Loading...
HomeMy WebLinkAbout20061085 Ver 2_More Info Received_20061222Project No. DWQ EXP 06-1085 Project Name: Elem School G Bio-retention 1 SUBMITTED DESIGN: REQUIRED DESIGN: elevations Permanent Pool (ft) 661 0.5 ft. depth Temporary Pool (ft) 661.5 areas Permanent Pool SA (sq ft) 6775 6758 sq. ft. Drainage Area (ac) 4.37 ac Impervious Area (ac) 1.39 31.8 % impervious Rational C 0.71 Size % 0.5 sand underdrain volumes Inlet Velocity 5.95 0 fps Inlet Flow Depth 10 in Depth to Ground Water 6 6 ft Planting Soil Infiltration 0.52. 0.52 in/hr In-Situ Soil Infiltration 0.6 0.00 in/hr ok ok check veloci ok ok Project Name: Elem School G Project No. DWQ 061085 DA 3 SUBMITTED DESIGN: elevations Bottom of Basin (ft) 677 Permanent Pool (ft) 680 Temporary Pool (ft) 681.5 areas Permanent Pool SA (sq ft) 9697 Drainage Area (ac) 5.32 Impervious Area (ac) 4.08 volumes Permanent Pool (cu ft) .19450 Temporary Pool (cu ft) 19247.4 Forebay (cu ft) 3.857 other parameters SA/DA 3.2 Orifice Diameter (in) 2 Design Rainfall (in) 1 Linear Interpolation of Correct SA/DA Im ervious Next Lowest 70 Project Impervious 76.7 Next Highest 80 REQUIRED DESIGN: 2.0 average depth status 3 ft. depth ok 1.5 ft. depth ok 5278 sq. ft. ok 7497 based on avg depth ok 76.7 % - 14295 cu. ft. ok 19.8 % ok 2.28 - 0.09 cfs drawdown - 2.5 day drawdown ok 3 ft. Permanent Pool Depth SA/DA fron (Avg. Depth) 2..07........ 3.054282768 /.OS 2.28 x.34 1.31 2.38 3.324513767 1.43 3 ft 4 Project No. DWQ EXP 06-1085 Project Name: Elem School G DA 4 SUBMITTED DESIGN: elevations Permanent Pool (ft) 672 Temporary Pool (ft) 672.5 areas Permanent Pool SA (sq ft) 1950 Drainage Area (ac) 1.2 Impervious Area (ac) 0.45 Rational C 0.73 Size % 0.5 volumes REQUIRED DESIGN: 0.5 ft. depth 1908 sq. ft. ac 37.5 % impervious ok ok sand underdrain Inlet Velocity 1.93 0 fps check veloci Inlet Flow Depth 6 in Depth to Ground Water 6 6 ft Planting Soil Infiltration 0.52 0.52 in/hr ok In-Situ Soil Infiltration 0.6 0.00 in/hr ok ~ DAVIS-MARTIN-POWELL & ASSOCIATES, INC. ENGINEERING LAND PLANNING SURVEYING 6415 Old Plank Road, High Point, NC 27265 - (336) 886-4821 • Fax (336) 886-4458 • www.dmp-inc.com ~ ~~~ ~~_. ~,~~ o~~ } 2 ? ii) ~ December 22, 2006 ~ o wgr~R ~h sT°'~'~~ R RE: Elementary School G DMP Job No. E3938 DWQ EXP No. 06-1085 Cynthia Van Der Wiele NCDWQ Wetlands Unit Express Review Program 2321 Crabtree Blvd Suite 250 Raleigh, NC 27604 Dear Ms. Van Der Wiele: Per your letter dated November 28, 2006, enclosed is one copy of the revised storm water plans in accordance with your comments. Your comments are listed below with our response in italics. As required by your letter, one (1) copy is going to you and two (2) copies are going to Mr. Barry Love in the Mooresville Regional Office. Storm water Management Plan a. Operation and Maintenance Agreement: DWQ has not received a signed and notarized operation and maintenance agreement for the bio-retention cells. You are required to provide one (1) original and two (2) copies of this Agreement. The OMAgreement has been revised to include operation and maintenance instructions for the bio retention area along with the O&M of the wet detention pond. The original and two (2) copies are included with this subrreittal. Copies are enclosed in the submittal to Mr. Love. b. Bio-Retention Planting Plan: DWQ requires that the plant material be at least 2.5" dbh for trees. Please explain why your plan specifies the use of smaller material. The size classification was pulled off of another plan done for a local municipality and I neglected to verify the size classifications from the local municipality versus DWQ's required size. The plant material has been changed to reflect a 2.5 "dbh as required by DWQ. c. Drainage Area 1/Bioretention: i. The required surface area is significantly larger than the permanent pool surface area you have proposed. Please redesign the Bioretention cell for this drainage area in accordance with DWQ's storm water BMP design guidance. The Bioretention area has been redesigned in accordance with the DWQ BMP design manual. The