cobbles (non -colloidal) 5.0 1.5
Graded, silt to cobbles (colloidal) 5.5 1.7
-11
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
Alluvial silts (non -colloidal) 3.5 1.1
Alluvial silts (colloidal) 5.0 1.5
Coarse Gravel (non -colloidal) 6.0 1.8
Cobbles and shingles 5.5 1.7
Shales and hard pans 6.0 1.8
Source - Adapted from recommendations by Special Committee on Irrigation
Research, American Society of Civil Engineers, 1926, for channels with straight
alignment. For sinuous channels, multiply allowable velocity by 0.95 for slightly
sinuous, by 0.9 for moderately sinuous channels, and by 0.8 for highly sinuous
channels.
Section 11 Borrow and Waste Areas
When the person conducting the land -disturbing activity is also the person conducting the
borrow or waste disposal activity, areas from which borrow is obtained and which are not
regulated by the provisions of the Mining Act of 1971, and waste areas for surplus
materials other than landfills regulated by the Department's Division of Waste
Management, shall be considered as part of the land -disturbing activity where the borrow
material is being used or from which the waste material originated. When the person
conducting the land -disturbing activity is not the person conducting the borrow and/or
disposing of the waste, these areas shall be considered a separate land -disturbing
activity.
Section 12 Access and Haul Roads
Temporary access and haul roads, other than public or private roads, constructed or
used in connection with any land -disturbing activity shall be considered a part of such
activity.
Section 13 Operations in Lakes or Natural Watercourses
Land disturbing activity in connection with construction in, on, over, or under a lake or
natural watercourse shall minimize the extent and duration of disruption of the stream
channel. Where relocation of a stream forms an essential part of the proposed activity,
the relocation shall minimize unnecessary changes in the stream flow characteristics.
Section 14 Responsibility for Maintenance
During the development of the site, the person conducting the land -disturbing activity
shall install and maintain all temporary and permanent erosion and sedimentation control
measures as required by the approved Plan or any provision of this Ordinance, the Act,
or any order adopted pursuant to this Ordinance or the Act. After site development, the
-12
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
landowner or person in possession or control of the land shall install and/or maintain all
necessary permanent erosion and sedimentation control measures, except those
measures installed within a road or street right-of-way or easement accepted for
maintenance by a governmental agency.
Section 15 Additional Measures
Whenever the Gaston County Natural Resources Department determines that significant
sedimentation is occurring as a result of land disturbing activity, despite application and
maintenance of protective practices, the person conducting the land -disturbing activity
will be required to and shall take additional protective action.
Section 16 Existing Uncovered Areas
a. All uncovered areas existing on the effective date of this Ordinance which
resulted from land -disturbing activity, exceed one acre, are subject to continued
accelerated erosion, and are causing off -site damage from sedimentation, shall
be provided with a ground cover or other protective measures, structures, or
devices sufficient to restrain accelerated erosion and control off -site
sedimentation.
b. Gaston County Natural Resources Department reserves the right to require
preparation and approval of an Erosion and Sedimentation Control Plan in any
instance where extensive control measures are required.
Section 17 Certificate of Approved Plan
No person shall undertake any land -disturbing activity subject to this Ordinance without
first obtaining a Certificate of Approved Plan from Gaston County, through its Natural
Resources Department, except that no Certificate of Approved Plan shall be required for
any land -disturbing activity:
for the duration of an emergency, activities essential to protect human
life; or
This exclusion from Certificate of Approved Plan should allow land -
disturbing activities for construction of a single-family residence on a
single lot, but may not exceed one acre. Despite not being required to
obtain a Certificate of Approved Plan, parties engaged in land -disturbing
activities of less than one -acre are subject to all portions of this
Ordinance. If the erosion and sediment control measures for the
development site are designed for all lot disturbances and being
maintained, individual lots within the development site may be excluded.
If a party has been determined to have been in recurring violation of this
Ordinance within the past two (2) years on the same property or if a land
-13
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
disturbing activity requiring a plan is begun without a certificate of
approved plan, the Certificate of Approved Plan fee may be doubled for
that party.
