HomeMy WebLinkAboutWM0701218_Permit (Issuance)_20191213ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
NORTH CAROLINA
Environmental Quality
Water Quality Regional Operations Section
December 13, 2019
Mr. William Regenthal, PG
Geological Resources, Inc.
I I3W Firetower Road
Winterville, North Carolina 28590
SUBJECT: Well Construction Permit No. WM0701218
RH Hassell Grocery
Intersection of NC Highway 45 and Evanstown Road
Harrellsville, Hertford County, North Carolina
Dear Mr. Regenthal:
In accordance with your application received December 9, 2019, we are forwarding herewith Well
Construction Permit No. WM0701218, dated December 13, 2019, issued to Northeast Oil Company for the
construction of four temporary monitoring wells on property located south of the subject facility and owned
by Arabella H Adams, in Harrelsville, Hertford County, North Carolina. This Permit will be effective from
the date of its issuance until December 13, 2020 and shall be subject to the conditions and limitations as
specified therein.
If any parts, requirements, or limitations contained in this Permit are unacceptable to you, you have the
right to an adjudicatory hearing before a hearing officer upon written demand to the Director within 30 days
following receipt of this Permit, identifying the specified issues to be contended. Unless such demand is
made, this Permit shall be final and binding.
A Well Construction Record (GW-1) must be filled out by the driller and submitted to Division of Water
Resources, Attn: Information Management, 1617 Mail Service Center, Raleigh, NC 27699-1617 within 30
days upon completion of the well construction. If additional information or clarification is required, please
contact Will Hart at 252-948-3968.
Sincerely,
14" Tay sc4.4
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
cc: Arabella H Adams 100 Hickory St, Greenville, NC 27858
WaRO-UST (electronic copy)
LaserFiche
North Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
Noana GwauNn �
252.946.6481
NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WATER RESOURCES
WATER QUALITY REGIONAL OPERATIONS SECTION
PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL SYSTEM
In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes,
and other applicable Laws, Rules and Regulations.
PERMISSION IS HEREBY GRANTED TO
Northeast Oil Company
FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM consisting of four
temporary groundwater monitoring wells owned by Northeast Oil Company located on
property near NC Highway 45 and Evanstown Road and owned by Arabella H Adams, in
Harrelsville, Hertford County, North Carolina. This Permit is issued in accordance with the
application received on December 9, 2019 in conformity with specifications and supporting
data, all of which are filed with the Department of Environmental Quality and are considered
integral parts of this Permit.
This Permit is for well construction only and does not waive any provision or requirement
of any other applicable law or regulation. Construction of any well under this Permit shall be
in strict compliance with the North Carolina Well Construction Regulations and Standards
(15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well
construction.
If any requirements or limitations specified in this Permit are unacceptable, you have a right
to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The
request must be in the form of a written petition conforming to Chapter 150B of the North
Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail
Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this
Permit is final and binding.
This Permit will be effective for one year from the date of its issuance and shall be subject to
other specified conditions, limitations, or exceptions as follows:
1. Issuance of this Permit does not obligate reimbursement from State trust
funds, if these wells are being installed as part of an investigation for
contamination from an underground storage tank or dry cleaner incident.
2. Issuance of this Permit does not supersede any other agreement, permit, or
requirement issued by another agency.
3. The well(s) shall be located and constructed as shown on the attachments
submitted as part of the Permit application.
4. Each well shall have a Well Contractor Identification Plate in accordance
with 15A NCAC 02C .0108(o).
5. Well construction records (GW-1) for each well shall be submitted to the
Division of Water Resources Information Processing Unit within 30 days
of the well completion.
6. When the well is discontinued or abandoned, it shall be abandoned in
accordance with 15A NCAC 02C .0113 and a well abandonment record
(GW-30) shall be submitted to the Division of Water Resources
Information Processing Unit within 30 days of the well abandonment.
Permit issued the Thirteenth day of December, 2019
FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT
COMMISSION
R0x T""
Robert Tankard, Assistant Regional Supervisor
Division of Water Resources
Water Quality Regional Operations Section
Washington Regional Office
By Authority of the Environmental Management Commission
Permit No. # WM0701218