Loading...
HomeMy WebLinkAboutNCC192737_NOI Application_20191206 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 11/7/2019 12:05:34 PM(NCG01 NOI Submission) Approve by Clark, Paul 11/12/2019 9:20:35 AM(Review-Construction NOI 18243) • Georgoulias, Bethany reassigned the task to Clark, Paul 11/8/2019 1:23 PM * As requested • The task was assigned to Farkas,Jim J by round robin distribution 11/7/2019 12:05 PM • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: November 11,2019 5:00 PM 11/7/2019 12:05 PM Submit by McCoy, Suzanne 12/6/2019 12:32:14 PM(Payment Verification for NCC192737) * Renewpetra const. llc • McCoy,Suzanne assigned the task to McCoy, Suzanne 12/6/2019 12:31 PM • The task was assigned to DEMLR NCG01 Payment Team.The due date is: December 24,2019 5:00 PM 11/12/2019 9:20 AM �ThF1 1Construction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System 'D application for•• - .•-under NorthCarolina's General Permit 1 1111:STORIVWATER DISCHARGES associated with construction activities(or NORTH CAROLINA Enrlrnnmenfu�Qr�arlry A. Project Information Part A. Project Location and Waterbody Information 1. Project Name* Clear Solar I,Array 2&3 2.County* Rutherford 3. Highway or Street 587 Pine Street Extension Address* Street nacre only is acceptable if no address number assigned yet 4. City or Township* Forest City 5.State* NC 6.Zip Code* 28043 7. Latitude* Enter the latitude in decimal degrees 35.3079 8. Longitude* Enter the longitude in decimal degrees(M.ST be negative) -81.8422 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/11/2019 Estinated Construction Project Start Date 10. Date to End* 04/22/2020 Estimated Construction Project End Cute 11.SIC(Primary)* Other(0000) Standard Industrial aassification for Ceveloprrent 12.Acres to be 11.82 disturbed* (including off-site borrow and waste areas) 13.Total site area 19.15 (acres)* 14. Post- 0.73 construction (Estimated) impervious area (acres)* NCC Project NCC-RUTHE-2019-Clear Solar I,Array 2&3 Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Morrow Creek Wate rbody* f brre of waterbody into which storrrwater runoff will discharge 15b.Waterbody 9-41-20 Index No.* NCWaterbody Index Nurrber Stormwater V No discharges will flow r Yes to additional wate rs* 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration-Legally Fbsponsible Entity and Individual Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1.Organization Renew Petra Construction, LLC Name* 2. First Name* Wayne ff Corporation,enter Pegistered Agent First Barre 3. Last Name* Marshall ff Corporation,enter Faegistered Agent Last%rre 3b.Title Managing Director 4. Permitee E-mail wmarshall@renewpetra.com Address* 5. Permittee 7048970713 Telephone No.* 6. Permittee Mailing Street Address Address* 11330 Vanstory Drive Address Line 2 Suite 101 City State/Frovince/Region Huntersville North Carolina Fostal/Zip Code Country 28078 United States Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 11330 Vanstory Drive Address Line 2 Suite 101 City State/Frovince/Fbgion Huntersville North Carolina Fbstal/Zip Code Country 28078 United States C. Site Contact Information Part C. ^ Roject Site Contact Inforrration ....................................................................................................................................................................................................................................................................................................................................................................................... 1.Type of Non-Government Ownership* 2. Primary Site Jason Contact-First Name* 3. Primary Site Sparks Contact-Last Name* 4.Title Director of Construction 5.Site Contact E- jsparks@renewpetra.com mail Address* 6.Site Contact 704-309-0629 Telephone No.* 7.Organization ReNew Petra Construction, LLC Name 8.Site Contact Street Address Mailing Address* 11330 Vanstory Drive Address Line 2 Suite 101 aty State/Rovince/f;bgion Huntersville North Carolina Fbstal/Zip Code Country 28078 United States 9. Consultant Name (Optional) Mike Crowley First and Last narre 10. Consultant E- mcrowley@caaengineers.com mail This person will be copied on all correspondence. 11. Consultant 19196256755 Telephone No. D. E&SC Plan Part D. ^ Erosion&Sediment Control(E&SC)Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/28/2019 Approved* 2. E&SC Plan Project RUTHE-2020-007 Number/ID* Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4.State DEQ Office* Asheville(ARO) Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. 5. E&SC Plan Clear Solar I North- ESC-SWPPP Permit_10-28- Approval 1.08MB 2019.pdf letter/documentation Mist be R7Fforrrat 6. NOI Certification Clear Solar I North-NOI sig page_10-29-2019.pdf 403.91 KB Form Mist be R7Fforrrat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E(i) provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Artcle;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is,to the best of my knowledge and belief, true,accurate, and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature 1 i��rtr�rr�°��la�rt ftl�rr/f Type Name* Wayne Marshall Title Managing Director Organization ReNew Petra Construction, LLC Date* 11/07/2019 F. Tracking and COC Info NOI Tracking No. 18243 NC Reference No. NCG01-2019-2737 Uses'count_nurrber'variable(increrrented by SP) Certificate of NCC192737 Coverage (COC) Uses'count number'variable(increrrented by SP) No.* Count Number 2737 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed(used to assign YY digits after"NOC'in COCno.)