HomeMy WebLinkAboutSW3191105_Millbridge Phase 7E Calculations_12/3/2019�I�I�C _I<SON community infrastructure consultants Millbridge Phase 7E Full Design WKD # 20170279.00.CL CALCULATIONS FOR: Stormwater, Water Quality, Detention & Erosion Control \\lil11//fj/ DATE: 9/11/2019 ��`o���\A'®`''�� REV: 11 /12/2019 610 COLONNADE DRIVE CHARLOTTE, NORTH CAROLINA 28205 TEL 704.334.5348 FAX 704.334.0078 www.WKDickson.com Millbridge Phase 7E Full Design ►WIC PROJECT NO.: 20170279.00.cL BY: CJH aw Q 1 <-, I<SC) DATE: 911112019 T.M.: WGB community intrastructuro consultor-ol, REVISED: 1111212019 P.M.: WGB PRE/POST DEVELOPMENT CURVE NUMBERS CURVE NUMBER: Predeveloped CN BASIN #1 Cover Type Area (SF) % CN Wtd. CN Woods 1285616 0.96 55 53.06 Pavement/Concrete 2716 0.00 98 0.20 Existing Pond 44262 0.03 98 3.26 Total 1332594 56.52 Composite CN 56.52 Use CN = 57 Predeveloped CN BASIN #2 Cover Type Area (SF) % CN Wtd. CN Woods 244766 1.00 55 55.00 Total 244766 1 55.00 Com osite CN 55.00 11 Use CN = Predeveloped CN BASIN #3 Cover Type Area (SF) % CN Wtd. CN Woods 394879 1.00 55 55.00 Total 394879 1 55.00 Composite CN 55.00 Use CN = Postdeveloped CN BMP #1 Cover Type Area (SF) % CN Wtd. CN PavemenbConcrete 30159 0.05 98 5.23 Buildings 29200 0.05 98 5.06 Woods/Grass 491821 0.87 58 50.47 Permanent Pool 14026 0.02 98 2.43 Total 565206 1.00 63.19 Com osite CN 63.19 11 =1 Use CN = 63 Postdeveloped CN BMP #2 Cover Type Area (SF) % CN Wtd. CN Pavement/Concrete 52824 0.13 98 12.29 Buildings 143500 0.34 98 33.39 Grass 215086 0.51 61 31.15 Permanent Pool 9762 0.02 98 2.27 Total 421172 1.00 79.10 Composite CN 79.10 11 =1 Use CN = 80 Postdeveloped CN BMP #3 Cover Type Area (SF) % CN Wtd. CN Pavement/Concrete 41885 0.14 98 13.65 Buildings 91000 0.30 98 29.66 Grass 158677 0.53 61 32.20 Permanent Pool 9080 0.03 98 2.96 Total 300642 1.00 78.47 Com osite CN 78.47 11 =1 Use CN = 79 Millbridge Phase 7E Full Design ►WIC PROJECT NO.: 20170279.00.cL BY: CJH aw Q 1 <—, ICsC) DATE: 911112019 T.M.: WGB community intrastructuro consultor-ot, REVISED: 1111212019 P.M.: WGB PRE/POST DEVELOPMENT CURVE NUMBERS Postdeveloped CN BYPASS POI #1 Cover Type Area (SF) % CN Wtd. CN Water Surface 44262 0.18 98 17.86 Woods/Grass 198634 0.82 58 47.43 Total 242896 1.00 65.29 Composite CN 65.29 11 =1 Use CN = Postdeveloped CN BYPASS POI #2 Cover Type Area (SF) % CN Wtd. CN Woods/Grass 50517 1.00 58.00 Total 50517 1.00 58.00 Com osite CN 58.00 Use CN = 58 Postdeveloped CN BYPASS POI #3 Cover Type Area (SF) % CN Wtd. CN Woods/Grass 14071 0.04 58 2.08 Woods 377693 0.96 55 53.02 Total 391764 1.00 55.11 Composite CN 55.11 11 =1 Use CN = 55 Millbridge Phase 7E Full Design MWK 1-->I KSQIV corriinunily ri[rost—cl—e consullonls PROJECT NO.: 20170279.00.cL BY: CJH DATE: 911112019 T.M.: WGB REVISED: 1111212019 P.M.: WGB IMPERVIOUS CALCULATIONS Impervious Calculations for Basins BMP 1 Drainage Area 12.98 acres Impervious Areas # Lots sf/lot Right of Way (paving, curb, sidewalk)= 27443 sf 8 3650 52' Lots (building, sidewalk, concrete patios, driveways, etc.)= 29200 sf Total Impervious= 56643 sf Percent Impervious= 10.02% BMP 2 Drainage Area 9.67 acres Impervious Areas Right of Way (paving, curb, sidewalk)= 52824 sf # Lots sf/lot Lots (building, sidewalk, concrete patios, driveways, etc.)= 143500 sf 41 3500 Total Impervious= 196324 sf Percent Impervious= 46.61% BMP 3 Drainage Area 6.90 acres Impervious Areas Right of Way (paving, curb, sidewalk)= 41885 sf # Lots sf/lot Lots (building, sidewalk, concrete patios, driveways, etc.)= 91000 sf 26 3500 Total Impervious= 132885 sf Percent Impervious= 44.20% 75 Millbridge Phase7E Full Design oft [ PROJECT NO.: 7c JHgn WN C) I c: ICSc> DATE: 911112019 T.M.: WGB cnmmiinity InfrnsTrelr._tiirF r_nnSlilTnnis REVISED: 1111212019 P.M.: WGBIJ I DRAINAGE AREA & WETPOND SUMMARY STORM WATER PRE-DEVELOPMENT/POST-DEVELOPMENT TABLE 2 YEAR 10 YEAR PRE CFS POST CFS DELTA PRE CFS POST CFS DELTA POI #1 4.10 3.26 -0.84 26.49 13.13 -13.36 POI #2 0.43 0.26 -0.17 3.68 1.58 -2.1 POI #3 0.77 0.76 -0.01 6.77 6.71 -0.06 Free Board Check Peak Elv. (50YR) Top of Berm Freeboad (ft) BMP 1 570.47 573.00 2.53 BMP 2 562.91 565.00 2.09 BMP 3 572.86 575.00 2.14 • Per Town of Waxhaw Stormwater Design Manual a minimum of 0.50' freeboard required • Per NCDEQ Stormwater Design Manual a minimum of 1.00' freeboard required PRE -DEVELOPMENT AREA DRAINAGE BASIN AREA AC. Pre #1 30.59 Pre #2 5.62 Pre #3 9.07 Total 45.28 POST -DEVELOPMENT AREA DRAINAGE BASIN AREA AC. BMP #1 12.98 By -Pass #1 5.58 BMP #2 9.67 BMP #3 6.90 B -Pass #2 1.16 By -Pass #3 8.99 TOTAL 45.28 Millbridge Phase 7E Full Design �W]C 'ROJECT NO.: z017oz79.00.cL BY: CJH )ATE: 9/11/2019 T.M. WGB unrTv tnrrosTrucTura conaurTonra REVISED: 1111212019 P.M.: WGB WATER QUALITY BASIN CALCULATIONS - WETPOND 1 WATER QUALITY REQUIREMENTS To meet the Water Quality requirements, the procedure outlined in the "Stormwater Best Management Practices' published by NCDENR will be used. This guide gives the required pond surface area and storage volume to meet an 85% pollutant removal efficiency. Also, the pond must detain the first 1" of rainfall and release this volume over a period of 2 to 5 days. Calculations for these requirements are as follows: Surface area requirements Drainage area to pond (Da)= 12.98 Ad Post -development impervious percentage = 10% Average pool depth = 5 ft Designed permanent pool elevation = 566.5 Interpolation to find required SA/DA ratio for non whole number Storage Depth volume 5 0.37 5 0.37 6 0.30 From table 1.1 in the BMP guidelines the required Surface Area to Drainage Area Ratio (SA/DA) for a permanent pool depth = 0.37 Required surface area = SA/DA / 100 x Drainage area= 0.05 Ad Surface area of pond as designed at permanent pool elevation = 0.2372 Ad 1" rainfall requirements Using the runoff volume calculations in the "Simple Method" Rv=0.05+0.9(I) Rv= 0.140194902 in/in Volume = (Design rainfall) (Rv) (Drainage Area) Volume = 1" rainfall x Rv in/in x 1/12 in/ft x Da = or 0.15 ac-ft This volume must be released over a period of 2-5 days 6603 ftA3 As designed pond areas Storage Volumes Cumulative Elevation Area(ac) Volume(ac-ft) 566.5 1.286444289 0.00 567 1.43383385 0.68 568 1.812641655 2.30 569 2.236960825 4.32 570 2.708268612 6.78 571 3.228043075 9.74 =orbay Volume (CF 10529 Total Volume (CF) 56038 Forebay % of Ponc 18.79 % % PERMANENT POOL DEPTH Impervious 3 4 5 6 7 10 0.51 0.43 0.37 0.3 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.4 30 1.17 0.81 0.84 0.72 0.61 0.56 40 1.51 1.22 1.09 0.91 0.78 0.71 50 1.79 1.47 1.31 1.13 0.95 0.87 60 2.09 1.73 1.49 1.31 1.12 1.03 70 2.51 2.04 1.8 1.56 1.34 1.17 80 2.92 2.36 2.07 1.82 1.62 1.4 90 1 3.25 2.64 2.31 1 2.04 1 1.84 1.59 2094.2 Permanent Pond Storage Volume Elevation (msl) Forebay (sf) Forebay (ac) FB Volume (cu-8) FB Volume (ac-8) Pond (sf) Pond (ac) Pond Volu (cu-ft) Pond Volume (ac-ft) 557 F-70-0-00-01 0 0.0000 558 0.0000 0.0000 3708 0.0851 1235 0.0283 �� 559 0.0000 0.0000 4274 0.0981 5218 0.1198 �� 560 0.0000 0.0000 4872 0.1118 9784 0.2246 �� 561 0.0000 0.0000 5502 0.1263 14962 0.3435 �� 562 1256 0.0288 0.0096 6164 0.1415 20786 0.4772 00 563 1703 0.0391 1472 0.0000 6858 0.1574 27288 0.6264 �� 564 2182 0.0501 3408 0.0444 7585 0.1741 34499 0.7920 00 565 2695 0.0619 5840 0.1003 8343 0.1915 42452 0.9746 �� 566 '0 0.0744 8799 0.1682 9134 0.2097 51179 1.1749 00 566.5 0.0848 10529 0.2079 10333 0.2372 56038 1.2864 �� 567 ���� 15551 0.3570 62458 1.4338 �� 568 ���� 17503 0.4018 78959 1.8126 �� 569 ���� 19519 0.4481 97442 2.2370 �� 570 ���� 21600 0.4959 117972 2.7083 �� 571 ���� 23745 0.5451 140614 3.2280 �� 572 ���� 25954 0.5958 165430 3.7978 �� 000�0 28228 0.6480 192486 4.4189 00 Interpolation to find elevation at which required storage volume is reached Storage Storage Storage Elev volume area (ac.) area (sf.) 566.5 0.00 1.29 56037.51 Elev 0.15 1.32 57471 567 0.68 1.43 62457.8 Elev= 566.61 Storage elevation = 0.11 feet above permanent pool elevation Determination of Orifice size for 2-5 day drawdown a= 2A x sgrt(h) `Falling head equation Ct(sgrt(2g)) a= Area of orifice a sqft t= Time to drawdown 259200 sec A= Average pond surface area 33902 sf g= Gravity constant 32.2 ft/s"2 h= Change in head 0.11 ft C= Orifice constant 0.6 Maximum orifice area = 0.02 sqft Maximum orifice size = 1.8 inches Selected orifice size = 1.75 inches Assume 2 day minimum (3 day drawdown) Millbridge Phase 7E Full Design WK MpEA4z:KSC>p4 community infrastructure consultants PROJECT NO.: 20170279.00.cL BY: CJH DATE: 911112019 T.M.: WGB REVISED: 1111212019 P.M.: WGB FLOATATION CALCULATIONS - BMP #1 CONSTRAINTS: Weight of Concrete 150 Ibs/ft^3 Weight of Water 62.4 Ibs/ft^4 Safety Factor (S.F.) 1.1 Height of structure 9.2 ft Structure thickness 6 in Outlet box width (interior) 4 ft Weight of outlet structure(Ws) Ws = (width + thickness x 4) x thickness x height x weight of concrete = Weight of water displaced Size Base Footing size Ww = ((width + 2 x thickness)^2) x Weight of water height = Wb = (S.F. x Ww) - Ws = 3367 Ibs Required concrete = Wb / (Weight of concrete -weight of water) = *Assume base is 6" wider than exterior box width and minimum thickness is 8 Thickness of base = 1.27 ft Length = 6.00 ft Width = 6.00 ft Thickness = 1.50 ft 14352 Ibs 38 cuft 12420 Ibs Millbridge Phase 7E Full Design p►WI< PROJECT NO.: 20170279.00.CL BY: CJH w DI KSC)IN DATE: 911112019 T.M.: WGB community Infrostructwe consuitonts REVISED: 1111212019 P.M.: WGB PRELIMINARY CALCULATIONS ANTI -SEEP COLLARS BMP #1 Pipe Diameter 36 in Length of Covered Pipe 188 ft Number of Collars 8 Anti -Seep Collar Sizes Length: 6.70 ft Width: 6.70 ft Note: Anti -seep collars are centered on pipe Vlillbridge Phase 7E Full Design 'ROJECT NO.: 20170279.00.cL BY: CJH )ATE: 9f11/2019 T.M.: WGB Unily int-sti-tu- -swt-ts tEVISED: 1111212019 P.M.: WGB WATER QUALITY BASIN CALCULATIONS- WETPOND 2 WATER QUALITY REQUIREMENTS To meet the Water Quality requirements, the procedure outlined in the "Stormwater Best Management Practices" published by NCDENR will be used. This guide gives the required pond surface area and storage volume to meet an 85 k pollutant removal efficiency. Also, the pond must detain the first 1" of rainfall and release this volume over a period of 2 to 5 days. Calculations for these requirements are as follows: Surface area requirements Drainage area to pond (Da)= 9.67 Ac Post -development impervious percentage = 47 Average pool depth = 3.5 ft Designed permanent pool elevation = 558.5 Interpolation to find required SA/DA ratio for non whole number Storage Depth volume 3 1.70 3.5 1.54 4 1.39 From table 1.1 in the BMP guidelines the required Surface Area to Drainage Area Ratio (SA/DA) for a permanent pool depth = 1.54 Required surface area = SA/DA / 100 x Drainage area= Surface area of pond as designed at permanent pool elevation = I" rainfall requirements Using the runoffvolume calculations in the "Simple Method" Rv = 0.05 + 0.9 (1) Rv= 0.469523615 in/in Volume = (Design rainfall) (Rv) (Drainage Area) Volume = 1" rainfall x Rv in/in x 1/12 in/ft x Da = This volume must be released over a period of 2.5 days As designed pond areas: Storage Volumes Cumulative Elevation Area(ac) Volume(ac-ft) 558.5 0.618875928 0.00 559 0.724847237 0.34 560 1.004347196 1.20 561 1.329071038 2.36 562 1.700643829 3.87 563 2.120621458 5.77 564 2.590572053 8.12 565 3.112076105 10.97 Forbay Volume (CF) 5030 Total Volume (CF) 26958 Forebay k of Pond 18.66% 0.15 Ac 0.1695 Ac or 0.38 ac-ft 16479 ft^3 PERMANENT POOL DEPTH Impervious 5 6 7 8 10 0.51 0.43 0.37 0.3 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.4 30 1.17 0.81 0.84 0.72 0.61 0.56 40 1.51 1.22 1.09 0.91 0.78 0.71 50 1.79 1.47 1.31 1.13 0.95 0.87 60 2.09 1.73 1.49 1.31 1.12 1.03 70 2.51 2.04 1.8 1.56 1.34 1.17 80 2.92 2.36 2.07 1.82 1.62 1.4 90 3.25 2.64 2.31 2.04 1.84 1.59 6487.161 Permanent Pond Storage Volume Elevation (msl) For (so Forebay (ac) FB Volume (cu-ft) FB Volume (ac-ft) Pond (4 Pond (ac) Pond Volu (cu-ft) Pond Volume (ac-ft) 553 � 0.0000 � 0.0000 3248 0.0746 ���� 554 09 0.0025 � 0.0000 3792 0.0871 3513 0.0806 �� 555 � 0.0118 343 0.0079 4375 0.1004 7587 0.1742 �� 556 960 0.0220 1068 0.0245 4991 0.1146 12262 0.2815 �� 557 1441 0.0331 2260 0.0519 5639 0.1295 17569 0.4033 �� 558 1956 0.0449 3950 0.0907 6320 0.1451 23539 0.5404 �� 558.5 2378 0.0546 5030 0.1155 7384 0.1695 26958 0.6189 �� 559 ���� 11233 0.2579 31574 0.7248 �� 560 ���� 13167 0.3023 43749 1.0043 �� 56'. ���� 15175 0.3484 57894 1.3291 �� 562 ���� 17251 0.3960 74080 1.7006 �� 563 ���� 19395 0.4452 92374 2.1206 �� 564 ���� 21608 0.4961 112845 2.5906 �� 565 ���� 0000000000 23890 0.5484 135562 3.1121 �� Interpolation to find elevation at which required storage volume is reached Storage Storage Storage Elev volume area (ac.) area (sf.) 559 0.34 0.72 31574.35 Elev 0.38 0.74 32184 560 1.20 1.00 43749.36 Elev= 559.05 Storage elevation = 0.55 feet above permanent pool elevation Determination of Orifice size for 2-5 day drawdown a= 2A x sgrt(h) 'Falling head equation Ct(sgrt(2g)) a= Area of orifice a sqft t= Time to drawdown 172800 sec A= Average pond surface area 19784 sf g= Gravity constant 32.2 ft/s^2 h= Change in head 0.55 ft C= Orifice constant 0.6 Maximum orifice area = 0.04 sqft Maximum orifice size = 2.5 inches Selected orifice size = 2.5 inches Assume 2 day minimum 2 day drawdown Millbridge Phase 7E Full Design WK MpEA4z:KSC>p4 community infrastructure consultants PROJECT NO.: 20170279.00.cL BY: CJH DATE: 911112019 T.M.: WGB REVISED: 1111212019 P.M.: WGB FLOATATION CALCULATIONS - BMP #2 CONSTRAINTS: Weight of Concrete 150 Ibs/ft^3 Weight of Water 62.4 Ibs/ft^4 Safety Factor (S.F.) 1.1 Height of structure 8.3 ft Structure thickness 6 in Outlet box width (interior) 4 ft Weight of outlet structure(Ws) Ws = (width + thickness x 4) x thickness x height x weight of concrete = Weight of water displaced Size Base Footing size Ww = ((width + 2 x thickness)^2) x Weight of water height = Wb = (S.F. x Ww) - Ws = 3038 Ibs Required concrete = Wb / (Weight of concrete -weight of water) = *Assume base is 6" wider than exterior box width and minimum thickness is 8". Thickness of base = 1.15 ft Length = 6.00 ft Width = 6.00 ft Thickness = 1.00 ft 12948 Ibs 35 cuft 11205 Ibs Millbridge Phase 7E Full Design p►WI< PROJECT NO.: 20170279.00.CL BY: CJH w DI KSC)IN DATE: 911112019 T.M.: WGB community Infrostructwe consuitonts REVISED: 1111212019 P.M.: WGB PRELIMINARY CALCULATIONS ANTI -SEEP COLLARS BMP #2 Pipe Diameter in Length of Covered Pipe ft Number of Collars Anti -Seep Collar Sizes Length: 6.65 ft Width: 6.65 ft Note: Anti -seep collars are centered on pipe Aillbridge Phase 7E Full Design ►WIrC+ 'ROJECT NO.: 20170279.00.CL BY: CJH _ � I � )ATE: 9111120191 T.M.: WGB ,nlw lief-fll-turf s ata r� ZEVISED: 1111212019 P.M.: WGB WATER QUALITY BASIN CALCULATIONS - WETPOND 3 WATER QUALITY REQUIREMENTS To meet the Water Quality requirements, the procedure outlined in the "Stormwater Best Management Practices" published by NCDENR will be used. This guide gives the required