Loading...
HomeMy WebLinkAbout20061085 Ver 2_Stormwater Info_20061116~ DAVIS-MARTIN-POWELL & ASSOCIATES, INC. ENGINEERING LAND PLANNING • SURVEYING 6415 Old Plank Road, High Point, NC 27265 (336) 886-4821 • Fax (336) 886-4458 • www.dmp-inc.com Cynthia Van Der Wiele NCDWQ Wetlands Unit/Express Review Program 2321 Crabtree Blvd Suite 250 Raleigh, NC 27604 November 15, 2006 RE: Elementary School G DMP Job No. E3938 DWQ EXP No. 06-1085 Dear Ms. Van Der Wiele, Thank you for your review of the storm water management plan for Elementary School G. Per the letter dated November 7, 2006 enclosed is 1 copy of the revised plan sheets in accordance with the comments with 2 copies being forward to Mr. Barry Love in the Mooresville Regional Office. The comments are listed below with our response in italics. A.) You have subdivided your project site into nine drainage areas. Three of these areas meet the criteria for requiring engineered storm water management- Basins 1,3, and 4. You have not provided storm water management for Basin No. 4. This will be required. A bio retention area for Basin No. 4 has been provided. Sizing calculations are enclosed B.) Grassed swales provide only 35%TSS removal; you are required by the conditions of the General Water Quality Certification to provide storm water BMP's that removes at least 85%TSS. Please redesign the storm water management plan for Basin No. 1. The grass swale has been replaced with a bio retention area. Sizing calculations are enclosed. C.) The fore bay for Wet Detention Pond for Basin No. 3 is extremely oversized. This does not provide additional water quality benefits. Please redesign your pond. The pond has been redesigned to include the required littoral shelf and the sediment fore bay has been redesigned to be more adequate for the pond. D.) Please provide a planting plan for the littoral shelves of the wet detention ponds. Please refer to the NC DENR 1999 Storm water Best Management Practices Manual for design guidance. A planting plan for the littoral shelves is included. If you have any additional comments or questions about the plans please do not hesitate to give me or Eddie MacEldowney a call. I look forward to hearing from you. ~~~aa~ D CC: File Barry Love (MRO) r ~~'' `'~~; ' Q<'thli'lfdiEr: Don Dixon (UCPS) Sincerely, Davis-Martin-Powell and Associates Ja G ffey, E Bioretention Sizing (#1 Basin #1) Watershed Size 4.37 acres Percent Connected Impervious 31.T Water Quality Storm 1 in For Disconnected/Composite Area Soil Type CN 0 A 49 1 B 69 0 C 79 0 D 84 69` Selected Curve Number Hate: Select Soil Group with "1" First Flush Runoff 1.1 Q ac-in equation: based off SCS CN Method. No Composite CN Average Depth 9 in