HomeMy WebLinkAbout20160847 Ver 1_Year 1_MR_ResponseToDWRComments_20191211fires December 6, 2019 Mac Haupt NC DEQ Division of Water Resources 512 N. Salisbury Street Raleigh, NC 27604 RE: Dairyland Stream Mitigation Site: MY1 Monitoring Report 302 Jefferson Street, Suite 110 Raleigh, NC 27605 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400 Listed below are comments provided by DWR on November 11, 2019 regarding the Dairyland Stream Mitigation Site: Year 1 Monitoring Report and RES' responses. 1. DWR would prefer that veg monitoring not take place until mid -late September for year 1 and 2. Noted. 2. In the future where reaches are suspected to lose flow, DWR expects the stream gauges to be installed by the end of the As -Built. Failure to do so may require and extra year of flow monitoring. Per the approved Mitigation Plan, bankfull events, not flow days, were to be reported on project reaches. This is why RES did not think it was an issue that HOBOs were installed quickly after as -built. If DWR would like flow to be reported as well, RES can report it in future monitoring years. 3. Are you using the CVS data entry tool? Yes. 4. Cross sections 10 and 11 look somewhat dry and contain some large stone, has there been an issue with flow on this reach. Cross sections 10 and 11 are located in the repair area on UT-2, where large stone was used to stabilize structures. The repair is described in Section 1.6 of the MY1 Report. There has not been an issue with flow on this reach however, RES can report flow from the Stage Recorder on UT-2. 5. Are you seeing flow in pond bottoms? Yes. 6. Have you touched base with landowner regarding encroachments? Yes. RES also plans to install t-posts with horse tape strung up to provide a physical barrier in the encroachment areas. res.us