pond surface area and storage volume to meet an 85 k pollutant removal efficiency. Also, the pond must detain the first 1" of rainfall and release this volume over a period of 2 to 5 days. Calculations for these requirements are as follows: Surface area requirements Drainage area to pond (Da)= 6.90 Ac Post -development impervious percentage = 44 Average pool depth = 3.5 ft Designed permanent pool elevation = 568.5 Interpolation to find required SA/DA ratio for non whole number Storage Depth volume 3 1.63 3.5 1.48 4 1.33 From table 1.1 in the BMP guidelines the required Surface Area to Drainage Area Ratio (SA/DA) for a permanent pool depth = 1.48 Required surface area = SA/DA 1100 x Drainage area= Surface area of pond as designed at permanent pool elevation = I" rainfall requirements Using the runoff volume calculations in the "Simple Method" Rv = 0.05 + 0.9 (1) Rv= 0.4478037 in/in Volume = (Design rainfall) (Rv) (Drainage Area) Volume = 1" rainfall x Rv in/in x 1/12 in/ft x Da = This volume must be released over a period of 2-5 days As designed pond areas: Storage Volumes Cumulative Elevation Area(ac) Volume(ac-ft) 568.5 0.536211018 0.00 569 0.635886158 0.29 570 0.887665918 1.05 571 1.170089902 2.07 572 1.484452925 3.40 573 1.832050379 5.05 574 2.214177384 7.07 575 2.632129514 9.49 0.10 Ac 0.1642 Ac or 0.26 ac-ft 11219 ft^3 PERMANENT POOL DEPTH Impervious 4 5 6 7 10 0.51 0.43 0.37 0.3 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.4 30 1.17 0.81 0.84 0.72 0.61 0.56 40 1.51 1.22 1.09 0.91 0.78 0.71 50 1.79 1.47 1.31 1.13 0.95 0.87 60 2.09 1.73 1.49 1.31 1.12 1.03 70 2.51 2.04 1.8 1.56 1.34 1.17 80 2.92 2.36 2.07 1.82 1.62 1.4 90 3.25 2.64 2.31 2.04 1.84 1.59 4438.411 Permanent Pond Storage Volume Elevation (msl) For (sf) Forebay ad) FB Volume -ft) FB Volume (ac-ff) Pond (sf) Pond ad) Pond Volu (­ft) Pond Volume (­ft) 564 389 0.0089 � 0.0000 3891 0.0893 ���� 565 605 0.0139 493 0.0113 4425 0.1016 4151 0.0953 �� 566 854 0.0196 1218 0.0280 4990 0.1146 8851 0.2032 �� 567 1137 0.0261 2209 0.0507 5586 0.1282 14131 0.3244 �� 568 1453 0.0334 3499 0.0803 6214 0.1427 20022 0.4596 �� 568.5 1929 0.0443 4341 0.0997 7151 0.1642 23357 0.5362 �� 569 ���� 10331 0.2372 27699 0.6359 �� 570 ���� 11639 0.2672 38667 0.8877 �� 571 ���� 13003 0.2985 50969 1.1701 �� 572 ���� 14424 0.3311 64663 1.4845 �� 573 ���� 15901 0.3650 79804 1.8321 �� 574 ���� 17435 0.4003 96450 2.2142 �� 575 00000000000 ���� 19025 0.4368 114656 2.6321 �� 00000000000 Forbay Volume (CF) 4341 Total Volume (CF) 23357 Forebay k of Pond 18.59 Interpolation to find elevation at which required storage volume is reached Storage Storage Storage Elev volume area (ac.) area (sf.) 568.5 0.00 0.54 23357.35 Elev 0.26 0.62 27182 569 0.29 0.64 27699.2 Elev= 568.94 Storage elevation = 0.44 feet above permanent pool elevation Determination of Orifice size for 2-5 day drawdown a= 2A x sgrt(h) 'Falling head equation Ct(sgrt(2g)) a= Area of orifice a sqft t= Time to drawdown 172800 sec A= Average pond surface area 17167 sf g= Gravity constant 32.2 ft/s^2 h= Change in head 0.44 ft C= Orifice constant 0.6 Maximum orifice area = 0.03 sgft Maximum orifice size = 2.2 inches Selected orifice size = 2.0 inches Assume 2 day minimum (2 day drawdown) Millbridge Phase 7E Full Design WK MpEA4z:KSC>p4 community infrastructure consultants PROJECT NO.: 20170279.00.cL BY: CJH DATE: 911112019 T.M.: WGB REVISED: 1111212019 P.M.: WGB FLOATATION CALCULATIONS - BMP #3 CONSTRAINTS: Weight of Concrete 150 Ibs/ft^3 Weight of Water 62.4 Ibs/ft^4 Safety Factor (S.F.) 1.1 Height of structure 9.85 ft Structure thickness 6 in Outlet box width (interior) 4 ft Weight of outlet structure(Ws) Ws = (width + thickness x 4) x thickness x height x weight of concrete = Weight of water displaced Size Base Footing size Ww = ((width + 2 x thickness)^2) x Weight of water height = Wb = (S.F. x Ww) - Ws = 3605 Ibs Required concrete = Wb / (Weight of concrete -weight of water) = *Assume base is 6" wider than exterior box width and minimum thickness is 8 Thickness of base = 1.36 ft Length = 6.00 ft Width = 6.00 ft Thickness = 1.50 ft 15366 Ibs 41 cuft 13298 Ibs Millbridge Phase 7E Full Design p►WI< PROJECT NO.: 20170279.00.CL BY: CJH w DI KSC)IN DATE: 911112019 T.M.: WGB community Infrostructwe consuitonts REVISED: 1111212019 P.M.: WGB PRELIMINARY CALCULATIONS ANTI -SEEP COLLARS BMP #3 Pipe Diameter 24 in Length of Covered Pipe 74 ft Number of Collars 3 Anti -Seep Collar Sizes Length: 5.93 ft Width: 5.93 ft Note: Anti -seep collars are centered on pipe SUPPLEMENT-EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: Quantity Location(s) Infiltration System 0 Bioretention Cell 0 Wet Pond 3 Stormwater Wetland 0 Permeable Pavement 0 Sand Filter 0 Rainwater Harvesting 0 Green Roof 0 Level Spreader -Filter Strip 0 Disconnected Impervious Surface 0 Treatment Swale 0 Dry Pond 1 0 Designer information for this project: Name and Title: Organization: Street address: City, State, Zip: Phone number(s): Email: Designer Weston Boles, PE WK Dickson & Co. Inc. 616 Colonnade Drive Charlotte, NC 28205 704.334.5348 wboles@wkdickson.com Signature of Designer Date Applicant: NEB Project Name: Millbridge Phase 7E Address City i Town Waxhaw, North Carolina Company: Landeavor, LLC Contact: Brad Heavner Mailing Address: 9101 Southern Pine Blvd. Suite 210 City, State, Zip: Charlotte, NC 28273 Phone number(s): 704.525.5998 Email: heavner@landeavor.com Certification Statement: I certify, under penalty of law: that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and - that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. Cover Page 1 4:34 PM 11/12/2019 WET POND Millbridge Phase 7E THE DRAINAGE AREA Drainage area number 1 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) 00 sf Parking / driveway (sq ft) Total surface water area (sq ft) 00 sf Sidewalk (sq ft) Total drainage area (sq ft) 565206 sf Roof (sq ft) BUA associated with existing development (sq ft) 00 sf Roadway (sq ft) Proposed new BUA (sq ft) 56643 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area 1 10.02 % ITotal BUA (sq ft) 56643 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify): Design rainfall depth (in) 1.0 in Phase II Post -Construction Stormwater Minimum volume required (cu ft) 6603 cf Design volume of SCM (cu ft) 6603 cf GENERAL MDC FROM 02H .1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes 1#12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Pump (preferred) 1#13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H .1053 #1 Method used SA/DA #6 Width of the vegetated shelf (feet) 6 It #1 Surface area of the main permanent pool (square feet) 10333 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 56038 cf #6 Elevation of top of shelf (fmsl) 567.00 ft #2 Average depth of the main pool (feet) 5.0 It #6 Elevation of bottom of shelf (fmsl) 566.00 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H:V) 6:1 #2 Elevation of the bottom of the permanent pool (fmsl) 558.00 ft #7 Diameter of drawdown orifice (inches) 1.75 in #2 Elevation of the top of the permanent pool (fmsl) 566.50 ft #7 Drawdown time for the temporary pool (hours) 72 hrs #2 Elevation of the top of the temporary pool (fmsl) 566.61 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? No #3 Depth provided for sediment storage (inches) 12 in #8 Does the pond minimize impacts to the receiving channel from the 1-yr, 24-hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path: #9 If yes, is documentation provided per Wet Pond MDC (9)? Forebay Berm Provided #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 10529 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Bermuda #5 Depth of forebay at entrance (inches) 54 in 911 Describe the planting plan for the vegetated shelf: #5 Depth of forebay at exit (inches) 54 in See planting details in construction documents prepared by W.K. Dickson and Company. #5 Does water flow out of the forebay in a non -erosive manner? Yes #5 Clean -out depth for forebay (inches) 12 in #5 Will the forebay be cleaned out when the depth is reduced to less than the above? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review: Wet Pond 2 4:34 PM 11/12/2019 WET POND Millbridge Phase 7E THE DRAINAGE AREA 2 Drainage area number 2 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) 00 sf Parking / driveway (sq ft) Total surface water area (sq ft) .00 sf Sidewalk (sq ft) Total drainage area (sq ft) 421172 sf Roof (sq ft) BUA associated with existing development (sq ft) 00 sf Roadway (sq ft) Proposed new BUA (sq ft) 196324 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area 146.61 % ITotal BUA (sq ft) 196324 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify): IDesign rainfall depth (in) 1.0 in Phase II Post -Construction Stormwater IMinimurn volume required (cu ft) 16479 cf Design volume of SCM (cu ft) 16479 cf GENERAL MDC FROM 02H .1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Pump (preferred) 1#13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H .1053 #1 Method used SA/DA #6 Width of the vegetated shelf (feet) 6 It #1 Surface area of the main permanent pool (square feet) 7384 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 26958 cf #6 Elevation of top of shelf (fmsl) 559.00 ft #2 Average depth of the main pool (feet) 3.50 ft #6 Elevation of bottom of shelf (fmsl) 558.00 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H:V) 6:1 #2 Elevation of the bottom of the permanent pool (fmsl) 553.00 ft #7 Diameter of drawdown orifice (inches) 2.50 in #2 Elevation of the top of the permanent pool (fmsl) 558.50 ft #7 Drawdown time for the temporary pool (hours) 48 hrs #2 Elevation of the top of the temporary pool (fmsl) 559.05 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? No #3 Depth provided for sediment storage (inches) 12 in #8 Does the pond minimize impacts to the receiving channel from the 1-yr, 24-hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path: #9 If yes, is documentation provided per Wet Pond MDC (9)? Forebay Berm Provided #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 5030 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Bermuda #5 Depth of forebay at entrance (inches) 54 in #11 Describe the planting plan for the vegetated shelf: #5 Depth of forebay at exit (inches) 54 in See planting details in construction documents prepared by W.K. Dickson and Company. #5 Does water flow out of the forebay in a non -erosive manner? Yes #5 Clean -out depth for forebay (inches) 12 in #5 Will the forebay be cleaned out when the depth is reduced to less than the above? I Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review: Wet Pond 3 4:34 PM 11/12/2019 WET POND Millbridge Phase 7E THE DRAINAGE AREA S Drainage area number 3 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) 00 sf Parking / driveway (sq ft) Total surface water area (sq ft) 00 sf Sidewalk (sq ft) Total drainage area (sq ft) 300642 sf Roof (sq ft) BUA associated with existing development (sq ft) .00 sf Roadway (sq ft) Proposed new BUA (sq ft) 132885 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area 14420 % jTotal BUA (sq ft) 132885 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify): IDesign rainfall depth (in) 1.0 in Phase II Post -Construction Stormwater IMinimurn volume required (cu ft) 11219 cf Design volume of SCM (cu ft) 11219 cf GENERAL MDC FROM 02H .1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Pump (preferred) 1#13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H .1053 #1 Method used SA/DA #6 Width of the vegetated shelf (feet) 6 It #1 Surface area of the main permanent pool (square feet) 7151 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 23357 cf #6 Elevation of top of shelf (fmsl) 569.00 ft #2 Average depth of the main pool (feet) 3.50 ft #6 Elevation of bottom of shelf (fmsl) 568.00 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H:V) 6:1 #2 Elevation of the bottom of the permanent pool (fmsl) 564.00 ft #7 Diameter of drawdown orifice (inches) 2.00 in #2 Elevation of the top of the permanent pool (fmsl) 568.50 ft #7 Drawdown time for the temporary pool (hours) 48 hrs #2 Elevation of the top of the temporary pool (fmsl) 568.94 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? No #3 Depth provided for sediment storage (inches) 12 in #8 Does the pond minimize impacts to the receiving channel from the 1-yr, 24-hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path: #9 If yes, is documentation provided per Wet Pond MDC (9)? Forebay Berm Provided #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 4341 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Bermuda #5 Depth of forebay at entrance (inches) 54 in #11 Describe the planting plan for the vegetated shelf: #5 Depth of forebay at exit (inches) 54 in See planting details in construction documents prepared by W.K. Dickson and Company. #5 Does water flow out of the forebay in a non -erosive manner? Yes #5 Clean -out depth for forebay (inches) 12 in #5 Will the forebay be cleaned out when the depth is reduced to less than the above? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review: Wet Pond 4 4:34 PM 11/12/2019 Millbridge Phase 7E Full Design oftw C 'ROJECT NO.: 20170279.00.CL BY: CJH WVE A � KSC>M DATE: 911112019 T.M.: WGB community Infrastructure Consultants REVISED: 1111212019 P.M.: WGB PRELIMINARY CALCULATIONS PREDEVELOPMENT BASIN #1 - TIME OF CONCENTRATION PRE -DEVELOPMENT Pre -development Flow Phase One Type: Sheet Flow Length: 100 ft "N" Value: 0.4 from tables Slope: 0.040 ft/ft Computed 'T' 16.5 Minutes ji Pre -development Type: Shallow Concentrated Flow Flow Phase Two Surface: u Length: 144 ft u=unpaved Slope: 0.111 ft/ft a=paved Velocitv: 5.38 ft/sec 11 Computed 'T': 0.007 hr, or J1 0.42 MinutesJ1 Pre -development I Type: Open Channel Flow Flow Phase Three Length: ft Velocity: 5 ft/sec (assumed) Computed 'T'. 0.08 hr, or 4.8 Minutes Pre -development Total Flow Summary Time of Concentration Total T c = 21.7 Minutes Lag Time T LAG = 13.0 Minutes T LAG =0.6 x T T LAG = 0.22 Hours Millbridge Phase 7E Full Design AWGB oftwK � D A � KSC7 N 'ROJECT NO.: 20170279.00.CL BY: DATE: 911112019 T.M.: Community Infrastructure Consultants REVISED: 1111212019 P.M.: PRELIMINARY CALCULATIONS PREDEVELOPMENT BASIN #2 - TIME OF CONCENTRATION PRE -DEVELOPMENT Pre -development Flow Phase One Type: Sheet Flow Length: 100 ft "N" Value: 0.4 from tables Slope: 0.02 ft/ft Computed 'T' 21.8 Minutes ji Pre -development Type: Shallow Concentrated Flow Flow Phase Two Surface: u Length: 153 ft u=unpaved Slope: 0.036 ft/ft p=paved Velocity: 3.06 ft/sec Computed 'T'. 