Loading...
HomeMy WebLinkAbout19991028 Ver 1_COMPLETE FILE_199909200 State of North Carolina Department of Environment and Natural Resources 00 Division of Water Quality James B. Hunt, Jr., Governor D E N R Bill Holman, Secretary Kerr T. Stevens, Director September 30, 1999 DWQ# 99-1028 Cumberland County Carolina Power and Light Company P.O. Box 327 New Hill, NC, 27562 Attn: Buzz Bryson APPROVAL of 401 Water Quality Certification Dear Mr. Bryson: You have our approval, in accordance with the attached conditions, to construct an overhead electric transmission line crossing the Cape Fear, as you described in your application received by the Division of Water Quality on 'September 20, 1999. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3101. This Certification allows to use Regional General Permit Number 49 when the Corps of Engineers issues it. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. Environmental Sciences Branch 4401 Reedy Creek Road Raleigh, North Carolina 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post consumer paper This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-9646. Sincerely, Kerr T. Stevens Attachment cc: Corps of Engineers Wilmington Field Office Fayetteville DWQ Regional Office Mr. John Dorney Central Files 991028 C P&L Carolina Power & light Company PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Mr. Allen Davis Wilmington Regulatory Field Office Corps of Engineers P.O. Box 1890 Wilmington, NC 28402-1890 Mr. John Dorney North Carolina Division of Water Quality PAYMENT Environmental Services Branch 4401 Reedy Creek Road RECEIVED Raleigh, NC 27607 til??d? ?131d? al?(1?35 SQ?;tl'11?M anoa? -- Subject: Carolina Power & Light Company (CP&L)" Fayetteville-Vander North 115KV Transmission Line w, ?bl 1B Dear Messrs. Davis and Dorney: CP&L is planning to construct an approximately eight-mile-long 115KV transmission line from the existing Fayetteville substation to the existing Vander substation in Cumberland County, North Carolina. This project was designed to minimize environmental impacts, particularly to wetlands and wooded areas, by locating the new transmission line within existing transmission and distribution line rights-of-way (ROW) to the extent possible. We have enclosed the preconstruction notification (Enclosure 1), consistent with Corps Regional General Permit No. 49 and General Water Quality Certification No. 3101, and request that the Corps and the Division of Water Quality verify that this work is consistent. The proposed transmission line will be constructed using single pole steel towers, which will be direct-embedded into the ground (i.e., placed in augered holes, with no fill other than the back-filling of removed dirt). As can be seen on Enclosure 2, over 7 '/z miles of the 8-mile route of this line will be co-located on an existing ROW. In fact, the line has been designed to replace alternate poles of' the existing distribution line, with that line being hung from the new transmission line. Co-locating also allows minimal clearing of additional ROW. Normally, a transmission line of this size would require a ROW width of 75-100 feet or more. However, co- location of the line necessitates clearing of only 25 feet or less of additional ROW along the planned route. Mr. Davis and Mr. Dorney 2 CP&L will utilize its standard transmission line construction practices for this project. Where required, rights-of-way will be cleared by cutting vegetation back to near ground level, but there will be no stump removal, "blading", or similar activities that disturb the root mat or underlying soil. Should any of this ROW clearing involve crossing wetlands, CP&L will use mats, low impact vehicles, or hand cutting in these areas, as appropriate, to avoid disturbing the wetlands. Poles will be set in non-wetlands to the extent possible. Should placing a pole in wetlands be required (for example, if the span length requires it, or if the line direction changes), the pole will be augered in using a standard boom truck or similar method. Should equipment have to enter into wetlands to set a pole, the wetlands will be matted or special low-impact equipment utilized. There will be no change in contours or redirection of water flow, nor will there be any discharges of dredged or fill material into wetlands (the minimal amount of dirt removed by digging the pole hole is repacked into the hole, with a small amount packed tightly against the hole at ground level to minimize seepage of rainfall or surface water into