Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20091180 Ver 1_Application_20091105
STATE OF NORTH CAROLINA QNp V 0 5 2009 1E S sAr ua, Iry K%CH DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR U. S. Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 ATTN: Mr. David Baker NCDOT Coordinator EUGENE A. CONTI, JR. SECRETARY ®9 .180 Subject: Application for Section 404 Nationwide Permit 13 for the proposed replacement of Bridge No. 142 over Big Pine Creek on SR 1151 (Big Pine Road) in Madison County, Federal Aid Project No. BRSTP-1151(5); Division 14; TIP No. B-3488. Dear Sir: The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 142 over Big Pine Creek on SR 1151. There will be 10 linear feet of permanent impact to Long Creek due to bank stabilization. This bank stabilization is due to rip rap being placed at the end of a ditch where it enters Big Pine Creek. Please see enclosed copies of the Pre-Construction Notification (PCN), jurisdictional determination form, stormwater management plan, permit drawings and design plans for the above mentioned project. The Categorical Exclusion (CE) was completed in September 2008 and a Right-of-Way consultation was completed in October 2009. They were distributed shortly thereafter. Additional copies are available upon request. Please note that this project is an accelerated bridge project on NCDOT's Maintenance of Effort list. The NCDOT Administration has deemed these projects highest priority. This project calls for a letting date of March 16, 2010 and a review date of Janurary 26, 2010; however, the let date may advance as additional funding becomes available. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 November 3, 2009 TELEPHONE: 919-431-2000 FAX: 919-431-2002 WEBS/TE: WWW..NCDOT.ORG LOCATION: 4701 ATLANTIC AVENUE SUITE 116 RALEIGH NC 27604 A copy of this permit application will be posted on the NCDOT Website at: http://www.ncdot.org/doh/preconstruct/pe/. If you have any questions or need additional information, please call Jason Dilday at (919) 431-6693. Z Thorpe, Ph.D. Environmental Management Director, PDEA W/attachment Mr. Brian Wrenn, NCDWQ (2 Copies) Ms. Marella Buncick, USFWS Ms. Marla Chambers, NCWRC Dr. Charles Nicholson, TVA W/o attachment (see website for attachments) Dr. David Chang, P.E., Hydraulics Mr. Victor Barbour, P.E., Project Services Unit Mr. Greg Perfetti, P.E., Structure Design Mr. Mark Staley, Roadside Environmental Mr. J.J. Swain, P.E. (Div. 13), Division Engineer Mr. Roger Bryan (Div. 13), DEO Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Scott McLendon, USACE, Wilmington Mr. Hank Schwab, PDEA Project Planning Engineer ? t?W? ?i O ? Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Corps: ® Section 404 Permit ? Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ®No 1d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes El ®No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ®No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ®No 2. Project Information 2a. Name of project: Replacment of Bridge 142 over Big Pine Creek on SR 1151 2b. County: Madison 2c. Nearest municipality / town: Walnut 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state project no: B-3488 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if applicable): not applicable 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no.: (919) 431-6693 3g. Fax no.: (919) 431-2002 3h. Email address: ildilday@ncdot.gov 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: 2 B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): not applicable 1b. Site coordinates (in decimal degrees): Latitude: 35.82293 Longitude: - 82.77906 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 2.0 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Big Pine Creek 2b. Water Quality Classification of nearest receiving water: CTr 2c. River basin: French Broad 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Forested communities with minor residential development. 3b. List the total estimated acreage of all existing wetlands on the property: 0.0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 10 feet perennial (Big Pine Creek) 3d. Explain the purpose of the proposed project: To replace a structurally deficient bridge (Sufficiency rating of 26.1 out of 100). 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a 41-foot bridge with a 50-foot, single span bridge on the existing alignment with an on-site detour. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property f project (including all prior phases) in the past? Comments: Big Pine Creek is perennial and a JD was not necessary. Yes ® No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): AgencylConsultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ® No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ®No 6b . If yes, , explain. C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T Site 1 ? P ? T ? Yes ? Corps ? No ? DWQ Site 2 ? P ? T ? Yes ? Corps ? No ? DWQ Site 3 ? P ? T ? Yes ? Corps ? No ? DWQ Site 4 ? P ? T ? Yes ? Corps ? No ? DWQ Site 5 ? P ? T ? Yes ? Corps ? No ? DWQ Site 6 ? P ? T ? Yes ? Corps ? No ? DWO 2g. Total wetland impacts X Permanent X Temporary 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact length number - (PER) or jurisdiction stream (linear feet) Permanent (P) or intermittent (Corps - 404, 10 width Temporary (T) (INT)? DWQ - non404, (feet) other) Site l ®P ? T Bank Stabilization Big Pine Creek ® PER ? INT ® Corps ? DWQ g0 10 Site 2 ? P ? T ? PER ? Corps ? INT ? DWQ Site 3 ? P ? T ? PER ? Corps ? INT ? DWQ Site 4 ? P ? T ? PER ? Corps ? INT ? DWQ Site 5 ? P ? T ? PER ? Corps ? INT ? DWQ Site 6 ? PC] T ? PER ? Corps ? INT ?DWQ 3h. Total stream and tributary impacts Perm 10 0 0 Temp 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all o en water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number - waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts X Permanent X Temporary 4g. Comments: 5. Pond or Lake Construction If d l k an a e construction proposed, then complete the chart below. or 5a. Sb. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID r Proposed use or (acres) numbe purpose of pond Excavat l Flooded Filled ed Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No if yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitig ation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T required? 131 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed bridge and on-site detour are spanning structures that will not impact Big Pine Creek. A moratorium prohibiting in-stream work and land disturbance within 25-feet of Big Pine Creek will be implemented from October 15- April 15. Design Standards for Sensitive Watershed will be used in all phases of construction. Rip rap pad will be placed at pipe outlet of ditch. No deck drains on the structure. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. A moratorium prohibiting in-stream work and land disturbance within 25-feet of Big Pine Creek will be implemented from October 15-April 15. Design Standards for Sensitive Watershed will be used in all phases of construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No If no, explain: Permanent impacts to Big Pine Creek are minimal and due to bank stabilization which do not constitute a "loss of waters of the U.S." 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 31b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1b . If yes, then is a diffuse flow plan included? If no, explain why. Comments: ? Yes ? No 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? N/A 2b . Does this project require a Stormwater Management Plan? ® Yes ? No 2c . If this project DOES NOT require a Stormwater Management Plan, explain why: 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached permit drawings. ? Certified Local Government 2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? not applicable ? Phase II 3b . Which of the following locally-implemented stormwater management programs El NSW apply (check all that apply): ? USMP ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a . Which of the following state-implemented stormwater management programs apply ? HOW (check all that apply): ? ORW ? Session Law 2006-246 ? Other: 4b . Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a . Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ? No F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ® Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes additional development, which could impact nearby downstream water quality? ® No 31b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act El Yes ®No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. E] Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS web page of TIE species for Graham County and the NHP database of element occurrences. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ®No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA Maps Dr. Gregory J. Thorpe Ph D A li t/A t' P _ pp can gen s rinted Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is rovided. II APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the 1D Form Instructional Guidebook. SECTION I: BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): B. DISTRICT OFFICE, FILE NAME, AND NUMBER: B-3488 (Replacement of Bridge No. 142 on SR1151 over Big Pine Creek) C. PROJECT LOCATION AND BACKGROUND INFORMATION: State:NC County/parish/borough: Madison City: Walnut Center coordinates of site (]at/long in degree decimal format): Lat. 35.82293° IV, Long. 82.77906'0 W. Universal Transverse Mercator: Name of nearest waterbody: Big Pine Creek Name of nearest Traditional Navigable Water (TNW) into which the aquatic resource flows: French Broad River Name of watershed or Hydrologic Unit Code (HUC): 06010106 ® Check if map/diagram of review area and/or potential jurisdictional areas is/are available upon request. Q Check if other sites (e.g., offsite mitigation sites, disposal sites, etc...) are associated with this action and are recorded on a different JD form. D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): Q Office (Desk) Determination. Date: E] Field Determination. Date(s): SECTION II: SUMMARY OF FINDINGS A. BHA SECTION 10 DETERMINATION OF JURISDICTION. r i'wpz ?'