surface area required has been calculated as explained on page 38 paragraph 2 and as shown in Figure 12 page 39. ii. DWQ generally recommends a ponding depth of 0.5 feet. Please explain your temporary pool elevation. The ponding depth is D.S'. The Bioretention worksheets that are enclosed with this submittal have been changed to reflect this. d. Drainage Area 3/Wet Pond: i. Please explain the volumes for the permanent and temporary pool. You have reduced the forebay volume to 1597.22; please explain why the forebay volume has been reduced to 6.1 The permanent volume on the BMP worksheets is from the bottom of the permanent pool to the top of the permanent pool. The temporary pool is from the top of the permanent pool to the top of the riser. The forebay volume has been increased to 19.8%. ii. Please explain the SA/DA ratio used. The SA/DA ratio does not appear to be based upon the five-foot permanent pool depth. The permanent pool depth is 3 feet. The SA/DA is interpolated for the 76.69 % impervious area with a Permanent pool depth of 3 '. SA/DA values are found in Table 1.1 on page S of the BMP design manual. iii. DWQ has calculated a 5.2 day drawdown for the wet pond. Please redesign to shorten this time. A larger water quality hole has been added to the plans to reduce the drawdown period below S days. Drainage Area 4/Bioretention: i. DWQ generally recommends a ponding depth of 0.5 feet. Please explain your temporary pool elevation. The ponding depth is 0.5 '. The Bioretention worksheets enclosed with this submittal have been changed to reflect this. ii. Please explain why the permanent pool surface area is significantly smaller than design criteria would dictate for the drainage area/impervious area. The bioretention area has been redesigned in accordance with the DWQ BMP design manual. The surface area required has been calculated as explained on page 38 paragraph 2 and as shown in Figure 12 page 39. Thank you for your review. If you have any further questions or comments please do not hesitate to give either me or Eddie MacEldowney a call. I look forward to hearing from you. Sincerely, Davis-Martin-Powell and Associates Ja G ffey, Cc: Barry Love (Mooresville RO) Don Dixon (UCPS) File OPERATION AND MAINTENANCE AGREEMENT ELEMENTARY SCHOOL "G" REA ROAD UNION COUNTY PUBLIC SCHOOLS WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.75 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.75 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 680 Sediment Removal EI. 676 75% Sediment Removal Elevation 676.25 --------------------------------------- 75% Bottom E~vation _675: FOREBAY MAIN POND Page 1 of 3 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. BIO RETENTION AREAS OPERATION AND MAINTANCE AGREEMENT The bio retention areas are defined as the plantings, mulched areas and out structure(s). Maintenance of the bio retention areas shall be performed as indicated 1. Inspect monthly and repair as required any erosion. 2. Re mulch any bare areas noted during monthly inspection. 3. Remove all old mulch and re mulch every two years. 4. Inspect for insect infestation and diseased plants on a monthly basis. Treat infestation or disease as required. Remove any diseased plants that are beyond treatment and replace during appropriate planting season. 5. Inspect and replace tree support stakes as required. 6. Water plant material for during initial planting every 3 days for the first two months. Water as needed to prevent the planting area from dying during drought conditions. Fertilize plantings during initial planting. 7. Remove any trash that has accumulated in the bio retention area. Identify source of trash and take steps to prevent further trash from accumulating in the bio retention area. 8. Do not allow grass clippings to be dumped or wash into the bio retention area. 9. Inspect for debris around the inlet pipe. Remove debris as needed. 10. Inspect energy dissipator for displaced rip rap. Maintain dissipator as needed. If rip rap is continually displaced into the bio retention area, replace rip rap with larger stone. This applies to dissipator(s) into the bio retention areas and dissipator(s) from the overflow structure. 