the hole). The Corps has previously agreed that these techniques for clearing right of way and directly embedding poles do not constitute a discharge and are thus not jurisdictional under Section 404 of the Clean Water Act. However, the proposed crossing of the Cape Fear River requires Section 10 approval, which CP&L asks that the Corps and the Division authorize under Regional General Permit 049. A plan and profile map of the crossing is provided as Enclosure 3. The required processing fee check (NCDWQ) is also enclosed. Should you have any questions, please contact Mr. Buzz Bryson in our Environmental Services Section at (919) 362-3551. Very truly yours, Don Weisenborn, Manager Transmission Projects DW/wtb Enclosures: 1. Preconstruction Notification 2. USGS quad sheets showing proposed route 3. Plan and profile map, showing clearance over the Cape Fear River 4. Processing Fee Check to NCDENR bc: Rick Brown Buzz Bryson Eddie Taylor Rhonda Webb DWQ ID: CORPS ACTION ID: NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #) 49 PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 1. NOTIFICATION TO THE CORPS OF ENGINEERS 2. APPLICATION TO NC DIV. OF WATER QUALTIY FOR SECTION 401 CERTIFICATION 3. COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES MUST BE SENT TO THE NC DIVISION OF WATER QUALITY, ATTN: JOHN DORNEY, 4401 REEDY CREEK ROAD, RALEIGH, NC 27607. PLEASE PRINT OR TYPE. OWNER'S NAME: Carolina Power & Light Company MAILING ADDRESS: P.O. Box 327 SUBDIVISION NAME: CITY: New Hill STATE: N.C. ZIP CODE: 27562 PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (IF DIFFERENT FROM MAILING ADDRESS ABOVE): Adjacent to intersection of SR 1007 and SR 1141 near Fayetteville (see enclosed maps) 3. TELEPHONE NUMBER: (HOME) 919-460-0256 (WORK) 919-362-3551 4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS, PHONE NUMBER: CP&L Contact is William T. (Buzz) Bryson, who can be reached at the above phone and address. 5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): COUNTY: Cumberland NEAREST TOWN: Fayetteville SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.) See attached maps 6. IMPACTED OR NEAREST STREAM/RIVER: Cape Fear RIVER BASIN: Cape Fear 7. (a) IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER, (SA), HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURCE WATERS (ORW), WATER SUPPLY (WS-I OR WS-II)? YES a NO X IF YES, EXPLAIN: (b) IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT AREA OF ENVIRONMENTAL CONCERN (AEC)? YES Q NO X (c) IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? 16. YOU ARE REQUIRED TO CONTACT THE STATE HIS'T'ORIC PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OT THE USE OF PUBLIC (STATE) LAND? YES ? NO X (IF NO, GO TO 18) (a) IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES ? NO ? (b) IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE? YES ? NO ? IF ANSWER 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369. 18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OF FILL MATERIAL INTO WETLANDS: (a) WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES, AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21, 26, 29, AND 38). ALL STREAM (INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE I INCH EQUALS 50 FEET OF 1 INCH EQUALS 100 FEET OF THEIR EQUIVALENT. (b) IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PRODUCT. (c) IF DELINEATION WAS PERFORMED BY A CONSUL'T'ANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. (d) ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED. (e) WHAT IS LAND USE OF SURROUNDING PROPERTY? Industrial, commercial, residential, agriculture. (f) IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? N/A (g) SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE. NOTE: WETLANDS OR WATERS OF THE US MAY NOT BE IMPACTED PRIOR TO: I. ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT, 2. EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF WATER QUALITY CERTIFICATION, AND 3. (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTENT WITH THE NORTH CAROLINA COASTAL MANAGEMENT ` ER'S/AGENT'S SIGNATURE ATE (AGENT'S SIGNATURE VALID ONLY IF AUTHORIZATION LETTER FROM THE OWNER IS PROVIDED). ll Z s Ir,' FAYETTEVILLE. N. C. . inl?'nl?l li?i .rlA ll SW/4 FAYFTFVD I.F 15' QIIADRAN I. F N-t nO W7HI,:)117.`? AIIONAL MAI' Af.l.llRAt'Y '.1ANDAIPW, Itev,io- shown in lirlr f)Ie Geld wr?i?rllanrl <.r?mpiled by the. Genloy,??.)I AI SURVFY. RCS ION, VIRGINIA 79099 Somm?y m ?:nuperatum with Slele ?d North Carclnla okenus'. 