Surface Area 0.12 ac equation: Volume /Depth 5335 sf Fill Soil Choice Nitrogen Removal -Sandy Loam K= 1 in/hr Soil Type: 12% Fines (Silt+Clay), 82-85% Sand, 3-Ei% Organic Other Pollutant Removal -Loamy Sand K= 2 in/hr Soil Type: 8% Fines (Silt+Clay), 86-90% Sand, 2-4% Organic K= 2 in/hr Underdrains Minimum Flow equation: Q = 2.3E-5 * K * A 0.25 cfs Factor of Safety (range between 2 and 10) 4 Design Flow Note to User: Yellow Cells Require User Input Blue Dells Have Been Previously Determined Pink Cells are Calculations within this Spreadsheet Breakdown of Runoff Connected Imperv RO 0.79 in 1.10 ac-in Composite RO (the rest) 0.00 in 0.01 ac-in 0.98 cfs Manning's Roughness Coefficient 0.011 smooth wall 0.015 corrugated wall :0.011. ; n Internal Slope (recommended minimum 0.5%) 05` Pipe(s) Diameter(s) 7:91: inches equation: D = 16 * (Q * n * s^0.5)^(3/8) # of 4"diam. # of 6" diam. calculations assume n=0.011 Underdrains Underdrains 7 3 Note: A minimum of 2 underdrains recommended Equivalent Pipe Diameters D= (in) No. of 4" diam 5.13 2 5.95 3 6.66 4 7.22 5 7.75 6 8.2 7 D= (in) No of 6" diam 7.84 2 9.11 3 10.13 4 Bioretention Sizing (#2 Basin #4) Watershed Size 1.2 acres Percent Connected Impervious 37.8' Water Quality Storm 1 in For Disconnected/Composite Area Soil Type CN 0; A 49 1 B 69 0 C 79 0 D 84 69 Selected Curve Number note: Select Soil Group with "1" First Flush Runoff 0.36 ac-in equation: based off SCS CN Method. No Composite CN Average Depth _9 in Surface Area 0.04 ac equation: Volume /Depth 1744 sf Fill Soil Choice Nitrogen Removal -Sandy Loam K=1 in/hr Soil Type: 12% Fines (Silt+Clay), 82-85% Sand, 3-6% Organic Other Pollutant Removal -Loamy Sand K= 2 in/hr Soil Type: 8% Fines (Silt+Clay), 86-90% Sand, 2-4% Organic K= ' - 2 in/hr Underdrains Minimum Flow equation: Q = 2.3E-5 " K * A Q.08 cfs Factor of Safety (range between 2 and 10) 4 Design Flow Note to User: Yellow Cells Require User Input Blue Gells Have Been Previously Determined Pink Cells are Calculations within this Spreadsheet Breakdown of Runoff Connected Imperv RO 0.79 in 0.36 ac-in Composite RO (the rest) 0.00 in 0.00 ac-in 0.32 cfs Manning's Roughness Coefficient 0.011 smooth wall 0.015 corrugated wall 0.011', n Internal Slope (recommended minimum 0.5%) 0.5 Pipe(s) Diameter(s) 5.2fl inches equation: D = 16 " (Q " n ' s^0.5)^(3/8) # of 4" diam. # of 6" diam. calculations assume n=0.011 Underdrains Underdrains 3 2 Note: A minimum of 2 underdrains recommended Equivalent Pipe Diameters D= (in) No. of 4"diam D= (in) No of 6" diam 5.13 2 7.84 2 5.95 3 9.11 3 6.66 4 10.13 4 7.22 5 7.75 6 8.2 7 wetpond.xls PERMANENT WET DETENTION POND DESIGN -; i PROJECT: ! School G INDEX NO: CHECKED BY: etm LOCATION: DATE: REVISED: 11-15-06 JNG SITE DATA TOTAL SITE AREA = 5.32 acres WATERSHED = PROPOSED BUILT UPON AREA = 4.08 acres CLASSIFICATION : WS - FUTURE BUILT UPON AREA = 0.00 acres TOTAL ON-SITE BUILT UPON AREA = 4.08 acres PERCENT BUILT-UPON = 76.69% (GWANVCA) _ ON-SITE DRAINAGE AREA TO POND = 5.32 acres MAX. OFF-SITE B.U.