0.014 hr, or E 0.84 Minutes Pre -development I Type: Open Channel Flow Flow Phase Three Length: ft Velocity: 1z ft/sec (assumed) Computed 'T': 0.038 hr, or 2.3 Minutes Pre -development Total Flow Summary I Time of Concentration Total T c = 24.9 Minutes Lag Time T LAG = 15.0 Minutes T LAG =0.6 x T =ITLAG = 0.25 Hours Millbridge Phase 7E Full Design oftwK c � ��.7� 'ROJECT NO.: 20170279.00.CL BY: CJH DATE: 911112019 T.M.: WGB community infrastructure Consultants REVISED: 1111212019 P.M.: WGB PRELIMINARY CALCULATIONS PREDEVELOPMENT BASIN #3 - TIME OF CONCENTRATION PRE -DEVELOPMENT Pre -development Flow Phase One Type: Sheet Flow Length: 100 ft "N" Value: 0.4 from tables Slope: 0.025 ft/ft Computed 'T' 19.9 Minutes Pre -development Type: Shallow Concentrated Flow Flow Phase Two Surface: Length: 168 ft u=unpaved Slope: 0.073 ft/ft p=paved Velocity: 4.36 ftlsec Computed 'T'. 0.011 hr, or 11 0.66 Minutes Pre -development I Type: Open Channel Flow Flow Phase Three Length: 51 ft Velocity: 5 ft/sec (assumed) Computed 'T': 0.003 hr, or 0.2 Minutes Pre -development Total Flow Summary Time of Concentration Total T , = 20.7 Minutes Lag Time ITLAG = 12.4 Minutes T LAG =0.6 x T JITLAG = 0.21 Hours Millbridge Phase 7E Full DesignAWGB oftwK 'ROJECT NO.: 20170279.00.CL BY: c WVE A � KSC>N DATE: 911112019 T.M.: community infrastructure Consultants REVISED: 1111212019 P.M.: PRELIMINARY CALCULATIONS POST DEVELOPMENT BYPASS #1 - TIME OF CONCENTRATION PRE -DEVELOPMENT Pre -development Flow Phase One Type: Sheet Flow Length: 100 ft "N" Value: 0.4 from tables Slope: 0.08 ft/ft Computed 'T' 12.5 Minutes Pre -development Type: Shallow Concentrated Flow Flow Phase Two Surface: u Length: 117 ft u=unpaved Slope: 0.064 ft/ft p=paved Velocity: 4.09 ft/sec Computed 'T'. 0.008 hr, or 11 0.48 Minutes Pre -development I ype: Open Channel Flow Flow Phase Three Length: ft Velocity: ft/sec (assumed) Computed 'T'. 0.065 hr, or 3.9 Minutes Pre -development Total Flow Summary Time of Concentration Total T c = 16.9 Minutes Lag Time T LAG = 10.1 Minutes T LAG =0.6 x T ]IT LAG = 0.17 Hours Millbridge Phase 7E Full DesignAWGB oftwK WVD A � KSC>M 'ROJECT NO.: 20170279.00.CL BY: DATE: 911112019 T.M.: community infrastructure ConsultantsREVISED: 1111212019 P.M.: PRELIMINARY CALCULATIONS POST DEVELOPMENT BYPASS #2 - TIME OF CONCENTRATION PRE -DEVELOPMENT Pre -development Flow Phase One Type: Sheet Flow Length: 100 ft "N" Value: 0.4 from tables Slope: 0.015 ft/ft Computed 'T' 24.4 Minutes Pre -development Type: Shallow Concentrated Flow Flow Phase Two Surface: Length: 401 ft u=unpaved Slope: 0.056 ftlft p=paved Velocity: 3.82 ftlsec Computed 'T': 0.029 hr, or 1.74 Minutes Pre -development Type: Open Channel Flow Flow Phase Three Length: 212 ft Velocity: 5 ft/sec (assumed) Computed 'T': 0.012 hr, or 0.7 Minutes Pre -development Total Flow Summary I Time of Concentration Total T c = 26.9 Minutes Lag Time T LAG = 16.1 Minutes T LAG =0.6 x T T LAG = 0.27 Hours Millbridge Phase 7E Full DesignAWGB oftwK WVD A � KSC>M 'ROJECT NO.: 20170279.00.CL BY: DATE: 911112019 T.M.: community infrastructure ConsultantsREVISED: 1111212019 P.M.: PRELIMINARY CALCULATIONS POST DEVELOPMENT BYPASS #2 - TIME OF CONCENTRATION PRE -DEVELOPMENT Pre -development Flow Phase One Type: Sheet Flow Length: 100 ft "N" Value: 0.4 from tables Slope: 0.02 ft/ft Computed 'T' 21.8 Minutes Pre -development Type: Shallow Concentrated Flow Flow Phase Two Surface: Length: 550 ft u=unpaved Slope: 0.068 ftlft p=paved Velocity: 4.21 ftlsec Computed 'T': 0.036 hr, or 2.16 Minutes Pre -development Type: Open Channel Flow Flow Phase Three Length: 173 ft Velocity: 5 ft/sec (assumed) Computed 'T': 0.01 hr, or 0.6 Minutes Pre -development Total Flow Summary I Time of Concentration Total T c = 24.6 Minutes Lag Time T LAG = 14.7 Minutes T LAG =0.6 x T T LAG = 0.25 Hours Millbridge Phase 7E Full Desig WWK �+ p, PROJECT NO.: 20170279.00.CL BY: CJH C) I � KS4C> P V DATE: 9/11/2019 T.M.: WGB community Infrastructure consultants REVISED: 1111212019 P.M.: WGB RIPRAP APRON DESIGN (NCDENR METHOD) 20 10 0 Outlet w - D4 + La Vve IdiamA�W (Eb) r•�❑.3Qp P ` � Bo 3 s in 21) 50 too 2W piwharxV ( l)evl CL Design of outlet protection from a round pipe flowing full, minimum tailwater condition Tw<0.5 diameter ES # Do (Pipe o) T. TW<0.5o Q V dso La Apron width Apron width Max Stone Apron IFES (ft) (ft) (cfs) (ftls) (ft) (ft) at pipe (ft) at outlet (ft) 0 (ft) Thickness(ft) - BMP #1 OKAY 7.32 0.25 9 23 0.38 0.56 ES - BMP #2 OKAY 0.25 zu 9 23 0.38 0.56 Millbridge2Phase7E Full Desig �KWK ID I c—, ICS <--> Imo! r:ommunity infrortructurc consultonir PROJECT oc e DATE: 09/11/19 T.M.: WGB REVISED: 11112119 P.M.: WGB RIPRAP APRON DESIGN (NCDENR METHOD) 3Go Pipe dig.rrEater {C�p} �$ a It 59...�;� . m 0 zo 120 11-D _J 50 100 Discharge (tolsec) Design of outlet protection from a round pipe flowing full, maximum tailwater condition Tw>_0.5 diameter FES # Do(Pipe o) TW T,,,,z0.50 Q V d50 La Apron width Apron width Max Stone Apron (ft) (ft) (cfs) (ftls) (ft) (ft) at pipe (ft) at outlet (ft) 0 (ft) Thickness(ft) FES - 100 OKAY 40.56 5.74 0.25 9 9 0.38 0.56 FES - 200 OKAY 26.40 3.73 0.25 9 9 0.38 0.56 FES - 300 OKAY 12.67 4.03 0.25 6 5 0.38 0.56 Millbridge Phase 7E Full Design �W[< PROJECT NO.: 20170279.00.CL BY: CJH IDIC ICSQ" DATE: 911112019 T.M.: WGB - „n reify nfvr r.1,,-1kjra cn iff r }s REVISED: 1111212019 P.M.: WGB SPREAD CALCULATIONS NON -SUMP CONDITION RAINFALL INTENSITY = 4.00 IN/HR 10 - YEAR 11 DRAINAGE RUNOFF SURFACE "Q" 1 SLOPE I I INLET BYPASS AREA COEFF. SUB. I TOTAL I LONG. TRANS. I I "Q" CAP. SPREAD DEPTH Qb TO SUMP INLET # A (acres) C IQS (cfs) QT (Cfs)l SL (f 0 ST ( IR) I K QCAP (cfs) T (ft) D (ft) (cfs) INLET# (') SAMPLE CALCULATION CI #1 1.00 1 4.00 4.00 1 0.0400 0.03125 128.5 2.30 7.1 0.22 1.70 CI #2 PROJECT CALCULATIONS CB-102 0.12 0.60 0.29 0.29 0.1000 0.03125 32 0.37 2.2 0.07 0.00 CB-103 CB-104 0.36 0.60 0.86 0.86 0.1000 0.03125 32.0 0.75 3.4 0.10 0.12 CB-103 CB-105 0.29 0.60 0.70 0.70 0.1000 0.03125 32.0 0.65 3.1 0.10 0.05 CB-112 CB-106 0.05 0.60 0.12 0.12 0.1000 0.03125 32.0 0.22 1.6 0.05 0.00 CB-105 CB-107 0.13 0.60 0.31 0.31 0.1000 0.03125 32.0 0.39 2.3 0.07 0.00 CB-106 CB-108 0.23 0.60 0.55 0.55 0.1000 0.03125 32.0 0.56 2.8 0.09 0.00 CB-107 CB-109 0.07 0.60 0.17 1 0.17 0.1000 1 0.03125 32.01 0.27 1.8 0.06 0.00 CB-104 CB-110 0.04 0.60 0.10 0.10 0.1000 0.03125 32.0 0.19 1.5 0.05 0.00 CB-109 CB-111 0.15 0.60 0.36 0.36 0.1000 0.03125 32.0 0.43 2.4 0.08 0.00 CB-110 CB-202 0.17 0.60 0.41 0.41 0.0334 0.03125 26.0 0.53 3.1 0.10 0.00 CB-203 CB-203 0.11 0.60 0.26 0.26 0.0159 0.03125 18.0 0.35 3.0 0.09 0.00 CB-204 CB-206 0.14 0.60 0.34 0.34 0.0342 0.03125 26.0 0.47 2.9 0.09 0.00 CB-205 CB-207 0.14 0.60 0.34 0.34 0.0342 0.03125 26.0 0.47 2.9 0.09 0.00 CB-205 CB-208 0.13 0.60 0.31 0.31 0.0203 0.03125 23.5 0.48 3.1 0.10 0.00 CB-205 CB-209 0.17 0.60 0.41 0.41 0.0191 0.03125 18.0 0.44 3.5 0.11 0.00 CB-208 CB-210 0.06 0.60 0.14 0.14 0.0134 0.03125 18.0 0.26 2.5 0.08 0.00 CB-209 CB-211 0.08 0.60 0.19 0.28 0.0363 0.03125 26.0 0.41 2.7 0.08 0.00 CB-210 CB-212 0.40 0.60 0.96 0.96 0.0390 0.03125 26.0 0.87 4.2 0.13 0.09 CB-211 CB-215 0.20 0.60 0.48 0.48 0.0334 0.03125 26.0 0.59 3.3 0.10 0.00 CB-205 CB-218 0.25 0.60 0.60 0.60 0.0350 0.03125 26.0 0.67 3.6 0.11 0.00 CB-206 CB-219 0.27 0.60 0.65 0.65 0.0350 0.03125 26.0 0.70 3.7 0.11 0.00 CB-207 CB-220 0.13 0.60 0.31 0.31 0.0191 0.03125 18.0 0.37 3.1 0.10 0.00 CB-204 CB-224 0.05 0.60 0.12 0.18 0.0363 0.03125 26.0 0.31 2.3 0.07 0.00 BYPASS CB-225 0.37 0.60 0.89 0.89 0.0390 0.03125 26.0 0.83 4.0 0.13 0.06 CB-224 CB-302 0.10 0.60 0.24 0.24 0.0420 0.03125 28.5 0.39 2.4 0.08 0.00 CB-319 CB-303 0.23 0.60 0.55 0.55 0.0423 0.03125 28.5 0.66 3.3 0.10 0.00 CB-302 CB-304 0.21 0.60 0.50 0.50 0.0220 0.03125 23.5 0.63 3.6 0.11 0.00 CB-303 CB-305 0.12 0.60 0.29 0.29 0.0364 0.03125 26.0 0.42 2.7 0.08 0.00 CB-304 CB-306 0.24 0.60 0.58 0.58 0.0458 0.03125 28.5 0.66 3.3 0.10 0.00 CB-305 CB-307 0.13 0.60 0.31 0.31 0.0458 0.03125 28.5 0.45 2.6 0.08 0.00 CB-308 CB-308 0.10 0.60 0.24 0.24 0.0397 0.03125 26.0 0.36 2.5 0.08 0.00 BYPASS CB-309 0.02 0.60 0.05 0.05 0.0397 0.03125 26.0 0.13 1.3 0.04 0.00 BYPASS CB-317 0.05 0.60 0.12 0.12 0.0420 0.03125 28.5 0.25 1.9 0.06 0.00 CB-318 CB-320 0.02 0.60 0.05 0.05 0.0116 0.03125 18.0 0.13 1.7 0.05 0.00 CB-319 CB-321 0.02 0.60 0.05 0.05 0.0118 0.03125 18.0 0.13 1.7 0.05 0.00 CB-324 CB-322 0.11 0.60 0.26 0.26 0.0118 0.03125 18.0 0.39 3.2 0.10 0.00 CB-323 CB-323 0.10 0.60 0.24 0.24 0.0131 0.03125 18.0 0.36 3.0 0.09 0.00 BYPASS CB-324 0.07 0.60 0.17 0.17 0.0131 0.03125 18.0 0.28 2.7 0.08 0.00 BYPASS CB-326 0.15 0.60 0.36 0.36 0.0423 0.03125 28.5 0.50 2.8 0.09 0.00 CB-317 CB-329 0.27 0.60 0.65 0.65 0.0220 0.03125 23.5 0.73 4.0 0.12 0.00 CB-330 CB-330 0.05 0.60 0.12 0.12 0.0359 1 0.03125 126.01 0.24 1 1.9 1 0.06 0.00 BYPASS Millbridge Phase 7E Full Design �k JVK PROJECT NO.: 20170279.00.CL BY: CJH aw II51<--- 1<s DATE: 9/11/2019 T.M.: WGB community infrostructura consultvnls REVISED: 1111212019 P.M.: WGB SPREAD CALCULATIONS SUMP CONDITION BMP #1 BMP #2 BMP #3 RAINFALL INTENSITY = 4.00 IN/HR 10 - YEAR DRAINAG4 RUNOFF SURFACE "Q" I SLOPE SINGLEINLET DOUBLEINLET INDICATE AREA COEFF. SUB. BYPASS TOTAL TRANS. SPREAD DEPTH SPREAD DEPTH "SINGLE" OR INLET # A (acres) C Q S (cfs) Q e (cfs) Q r (cfs) S r MIRE) T (ff) D (fr) T (ff) D (ff) "DOUBLE" SAMPLE CALCULATION C1#1 1.00 0.6 2.40 0.00 2.40 1 0.03125 7.1 0.22 5.6 0.18 DOUBLE PROJECT CALCULATIONS CB-103 0.19 0.6 0.46 0.00 0.46 0.03125 2.4 0.07 1.9 0.06 SINGLE CB-112 0.76 0.6 1.82 0.00 1.82 0.03125 5.9 0.19 4.7 0.15 DOUBLE CB-204 0.29 0.6 0.70 0.00 0.70 0.03125 3.1 0.10 2.5 0.08 SINGLE CB-205 0.40 0.6 0.96 0.00 0.96 0.03125 3.9 0.12 3.0 0.10 SINGLE CB-318 0.6 0.94 0.00 0.94 0.03125 3.8 0.12 3.0 0.09 SINGLE CB-319 0.6 0.50 0.00 0.50 1.03125 0.1 0.08 0.1 0.06 SINGLE Millbridge Phase 7E Full Design �W[< PROJECT NO.: 20170279.00.CL BY: CJH IDIC ICSQ" DATE: 911112019 T.M.: WGB - „n reify nfvr r.1,,-1kjra cn iff r }s REVISED: 1111212019 P.M.: WGB SPREAD CALCULATIONS NON -SUMP CONDITION RA INFALL INTENSITY= 8.21 IN/HR 25-YEAR 11 DRAINAGE RUNOFF SURFACE "Q" 1 SLOPE I I INLET BYPASS AREA COEFF. SUB. I TOTAL I LONG. TRANS. I I "Q" CAP. SPREAD DEPTH Qb TO SUMP INLET # A (acres) C IQS (cfs) QT (Cfs)l SL (f 0 ST ( IR) I K QCAP (cfs) T (ft) D (ft) (cfs) INLET# (') SAMPLE CALCULATION CI #1 1.00 1 8.21 4.00 1 0.0400 0.03125 128.5 2.30 7.1 0.22 1.70 CI #2 PROJECT CALCULATIONS CB-102 0.12 0.60 0.59 0.59 0.1000 0.03125 32 0.59 2.9 0.09 0.00 CB-103 CB-104 0.36 0.60 1.77 1.77 0.1000 0.03125 32.0 1.17 4.4 0.14 0.61 CB-103 CB-105 0.29 0.60 1.43 1.43 0.1000 0.03125 32.0 1.02 4.0 0.13 0.41 CB-112 CB-106 0.05 0.60 0.25 0.38 0.1000 0.03125 32.0 0.44 2.5 0.08 0.00 CB-105 CB-107 0.13 0.60 0.64 0.89 0.1000 0.03125 32.0 0.76 3.4 0.11 0.13 CB-106 CB-108 0.23 0.60 1.13 1.13 0.1000 0.03125 32.0 0.88 3.7 0.12 0.25 CB-107 CB-109 0.07 0.60 0.34 1 0.34 0.1000 1 0.03125 32.01 0.42 2.4 0.07 0.00 CB-104 CB-110 0.04 0.60 0.20 0.26 0.1000 0.03125 32.0 0.35 2.1 0.07 0.00 CB-109 CB-111 0.15 0.60 0.74 0.74 0.1000 0.03125 32.0 0.68 3.2 0.10 0.06 CB-110 CB-202 0.17 0.60 0.84 0.84 0.0334 0.03125 26.0 0.84 4.1 0.13 0.00 CB-203 CB-203 0.11 0.60 0.54 0.54 0.0159 0.03125 18.0 0.56 4.0 0.12 0.00 CB-204 CB-206 0.14 0.60 0.69 0.87 0.0342 0.03125 26.0 0.85 4.1 0.13 0.02 CB-205 CB-207 0.14 0.60 0.69 0.92 0.0342 0.03125 26.0 0.88 4.2 0.13 0.04 CB-205 CB-208 0.13 0.60 0.64 0.79 0.0203 0.03125 23.5 0.85 4.4 0.14 0.00 CB-205 CB-209 0.17 0.60 0.84 0.84 0.0191 0.03125 18.0 0.69 4.5 0.14 0.15 CB-208 CB-210 0.06 0.60 0.30 0.39 0.0134 0.03125 18.0 0.48 3.6 0.11 0.00 CB-209 CB-211 0.08 0.60 0.39 1.00 0.0363 0.03125 26.0 0.91 4.3 0.13 0.09 CB-210 CB-212 0.40 0.60 1.97 1.97 0.0390 0.03125 26.0 1.36 5.4 0.17 0.61 CB-211 CB-215 0.20 0.60 0.99 0.99 0.0334 0.03125 26.0 0.93 4.3 0.14 0.06 CB-205 CB-218 0.25 0.60 1.23 1.23 0.0350 0.03125 26.0 1.05 4.7 0.15 0.18 CB-206 CB-219 0.27 0.60 1.33 1.33 0.0350 0.03125 26.0 1.10 4.8 0.15 0.23 CB-207 CB-220 0.13 0.60 0.64 0.64 0.0191 0.03125 18.0 0.58 4.1 0.13 0.06 CB-204 CB-224 0.05 0.60 0.25 0.77 0.0363 0.03125 26.0 0.78 3.9 0.12 0.00 BYPASS CB-225 0.37 0.60 1.82 1.82 0.0390 0.03125 26.0 1.30 5.3 0.17 0.53 CB-224 CB-302 0.10 0.60 0.49 0.62 0.0420 0.03125 28.5 0.71 3.5 0.11 0.00 CB-319 CB-303 0.23 0.60 1.13 1.18 0.0423 0.03125 28.5 1.06 4.4 0.14 0.13 CB-302 CB-304 0.21 0.60 1.03 1.03 0.0220 0.03125 23.5 0.98 4.8 0.15 0.05 CB-303 CB-305 0.12 0.60 0.59 0.74 0.0364 0.03125 26.0 0.76 3.8 0.12 0.00 CB-304 CB-306 0.24 0.60 1.18 1.18 0.0458 0.03125 28.5 1.03 4.4 0.14 0.15 CB-305 CB-307 0.13 0.60 0.64 0.64 0.0458 0.03125 28.5 0.70 3.5 0.11 0.00 CB-308 CB-308 0.10 0.60 0.49 0.49 0.0397 0.03125 26.0 0.57 3.2 0.10 0.00 BYPASS CB-309 0.02 0.60 0.10 0.10 0.0397 0.03125 26.0 0.21 1.8 0.06 0.00 BYPASS CB-317 0.05 0.60 0.25 0.25 0.0420 0.03125 28.5 0.40 2.5 0.08 0.00 CB-318 CB-320 0.02 0.60 0.10 0.10 0.0116 0.03125 18.0 0.21 2.2 0.07 0.00 CB-319 CB-321 0.02 0.60 0.10 0.10 0.0118 0.03125 18.0 0.21 2.2 0.07 0.00 CB-324 CB-322 0.11 0.60 0.54 0.54 0.0118 0.03125 18.0 0.61 4.2 0.13 0.00 CB-323 CB-323 0.10 0.60 0.49 0.49 0.0131 0.03125 18.0 0.56 4.0 0.12 0.00 BYPASS CB-324 0.07 0.60 0.34 0.34 0.0131 0.03125 18.0 0.45 3.5 0.11 0.00 BYPASS CB-326 0.15 0.60 0.74 0.74 0.0423 0.03125 28.5 0.79 3.7 0.12 0.00 CB-317 CB-329 0.27 0.60 1.33 1.33 0.0220 0.03125 23.5 1.15 5.2 0.16 0.18 CB-330 CB-330 0.05 0.60 0.25 0.43 0.0359 1 0.03125 126.01 0.54 1 3.1 1 0.10 0.00 BYPASS Millbridge Phase 7E Full Design �k JVK PROJECT NO.: 20170279.00.CL BY: CJH aw II51<--- 1<s DATE: 9/11/2019 T.M.: WGB community infrostructura consultvnls REVISED: 1111212019 P.M.: WGB SPREAD CALCULATIONS SUMP CONDITION BMP #1 BMP #2 BMP #3 RAINFALL INTENSITY= 8.21 IN/HR 25- YEAR DRAINAG4 RUNOFF SURFACE "Q" I SLOPE SINGLEINLET DOUBLEINLET INDICATE AREA COEFF. SUB. BYPASS TOTAL TRANS. SPREAD DEPTH SPREAD DEPTH "SINGLE" OR INLET # A (acres) C Q S (cfs) Q e (cfs) Q r (cfs) S r MIRE) T (ff) D (fr) T (ff) D (ff) "DOUBLE" SAMPLE CALCULATION C1#1 1.00 0.6 4.93 0.00 4.93 1 0.03125 11.5 0.36 9.1 0.28 DOUBLE PROJECT CALCULATIONS CB-103 0.19 0.6 0.94 0.00 0.94 0.03125 3.8 0.12 3.0 0.09 SINGLE CB-112 0.76 0.6 3.74 0.00 3.74 0.03125 9.6 0.30 7.5 0.24 DOUBLE CB-204 0.29 0.6 1.43 0.06 1.49 0.03125 5.2 0.16 4.1 0.13 SINGLE CB-205 0.40 0.6 1.97 0.12 2.09 0.03125 6.5 0.20 5.1 0.16 SINGLE CB-318 0.6 1.92 0.00 1.92 0.03125 6.1 0.19 4.8 0.15 SINGLE CB-319 0.6 1.03 1 0.00 1 1.03 1 1.031251 0.1 1 0.13 1 0.1 1 0.10 1 SINGLE Millbridge Phase 7E �V%]< PROJECT NO 20170279.00.CL BY: CJH aW Q A C� KSC>" DATE: 9/6/2019 T.M.: WGB CvmmL—ItV 1nff0stFkJC1LJF0 cv nsii rfonrs REVISED: 1111212019 P.M.: WGB SEDIMENT BASIN CALCULATIONS SEDIMENT BASIN #1 PH DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area TDA 9.72 ac Proposed sediment depth ft Disturbed area DA 9.72 ac Bottom elevation of basin ms/ Re uired sediment stora a 1800xTDA 17496 cf I Dep th of flow over Riser ft BASIN CONFIGURATION Bottom elevation 567 msl Sediment Storage elevation 570 msl Primary Spillway crest 572 msl Top of Berm 573 msl ESTIMATED BASIN SIZE RECTANGULAR Length(ft) Width(ft) Bottom 102 48 Top 120 66 BASIN EFFICIENCY Sediment storage provided: 75399 OKAY Sediment storage required: 17496 cf Surface area/Flow comparison: 28450 OKAY PLANNED BASIN SIZE REFER TO EROSION CONTROL PLAN Elev. Area SF Cumulative Volume CF 567 21891 0 568 24021 22956 569 26207 48070 570 28450 75399 571 30749 104998 572 33104 166552 573 35517 232818 DESIGN FLOW Q=CIA RISER DESIGN Bare soil coefficient 'C' = Riser pipe diameter 54 in 4'x4' Box equivalent to 54" diameter riser Depth of flow 2 ft Flow through riser: 136 cfs OKAY Com osite 'C'= Area 'A' = 9.72 ac 10 yr. storm rainfall intensity,'I' = 7.03 in/hr Computed flow from site, 'Q' = 41 cfs SPILLWAY DESIGN Spillway design: (L =Q/(C *h ^ 1. 