Loading...
HomeMy WebLinkAboutSW6191005_Plan (SCM Detail)_201912181 FOR OFFICIAL USE ONLY 2 3 5 7 I 8 9 I 10 G F E BJ C n 11' TYPI NOTE: 3:1 MAX SIDE SLOPES IF/WHERE VEHICLES CROSS AND USE COURSE AGGREGATE TO FORM THE DIVERSION BERM. —DITCH LINER COMPACTE (SEE PLAN) SOIL (SEE NOTE) 2• S EMPx �sFFir,�9�- 18" MIN. FLOW FROM SITE N � OIF 1MP� �,Ll I- E,'EL1 Wl F�_:,::, Ll I- Wl F�_:,::, LII- I I I Wl F� E, Ll F�_,:::,Ll I I I :,:::::I I I- I 1_1 I NOTE: ANY CLEANWATER DIVERSION DITCHES SHALL BE STABILIZED WITH VEGETATION IMMEDIATELY AFTER CONSTRUCTION AND THE CHANNEL FLOW AREA SHALL REMAIN STABILIZED THROUGH THE DURATION OF CONSTRUCTION TO AVOID SEDIMENTATION OF UNDISTURBED AREAS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PEMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. SEE PRETREATMENT DETAIL TO BUILDING ADDITION OR PARKING LOT 2' MIN. CONSTRUCTION SPECIFICATIONS 1. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 2. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT 3. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT 4. VEGETATE THE SOIL BERM IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. 5. SEED AND MULCH DIVERSION DITCH IMMEDIATELY AFTER CONSTRUCTION UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. DITCH DEPTH BOTTOM SIDE LINER (V) WIDTH (W) SLOPES TD#1-TD#4 1.5' 0' 3:1 S75 TEMPORARY DIVERSION DITCH CG102 IC-505 NOT TO SCALE 4" MIN. CLEAN SAND UNLESS THE NATIVE SOIL IS EQUIVALENT (1-2% FINES OR LESS). BASIN BOTTOM (MAX)1 3 1' MIN. UNDISTURBED IN -SITU 2' MIN. SOIL (K= 0.52"/HR. MIN.) NOTE: REFER TO GRADING PLAN FOR THE GRADING INFORMATION. SHWT = SEASONAL HIGH WATER TABLE MAINTENANCE: 4' MIN. (MAX)1 3 SHWT 2' MIN. 4" MIN. GRAVEL CLOTH NOTE: PLACE AT LOCATIONS SHOWN ON CG104 FOR INFILTRATION BASINS 2 & 3. PEA GRAVEL PRETREATMENT THE DRAINAGE AREA SHALL BE CAREFULLY MANAGED TO REDUCE THE SEDIMENT LOAD TO THE INFILTRATION BASIN. IMMEDIATELY AFTER THE INFILTRATION BASIN IS ESTABLISHED, THE VEGETATION SHALL BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS). NO PORTION OF THE INFILTRATION BASIN IS TO BE FERTILIZED AFTER THE INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH THE VEGETATION. THE VEGETATION IN AND AROUND THE BASIN SHALL BE MAINTAINED AT A HEIGHT OF APPROXIMATELY SIX INCHES. AFTER THE INFILTRATION BASIN IS ESTABLISHED, IT SHALL BE INSPECTED ONCE A QUARTER AND WITHIN 24 HOURS AFTER EVERY STORM EVENT GREATER THAN 1.0 INCHES (OR 1.5 INCHES IF IN A COASTAL COUNTY). RECORDS OF INSPECTION AND MAINTENANCE SHALL BE KEPT IN A KNOWN SET LOCATION AND SHALL BE AVAILABLE UPON REQUEST. STORMWATER MANAGEMENT INFILTRATION BASIN CS101 lC-505 NOT TO SCALE CG 1031V CG 104 CLASS B RIPF' " 12" OF NCDOT #5 OR #57 WASHED ST( FILTER CLOT 4' TO 6' CROSS-SECTION VIEW MAINTENANCE: 1 ti' RAIN INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 IN. OR GREATER) RAINFALL EVENTS AND REPAIR IMMEDIATELY. CLEAN OUT STRAW, SEDIMENT, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIP RAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. TEMPORARY CHECK DAM CG102IC-505 NOT TO SCALE EXCAVATED AREA (AS REQUIRED) CONSTRUCTION SPECIFICATIONS 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. 2. GRADE THE APPROACH TO THE INLET UNIFORMLY. 3. PROTECT WEEP HOLES BY NCDOT #5 OR # 57 WASHED STONE. 4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN PERMANENTLY STABILIZED, SEAL WEEP HOLES, FILL THE BASIN WITH STABLE SOIL TO FINAL GRADING ELEVATIONS, COMPACT IT PROPERLY, AND STABILIZE. ACCUMULATED SEDIMENT CONSTRUCTION SPECIFICATIONS: 1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN PLAN ON A FILTER FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM HEAVY FLOW THAT COULD CAUSE EROSION. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT THE OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. NCDOT #5 0� �� OR # 57 WASHED STONE NCDOT #5 OR # 57 WASHED STONE SUPPORTED BY HARDWARE CLOTH TO ALLOW DRAINAGE AND RESTRICT SEDIMENT MOVEMENT MAINTENANCE \\ III j/ / ✓ //i / I „ / PLAN INSPECT, CLEAN, AND PROPERLY MAINTAIN THE EXCAVATED BASIN AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN PERMANENTLY STABILIZED. TO PROVIDE SATISFACTORY BASIN EFFICIENCY, REMOVE SEDIMENT WHEN THE VOLUME OF THE BASIN HAS BEEN REDUCED BY ONE-HALF. SPREAD CAII'',, ALL EXCAVATED MATERIAL EVENLY OVER THE SURROUNDING LAND ; R�<i,�'�; AREA OR STOCKPILE AND STABILIZE IT APPROPRIATELY. .�oF off. 9 'Q SE 4 = FAV e . EXCAVATED DROP INLET PROTECTION (TEMPORARY) DETAIL I I I I I i I `7\2�7612079 CG101 C-505 NOT TO SCALE ISSUED FOR CONSTRUCTION US Army Corps of Engineers® IIIIII IIIIII X W 0 O 0 X 0 w�'O� o ~ ~ U X > O N E� Q X U W 0 U N� X w o D W z J - 0 M z 0 X — Q N N 3:0XU� wz �0 Q0 zLO 0 m 0 li U ui m 0 ui z c� z U Yui � 0 W W �_ W D 0 N Z 00 Oz UDcnOf cnQ 0 co Of z D c� M W J 2 o zz W U Z 0 �(O Q_zn,� U 19* �U- z=z Lobb,W O OOcl IN z J w cn U`O Z 0 Z oQo,o,U CO 2' .� .� J O ? O 4) U Q 02~ C� icd M J Q co�: M J u� j z0 0 U) }} U J J H U Q 0� z w z 0 0z w Qo � mLO W 0 �-M a�00 oz SHEET ID C-505