^^ xx RKA There Appear,to,tierio "navigable waters of the U.S." within Rivers and Harbors Act (PHA) jurisdiction (as defined by 33 CFR part 329) in the review area. [Required] 3 Waters subject to the ebb and flow of the tide. El Waters are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce. Explain: B. CWA SECTION 404 DETERMINATION OF JURISDICTION. There Aie "waters of the U.S." within Clean Water Act (CWA) jurisdiction (as defined by 33 CFR part 328) in the review area. [Required] 1. Waters of the U.S. a. Indicate presence of waters of U.S. in review area (check all that apply): t TNWs, including territorial seas Wetlands adjacent to TNWs ® Relatively permanent waters' (RPWs) that flow directly or indirectly into TNWs Non-RPWs that flow directly or indirectly into TN Ws Q Wetlands directly abutting RPWs that flow directly or indirectly into TNWs Wetlands adjacent to but not directly abutting RPWs that flow directly or indirectly into TNWs Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs Impoundments of jurisdictional waters 0 Isolated (interstate or intrastate) waters, including isolated wetlands b. Identify (estimate) size of waters of the U.S. in the review area: Non-wetland waters: 250 linear feet: 30 width (ft) and/or acres. Wetlands: acres. c. Limits (boundaries) of jurisdiction based on: Eitsbll&W1r)y;DHWM! Elevation of established OHWM (if known): 2. Non-regulated waters/wetlands (check if applicable):' 0 Potentially jurisdictional waters and/or wetlands were assessed within the review area and determined to be not jurisdictional. Explain: Boxes checked below shall be supported by completing the appropriate sections in Section III below. ' For purposes of this form, an RP W is defined as a tributary that is not a TN W and that typically flows year-round or has continuous flow at least "seasonally" (e.g., typically 3 months). Supporting documentation is presented in Section III.F. SECTION III: CWA ANALYSIS A. TNWs AND WETLANDS ADJACENT TO TNWs The agencies will assert jurisdiction over TNWs and wetlands adjacent to TNWs. If the aquatic resource is a TNW, complete Section III.A.1 and Section III.D.1. only; if the aquatic resource is a wetland adjacent to a TNW, complete Sections III.A.1 and 2 and Section III.D.1.; otherwise, see Section 11133 below. 1. TNW Identify TNW: Summarize rationale supporting determination: 2. Wetland adjacent to TNW Summarize rationale supporting conclusion that wetland is "adjacent": B. CHARACTERISTICS OF TRIBUTARY (THAT IS NOT A TNW) AND ITS ADJACENT WETLANDS (IF ANY): This section summarizes information regarding characteristics of the tributary and its adjacent wetlands, if any, and it helps determine whether or not the standards for jurisdiction established under Rapanoshave been met. The agencies will assert jurisdiction over non-navigable tributaries of TNWs where the tributaries are "relatively permanent waters" (RPWs), i.e. tributaries that typically flow year-round or have continuous flow at least seasonally (e.g., typically 3 months). A wetland that directly abuts an RPW is also jurisdictional. If the aquatic resource is not a TNW, but has year-round (perennial) flow, skip to Section III.D.2. If the aquatic resource is a wetland directly abutting a tributary with perennial flow, skip to Section III.D.4. A wetland that is adjacent to but that does not directly abut an RPW requires a significant nexus evaluation. Corps districts and EPA regions will include in the record any available information that documents the existence of a significant nexus between a relatively permanent tributary that is not perennial (and its adjacent wetlands if any) and a traditional navigable water, even though a significant nexus finding is not required as a matter of law. If the waterbody° is not an RPW, or a wetland directly abutting an RPW, a JD will require additional data to determine if the waterbody has a significant nexus with a TNW. If the tributary has adjacent wetlands, the significant nexus evaluation must consider the tributary in combination with all of its adjacent wetlands. This significant nexus evaluation that combines, for analytical purposes, the tributary and all of its adjacent wetlands is used whether the review area identified in the JD request is the tributary, or its adjacent wetlands, or both. If the JD covers a tributary with adjacent wetlands, complete Section III.B.1 for the tributary, Section III.B.2 for any onsite wetlands, and Section 111.6.3 for all wetlands adjacent to that tributary, both onsite and offstte. The determination whether a significant nexus exists is determined in Section III.C below. 1. Characteristics of non-TN Ws that flow directly or indirectly into TNW (i) General Area Conditions: Watershed size: Pickl:iist Drainage area: lPieA tRi Average annual rainfall: inches Average annual snowfall: inches (ii) Physical Characteristics: (a) Relationship with TNW ® Tributary flows directly into TNW. ? Tributary flows through P ek3?ist tributaries before entering TNW. Project waters are Plek'-List river miles from TNW. Project waters are PIe§ L''Ist river miles from RPW. Project waters are Sil&lsi aerial (straight) miles from TNW. .. Project waters are Pigkr',el'_t aerial (straight) miles from RPW. Project waters cross or serve as state boundaries. Explain Identify flow route to TNW': Tributary stream order, if known: 4 Note that the Instructional Guidebook contains additional information regarding swalm, ditches, washes, and erosional features generally and in the and West. ' Flow route can be described by identifying, e.g., tributary a, which flows through the review area, to flow into tributary b, which then flows into TNW. (b) General Tributary Characteristics (check all that apply)' Tributary is: ? Natural ? Artificial (man-made). Explain: ? Manipulated (man-altered). Explain: Tributary properties with respect to top of bank (estimate): Average width: feet Average depth: feet Average side slopes: PiekList. Primary tributary substrate composition (check all that apply): ? Silts ? Sands ? Concrete ? Cobbles ? Gravel ? Muck ? Bedrock ? Vegetation. Type/%cover: ? Other. Explain: Tributary condition/stability Le.g., highly eroding, sloughing banks]. Explain: Presence of run/riffle/pool complexes. Explain: Tributary geometry: Elckililsf Tributary gradient (approximate average slope): % (c) Flow: Tributary provides for: 1-4&Elk Estimate average number of flow events in review area/year: Pack List Describe flow regime: Other information on duration and volume: Surface flow is: Pick'Lfet. Characteristics: Subsurface flow: KdA lit. Explain findings: ? Dye (or other) test performed: Tributary has (check all that apply): ? Bed and banks ? OHWM6 (check all indicators that apply): ? clear, natural line impressed on the bank ? ? changes in the character of soil ? ? shelving ? ? vegetation matted down, bent, or absent ? ? leaf litter disturbed or washed away ? ? sediment deposition ? ? water staining ? ? other (list): ? Discontinuous OHWM.' Explain: If factors other than the OHWM were used to determ Q High Tide Line indicated by: 13 ? oil or scum line along shore objects ? fine shell or debris deposits (foreshore) ? physical markings/characteristics ? tidal gauges ? other (list): the presence of litter and debris destruction of terrestrial vegetation the presence of wrack line sediment sorting scour multiple observed or predicted flow events abrupt change in plant community ne lateral extent of CWA jurisdiction (check all that apply) Mean High Water Mark indicated by: ? survey to available datum; ? physical markings; ? vegetation lines/changes in vegetation types. (iii) Chemical Characteristics: Characterize tributary (e.g., water color is clear, discolored, oily film; water quality; general watershed characteristics; etc.). Explain: - Identify specific pollutants, if known: "A natural or man-made discontinuity in the OHWM does not necessarily sever jurisdiction (e.g., where the stream temporarily flows underground, or where the OHWM has been removed by development or agricultural practices). Where there is a break in the OHWM that is unrelated to the watetbody's flow regime (e.g., flow over a rock outcrop or through a culvert), the agencies will look for indicators of flow above and below the break. 'Ibid. (iv) Biological Characteristics. Channel supports (check all that apply): ? Riparian corridor. Characteristics (type, average width): ? Wetland fringe. Characteristics: ? Habitat for: ? Federally Listed species. Explain findings: ? Fish/spawn areas. Explain findings: ? Other environmentally-sensitive species. Explain findings: ? Aquatic/wildlife diversity. Explain findings: 2. Characteristics of wetlands adjacent to non-TNW that flow directly or indirectly into TNW (i) Physical Characteristics: (a) General Wetland Characteristics: Properties: Wetland size: acres Wetland type. Explain: Wetland quality. Explain: Project wetlands cross or serve as state boundaries. Explain: (b) General Flow Relationship with Non-TNW: Flow is: Pek'Lisi. Explain: Surface flow is: Picf Uht Characteristics: Subsurface flow: Pick Last. Explain findings: ? Dye (or other) test performed: (c) Wetland Adiacencv Determination with Non-TNW: ? Directly abutting ? Not directly abutting ? Discrete wetland hydrologic connection. Explain: ? Ecological connection. Explain: ? Separated by berm/barrier. Explain: (d) Proximity (Relationship) to TN W Project wetlands are Kek1lit river miles from TNW. Project waters are YPlck__isi aerial (straight) miles from TNW. Flow is from: PI Ilit. Estimate approximate location of wetland as within the fijjk s? floodplain. (ii) Chemical Characteristics: Characterize wetland system (e.g., water color is clear, brown, oil film on surface; water quality; general watershed characteristics; etc.). Explain: Identify specific pollutants, if known: (iii) Biological Characteristics. Wetland supports (check all that apply): ? Riparian buffer. Characteristics (type, average width): ? Vegetation typelpercent cover. Explain: ? Habitat for: ? Federally Listed species. Explain findings: ? Fish/spawn areas. Explain findings: ? Other environmentally-sensitive species. Explain findings: ? Aquatic/wildlife diversity. Explain findings: 3. Characteristics of all wetlands adjacent to the tributary (if any) All wetland(s) being considered in the cumulative analysis: Nle .RU Approximately ( ) acres in total are being considered in the cumulative analysis. For each wetland, specify the following: Directly abuts? (Y/N) Size (in acres) Directly abuts? (Y/N) Size (in acres) Summarize overall biological, chemical and physical functions being performed: C. SIGNIFICANT NEXUS DETERMINATION A significant nexus analysis will assess the flow characteristics and functions of the tributary itself and the functions performed by any wetlands adjacent to the tributary to determine if they significantly affect the chemical, physical, and biological integrity of a TNW. For each of the following situations, a significant nexus exists if the tributary, in combination with all of its adjacent wetlands, has more than a