11. Observe draw down time of bio retention areas. If draw down exceeds 72 hours, remove and replace mulch and top 4 inches of planting soil. Aerate planting soil prior to replacing mulch. 12. Prune bio retention planting annually. 13. Bio retention areas become acidic over time. Soil testing on an annual basis is recommended. Application of limestone shall be done in accordance with the soil testing recommendations. 14. Soil testing should include tests for toxins and heavy metals. Plant life will become impaired due to the accumulation of toxins and heavy metals. If toxins and heavy metals are allowed to accumulate to the point where the bio retention planting materials are becoming ineffective, removal of all plants and planting soil may be required. Page 2 of 3 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above for the wet detention basin and the bio retention areas. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Donald S. Hughes, AIA Title: Director Facilities Planning and Construction Address: 116 North Main Street, Monroe, NC 28112 Phone: Signatu Date: ~ .~ ~ ., ,,,~, Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, ~r( (] ~ ~ ,1.~ ~~ , a Notary Public for the State of ~ Y ~ ~I~' County of Z,l.~n~ (m , do h~~eby certify that .1t~~~nDon Hughes personally appeared before me this !~ ~'` day of ~~` , _s~, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ~ d "~~ _~ ~ " Page 3 of 3 OPERATION AND MAINTENANCE AGREEMENT ELEMENTARY SCHOOL "G" REA ROAD UNION COUNTY PUBLIC SCHOOLS WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.75 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.75 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 680 Sediment moval EI. 676.2 _ 75% -------------- Sediment Removal Elevation 676.25 75% -------------------------------------------- ------ Bottom E vation _675 5% Bottom Elevation 67~_ '° FOREBAY MAIN POND Page 1 of 3 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. 610 RETENTION AREAS OPERATION AND MAINTANCE AGREEMENT The bio retention areas are defined as the plantings, mulched areas and out structure(s). Maintenance of the bio retention areas shall be performed as indicated 1. Inspect monthly and repair as required any erosion. 2. Re mulch any bare areas noted during monthly inspection. 3. Remove all old mulch and re mulch every two years. 4. Inspect for insect infestation and diseased plants on a monthly basis. Treat infestation or disease as required. Remove any diseased plants that are beyond treatment and replace during appropriate planting season. 5. Inspect and replace tree support stakes as required. 6. Water plant material for during initial planting every 3 days for the first two months. Water as needed to prevent the planting area from dying during drought conditions. Fertilize plantings during initial planting. 7. Remove any trash that has accumulated in the bio retention area. Identify source of trash and take steps to prevent further trash from accumulating in the bio retention area. 8. Do not allow grass clippings to be dumped or wash into the bio retention area. 9. Inspect for debris around the inlet pipe. Remove debris as needed. 10. Inspect energy dissipator for displaced rip rap. Maintain dissipator as needed. If rip rap is continually displaced into the bio retention area, replace rip rap with larger stone. This applies to dissipator(s) into the bio retention areas and dissipator(s) from the overflow structure. 11. Observe draw down time of bio retention areas. If draw down exceeds 72 hours, remove and replace mulch and top 4 inches of planting soil. Aerate planting soil prior to replacing mulch. 12. Prune bio retention planting annually. 13. Bio retention areas become acidic over time. Soil testing on an annual basis is recommended. Application of limestone shall be done in accordance with the soil testing recommendations. 