Loading...
HomeMy WebLinkAboutNCC190846_NOT Closeout Documents_20191210NORTH CAROLINA - uontrolled'N1teS. LU. Project Name: Panda Express State: NORTH CAROLINA County: New Hanover Financially Responsible Party: Venture Construction Inspection Date: 12/09/19 Inspection Type: PHASE Company: Controlled Sites, LLC Address: PO Box 721, Clover, SC 29710 Inspector Name: Corey Parks Certification #: LDCMCSI-2018-00221 Contact #: 803-493-1012 Weather: Partly Cloudy Soils: WET 7 DAY RAINFALL DATA DAY: DATE: RAIN Total: SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 12/08/19 12/09/19 12/03/19 12/04/19 12/05/19 12/06/19 12/07/19 0.62 0 0 0 0 0.04 0 REF# A. B C D E F G H J K L M N O P Q R S T EROSION and SEDIMENTATION CONTROL MEASURES Do Construction Entrances need to be improved? Does Silt Fence need to be repaired or installed? Are there Diversion Ditch or Rock Check issues? Does inlet protection need to be repaired or installed? Are any additional controls or maintenance needed? Do any areas need to be stabilized? NON- STORM WATER CONTROLS Debris or Debris boxes needing attention? Do portable restrooms need to be repositioned? Fuel Tank or container issues? Does Concrete Washout need attention? Paint/Drywall washout not properly located and/or needing attention? POINT DISCHARGE AND STREET CONDITIONS Any sediment exiting the site? Any streets need to be cleaned? Any mud tracking on the adjacent public streets? Do sediment or skimmer basins need maintenance? SWPPP DOCUMENTS Are the inspection reports on site? Is the SWPPP and applicable permit on site? Does the SWPPP match the current site conditions? Have there been no NPDES inspections from the state or federal agencies since last visit? Are the BMPs required by the SWPPP appropriate for the existing site conditions? YES/NO/NA Actual Dimensions (ft.) Proposed Dimensions (ft) Significant Deviation From Plan? NO 51'X15' 50'X12' NO NO Per Plan Pere Plan NO NO N/A N/A N/A NO NO NO NO NO N/A NO N/A NO NO NO N/A YES YES YES YES YES 1 NORTH CAROLINA Co U rfie v tef-omhsL pections been addressed in manner? YES Date I REF# LOT# RESPONSIVE ACTIONS NEEDED Inspected Correction r By this digital signature, I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accorc system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persc manage the system, or those persons directly responsible for gathering the infomation, the information submitted is, to the best of my knowledge and accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonme knowing violations. n I of Inspector: Corey Parks Signature: Report Comments: To remain in compliance, all areas that have been brought to grade should be stabilized after 14 days or any areas with slopes 3:1 or should be stabilized within 7 days as per the NC DEN DWQ(State) regulation. NORTH CAROLINA tControlicd Sites, LI_C Current Phase of Project Phase of Grading X Comments Installation of perimeter erosion and sediment control measures Clearing and grubbing of existing ground cover Completion of any phase of grading of slopes or fills. Installation of storm drainage facilities. Completion of Construction or development of all land disturbing activities Permanent ground cover sufficient to restrain erosion has been established. X X X X X X Ground Stabilization Time Frames Size Area Description Stabilization Timeframe Exceptions Perimeter dikes, swales and slopes 7 Days NONE High Quality Water (HQW) Zones 7 Days NONE Slopes steeper than 3:1 7 Days If slopes10' or less in length and are not steeper than 2:1, 14 days are allowed Slopes 4:1 or flatter All other areas with slopes flatter than 4:1 14 Days 7 days for slopes greater than 50' in length 14 Days NONE, except for perimeters and HQW zones Ground Stabilization: Must be recorded after each Phase of Grading Area where temporary or permanent ground cover is required. Date disturbance stopped or completed Time limit for Time ground cover. 7 or 14 days Is ground cover sufficient to restrain erosion? YES or NO Inspection Date Describe Actions Needed Date Correction Verified N/A NORTH CAROLINA Single Family lot disturbance/stabilization is located (it applicable) on pace 5 OBSERVATIONS OF RUNOFF AT STORMWA TER DISCHARGE OUTFALLS: DETAILS OF RECOMMENDED CORRECTIVE ACTIONS Proposed ACTUAL Significant Storm water Discharge Outfall Dimensions Dimensions Deviation Identifications (ft.) (ft.l from Plan? N/A Additional Recommendations: Additional Recommendations: Additional Recommendations: Additional Recommendations: Additional Recommendations: Additional Recommendations: Additional Recommendations: Additional Recommendations: Additional Recommendations: Additional Recommendations: Additional Recommendations: Additional Recommendations: Is there any visible Oil Sheen, Any increase Suspended or in stream Floating turbidity from Solids, or discharge? discoloration? Any visible Se Any Visible in streams, erosion below outside of t SDO? the s 4 NORTH CAROLINA (jrnomfloduSiptccwt+bp n(ompleted? YES Has the final permanent ground cover been completed and established? YES REPORT ANDY VISIBLE SEDIMENTATION TO STREAMS AND WETLANDS TO DWQ WITHIN 24 HOURS. http://Porta1.ncdenr.org/web/wq/ NORTH CAROLINA NORTH CAROLINA Controlled lled Sites, LI-C : NORTH CAROLINA r P Controlled Sites, LLC: greater NORTH CAROLINA Controlled lled Sites, LI-C : 101� Controlxed Sites, LLC. �dimentation Netlands. Or he limits of site? NORTH CAROLINA 10 NORTH CAROLINA �«ntrc}ll d Sites, LLC 11 NORTH CAROLINA �rolled Sites, LI-(: 12