Loading...
HomeMy WebLinkAbout20180536 Ver 2_Stream & Wetland Impacts_20191218Strickland, Bev From: Heath Caldwell <heath.caldwell@wetlands-epg.com> Sent: Wednesday, December 18, 2019 4:28 PM To: Johnson, Alan Cc: Len Rindner; Daniel Kuefler Subject: [External] Fwd: lanier village Attachments: 3143-Stream & Wetland Impacts 12-18-19.pdf • External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Mff-rt-s—pam@nc.gov Alan - Attached are updated exhibits addressing your comments. In addition to the original avoidance and minimization efforts out here, we were able to reduce the impact to the head of the stream (20LF less impact) to only 1 OLF reducing the overall permanent impacts for the site to 102LF. A french drain will be added at the fill impact at Wetland C to provide stability and maintain the hydrology to the head of that wetland. Additionally, the outfall from the BMP#1 was directed to the opposite side to provide supplemental hydrology to that floodplain/wetland area. Please review and let us know if this satisfies your concerns here. If so, we'll send on over to Dave to get these included in his review as well. Thanks - Heath ---------- Forwarded message --------- From: Len Rindner <len.rindner@wetlands-epg.com> Date: Tue, Dec 10, 2019 at 10:34 AM Subject: Fwd: lanier village To: Heath Caldwell <heath. caldwell(cr�,wetlands-og.com>, Daniel Kuefler <daniel.kuefler@wetlands-epg.com> FYI ---------- Forwarded message --------- From: Johnson, Alan <alanJohnson o,ncdenr.gov> Date: Tue, Dec 10, 2019 at 10:31 AM Subject: lanier village To: Daniel Kuefler<daniel.kuefler(cr�,wetlands-epg.com>, Len Rindner (len.rindner@wetlands-epg.com) <len.rindner@wetlands-epg.com> BMP #1 — can't it discharge towards -into the wetland??? And French drain the fill material above the impact wetland 91 if able/possible Stream impact #2, loose the lot. Avoid the stream headwater/beginning. Loosing one lot shouldn't kill the project. Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Len Rindner Leonard S. Rindner, PLLC Wetlands and Environmental Planning Group www.wetlands-epg.com (704) 904-2277 Heath Caldwell Wetlands & Environmental Planning Group Leonard S. Rindner, PLLC www.wetlands-epg.com 704.999.5279 4 EXISTING CONDITIONS MAP PROJECT BOUNDARY \ EXISTING 20' PERMANENT SANITARY I LIMITS SEWER EASEMENT 1 / � DB 32885-131 I \L Ji � —Tar— � � nlnl \ INTERMITTENT STREAM D WETLANDS C \ '� \ \ -163 `F Fi ���� f WETLAND B / � \ \\ -0.09 AC. ( \ \� 1 r r _EY \/ INTERMITTENT \ STREAM A -511 LF At k \ �; !FARMS ��� /" / `"/ PERENNIAL 1 STREAM E L � -1,366 LF —Air— A 0110*1[si-004NO 0 0 -300 0 150 300 600 ( IN FEET ) 1 inch = 300 ft. Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown By. RS Date: 12-18-2019 Rev.