14. Soil testing should include tests for toxins and heavy metals. Plant life will become impaired due to the accumulation of toxins and heavy metals. If toxins and heavy metals are allowed to accumulate to the point where the bio retention planting materials are becoming ineffective, removal of all plants and planting soil may be required. Page 2 of 3 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above for the wet detention basin and the bio retention areas. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Donald S. Hughes, AIA Title: Director Facilities Planning and Construction Address: 116 North Main Street, Monroe, NC 28112 Phone Signatu Date: , ., ~, ,.,~, Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, ~rl (~ ~ 1 ,C~G~ ~~ , a Notary Public for the State of ~}~ Y~'1 ~~r/l~-J County of ~~ I (m , do hereby certify that .~.,nDon Hughes personally appeared before me this 3~V \ day of ~1NU.~'l , ~~Q, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ~ d "~ ~ _~ Page 3 of 3 DWQ Project No. ~ x p ~~' ~ ~ Qi S DIVISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET I. PROJECT INFORMATION please complete the following information): Project Name : ~l~meiz ~~ - ~- ~ i, ~~- _ arr Contact Person: E ricl ~f ~G c ' $ ~~:. , ~~ ~, ~ Phone Number: j, ~, ~ ~) ~> ~ ~: - ~°? k ~.. For projects with multiple basins, specify which basin~this worksheet applies to:./~"~,~' f,'~ ~' ~, = ~ ~? J~ ~ _.'- Permanent Pool Elevation Temporary Pool Elevation (~inf, ~!~ ft. (elevation of the orifice invert out) (elevation of the outlet structure invert in) Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate to-Situ Soil Infiltration Rate II. REQUIRED ITEMS CHECKLIST ~~ `) ~ ~ sq. ft. `/, ? 7 ac. /, 3q ac. . "7 I ,rj ~-~ a `'~ fps ,~ .> ~ in > ~ ft. o.~a - ~. ~! in./hr. (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in wlsand under drain or 7% in w/o) (the soil layer down to 4 feet) %, L~ -- ~ ~ ~ in./hr. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Aooficants Initials ~ n~.C-~ No vertical sand bed is proposed .'r~~, The bioretention area is at least 40 feet by 15 feet. Sheet flow is provided at inlet. ,1 a :' _.: Water table depth is greater than 6 feet. `: ~y` <: Minimum of 6" ponding is provided. Jr~' `~ The ponded area will draw down in less than 4 days. v', r~' ~ Planting soil infiltration rate is greater than 0.52 in/hr. .::~ t~:i., The in-situ soil infiltration rate is greater than 0.2 in/hr. . `~r,~ `~ A planting plan with species and densities is provided. ,~' r: ~, Mulch layer is specified in plans. ~~'', Planting soil meets minimum soil specifications (NCDENR stormwater Best Management Practices Manual, April 1999) ~~~ ~~: Plan details for the bioretention area provided. r.~ ~~ Plan details for the inlet and outlet are provided. '`-' F° An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains rr jj~ ~ s Client V6~#!~~ ~.~~+~;~-- d~: ~ ~d ~r,~z,,;~~~C, Computed By ~~ ~`~~{ ~: G - Job No. ~~ ~Y.>`~ ; ~ Date A,~. ~ 1 ¢ ~ c? ~•- dm Project Description rk4. Checked By - Calculations For 3 { ~" ~' `£ ~- ~ ~ Date DAVIS-MARTIN-POWELL & ASSOCIATES, INC. 218 GATEWOOD AVE., SUITE 102, HIGH POINT, NC 27262 Page of A-- ___ _ _ _. _.__ _._ .., m .. ~ ' ~_ ,~ i ~, T'7 ~ ,~ _. _ .. ~_ .~. ~___ _ _ _ ~YV.4k 1:- ~- .._ ~_ ~. ~ ~ ~ _ v _... ... _ _ , _.. __. _ ____ 1. ~.~ -----:- _ ', ~ I r ~, I _.., m __ _ ~~ __ _.,,.u _.. _._ _ _;..._ .__. _ ._~~ ~~ ____ ~ ___ ~ /~ , _ _ _ ' _ ~ ._ _ _. __.._,_ _..__. _~ _~_~_._ ~. ~ ..._• _,r .~.__. __~_ _ ..._~.._ ~ ~_ ~~4tiW°I°k- 4"~-.- ~f ~ 4a t 1.~ ~."i1is. ~;...t '! { h J!~ ~Wf F 4.';~i t~je. ~~('l ~f A' ~ }/ / ( y - i. ' ~ ` 1 ci.~~' ~ n _._.. _.,__._ ......,......ice.. ._ _ _,-.,., ,_.._.__,.:.. ..., ...,.. . .... ._ . ,. ........,. .. __....__. , __, ." ....,.: .. ,,. .. _ ; r . ... ~.~.._..._.: .~ ' m. $ G~ P, :-~ ter` ~" ~~ 1 ~ a ~ •-• ~ r r~ ~ ~ a _. . ... _ ,. . ,~, . F (..~ _._ ___.. __ .... ......._ ,... }" _~.C,r,. ~ ~'_(..a..5. _ ~ . ,. _._ ._ ~ ._,., _ ,.__ .. _.. ~ _ ~,_~._ _ . _ ~_ _._ ~~. _ ~ _ _ , _ ~- , :.