Loading...
HomeMy WebLinkAbout19990253 Ver 1_COMPLETE FILE_19990415Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director MEMORANDUM TO: John Parker, DCM FROM: John Dorney, DW 7 RE: Water Quality Comments Craven County Convention Center Craven County DWQ Project # 990253 .` 410 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES April 16, 1999 DWQ has no objections to the project plans to construct a public Convention Center at East Front and South Front Streets on the Trent River. However, the application should be reminded that DWQ's coastal stormwater rules will need to be considered through our Washington Regional office staff. Please call me at 733-1786 if you have any questions. cc: Washington DWQ Regional Office John Dorney Central Files 990253.dcm Wetlands/401 Unit 4401 Reedy Creek Road Raleigh, North Carolina 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal pp ortunity Affirmative Action Employer 50% recycled/10% post consumer paper P DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Craven County c/o Harold Blizzard, Craven County Manager 2. LOCATION OF PROJECT SITE: Craven County, City of New Bern, corner of East Front Street and South Front Street on the Trent River Photo Index - 1989: 3 128 16 (indexed by K-16,17,18; L-16,17; M-15,16) 1995: 72-804 (indexed by Q-7,8; R-7,8; S-8,9; T-9) State Plane Coordinates - X: 2,587,900 Y: 497,400 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 5 January 99 & 19 February 99 Was Applicant Present - Yes, initial visit. No, second visit. 5. PROCESSING PROCEDURE: Applicatoecived - -20 January 99 1 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - City of New Bern Land Classification From LUP - Developed (B) AEC(s) Involved: ES (C) Water Dependent: No (D) Intended Use: Public Convention Center (E) Wastewater Treatment: Existing - City of New Bern Planned - City of New Bern (F) Type of Structures: Existing - Bulkhead, Stormwater Pond, and Sidewalk Planned - Convention Center, Sidewalks, Steps, and Stormwater Pond (G) Estimated Annual Rate of Erosion: None Source - Site Inspection 7. HABITAT DESCRIPTION: [AREA] T)RFTIrtpn RTT T Cn nrrurn (A) Vegetated Wetlands (B) Non-Vegetated Wetlands Estuarine Waters (C) Other 21,166 sq. ft. Estuarine Shoreline High Ground (D) Total Area Disturbed: 4.137 ac. (E) Primary Nursery Area: No (F) Water Classification: SB Sw NSW Open: No 8. PROJECT SUMMARY: The applicant proposes to construct a public convention center complex which will include sidewalks, buildings, steps, parking areas, natural landscaped areas, and stormwater retention facilities. PROJECT NARRATIVE FOR CRAVEN COUNTY CONVENTION CENTER A new Convention Center for the Craven County Bern is proposed at the comer of East Front Street (US70 Business) and South Front Street with the convention center located on the south side of S. Front Street and some additional off-site parking located on the north side of S. Front Street. An old business was located on the convention center site and a gas station was located on the north side of S. Front Street. This infrastructure was demolished in August of 1998 to allow construction to begin immediately once all design details were finalized and bids were awarded. The Convention Center is scheduled to be completed in two phases. The first phase is the construction of a 44,000 square foot facility while the second phase consists of a 30,000 square foot addition. The building will occupy the majority of the property located adjacent the Sheraton Inn. The existing perimeter sidewalk will remain and no construction other than landscaping is proposed between the existing bulkhead and the sidewalk. The Convention Center's finished floor elevation will be set at +11.0. This is approximately 4.0 ft. above the existing ground and is bove the 100 Year flood event. Two parking areas will be constructed for the facility. One area is located in front of the convention center loading dock along South Front Street and another is located across the street on the corner of East Front Street (US70 Business) and South Front Street. The main access to the facility will be by a long wheelchair accessible ramp which runs from the sidewalk along South Front Street to the convention center. The stormwater for the Convention Center site will be treated by the use of wet detention ponds. The stormdrainage for the property located on the south side of South Front Street is collected in a series of pipe and inlet systems which carry the water to a retention pond. The outlet into the pond is lined with rip rap and the invert is set so that the flow into the pond is submerged during large events. Once this collected flow enters