% _ OFF-SITE DRAINAGE AREA TO POND = 0.00 acres TOTAL WATERSHED AREA TO POND = 5.32 acres DISTURBED AREA = 5.32 acres TEM P. SED. STOR. USED (Y/N Y DESIGN DATA TEMPORARY SEDIMENT STORAGE 0.5 acre-inch per disturbed acre PERMANENT SEDIMENT STORAGE 0.125 acre-in per total drainage area PERMANENT WATER QUALITY COMPOSITE B.U. % = 76.69 percent _ DEPTH (minimum 3 feet) 3.0 feet SA/DA (Figure 5.6-2) 3.2 percent TEMPORARY WATER QUALITY 1.0 Inch rainfall to be controlled PRINCIPAL SPILLWAY TYPE X corrugated aluminum reinforced concrete DESIGN STORM 10 ,year RAINFALL INTENSITY 5.32 inches per hour RUNOFF COEFFICIENT 0.7 EMERGENCY SPILLWAY TYPE X grass lined rip-rap lined DESIGN STORM 100 year RAINFALL INTENSITY 8.15 inches per hour RUNOFF COEFFICIENT 0.7 POND DATA ~ ELEV. @ BOT. OF POND = 675 i SURFACE AREA = 2518 SF ELEV.@ BOT. OF PSS = 675 ~ SURFACE AREA = 2518 SF ELEV. @ BOT. OF PWQ = 677 ~ SURFACE AREA = 4221 SF ELEV. @ BOT. OF TWQ = 680 SURFACE AREA = 9697 SF ELEV. @ TOP. OF TWQ = 681.5 SURFACE AREA = 14968 SF EL EV_ @ EMER_ SPILLWAY = T683 _ ~____ _ _____ _ ELEV. @ TOP OF DAM = 1685 ~ __ ___ _ _ INVERT OF BARREL = ________ 909 _________ _______ ~ Page 1 wetpond.xls ELEV. @ BOT. OF POND=1675.00 SURFACE AREA =2518 Square Feet ~ ELEV. C~ BOT. OF TWQ = 680.00 SURFACE AREA = 9697 Square Feet I I ALLOW 75% OF BASIN VOLUME TO WQ ORIFICE =1 22903 Cubic Feetl OKI 14 ELEV. @ BOT. OF PSS =1675.00 ~ SURFACE AREA =12518 Square Feet ~ ELEV. (c~ BOT. OF PWQ = 677.00 ! SURFACE AREA = 4221 Square Feet VOLUME PROVIDED = 741 NORMAL POOL ELEVATION = 680.00 SURFACE AREA PROVIDED = 9697 Square Feet Rv=~ 0.740 in/ink VOLUME REQUIRED = 14295 Cubic Feed ELEV. @ BOT. OF TWQ = 680.00 SURFACE AREA =19697 Square Feet ELEV. @ TOP OF TWQ = 681.50 SURFACE AREA = 14968 Square Feet i ~ ~ VOLUME PROVIDED = 18499 Cubic Feet OK Page 2 wetpond.xls PRINCIPAL SPILLWAY DESIGN STORM PEAK FLOW = 19.8 CFS HEAD ABOVE TOP OF RISER = ; i 1.50 ELEVATION AT TOP OF RISER = ~ I 681.50 BARREL: ELEV. OF BARREL INV. = 909 TRY BARREL DIA. = 24.00 in. dia. h = -227 ORIFICE EQUATION i Q =i #NUM! #NUM! RISER: RISER(AREA) =1.5 TIMES BARREL(AREA) TRY RISER DIA. = 36 in. dia. WEIR EQUATION Q =; 57.7 CFS OK ORIFICE EQUATION Q= 41.7 CFS OK ORIFICE CONTROLS WATER QUALITY RELEASE HOLE ELEV. @ BOT. OF WATER QUALITY REL EASE HOLE = 680.00 MAXIMUM RELEASE RATE = i 4 Days MINIMUM RELEASE RATE = 6 Days MAXIMUM HOLE