~ _ r ___._ (Revised, Superseded, and Void Calculations Must Be Clearly Identified, Initialed, and Dated by the Responsible Individual) Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stonrnwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and .specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. I. ~' PROJECT INFORMATION (please compto the following information): Project Name : ~lP~n~d' ~r„~! ~~~ior~;` Contact Person: E~ ~~ f?~ -;~~~t~~~~~ Phone Number: (,3101 ~~i~- `~~~`~~'% For projects with multiple basins, specify wlri~h basin this worksheet applies to:7~PA~,~~,°9~~- z~«~t ~3 Basin Bottom Elevation ~o '~ ~ ft. Permanent Pool Elevation ~n~~ ft. Temporary Pool Elevation ~~'~- ~`j ~ ft. (average elevation of the floor of the basin) (elevation of the orifice invert out) (elevation of the outlet structure invert in) Permanent Pool Surface Area 9(O 9 ~ sq. ft. (water surface area at permanent pool elevation) Drainage Area ..`~ . 4 ac. (on-site and off-site drainage to the basin) Impervious Area ~/, 0 8 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume Temporary Pool Volume Forebay Volume SA/DA used Diameter of Orifice f ~ ~`~ cu. ft. %~ MS'S "y cu. ft. ,3, a a, (combined volume of main basin and forebay) (volume detained on top of the permanent pool) (surface area to drainage area ratio) in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources,~November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials The temporary pool controls runoff from the 1 inch storm event. ° „'"~ The basin length to width ratio is greater than 3:1. _' e.-! _ The basin side slopes are no steeper than 3:1. _' ;-~' " A submerged and vegetated perimeter shelf at less than 6:1 is provided. ° =--~ Vegetation to the permanent pool elevation is specified. ~~ ~~ An emergency drain is provided to drain the basin. f ~ ' The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). ~'' ~ The temporary pool draws down in 2 to 5 days. ~ The forebay volume is approximately equal to 20% of the total basin volume. °~ ~-~ Sediment storage is provided in the permanent pool. °° `> Access is provided for maintenance. . r- ' A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. ' `~ A vegetation management/mowing schedule is provided in the O&M plan, ' ~ ~ ~~ Semi-annual inspections are specified in the 0&M plan. E ~ _ A debris check is specified in the O&M plan to be performed after every storm event. ~ ' :-, A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. ~~-! -: A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page 1 of 1 wetpond.xls PERMANENT WET DETENTION POND DESIGN PROJECT: ( School G INDEX NO: CHECKED BY: etm LOCATION: DATE: REVISED: 12.22.06 JNG SITE DATA ~ TOTAL SITE AREA = 5.32 acres WATERSHED = PROPOSED BUILT UPON AREA = 4.08 acres CLASSIFICATION : WS - FUTURE BUILT UPON AREA = 0.00 acres TOTAL ON-SITE BUILT UPON AREA = 4.08 acres PERCENT BUILT-UPON = 76.69% (GWA/WCA) _ ON-SITE DRAINAGE AREA TO POND = 5.32 acres MAX. OFF-SITE B.U.% _ OFF-SITE DRAINAGE AREA TO POND = 0.00 acres TOTAL WATERSHED AREA TO POND = 5.32 acres DISTURBED AREA = 5.32 acres TEM P. SED. STOR. USED Y/N Y DESIGN DATA TEMPORARYSEDIMENT STORAGE 0.5 acre-inch per disturbed acre PERMANENT SEDIMENT STORAGE 0.125 acre-in per total drainage area PERMANENT WATER QUALITY COMPOSITE B.U. % = 76.69 percent DEPTH (minimum 3 feet) 3.0 feet SA/DA (Figure 5.6-2) 3.2 percent TEMPORARY WATER QUALITY 1.0 Inch rainfall to be controlled PRINCIPAL SPILLWAY TYPE X corrugated aluminum reinforced concrete DESIGN STORM 10 year RAINFALL INTENSITY 5.32 inches per hour RUNOFF COEFFICIENT 0.7 EMERGENCY SPILLWAY TYPE X grass lined rip-rap lined DESIGN STORM 100 year RAINFALL INTENSITY 8.15 inches per hour RUNOFF COEFFICIENT 0.7 POND DATA ELEV. @ BOT. OF POND =1 675 SURFACE AREA = 2518 SF ELEV.