4. No Certificate of Approved Plan will be issued to any party having an
outstanding recurring violation on the same property subject to this
Ordinance.
This decision may be appealed to the Environmental Review Board.
Section 18 Erosion and Sedimentation Control Plans
a. A pre -submittal conference with Natural Resources staff can be requested by the
person(s) conducting land -disturbing activity or an agent of that party to take
place at least ten (10) days prior to submittal of the Plan for land -disturbing
activities .
b. At the pre -submittal conference, Natural Resources staff shall inform the
applicant of the processes involved with Plan review and approval, issuance of a
Plan Certificate and Letter of Approval, and the relationship of said Plan and
Letter of Approval with zoning, building code, and other land -use regulations in
effect in Gaston County. At the time of application submission, Natural
Resources staff also shall notify the applicant of the appeal process as provided
in the Ordinance.
C. Persons conducting land -disturbing activity on a tract which covers one or more
acres shall file two (2) copies of the Erosion and Sedimentation Control Plan with
the County Natural Resources Department at least thirty (30) days prior to
beginning such activity and shall keep another copy of the Plan on file at the job
site. After approving the Plan, if the County Natural Resources Department
either upon review of such Plan or on inspection of the job site, determines that a
significant risk of accelerated erosion or off -site sedimentation exists, the County
Natural Resources Department will require a revised Plan. Pending the
preparation of the revised Plan, work shall cease or shall continue under
conditions outlined by the appropriate authority.
d. Erosion and Sedimentation Control Plans may be disapproved unless
accompanied by an authorized statement of financial responsibility and
ownership. The person financially responsible for the land -disturbing activity or
his attorney shall sign this statement in fact. The statement shall include the
mailing and street addresses of the principal place of business of the person
financially responsible and of the owner of the land or their registered agents. If
the person financially responsible is not a resident of North Carolina, a North
Carolina agent must be designated in the statement for the purpose of receiving
notice of compliance or non-compliance with the Plan, the Act, this Ordinance,
or rules or orders adopted or issued pursuant to this Ordinance. If the applicant
is not the owner of the land to be disturbed, the draft erosion and sedimentation
control planmust include the owner's consent for the applicant to submit a draft
erosion and sedimentation control plan and conduct the anticipated land-
-14
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
disturbing activity.
e. The Gaston Soil and Water Conservation District shall review the Plan and
submit any comments and recommendations to Natural Resources staff within
twenty (20) days after the Gaston Soil and Water District received the Erosion
and Sedimentation Control Plan, or within any shorter period of time as may be
agreed upon by Gaston Soil And Water Conservation District and the Natural
Resources staff. Failure of the Gaston Soil and Water Conservation District to
submit its comments and recommendations within twenty (20) days or within any
agreed upon shorter period of time shall not delay final action on the Plan.
The Natural Resources staff will review each complete Plan submitted to them
and within thirty (30) days of receipt thereof will notify the person submitting the
Plan that it has been approved, approved with modifications, approved with
performance reservations, or disapproved. Failure to approve, approve with
modifications, or disapprove a complete Erosion and Sedimentation Control Plan
within thirty (30) days of receipt shall be deemed approval. Disapproval of a Plan
must specifically state in writing the reasons for disapproval. The Natural
Resources Department must approve with modifications, or disapprove a revised
Plan within fifteen (15) days of receipt, or it is deemed to be approved. The
Natural Resources Department shall only approve a plan upon determining that it
complies with all applicable state and local regulations for erosion and
sedimentation control. If, following commencement of a land -disturbing activity
pursuant to an approved Plan, the Natural Resources staff determines that the
Plan is inadequate to meet the requirements of this Ordinance, the Natural
Resources staff may require any revision of the Plan that is necessary to comply
with this Ordinance. Failure to approve, approve with modifications, or
disapprove a revised Erosion and Sedimentation Control Plan within fifteen (15)
days of receipt shall be deemed approval. The approved erosion and
sedimentation control plan shall expire one (1) year following the date of
approval, if no land disturbing activity has been undertaken.
