HomeMy WebLinkAbout20150356 Ver 3_Email_20191204Strickland, Bev
From: Johnson, Alan
Sent: Wednesday, December 4, 2019 4:32 PM
To: Steven Hinshaw
Subject: RE: [External] Re: Seven Oaks Marina
need to be in the field. Leaving at 9:30 a.m. but available before
From: Steven Hinshaw [mailto:steven@hinshawproperties.com]
Sent: Wednesday, December 4, 2019 4:17 PM
To: Johnson, Alan <alan.johnson@ncdenr.gov>
Cc: Jim <jim@carolinalandsolutions.net>
Subject: RE: [External] Re: Seven Oaks Marina
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
1ffport.spam@nc.gov
Yes! A lot to digest. Can you do a call tomorrow morning?
Thanks.
From: Johnson, Alan <alan.iohnson@ncdenr.gov>
Sent: Wednesday, December 4, 2019 4:08 PM
To: Steven Hinshaw <steven@hinshawproperties.com>
Subject: RE: [External] Re: Seven Oaks Marina
You have 762 linear ft (If) of shoreline for this parcel. Which means you have a total of 22,860
sq ft of zone 1 buffer.
The fee for mitigation is 1.85/sq ft. of buffer impact. X 2
Buffer restoration is based on the area of impact (length of impact X buffer
width). Restoration is at a rate of 260 trees/ac. Shown below is approx. length for the various
segments of the parcel. I need photos from Shannon to confirm impact(s). He stated he
could provide.
Please read below. A phone call may be in order, once you've digested. Thanks, Alan
Red - 180 ft (wooded) X 30 = 5,400 / 43,560 = 0.12 acre X 260 = 32 trees would be required
to restore this section. I propose a minimum of 10 trees in a similar "row" through the buffer
(1 tree every 10 ft of 30 ft of buffer)
Orange — 75 ft (wooded), 14 trees for restoration
Green — 176 ft (100 ft which was already free of trees), 14 trees for restoration
Blue — 95 ft (which was clear of trees), no trees required
1
A minimum of 60 trees would typically be required (3" diameter, 8 ft, native species) for
restoration.
If the blue is limited to just the 95 ft. The 28 trees (14 + 14) can be spread through the Orange,
blue, and green areas in a similar manner as shown (no bunching). The aforementioned would
be partial mitigation. Then For the wooded section(s), 255 X 30 = 7,560 sq ft., mitigation
would be paid into the program at a reduced rate (for partial mitigation on site), since they
aren't technically fully restored. The 30 X 30 launch pad would be mitigated at full rate. Storm
water from the access/launch pad should not flow into the lake
\V
ss rux
,ar.oAV Wr i
MPr
i d +wG a**
i
4
�a 5kag�ng �,• � �+�
fv e i
w k.imtts rt��
r
]bw Na
From: Steven Hinshaw[mailto:steven@hinshawproperties.com]
Sent: Wednesday, December 4, 2019 11:27 AM
To: Jim<jim@carolinalandsolutions.net>; Johnson, Alan <alan.iohnson@ncdenr.gov>
Subject: [External] Re: Seven Oaks Marina
• External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
r m nc. ov
Alan - as promised attached is a landscape plan for the buffer areas. Thanks.