Loading...
HomeMy WebLinkAboutNCC193166_NOI Application_20191216Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 12/11/2019 3:19:01 PM (NCG01 NOI Submission) Approve by Clark, Paul 12/11/2019 3:25:11 PM (Review- Construction NOI 19451) • The task was assigned to Clark, Paul by round robin distribution 12/11/2019 3:19 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 13, 2019 5:00 PM 12/11/2019 3:19 PM Submit by McCoy, Suzanne 12/16/2019 1:37:31 PM (Payment Verification for NCC193166) * Sorensen Contracting Corp. • McCoy, Suzanne assigned the task to McCoy, Suzanne 12/16/2019 1:37 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 22, 2020 5:00 PM 12/11/2019 3:25 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Sorensen 2. County* Wake 3. Highway or Street 7636 Ladora Drive Address * Street narre only is acceptable if no address number assigned yet 4. Cityor Township* Willow Spring 5. State * NC 6. Zip Code * 27592 7. Latitude * Enter the latitude in decimal degrees 35.5812 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -78.7029 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 12/30/2019 Estimated Construction Project Start Date 10. Date to End* 07/31/2020 Estimated Construction Project End Cute 11. SIC (Primary) * Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Developrrent 12. Acres to be 0.91 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.52 (acres) * 14. Post- 0.00 construction (Estimated) impervious area (acres)* NCC Project NCC-WAKE-2019-Sorensen Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Black Creek Waterbody* %neof waterbody into which storrrwater runoff will discharge 15b. Waterbody 27-45-(2) Index No. * NCWaterbody Index Nurrber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project subject to the NC Sediment Pollution Control Act?* 16b. Is this project subject to the US Clean Water Act? r Yes r No, not subject to NC SPCA r Yes f No, not subject to US CWA This project will be issued a Certificate of Coverage under NCG250000 rather than NCG010000. The Erosion and Sediment Control Plan shall be reviewed and approved by the appropriate DEMLR Regional Office, and then this Notice of Intent form shall be completed and submitted. B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Land Owner Name * 2. First Name* Michael If Corporation, enter Registered Agent First f brre 3. Last Name* Sorensen If Corporation, enter Faegistered Agent Last %rre 3b. Title Land Owner 4. Permitee E-mail keith.buildingart@gmail.com Address * 5. Permittee 919-795-5975 Telephone No.* 6. Permittee Mailing Street Address Address* Fuquay-Varina Address Line 2 PO Box 1105 City State / Province / Faegion Fuquay-Varina NC Postal / Zip Code Country 27526 us Check box if the r Yes street address the same as mailing address 7. Permittee Street Street Address Address* Fuquay-Varina Address Line 2 8505 Currin Drive City State / Frovince / Region Fuquay-Varina NC Fbstal / Zip Code Country 27526 us C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Type of Individual Ownership * 2. Primary Site Michael Contact - First Name * 3. Primary Site Sorensen Contact - Last Name * 4. Title 5. Site Contact E- keith.buildingart@gmail.com mail Address* 6. Site Contact 919-795-5975 Telephone No.* 7. Organization Name 8. Site Contact Street Address Mailing Address* Fuquay-Varina Address Line 2 PO Box 1105 Cty Fuquay-Varina Fbstal / Zip Code 27526 9. Consultant Name (Optional) First and Last narre 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Rovince / Fbgion NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 12/05/2019 Approved * 2. E&SC Plan Project SEC-023662-2019 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Wake County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan US Army Cor SAW-2019-02202 signed NWP Approval 1.57MB verification. pdf letter/documentation Wake CO SEC-023662-2019 Approval Letter 276.92KB Sediment and Erosion 12-5-19.pdf Mast be RDFfon-rat 6. NOI Certification SIGNED NCG01 NOI Cert Form SIGNED.pdf 766.77KB Form Mist be RDFfornat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature �frCcr�rrP�!Jli y�d�r%�rlrsv7! Type Name* Michael Keith Sorensen Title land owner Organization land owner Date * 12/11 /2019 F. Tracking and COC Info NOI Tracking No. 19451 NC Reference No. NCG25-2019-3166 Uses 'count number' variable (incremrented by SP) Certificate of NCC193166 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 3166 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)