g. Any Plan submitted for a land -disturbing activity for which an environmental
document is required by the North Carolina Environment Policy Act (G.S. 113A-
1, et seq.) shall be deemed incomplete until a complete environmental document
is available for review. The Gaston Natural Resources Department shall promptly
notify the person submitting the Plan that the thirty (30) day time limit for review
of the Plan pursuant to Section 18(f) of this Ordinance shall not begin until a
complete environmental document is available to review. The person submitting
a Plan to the Natural Resources Department, prior to submission of the Plan, is
solely and exclusively responsible for determining whether the proposed land -
disturbing activities require any form of state or federal environmental certification
or documentation. The Natural Resources Department shall condition approval
of an Erosion and Sedimentation Control Plan upon the applicant's compliance
with federal and state water quality laws, regulations and rules; and shall
disapprove an Erosion and Sedimentation Control Plan if implementation of the
plan would result in a violation of rules adopted by the Environmental
Management Commission to protect riparian buffers along surface waters.
h. Any Plan required by this section shall contain architectural and engineering
-15
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
drawings, maps, assumptions, calculations, and narrative statements as needed
to adequately describe the proposed development of the tract and the measures
planned to comply with the requirements of this Ordinance. Plan content may
vary to meet the needs of specific site requirements. Detailed guidelines for
Plan preparation may be obtained from the Natural Resources Department
on request.
The Gaston County Natural Resources Department may disapprove an Erosion
and Sedimentation Control Plan upon a finding that an applicant, or a parent,
subsidiary, or other affiliate of the applicant:
1. is conducting land -disturbing activity without an approved Plan, or has
received notice of violation of a Plan previously approved by the
Commission or a local government pursuant to the Act and has not
complied with the notice within the time specified in the notice;
2. has failed to pay a civil penalty assessed pursuant to the Act or a local
Ordinance adopted pursuant to the Act by the time the payment is due
and is not currently being appealed.
3. has been convicted of a misdemeanor pursuant to G.S. 113A-G4 (b)
or any criminal provision of a local ordinance adopted pursuant to the
Act or;
4. has failed to substantially comply with State rules or local ordinances
and regulations adopted pursuant to the Act. For purposes of this sub-
section (i) an applicant's record may be considered for only the two (2)
years prior to the application date.
is in violation of Federal, State, or local laws, rules, regulations or
ordinances pertaining to a different phase of the same tract and/or
development
Applications for amendment of an Erosion and Sedimentation Control Plan in
written and/or graphic form may be made at any time under the same conditions
as the original application. Until such time as said amendment is approved by
the Gaston County Natural Resources Department, the land -disturbing activity
shall not proceed except in accordance with the Erosion and Sedimentation
Control Plan as originally approved.
k. Any person engaged in land -disturbing activity who fails to file a Plan in
accordance with this Ordinance, or who conducts a land -disturbing activity
except in accordance with provisions of an approved Plan, shall be deemed in
violation of this Ordinance.
Any person engaged in land -disturbing activity who is required by this Ordinance
to file an Erosion and Sedimentation Control Plan shall pay a plan review fee to
the County in an amount to be determined by the Gaston County Board of
Commissioners.
-16
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
Section 19 Environmental Review Advisory Board
a. Creation — There is hereby created in Gaston County, the Environmental
Review Advisory Board which is charged with the duties as provided for in this
Ordinance. The Environmental Review Advisory Board shall consist of the
following members:
1. One person appointed by a participating municipality as outlined in the
Environmental Review Advisory Board's Policies and Procedures,
2. 1 member of the Gaston County Home Builders Association,and two
other developers nominated by the Gaston County Home Builders
Association for a total of three individuals
3. Chairman of the Gaston County Soil and Water Conservation District or
his/her designee,
4. Chairman of the Gaston County Quality of Natural Resources
Commission or his/her designee,
5. A member of the Gaston County Chamber of Commerce or his/her
designee,
6. One township representative appointed by the Gaston County Board of
Commissioners, and,
7. A professional engineer registered under the provisions of Chapter 89C
of the General Statutes of North Carolina, appointed by the Gaston
County Board of Commissioners.
b. Appointments — The Environmental Review Advisory Board members
appointed by the Gaston County Board of Commissioners shall serve terms of
office of three (3) years and until their successors are appointed and duly
qualified.