5)); C= 3.0 h= 1.00 Spillway length @ flow depth 14 OUTLET PIPE DESIGN Outlet pipe diameter 36 in Flow through outlet pipe 71 cfs (Note: Flow determined using outlet control and pipe 80 % full) OUTLET PIPE IS OKAY Pipe slope ft/ft 0.005 ft/ft Pipe length(ft) 194.46 ft Outlet pipe invert in 561.90 Outlet pipe invert out 560.93 CONCRETE ANCHOR SIZE SEE PERMENANT POND CONCRETE ANCHOR SIZE SURFACE AREA/FLOW COMPARISON: amlllL- Formula: A=435*Q 1 7.03 10 year storm A: Minimum Surface Area (acres) measured at the crest of the principal spillway Q desi n : 41 CFS A Re uired : 17835 sf of surface area at sed stor elev Q: Peak inflow rate of 10 year storm in cfs A Provided 28450 OKAY Cubic Feet per day irmula: Qd=V/td = (ft^3/day) ,DENR optimal dewatering time is 3 days = desired detwatering time in days = 3 days Qd: 5832 ft^3/day Orifice Diameter elect Skimmer Size: in. :ad on Orifice (Use Chart): ft. rrmula: Ir=V p,n23iQ• Hl D: 2.25 in. :tual Orifice Diameter: 2.5 in. OKAY NCDENR Head on Orifice Chart Skimmer Size (in.) Head on Orifice (ft-) 1.5 0.125 2 0.167 2.5 0.208 3 0.25 4 0.333 5 0.333 b 0.417 S 10.5 Millbridge Phase 7E �v%]< PROJECT NO 20170279.00.CL BY: CJH aW Q A C� KSC>" DATE: 9/6/2019 T.M.: WGB co—L—Ify �nfrr,sr ucfurc cvn- rirnnts REVISED: 1111212019 P.M.: WGB SEDIMENT BASIN CALCULATIONS SEDIMENT BASIN #1 PH2 DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area TDA 12.98 ac Proposed sediment depth ft Disturbed area DA 12.98 ac Bottom elevation of basin ms/ Re uired sediment stora a 1800xTDA 23364 cf I Depth of flow over Riser ft BASIN CONFIGURATION Bottom elevation 567 msl Sediment Storage elevation 570 msl Primary Spillway crest 572 msl Top of Berm 573 msl ESTIMATED BASIN SIZE RECTANGULAR Length(ft) Width(ft) Bottom 119 57 Top 137 75 BASIN EFFICIENCY Sediment storage provided: 75399 OKAY Sediment storage required: 23364 cf Surface area/Flow comparison: 28450 OKAY PLANNED BASIN SIZE REFER TO EROSION CONTROL PLAN Elev. Area SF Cumulative Volume CF 567 d!)7 0 568 24021 22956 569 26207 48070 570 28450 75399 571 30749 104998 572 33104 166552 573 35517 232818 DESIGN FLOW Q=CIA RISER DESIGN Bare soil coefficient 'C' = Riser pipe diameter 54 in 4'x4' Box equivalent to 54" diameter riser Depth of flow 2 ft Flow through riser: 136 cfs OKAY Com osite 'C'= Area 'A' = 12.98 ac 10 yr. storm rainfall intensity,'I' = 7.03 in/hr Computed flow from site, 'Q' = 55 cfs SPILLWAY DESIGN Spillway design: (L =Q/(C *h ^ 1. 5)); C= 3.0 h= 1.00 Spillway length @ flow depth 19 OUTLET PIPE DESIGN Outlet pipe diameter 36 in Flow through outlet pipe 71 cfs (Note: Flow determined using outlet control and pipe 80 % full) OUTLET PIPE IS OKAY Pipe slope ft/ft 0.005 ft/ft Pipe length(ft) 194.46 ft Outlet pipe invert in 561.90 Outlet pipe invert out 560.93 CONCRETE ANCHOR SIZE SEE PERMENANT POND CONCRETE ANCHOR SIZE SURFACE AREA/FLOW COMPARISON: Formula: A=435-Q 1 7.03 10 year storm A: Minimum Surface Area (acres) measured at the crest of the principal spillway Q(design) : 55 CFS A Re uired : 23925 sf of surface area at sed stor elev Q: Peak inflow rate of 10 year storm in cfs A Provided 28450 OKAY Cubic Feet per da Formula: Qd=V/td = (ft^3/day) NCDENR optimal dewatering time is 3 days td = desired detwatering time in days = 3 days Qd: 7788 ft^3/dav Select Skimmer Size: 3 in. Head on Orifice (Use Chart): 5 ft. Formula: f F7= V Q.n23iQ• H, D: 2.60 in. Actual Orifice Diameter: 2.5 in. OKAY NCDENR Head on Orifice Chart Skimmer Size (in.) Head on Orifice (ft.) 1.5 0.125 2 0.167 2.5 3 0.208 0.25 4 0.333 5 0.333 b 0.417 8 0.5 Millbridge Phase 7E �V%]< PROJECT NO 20170279.00.CL BY: CJH � Q I C� i<S<--> DATE: 9/6/2019 T.M.: WGB I co—L—Ify �nfrnsrrucfuro con- rirnnts REVISED: 1111212019 P.M.: WGB I SEDIMENT BASIN CALCULATIONS SEDIMENT BASIN #2 PHI DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area TDA 14.94 ac Proposed sediment depth ft Disturbed area DA 14.94 ac Bottom elevation of basin ms/ Re uired sediment stora a 1800xTDA 26892 cf I Dep th of flow over Riser ft BASIN CONFIGURATION Bottom elevation 559 msl Sediment Storage elevation 562 msl Primary Spillway crest 563.5 msl Top of Berm 565 msl ESTIMATED BASIN SIZE RECTANGULAR Length(ft) Width(ft) Bottom 128 61 Top 146 79 BASIN EFFICIENCY Sediment storage provided: 76761 OKAY Sediment storage required: 26892 cf Surface area/Flow comparison: 28946 OKAY PLANNED BASIN SIZE REFER TO EROSION CONTROL PLAN Elev. Area SF Cumulative Volume CF 559 22303 0 560 24461 23382 561 26675 48950 562 28946 76761 563 31273 106870 564 33657 169473 565 36097 236843 DESIGN FLOW Q=CIA RISER DESIGN Bare soil coefficient 'C' = 0.60 Riser pipe diameter in 4'x4' Box equivalent to 54" diameter riser Depth of flow 1.5 ft Flow through riser: 87 cfs OKAY Com osite 'C'= ).60 Area 'A' = 14.94 ac 10 yr. storm rainfall intensity,'I' = 7.03 in/hr Computed flow from site, 'Q' = 63 cfs SPILLWAY DESIGN Spillway design: (L =Q/(C *h ^ 1. 5)); C= 3.0 h= 1.00 Spillway lengthlength@ flow depth 21 OUTLET PIPE DESIGN Outlet pipe diameter 36 in Flow through outlet pipe 88 cfs (Note: Flow determined using outlet control and pipe 80 % full) OUTLET PIPE IS OKAY Pipe slope ft/ft 0.005 ft/ft Pipe length(ft) 86.38 ft Outlet pipe invert in 553.90 Outlet pipe invert out 553.47 CONCRETE ANCHOR SIZE SEE PERMENANT POND CONCRETE ANCHOR SIZE SURFACE AREA/FLOW COMPARISON: Formula: A=435-Q I I 7.03 10 year storm A: Minimum Surface Area (acres) measured at the crest of the principal spillway Q(design):l 63 CFS A Re uired : 27405 sf of surface area at sed stor elev Q: Peak inflow rate of 10 year storm in cfs A Provided 28946 OKAY Cubic Feet per day irmula: Qd=V/td = (ft^3/day) ,DENR optimal dewatering time is 3 days = desired detwatering time in days = 3 days Qd: 8964 ft^3/day Orifice Diameter elect Skimmer Size: 3 in. :ad on Orifice (Use Chart): 5 ft. irmula: D= Q,na� alo•1rlt D: 2.79 in. :tual Orifice Diameter: 2.5 in. OKAY NCDENR Head on Orifice Chart Skimmer Size (in.) Head on Orifice (ft.) 1.5 0.125 2 0.167 2.5 3 0.208 0.25 4 0.333 5 0.333 6 0.417 8 0.5 Millbridge Phase 7E �V%]< PROJECT NO 20170279.00.CL BY: CJH aW Q A C� KSC>" DATE: 09/06/19 T.M.: WGB CvmmL—ItV 1nff0stFkJC1LJF0 cv nsii rfonrs REVISED: 1111212019 P.M.: WGB SEDIMENT BASIN CALCULATIONS SEDIMENT BASIN #2 PH2 DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area TDA 9.67 ac Proposed sediment depth ft Disturbed area DA 9.67 ac Bottom elevation of basin ms/ Re uired sediment stora a 1800xTDA 17406 cf I Dep th of flow over Riser ft BASIN CONFIGURATION Bottom elevation 559 msl Sediment Storage elevation 562 msl Primary Spillway crest 563.5 msl Top of Berm 565 msl ESTIMATED BASIN SIZE RECTANGULAR Length(ft) Width(ft) Bottom 102 48 Top 120 66 BASIN EFFICIENCY Sediment storage provided: 64928 OKAY Sediment storage required: 17406 cf Surface area/Flow comparison: 24883 OKAY PLANNED BASIN SIZE REFER TO EROSION CONTROL PLAN Elev. Area SF Cumulative Volume CF 559 7tf4— 0 560 20555 19524 561 22685 41144 562 24883 64928 563 27141 90940 564 29455 145278 565 31826 DESIGN FLOW Q=CIA RISER DESIGN Bare soil coefficient 'C' = Riser pipe diameter 54 in 4'x4' Box equivalent to 54" diameter riser Depth of flow 1.5 ft Flow through riser: 87 cfs OKAY Com osite 'C'= Area 'A' = 9.67 ac 10 yr. storm rainfall intensity,'I' = 7.03 in/hr Computed flow from site, 'Q' = 41 cfs SPILLWAY DESIGN Spillway design: (L =Q/(C *h ^ 1. 5)); C= 3.0 h= 1.00 Spillway length @ flow depth 14 OUTLET PIPE DESIGN Outlet pipe diameter 36 in Flow through outlet pipe 88 cfs (Note: Flow determined using outlet control and pipe 80 % full) OUTLET PIPE IS OKAY Pipe slope ft/ft 0.005 ft/ft Pipe length(ft) 86.38 ft Outlet pipe invert in 553.90 Outlet pipe invert out 553.47 CONCRETE ANCHOR SIZE SEE PERMENANT POND CONCRETE ANCHOR SIZE SURFACE AREA/FLOW COMPARISON: amlllL— Formula: A=435*Q 1 7.03 10 year storm A: Minimum Surface Area (acres) measured at the crest of the principal spillway Q desi n : 41 CFS A Re uired : 17835 sf of surface area at sed stor elev Q: Peak inflow rate of 10 year storm in cfs A Provided 24883 OKAY Cubic Feet per day irmula: Qd=V/td = (ft^3/day) ,DENR optimal dewatering time is 3 days = desired detwatering time in days = 3 days Qd: 5802 ft^3/day Orifice Diameter elect Skimmer Size: in. :ad on Orifice (Use Chart): ft. rrmula: Ir=V p,n23iQ• Hl D: 2.24 in. :tual Orifice Diameter: 2.5 in. OKAY NCDENR Head on Orifice Chart Skimmer Size (in.) Head on Orifice (ft-) 1.5 0.125 2 0.167 2.5 0.208 3 0.25 4 0.333 5 0.333 b 0.417 S 10.5 Millbridge Phase 7E �V%]< PROJECT N020170279.00.CL BY: CJH WW Q I C� i<S<--> DATE: 9/6/2019 T.M.: WGB co—L—Ify �ntrnsrnicfuro con- rirnnts REVISED: 1111212019 P.M.: WGB SEDIMENT BASIN CALCULATIONS SEDIMENT BASIN #3 PHI DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area TDA 4.49 ac Proposed sediment depth ft Disturbed area DA 4.49 ac I Bottom elevation of basin ms/ Re uired sediment stora a 1800xTDA 8082 cf I Depth of flow over Riser ft BASIN CONFIGURATION Bottom elevation 569 msl Sediment Storage elevation 572 msl Primary Spillway crest 573.5 msl Top of Berm 575 msl ESTIMATED BASIN SIZE RECTANGULAR Length(ft) Width(ft) Bottom 68 31 Top 86 49 BASIN EFFICIENCY Sediment storage provided: 37020 OKAY Sediment storage required: 8082 cf Surface area/Flow comparison: 14424 OKAY PLANNED BASIN SIZE REFER TO EROSION CONTROL PLAN Elev. Area SF Cumulative Volume CF 569 10331 0 570 11639 10985 571 13003 23306 572 14424 37020 573 15901 52182 574 17435 84041 575 19025 118967 DESIGN FLOW Q=CIA RISER DESIGN Bare soil coefficient 'C' = 0.60 Riser pipe diameter in 4'x4' Box equivalent to 54" diameter riser Depth of flow 1.5 ft Flow through riser: 87 cfs OKAY Com osite 'C'= Area 'A' = 4.49 ac 10 yr. storm rainfall intensity,'I' = 7.03 in/hr Computed flow from site, 'Q' = 19 cfs SPILLWAY DESIGN Spillway design: (L =Q/(C *h ^ 1. 5)); C= 3.0 h= 1.00 Spillway lengthlength@ flow depth 10 OUTLET PIPE DESIGN Outlet pipe diameter 24 in Flow through outlet pipe 36 cfs (Note: Flow determined using outlet control and pipe 80 % full) OUTLET PIPE IS OKAY Pipe slope ft/ft 0.005 ft/ft Pipe length(ft) 61.23 ft Outlet pi e invert in 565.31 Outlet pipe invert out 565.00 CONCRETE ANCHOR SIZE SEE PERMENANT POND CONCRETE ANCHOR SIZE SURFACE AREA/FLOW COMPARISON: Formula: A=435'Q 1 7.03 10 year storm A: Minimum Surface Area (acres) measured at the crest of the principal spillway Q desi n : 19 CFS A Re uired : 8265 sf of surface area at sed stor elev Q: 91M Peak inflow rate of 10 year storm in cfs A Provided 14424 OKAY Cubic Feet per da Formula: Qd=V/td = (ft^3/day) NCDENR optimal dewatering time is 3 days td = desired detwatering time in days = 3 days Qd: 2694 ft^3/day Orifice Diameter Select Skimmer Size: 3 in. Head on Orifice (Use Chart): 5 ft. Formula: = Q.n -) D: 1.53 in. Actual Orifice Diameter: 2 in. OKAY NCDENR Head on Orifice Chart Skimmer Size (in.) Head on Orifice (ft.) 1.5 0.125 2 0.167 2.5 3 0.208 0.25 4 0.333 5 0.333 6 0.417 8 0.5 Millbridge Phase 7E �v%]< PROJECT NO 20170279.00.CL BY: CJH aW Q A C� KSC>" DATE: 09/06/19 T.M.: WGB co—L—Ify �ntrnsr ucfuro con- rirnnts REVISED: 1111212019 P.M.: WGB SEDIMENT BASIN CALCULATIONS SEDIMENT BASIN #3 PH2 DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area TDA 6.90 ac Proposed sediment depth ft Disturbed area DA 6.90 ac Bottom elevation of basin ms/ Re uired sediment stora a 1800xTDA 12420 cf I Depth of flow over Riser ft BASIN CONFIGURATION Bottom elevation 569 msl Sediment Storage elevation 572 msl Primary Spillway crest 573.5 msl Top of Berm 575 msl ESTIMATED BASIN SIZE RECTANGULAR Length(ft) Width(ft) Bottom 85 40 Top 103 58 BASIN EFFICIENCY Sediment storage provided: 37020 OKAY Sediment storage required: 12420 cf Surface area/Flow comparison: 14424 OKAY PLANNED BASIN SIZE REFER TO EROSION CONTROL PLAN Elev. Area SF Cumulative Volume CF 569 1 u3., . 0 570 11639 10985 571 13003 23306 572 14424 37020 573 15901 52182 574 17435 84041 575 19025 118967 DESIGN FLOW Q=CIA RISER DESIGN Bare soil coefficient 'C' = Riser pipe diameter 54 in 4'x4' Box equivalent to 54" diameter riser Depth of flow 1.5 ft Flow through riser: 87 cfs OKAY Com osite 'C'= Area 'A' = 6.90 ac 10 yr. storm rainfall intensity,'I' = 7.03 in/hr Computed flow from site, 'Q' = 29 cfs SPILLWAY DESIGN Spillway design: (L =Q/(C *h ^ 1. 5)); C= 3.0 h= 1.00 Spillway length @ flow depth 10 OUTLET PIPE DESIGN Outlet pipe diameter 24 in Flow through outlet pipe 36 cfs (Note: Flow determined using outlet control and pipe 80 % full) OUTLET PIPE IS OKAY Pipe slope ft/ft 0.005 ft/ft Pipe length(ft) 61.23 ft Outlet pipe invert in 565.31 Outlet pipe invert out 565.00 CONCRETE ANCHOR SIZE SEE PERMENANT POND CONCRETE ANCHOR SIZE SURFACE AREA/FLOW COMPARISON: Formula: A=435*Q 1 7.03 10 year storm A: Minimum Surface Area (acres) measured at the crest of the principal spillway Q desi n : 29 CFS A Re uired : 12615 sf of surface area at sed stor elev Q: Peak inflow rate of 10 year storm in cfs A Provided 14424 OKAY Cubic Feet per day rmula: Qd=V/td = (ft^3/day) ;DENR optimal dewatering time is 3 days = desired detwatering time in days = 3 days Qd: 4140 ft^3/dav t Skimmer Size: 3 in. on Orifice (Use Chart): 5 ft. ula: f F7= V Q.n23iQ• H, D: 1.89 in. it Orifice Diameter: 2 in. OKAY NCDENR Head on Orifice Chart Skimmer Size (in.) Head on Orifice (ft-) 1.5 0.125 2 0.167 2.5 0.208 3 0.25 4 0.333 5 0.333 b 0.417 S 10.5 �7 � � � � -7 �D ICI S N TRAPEZOIDAL CHANNEL COMPUTATION SHEET PROJECT: Millbridge Phase 7E LOCATION: Waxhaw, NC Q; aT+ LL w LL Q a+ N fa J s i O = t = i 0 -y O- O- «_ 4 Q U U •= C W y K C LL .S O O •C ` O C J O O- '6_ -� •C U Gl Gl -y O j •f6 p H Fn f06 •tn s U fn U Q U Of I m 2 LL 0 N Ac Co Ri L d b e n C Qd S T TDD #1.1 7.10 0.60 7.03 308.0 2.00 6.00 18.00 3 0.025 430.31 29.95 0.49 8.23 0.065 1.98 31 Synthetic Mat ✓ TDD #1.2 0.64 0.60 7.03 116.0 2.00 4.00 12.00 2 0.065 67.75 2.70 0.35 1.63 0.026 0.57 77 Straw with Net ✓ TDD #2.1 12.72 0.60 7.03 502.0 2.25 3.00 12.00 2 0.025 118.98 53.65 1.54 5.73 0.010 0.96 225 Synthetic Mat ✓ TDD #2.2 0.21 0.60 7.03 137.0 2.00 2.00 10.00 2 0.065 35.73 0.89 0.31 1.08 0.015 0.29 133 Straw with Net ✓ TDD #3.1 2.17 0.60 7.03 242.0 2.00 2.00 10.00 2 0.033 90.85 9.15 0.66 4.15 0.025 1.04 80 Straw with Net ✓ *Manning's values area based on channel lining and design flow depth as shown in NC DENR Table 8.05e. "Shear Stress is NA if design velocity is less than 2 fps and temporary seeding is used as a liner. Per NC DENR linings are not required if velocity is less than 2 fps. TEMPORARY Designir Product Description Longevity Applications Stress lbs/ft' (Pa) ERONET 1.51b., accelerated photodegradable, polypropylene 45 days Low Flow Channels Unvegetated 1.55 (74) Unvegetated 5.0 (1.52) topnet,100% straw fiber matrix 4.1-3.1Slopes OS75 ov 1.51b., photodegradable, polypropylene top G Moderate Flow Channels bottom net, 100% straw fiber matrix 60 days 3.1-2.1Slopes Unvegetated 1.75 (84) Unvegetated 6.0 (1.83) OS150 1.51b.,photodegradable, polypropylene top net, 12months Low Flow Channels Unvegetated 1.55 (74) Unvegetated 5.0 (152) 100% straw fiber matrix 4.1-3.1Slopes S75 00 151b., photodegradable, polypropylene top G 12 months Moderate Flow Channels Unvegetated 1.75 (84) Unvegetated 6.0 (1.83) bottom net, 100% straw fiber matrix 3.1-2.1 Slopes 5150 Fk 2.91b., UV -stable polypropylene top net, 70%straw/30% coconut fiber matrix, 1.51 b., 24months Medium Flow Channels Medium Unvegetated 2. 