• Engineer. • CRB Scale: As Shown I Sheet: 1 OF 11 R. Joe Harrisi Associates, IMPACTED WETLANDS & STREAMS - OVERALL MAP IMPERVIOUS AREA Description Area (% ) Proposed 28 MR N 011011MIN F.Al 0 0 TEMPORARY IMPACT #4 (STREAM E) 5 LF ± DISTURBANCE \ 8" DIP SAN. SEWER j I PERMANENT IMPACT#3 (STREAM A) _ 92 LF ± DISTURBANCE 36" RCP WITH HEADWALLS ' 10LFTEMPORARY IMPACT / ( CUMULATIVE IMPACT (PERMANENT) —300 0 150 300 600 ( IN FEET ) 1 inch = 300 ft. Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown By. RS I Date: 12-18-20191 Rev.• Engineer. • CRB I Scale: As Shown I Sheet: 2 OF 11 Desc. I Type Len/Area Impact #1 (Wetland C) 0.087 Ac. Impact #2 (Stream A) 10 Lf. Impact #3 (Stream A) 92 Lf. Total Stream 102 Lf. Total Wetlands 0.087 Ac. CUMULATIVE IMPACT (TEMPORARY) Desc. Type Len/Area Impact #3 (Stream A) 10 Lf. Impact #4 (Stream E) 5 U. Total Stream 15 Lf. R. Joe Harris & Associates, Inc. Engineering • Planning Management 127 Ban CASEY Drive, Snim 101, Port Mill, S.C. 29708 (803) 902-1799 IMPACT #1 PLAN VIEW - (WETLAND Q 680 670 660 650 640 V MY VfII\1 ,UE '/ EXISTING WETLAND C — EXISTING 30' WETLAND BUFFER 650 \� IMPACT #1 CROSS SECTION VIEW - (WETLAND Q PROPOSED CENTERLINE OF PROPOSED GRADE PROP.ROAD RETAINING WALL EXISTING 0+00 1+00 2+00 \_2 +69. 82 EXTENTS OF WETLAND C (TYP.) GRAPHIC SCALE -60 0 30 60 120 ( IN FEET ) 1 inch = 60 ft. Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown By RS Dote: 12-18-2019 Rev.• Engineer: CRB Scale: As Shown I Sheet: 3 OF 11 IMPACT #2 PLAN VIEW - (STREAM A) END OF PERMANENT IMPACT o� 6j0 IMPACT #2 CROSS SECTION �\ PROP. HEADWALL \ �� EXISTING STREAM - 30' EXISTING STREAM BUFFER IMPACT #2 CROSS SECTION VIEW - (STREAM A PROP. 4'X4' I.D. PRECAST SPRING BOX PROPOSED GRADE PROP. 2LF 18" RCP PIPE 690 PROP. HEADWALL EXISTING GRADE 680 670 660 650 0+00 1+00 1+49.02 BEGIN STREAM A END PERMANENT IMPACT A104.110011lei WWAI00 -60 0 30 60 120 ( IN FEET ) 1 inch = 60 ft. Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown By RS Dote: 12-18-2019 Rev.• Engineer: CRB Scale: As Shown I Sheet: 4 OF 11 66� EXISTING TOP OF BANK R. Joe Harris & Associates, Inc. (I RJ Engineering -Planning Management 127 Bc CASEY D,iv Suiro I111, Fort Mill, S.0 29708 (80})802-1799 IMPACT #3 PLAN VIEW - STREAM A I 52 1: m ' 1 it 1 53 1 / W _SS PERMANENT IMPACT #3 T (STREAM A) 92 LF ± DISTURBANCE 80LF - 36" RCP WITH HEADWALLS In SEGMENTAL 72 6�0 \ BLOCK HEADWALL I \ ll 4! c EXISTING TOP OF BANK BEGIN — �� PERMANENT \\ IMPACT 1 �0 \66 I END OF TEMPORARY IMPACT (APPROX. 5') J RESTORE TO ORIGINAL J / CONDITION EXISTING 30' STREAM BUFFER 71 � 33� - 1 � W - 32 W W W � END OF TEMPORARY IMPACT � EXISTING (APPROX. 5') RESTORE TO ORIGINAL WETLAND B CONDITION � W 80± LF - 36" RCP CULVERT 3 L-_ GRAPHIC SCALE -60 0 30 60 120 ( IN FEET ) 1 inch = 60 ft. Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown ByRS Dote: 12-18-2019 Rev.• Engineer: CRB Scale: As Shown Sheet: 5 OF 11 EXISTING STREAM A R. Joe Harris & Associates, Inc. (I RJ Engineering -Planning Management 127 Bc CASEY D,iv Suiro I111, Fort Mill, S.0 29708 (80})802-1799 670 .•1 650 MR IMPACT #3 CROSS SECTION VIEW - (STREAM A PROPOSED RADE AT CENTERLINE PROP. 30" RCP / INV 653.38± \ / PROP. 36" RCP I INV 645.92± AT CULVERT TO BE �I INSTALLED WITH 8" DEPTH OF BURY EXISTING GRADE AT CENTERLINE ULVERT CL 0+00 1+00 2+00 *SEE SHEET 10 FOR BAFFLE DETAIL Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown By RS Dote: 12-18-2019 Rev.• Engineer: CRB Scale: As Shown I Sheet: 6 OF 11 HOR. SCALE: 60 0 30 60 1 inch = 60ft. VER. SCALE: 6 0 3 6 1 inch = 6ft. j� jiro JoeHarrisiAssociates, %jO%Engineering -Planning /////�%%�%/O%�� Management 670 's Me 650 Me IMPACT #3 PROFILE VIE PROPOSED GRADE P P. 18" P PROP. IN = 665. ± 8" PVC SS INV - 2.70± PROPO ED HEADWALL I I CULVER TO BE I I INSTALLED WITH 8" I DEPTH CF BURY I \ EXISTI 79.5 LF 32% JG GRADE 0+00 1+00 2+00 3+00 *SEE SHEET 10 FOR BAFFLE DETAIL Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown By. RS I Date: 12-18-20191 Rev.• Engineer. • CRB I Scale: As Shown I Sheet: 7 OF 11 V2 HOR. SCALE: 40 0 20 40 1 inch = 40ft. VER. SCALE: 4 0 2 4 1 inch = 4ft. R. Joe Harris & Associates, Inc. Engineering • Planning Management 127 Ban CASEY Drive, Snit, 101, Port Mill, S.C. 29708 (803) 902-1799 CULVERT BAFFLE DETAIL ELOW L0.83' 0.83' 1 5" SECTION A —A Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown By RS I Dote: 12-18-20191 Rev.- SIDE VIEW SECTION B—B Engineer: CRB I Scale: As Shown I Sheet: 8 OF 11 02 SECTION C—C R. Joe Harris & Associates, Inc. Engineering -Planning Management 127 Bc CASEY D,iv Suiro I111, Fort Mill, S.0 29708 (80})802-1799 IMPACT B PLAN VIEW - STREAM S 34 \ 33—) CITY OF CHARLOTTE TRACT 15 pB 27070-502 (900 SQ.FT. OUT PARCEL) BRISTOL FARMS WASTEWATER PUMP STATION ' \ 1 PROP. 8" DIP \ SAN. SEWER PIPE \ \ FN\ \ \(j) \ \ \A GRAPHIC SCALE —60 0 30 60 120 ( IN FEET ) 1 inch = 60 ft. Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown By RS Dote: 12-18-2019 Rev.• Engineer: CRB Scale: As Shown I Sheet: 9 OF 11 j� jiro JoeHarrisiAssociates, %jO%Engineering -Planning Management /////�%%�%/0%�� 1 650 GRADE m 25 YEAR ELEVATION: 1 630 \ h LF - 8" DIP TO MH @ 0.60% 20.00 LF - 8" DIP 0.60% ,NO COUPLI qGS, ALL FULL JOINTS -IF DIP REINFORCED CONCRETE PIER' I (SEED TAILS) J 20 LF CENTERED ON PIPE REINFORCED CONCRETE PIER (SEE DETAILS) 20 LF CENTERED ON PIPE REINFORCED CONCRETE PIER Rqn (SEE DETAILS Lanier Village - Phase 3 Mecklenburg County, North Carolina Drown By. RS Date: 12-18-2019 Rev.