the pond via the pipe system, it must flow through and over a "Class B" stone forebay prior to exiting through the pond outlet structure. The pond outlet structure has a two-stage wier to provide additional outflow capacity for events larger than 100 years to minimize flooding. The existing pond constructed for the adjacent Sheraton Inn property was enlarged to accommodate the Convention Center and the outlet through the bulkhead for the existing pond was utilized. This pipe outlets into the Neuse River. The stormwater for the off-site parking located on the north side of South Front Street is also treated by the use of a wet detention pond. The parking area drainage is collected in a series of catch basins and routed to the retention pond. A retaining wall was required to provide the necessary volume. The outlet into the pond is lined with rip rap and the invert is set so that the flow into the pond is submerged during large events. Once this collected flow enters the pond via the pipe system, it must flow through and over a "Class B" stone forebay prior to exiting through the pond outlet structure. The pond outlet structure ties into an existing stormdrain line which exits into the Neuse River. The areas above the normal pool elevation on both ponds will be landscaped to prevent erosion and to provide some filtering of the system during elevated water levels. The pond outlets utilize small diameter PVC pipes placed at low elevations in order to drain the pond down to the normal pool elevation. Each outlet structure has an overflow emergency weir to accommodate events larger than the 10 Year flood. The small diameter inlets are protected from debris by a % inch stainless steel screen mesh. The emergency outlet of each system is covered with grating to prevent trash from entering the pipe system. Each wet detention pond will be utilized as a sediment basin during construction for the proposed construction. camanam.doc Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 4,137 AC. 3.037 A 11,594 SF b. Size of individual lot(s) 13,335 SF 23,052 SF c. Approximate elevation of tract above MHW or NWL +7.0 d. Soil type(s) and texture(s) of tract Sands e. Vegetation on tract Grass f. Man-made features now on tract Sidewalk & Storm Drainage g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use pl=.) Conservation X Developed Rural Transitional Community Other h. How is the tract zoned by local government? Commercial i. Is the proposed project consistent with the applicable zoning? X Yes No (dnach zoning compliance -rrifrcate, rf appZi=ble) j. Has a professional archaeological assessment been done for the tract? Yes X No If yes, by whom? . k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? X Yes No 1. Are there wetlands on the site? Yes X No Coastal (marsh) Other If yes, has a delineation been conducted? (Aeach docunu- ation, tf available) m. Describe existing wastewater treatment facilities. City of New Bern Gravity Sewer Located Under roe Street u is ys em n. Describe location and type of discharges to water of the state. (For example, surface runoff, sanita., wastewater, industrial/commercial effluent, "was; down" and residential discharges.) Stormwater o. Describe existing drinking water supply source. City of New Bern Water _(Public System) 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is no- claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission. from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03195 Form DCNI-I'1P-3 UPLAND DEVELOPMENT ? 0 1999 (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-M2-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities,. units or structures proposed Masonry Convention Center - One Structure b. Number of lots or parcels 4 C. Density (give the number of residential units and the units per acre) N/A d. Size of area to be graded, filled or disturbed including roads, ditches, etc. 4.137 Acres e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan.at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? x Yes No If yes, date submitted JAN 5 . l9 l9 F. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. Asphalt & Concrete h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? x Yes No If yes, date submitted 12-17-98 i. Describe proposed method of sewage disposal. Public System. j. Have the facilities described in Item i. above received state or local approval? See Above (Xttach appropriate documentation) k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges). Surface Runoff 1. Describe proposed drinking water supply source (e.g. well, community, public system, etc.) Public System m. Will water be impounded? X Yes No If yes, how many acres? 