SIZE = 0.014273539 1.62 in. dia. MINIMUM HOLE SIZE = 0.009515693 1.32 in. dia. EMERGENCY SPILLWAY ELEV. @EMER. SPILLWAY = , 683 DESIGN STORM PEAK FLOW = 30.4 CFS FLOW THROUGH EMER. SPILLWAY = 10.5 CFS HEAD ABOVE TOP OF RISER = 1 BOTTOM WIDTH = 3.51 FLOTATION OF RISER ELEV. @ TOP OF RISER = 681.50 ELEV. @ BOT. OF PSS = 675.00 H = 6.50 ft AREA OF RISER = 7.1 SF VOLUME OF RISER = 45.9 Cubic Feet AREA OF BARREL = ; 3.1 SF EXPOSED LENGTH = 10.00 ft VOLUME OF BARREL = ' 31.4 Cubic Feet WEIGHT OF WATER DISPLACED = 4827.37 Ib FACTOR OF SAFETY (10%) 5310.11 Ib VOLUME OF CONCRETE ANCHOR = , 35.4 Cubic Feet Page 3 i Wet Detention Pond ~ Volume Worksheet Sediment Forebay 20% of permanent sed iment storage 1340.274 cf EI Area Av. Area Volume Sum Volume 675 517.67 652.15 652.15 676 786.63 652.15 945.065 945.065 677 1103.5 1597.215 Sediment storage in forebay is 23.8% of perm anent sedi ment storag e i Overall Volume EI Area Av. Area Volume Sum Volum e 675 2518.13 2924.995 2924.995 676 3331.86 2924.995 3776.375 3776.375 677 4220.89 6701.37 4701.495 4701.495 678 5182.1 11402.87 6245.74 6245.74 679 7309.38 17648.61 ! 8503.04 8503.04 680 9696.7 26151.65 11953.05 11953.05 681 14209.4 38104.7 14947.63 14947.63 682 15685.86 53052.33 I 16452.37 16452.37 683 17218.88 69504.7' 17218.88 1 I 10 Year Storm PROJECT__: _ School G _ JOB NUMBER: E-3698 10-Year O 22.01 D 24 AREA 3.14 EMERGENCY S PILLWAY TP 19.4806 BARREL INVERT UP 675 ELEVATION 683.5 dT 4 Cw 3.33 BARREL INVERT OR LENGTH 25 Ks 2392.410083 L 160 DOWNSTREAM W.L. 674 C FACTOR 3 b 1.49 36 N FACTOR 0.027 N 1 STARTING LEVEL 680 Ke 1 Cd 0.59 SPILLWAY LEVEL 681.5 SPILLWAY AREA 7.07 SPILLWAY LENGTH 9.42 1 INFLOW STORAGE STAGE HEADWATER ORIFICE WEIR HYD. GRADE TOTAL EMERGENCY _ _ _ _ _ TIME CFS CFS FT _ FLOW FLOW FLOW FLOW FLOW SPILLWAY 0.0 0.00 0 680.00 0.00 0.00 0.00 0.00 0.00 0 1.9 0.54 63 680.09 33.53 0.00 0.00 19.99 0.00 0 2.9 1.20 133 680.14 33.72 0.00 0.00 20.08 0.00 0 3.9 2.10 256 680.22 33.97 0.00 0.00 20.21 0.00 0 4.9 3.22 444 680.32 34.30 0.00 0.00 20.37 0.00 0 5.8 4.54 709 680.44 34.68 0.00 0.00 20.56 0.00 0 6.8 6.01 1060 680.58 35.11 0.00 0.00 20.78 0.00 0 7.8 7.60 1505 680.73 35.59 0.00. 0.00 21.02 0.00 0 8.8 9.28 2047 680.90 36.11 0.00 0.00 21.28 0.00 0 9.7 11.00 2691 681.08 36.67 0.00 0.00 21.56 0.00 0 10.7 12.73 3434 681.28 37.24 0.00 0.00 21.85 0.00 0 11.7 14.40 4276 681.48 37.84 0.00 0.00 22.15 0.00 0 12.7 16.00 5211 681.69 38.45 14.54 2.57 22.46 2.57 0 13.6 17.47 6082 681.87 38.98 20.46 7.17 22.73 7.17 0 14.6 18.79 6761 682.01 39.37 23.95 11.49 22.93 11.49 0 15.6 19.91 7253 682.11 39.64 26.13 14.92 23.07 14.92 0 16.6 20.81 7597 682.18 39.83 27.53 17.44 23.16 17.44 0 17.5 21.47 7833 682.22 39.95 28.43 19.22 23.23 