0(96) Unvegetated 8. 0(2.44) pes photodegradable polypropylene bottom net SC150 kk 2.91b., UV stable polypropylene top G bottom nets, 36months High Flow Channels Unvegetated 2. 25(108) Unvegetated 10. 0(3. 05) 100% coconut fiber matrix 1.1 and Greater Slopes C125 BIONET 9.3lb., lenowoven biodegradable jute top net, 12months Low Flow Channels Unvegetated 1. 60(76) Unvegetated 5. 0(1.52) 100% straw fiber matrix 4.1-3.1Slopes S75BN 9.3lb., leno woven biodegradable jute top net, 100% straw fiber matrix, 7.71 b., woven biodegradable jute 12months Moderate Flow Channels Unvegetated 1. 85(88) Unvegetated 6. 0(1. 83) bottom net 3.1-2.1Slopes S150BN 9.3lb. Zeno woven biodegradable jute top net,70% Medium Flow Channels straw/30% coconut fiber matrix, 7.71 b., woven 18months 2.1-V.151opes Unvegetated 2.10(100) Unvegetated 8. 0(2.44) biodegradablejutehottom net SC150BN TEMPORARY imL Design Product Description Longevity Applications Stress lbs/ft' (Pa) u BIONET CONPU 9.3 P, , leno woven biodegradable jute top net, 100 High Flow Channels coconut fiber matrix, 7.71 b., woven biodegradable 24mo. V.1 and Greater Slopes Unvegetated 2. 35(112) Unvegetated 10. 0(3. 05) jute bottom net C125BN ow 1431b., (700 g) woven biodegradable colrtop Hi High Flow Channels net, 100% coconut fiber matrix, 7.71 b., woven blodegrdable jute bottom net 36mo. and Greater Slopes Unvegetated 2. 35(112) Unvegetated 10. 0(3. 05) C700BN PERMANENT ERONET 0-ok 5.0lb., UV -stable polypropylene top net, 100 % polypropylene 3.016., UV -stable High Flow Channels Permanent Unvegetated 3.0 (144) Unvegetated 9.0 (2.7) bottomfiber net polypropylene bottom net I I Slopes Vegetated 8.0 (383) Vegetated 16.0 (4.9) P300 VMAX -`_ 5.01b., UV -stable polypropylene top G bottom nets, ., UV -stable polypropylene corrugated center High Flow Channels Permanent Unvegetated 3.0 (144) Unvegetated 9.5 (29) net, 70%straw/30 % coconut fiber matrix net, I I and Greater Slopes Vegetated 10.0 (480) Vegetated 15.0 (4.6) SC250 8.0Ib., UV -stable polypropylene top G bottom nets, 24.01b., UV -stable polypropylene corrugated center High Flow Channels Permanent Unvegetated 3.2 (153) Unvegetated 10.5 (3.2) net, 100 % coconut fiber matrix I I and Greater Slopes Vegetated 12.0 (576) Vegetated 20.0 (6.0) C350 24.0Ib.,UV-stable polypropylene top G bottom nets, 24.01b., UV -stable polypropylene corrugated Extreme High Flow Channels Permanent Unvegetated 4. 0(191) Unvegetated 12.5(3. 8) center net, 100 % polypropylene fiber matrix I I and Greater Slopes Vegetated 14.0 (672) Vegetated 25.0 (7.6) P550 100%UV-stable polypropylene monofllament Permanent Extreme High Flow Channels Vegetated 15. 0(718) Vegetated 25. 0(7. 6) yarns, woven Into a 3-0 structure I I and Greater Slopes TMax 100%UV-stable polypropylene monofllament Permanent Extreme High Flow Channels Vegetated 16. 0(766) Vegetated 25. 0(7. 6) yarns, woven Into a 3-0 structure I I and Greater Slopes W3000 Project Description Friction Method Solve For Input Data Worksheet for Circular Pipe - 1 Manning Formula Full Flow Capacity Roughness Coefficient 0.024 Channel Slope 0.02000 ft/ft Normal Depth 1.50 ft Diameter 1.50 ft Discharge 8.05 ft3/s Results Discharge 8.05 ft3/s Normal Depth 1.50 ft Flow Area 1.77 w Wetted Perimeter 4.71 ft Hydraulic Radius 0.38 ft Top Width 0.00 ft Critical Depth 1.10 ft Percent Full 100.0 % Critical Slope 0.02543 ft/ft Velocity 4.55 ft/s Velocity Head 0.32 ft Specific Energy 1.82 ft Froude Number 0.00 Maximum Discharge 8.66 ft3/s Discharge Full 8.05 ft3/s Slope Full 0,02000 ft/ft Flow Type SubCritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % Bentley Systems, Inc, Haestad Methods Soh BizirtIG)yffilewMaster V8i (SELECTseries 1) [08.11.01.03] 9/17/2018 1:49:08 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Worksheet for Circular Pipe - I GVF Output Data Normal Depth Over Rise 100.00 % Downstream Velocity Infinity fUs Upstream Velocity Infinity ft/s Normal Depth 1.50 ft Critical Depth 1,10 ft Channel Slope 0.02000 fUft Critical Slope 0.02543 ft/ft Bentley Systems, Inc. Haestad Methods Sol tHisitftEdetwMaster V81 (SELECTseries 1) [08.11.01.03] 9/1712018 1:49:08 PM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Hydraflow Storm Sewers Extension for Autodesk@ AutoCAD@ Civil 3D@ Plan Project File: MiUbhdgoPhase 7E'0NP#1.stn Number of lines: 15 1 Date: 11/12/2019 Storm Sewers v2018.30 Page 1 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) I End 25.818 0.00 10.63 0.60 0.00 6.38 5.0 7.3 6.4 40.99 55.67 5.80 36 0.70 562.00 562.18 566.50 566.60 565.42 571.67 Pipe - (110) 2 1 145.500 0.12 10.63 0.60 0.07 6.38 5.0 6.9 6.5 41.66 100.5 1071 36 2.27 566.90 570.20 568.25 572.30 571.67 580.44 Pipe - (111) 3 2 77.377 0.19 10.51 0.60 0.11 6.31 5.0 6.6 6.6 41.55 82.60 8.08 36 1.53 570.30 571.49 572.30 573.59 580.44 579.48 Pipe - (112) 4 3 85767 0.36 6.93 0.60 0.22 4.16 5.0 6.3 6.7 27.72 42.01 7.86 30 1.05 571.99 572.89 573.59 574.68 579.48 580.39 Pipe - (114) 5 4 24.500 0.29 6.57 0.60 0.17 3.94 5.0 6.3 6.7 26.34 26.64 9.27 24 1.39 574.39 574.73 576.01 576.52 580.39 580.75 Pipe - (115) 6 5 96.164 0.05 6.28 0.60 0.03 3.77 5.0 6.1 6.7 25.37 44.49 8.59 24 3.87 574.73 578.45 576.52 580.22 580.75 584.45 Pipe - (116) 7 6 45M0 0.13 6.23 0.60 0.08 3.74 5.0 6.0 6.8 25.27 53.74 8.60 24 5.65 578.45 581.04 580.22 582.81 584.45 587.06 Pipe - (117) 8 7 144.129 0.23 6.10 0.60 0.14 3.66 5.0 5.7 6.8 25.04 55.57 8.53 24 6.04 581.04 589.74 582.81 591.50 587.06 596.81 Pipe - (118) 9 8 20.000 0.07 1.21 0.60 0.04 0.73 5.0 5.6 6.9 4.99 7.42 4.51 18 0.50 592.21 592.31 593.11 593.21 596.81 596.81 Pipe - (119) 10 9 61.746 0.04 1.14 0.60 0.02 0.68 5.0 5.2 7.0 4.77 27.09 3.75 18 6.66 592.31 596.42 593.68 597.26 596.81 600.93 Pipe - (120) 11 10 39.436 1.10 1.10 0.60 0.66 0.66 5.0 5.0 7.0 4.64 16.39 6.61 15 6.44 596.67 599.21 597.26 600.08 600.93 603.49 Pipe - (121) 12 8 51.751 4.66 4.66 0.60 2.80 2.80 5.0 5.0 7.0 19.66 15.99 6.26 24 0.50 590.24 590.50 592.24 592.63 596.81 595.50 Pipe - (168) 13 3 20.000 0.76 3.39 0.60 0.46 2.03 5.0 6.5 6.6 13.49 94.31 4.56 36 2.00 572.09 572.49 573.59 573.66 579.48 579.48 Pipe - (113) 14 13 33.327 0.00 2.63 0.60 0.00 1.58 5.0 6.1 6.7 10.61 148.1 4.55 36 4.93 572.49 574.13 573.66 575.16 579.48 582.04 Pipe - (155) 15 14 104.058 2.63 2.63 0.60 1.58 1.58 5.0 5.0 7.0 11�09 49.36 5.32 36 0.55 574.33 574.90 575.30 575.95 582.04 579.73 Pipe - (156) Project File: Millbridge Phase 7E - BIVIP #1.stm Number of lines: 15 Run Date: 11/12/2019 NOTES:Intensity = 84.35 / (Inlet time + 15.10) 1 0.83; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v2018.30 Hydraflow Storm Sewers Extension for Autodesk@ AutoCAD@ Civil 3D@ Plan Project File: MiUbhdgoPhase 7E'0NP#1.stn Number of lines: 15 1 Date: 11/12/2019 Storm Sewers v2018.30 Page 1 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) I End 25.818 0.00 10.63 0.60 0.00 6.38 5.0 7.0 7.6 48.42 55.67 6.85 36 0.70 562.00 562.18 566.50 566.64 565.42 571.67 Pipe - (110) 2 1 145.500 0.12 10.63 0.60 0.07 6.38 5.0 6.6 7.7 49.11 100.5 1133 36 2.27 566.90 570.20 568.38 572.48 571.67 580.44 Pipe - (111) 3 2 77.377 0.19 10.51 0.60 0.11 6.31 5.0 6.4 7.8 48.92 82.60 8.70 36 1.53 570.30 571.49 572.48 573.77 580.44 579.48 Pipe - (112) 4 3 85767 0.36 6.93 0.60 0.22 4.16 5.0 6.1 7.8 32M 42.01 8.36 30 1.05 571.99 572.89 573.77 574.83 579.48 580.39 Pipe - (114) 5 4 24.500 0.29 6.57 0.60 0.17 3.94 5.0 6.1 7.9 30.96 26.64 9.85 24 1.39 574.39 574.73 576.39 576.85 580.39 580.75 Pipe - (115) 6 5 96.164 0.05 6.28 0.60 0.03 3.77 5.0 5.9 7.9 29.79 44.49 9.48 24 3.87 574.73 578.45 579.01 580.68 580.75 584.45 Pipe - (116) 7 6 45M0 0.13 6.23 0.60 0.08 3.74 5.0 5.8 7.9 29.65 53.74 9.60 24 5.65 578.45 581.04 581.49 582.90 584.45 587.06 Pipe - (117) 8 7 144.129 0.23 6.10 0.60 0.14 3.66 5.0 5.6 8.0 29.34 55.57 9.66 24 6.04 581.04 589.74 582.90 591.59 587.06 596.81 Pipe - (118) 9 8 20.000 0.07 1.21 0.60 0.04 0.73 5.0 5.5 8.0 5.84 7.42 4.65 18 0.50 592.21 592.31 593.21 593.31 596.81 596.81 Pipe - (119) 10 9 61.746 0.04 1.14 0.60 0.02 0.68 5.0 5.1 8.2 5.58 27.09 4.07 18 6.66 592.31 596.42 593.82 597.33 596.81 600.93 Pipe - (120) 11 10 39.436 1.10 1.10 0.60 0.66 0.66 5.0 5.0 8.2 5.42 16.39 6.85 15 6.44 596.67 599.21 597.33 600.15 600.93 603.49 Pipe - (121) 12 8 51.751 4.66 4.66 0.60 2.80 2.80 5.0 5.0 8.2 22.95 15.99 7.31 24 0.50 590.24 590.50 592.24 592.77 596.81 595.50 Pipe - (168) 13 3 20.000 0.76 3.39 0.60 0.46 2.03 5.0 6.3 7.8 15.87 94.31 474 36 2.00 572.09 572.49 573.77 573.76 579.48 579.48 Pipe - (113) 14 13 33.327 0.00 2.63 0.60 0.00 1.58 5.0 5.9 7.9 12.46 148.1 477 36 4.93 572.49 574.13 573.76 575.25 579.48 582.04 Pipe - (155) 15 14 104.058 2.63 2.63 0.60 1.58 1.58 5.0 5.0 8.2 12�95 49.36 5.56 36 0.55 574.33 574.90 575.38 576.04 582.04 579.73 Pipe - (156) Project File: Millbridge Phase 7E - BIVIP #1.stm Number of lines: 15 Run Date: 11/12/2019 NOTES:Intensity = 93.88 / (Inlet time + 14.70) 1 0.82; Return period =Yrs. 25 c = cir e = ellip b = box Storm Sewers v2018.30 Hydraflow Storm Sewers Extension for Autodesk@ AutoCAD@ Civil 3D@ Plan Project File: MiUbhdgoPhase 7E'0NP#2.stn Number of lines: 28 1 Date: 11/12/2019 Storm Sewers v2018.30 Page 1 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) I End 27.494 0.00 7.25 0.60 0.00 4.35 5.0 11.0 5.7 24.61 47.17 3.48 36 0.50 554.00 554.14 558.50 558.54 557.42 569.72 Pipe - (124) 2 1 145.483 0.17 6.52 0.60 0.10 3.91 5.0 10.3 5.8 22.68 130.3 10.03 36 3.81 561.21 566.76 562.06 568.29 569.72 580.82 Pipe - (125) 3 2 93.908 0.11 5.47 0.60 0.07 3.28 5.0 9.7 5.9 19.40 47.66 5.64 36 0.51 566.76 567.24 568.29 568.65 580.82 578.10 Pipe - (126) 4 3 %500 0.18 5.36 0.60 0.11 3.22 5.0 9.3 6.0 M25 46.43 5.90 36 0.48 567.24 567.53 568.65 568.93 578.10 577.45 Pipe - (127) 5 4 20.000 0.40 5.18 0.60 0.24 3.11 5.0 9.2 6.0 18.66 29.01 6.26 30 0.50 567.53 567.63 568.99 569.09 577.45 577.45 Pipe - (139) 6 5 51.277 0.14 4.78 0.60 0.08 2�87 5.0 9.0 6.1 1736 29.00 5.96 30 0.50 567.63 567.89 569.09 569.29 577.45 578.76 Pipe - (140) 7 6 21.648 0.14 4.39 0.60 0.08 2M 5.0 8.9 6.1 M01 29.00 5.78 30 0.50 567.89 568.00 569.29 569.35 578.76 578.45 Pipe - (144) 8 7 54�107 0.11 4.25 0.60 0.07 M5 5.0 8.6 6.1 I&M 30.84 &09 30 0.57 571.48 571.79 572.75 573.12 578.45 578.45 Pipe - (128) 9 8 104.000 0.13 4.14 0.60 0.08 2A8 5.0 8.0 6.3 15�55 29.00 5.84 30 0.50 571.79 572.31 573.12 573.64 578.45 580.46 Pipe - (129) 10 9 105.206 0.06 1.83 0.60 0.04 1.10 5.0 7.6 6.4 &99 14.48 678 18 1.90 575.53 577.53 576.26 578.55 580.46 582.46 Pipe - (131) 11 10 50.665 0.08 1.77 0.60 0.05 1.06 5.0 7.4 6.4 6.81 14.68 6.13 18 1.95 577.73 578.72 578.55 579.73 582.46 583.86 Pipe - (132) 12 11 87.537 0.18 1.64 0.60 0.11 0.98 5.0 7.0 6.5 6.41 7.45 474 18 0.50 578.92 579.36 579.99 580.43 583.86 587.34 Pipe - (133) 13 12 20.000 0.19 1.46 0.60 0.11 0.88 5.0 6.8 6.5 5.73 7.42 3.39 18 0.50 579.56 579.66 580.96 581.00 587.34 587.34 Pipe - (151) 14 13 143.547 0.08 1.27 0.60 0.05 0.76 5.0 6.3 6.7 5.09 8.28 4.73 15 1.64 579.86 582.22 581.09 583.13 587.34 590.03 Pipe - (152) 15 14 55�913 0.46 1.19 0.60 0.28 0.71 5.0 6.0 6.7 4.81 8.33 &09 15 1.66 584.82 585.75 585.50 586.64 590.03 589.50 Pipe - (153) 16 15 156.001 0.73 0.73 0.60 0.44 0.44 5.0 5.0 7.0 3.08 12.66 3.81 15 3.85 585.75 591.75 586.64 592.46 589.50 595.50 Pipe - (154) 17 11 20.000 0.05 0.05 0.60 0.03 0.03 5.0 5.0 7.0 0.21 4.57 1.74 15 0.50 579.52 579.62 579.73 579.80 583.86 583.87 Pipe - (150) 18 9 38A47 0.59 2.01 0.60 0.35 1.21 5.0 6.3 6.7 8.04 16.00 5.08 24 0.50 572.81 573.00 573.81 574.01 580.46 577.50 Pipe - (147) 19 18 158.717 0.53 1.42 0.60 0.32 0.85 5.0 5.5 6.9 5.86 18.63 7.20 18 3.15 573.50 578.50 574.08 579.43 577.50 582.50 Pipe - (148) 20 19 100.295 0.89 0.89 0.60 0.53 0.53 5.0 5.0 7.0 3.75 11.17 5.06 15 2.99 578.75 581.75 579.43 582.53 582.50 585.50 Pipe - (149) 21 2 20.000 0.20 0.88 0.60 0.12 0.53 5.0 8.0 6.3 3.31 4.57 4.06 15 0.50 576.48 576.58 577.27 577.37 580.82 580.82 Pipe - (136) 22 21 31739 0.43 1 0.68 0.60 1 0.26 0.41 5.0 7.8 6.3 2.58 4.57 2.90 15 0.50 576.58 576.74 577.50 577.53 580.82 579.68 Pipe - (137) 1 Project File: Millbridge Phase 7E - BIVIP #2.strn Number of lines: 28 Run Date: 11/12/2019 NOTES:Intensity = 84.35 / (Inlet time + 15.10) 1 0.83; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v2018.30 Page 2 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) 23 22 143.531 0.25 0.25 0.60 0.15 0.15 5.0 5.0 7.0 1.05 9.35 2.05 15 2.10 576.74 579.75 577.71 580.15 579.68 583.50 Pipe - (138) 24 9 20.000 0.17 0.17 0.60 0.10 0.10 5.0 5.0 7.0 0.72 4.57 2.72 15 0.50 576.11 576.21 576.44 576.54 580.46 580.46 Pipe - (130) 25 6 140.906 0.11 0.25 0.60 0.07 0.15 5.0 5.7 6.8 1.03 5.16 3.16 15 0.64 572.51 573.41 572.89 573.81 578.76 583.83 Pipe - (141) 26 25 20.003 0.14 0.14 0.60 0.08 0.08 5.0 5.0 7.0 0.59 4.57 2.11 15 0.50 573.41 573.51 573.81 573.82 583.83 583.83 Pipe - (145) 27 1 93.473 0.20 0.73 0.60 0.12 0.44 5.0 6.8 6.6 2.87 4.57 3.93 15 0.50 562.03 562.50 562.75 563.22 569.72 568.50 Pipe - (158) 28 27 195.074 0.53 0.53 0.60 0.32 0.32 5.0 5.0 7.0 2.24 5.16 3.21 15 0.64 562.50 563.75 563.34 564.35 568.50 568.50 Pipe - (159) Project File: Millbridge Phase 7E - BIVIP #2.strn Number of lines: 28 Run Date: 11/12/2019 NOTES:Intensity = 84.35 / (Inlet time + 15.10) 1 0.83; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v2018.30 Hydraflow Storm Sewers Extension for Autodesk@ AutoCAD@ Civil 3D@ Plan Project File: MiUbhdgoPhase 7E'0NP#2.stn Number of lines: 28 1 Date: 11/12/2019 Storm Sewers v2018.30 Page 1 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) I End 27.494 0.00 7.25 0.60 0.00 4.35 5.0 10.2 &B 29.51 47.17 4.18 36 0.50 554.00 554.14 558.50 558.55 557.42 569.72 Pipe - (124) 2 1 145.483 0.17 6.52 0.60 0.10 3.91 5.0 9.5 6.9 27.13 130.3 10.60 36 3.81 561.21 566.76 562.14 568.44 569.72 580.82 Pipe - (125) 3 2 93.908 0.11 5.47 0.60 0.07 3.28 5.0 9.0 7.1 23.15 47.66 5.98 36 0.51 566.76 567.24 568.44 568.79 580.82 578.10 Pipe - (126) 4 3 %500 0.18 5.36 0.60 0.11 3.22 5.0 8.7 7.1 22.93 46.43 &25 36 0.48 567.24 567.53 568.79 569.07 578.10 577.45 Pipe - (127) 5 4 20.000 0.40 5.18 0.60 0.24 3.11 5.0 8.6 7.1 22.22 29.01 6.52 30 0.50 567.53 567.63 569.17 569.27 577.45 577.45 Pipe - (139) 6 5 51.277 0.14 4.78 0.60 0.08 2�87 5.0 8.4 7.2 20.66 29.00 4.46 30 0.50 567.63 567.89 569.96 570.04 577.45 578.76 Pipe - (140) 7 6 21.648 0.14 4.39 0.60 0.08 2M 5.0 8.3 7.2 1M4 29.00 3.88 30 0.50 567.89 