speculative or insubstantial effect on the chemical, physical and/or biological integrity of a TNW. Considerations when evaluating significant nexus include, but are not limited to the volume, duration, and frequency of the flow of water in the tributary and its proximity to a TNW, and the functions performed by the tributary and all its adjacent wetlands. It is not appropriate to determine significant nexus based solely on any specific threshold of distance (e.g. between a tributary and its adjacent wetland or between a tributary and the TN"). Similarly, the fact an adjacent wetland lies within or outside of a floodplain is not solely determinative of significant nexus. Draw connections between the features documented and the effects on the TNW, as identified in the Rapanos Guidance and discussed in the Instructional Guidebook. Factors to consider include, for example: • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to carry pollutants or flood waters to TN Ws, or to reduce the amount of pollutants or flood waters reaching a TNW? • Does the tributary, in combination with its adjacent wetlands (if any), provide habitat and lifecycle support functions for fish and other species, such as feeding, nesting, spawning, or rearing young for species that are present in the TNW? • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to transfer nutrients and organic carbon that support downstream foodwebs? • Does the tributary, in combination with its adjacent wetlands (if any), have other relationships to the physical, chemical, or biological integrity of the TNW? Note: the above list of considerations is not inclusive and other functions observed or known to occur should be documented below: 1. Significant nexus findings for non-RPW that has no adjacent wetlands and flows directly or indirectly into TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary itself, then go to Section III.D: 2. Significant nexus findings for non-RPW and its adjacent wetlands, where the non-RPW flows directly or indirectly into TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section III.D: 3. Significant nexus findings for wetlands adjacent to an RPW but that do not directly abut the RPW. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section III.D: D. DETERMINATIONS OF JURISDICTIONAL FINDINGS. THE SUBJECT WATERS/WETLANDS ARE (CHECK ALL THAT APPLY): 1. TNWs and Adjacent Wetlands. Check all that apply and provide size estimates in review area: El TN Ws: linear feet width (fl), Or, acres. Q Wetlands adjacent to TNWs: acres. 2. RPWs that flow directly or indirectly into TNWs. ® Tributaries of TNWs where tributaries typically flow year-round are jurisdictional. Provide data and rationale indicating that tributary is perennial: Big Pine Creek is a perennial stream and has a NCDWQ stream rating scores greater than 30. Tributaries of TNW where tributaries have continuous flow "seasonally" (e.g., typically three months each year) are jurisdictional. Data supporting this conclusion is provided at Section III.B. Provide rationale indicating that tributary flows seasonally: Provide estimates for jurisdictional waters in the review area (check all that apply): ® Tributary waters: 250 linear feet 30 width (ft). El Other non-wetland waters: acres. Identify type(s) of waters: 3. Non-RPWss that flow directly or indirectly into TNWs. 0 Waterbody that is not a TN W or an RPW, but flows directly or indirectly into a TN W, and it has a significant nexus with a TN W is jurisdictional. Data supporting this conclusion is provided at Section III.C. Provide estimates for jurisdictional waters within the review area (check all that apply): 0 Tributary waters: linear feet width (ft). Q Other non-wetland waters: acres. Identify type(s) of waters: 4. Wetlands directly abutting an RPW that flow directly or indirectly into TNWs. El Wetlands directly abut RPW and thus are jurisdictional as adjacent wetlands. Wetlands directly abutting an RPW where tributaries typically flow year-round. Provide data and rationale indicating that tributary is perennial in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW: Q Wetlands directly abutting an RPW where tributaries typically flow "seasonally." Provide data indicating that tributary is seasonal in Section III.B and rationale in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW: Provide acreage estimates for jurisdictional wetlands in the review area: acres. 5. Wetlands adjacent to but not directly abutting an RPW that flow directly or indirectly into TN Ws. Q Wetlands that do not directly abut an RPW, but when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW arejurisidictional. Data supporting this conclusion is provided at Section III.C. Provide acreage estimates forjurisdictional wetlands in the review area: acres. 6. Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs. Q Wetlands adjacent to such waters, and have when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisdictional. Data supporting this conclusion is provided at Section III.C. Provide estimates for jurisdictional wetlands in the review area: acres. 