@ BOT. OF PSS = 675 SURFACE AREA = 2518 SF ELEV. @ BOT. OF PWQ = 677 SURFACE AREA = 4221 SF ELEV. @ BOT. OF TWQ = 680 SURFACE AREA = 9697 SF ELEV. @ TOP. OF TWQ = 681.5 I SURFACE AREA = 14968 SF ELEV. @ EMER. SPILLWAY =1 683 ELEV. @ TOP OF DAM = 685 I j INVERT OF BARREL =1 909 ': Page 1 wetpond.xls ELEV. @ BOT. OF POND= 675.00 SURFACE AREA = 2518 Square Feet I ELEV. @ BOT. OF TWQ = 680.00 SURFACE AREA = 9697 Square Feet ALLOW 75% OF BASIN VOLUME TO WQ ORIFICE _~ 22903 Cubic Feet OKI ELEV. @ BOT. OF PSS = 675.00 SURFACE AREA = 2518 Square Feet ELEV. (~. BOT. OF PWQ = 677.00 SURFACE AREA = 4221 Square Feet_ VOLUME PROVIDED = OKI NORMAL POOL ELEVATION =I 680.001 ~-r SURFACE AREA PROVIDED = 9697 Sauare Feet I Rv= 0.740 in/in ~ VOLUME REQUIRED = 14295 Cubic Feet1 ELEV. @ BOT. OF TWQ =1680.00 ~ SURFACE AREA =9697 Square Feet ELEV. (a7 TOP OF TWQ = 681.50 SURFACE AREA = 14968 Square Feet VOLUME PROVIDED = OK Page 2 wetpond.xls I i I PRINCIPAL SPILLWAY DESIGN STORM PEAK FLOW = 19.8 CFS HEAD ABOVE TOP OF RISER = 1.50 ELEVATION AT TOP OF RISER = 681.50 BARREL: ELEV. OF BARREL INV. = 909 TRY BARREL DIA. = 24.00 in. dia. h = -227 ORIFICE EQUATION Q = #NUM! #NUM! RISER: RISER(AREA) =1.5 TIMES BARREL(AREA) TRY RISER DIA. = 36 in. dia. WEIR EQUATION Q = 57.7 CFS OK ORIFICE EQUATION Q= 41.7 CFS OK ORIFICE CONTROLS WATER QUALITY RELEAS E HOLE ELEV. @ BOT. OF WATER QUALITY RELEASE HOLE = 680.00 MAXIMUM RELEASE RATE = 2 Days MINIMUM RELEASE RATE = 5 Days MAXIMUM HOLE SIZE = 0.028547078 2.29 in. dia. MINIMUM HOLE SIZE = 0.011418831 1.45 in. dia. I I I EMERGENCY SPILLWAY ELEV. @EMER. SPILLWAY = 683 DESIGN STORM PEAK FLOW = 30.4 CFS FLOW THROUGH EMER. SPILLWAY = 10.5 CFS HEAD ABOVE TOP OF RIS ER = 1 BOTTOM WIDTH = 3.51 FLOTATION OF RISER ELEV. @ TOP OF RISER = 681.50 ELEV. @ BOT. OF PSS = 675.00 H = 6.50 ft AREA OF RISER = 7.1 SF VOLUME OF RISER = 45.9 Cubic Feet AREA OF BARREL = 3.1 SF EXPOSED LENGTH = 10.00 ft VOLUME OF BARREL = 31.4 Cubic Feet WEIGHT OF WATER DISPLACED = 4827.37 Ib FACTOR OF SAFETY (10%) 5310.11 Ib VOLUME OF CONCRETE ANCHOR = 35.4 Cubic Feet Page 3 10 Year Storm PROJECT: School G JOB NUMBER: E-3698 10-Year O 25.15 D 24 AREA 3.14 EMERGENCY S PILLWAY TP 17.0455 BARREL INVERT UP 675 ELEVATION 682.5 dT 4 Cw 3.33 BARREL INVERT OR LENGTH 25 Ks 2392.410083 L 160 DOWNSTREAM W.L. 674 C FACTOR 3 b 1.49 36 N FACTOR 0.027 N 1 STARTING LEVEL 680 Ke 1 Cd 0.59 SPILLWAY LEVEL 681.5 SPILLWAY AREA 7.07 SPILLWAY LENG TH 9.42 1 INFLOW STORAGE STAGE HEADWATER ORIFICE WEIR HYD. GRADE TOTAL EMERGENCY __ __ TIME _ CFS CFS FT FLOW FLOW FLOW FLOW FLOW SPILLWAY 0.0 0.00 0 680.00 0.00 0.00 0.00 0.00 0.00 0 1.7 0.62 63 680.09 33.53 0.00 0.00 19.99 0.00 0 2.6 1.37 133 680.14 33.72 0.00 0.00 20.08 0.00 0 3.4 2.40 256 680.22 33.97 0.00 0.00 20.21 0.00 0 4.3 3.68 444 680.32 34.30 0.00 0.00 20.37 0.00 0 5.1 5.18 709 680.44 34.68 0.00 0.00 20.56 0.00 0 6.0 6.87 1060 680.58 35.11 0.00 0.00 20.78 0.00 0 6.8 8.69 1505 680.73 35.59 0.00 0.00 21.02 0.00 0 7.7 10.61 2047 680.90 36.11 0.00 0.00 21.28 0.00 0 8.5 12.58 2691 681.08 36.67 0.00 0.00 21.56 0.00 0 9.4 14.54 3434 681.28 37.24 0.00 0.00 21.85 0.00 0 10.2 16.46 4276 681.48 37.84 0.00 0.00 22.15 0.00 0 11.1 18.29 5211 681.69 38.45 14.54 2.57 22.46 2.57 0 11.9 19.97 6101 681.88 38.99 20.57 7.28 22.74 7.28 0 12.8 21.47 6827 682.03 39.40 24.26 11.94 22.95 11.94 0 13.6 22.75 7380 682.13 39.71 26.66 15.84 23.11 15.84 0 14.5 23.78 7786 682.21 39.93 28.25 18.86 23.22 18.86 0 15.3 24.54 8076 682.27 40.08 29.33 21.10 23.29 21.10 0 16.2 25.00 8276 682.31 40.18 30.04 22.66 23.35 22.66 0 17.0 25.15 8403 682.33 40.25 30.48 23.68 23.38 23.38 0 17.9 25.00 8486 682.34 40.29 30.76 24.34 23.40 23.40 0 18.8 24.54 8544 682.36 40.32 30.96 24.81 23.42 23.42 0 19.6 23.78 8563 682.36 40.33 31.02 24.96 23.42 23.42 0 20.5 22.75 8528 682.35 40.31 30.90 24.68 23.41 23.41 0 21.3 21.47 8429 682.33 40.26 30.57 23.88 23.39 23.39 0 22.2 20.14 8263 682.30 40.18 29.99 22.56 23.34 22.56 0 23.0 18.88 8074 682.27 40.08 29.32 21.08 23.29 21.08 0 23.9 17.69 7901 682.23 39.99 28.69 19.74 23.25 19.74 0 24.7 16.57 7739 682.20 39.90 28.08 18.51 23.20 18.51 0 25.6 15.53 7587 682.17 39.82 27.49 17.36 23.16 17.36 0 26.4 14.55 7443 682.15 39.74 26.91 16.30 23.12 16.30 0 27.3 13.64 7307 682.12 39.67 26.36 15.31 23.08 15.31 0 28.1 12.78 7177 682.09 39.60 25.81 14.38 23.05 14.38 0 29.0 11.98 7054 682.07 39.53 25.28 13.51 23.01 13.51 0 29.8 11.22 6937 682.05 39.47 24.76 12.70 22.98 12.70 0 30.7 10.52 6826 682.02 39.40 24.25 11.93 22.95 11.93 0 