Loading...
HomeMy WebLinkAboutNCC193001_ESC Approval Submitted_20191205 ROY COOPER. Cavernor MICHAEL S.REGAN Secretary S.DANIEL SMITH NORTH CAROLINA Interim Direclor Environmental Quality November 13, 2019 LETTER OF APPROVAL Development by the Numbers, Inc. James Minor, President/Owner 320 N Judd Parkway NE Suite 220 Fuquay-Varina,NC 27526 RE: Project Narne: Purfoy Place Subdivision Acres Approved: 19.0 Project ID: HARNE-2020-037 County: Harnett, City: Hectors Creek Address: Purfoy Road River Basin: Cape Fear Stream Classification: Other Submitted by: Spencer Terry Date Received by LQS: October 21, 2019 Plan Type: Residential Dear Mr. Minor: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3)years following the date of approval,if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and subunit an electronic Notice of Intent (NOI) form requesting a. Certificate of-Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above-named project. . The NOI form may be accessed at dea.nc.gov/NCGO1. the NOI. form to Annette Lucas at Annette.lucasoncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a$100 fee will soon be charged annually.This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. �,,AQE North Carolina Departnnent of Environmental Quality I Division of Energy,Mineral and Land Resources z� Fayetteville Regional Office 225 Green Street.Suite'714; Fayetteville,North Carolina 28301 �s3VanmkmE kt¢nai!un=.r oEfas�i 910A33.3300 - Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC,once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, :requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations,and rules.In addition,local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided.You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.In addition,it would be helpful if you notify this office of the proposed starting date for this project.Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, C_" S&,.,_ Chris Baker Assistant Regional Engineer DEMLR- Fayetteville Regional Office Enclosures: Certificate of Approval cc: Spencer Terry, P. E., Carolina Land Development Group, Inc.—electronic copy Ken Slatturn, Harnett County Planning & Inspections Office—electronic copy Fayetteville Regional Office