7. Impoundments of jurisdictional waters.9 As a general rule, the impoundment of ajurisdictional tributary remains jurisdictional. Q Demonstrate that impoundment was created from "waters of the U.S.," or 0 Demonstrate that water meets the criteria for one of the categories presented above (1-6), or es Demonstrate that water is isolated with a nexus to commerce (see E below). E. ISOLATED [INTERSTATE OR INTRA-STATE] WATERS, INCLUDING ISOLATED WETLANDS, THE USE, DEGRADATION OR DESTRUCTION OF WHICH COULD AFFECT INTERSTATE COMMERCE, INCLUDING ANY SUCH WATERS (CHECK ALL THAT APPLY):"' Q which are or could be used by interstate or foreign travelers for recreational or other purposes. Q from which fish or shellfish are or could be taken and sold in interstate or foreign commerce. Q which are or could be used for industrial purposes by industries in interstate commerce. Q Interstate isolated waters. Explain: Other factors. Explain: Identify water body and summarize rationale supporting determination: 'See Footnote # 3. ° To complete the analysis refer to the key in Section III.D.6 of the Instructional Guidebook. Prior to asserting or declining CWA jurisdiction based solely on this category, Corps Districts will elevate the action to Corps and EPA HQ for review consistent with the process described in the Corps/EPA Memorandum Regarding CWA Ad Jurisdiction Following Rapanox Provide estimates for jurisdictional waters in the review area (check all that apply): Q Tributary waters: linear feet width (ft). 0 Other non-wetland waters: acres. Identify type(s) of waters: El Wetlands: acres. NON-JURISDICTIONAL WATERS, INCLUDING WETLANDS (CHECK ALL THAT APPLY): If potential wetlands were assessed within the review area, these areas did not meet the criteria in the 1987 Corps of Engineers Wetland Delineation Manual and/or appropriate Regional Supplements. El Review area included isolated waters with no substantial nexus to interstate (or foreign) commerce. ? Prior to the Jan 2001 Supreme Court decision in "SWANCC," the review area would have been regulated based solely on the "Migratory Bird Rule" (MBR). 0 Waters do not meet the "Significant Nexus" standard, where such a finding is required for jurisdiction. Explain: Other: (explain, if not covered above): Provide acreage estimates for non-jurisdictional waters in the review area, where the sole potential basis ofjurisdiction is the MBR factors (i.e., presence of migratory birds, presence of endangered species, use of water for irrigated agriculture), using best professional judgment (check all that apply): 0 Non-wetland waters (i.e., rivers, streams): linear feet width (ft). 0 Lakes/ponds: acres. Q Other non-wetland waters: acres. List type of aquatic resource: F1 Wetlands: acres. Provide acreage estimates for non jurisdictional waters in the review area that do not meet the "Significant Nexus" standard, where such a finding is required forjurisdiction (check all that apply): Non-wetland waters (i.e., rivers, streams): linear feet, width (ft). El Lakes/ponds: acres. 0 Other non-wetland waters: acres. List type of aquatic resource: Q Wetlands: acres. SECTION IV: DATA SOURCES. A. SUPPORTING DATA. Data reviewed for JD (check all that apply - checked items shall be included in case file and, where checked and requested, appropriately reference sources below): Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Q Data sheets prepared/submitted by or on behalf of the applicant/consultant. ? Office concurs with data sheets/delineation report. ? Office does not concur with data sheets/delineation report. El Data sheets prepared by the Corps: El Corps navigable waters' study: Q U.S. Geological Survey Hydrologic Atlas: ? USGS NHD data. ? USGS 8 and 12 digit HUC maps. 0 U.S. Geological Survey map(s). Cite scale & quad name: El USDA Natural Resources Conservation Service Soil Survey. Citation: 0 National wetlands inventory map(s). Cite name: 0 State/Local wetland inventory map(s): El FEMAIFIRM maps: Q 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) Photographs: ? Aerial (Name & Date): or ? Other (Name & Date): Previous determination(s). File no. and date of response letter: Applicableisupporting case law: Applicable/supporting scientific literature: Other information (please specify): B. ADDITIONAL COMMENTS TO SUPPORT JD: STORMWATER MANAGEMENT PLAN Project: 33104. 1.1 TIP No. B-3488 Madison County 10/22/2009 Hydraulics Project Manager: Dennis Hoyle, P.E. (URS Corporation) Marshal Clawson, P.E. (NCDOT Hydraulics Unit) ROADWAY DESCRIPTION The project B-3488 consists of constructing a new bridge 50 feet long to replace the existing bridge 4142 in Madison County on SR-1151 over Big Pine Creek. A temporary detour bridge 65 feet long will be required. The total project length is 0.056 miles. The project creates a surface water impact by adding bank stabilization to Big Pine Creek, which is located in the French Broad River Basin. The project drainage systems consist of a grated inlet with associated pipe system and riprap pad at the pipe outlet along with a riprap lined ditch. Jurisdiction Stream: Big Pine Creek ENVIRONMENTAL DESCRIPTION The project is located within the French Broad River Basin in Madison County. A temporary work bridge will be required for construction of the proposed structure. Impacts have been minimized by using a riprap pad at the pipe outlet and riprap bank stabilization where the ditch ties in with Big Pine Creek. BEST MANAGEMENT PRACTICES AND MA.IOR STRUCTURES The primary goal of Best Management Practices (BMPs) is to prevent degradation of the states surface waters caused by the location, construction and operation of the highway system. The BMPs are activities, practices and procedures taken to prevent or reduce stormwater pollution. The BMP measures used on this project to reduce stormwater impacts are: • Riprap pad at pipe outlet • Bank stabilization at ditch tie in point with Big Pine Creek • No deck drains on the structure W F PROJECT LOCATION y MADISON COUNTY 25 1152 n ??' x?Rd? 11 Pa 2. gam 1151 cu S? 1151 "` / Ova 1151 ?? 