19.22 0 18.5 21.87 7988 682.25 40.03 29.01 20.41 23.27 20.41 0 19.5 22.01 8081 682.27 40.08 29.35 21.14 23.30 21.14 0 20.5 21.87 8124 682.28 40.10 29.50 21.47 23.31 21.47 0 21.4 21.47 8124 682.28 40.10 29.50 21.47 23.31 21.47 0 22.4 20.81 8086 682.27 40.08 29.36 21.17 23.30 21.17 0 23.4 19.91 8012 682.26 40.05 29.09 20.60 23.28 20.60 0 24.4 18.79 7906 682.24 39.99 28.71 19.78 23.25 19.78 0 25.3 17.63 7780 682.21 39.92 28.23 18.82 23.21 18.82 0 26.3 16.52 7645 682.19 39.85 27.72 17.80 23.18 17.80 0 27.3 15.48 7509 682.16 39.78 27.18 16.79 23.14 16.79 0 28.2 14.50 7376 682.13 39.71 26.64 15.81 23.10 15.81 0 29.2 13.59 7246 682.11 39.64 26.10 14.87 23.07 14.87 0 30.2 12.73 7121 682.08 39.57 25.57 13.98 23.03 13.98 0 31.2 11.93 7002 682.06 39.50 25.05 13.14 23.00 13.14 0 32.1 11.18 6887 682.04 39.44 24.53 12.35 22.97 12.35 0 33.1 10.48 6778 682.02 39.38 24.03 11.60 22.94 11.60 0 34.1 9.82 6673 681.99 39.32 23.54 10.90 22.91 10.90 0 35.1 9.20 6574 681.97 39.26 23.05 10.25 22.88 10.25 0 36.0 8.62 6479 681.96 39.21 22.58 9.63 22.85 9.63 0 Page 1 10 Year Storm INTENSITY 5.91 SCS CURVE NO. 81 _ ___ C" FACTOR 0.7 __ Weighted C -See Below _ PRECIP DEPTH 3.64 ----- - DRAINAGE AREA 5.32 T 19.48062221 -_- O 22.00884 _ _ ___ S Z ___ CONTOUR CONTOUR INCR ACCUM __ _ _ __ _ ___ AREA VOLUME VOLUME STAGE In S In Z Zest 675 2518.13 0 0 0 676 3331.86 2924.995 2924.995 1 7.9810 0.0000 2.0771 677 4220.89 3776.375 6701.37 2 8.8101 0.6931 2.1759 678 5182.1 4701.495 11402.865 3 9.3416 1.0986 2.86 679 7309.38 6245.74 17648.605 4 9.7784 1.3863 3.84 680 9696.7 8503 26152 5 10.1717 1.6094 5.00 Ks 2392.410083 __ b 1.49 Area "C" C*A 4.96 0.22 1.0912 6.04 0.6 3.624 _ - - -- -- _ 11 4.7152 Wei hted C 0.4 Page 2 100 year Storm PR_OJECT:_ _ _School G__ _ JOB NUMBER: E-3698 100-Year O 30.35 D 24 AREA 3.14 EMERGENCYS PILLWAY TP 25.2045 BARREL INVERT UP 675 ELEVATION 682.5 dT 4 Cw 3.33 BARREL INVERT O R LENGTH 25 Ks 2392.41008 L 160 DOWNSTREAM W. L. 674 C FACTOR 3 b 1.49 36 N FACTOR 0.027 N 1 STARTING LEVEL 680 Ke 1 Cd 0.59 SPILLWAY LEVEL 681.5 SPILLWAY AREA 7.07 SPILLWAY LENG TH 9.42 1 INFLOW STORAGE STAGE HEADWATER ORIFICE WEIR HYD. GRADE TOTAL EMERGENCY TIME CFS CFS FT FLOW _ FLOW FLOW FLOW FLOW SPILLWAY 0.0 0.00 0 680.00 0.00 0.00 0.00 0.00 0.00 0 2.5 0.74 112 680.13 33.67 0.00 0.00 20.05 0.00 0 3.8 1.65 237 680.21 33.94 0.00 0.00 20.19 0.00 0 5.0 2.90 457 680.33 34.32 0.00 0.00 20.38 0.00 0 6.3 4.44 793 680.48 34.79 0.00 0.00 20.62 0.00 0 7.6 6.26 1266 680.65 35.34 0.00 0.00 20.89 0.00 0 8.8 8.29 1892 680.85 35.97 0.00 0.00 21.21 0.00 0 10.1 10.49 2685 881.08 36.66 0.00 0.00 21.56 0.00 0 11.3 12.80 3653 681.33 37.40 0.00 0.00 21.93 0.00 0 12.6 15.18 4800 681.60 38.19 10.47 0.96 22.33 0.96 0 13.9 