C. Fees — The Environmental Review Advisory Board shall make fee
recommendations to the Gaston County Board of Commissioners.
d. Other duties and responsibilities — The Environmental Review Advisory Board
shall hear and decide appeals from any decision or determination made by the
Gaston Natural Resources Department in the enforcement of this Ordinance and
other duties as directed by the Gaston County Board of Commissioners.
Section 20 Appeals
a. Except as provided in Section 18 (b) of this Ordinance the appeal of a
disapproval or approval with modifications of a Plan shall be governed by the
following provisions:
The disapproval or modification of any proposed Erosion and
Sedimentation Control Plan by the County Natural Resources
Department shall entitle the person submitting the Plan to a public
hearing if such person submits written demand for a hearing within
fifteen (15) days after receipt of written notice of disapproval or
modifications.
-17
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
Hearings held pursuant to this section shall be conducted by the Gaston
County Environmental Review Advisory Board, within thirty (30) days
after the date of the appeal or request for a hearing.
The Environmental Review Advisory Board will render its final decision
on any Erosion and Sedimentation Control Plan following completion of
the hearings.
4. If the Environmental Review Advisory Board upholds the disapproval or
modification of a proposed Soil Erosion and Sedimentation Control Plan
following the hearing, the person submitting the Plan shall then be
entitled to appeal the local government's decision to the North Carolina
Sedimentation Control Commission as provided in Section 113A-61 (c)
of the General Statutes and Title 15A NCAC 4B .0018 (d).
b. In the event that an Erosion and Sedimentation Control Plan is disapproved
pursuant to Section 18 (i) of this Ordinance, the Gaston County Natural
Resources Department shall notify the Director of Land Resources of such
disapproval within ten (10) days. The Department shall also advise the applicant
and the Director in writing as to the specific reasons the Plan was disapproved.
The applicant may appeal the Department's disapproval of the Plan pursuant to
Section 18(i) of this Ordinance directly to the North Carolina Sediment Control
Commission.
Section 21 Inspections and Investigations
a. Agents, officials, or other qualified persons authorized by Gaston County will
periodically inspect land -disturbing activities to ensure compliance with the Act,
this Ordinance, or rules or orders adopted or issued pursuant to this Ordinance,
and to determine whether the measures required in the Plan are effective in
controlling erosion and sediment resulting from land -disturbing activity. Notice of
the right to inspect shall be included in the Certificate of Approval of each Erosion
and Sedimentation Control Plan. A list of authorized agents and officials shall
be provided or listed at the Natural Resources Department.
b. No person shall willfully resist, delay, or obstruct an authorized representative,
employee, or agent of the County while that person is inspecting or attempting
to inspect a land -disturbing activity under this section.
C. If, it is determined that a person engaged in land -disturbing activity has failed to
comply with the Act, this Ordinance, or rules, or orders adopted or issued
pursuant to this Ordinance, a notice of violation shall immediately be served upon
that person. The notice may be served by any means under GS 1A-1, Rule 4.
The notice shall specify a date by which the person must comply with the Act,
this Ordinance, or rules, or orders adopted pursuant to this ordinance, and inform
the person of the actions that need to be taken to comply with the Act, this
Ordinance, or rules or orders adopted pursuant to this Ordinance. Any person
who fails to comply in the time specified is subject to additional civil and criminal
-18
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
penalties for a continuing violation as provided in this Ordinance.
d. The Gaston County Natural Resources Department shall have the power to
conduct such investigation as it may reasonably deem necessary to carry out its
duties as prescribed in this Ordinance, and for this purpose to enter at
reasonable times upon any property, public or private, for the purpose of
investigating and inspecting the sites of any land -disturbing activity.
e. The Gaston County Natural Resources Department shall also have the power to
require written statements, or the filing of reports under oath, with respect to
pertinent questions relating to land -disturbing activity.