568.00 570.66 570.70 578.76 578.45 Pipe - (144) 8 7 54�107 0.11 4.25 0.60 0.07 M5 5.0 8.1 7.3 M59 30.84 6AI 30 0.57 571.48 571.79 572.88 573.25 578.45 578.45 Pipe - (128) 9 8 104.000 0.13 4.14 0.60 0.08 2A8 5.0 7.6 7A 18A3 29.00 &20 30 0.50 571.79 572.31 573.25 573.76 578.45 580.46 Pipe - (129) 10 9 105.206 0.06 1.83 0.60 0.04 1.10 5.0 7.2 7.5 8.26 14.48 7.17 18 1.90 575.53 577.53 576.34 578.64 580.46 582.46 Pipe - (131) 11 10 50.665 0.08 1.77 0.60 0.05 1.06 5.0 7.0 7.6 8.05 14.68 6.48 18 1.95 577.73 578.72 578.64 579.82 582.46 583.86 Pipe - (132) 12 11 87.537 0.18 1.64 0.60 0.11 0.98 5.0 6.7 77 7.56 7.45 4.80 18 0.50 578.92 579.36 580.17 580.61 583.86 587.34 Pipe - (133) 13 12 20.000 0.19 1.46 0.60 0.11 0.88 5.0 6.6 77 6.75 7.42 3.82 18 0.50 579.56 579.66 581.15 581.23 587.34 587.34 Pipe - (151) 14 13 143.547 0.08 1.27 0.60 0.05 0.76 5.0 6.1 7.9 5.98 8.28 5.31 15 1.64 579.86 582.22 581.34 583.21 587.34 590.03 Pipe - (152) 15 14 55�913 0.46 1.19 0.60 0.28 0.71 5.0 5.9 7.9 5.65 8.33 6A4 15 1.66 584.82 585.75 585.58 586.71 590.03 589.50 Pipe - (153) 16 15 156.001 0.73 0.73 0.60 0.44 0.44 5.0 5.0 8.2 3.59 12.66 4.06 15 3.85 585.75 591.75 586.71 592.51 589.50 595.50 Pipe - (154) 17 11 20.000 0.05 0.05 0.60 0.03 0.03 5.0 5.0 8.2 0.25 4.57 1.42 15 0.50 579.52 579.62 579.82 579.83 583.86 583.87 Pipe - (150) 18 9 38A47 0.59 2.01 0.60 0.35 1.21 5.0 6.2 7.8 9.45 16.00 5.30 24 0.50 572.81 573.00 573.91 574.11 580.46 577.50 Pipe - (147) 19 18 158.717 0.53 1.42 0.60 0.32 0.85 5.0 5.5 8.1 &86 18.63 &14 18 3.15 573.50 578.50 574.33 579.51 577.50 582.50 Pipe - (148) 20 19 100.295 0.89 0.89 0.60 0.53 0.53 5.0 5.0 8.2 4.38 11.17 5.27 15 2.99 578.75 581.75 579.51 582.59 582.50 585.50 Pipe - (149) 21 2 20.000 0.20 0.88 0.60 0.12 0.53 5.0 7.6 7.4 3.92 4.57 4.18 15 0.50 576.48 576.58 577.37 577A7 580.82 580.82 Pipe - (136) 22 21 31739 0.43 1 0.68 0.60 1 0.26 0.41 5.0 7A 7.5 3.05 4.57 2.99 15 0.50 576.58 576.74 577.61 577.66 580.82 579.68 Pipe - (137) 1 Project File: Millbridge Phase 7E - BIVIP #2.strn Number of lines: 28 Run Date: 11/12/2019 NOTES:Intensity = 93.88 / (Inlet time + 14.70) 1 0.82; Return period =Yrs. 25 c = cir e = ellip b = box Storm Sewers v2018.30 Page 2 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) 23 22 143.531 0.25 0.25 0.60 0.15 0.15 5.0 5.0 8.2 1.23 9.35 2.15 15 2.10 576.74 579.75 577.84 580.19 579.68 583.50 Pipe - (138) 24 9 20.000 0.17 0.17 0.60 0.10 0.10 5.0 5.0 8.2 0.84 4.57 2.84 15 0.50 576.11 576.21 576.47 576.57 580.46 580.46 Pipe - (130) 25 6 140.906 0.11 0.25 0.60 0.07 0.15 5.0 5.6 8.0 1.20 5.16 3.31 15 0.64 572.51 573.41 572.92 573.84 578.76 583.83 Pipe - (141) 26 25 20.003 0.14 0.14 0.60 0.08 0.08 5.0 5.0 8.2 0.69 4.57 216 15 0.50 573.41 573.51 573.84 573.86 583.83 583.83 Pipe - (145) 27 1 93.473 0.20 0.73 0.60 0.12 0.44 5.0 6.5 77 3.38 4.57 4.07 15 0.50 562.03 562.50 562.84 563.30 569.72 568.50 Pipe - (158) 28 27 195.074 0.53 0.53 0.60 0.32 0.32 5.0 5.0 8.2 Z61 5.16 3.37 15 0.64 562.50 563.75 563.43 564.40 568.50 568.50 Pipe - (159) Project File: Millbridge Phase 7E - BIVIP #2.strn Number of lines: 28 Run Date: 11/12/2019 NOTES:Intensity = 93.88 / (Inlet time + 14.70) 1 0.82; Return period =Yrs. 25 ; c = cir e = ellip b = box Storm Sewers v2018.30 Hydraflow Storm Sewers Extension for Autodesk@ AutoCAD@ Civil 3D@ Plan 27 Project File: MiUbhdgoPhase 7E'0NP#3.stn Number of lines: 31 1 Date: 11/12/2019 Storm Sewers v2018.30 Page 1 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) I End 14.383 0.00 6.44 0.60 0.00 3.86 5.0 33.9 3.4 13.08 15.99 5.87 24 0.50 569.00 569.07 570.30 570.44 571.33 574.48 Pipe - (54) 2 1 87.173 0.28 2.80 0.60 0.17 1.68 5.0 33.7 3.4 5.77 27.90 4.15 18 7.06 569.27 575.43 570.95 576.35 574.48 583.76 Pipe - (105) 3 2 12.827 0.41 2.52 0.60 0.25 1.51 5.0 33.6 3.4 5.21 21.19 7.38 18 4.07 577.88 578.40 578.38 579.28 583.76 583.50 Pipe - (106) (1) 4 3 140.462 0.41 2.11 0.60 0.25 1.27 5.0 331 3.4 4.41 21.19 4.34 18 4.07 578.40 584.12 579.28 584.92 583.50 589.50 Pipe - (106) 5 4 157.617 0.45 1.70 0.60 0.27 1.02 5.0 32.4 3.4 3.62 16.41 4.87 18 2.44 584.32 588.17 584.92 588.90 589.50 593.50 Pipe - (107) 6 5 164.396 0.39 1.25 0.60 0.23 0.75 5.0 317 3.5 2.72 10.04 4.82 15 2.42 588.37 592.34 588.90 593.00 593.50 597.50 Pipe - (108) 7 6 155.883 0.86 0.86 0.60 0.52 0.52 5.0 M9 3.5 1.93 13.95 4.20 15 4.67 592.54 599.82 593.00 600.37 597.50 604.50 Pipe - (109) 8 7 126.418 0.00 0.00 0.60 0.00 0.00 5.0 5.0 0.0 0.10 13.41 0.99 15 4.31 600.02 605A7 60037 605.59 604�50 613.60 Pipe - (167) 9 1 79M1 0.09 3.64 0.60 0.05 2�18 5.0 %9 4A 9.70 37.59 4.42 24 2.76 569.27 571.47 570.95 572.58 574.48 584.15 Pipe - (78) 10 9 89738 0.23 2.48 0.60 0.14 1.49 5.0 19A 4.5 &69 25.60 4.78 24 1.28 571.67 572.82 572.58 573.74 584.15 587.93 Pipe - (79) 11 10 225.462 0.21 1.21 0.60 0.13 0.73 5.0 18.0 47 3.38 9.74 4.59 18 0.86 582.50 584.44 583.11 585.14 587.93 595.02 Pipe - (80) 12 11 201.288 0.12 0.66 0.60 0.07 0.40 5.0 15.7 4.9 1.95 19.36 3.66 18 3.40 584.64 591.48 585.14 592.01 595.02 599.93 Pipe - (82) 13 12 114.712 0.24 0.54 0.60 0.14 0.32 5.0 14.2 5.1 1.67 12.48 3.19 18 1.41 591.48 593.10 592.01 593.58 599.93 605.12 Pipe - (83) 14 13 20.000 0.13 0.30 0.60 0.08 0.18 5.0 13.8 5.2 0.94 7.43 2.38 18 0.50 593.10 593.20 593.58 593.56 605.12 605.12 Pipe - (84) 15 14 4&012 0.15 0.17 0.60 0.09 0.10 5.0 1M 5.5 0.56 7.51 2�09 18 0.51 593.20 593.42 593.56 593.70 605�12 601.81 Pipe - (85) 16 15 20.000 0.02 0.02 0.60 0.01 0.01 5.0 5.0 7.0 0.08 7.43 0.28 18 0.50 593.42 593.52 593.82 593.82 601 �81 601.81 Pipe - (86) 17 11 20.000 0.27 0.34 0.60 0.16 0.20 5.0 14.5 5.1 1.04 7.42 2.49 18 0.50 584.64 584.74 585.14 585.12 595.02 595.02 Pipe - (102) 18 17 4&098 0.05 0.07 0.60 0.03 0.04 5.0 9.8 5.9 0.25 7.42 1.21 18 0.50 584.74 584.97 585.12 585.17 595.02 592.57 Pipe - (103) 19 18 20.000 0.02 0.02 0.60 0.01 0.01 5.0 5.0 7.0 0.08 4.57 1.43 15 0.50 585.22 585.32 585.34 585.44 592.57 592.57 Pipe - (104) 20 9 20.000 0.05 1.07 0.60 0.03 0.64 5.0 9.6 5.9 3.80 7.43 3.82 18 0.50 571.72 571.82 572.58 572.61 584.15 584.14 Pipe - (87) 21 20 62.596 0.39 1.02 0.60 0.23 0.61 5.0 9.3 6.0 3.66 4.83 4.33 15 0.56 572.32 572.67 573.13 573.48 584.14 582.61 Pipe - (88) 22 21 21.680 0.09 0.63 0.60 1 0.05 0.38 5.0 9.1 6.0 2.28 5.00 3.02 15 0.60 572.67 572.80 573.68 573.40 582.61 582.55 Pipe - (89) 1 Project File: Millbridge Phase 7E - BIVIP #3.stm Number of lines: 31 Run Date: 11/12/2019 NOTES:Intensity = 84.35 / (Inlet time + 15.10) 1 0.83; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v2018.30 Page 2 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) 23 22 96.594 0.02 0.54 0.60 0.01 0.32 5.0 8.2 6.2 2.01 4.41 3.50 15 0.47 572.80 573.25 573.40 573.84 582.55 583.74 Pipe - (90) 24 23 44.945 0.02 0.52 0.60 0.01 0.31 5.0 7.8 6.3 1.97 4.62 3.03 15 0.51 573.25 573.48 574.00 574.06 583.74 583.59 Pipe - (91) 25 24 19.930 0.11 0.50 0.60 0.07 0.30 5.0 7.6 6.4 1.91 4.57 3.56 15 0.50 577.48 577.58 578.04 578.14 583.59 583.59 Pipe - (92) 26 25 95�208 0.10 0.39 0.60 0.06 0.23 5.0 6.4 6.7 1.56 4.58 2A8 15 0.50 577.58 578.06 578.44 578.58 583.59 582.41 Pipe - (93) 27 26 20.000 0.07 0.07 0.60 0.04 0.04 5.0 5.0 7.0 0.30 4.57 0.34 15 0.50 578.06 578.16 578.94 578.94 582.41 582.41 Pipe - (94) 28 26 49.720 0.22 0.22 0.60 0.13 0.13 5.0 5.0 7.0 0.93 4.87 1.99 15 0.57 578.06 578.34 578.94 578.72 582.41 582.50 Pipe - (157) 29 10 20.014 0.15 1.04 0.60 0.09 0.62 5.0 6.3 6.7 4.17 15.99 4.20 24 0.50 576.77 576.87 577.47 577.59 587.93 587.90 Pipe - (98) 30 29 72�357 0.34 0.89 0.60 0.20 0.53 5.0 5.7 6.8 3.65 7.42 4.18 18 0.50 576.87 577.23 577.61 577.97 587.90 582.50 Pipe - (99) 31 30 54�057 0.55 0.55 0.60 0.33 0.33 5.0 5.0 7.0 232 7.43 2M 18 0.50 577.23 577.50 578.11 578.14 582.50 582.50 Pipe - (100) Project File: Millbridge Phase 7E - BIVIP #3.stm Number of lines: 31 Run Date: 11/12/2019 NOTES:Intensity = 84.35 / (Inlet time + 15.10) 1 0.83; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v2018.30 Hydraflow Storm Sewers Extension for Autodesk@ AutoCAD@ Civil 3D@ Plan 27 Project File: MiUbhdgoPhase 7E'0NP#3.stn Number of lines: 31 1 Date: 11/12/2019 Storm Sewers v2018.30 Page 1 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) I End 14.383 0.00 6.44 0.60 0.00 3.86 5.0 33.5 3.9 15.36 15.99 6.24 24 0.50 569.00 569.07 570.41 570.59 571.33 574.48 Pipe - (54) 2 1 87.173 0.28 2.80 0.60 0.17 1.68 5.0 33.3 4.0 6.76 27.90 4.60 18 7.06 569.27 575.43 571.15 576.43 574.48 583.76 Pipe - (105) 3 2 12.827 0.41 2.52 0.60 0.25 1.51 5.0 33.2 4.0 6.10 21.19 7.75 18 4.07 577.88 578.40 578.43 579.35 583.76 583.50 Pipe - (106) (1) 4 3 140.462 0.41 2.11 0.60 0.25 1.27 5.0 3M 4.0 5.16 21.19 4.59 18 4.07 578.40 584.12 579.35 584.99 583.50 589.50 Pipe - (106) 5 4 157.617 0.45 1.70 0.60 0.27 1.02 5.0 32.2 4.0 4.22 16.41 5.01 18 2.44 584.32 588.17 584.99 588.96 589.50 593.50 Pipe - (107) 6 5 164.396 0.39 1.25 0.60 0.23 0.75 5.0 31 �6 4.1 3.16 10.04 4.96 15 2.42 588.37 592.34 588.96 593.06 593.50 597.50 Pipe - (108) 7 6 155.883 0.86 0.86 0.60 0.52 0.52 5.0 M9 4.1 Z23 13.95 4.29 15 4.67 592.54 599.82 593.06 600.42 597.50 604.50 Pipe - (109) 8 7 126.418 0.00 0.00 0.60 0.00 0.00 5.0 5.0 0.0 0.10 13.41 0.97 15 4.31 600.02 605A7 600A2 605.59 604�50 613.60 Pipe - (167) 9 1 79M1 0.09 3.64 0.60 0.05 2�18 5.0 17�8 5.5 11 �91 37.59 4.86 24 2.76 569.27 571.47 571.15 572.71 574.48 584.15 Pipe - (78) 10 9 89738 0.23 2.48 0.60 0.14 1.49 5.0 173 5.5 8.21 25.60 5.04 24 1.28 571.67 572.82 572.71 573.84 584.15 587.93 Pipe - (79) 11 10 225.462 0.21 1.21 0.60 0.13 0.73 5.0 16.1 5.7 4.13 9.74 4.87 18 0.86 582.50 584.44 583.18 585.22 587.93 595.02 Pipe - (80) 12 11 201.288 0.12 0.66 0.60 0.07 0.40 5.0 14.2 6.0 2.38 19.36 3.76 18 3.40 584.64 591.48 585.22 592.06 595.02 599.93 Pipe - (82) 13 12 114.712 0.24 0.54 0.60 0.14 0.32 5.0 12.9 6.2 2.02 12.48 3.37 18 1.41 591.48 593.10 592.06 593.64 599.93 605.12 Pipe - (83) 14 13 20.000 0.13 0.30 0.60 0.08 0.18 5.0 12.5 6.3 1.13 7.43 2.51 18 0.50 593.10 593.20 593.64 593.60 605.12 605.12 Pipe - (84) 15 14 4&012 0.15 0.17 0.60 0.09 0.10 5.0 11�O 6.6 0.67 7.51 2.21 18 0.51 593.20 593.42 593.60 593.72 605�12 601.81 Pipe - (85) 16 15 20.000 0.02 0.02 0.60 0.01 0.01 5.0 5.0 8.2 0.10 7.43 0.53 18 0.50 593.42 593.52 593.72 593.73 601 �81 601.81 Pipe - (86) 17 11 20.000 0.27 0.34 0.60 0.16 0.20 5.0 13.1 6.2 1.26 7.42 2.56 18 0.50 584.64 584.74 585.22 585.16 595.02 595.02 Pipe - (102) 18 17 4&098 0.05 0.07 0.60 0.03 0.04 5.0 9.2 7.0 0.29 7.42 1.23 18 0.50 584.74 584.97 585.16 585.20 595.02 592.57 Pipe - (103) 19 18 20.000 0.02 0.02 0.60 0.01 0.01 5.0 5.0 8.2 0.10 4.57 1.51 15 0.50 585.22 585.32 585.35 585.45 592.57 592.57 Pipe - (104) 20 9 20.000 0.05 1.07 0.60 0.03 0.64 5.0 9.0 7.1 4.54 7.43 3.83 18 0.50 571.72 571.82 572.71 572.74 584.15 584.14 Pipe - (87) 21 20 62.596 0.39 1.02 0.60 0.23 0.61 5.0 8.7 7.1 4.37 4.83 4.45 15 0.56 572.32 572.67 573.25 573.60 584.14 582.61 Pipe - (88) 22 21 21.680 0.09 0.63 0.60 1 0.05 0.38 5.0 8.5 7.2 2.71 5.00 3.22 15 0.60 572.67 572.80 573.80 573.46 582.61 582.55 Pipe - (89) 1 Project File: Millbridge Phase 7E - BIVIP #3.stm Number of lines: 31 Run Date: 11/12/2019 NOTES:Intensity = 93.88 / (Inlet time + 14.70) 1 0.82; Return period =Yrs. 25 c = cir e = ellip b = box Storm Sewers v2018.30 Page 2 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) 23 22 96.594 0.02 0.54 0.60 0.01 0.32 5.0 7.8 7.4 2.39 4.41 3.66 15 0.47 572.80 573.25 573.46 573.90 582.55 583.74 Pipe - (90) 24 23 44.945 0.02 0.52 0.60 0.01 0.31 5.0 7.4 7.5 2.33 4.62 3.12 15 0.51 573.25 573.48 574.08 574.14 583.74 583.59 Pipe - (91) 25 24 19.930 0.11 0.50 0.60 0.07 0.30 5.0 7.2 7.5 2.26 4.57 3.71 15 0.50 577.48 577.58 578.10 578.20 583.59 583.59 Pipe - (92) 26 25 95�208 0.10 0.39 0.60 0.06 0.23 5.0 6.2 7.8 1.83 4.58 2�54 15 0.50 577.58 578.06 578.52 578.65 583.59 582.41 Pipe - (93) 27 26 20.000 0.07 0.07 0.60 0.04 0.04 5.0 5.0 8.2 0.34 4.57 0.37 15 0.50 578.06 578.16 579.01 579.01 582.41 582.41 Pipe - (94) 28 26 49.720 0.22 0.22 0.60 0.13 0.13 5.0 5.0 8.2 1.08 4.87 2�09 15 0.57 578.06 578.34 579.01 578.75 582.41 582.50 Pipe - (157) 29 10 20.014 0.15 1.04 0.60 0.09 0.62 5.0 6.1 7.9 4.90 15.99 4.40 24 0.50 576.77 576.87 577.53 577.65 587.93 587.90 Pipe - (98) 30 29 72�357 0.34 0.89 0.60 0.20 0.53 5.0 5.6 8.0 4.28 7.42 4.34 18 0.50 576.87 577.23 577.68 578.05 587.90 582.50 Pipe - (99) 31 30 54�057 0.55 0.55 0.60 0.33 0.33 5.0 5.0 8.2 2.71 7.43 2.72 18 0.50 577.23 577.50 578.19 578.23 582.50 582.50 Pipe - (100) Project File: Millbridge Phase 7E - BIVIP #3.stm Number of lines: 31 Run Date: 11/12/2019 NOTES:Intensity = 93.88 / (Inlet time + 14.70) 1 0.82; Return period =Yrs. 25 c = cir e = ellip b = box Storm Sewers v2018.30 2S 13S 1 S Pre -Development #2 Pre -Development #3 Pre -Development #1 Pre=45.28 AC 9S 10S 8S L 1 BMr#2 BM #3 BMry #1 A 7P BMP 1 BMP#2 12S 14S BM #3 11 S \ Bypass #2 Post Development #3 Bypass #1 Post Development #1 17L Post Development #2 Post= 45.28 AC Subcat Reach on Link Routing Diagram for Millbridge Phase 7E Prepared by WK Dickson & Co., Printed 11/12/2019 HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Millbridge Phase 7E Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (su bcatch me nt-n u mbe rs) 12.980 63 (8S) 9.670 80 (9S) 6.900 79 (10S) 0.060 98 Paved roads w/curbs & sewers, HSG B (1 S) 2.040 98 Water Surface, HSG B (1 S, 11 S) 52.870 55 Woods, Good, HSG B (1 S, 2S, 13S, 14S) 6.040 58 Woods/grass comb., Good, HSG B (11 S, 12S, 14S) 90.560 62 TOTAL AREA Millbridge Phase 7E Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 61.010 HSG B 1 S, 2S, 11 S, 12S, 13S, 14S 0.000 HSG C 0.000 HSG D 29.550 Other 8S, 9S, 10S 90.560 TOTAL AREA Millbridge Phase 7E Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 0.000 29.550 29.550 8S, 9S 10S 0.000 0.060 0.000 0.000 0.000 0.060 Paved roads w/curbs & sewers is 0.000 2.040 0.000 0.000 0.000 2.040 Water Surface is, 11S 0.000 52.870 0.000 0.000 0.000 52.870 Woods, Good is, 2S, 13S, 14S 0.000 6.040 0.000 0.000 0.000 6.040 Woods/grass comb., Good 11 S, 12S, 14S 0.000 61.010 0.000 0.000 29.550 90.560 TOTAL AREA Millbridge Phase 7E Prepared by WK Dickson & Co. HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Printed 11/12/2019 Page 5 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 5P 561.90 560.89 187.7 0.0054 0.013 36.0 0.0 0.0 2 6P 553.90 553.00 92.5 0.0097 0.013 36.0 0.0 0.0 3 7P 565.31 565.00 61.2 0.0051 0.013 24.0 0.0 0.0 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 6 Time span=0.00-99.00 hrs, dt=0.05 hrs, 1981 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre-Development#1 Runoff Area=30.590 ac 3.53% Impervious Runoff Depth=0.00" Tc=21.7 min CN=57 Runoff=0.00 cfs 0.000 of Subcatchment2S: Pre-Development#2 Runoff Area=5.620 ac 0.00% Impervious Runoff Depth=0.00" Tc=24.9 min CN=55 Runoff=0.00 cfs 0.000 of Subcatchment8S: BMP #1 Runoff Area=12.980 ac 0.00% Impervious Runoff Depth=0.00" Tc=5.0 min CN=63 Runoff=0.00 cfs 0.000 of Subcatchment9S: BMP #2 Runoff Area=9.670 ac 0.00% Impervious Runoff Depth=0.08" Tc=5.0 min CN=80 Runoff=1.08 cfs 0.067 of Subcatchment 10S: BMP #3 Runoff Area=6.900 ac 0.00% Impervious