1957 M 1,' AND SYM IIOIS I'; AVAIIAIIII - 0001 ,l ludo aeNal phuluh?.lphs la ken I'INI alid other snllrce5. Lhi.s I'11111<'HI-V11,H) I`)lll niormatlnll ni,l field rhei. ked. Mal) i'dded 1`Ihl DMA 5')5M1 III 9W SFRII.S VH4I Wlpl?• lint de", -t",.??i.l iil ) Yll/ ? I I P 1 ? ? N?t_osu2 C Z: d Pl i ? L. )v HwA OUp HUM) CI AY01 CAI ON Pnmary hll;hway. I gld duty roa(j , hard u. ?„ I I ha J 5mlar.e unproved slrfare .? r , .? .and aiy highway. ' haul surfda• _ _ _ Uni nlprovrd road NIFRVAI lG 1 1 1 1 IntorLde Route ll Route SLIIe Rnulo VLIMCAL DAl I) M OF I'1l') ?, h/ 1 1 4 1 } fr i! ? I,?rf l l X11 ?}, }Mf 1r,h? ?.. ? + ?? ?` .rml'? ? ?' ,fit ?'' 11q'tll e, 1 1I+' • ? ?..'-_ f 'f 1 ?,q ? 19111 Y?1 t1o ?11 ?'}.?M ,.-1 I ? ?? ?? I a f ??__?.1::, lo, 1} ,ifi? ? ??.vj, rs?? 1?}?,1yit ? .• ? ? /' f4 /. ? ? / ? J \ 1 I? ? u 1 y h y? F •• 1\ ' ?l eo. It t• / • / ? m ? Y ?? r /IA rv ? 1. le -p0 P _ ( ? •? i j . U 17 S l y n . .... w -• u C >iN ,? 1 1 qn(' 1 ? ? ? to ? E ? ? ?f• \\\ 1`? + `? 111 ' ? ? ? 7 . r Q, - IS ? r v l II'r 'Y4 ? ? ? d ? V I" LA N Q tJ 8. 10 (a) HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROJECT? YES Q NO X IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION): (b) ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES a NO X IF YES, DESCRIBE ANTICIPATED WORK: (a) ESTIMATED TOTAL NUMBERS OF ACRES IN TRACT OF LAND: 21 (on right of way) (b) ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: less than 3 (again, on ROW) (a) NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY: FILLING: N/A EXCAVATION: N/A FLOODING: N/A OTHER : N/A DRAINAGE: N/A TOTAL ACRES TO BE IMPACTED: No impact (b) (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION: No impact. LENGTH BEFORE: FT AFTER: FT WIDTH BEFORE (based on normal high water contours): _ FT AVERAGE DEPTH BEFORE: FT AFTER: FT (b) (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: _ CHANNEL EXCAVATION: _ CONSTRUCTION OF A DAM/FLOODING: _ OTHER: No impact. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? N/A WHAT IS THE EXPECTED POND SURFACE AREA? N/A 12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL, EQUIPMENT TO BE USED? (ATTACH PLANS; 81/2 BY I 1 DRAWINGS ONLY) Construction of overhead electric transmission line, as described in the cover letter and attached maps. 13. PURPOSE OF PROPOSED WORK: Provide/improve delivery of electricity to customers. 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS) Least impacting route selected. Overhead crossing and selection of placement sites for poles minimizes impact. 15. YOU ARE REQUIRED TO CONTACT THE US FISH AND WILDLIFE SERVICE AND/OR NATIONAL MARINE FISHERIES SERVICE REGARDING THE PRESENCE OF ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE. PROPOSED PROJECT. DATE CONTACTED: ll_? 0? Q? 0 1 - w w LJ Ld n CL a_ li a a (n (n N (n Q0 ? (D M N In M M ~ 10 I 1 I O C:) O CD _j p0 O _j0 _j -1 0 I 1 -- 200 in F- Ln F- O U) O =U =U (7) U 00U I , - va- ' - -- - o • _ - --I Y; -- - - - -- --- 160 _ ? I col C N @ Q0 - ? - -- - 140 00 co 120 C> --100 o? Lni - - -- - -- - -- -- - 25' ob - - - 80 ico - A Loo - - T 3 - - -- -- -; #!3 -- - 60 - I J 40 1 t ---- ? LT OP R AT R LEV - 0.1 ' OP ?OR . WA 'ER =0.4r L- _ - - - 357' 293' 317' ERWIN - FAYETTEVILLE _ NSKV LINE 20 EDGE OF OEPI6S PILE DEBRIS P, TOP M O p STEEL TOWER IBRICK AND WOW) o TOE OF SLOPE., 0 a i 38 TOE OF :LOPE. 49 ; `°era F Of L • (END 0) E FE FEE ? 6-Ir PINES NDER KV C?S BSTTA T O 39 TOI 37 \ NS U A I N \ SUB Z WATERLINE 6.0 CHAIN LINK FENCE -- -- CL DITCH J-- 3.5' CNAN LINK FENCE CAPE FEAR RIVER a? STEEL TOWER , STEEL TOWER 41 2 pq --EDGE OF WET AMA PLANT ROAD PP / POSSIBLY DUE To RUN OFF FROM BOG FOOD PLANT PAVED ROAD _ NOTEI UNKNOWN UNDERGROUND CONCRETE UTILITY BOX UNKNOWN ABOVE CRaua CONCRETE UTILITY BOX THE CROSSING OF THE FAYETTEVILLE VANDER NORTH 115KV LINE OVER THE CAPE FEAR RIVER BETWEEN TMFAYETTEVILLE 'RCP STRUCTURES 37 AND 38 IS LOCATED APPROXIMATELY 230KV SUBSTATION 36 5900 FEET OR 1.12 MILES SOUTH OF THE HIGHWAY EDGE OF GRAVEL DRIVE 24 BRIDGE JUST EAST OF FAYETTEVILLE. N.C. PURPOSE: TO TRANSMIT OVERHEAD ELECTRIC POWER AT 115.000 VOLTS FROM THE FAYETTEVILLE 230KV SUBSTATION TO THE VANDER 115KV SUBSTATION FAYETTEVILLE CAROLINA POWER & LIGHT HWY 301 NC 24 RALEIGH N. C. 230KV y NC 53/210 FAYETTEVILLE - VANDER 115KV NORTH LINE 3 SUB i Y CROSSING CAPE FEAR RIVER A LOCATION CUMBERLAND COUNTY 19se-_ VICINITY HORZ. 1"=400' Scale VERT.I"=40' Date 10/12/99 NC 87 MAP OVERHEAD WIRE `may Drawn B ELT B C y ROSSING TO: VANDER NOT TO SCALE Dwg. No. CT-43731, SH. 3 L. QGL_0 5 LA Q ? 23