31.5 9.85 6720 682.00 39.34 23.76 11.21 22.92 11.21 0 Page 1 10 Year Storm ___ INTENSITY 5.91 SCS CURVE NO. 81 C" FACTOR 0.8 Weighted C -See Below PRECIP DEPTH 3.64 _____ DRAINAGE AREA 5.32 Tp 17.04554444 O 25.15296 __ S Z CONTOUR CONTOUR INCR ACCUM _ AREA VOLUME VOLUME STAGE In S In Z Zest ___ 675 2518.13 0 0 0 676 3331.86 2924.995 2924.995 1 7.9810 0.0000 2.0771 677 4220.89 3776.375 6701.37 2 8.8101 0.6931 2.1759 _ _ 678 5182.1 4701.495 11402.865 3 9.3416 1.0986 2.86_ 679 7309.38 6245.74 17648.605 4 9.7784 1.3863 3.84 680 9696.7 8503 26152 5 10.1717 1.6094 5.00 Ks 2392.410083 ------- - b 1.49 Area "C" C`A 1.24 0.5 0.62 4.08 0.95 3.876 5.32 4.496 __ Weighted C 0.8 Page 2 100 year Storm PROJECT: School G JOB NUMBER: E~698 100-Year O 34.69 D 24 AREA 3.14 EMERGENCY S PILLWAY TP 22.0540 BARREL INVERT UP 675 ELEVATION 682.5 dT 4 Cw 3.33 BARREL INVERT O R LENGTH 25 Ks 2392.41008 L 160 DOWNSTREAM W. L. 674 C FACTOR 3 b 1.49 36 N FACTOR 0.027 N 1 STARTING LEVEL 680 Ke 1 Cd 0.59 SPILLWAY LEVE 681.5 SPILLWAY AREA 7.07 SPILLWAY LENG TH 9.42 1 __ INFLOW _ STORAGE STAGE HEADWATER ORIFICE WEIR HYD. GRADE TOTAL EMERGENCY TIME CFS CFS FT FLOW FLOW FLOW FLOW FLOW SPILLWAY 0.0 0.00 0 680.00 0.00 0.00 0.00 0.00 0.00 0 2.2 0.85 112 680.13 33.67 0.00 0.00 20.05 0.00 0 3.3 1.89 237 680.21 33.94 0.00 0.00 20.19 0.00 0 4.4 3.31 457 680.33 34.32 0.00 0.00 20.38 0.00 0 5.5 5.08 793 680.48 34.79 0.00 0.00 20.62 0.00 0 6.6 7.15 1266 680.65 35.34 0.00 0.00 20.89 0.00 0 7.7 9.47 1892 680.85 35.97 0.00 0.00 21.21 0.00 0 8.8 11.98 2685 681.08 36.66 0.00 0.00 21.56 0.00 0 9.9 14.63 3653 681.33 37.40 0.00 0.00 21.93 0.00 0 11.0 17.34 4800 681.60 38.19 10.47 0.96 22.33 0.96 0 12.1 20.06 6064 681.87 38.97 20.36 7.06 22.73 7.06 0 13.2 22.70 7099 682.08 39.56 25.47 13.82 23.03 13.82 0 14.3 25.22 7853 682.23 39.96 28.51 19.37 23.23 19.37 0 15.4 27.54 8393 682.33 40.24 30.44 23.60 23.38 23.38 0 16.5 29.61 8805 682.40 40.45 31.82 26.93 23.48 23.48 0 17.6 31.37 9327 682.50 40.71 33.45 31.29 23.62 23.62 0 18.7 32.80 9934 682.61 41.00 35.22 36.52 23.77 23.81 0 19.8 33.84 10598 682.72 41.31 37.01 42.40 23.93 24.34 0 21.0 34.47 11268 682.84 41.62 38.71 48.51 24.08 25.52 1 22.1 34.69 11874 682.94 41.89 40.18 54.16 24.22 27.40 3 23.2 34.47 12343 683.02 42.09 41.22 58.59 24.33 29.50 5 24.3 33.84 12630 683.06 42.22 41.86 61.34 24.39 31.11 7 25.4 32.80 12741 683.08 42.27 42.10 62.41 24.41 31.80 7 26.5 31.37 12713 683.08 42.25 42.04 62.14 24.41 31.62 7 27.6 29.64 12582 683.06 42.20 41.75 60.88 24.38 30.82 6 28.7 27.78 12381 683.02 42.11 41.31 58.95 24.33 29.70 5 29.8 26.03 12138 682.98 42.01 40.76 56.65 24.28 28.50 4 30.9 24.39 11866 682.94 41.89 40.14 54.08 24.22 27.37 3 32.0 22.86 11568 682.89 41.75 39.44 51.29 24.15 26.34 2 33.1 21.42 11242 682.83 41.61 38.65 48.27 24.08 25.46 1 34.2 20.07 10885 682.77 41.45 37.75 45.01 23.99 24.75 1 35.3 18.81 10492 682.70 41.27 36.74 41.46 23.90 24.22 0 36.4 17.62 10056 682.63 41.06 35.55 37.58 23.80 23.88 0 37.5 16.51 9569 682.54 40.83 34.17 33.35 23.68 23.68 0 38.6 15.47 9026 682.44 40.56 32.52 28.76 23.54 23.54 0 39.7 14.50 8428 682.33 40.26 30.56 23.87 23.39 23.39 0 40.8 13.59 7779 682.21 39.92 28.23 18.81 23.21 18.81 0 41.9 12.73 7377 682.13 39.71 26.64 15.82 23.10 15.82 0 43.0 11.93 7120 682.08 39.57 25.56 13.97 23.03 13.97 0 44.1 11.18 6935 682.05 39.47 24.75 12.68 22.98 12.68 0 45.2 10.48 6790 682.02 39.38 24.08 11.68 22.94 11.68 0 46.3 9.82 6666 681.99 39.31 23.50 10.86 22.90 10.86 0 47.4 9.20 6557 681.97 39.25 22.97 10.13 22.87 10.13 0 48.5 8.62 6457 681.95 39.20 22.47 9.49 22.84 9.49 0 49.6 8.08 6363 681.93 39.14 21.99 8.89 22.82 8.89 0 50.7 7.57 6276 681.91 39.09 21.53 8.34 22.79 8.34 0 51.8 7.09 6193 681.90 39.04 21.08 7.84 22.77 7.84 0 52.9 6.65 6115 681.88 39.00 20.65 7.36 22.74 7.36 0 Page 1 100 year Storm --~-~---~-~----- INTENSITY --- 8.15 - SCS CURVE NO. 81 _____ C" FACTOR 0.8 Weighted C -See Below PRECIP DEPTH 5.3 DRAINAGE AR EA 5.32 T 22.0539732 O 34.6864 S Z _ CONTOUR CONTOUR INCR ACCUM AREA VOLUME VOLUME STAGE In S In Z Zest ________ 675 _ 2518.13 0 0 0 __ 676 3331.86 2924.995 2924.995 1 7.9810 0.0000 