Section 22 Penalties
a. Civil Penalties
Any person who violates any of the provisions of the Act, this Ordinance,
or rules or orders adopted or issued pursuant to this Ordinance, or who
initiates or continues a land -disturbing activity for which an Erosion and
Sedimentation Control Plan is required, except in accordance with the
terms, conditions, and provisions of an approved Plan, is subject to a
civil penalty. The maximum civil penalty for a violation is five thousand
dollars ($5,000.00). The maximum civil penalty for a violation of a stop -
work order is five thousand dollars ($5,000.00). A civil penalty may be
assessed from the date of the violation. Each day of continuing violation
shall constitute a separate violation. When the person has not been
assessed any civil penalty under this subsection for any previous
violation, and that person abated continuing environmental damage
resulting from the violation within 180 days from the date of the notice of
violation, the maximum cumulative total civil penalty assessed under this
subsection for all violations associated with the land -disturbing activity for
which the erosion and sedimentation control plan is required is twenty-
five thousand dollars ($25,000).
The Gaston County Natural Resources Department shall determine the
amount of the civil penalty to be assessed under this subsection as set
forth in the Guidelines for Assessing Civil Penalties for Violations of
Gaston County's Soil Erosion and Sedimentation Control Ordinance.
The Gaston Natural Resources Department shall notify the person who
is assessed the civil penalty of the amount of the penalty and the reason
for assessing the penalty. In determining the amount of the penalty the
Natural Resources Department shall consider the degree and extent of
harm caused by the damage, the cost of rectifying the damage, the
amount of money the violator saved by noncompliance, whether the
violation was committed willfully, and the prior record of the violator in
complying or failing to comply with this Ordinance. The notice of
assessment shall be served by any means authorized under North
Carolina General Statute 1A-1,Rule 4, and shall direct the violator to
either pay the assessment, contest the assessment within thirty (30)
-19
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
days by written demand for a local hearing, or file a request with the
Sedimentation Control Commission for remission of the assessment
within 60 days of receipt of the notice. A remission request must be
accompanied by a waiver of the right to a contested case hearing
pursuant to Chapter 150B of the North Carolina General Statutes and a
stipulation of the facts on which the assessment was based. A local
hearing on a civil penalty/contested assessment shall be conducted by
the Gaston County Environmental Review Advisory Board within thirty
(30) days after the date of the written demand for the hearing. The
Environmental Review Abvisory Board shall render its final decision on
the civil penalty/contested assessment at the conclusion of the hearing.
Appeal from the final decision of the Environmental Review Advisory
Board shall be to the Superior Court of Gaston County.
3. If payment is not received within sixty (60) days after it is due, the
Environmental Review Advisory Board may institute a civil action to
recover the amount of the assessment. The civil action may be brought
in Gaston County Superior Court of the county where the violation
occurred, or the violator's residence or principal place of business is
located. Such civil actions must be filed within three (3) years of the date
the assessment was due. An assessment that is not contested is due
when the violator is served with a notice of assessment. An assessment
that is contested is due at the conclusion of the administrative and
judicial review of the assessment.
4. Civil penalties collected pursuant to this ordinance shall be remitted to
the Civil Penalty and Forfeiture Fund in accordance with G.S. 115C-
457.2. Penalties collected by the county may be diminished only by the
actual cost of collection. The collection cost percentage to be used shall
be established and approved by the North Carolina Office of State
Budget and Management on an annual basis, based upon the
computation of actual collection costs by each (city)(town)(county) for the
prior fiscal year. [The collection cost percentage shall not exceed twenty
percent (20%) of penalties collected.]
b. Final Certificate of Occupancy
With regard to the development of any tract that is subject to this Ordinance, the
Code Enforcement Department shall not issue a Certificate of Occupancy where
any of the following conditions exist:
There is a violation of this Ordinance with respect to the tract.