1145 145 o`-? 144 213 lr a 1143 1151 s J '!- Indi Buntilt R 1139 t Py ?B?Cov?_Rd-155 J ad// PROJECT LOCATION VICINITY MAP NTS NCDOT DIVISION OF HIGHWAYS WETLAND/STREAM MADISON COUNTY IMPACTS PROJECT: 331043.1 (B-3488) REPLACEMENT OF BRIDGE NO.142 OVER BIG PINE CREEK Permit Drawing ON SR 1151 (BIG PINE ROAD) 'leet of SHEET OF 10/22 / 2009 PROPERTY OWNERS NAMES AND ADDRESSES PARCEL NO. NAMES ADDRESSES ROGER S.MAKEPEACE BRATTON, RILEY W. DIANN E. BRATTON P.O. BOX 1783 ASHEVILLE,NC 28806 5112C STRAWBERRY HILL DR. CHARLOTTE, NC 28211 Permit Drawing G? Sheet L of A P f N o a z 0 c p. w z : 0 ?I z M Cx7 p ? a ? o ? m ? a co ? 0 co Z p M R 0 0 H o a C o m Z F m$ a o LLJ L+ a M J \£ \ \\'/ a cot R+ ?''`'s\. \ u b ?ij W d s Q. \ ~ ?u m N a v? o? h W \ \ Wa oo y) O \ w W C ICA \ 0. W U O ate``... m V m i Q ? o b a I I I < s LLJ ? I I I `" Sl W m 0 c C ' \ ? dz v Zoo 0- z 0 0 0- Co o c E=4 .N q n N• O O F7 w U E WW a ® w a Z V C7 r . O Z M O U a m O n N v rh E+ -+ R Q E E Z 0 " N u N O ;4 u a a o y € N a Z F W U a a a m IL ma y ? c d j N I" = U > ? R' m d Z t? tv Q v u w " x 3 W ? r + CCC ? m L m u no n Eu. " 3 C c c c c 3 N _ 6 U 0 O 3 a d S 0 c c w m p H Y J T U F - ? C IC J ? a W .U y fn C m Y C A a E 0 w c c N J V m O Ql g a o- o m 0 Y U O + 0 LL J 0 < ai c t- o z? iEnvironmentnlAL)r-ewln9sVD3488_HY0.orm-rsn.091 CT. , 9 O _R m y D r M p p '- 0 o N I Z r ° N UI P o o N VI . -o o / y 9 Z ° G1 0 ? 2Z in O v A mx QZ _ND Z D D D Z r{ " b C y n C O N N 2 O ° (?/1 m m Z (F n t J II II II II II II II ? p ? C C p p N a o y P P o? W C ° 11 D 3e ae X°° a y0D 0 E Ap . y?! 2 m H O m C _ N N 0 m m ; oz y y y ZG1=ka _ m O xy Zn O "' I Z p p m 0, Z ? ? m L oVI =N A ? Zm0Z O C O < y? m = C D O n ? mm < b CA A A_ a Y O <? m v° m O p mn ?C m v a o p y N Q m? ? } ? 11 ^ III m m ? II o u P P ° O 3 0 ° ? I r '?`I N ? I C1 p I N a a V t !a C o ? ? i ? v a ? ? H-1 a o : D O Fiji! SS Y fi p 1 2 b P Py I g Y ?i1 ry ^ n p ap ? > 9 c ? 0 y b C 0 a C b z n y I ab b TIP PROJECT: B 3488 H ? I Z r? y DO qm On b z? ?/ I I O 5 ? I ? Iti yy? ? \ m ? \ ? I G] 12 2 ° F r' A\ \ \ 2 r -1 41 lit W aA cM Y ?Z n? ' N A O b ?.J n ?CCy l? n?O H O x ti O A C7 C n b o' z C) O U ?z 00 X x n 0 C ?y ac?• 3• I e y G1 A §$ j OD 0 110 s I? RMI I? 4 n aa?g r V / x s. agyr?p \\\ cz \\ om° c°m ico ro q Dy 9N TN , , Oy ? D O Ay 9 ? ? Z ' Z t- o > CC n 57 ? pi 7i p G VI o ? O H w II \ \ m J 7 fL(NDm`J 1 ?. f3 / /nr a 0A off- ? ? J © © a i li y \\ ° q 11 O ?,tn ?1 ? ??6$ ~ c o AT ?'tp? N o/ , ?< O _15 N y0 yy a A 2 l ? - CCC _ NQx? _ N a?v? O ipC N ? EE b O O En ?n tz ggq A <m R` a - ?'O ?go ,aN a Oo = ?p? Z,o is m ??ucl U g? ?o ?v b R f f ?? O b N ipip N d • ry s N ? o vo? 4 [ 8 NX .pr m.pshN 9.dg? I t 1 D N t A 0 M 1 y 1 I a m fi co o 0 a7 m J 1 m A z +- m ?D z n o N P r 1 W ,w myn A N N w;6 M mD Z {/r - w y V 0 l5 ? \ I s? \ M W-. i tIC?; , . J"i\I 1 1 \ \ ?? \ 0.1 0 -oCDZ> \ \\ \? `\ z \ \ N wOMO I \\\\ \\ \\ *f 0 co >r- \\ \ \ Zf \ \ \ 1 \\ 1 `\ x ? N Z MO.. / / \ l $$ N? f / mm m 8. mvi 0D ' Tm Y. AZ / '1? In ? a^ n0 O D ? O Z da °z r o ;o zo? xZ 7 .4 o d b to ?m Q H v Y w W 15 y\ 0 , \ \ > 0 x\ ? \\ nzz \\\\??- \\ \ A -4 w --I - \ - T Z o -? \\ 1 1 \ m0 \ _J 1 QZmy \ 1 ?\ Sf w M z \ \ \ \ x V \ \ \s? a \ \-sl 9 \ N ? \ N O / ? O Z ?NL! Nvl x \ \ \ a a co = a a >yk a gin ?? a -i v m c,v o0 r m: 7 ?7 D z TN rtD _I, Iz r D ?z Tn o N ? ov r co co ° o N? mA z z 0 3 i r -Ni D _w 1 O 1 D A O r t t \ o /19 7 9 \,`N ww :. \ N J ` ZAZ Gb 000 6 O Q 9N TN Tj Sy T? >i y AZ N Fm o v K i ?? m •3 m Z 1 VI o ro N CO m 4 g 1 ro C 0 221 1 0. 0 1 ? t,3 f" a N sg a ' ab ? Rl ON i s? [CONTRACT: TIP PROJECT: B-3488 N •9 9 Z O OQ Z N = Z N Q a? Qz N> 2 ?K mC mZ pn T p Am 00 I y mN r_ H N T s m r x t s l.• H z ; ; s O o - IN C ) 0 = 50 I ,,\ \I \ o \ \ \ 1 gym,; / ! a \ \ ??1 y O ZI `' m w o 00 W tW W I> -e I? r ?ro > I b ZI n O Z 0 Cn co? ®® zz ?x a ? a f N A r ? g F e W I W m m ? O N N a a m ? i r f y ? p 1\ K h y Q p O bu ?o .1 N x S? ? O hi b M .1a A n C I I 9 ?p r p 0~ z = a r? L <y T' ? ?C ' , I p p? 9 T? "i '° ?O A ( 1 4 ?c r A? y y S a ? g 0 o" N r r 1 m s L Y J N N J ? -1 Tp o ,a m )< P Lrl _ < D D .5! II r X CT CO N ° UI y .2 b + + z0 CA CA m0 O r ON UI N ? D D -I O N ^ + JN O a n A - <? a J J ?K W n i O 0 oo I a I z y r ? o I z OO N b ji I r W N ? O O I D Z y? € < 70 N m - - -? --rte -? -1 o o m n i I E-- -F) H N ° 0, m'a s m ^ Y' D NV I p g I $ g VI A --I C71 Z O ° A s ^? - m J z m L p D D O Q ?' < J J O 4 N IV m im + J ? x D m w N _ I c ? J Wm 1 = r o OD N W o m g _ y v ' m 0 O O ? ' ^' Ul Z .w V 0 0 Z8 z p o + z y W b y? ^ 0 00 03 OX o v I O g Ill c I t o ?o ? I ?f c v l I Il 9 O p \O 'O c O z ° I W ? l = 7? p o 0 ° <o ? D O r ? m N X D n G) O O O U_ N O N D O °o LA + D 0 00 o F u N J J o r 0 O G N c A ° m n o o ?Ig 9 --I m 0 ° --I O 0 ° 3 ° ---- m 6 J_ ° rF r s Z O O 0 ° W Z O o 0 l w 1 y D n o f ~ -F t m X E C y r 9 W N N r N a N 9 9 w 9 W9 r G l y S C 6 V 9 9?b y 7 N O. N O A 1 D m< 6 m 9 y? < 9w y -D O E A D y y a _ v y j m -DI a D D 0ya H9 y9 y0 m e m s a iii Z m i" ohs°m o'zx s s ? ? m ma m i = s -? m 7 m n m v ? ^ v s S;N v?D ? zw^ ?? m+ma mm9 III m vg = ° a ' s . ? m ° o s?c 17iv z 11i o y Z m W y y N m a il0 T j r >mA r Ym0 w m m w l OAT 0 bNm wNT ~ 111 l r 1" 'a ' m ome m r o NN y y y1 1W 1v w YN?i III m a C m w 1 T n e a ? n ° aa a+ i o m ?"a Q? Qom v r om om m?