Runoff Depth=0.07" Tc=5.0 min CN=79 Runoff=0.58 cfs 0.040 of Subcatchment 11 S: Bypass #1 Runoff Area=5.580 ac 18.28% Impervious Runoff Depth=0.00" Tc=16.9 min CN=65 Runoff=0.00 cfs 0.000 of Subcatchment 12S: Bypass #2 Runoff Area=1.160 ac 0.00% Impervious Runoff Depth=0.00" Tc=24.9 min CN=58 Runoff=0.00 cfs 0.000 of Subcatchment 13S: Pre-Development#3 Runoff Area=9.070 ac 0.00% Impervious Runoff Depth=0.00" Tc=20.7 min CN=55 Runoff=0.00 cfs 0.000 of Subcatchment14S: Post Development#3 Runoff Area=8.990 ac 0.00% Impervious Runoff Depth=0.00" Tc=20.7 min CN=55 Runoff=0.00 cfs 0.000 of Pond 5P: BMP #1 Peak EIev=566.50' Storage=0 cf Inflow=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Pond 6P: BMP #2 Peak EIev=558.74' Storage=2,449 cf Inflow=1.08 cfs 0.067 of Primary=0.06 cfs 0.067 of Secondary=0.00 cfs 0.000 of Outflow=0.06 cfs 0.067 of Pond 7P: BMP #3 Peak EIev=568.67' Storage=1,579 cf Inflow=0.58 cfs 0.040 of Primary=0.02 cfs 0.039 of Secondary=0.00 cfs 0.000 of Outflow=0.02 cfs 0.039 of Link 17L: Post Development#2 Inflow=0.02 cfs 0.039 of Primary=0.02 cfs 0.039 of Link 18L: Post Development#1 Inflow=0.06 cfs 0.067 of Primary=0.06 cfs 0.067 of Total Runoff Area = 90.560 ac Runoff Volume = 0.107 of Average Runoff Depth = 0.01" 97.68% Pervious = 88.460 ac 2.32% Impervious = 2.100 ac Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1S: Pre -Development #1 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 29.510 55 Woods, Good, HSG B 1.020 98 Water Surface, HSG B 0.060 98 Paved roads w/curbs & sewers. HSG B 30.590 57 Weighted Average 29.510 96.47% Pervious Area 1.080 3.53% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.7 Direct Entry, N 3 0 LL Subcatchment 1S: Pre -Development #1 Hydrograph Charlotte 6yhr'A-inch Rainfall=1.00" Renoff Area=30.590 at. Runoff VpIU'rnq=0r060 clf Runoff Depth 0!001' TcT21.7 min �,CN'=57 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 8 Hydrograph for Subcatchment 1S: Pre -Development #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.00 6.00 1.00 0.00 0.00 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 52.00 1.00 0.00 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 61.00 1.00 0.00 0.00 62.00 1.00 0.00 0.00 63.00 1.00 0.00 0.00 64.00 1.00 0.00 0.00 65.00 1.00 0.00 0.00 66.00 1.00 0.00 0.00 67.00 1.00 0.00 0.00 68.00 1.00 0.00 0.00 69.00 1.00 0.00 0.00 70.00 1.00 0.00 0.00 71.00 1.00 0.00 0.00 72.00 1.00 0.00 0.00 73.00 1.00 0.00 0.00 74.00 1.00 0.00 0.00 75.00 1.00 0.00 0.00 76.00 1.00 0.00 0.00 77.00 1.00 0.00 0.00 78.00 1.00 0.00 0.00 79.00 1.00 0.00 0.00 80.00 1.00 0.00 0.00 81.00 1.00 0.00 0.00 82.00 1.00 0.00 0.00 83.00 1.00 0.00 0.00 84.00 1.00 0.00 0.00 85.00 1.00 0.00 0.00 86.00 1.00 0.00 0.00 87.00 1.00 0.00 0.00 88.00 1.00 0.00 0.00 89.00 1.00 0.00 0.00 90.00 1.00 0.00 0.00 91.00 1.00 0.00 0.00 92.00 1.00 0.00 0.00 93.00 1.00 0.00 0.00 94.00 1.00 0.00 0.00 95.00 1.00 0.00 0.00 96.00 1.00 0.00 0.00 97.00 1.00 0.00 0.00 98.00 1.00 0.00 0.00 99.00 1.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 2S: Pre -Development #2 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 5.620 55 Woods, Good, HSG B 5.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 2S: Pre -Development #2 Hydrograph � � � � � � � � � � � � � � � � ■Runoff Charlotte 6yhr'A-inch Rainfall1=1.00" Run'�off Area=5.620 aI kunoff VpI6mp=Or060 clf Runoff Depthl, 0!0W 3TcT24.9 min 0 LL CN=55 0.00 cfs .0 65 70 75 :0 5 •0 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 10 Hydrograph for Subcatchment 2S: Pre -Development #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.00 6.00 1.00 0.00 0.00 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 52.00 1.00 0.00 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 61.00 1.00 0.00 0.00 62.00 1.00 0.00 0.00 63.00 1.00 0.00 0.00 64.00 1.00 0.00 0.00 65.00 1.00 0.00 0.00 66.00 1.00 0.00 0.00 67.00 1.00 0.00 0.00 68.00 1.00 0.00 0.00 69.00 1.00 0.00 0.00 70.00 1.00 0.00 0.00 71.00 1.00 0.00 0.00 72.00 1.00 0.00 0.00 73.00 1.00 0.00 0.00 74.00 1.00 0.00 0.00 75.00 1.00 0.00 0.00 76.00 1.00 0.00 0.00 77.00 1.00 0.00 0.00 78.00 1.00 0.00 0.00 79.00 1.00 0.00 0.00 80.00 1.00 0.00 0.00 81.00 1.00 0.00 0.00 82.00 1.00 0.00 0.00 83.00 1.00 0.00 0.00 84.00 1.00 0.00 0.00 85.00 1.00 0.00 0.00 86.00 1.00 0.00 0.00 87.00 1.00 0.00 0.00 88.00 1.00 0.00 0.00 89.00 1.00 0.00 0.00 90.00 1.00 0.00 0.00 91.00 1.00 0.00 0.00 92.00 1.00 0.00 0.00 93.00 1.00 0.00 0.00 94.00 1.00 0.00 0.00 95.00 1.00 0.00 0.00 96.00 1.00 0.00 0.00 97.00 1.00 0.00 0.00 98.00 1.00 0.00 0.00 99.00 1.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 8S: BMP #1 [49] Hint: Tc<2dt may require smaller dt [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 12.980 63 12.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: BMP #1 Hydrograph ■ Runoff Charlotte 6-hr,14nch Rainfall=1!00 Renoff Area=12.980 at Runoff Vplu',mp=0r0010 clf Runoff Depth, 0!001' Te=5.0 min CN,=6$ 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment 8S: BMP #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.00 6.00 1.00 0.00 0.00 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 52.00 1.00 0.00 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 61.00 1.00 0.00 0.00 62.00 1.00 0.00 0.00 63.00 1.00 0.00 0.00 64.00 1.00 0.00 0.00 65.00 1.00 0.00 0.00 66.00 1.00 0.00 0.00 67.00 1.00 0.00 0.00 68.00 1.00 0.00 0.00 69.00 1.00 0.00 0.00 70.00 1.00 0.00 0.00 71.00 1.00 0.00 0.00 72.00 1.00 0.00 0.00 73.00 1.00 0.00 0.00 74.00 1.00 0.00 0.00 75.00 1.00 0.00 0.00 76.00 1.00 0.00 0.00 77.00 1.00 0.00 0.00 78.00 1.00 0.00 0.00 79.00 1.00 0.00 0.00 80.00 1.00 0.00 0.00 81.00 1.00 0.00 0.00 82.00 1.00 0.00 0.00 83.00 1.00 0.00 0.00 84.00 1.00 0.00 0.00 85.00 1.00 0.00 0.00 86.00 1.00 0.00 0.00 87.00 1.00 0.00 0.00 88.00 1.00 0.00 0.00 89.00 1.00 0.00 0.00 90.00 1.00 0.00 0.00 91.00 1.00 0.00 0.00 92.00 1.00 0.00 0.00 93.00 1.00 0.00 0.00 94.00 1.00 0.00 0.00 95.00 1.00 0.00 0.00 96.00 1.00 0.00 0.00 97.00 1.00 0.00 0.00 98.00 1.00 0.00 0.00 99.00 1.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 9S: BMP #2 [49] Hint: Tc<2dt may require smaller dt Runoff = 1.08 cfs @ 3.23 hrs, Volume= 0.067 af, Depth= 0.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 9.670 80 9.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: BMP #2 Hydrograph � � � � � � � � � � � � � � � � � � � � ■Runoff 1.08 cfs 1T1T /N► -'------ I' ------ II ------ ------ II---Qh�T]ofte 17yhT'I t ino- 1 Rainfall=1.00 Runoff Area=9.670 at Runoff Vplu',mp=0I Of Runoff Depth', 0!0W' LL Tc=5.0 min CN=8Q 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 14 Hydrograph for Subcatchment 9S: BMP #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.05 0.26 5.00 0.96 0.07 0.16 6.00 1.00 0.08 0.11 7.00 1.00 0.08 0.00 8.00 1.00 0.08 0.00 9.00 1.00 0.08 0.00 10.00 1.00 0.08 0.00 11.00 1.00 0.08 0.00 12.00 1.00 0.08 0.00 13.00 1.00 0.08 0.00 14.00 1.00 0.08 0.00 15.00 1.00 0.08 0.00 16.00 1.00 0.08 0.00 17.00 1.00 0.08 0.00 18.00 1.00 0.08 0.00 19.00 1.00 0.08 0.00 20.00 1.00 0.08 0.00 21.00 1.00 0.08 0.00 22.00 1.00 0.08 0.00 23.00 1.00 0.08 0.00 24.00 1.00 0.08 0.00 25.00 1.00 0.08 0.00 26.00 1.00 0.08 0.00 27.00 1.00 0.08 0.00 28.00 1.00 0.08 0.00 29.00 1.00 0.08 0.00 30.00 1.00 0.08 0.00 31.00 1.00 0.08 0.00 32.00 1.00 0.08 0.00 33.00 1.00 0.08 0.00 34.00 1.00 0.08 0.00 35.00 1.00 0.08 0.00 36.00 1.00 0.08 0.00 37.00 1.00 0.08 0.00 38.00 1.00 0.08 0.00 39.00 1.00 0.08 0.00 40.00 1.00 0.08 0.00 41.00 1.00 0.08 0.00 42.00 1.00 0.08 0.00 43.00 1.00 0.08 0.00 44.00 1.00 0.08 0.00 45.00 1.00 0.08 0.00 46.00 1.00 0.08 0.00 47.00 1.00 0.08 0.00 48.00 1.00 0.08 0.00 49.00 1.00 0.08 0.00 50.00 1.00 0.08 0.00 51.00 1.00 0.08 0.00 52.00 1.00 0.08 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 1.00 0.08 0.00 54.00 1.00 0.08 0.00 55.00 1.00 0.08 0.00 56.00 1.00 0.08 0.00 57.00 1.00 0.08 0.00 58.00 1.00 0.08 0.00 59.00 1.00 0.08 0.00 60.00 1.00 0.08 0.00 61.00 1.00 0.08 0.00 62.00 1.00 0.08 0.00 63.00 1.00 0.08 0.00 64.00 1.00 0.08 0.00 65.00 1.00 0.08 0.00 66.00 1.00 0.08 0.00 67.00 1.00 0.08 0.00 68.00 1.00 0.08 0.00 69.00 1.00 0.08 0.00 70.00 1.00 0.08 0.00 71.00 1.00 0.08 0.00 72.00 1.00 0.08 0.00 73.00 1.00 0.08 0.00 74.00 1.00 0.08 0.00 75.00 1.00 0.08 0.00 76.00 1.00 0.08 0.00 77.00 1.00 0.08 0.00 78.00 1.00 0.08 0.00 79.00 1.00 0.08 0.00 80.00 1.00 0.08 0.00 81.00 1.00 0.08 0.00 82.00 1.00 0.08 0.00 83.00 1.00 0.08 0.00 84.00 1.00 0.08 0.00 85.00 1.00 0.08 0.00 86.00 1.00 0.08 0.00 87.00 1.00 0.08 0.00 88.00 1.00 0.08 0.00 89.00 1.00 0.08 0.00 90.00 1.00 0.08 0.00 91.00 1.00 0.08 0.00 92.00 1.00 0.08 0.00 93.00 1.00 0.08 0.00 94.00 1.00 0.08 0.00 95.00 1.00 0.08 0.00 96.00 1.00 0.08 0.00 97.00 1.00 0.08 0.00 98.00 1.00 0.08 0.00 99.00 1.00 0.08 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 10S: BMP #3 [49] Hint: Tc<2dt may require smaller dt Runoff = 0.58 cfs @ 3.25 hrs, Volume= 0.040 af, Depth= 0.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 6.900 79 6.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: BMP #3 Hydrograph 0.65 0.5$ CfS --'�I--i---1---i---1---r-- i---1---i---1---r-- i---1I--i---1---i---1---r-- ■Runoff rt---1---t---1---r---1---r--rt---1---t---1--- ih4rlgtte-6yhr''F='rnc�-- 0.55 rt1 --- 1 Y--- r--- r--rt--- t--- r------ Rai rfarl=1 �00"-- 0.s --- T--- r--- r--7--- T--- Rrun7off Me&6.900 ad-- 0.45 1 1 1 0.4 T---1---T---1---r---1---r--7---1---T- F u-I-ff VoluTne=0r04'10 af 7--- I --- T--- I---r--- I---r--7--- I---T--- I --- r--7-- ff T---I---r---I---r -- V 0.35 1 1 1 1 1 1 1 1 1 1 1 1 Runoff Depth1=0.071' - 7---r--T---1---r---1---r- 7- - T- - r--7- r T- r r 0 03 Te=5.0 Min LL I 1 1 7---I - T ---I-- r ---I-- r--T---I-- T--- I_- r--T---I --T I r I r-- 0.25----T------1---,---1---, -----1---T ---1---, -----1--- 02 7---r--T---1---r---1---r--7---1---T---1---r--7---r --T---1---r---1---r-- 0.15 I 1 1 1 T---1- r---1- r--T---1- T---1- r--T- - -T T---1- 1---1---T-- 0.1 0.05 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 16 Hydrograph for Subcatchment 10S: BMP #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.04 0.16 5.00 0.96 0.06 0.10 6.00 1.00 0.07 0.07 7.00 1.00 0.07 0.00 8.00 1.00 0.07 0.00 9.00 1.00 0.07 0.00 10.00 1.00 0.07 0.00 11.00 1.00 0.07 0.00 12.00 1.00 0.07 0.00 13.00 1.00 0.07 0.00 14.00 1.00 0.07 0.00 15.00 1.00 0.07 0.00 16.00 1.00 0.07 0.00 17.00 1.00 0.07 0.00 18.00 1.00 0.07 0.00 19.00 1.00 0.07 0.00 20.00 1.00 0.07 0.00 21.00 1.00 0.07 0.00 22.00 1.00 0.07 0.00 23.00 1.00 0.07 0.00 24.00 1.00 0.07 0.00 25.00 1.00 0.07 0.00 26.00 1.00 0.07 0.00 27.00 1.00 0.07 0.00 28.00 1.00 0.07 0.00 29.00 1.00 0.07 0.00 30.00 1.00 0.07 0.00 31.00 1.00 0.07 0.00 32.00 1.00 0.07 0.00 33.00 1.00 0.07 0.00 34.00 1.00 0.07 0.00 35.00 1.00 0.07 0.00 36.00 1.00 0.07 0.00 37.00 1.00 0.07 0.00 38.00 1.00 0.07 0.00 39.00 1.00 0.07 0.00 40.00 1.00 0.07 0.00 41.00 1.00 0.07 0.00 42.00 1.00 0.07 0.00 43.00 1.00 0.07 0.00 44.00 1.00 0.07 0.00 45.00 1.00 0.07 0.00 46.00 1.00 0.07 0.00 47.00 1.00 0.07 0.00 48.00 1.00 0.07 0.00 49.00 1.00 0.07 0.00 50.00 1.00 0.07 0.00 51.00 1.00 0.07 0.00 52.00 1.00 0.07 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 1.00 0.07 0.00 54.00 1.00 0.07 0.00 55.00 1.00 0.07 0.00 56.00 1.00 0.07 0.00 57.00 1.00 0.07 0.00 58.00 1.00 0.07 0.00 59.00 1.00 0.07 0.00 60.00 1.00 0.07 0.00 61.00 1.00 0.07 0.00 62.00 1.00 0.07 0.00 63.00 1.00 0.07 0.00 64.00 1.00 0.07 0.00 65.00 1.00 0.07 0.00 66.00 1.00 0.07 0.00 67.00 1.00 0.07 0.00 68.00 1.00 0.07 0.00 69.00 1.00 0.07 0.00 70.00 1.00 0.07 0.00 71.00 1.00 0.07 0.00 72.00 1.00 0.07 0.00 73.00 1.00 0.07 0.00 74.00 1.00 0.07 0.00 75.00 1.00 0.07 0.00 76.00 1.00 0.07 0.00 77.00 1.00 0.07 0.00 78.00 1.00 0.07 0.00 79.00 1.00 0.07 0.00 80.00 1.00 0.07 0.00 81.00 1.00 0.07 0.00 82.00 1.00 0.07 0.00 83.00 1.00 0.07 0.00 84.00 1.00 0.07 0.00 85.00 1.00 0.07 0.00 86.00 1.00 0.07 0.00 87.00 1.00 0.07 0.00 88.00 1.00 0.07 0.00 89.00 1.00 0.07 0.00 90.00 1.00 0.07 0.00 91.00 1.00 0.07 0.00 92.00 1.00 0.07 0.00 93.00 1.00 0.07 0.00 94.00 1.00 0.07 0.00 95.00 1.00 0.07 0.00 96.00 1.00 0.07 0.00 97.00 1.00 0.07 0.00 98.00 1.00 0.07 0.00 99.00 1.00 0.07 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 11S: Bypass #1 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 4.560 58 Woods/grass comb., Good, HSG B 1.020 98 Water Surface, HSG B 5.580 65 Weighted Average 4.560 81.72% Pervious Area 1.020 18.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.9 Direct Entry, Subcatchment 11S: Bypass #1 Hydrograph 1 � � � � � � � � � � � � � � � � � � � ❑Runoff Oharlpttp 6ihr'A4nch Rainfall=1!00 Runoff Area=5.580 at Runoff V0161me=0r060 clf Runoff Depth0.001' LL TcyT16.9 Min +CN'I=6$ 0.00 cfs 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 18 Hydrograph for Subcatchment 11S: Bypass #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.00 6.00 1.00 0.00 0.00 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 52.00 1.00 0.00 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 61.00 1.00 0.00 0.00 62.00 1.00 0.00 0.00 63.00 1.00 0.00 0.00 64.00 1.00 0.00 0.00 65.00 1.00 0.00 0.00 66.00 1.00 0.00 0.00 67.00 1.00 0.00 0.00 68.00 1.00 0.00 0.00 69.00 1.00 0.00 0.00 70.00 1.00 0.00 0.00 71.00 1.00 0.00 0.00 72.00 1.00 0.00 0.00 73.00 1.00 0.00 0.00 74.00 1.00 0.00 0.00 75.00 1.00 0.00 0.00 76.00 1.00 0.00 0.00 77.00 1.00 0.00 0.00 78.00 1.00 0.00 0.00 79.00 1.00 0.00 0.00 80.00 1.00 0.00 0.00 81.00 1.00 0.00 0.00 82.00 1.00 0.00 0.00 83.00 1.00 0.00 0.00 84.00 1.00 0.00 0.00 85.00 1.00 0.00 0.00 86.00 1.00 0.00 0.00 87.00 1.00 0.00 0.00 88.00 1.00 0.00 0.00 89.00 1.00 0.00 0.00 90.00 1.00 0.00 0.00 91.00 1.00 0.00 0.00 92.00 1.00 0.00 0.00 93.00 1.00 0.00 0.00 94.00 1.00 0.00 0.00 95.00 1.00 0.00 0.00 96.00 1.00 0.00 0.00 97.00 1.00 0.00 0.00 98.00 1.00 0.00 0.00 99.00 1.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 12S: Bypass #2 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 1.160 58 Woods/grass comb., Good, HSG B 1.160 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 12S: Bypass #2 Hydrograph � � � � � � � � � � � � � � � � � � � � ■Runoff Charlotte 6yhr'A-inch Rainfall)=1.00" Run'�off Area=1.160 aI Fkunoff VpI6mp=0 060 clf Runoff Depth), O.OW' 3TcT24.9 min LL0 CN=50 0.00 cfs .0 65 70 75 :0 5 •0 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 20 Hydrograph for Subcatchment 12S: Bypass #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.00 6.00 1.00 0.00 0.00 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 52.00 1.00 0.00 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 61.00 1.00 0.00 0.00 62.00 1.00 0.00 0.00 63.00 1.00 0.00 0.00 64.00 1.00 0.00 0.00 65.00 1.00 0.00 0.00 66.00 1.00 0.00 0.00 67.00 1.00 0.00 0.00 68.00 1.00 0.00 0.00 69.00 1.00 0.00 0.00 70.00 1.00 0.00 0.00 71.00 1.00 0.00 0.00 72.00 1.00 0.00 0.00 73.00 1.00 0.00 0.00 74.00 1.00 0.00 0.00 75.00 1.00 0.00 0.00 76.00 1.00 0.00 0.00 77.00 1.00 0.00 0.00 78.00 1.00 0.00 0.00 79.00 1.00 0.00 0.00 80.00 1.00 0.00 0.00 81.00 1.00 0.00 0.00 82.00 1.00 0.00 0.00 83.00 1.00 0.00 0.00 84.00 1.00 0.00 0.00 85.00 1.00 0.00 0.00 86.00 1.00 0.00 0.00 87.00 1.00 0.00 0.00 88.00 1.00 0.00 0.00 89.00 1.00 0.00 0.00 90.00 1.00 0.00 0.00 91.00 1.00 0.00 0.00 92.00 1.00 0.00 0.00 93.00 1.00 0.00 0.00 94.00 1.00 0.00 0.00 95.00 1.00 0.00 0.00 96.00 1.00 0.00 0.00 97.00 1.00 0.00 0.00 98.00 1.00 0.00 0.00 99.00 1.