If there remains due and payable to Gaston County civil penalties that
have been levied against the person conducting the land -disturbing
activity for violation(s) of this Ordinance. If a penalty is under appeal, the
Environmental Review Advisory Board may require the amount of the
fine, and any other amount that the person would be required to pay
under this Ordinance if the person loses the appeal, be placed in a
refundable account or surety prior to issuing the Certificate of
- 20
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
Occupancy.
3. The requirements of the plan have not been completed and the building
for which a Certificate of Occupany is requested is the only building then
under construction on the tract.
4. On the tract which includes multiple buildings on a single parcel, the
requirements of the plan have not been completed and the building for
which a Certificate of Occupany is requested is the last building then
under construction on the tract.
5. On a tract which includes multiple parcels created pursuant to the
applicable subdivision regulations, the requirements of the plan have not
been completed with respect to the parcel for which the Certificate of
Occupany is requested.
6. Any person conducting land -disturbing activities that has been denied a
Certificate of Occupancy under the provisions in this Ordinance may
make a written appeal of the decision to the Environmental Review
Advisory Board.
C. Criminal Penalties
Any person who knowingly or willfully violates any provision of this Ordinance, or
rule or order adopted or issued pursuant to this Ordinance, or who willfully
initiates or continues a land -disturbing activity for which an Erosion and
Sedimentation Control Plan is required except in accordance with the terms,
conditions, and provisions of an approved Plan, shall be guilty of a Class 2
misdemeanor which may include a fine not to exceed Five Thousand Dollars
($5,000.00).
d. Stop Work Orders
Whenever a building, sign, or structure, or part thereof is being constructed,
reconstructed, altered or repaired in violation of this Ordinance, the Enforcement
Officer may order the work to be immediately stopped. The stop order shall be in
writing and directed to the owner, occupant, or person doing the work. The stop
order shall state the specific work to be stopped, the specific reasons for the
stoppage, and the conditions under which the work may be resumed. Such
action shall be in accordance with NCGS 160A-421 or 153-361, as applicable, or
the NC Building Code.
Section 23 Injunctive Relief
a. Whenever the Environmental Review Advisory Board has reasonable cause to
believe that any person is violating or threatening to violate this Ordinance or any
rule or order adopted or issued pursuant to this Ordinance, or any term,
condition, or provision of an approved Erosion and Sedimentation Control Plan, it
may, either before or after the institution of any other action or proceeding
-21
Gaston County, North Carolina
Soil Erosion & Sedimentation Control Ordinance
authorized by this Ordinance, institute a civil action in the name of the County, for
injunctive relief to restrain the threatened violation. The action will be brought in
the Superior Court of Gaston County.
b. Upon determination by a court that an alleged violation is occurring or is
threatened, the court shall enter any order or judgement that is necessary to
abate the violation, to ensure that restoration is performed, or to prevent the
threatened violation. The institution of an action for injunctive relief under this
section shall not relieve any party to the proceedings from any civil or criminal
penalty prescribed for violations of this Ordinance.
Section 24 Restoration of Areas Affected by Failure to Comply
The Environmental Review Advisory Board may require a person who engaged in a land -
disturbing activity and failed to retain sediment generated by the activity, as required by
G.S.113-A-57 (3), to restore the waters and the land affected by the failure so as to
minimize the detrimental effects of the resulting pollution by sedimentation. This authority
is in addition to any other civil or criminal penalty or injunctive relief authorized under this
Ordinance.
Section 25 Severability
If any section or sections of this Ordinance is/are held to be invalid or unenforceable, all
other sections shall nevertheless continue in full force and effect.
Section 26 Effective Date
This ordinance shall become effective upon adoption and approval by the North Carolina
Sedimentation Control Commission.
File:T:/SESCO/Ero and Sed Ordinances/Revision to the April 2003 Gaston Soil Erosion and Sedimentation Control Ordinance/
Revised Gaston SESCO 05-17-07, 06-28-07 & 09-23-2010.doc
- 22