0.24 n. If the project is a oceanfront development, when was the lot(s) platted and recorded? N/A g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. _ 5.6% Craven County Convention Ckrtter Applicant or Pro' t dame Signature - Date D ...:.....7 All- N O z Z z } ? > ~ ? $ H O z L 5a U zF Z$ c 8 OZ > 8 0 a. a a d W V & ? a ° • • :a y dM U 3 22 ? o ?? zt gg 5 r 4 ?5 ? @ri YY oZ ? v J M .0 / ' W C7z PN N? _ / - ?. zo zw z?' X05 \ ZRY?N 60' R? v a_ - .a ? OE qq o 5 92 ?? \ ? '? U 7? , ?? a .$ a off / - ? N 6 ?b 6 0 ? '' \ ?' ? 6/g'Sg E 5n r W W r N W 1 a' U 1 '? pCGESS EASE*tt???/ ?0_5 0? Z O t- a W /\ VI ';? 2 199 Ill 1 19 LL \ N 1 m a O N a W S\ r Ny ?\? O vQi9 U s ne\Q\?' ?z m \ <" r m O U1.O 'O_^ Q W p ° ? c r t0 ?'„ W s z \o ?i z a 0 H a J a LAJ ? z ?a = O z0 U Oa z U ? W > WZ a QU U Uz \ H O O z p a N Z a w O ¢ a = U 0 Q N O O n C O Oz ? c J Q U U 1 I ? CD NJ d rn O co ? G Q\ . O C U ?. Z C r V / a z J O W Q? 0 LL- ? r ri O 0) 0 O n O N O On O I I w J U IU) ll_ W I- z W U >- z ~ O z 1- D W O > U z Z O W U > ? Q Z 0-) U W t- O z Q Z U W ? W -J W Q I- o- W Q n _ U 0 Q Un o? C77 C? 7 G\Z VLC) J D r- mJ 1W O 0 aQ O W ?_ O J W' D z 0 U III z Q n W V F z V-V 3NI?HOIVA d-V 3NI-]H:D1dW DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Craven County c/o Harold Blizzard, Craven County Manager 2. LOCATION OF PROJECT SITE: Craven County, City of New Bern, corner of East Front Street and South Front Street on the Trent River Photo Index - 1989: 3 128 16 (indexed by K-16,17,18; L-16,17; M-15,16) 1995: 72-804 (indexed by Q-7,8; R-7,8; S-8,9; T-9) State Plane Coordinates - X: 2,587,900 Y: 4971400 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 5 January 99 & 19 February 99 Was Applicant Present - Yes, initial visit. No, second visit. 5. PROCESSINQ,PROCEDURE: Application Received - 20 January 99 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - City of New Bern Land Classification From LUP - Developed (B) AEC(s) Involved: ES (C) Water Dependent: No (D) Intended Use: Public Convention Center (E) Wastewater Treatment: Existing - City of New Bern Planned - City of New Bern (F) Type of Structures: Existing - Bulkhead, Stormwater Pond, and Sidewalk Planned - Convention Center, Sidewalks, Steps, and Stormwater Pond (G) Estimated Annual Rate of Erosion: None Source - Site Inspection 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non-Vegetated Wetlands Estuarine Waters (C) Other 21,166 sq. ft. Estuarine Shoreline High Ground (D) Total Area Disturbed: 4.137 ac. (E) Primary Nursery Area: No (F) Water Classification: SB Sw NSW Open: 'No 8. PROJECT SUMMARY: The applicant proposes to construct a public convention center complex which will include sidewalks, buildings, steps, parking areas, natural landscaped areas, and stormwater retention facilities. PROJECT NARRATIVE J pi 2 1999 FOR CRAVEN COUNTY CONVENTION CENTER A new Convention Center for the Craven County Bern is proposed at the corner of East Front Street (US70 Business) and South Front Street with the convention center located on the south side of S. Front Street and some additional off-site parking located on the north side of S. Front Street. An old business was located on the convention center site and a gas station was located on the north side of S. Front Street. This infrastructure was demolished in August of 1998 to allow construction to begin immediately once all design details were finalized and bids were awarded. The Convention Center is scheduled to be completed in two phases. The first phase is the construction of a 44,000 square foot facility while the second phase consists of a 30,000 square foot addition. The building will occupy the majority of the property located adjacent the Sheraton Inn. The existing perimeter sidewalk will remain and no construction other than landscaping is proposed between the existing bulkhead and the sidewalk. The Convention Center's finished flooa•elevation will be set at +11.0. This is approximately 4.0 ft. above the existing ground and is bove the 100 Year flood event. Two parking areas will be constructed for the facility. One area is located in front of the convention center loading dock along South Front Street and another is located across the street on the corner of East Front Street (US70 Business) and South Front Street. The main access to the facility will be by a long wheelchair accessible ramp which runs from the sidewalk along South Front Street to the convention center. The stormwater for the Convention Center site will be treated by the use of wet detention ponds. The stormdrainage for the property located on the south side of South Front Street is collected in a series of pipe and inlet systems