2.0771 677 4220.89 3776.375 6701.37 2 8.8101 0.8931 2.1759 678 5182.1 4701.495 11402.865 3 9.3416 1.0986 2.86 679 7309.38 6245.74 17648.605 4 9.7784 1.3863 3.84 680 9696.7 8503 26152 5 10.1717 1.6094 5.00 Ks 2392.410083 b 1.49 Area "C" C'A 1.24 0.5 0.62 4.08 0.95 3.876 5.32 4.496 ____ Weighted C 0.8 Page 2 Wet Detention Pond Volume Worksheet Sediment Forebay EI Area Av. Area Volume Sum Volume 675 864.09 1042.75 1042.75 676 1221.41 1042.75 1608.585 2815.024 677.75 1995.76 3857.774 Overall Volume EI Area Av. Area Volume Sum Volume 675 2518.13 2924.995 2924.995 676 3331.86 2924.995 3776.375 3776.375 677 4220.89 6701.37 4701.495 4701.495 678 5182.1 11402.87 6245.74 6245.74 679 7309.38 17648.61 8503.04 8503.04 680 9696.7 26151.65 11953.05 11953.05 681 14209.4 38104.7 14947.63 14947.63 682 15685.86 53052.33 16452.37 16452.37 683 17218.88 69504.7 17218.88 ~ DWQ Project No DIVISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : ~.,~F'r, ' `~ A ~. Contact Person: ~ , ~ ~ F, ~ - ~ ~ r; Phone Number: (? ~~ 1 ~t~t: - ~`~'a: ~` For projects with multiple basins, specify which basin this worksheet applies to: =r~ J;u rlA~~ ~ :'•'',~'',rs` ~` ~- Permanent Pool Elevation `'~. ~~ ~ ~ ft. (elevation of the orifice invert out) Temporary Pool Elevation ~ ~~ ~ ~° ft. (elevation of the outlet structure invert in) Bioretention Surface Area r ~~ ~ sq. ft, Drainage Area <-', ~' ;~ ac. (on-site and off-site drainage to the basin) Impervious Area `_ ~ `~'~ ac. (on-site and off-site drainage to the basin) Rational C Coefficient ~• `~. ~, Size % ~" % (either 5% in w/sand under drain or 7% in w/o) Inlet Velocity ~ ~--" fps Inlet flow depth ~ in Depth to Ground Water t,<; ft. Planting Soil Infiltration Rate r^.sn - <.,•~, t~.' in./hr. (the soil layer down to 4 feet) In-Situ Soil Infiltration Rate ;~, ~, - ~ • ~ in./hr. (the soil layer below 4 feet or below the sand bed) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials _I f~~a No vertical sand bed is proposed J t~~ The bioretention area is at least 40 feet by 15 feet. -- = ~-- Sheet flow is provided at inlet. __' r> ~~- Water table depth is greater than 6 feet. ' r~.' ~ Minimum of 6" ponding is provided. r::? r` The ponded area will draw down in less than 4 days. 1~..`': Planting soil infiltration rate is greater than 0.52 inlhr. t«~ ° The in-situ soil infiltration rate is greater than 0.2 in/hr. ,`~ i~ ~~~ A planting plan with species and densities is provided. 4 f_t ~:~ Mulch layer is specified in plans. ra f, Planting soil meets minimum soil specifications (NCDENR stormwater Best Management Practices Manual, April 1999) . `. ~-.`~'~, Plan details for the bioretention area provided. `~ -~~ ~ Plan details for the inlet and outlet are provided. . p=~ P, An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains k Client ~~ ' ''~~ ~'~'~ `'^ ~ ` Crt,d,~``" Computed By dm Job No. +~ E 4"~ Date - Project Description Checked By Calculations For ti ~1 a ~` ~ ~ i Date DAVIS-MARTIN-POWELL & ASSOCIATES, INC. 218 GATEWOOD AVE., SUITE 102, HIGH POINT, NC 27262 Page of ~ _ _L _; ~ ~ _ __ . ._ -~,..~_ ~ M..; f~_ ~ . - _ ~ __.... ., r ~.._ F -c -r-~~. ., _.._.__ .~_ . _ _._ __ .._ _ ___ ..,, U ._ , ~ ~_. _ .m _ _ _. ' __ . _ ~ _ __ Ot t~~ _ _..,,~~._ _~ ~_.~_ _.~ . ~3 _ . ;_. ,__.. .._.,._ w ~,r ~ ~, ~, f:-, F ~ ~ _._ . , ,, _ - _ _ m,-~.._ < '`~ _ _.__ _., .. .__....... _ _ s .. _ _ (Revised, Superseded, and Void Calculations Must Be Clearly Identified, Initialed, and Dated by the Responsible Individual) The following explanation for not meeting all the requirements under Item II of the Bio- Retention Worksheets and 401 Wet Detention Basin Worksheets for Elementary School G. Drainage Basin #1 Sheet flow is not provided into the bio retention area. The storm drainage system discharges into the bio retention area. An adequately sized energy dissipator is located at the discharge point. Drainage Basin #4 Sheet flow is not provided into the bio retention area. The storm drainage system discharges into the bio retention area. An adequately sized energy dissipator is located at the discharge point.