°c "ov m c = a ° m, v off os o H z . ° ° ?' y m ?' m 1 11 y 9 2 y S Sm z O 'C S I v T, 1 Q) D J J + N C/ O r I v m D J + V W N I v I N J O N 0 0 '001 I I I Z 110 D V C + a V O 0 I r W 'o r o ? OZ G) I 70 m J Vy + CA) 00 0 O l` 0 0 0 I I ?I ?I I 0 mo K m? Y ZN ON U p I I I y ril -rR I I I vv m m ?I DD N O N W N N °0 0 00 vv T, V V) (n DD N O + + 01 14 V Ul b O 00 D r' N m II -rte yb O vv m m I V CA N D D ?J J O V V ++? W ul -0 NOD m r z 0 N v I m n ?v? vT, 0 m Z -q Z +O v W to Ti N D W NZ + N W N ? m n ? l ?m ?m m ?m mw M9 mm m x C -i 9 9 (? W L N L ? m N m + 0 N CY ? Ma C m 3 ? m rxi ? > m ? g! N s 3 O a > 9 m p > 9 N m N' m y 'L ? N' ? Z H _ m a y ? ? C m v A O N O c m N 0 A C) c O r b y O 8 g? A a g? e n> Z? A DOIz zln 10 o lg a g ?g lg 0 e. o;n 4 I g I \ o B ? / A P ooc E rm 2 an V o O J -ns. u N? O a sa '"cc o s yx ? ° f- H r m o p o amD g o ? R: .. g fo m Atir°De m?tiroD? m??r °D? ins-I?-o ? ?I II II"u?I? ?In n????n? Iluu"II II VI mull"u IDILn x °ONaa?j?o ba?ayki kN°a b+i"„?4w mwamm Arno y4 ^'N"Ow ??`e?tn? ryw?"tn??'o v??im$Q?"`•?vi ,'nb?roD? matiroD? ma?roD? II II " II VI W11 4IIi?'? ?II ?II a ?II gN?NC?WNI 1"ip 1g L A II 0II ia " „w11 .lII ,O ? II p W II m II aII NII ?? /1 u ?!±!n R+ N;Nch-' , hn iVgaw+ y e $ $ aE $ ay S5 Y S5 TIMESS Se{s afaaf9aIEaaa9aP811GN8fafaasasfssaass 5/28/99 OD OD O O B EG/ GRAO£ I i m a x ^ - ro+5 ro; m EL 1622Jr /ln one ?ma N b ? ? ? Nom ? T B GIN BRI E mo m$ ? ti;? ? - ET-11+1.3 2 mi ^' m?E E - 1821.4 ow =mmy T-Im n / om ;? 2 m g?N m$am„ B o N gy U N E D BRILL iN O:n pp - T- W78 42 N N W p n V : p END RARE tR A e `? -DET- 12+3983 W I W W m ?D / 0 Z °+ I Z ? II 1 I m p D ? m ti O A A -1. 14 L =182 DO 71 i SA oP -C EL 15+11,00 - 18209 ' o, 3- 1 LA D BRIDGE my -L EL 15+61100 - 0 C u 0 ?ch O E 4120180 N x O l o Y = Arch TO n^ T oZ+? OP -L-1/ +0651 ' u u ° S I + al e ?a A 74' L 181B am _ ?+ a . ATCN TO EXISTING E GRADE D l-1 L 1 82 39 7 ??? m N -L ?+28 . . In x ti 0 I m II y W ? s r _ A ? S p I ' ? ~ rn mr n c c3 xx .^ ? oooTT co aiv^8m? "?aQ $. `; u u u a u n n C ? ? a 8 m p o ? a m ? m ?? b'? ?U L'S D I I ? z o ? n ' x a g I I O .? ^? <nT<n ?< ? ? ? ? IAA ~ ta m H ~ ? j '0 ? il { /1 1 /1 1 i1 I p ? a i ¢z i R z = En d H 2 O $s$*'$SY BEBf USEfl STlMES*S$s NRME6H8GGNiitiii6684.$ 8/2]/99 1 .. 1 I i / ' ' 0 I A m I( I 0 41 --Il m + I N o o, m O v> ---18 2.31 m N N _. .m. -+ + Lcn/ o O 182 + .19 a) mm / -I A N I.w. ? I. O I N co O N ? I f I I I 1 2 OO 1?1 a I s u - UN n R o ? ? s ? m = Ago R ,.gyp OO co Z m . .. z O ., ..... . . J z ssssssSYSTIMEiiiii 6f66USFFNPMF.11f3?GNSSatncef KBBtft 8/2j/99 I / I i ? I w I U LD / b I D O y m T W S K ?. Z T # ti I O O W o? I o I •° m G? i+ I'I I o U I o D ? + _ F I + ? I > I LA m m I O co o I >? > I O I.I O O m oo N O o r I O . rn ? C71 -+ .. ?.+ smv Z O ? J . . I Dmo m O 0 1 ? 0 Ifs- IIf / ... N m/ II-- - IB 1.45 mo W / I I rn C L 4 C) rn. ' 1 oZ I I W rn 1 11821. 6 u I m 1 rn. Co D lp I I -? + X I F W N 0 / / wv rn N c N I ? N I Q W m I m n m T Z x m z O ssssss5YSTIM{ESSSSs t Bit USEFNRMEt if80GN66it II1Bititititi 9/2]/99 N N i I O 1 I 1 II ? . 1 i A O. \ I ti N O ? m y Z A O Q no ? ? A ti N Dvo I' N m ?. N DN _. (n O Ul I O s o N W I I I ? O O O N .. N r - . O 1/I D 1 0 O rv ? m m? I m 9 ? O D a D .. n m I ? s o ? i 1 f ' / I ti .. III Tlj - - 1819 8 ° N . I N i I } \.. O I I O 1 ° 1 l \ m o 1 I ? W A In .. W i a \ m ? m \ i l- O ? x m 1 ? tM Z O SS.SSSSYSTIMES.SSS ' Ss uss`usagE U.OGNSa.asss. SS GS... 6EaEU5EflNRME.... 9/23/99 I U I I 1 p I I I I D 1 a N O O Dn m.S I I (Jl O vl I: GD N N v co I ?m I .. O I O p O ? O y N 0. J .. .. O o Ln a I _ IV K + O L 1 W ? I - 1 19 80 . I ° ou I ? IR?n f; ? N I O ? I l i 1 lI ? I O I -- - 18 1 .83 I o II N ' I ? I N I \ 0 I W A to n.. I r (y D m z \ , n z p x ? a 9 r) 36 z Q Esss$SSYSTIMESSSSS E{EfisiffESE8f6t0?NOif 066E Ei6ifst sf i{uSEeNAMEEEfs 8/23/99 I U 1 1 I I I ? I I I I I I -w f I 'J 1 I a I I I I_ o 0 o° + c + 60 EO • l a o o _.. o I o I o 5 E -D I- PR FILE I II I ? ? n I I m I ? • 1 I I I: ? I I \ I \ \ O U 1 I I Q 1 , 0 Staff SSYSTIUEaasfS isOGNCSSCascccsssssfa PN'$ $ $ M USE E 8/23/99 I I I i i o.. I U „ I 1 ? I I I O O I I Ol O V V + ? I _ m m U7 N fs ., . 019.91 N N I I O I 0 I O O N ? I m a w v V „ 1 I 1 \ - o 1 i O m A m W m a JO m i z x m T M z 0 16tBa II5 YS TIMEti ifi - B ftsiifOts iIISBS6 BNE N M ? ? S$$$ I Stu NaMEn 8/23/99 E I' I i u I I + m O + OD O + N ? I ? I I N `D O V -f p I ? I I j ? I I I ? I 1 I 1 I - I o N a m A W A m m i 1 ? z 0 fsssss5YSTIME$*S$$ esss siisssssss $** DON ....... ....... ssuUSERNaME*$,$ 8/23/99 11-0 I f I o i II 1 1 I ? M m t Z m I , C C I I-L ) EOP p ED o W ?N I o + A?l 4c; ON O c ?m ,., .? ? N O .p N N m I. 00 1 O N ? D m ) ? ?. I T-i 1 -- IiI I V T +u \ _. N I I 1 •? \ o ? R N I o A I m < m m ? .. .... .. .. ,. O X = m m Z ESSSSESYSiIMESSSEE 6s8668L6 SSSLttsipGNS88t6668LENiiLB eseEUSEFNRMEEeaf 8/29/99 i o i O N N 0,I m -L- E P 7 c I I N I _ I ? o m 0 p W m A z z z 0