which carry the water to a retention pond. The outlet into the pond is lined with rip rap and the invert is set so that the flow into the pond is submerged during large events. Once this collected flow enters the pond via the pipe system, it must flow through and over a "Class B" stone forebay prior to exiting through the pond outlet structure. The pond outlet structure has a two-stage wier to provide additional outflow capacity for events larger than 100 years to minimize flooding. The existing pond constructed for the adjacent Sheraton Inn property was enlarged to accommodate the Convention Center and the outlet through the bulkhead for the existing pond was utilized. This pipe outlets into the Neuse River. The stormwater for the off-site parking located on the north side of South Front Street is also treated by the use of a wet detention pond. The parking area drainage is collected in a series of catch basins and routed to the retention pond. A retaining wall was required to provide the necessary volume. The outlet into the pond is lined with rip rap and the invert is set so that the flow into the pond is submerged during large events. Once this collected flow enters the pond via the pipe system, it must flow through and over a "Class B" stone forebay prior to exiting through the pond outlet structure. The pond outlet structure ties into an existing stormdrain line which exits into the Neuse River. The areas above the normal pool elevation on both ponds will be landscaped to prevent erosion and to provide some filtering of the system during elevated water levels. The pond outlets utilize small diameter PVC pipes placed at low elevations in order to drain the pond down to the normal pool elevation. Each outlet structure has an overflow emergency weir to accommodate events larger than the 10 Year flood. The small diameter inlets are protected from debris by a '/2 inch stainless steel screen mesh. The emergency outlet of each system is covered with grating to prevent trash from entering the pipe system Each wet detention pond will be utilized as a sediment basin during construction for the proposed construction. camanara.doc Form DCM-MY-1 APPLICATIONN 2 0 1999 (To be completed by all applicants) b. City, town community or landmark New fern 1. APPLICANT c. Street address or secondary road number Corner of East Front and South Front S a. Landowner: Name Craven County Address 406 Craven Street City New Bern State NC Zip 28560 Day Phone (252) 636-6600 Fax (252) 636-6638 b. Authorized Agent: -Name Tim Reid/Moffatt & Nichol Engineers Address 2209 Century Drive, Suite 500 City Raleigh State NC Zip 27612 Day Phone (919) 781-4626 Fax (919) 781-4869 c. Project name (if any) Craven County Convention Center NOTE: Permit will be issued in name of lmadowner(s), mid/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Craven d. Is proposed work within city limits or planni; jurisdiction? x Yes' No e. Name of body of water nearest project (e.g. rive creek, sound, bay) Neuse Ri er 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e. building a home, motel, marina, bulkhead, pier, a excavation and/or filling activities. Construct a Convention Center and Supporting Infrastructure. b. Is the proposed activity maintenance of an existi project, new work, or both? New Work c. Will the project be for public, private or commerc use? Public d. Give a brief description of purpose, use, methods construction and daily operations of propos project. If more space is needed, please au= additional pages. Area within reaui red s, back consists of sidewalk constructio stormwater retention & landscaping. Building construction is typica Al Stormwater for the site will be route through a wet detention pond and will utilize existing out a s. o a T discharge points require "-_!--J AZ /M Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 4.137 AC. 3.037 A 11,594 SF b. Size of individual lot(s) 13,335 SF 23,052 SF c. Approximate elevation of tract above MHW or NWL +7.0 d. Soil type(s) and texture(s) of tract Sands e. Vegetation on tract Grass f. Man-made features now on tract S i d ewa 1 k & Storm Drainage g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) Conservation X Developed Rural Transitional Community Other h. How is the tract zoned by local government? Commercial i. Is the proposed project consistent with the applicable zoning? X Yes No (.mach zoning compliance cerrificate, if applicable) j. Has a professional archaeological assessment been done for the tract? Yes X No If yes, by whom? . k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? X Yes No 1. Are there wetlands on the site? Yes X No Coastal (marsh) Other If yes, has