17.55 6055 681.87 38.96 20.31 7.00 22.72 7.00 0 15.1 19.86 7027 682.06 39.52 25.16 13.32 23.01 13.32 0 16.4 22.06 7689 682.19 39.88 27.88 18.13 23.19 18.13 0 17.6 24.10 8140 682.28 40.11 29.56 21.59 23.31 21.59 0 18.9 25.91 8466 682.34 40.28 30.69 24.18 23.40 23.40 0 20.2 27.45 8773 682.40 40.44 31.71 26.67 23.48 23.48 0 21.4 28.70 9167 682.47 40.63 32.98 29.94 23.58 23.58 0 22.7 29.61 9623 682.55 40.85 34.33 33.82 23.69 23.70 0 23.9 30.16 10112 682.64 41.09 35.71 38.08 23.81 23.91 0 25.2 30.35 10600 682.72 41.32 37.02 42.42 23.93 24.34 0 26.5 30.16 11040 682.80 41.52 38.14 48.41 24.03 25.03 1 27.7 29.61 11386 682.86 41.67 39.00 49.60 24.11 25.82 2 29.0 28.70 11604 882.89 41.77 39.52 51.62 24.16 26.45 2 30.2 27.45 11679 682.91 41.80 39.70 52.33 24.18 28.70 3 31.5 25.91 11619 682.90 41.78 39.56 51.77 24.16 26.50 2 32.8 24.31 11453 682.87 41.70 39.16 50.22 24.13 26.00 2 34.0 22.78 11209 682.83 41.59 38.57 47.97 24.07 25.38 1 35.3 21.34 10904 682.78 41.46 37.80 45.17 24.00 24.78 1 36.5 20.00 10542 682.71 41.29 36.87 41.90 23.91 24.28 0 37.8 18.74 10124 882.64 41.09 35.74 38.18 23.81 23.92 0 39.1 17.56 9643 682.56 40.86 34.38 33.99 23.70 23.70 0 40.3 16.46 9095 682.46 40.60 32.74 29.34 23.56 23.58 0 41.6 15.42 8480 682.34 40.29 30.74 24.29 23.40 23.40 0 42.8 14.45 7803 682.22 39.94 28.32 18.99 23.22 18.99 0 44.1 13.54 7391 682.14 39.72 26.70 15.92 23.11 15.92 0 45.4 12.69 7147 682.09 39.58 25.68 14.16 23.04 14.18 0 46.6 11.89 6975 682.05 39.49 24.93 12.95 22.99 12.95 0 47.9 11.14 6838 682.03 39.41 24.31 12.01 22.95 12.01 0 49.1 10.44 6719 682.00 39.34 23.75 11.21 22.92 11.21 0 50.4 9.78 6611 681.98 39.28 23.24 10.49 22.89 10.49 0 51.7 9.17 6511 681.96 39.23 22.74 9.84 22.86 9.84 0 52.9 8.59 6417 681.94 39.17 22.27 9.23 22.83 9.23 0 54.2 8.05 6327 681.92 39.12 21.80 8.67 22.80 8.67 0 55.4 7.54 6243 681.91 39.07 21.35 8.14 22.78 8.14 0 56.7 7.07 6162 681.89 39.02 20.91 7.64 22.76 7.64 0 58.0 6.62 6085 681.87 38.98 20.48 7.18 22.73 7.18 0 59.2 6.21 6011 681.86 38.94 20.05 6.74 22.71 8.74 0 60.5 5.82 5941 681.84 38.89 19.64 6.34 22.69 6.34 0 Page 1 100 year Storm -- - - --- - INTENSrfY 8.15 SCS CURVE NO. 81 _ C" FACTOR 0.7 Weighted C -See Below PRECIP DEPTH 5.3 DRAINAGE AR EA 5.32 T 25.2045408 _____ O 30.3506 S Z CONTOUR__ CONTOUR INCR ACCUM __ __ ___ AREA VOLUME VOLUME _ STAGE In S In Z Zest 675 2518.13 0 0 0 676 3331.86 2924.995 2924.995 1 7.9810 0.0000 2.0771 677 4220.89 3776.375 6701.37 2 8.8101 0.6931 2.1759 678 5182.1 4701.495 11402.865 3 _ 9.3416 1.0986 2.86 679 7309.38 6245.74 17648.605 4 _ 9.7784 1.3863 3.84 680 9696.7 8503 26152 5 10.1717 1.6094 5.00 Ks 2392.410083 __ _.__ b 1.49 Area "C" C'A 4.96 0.22 1.0912 6.04 0.6 3.624 11 4.7152 Wei hted C 0.4 Page 2 r