From: Clark, Paul <paul.clark@ncdenr.gov>
Sent: Monday, August 12, 2019 10:44 AM
To: Ginger Turner
Cc: Jordan Maroules; Georgoulias, Bethany; Morman, Alaina; McCoy, Suzanne; Lucas, Annette
Subject: RE: [External] RE: Construction Stormwater NOI Not Accepted
Ginger,
Thank you for the informative, but surprising response. I wrongly assumed that because the site was considerably
closer to Spooner Creek, it would drain there rather than the Newport River. I apologize for believing that the site
would drain to the closest waterbody and thus believing there to be some error in the eNOI application. We are not
able to retrieve and reprocess an application that has been rejected. In this case, it will be necessary to resubmit the
application.
I'm copying the entire SW review team, so that they realize that although the Waste Removal - Contractors Plant and
Storage Yard project site is much closer to Spooner Creek, it drains to Newport River as you explained. Thx.
Paul Clark
Water Supply Watershed Protection Coordinator
Stormwater Program
Division of Energy, Mineral, and Land Resources
Department of Environmental Quality
(919) 707-3642
paul.clark@ncdenr.gov
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
Before printing this email, please consider your budget and the environment.
https://deg.nc.gov/sw
From: Ginger Turner <ginger@tcgpa.com>
Sent: Monday, August 12, 2019 10:32 AM
To: Clark, Paul <paul.clark@ncdenr.gov>
Cc: Jordan Maroules <jordan@streamlinedevelopers.com>
Subject: [External] RE: Construction Stormwater NOI Not Accepted
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam �-i tL.;;
Paul,
We are in receipt of the comment in regards to the Lat/Long and receiving waterbody. The proposed site grading is such
that it drains to the roadway ditch system which flow to US 70 and then through a series of piping and ditching to the
Newport River. Please let me know what more you may need to continue the review.
Thank you,
Ginger Y. Turner, PE
The Cullipher Group, PA
151A Highway 24
Morehead City, NC 28557
(252) 773-0090 (main)
(252) 499-2166 (direct)
ginger@tcgpa.com
From: Jordan Maroules <Jordan@streamlinedevelopers.com>
Sent: Friday, August 9, 2019 12:26 PM
To: Ginger Turner <ginger@tcgpa.com>
Subject: Fwd: Construction Stormwater NOI Not Accepted
Jordan Maroules
Streamline Developers
www.streamlinedevelopers.com
252-648-8297
Begin forwarded message:
From: laserfiche@ncdenr.gov
Date: August 9, 2019 at 12:25:15 PM EDT
To: iordan@streamlinedevelopers.com
Cc: paul.clark@ncdenr.gov, iordan@streamlinedevelopers.com
Subject: Construction Stormwater NOI Not Accepted
This email is to notify you that your application for Waste Removal - Contractors Plant and Storage Yard
was not accepted for the following reason:
Part A - nos. 7, 8, 15a, 15b - Lat: 34.7362, Long:-76.8156. The lat/long appear to drain to Spooner Creek
(index no. 20-36-10). The state cannot edit the eNOI application after it has been submitted. Please
check the receiving water and resubmit the eNOI. Questions, please contact paul.clark@ncdenr.gov,
9197073642.thx.
Please contact The Stormwater Program Administrative Assistant for more information at (919) 707-
3640. Please reference NOI application no. 14685 and Project ID NCC-CARTE-2019-Waste Removal -
Contractors Plant and Storage Yard.