a delineation been conducted? (Anach documentation, if available) m. Describe existing wastewater treatment facilities. -City of New Bern Gravity Sewer Located Under ron ree (Public System) n. Describe location and type of discharges to Ovate: of the state. (For example, surface runoff, sanitar, wastewater, industrial/commercial effluent, "wasi down" and residential discharges.) Stormwater o. Describe existing drinking water supply source. City of New Bern Water (Public System) 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy or the deed (with state application only) or other instrument under which the applicant claims tit]e to the affected properties. If the applicant is no: claiming to be the owner of said property, the: forward a copy of the deed or other instrument under which the owner claims title, plus written permissior: from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note, that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03/95 Form DCh1-'1'vtP-3 UPLAND DEVELOPMENT JAN 2 0 1999 (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM4,2-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities, units or structures proposed Masonry Convention Center - One Structure b. Number of lots or parcels 4 c. Density (aivp the number of residential units and the units per acre) N/A d. Size of area to be graded, filled or disturbed including roads, ditches, etc. _ 4.137 Acres If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan.at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? x Yes No If yes, date submitted JAO $5. 1999 List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. Asphalt & Concrete h. Projects that require a CAMA Major Development Permit may also require a Stormwate'r Certification. Has a site development plan been submitted to the Division of Environmental Management for review? x Yes No If yes, date submitted 12-17-98 i. Describe proposed method of sewage disposal. Public System. j. Have the facilities described in Item i. above received state or local approval? See Above (,4=ch appropriate documemarion) k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges). Surface Runoff 1. Describe proposed drinking water supply source (e.°. well, community, public system, etc.) Public System m. Will water be impounded? If yes, how many acres? _ n. If the project is a oceanfront development, -when was the lot(s) platted and recorded? N/A g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildings, rooftops, or to be u ed for vehicular driveways or parking. 5.6% S'eL 3:o Rspo: i Revised 03/95 Craven County Convention C Applicant or Pro' t Name Signature -t:?7f Date x Yes No 0.24 JAN 2 U 1999 w I-- V) z W U D ?13A??J 3sn]N ° n ry z O ?S UOa3 w > Ln z L O O C ?O C/) - O o p O ?S LL- a/pp,W - (D _..: f-0 o ? ?S Jloapa W .. N ?S ?1aoo U°H W 1 3: Q) -0 ?-- C) O o m U a a r ? Z z ~ U D O 5 U O? U z w w Z F- > Z L'i w 1<1 0: Z U U O F w0 ?Z > Z U ~ O I- a w U Q a x oav? cj? o _::) F-- m ct? L-Li ry z LLJ ?6 Q? qqa'. ,. >?a { ?? ? ? (S ylk Y ?7 $?: ;2's i' .y 2? ?rj Vi ?.¢!! ?' 8x> `gyhi Y r h €€?°?= c ( b' ?, ,f1 a ?f ,j\ -s fo !€fsgt 5 <* S3?oLgp++ t s? ki ??r: i E 6 Sir W. B? RRk.a `%G'3? TcS SRa WW oSO( d ( w_et f /-,!¢ 'L? ?d, Y p?]! { g.v R.:..-... 'R£•GT?'G1'o R43 dEd M m ; +4' r ' ? 3. Ea 1 I I a, r T• i• \` ,1 i ??? ?U ( •V:,.{??i:?;>: be :111 f''. '?. ::a° ? IIt?•= Es ::y t• 11 Gi:. ? ? i"' eo :?1'1F<4 ? K x m 'y'`::: .....? O :111 ?•y: ? W yy + ?. ; 111 fir-' t- o :. -.. ..-.. ..... .-.?..... ....- - ..__. ..... ...... ...... ...... ..... .t t SOUTH FRONT STREET `•rY i 4,s•'S{'• 3}S ... , d E ire, .: , 1: I t: {$ ,_. ,•??:.;?{=...o... ?:% of? r :J?_ --?r ... ?\\ I: is ,j#t ?:: .? :. <: {( I 3 3 1A :? Me •gpC ... 1-_._.w.+a-•''.__-..'_-_-' _ ,fp a L? , 1 l\L 1:: '•:: f: I - .e 1 .. j?Q is •' I I':'`,N: ••? y R t, W ...... .... .. 1•: :. 1 E y I :'. c :.a?., ` 0 ?....... .-_ j.. ? uhf. ••1• j?l. 1: __a'a:a h\e ? ? ?; i. .. Z .::::. L) z LIJ p W S` -•-•-_-_-....- -._....i ?-tip ? i tn1111G ? d '\ Z ?? ??\ 3..Y11 \?\\\t\lf.••: - -. may} tom` - viI 1111111 \ \\ s(' ?+' "?>+?:?+\• r:IJP c -r V: ot- at O O ro AF 0 O of O O ?? II J O Z a J 0. } H O v U W W Z W > Q Q z 01 L) O c' ?Qo F 0 Z M O U F LLJ a w Q a = o a VI cn cn O o Z JV ?,: f ,. \ t ; I tYY ? .? •t' {\` 1 41 ; t ' \ Gq Id a $- ?« t.?= S oY ,fie ?o g F . I t !? ;il-. 1 1: S I II :`{:? ? W o ??a0 H S i 1 Ear 1 9 12 s 14e ? S K s ? 22 g= ? Y ? J z Q O w CK C) L` (n rri 0 c)-)r 0 Q O O N O r- Cl 0 I I W J U Q w z w U >- z '- O z w O > U Z Z O W U > ? a z U F- O z z Q W U > W -1 w Q F- C W C)f Q n 2 U 0 Q U) rn rn rn r-. a Z Q Y Ln J D7 J ww O il- Q O W f- _ O J W J z 0 U W Z Q J N z W `d-d INI?HO1dW d-`d IINI?H:DiVN