• Engineer. • CRB Scale: As Shown I Sheet: 10 OF 11 4. HOR. S 60 1 inch = VER. SC 0 30 60 1 inch = 6 t. / 100 YEAR STORM ELEVATION: 638.40, I END BASE MANHOL STD DET #9, REPLE )NE WITH #57 STONI ,WABLE FILL PIPE C( CREEK SIDE BY COP _LAR - NOT RUBBER l� #67 ID ECTION R. Joe Harris & Associates, jEngineering -Planning Management NOTES FOR STREAM BANK STABILIZATION: 1. LIVE STAKES SHALL BE APPROXIMATELY 24" IN LENGTH 2. LIVE STAKES SHALL BE 0.5" - 1.5" IN DIAMETER AT TIME 1. UPON COMPLETION OF STREAM CROSSING WORK, CONTRACTOR SHALL BACKFILL OF PLANTING AND MECHANICALLY TAMP (NO SPECIFIC DENSITY) SOILS INTO PLACE AND DRESS 3. LIVE STAKES SHALL BE BLACK WILLOW OR SPECIES DISTURBED SURFACES. SPECIFIED BY COE/DHEC OR CONSULTANT 2. BEGINNING AT A POINT 2' ABOVE WATER SURFACE ELEVATION, GRASS DISTURBED 24"t 4. SPECIES SHALL BE DORMANT AT TIME OF ACQUISITION AREAS (SEED, FERTILIZER & STRAW MULCH) STREAM BANK, TOP OF BANK AND AND PLANTING AND LOCALLY GROWN/HARVESTED DISTURBED AREAS UPLAND OF STREAM. 3. INSTALL COIR FIBER NET/MAT STARTING MINIMUM 12" BELOW WATER SURFACE 5. LIVE STAKES SHALL BE SPACED T O.C. ELEVATION AND EXTENDING A MINIMUM 5' BEYOND TOP OF BANK. MINIMIM 6. LIVE STAKES SHALL BE PLANTED A MINIMUM OF 18" IN SPECIFICATIONS FOR COIR FIBER NET/MAT AS FOLLOWS: DEPTH WITH NO MORE THAN 4"-6" OF STAKE EXPOSED - MIN. THICKNESS OF 0.30 INCHES - 100% COCONUT FIBER AND WOVEN INTO TWINE - AVG. WEIGHTOF 20 OUNCES/SQ.YD. LIVE STAKE DETAIL 4. COIR FIBER NET/MAT SHALL BE SECURELY HELD IN PLACE WITH USE OF WOODEN STAKES AND WIRE STAPLES (AS NEEDED). 5. INSTALL LIVE STAKES BEGINNING AT WATER SURFACE ELEVATION AND EXTENDING 2 VERTICAL FEET UP THE STREAM BANK. SEE LIVE STAKE DETAIL FOR ADDITIONAL REQUIREMENTS. 6. INSTALL SILT FENCE W/WIRE REINFORCEMENT ALONG TOP OF BANK (ADJACENT TO END OF COIR FIBER NET/MAT) FOR WIDTH OF DISTURBED SOILS. INSTALL SILT FENCE EXTEND COIR FIBER MAT I REINFORCED WITH HOG 5' BEYOND TOP OF BANK WIRE AT TOP OF BANK (EDGE OF COIR FIBER NET/MAT) COIR FIBER NET/MAT GRASS (SEED, MULCH & FERTILIZE) REMAINING DISTURBED STREAM BANK AREAS INCLUDING TOPS OF BANK (UNDER COIR NET/MAT) LIVE STAKE (WILLOWS OR SPECIES APPROVED BY COE/DHEC) FOR FIRST 24" ABOVE NORMAL WATER SURFACE ELEVATION WATER SURFACE ELEVATION 12I" t 1 I 'I III EXTEND COIR FIBER NET/MAT 12" BELOW WATER SURFACE ELEVATION STREAM BANK STABILIZATION - LIVE STAKE TYPICAL DETAIL - N.T.S. Lanier Village - Phase 3 Mecklenburg County, North Carolina RS Date: 12-18-2019 CRB Scale: As Shown cum rtwn (anu I UM livlrvn 1 ) Y BE USED TO REFORM REAM BANK (STACKED). 18" OF IL SHALL COVER STREAM �E FACE OF ROCK STACK. IE OF ROCK TO ANCHOR BANK OPTIONAL) R. Joe Harris & Associates, Inc. Engineering • Planning - Management 127 Be" CASEY Ddve, Seiro 101, Port Mill, S.C. 29708(803) 802-1799