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 13S: Pre -Development #3 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 9.070 55 Woods, Good, HSG B 9.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 13S: Pre -Development #3 Hydrograph � � � � � � � � � � � � � � � � ■Runoff Charlotte 6yhr'A-inch Rainfall1=1.00" Runoff Area=9.070 aI kunoff VpI6mp=Or060 clf Runoff Depth 0!0W 3TcT20.7 min 0 LL CN=55 0.00 cfs .0 65 70 75 :0 5 •0 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 22 Hydrograph for Subcatchment 13S: Pre -Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.00 6.00 1.00 0.00 0.00 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 52.00 1.00 0.00 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 61.00 1.00 0.00 0.00 62.00 1.00 0.00 0.00 63.00 1.00 0.00 0.00 64.00 1.00 0.00 0.00 65.00 1.00 0.00 0.00 66.00 1.00 0.00 0.00 67.00 1.00 0.00 0.00 68.00 1.00 0.00 0.00 69.00 1.00 0.00 0.00 70.00 1.00 0.00 0.00 71.00 1.00 0.00 0.00 72.00 1.00 0.00 0.00 73.00 1.00 0.00 0.00 74.00 1.00 0.00 0.00 75.00 1.00 0.00 0.00 76.00 1.00 0.00 0.00 77.00 1.00 0.00 0.00 78.00 1.00 0.00 0.00 79.00 1.00 0.00 0.00 80.00 1.00 0.00 0.00 81.00 1.00 0.00 0.00 82.00 1.00 0.00 0.00 83.00 1.00 0.00 0.00 84.00 1.00 0.00 0.00 85.00 1.00 0.00 0.00 86.00 1.00 0.00 0.00 87.00 1.00 0.00 0.00 88.00 1.00 0.00 0.00 89.00 1.00 0.00 0.00 90.00 1.00 0.00 0.00 91.00 1.00 0.00 0.00 92.00 1.00 0.00 0.00 93.00 1.00 0.00 0.00 94.00 1.00 0.00 0.00 95.00 1.00 0.00 0.00 96.00 1.00 0.00 0.00 97.00 1.00 0.00 0.00 98.00 1.00 0.00 0.00 99.00 1.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 14S: Post Development #3 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 8.670 55 Woods, Good, HSG B 0.320 58 Woods/grass comb., Good, HSG B 8.990 55 Weighted Average 8.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 14S: Post Development #3 Hydrograph ■ Runoff Oharipttp 6ihr'l4nch Rainfall=1!00 Run�off Area=8.990 at Runoff VQIu',mp=0r000 clf Runoff Depth, 0!001' TcT20.7 Min RCN',=5$ 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 24 Hydrograph for Subcatchment 14S: Post Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.00 6.00 1.00 0.00 0.00 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 52.00 1.00 0.00 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 61.00 1.00 0.00 0.00 62.00 1.00 0.00 0.00 63.00 1.00 0.00 0.00 64.00 1.00 0.00 0.00 65.00 1.00 0.00 0.00 66.00 1.00 0.00 0.00 67.00 1.00 0.00 0.00 68.00 1.00 0.00 0.00 69.00 1.00 0.00 0.00 70.00 1.00 0.00 0.00 71.00 1.00 0.00 0.00 72.00 1.00 0.00 0.00 73.00 1.00 0.00 0.00 74.00 1.00 0.00 0.00 75.00 1.00 0.00 0.00 76.00 1.00 0.00 0.00 77.00 1.00 0.00 0.00 78.00 1.00 0.00 0.00 79.00 1.00 0.00 0.00 80.00 1.00 0.00 0.00 81.00 1.00 0.00 0.00 82.00 1.00 0.00 0.00 83.00 1.00 0.00 0.00 84.00 1.00 0.00 0.00 85.00 1.00 0.00 0.00 86.00 1.00 0.00 0.00 87.00 1.00 0.00 0.00 88.00 1.00 0.00 0.00 89.00 1.00 0.00 0.00 90.00 1.00 0.00 0.00 91.00 1.00 0.00 0.00 92.00 1.00 0.00 0.00 93.00 1.00 0.00 0.00 94.00 1.00 0.00 0.00 95.00 1.00 0.00 0.00 96.00 1.00 0.00 0.00 97.00 1.00 0.00 0.00 98.00 1.00 0.00 0.00 99.00 1.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 25 Summary for Pond 5P: BMP #1 Inflow Area = 12.980 ac, 0.00% Impervious, Inflow Depth = 0.00" for 1-inch event Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 566.50' @ 0.00 hrs Surf.Area= 13,995 sf Storage= 0 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert Avail.Storage Storage Description #1 566.50' 137,597 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 566.50 13,995 0 0 567.00 15,551 7,387 7,387 568.00 17,503 16,527 23,914 569.00 19,519 18,511 42,425 570.00 21,600 20,560 62,984 571.00 23,745 22,673 85,657 572.00 25,954 24,850 110,506 573.00 28,228 27,091 137,597 Device Routing Invert Outlet Devices #1 Primary 561.90' 36.0" Round RCP -Round 36" L= 187.7' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 561.90' / 560.89' S= 0.0054 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 566.50' 1.7" Vert. WQ Orrfice C= 0.600 #3 Device 1 570.10' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.90 Width (feet) 2.50 2.50 #4 Device 1 571.00' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 571.80' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.50' (Free Discharge) L1=RCP_Round 36" (Passes 0.00 cfs of 57.25 cfs potential flow) �2=WQ Orrfice ( Controls 0.00 cfs) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 26 N U 3 0 LL 1 n nn r-fs 0.00 cfs 573 572 571 w w c 570 0 .� w w 569 568 567 Pond 5P: BMP #1 Hydrograph Ihf1OW Aee9=112.980 ae Pdak EIeV=5',66,50' Storage=Q c';f 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Pond 5P: BMP #1 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) Lry ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 27 Pond 5P: BMP #1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 F Surface ❑ Storage 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 28 Hydrograph for Pond 5P: BMP #1 Time Inflow Elevation Outflow Primary Secondary (hours) (cfs) (feet) (cfs) (cfs) (cfs) 0.00 0.00 566.50 0.00 0.00 0.00 2.50 0.00 566.50 0.00 0.00 0.00 5.00 0.00 566.50 0.00 0.00 0.00 7.50 0.00 566.50 0.00 0.00 0.00 10.00 0.00 566.50 0.00 0.00 0.00 12.50 0.00 566.50 0.00 0.00 0.00 15.00 0.00 566.50 0.00 0.00 0.00 17.50 0.00 566.50 0.00 0.00 0.00 20.00 0.00 566.50 0.00 0.00 0.00 22.50 0.00 566.50 0.00 0.00 0.00 25.00 0.00 566.50 0.00 0.00 0.00 27.50 0.00 566.50 0.00 0.00 0.00 30.00 0.00 566.50 0.00 0.00 0.00 32.50 0.00 566.50 0.00 0.00 0.00 35.00 0.00 566.50 0.00 0.00 0.00 37.50 0.00 566.50 0.00 0.00 0.00 40.00 0.00 566.50 0.00 0.00 0.00 42.50 0.00 566.50 0.00 0.00 0.00 45.00 0.00 566.50 0.00 0.00 0.00 47.50 0.00 566.50 0.00 0.00 0.00 50.00 0.00 566.50 0.00 0.00 0.00 52.50 0.00 566.50 0.00 0.00 0.00 55.00 0.00 566.50 0.00 0.00 0.00 57.50 0.00 566.50 0.00 0.00 0.00 60.00 0.00 566.50 0.00 0.00 0.00 62.50 0.00 566.50 0.00 0.00 0.00 65.00 0.00 566.50 0.00 0.00 0.00 67.50 0.00 566.50 0.00 0.00 0.00 70.00 0.00 566.50 0.00 0.00 0.00 72.50 0.00 566.50 0.00 0.00 0.00 75.00 0.00 566.50 0.00 0.00 0.00 77.50 0.00 566.50 0.00 0.00 0.00 80.00 0.00 566.50 0.00 0.00 0.00 82.50 0.00 566.50 0.00 0.00 0.00 85.00 0.00 566.50 0.00 0.00 0.00 87.50 0.00 566.50 0.00 0.00 0.00 90.00 0.00 566.50 0.00 0.00 0.00 92.50 0.00 566.50 0.00 0.00 0.00 95.00 0.00 566.50 0.00 0.00 0.00 97.50 0.00 566.50 0.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 29 Stage -Discharge for Pond 5P: BMP #1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 566.50 0.00 0.00 0.00 566.60 0.01 0.01 0.00 566.70 0.03 0.03 0.00 566.80 0.04 0.04 0.00 566.90 0.04 0.04 0.00 567.00 0.05 0.05 0.00 567.10 0.06 0.06 0.00 567.20 0.06 0.06 0.00 567.30 0.06 0.06 0.00 567.40 0.07 0.07 0.00 567.50 0.07 0.07 0.00 567.60 0.08 0.08 0.00 567.70 0.08 0.08 0.00 567.80 0.08 0.08 0.00 567.90 0.09 0.09 0.00 568.00 0.09 0.09 0.00 568.10 0.09 0.09 0.00 568.20 0.10 0.10 0.00 568.30 0.10 0.10 0.00 568.40 0.10 0.10 0.00 568.50 0.11 0.11 0.00 568.60 0.11 0.11 0.00 568.70 0.11 0.11 0.00 568.80 0.11 0.11 0.00 568.90 0.12 0.12 0.00 569.00 0.12 0.12 0.00 569.10 0.12 0.12 0.00 569.20 0.12 0.12 0.00 569.30 0.13 0.13 0.00 569.40 0.13 0.13 0.00 569.50 0.13 0.13 0.00 569.60 0.13 0.13 0.00 569.70 0.13 0.13 0.00 569.80 0.14 0.14 0.00 569.90 0.14 0.14 0.00 570.00 0.14 0.14 0.00 570.10 0.14 0.14 0.00 570.20 0.40 0.40 0.00 570.30 0.88 0.88 0.00 570.40 1.49 1.49 0.00 570.50 2.22 2.22 0.00 570.60 3.05 3.05 0.00 570.70 3.96 3.96 0.00 570.80 4.95 4.95 0.00 570.90 6.02 6.02 0.00 571.00 7.15 7.15 0.00 571.10 9.74 9.74 0.00 571.20 13.56 13.56 0.00 571.30 18.18 18.18 0.00 571.40 23.47 23.47 0.00 571.50 29.33 29.33 0.00 571.60 35.72 35.72 0.00 571.70 42.59 42.59 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 571.80 49.90 49.90 0.00 571.90 58.42 57.63 0.79 572.00 67.98 65.75 2.23 572.10 78.40 74.25 4.15 572.20 89.59 83.11 6.48 572.30 101.61 92.31 9.30 572.40 114.40 101.85 12.55 572.50 119.76 103.98 15.78 572.60 123.83 104.58 19.25 572.70 128.10 105.18 22.92 572.80 132.57 105.77 26.80 572.90 137.34 106.37 30.98 573.00 142.31 106.95 35.36 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 30 Stage -Area -Storage for Pond 5P: BMP #1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 566.50 13,995 0 566.60 14,306 1,415 566.70 14,617 2,861 566.80 14,929 4,339 566.90 15,240 5,847 567.00 15,551 7,387 567.10 15,746 8,951 567.20 15,941 10,536 567.30 16,137 12,140 567.40 16,332 13,763 567.50 16,527 15,406 567.60 16,722 17,068 567.70 16,917 18,750 567.80 17,113 20,452 567.90 17,308 22,173 568.00 17,503 23,914 568.10 17,705 25,674 568.20 17,906 27,454 568.30 18,108 29,255 568.40 18,309 31,076 568.50 18,511 32,917 568.60 18,713 34,778 568.70 18,914 36,660 568.80 19,116 38,561 568.90 19,317 40,483 569.00 19,519 42,425 569.10 19,727 44,387 569.20 19,935 46,370 569.30 20,143 48,374 569.40 20,351 50,399 569.50 20,560 52,444 569.60 20,768 54,510 569.70 20,976 56,598 569.80 21,184 58,706 569.90 21,392 60,834 570.00 21,600 62,984 570.10 21,815 65,155 570.20 22,029 67,347 570.30 22,243 69,561 570.40 22,458 71,796 570.50 22,673 74,052 570.60 22,887 76,330 570.70 23,102 78,630 570.80 23,316 80,950 570.90 23,530 83,293 571.00 23,745 85,657 571.10 23,966 88,042 571.20 24,187 90,450 571.30 24,408 92,879 571.40 24,629 95,331 571.50 24,850 97,805 571.60 25,070 100,301 571.70 25,291 102,819 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 571.80 25,512 105,359 571.90 25,733 107,922 572.00 25,954 110,506 572.10 26,181 113,113 572.20 26,409 115,742 572.30 26,636 118,395 572.40 26,864 121,070 572.50 27,091 123,767 572.60 27,318 126,488 572.70 27,546 129,231 572.80 27,773 131,997 572.90 28,001 134,786 573.00 28,228 137,597 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 31 Summary for Pond 6P: BMP #2 Inflow Area = 9.670 ac, 0.00% Impervious, Inflow Depth = 0.08" for 1-inch event Inflow = 1.08 cfs @ 3.23 hrs, Volume= 0.067 of Outflow = 0.06 cfs @ 6.07 hrs, Volume= 0.067 af, Atten= 94%, Lag= 170.3 min Primary = 0.06 cfs @ 6.07 hrs, Volume= 0.067 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 558.74' @ 6.07 hrs Surf.Area= 10,474 sf Storage= 2,449 cf Plug -Flow detention time= 844.2 min calculated for 0.067 of (99% of inflow) Center -of -Mass det. time= 843.2 min ( 1,086.3 - 243.1 ) Volume Invert Avail.Storage Storage Description #1 558.50' 109,406 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 558.50 9,762 0 0 559.00 11,233 5,249 5,249 560.00 13,167 12,200 17,449 561.00 15,175 14,171 31,620 562.00 17,251 16,213 47,833 563.00 19,395 18,323 66,156 564.00 21,608 20,502 86,657 565.00 23,890 22,749 109,406 Device Routing Invert Outlet Devices #1 Primary 553.90' 36.0" Round RCP -Round 36" L= 92.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 553.90' / 553.00' S= 0.0097 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 558.50' 2.5" Vert. WQ Orrfice C= 0.600 #3 Device 1 561.05' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.15 Width (feet) 1.00 1.00 #4 Device 1 562.20' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 563.95' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.06 cfs @ 6.07 hrs HW=558.74' (Free Discharge) L1=RCP_Round 36" (Passes 0.06 cfs of 68.66 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.06 cfs @ 1.79 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=558.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 32 Pond 6P: BMP #2 Hydrograph 1.08 cfs ■ Inflow El Ouff low - --------- --- -- -- -- -- ---It�lflbw��4�-ecI-�.-6 V at, - ■ Primary � � � � � � ■ Secondary P!eclk EIev=5$8.14';' 1 StbragO=2,449 cf N I I I I I I I I I I I I I I I I I I U I I I I I I I I I I I I I I I I I I I 3 I I I I I I I I I I I I I I I I I I I o I I I I I I I I I I I I I I I I I I LL 0.06 cfs 0.00 cfs 565 564 563 w w c 562 0 .� w w 561 560 559 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Pond 6P: BMP #2 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 33 Pond 6P: BMP #2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 0 20,000 40,000 60,000 80,000 100,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 34 Hydrograph for Pond 6P: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 558.50 0.00 0.00 0.00 2.50 0.00 0 558.50 0.00 0.00 0.00 5.00 0.16 2,187 558.72 0.05 0.05 0.00 7.50 0.00 2,162 558.71 0.05 0.05 0.00 10.00 0.00 1,725 558.67 0.04 0.04 0.00 12.50 0.00 1,399 558.64 0.03 0.03 0.00 15.00 0.00 1,157 558.62 0.02 0.02 0.00 17.50 0.00 973 558.60 0.02 0.02 0.00 20.00 0.00 832 558.58 0.01 0.01 0.00 22.50 0.00 725 558.57 0.01 0.01 0.00 25.00 0.00 643 558.57 0.01 0.01 0.00 27.50 0.00 575 558.56 0.01 0.01 0.00 30.00 0.00 515 558.55 0.01 0.01 0.00 32.50 0.00 461 558.55 0.01 0.01 0.00 35.00 0.00 413 558.54 0.01 0.01 0.00 37.50 0.00 369 558.54 0.00 0.00 0.00 40.00 0.00 331 558.53 0.00 0.00 0.00 42.50 0.00 296 558.53 0.00 0.00 0.00 45.00 0.00 265 558.53 0.00 0.00 0.00 47.50 0.00 237 558.52 0.00 0.00 0.00 50.00 0.00 212 558.52 0.00 0.00 0.00 52.50 0.00 190 558.52 0.00 0.00 0.00 55.00 0.00 170 558.52 0.00 0.00 0.00 57.50 0.00 152 558.52 0.00 0.00 0.00 60.00 0.00 136 558.51 0.00 0.00 0.00 62.50 0.00 122 558.51 0.00 0.00 0.00 65.00 0.00 109 558.51 0.00 0.00 0.00 67.50 0.00 98 558.51 0.00 0.00 0.00 70.00 0.00 88 558.51 0.00 0.00 0.00 72.50 0.00 78 558.51 0.00 0.00 0.00 75.00 0.00 70 558.51 0.00 0.00 0.00 77.50 0.00 63 558.51 0.00 0.00 0.00 80.00 0.00 56 558.51 0.00 0.00 0.00 82.50 0.00 50 558.51 0.00 0.00 0.00 85.00 0.00 45 558.50 0.00 0.00 0.00 87.50 0.00 40 558.50 0.00 0.00 0.00 90.00 0.00 36 558.50 0.00 0.00 0.00 92.50 0.00 32 558.50 0.00 0.00 0.00 95.00 0.00 29 558.50 0.00 0.00 0.00 97.50 0.00 26 558.50 0.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 35 Stage -Discharge for Pond 6P: BMP #2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 558.50 0.00 0.00 0.00 558.60 0.02 0.02 0.00 558.70 0.05 0.05 0.00 558.80 0.07 0.07 0.00 558.90 0.09 0.09 0.00 559.00 0.10 0.10 0.00 559.10 0.12 0.12 0.00 559.20 0.13 0.13 0.00 559.30 0.14 0.14 0.00 559.40 0.15 0.15 0.00 559.50 0.16 0.16 0.00 559.60 0.16 0.16 0.00 559.70 0.17 0.17 0.00 559.80 0.18 0.18 0.00 559.90 0.19 0.19 0.00 560.00 0.19 0.19 0.00 560.10 0.20 0.20 0.00 560.20 0.21 0.21 0.00 560.30 0.21 0.21 0.00 560.40 0.22 0.22 0.00 560.50 0.23 0.23 0.00 560.60 0.23 0.23 0.00 560.70 0.24 0.24 0.00 560.80 0.24 0.24 0.00 560.90 0.25 0.25 0.00 561.00 0.25 0.25 0.00 561.10 0.30 0.30 0.00 561.20 0.45 0.45 0.00 561.30 0.68 0.68 0.00 561.40 0.95 0.95 0.00 561.50 1.27 1.27 0.00 561.60 1.62 1.62 0.00 561.70 2.01 2.01 0.00 561.80 2.42 2.42 0.00 561.90 2.86 2.86 0.00 562.00 3.33 3.33 0.00 562.10 3.83 3.83 0.00 562.20 4.35 4.35 0.00 562.30 6.44 6.44 0.00 562.40 9.84 9.84 0.00 562.50 14.10 14.10 0.00 562.60 19.06 19.06 0.00 562.70 24.61 24.61 0.00 562.80 30.71 30.71 0.00 562.90 37.30 37.30 0.00 563.00 44.36 44.36 0.00 563.10 51.84 51.84 0.00 563.20 59.72 59.72 0.00 563.30 67.99 67.99 0.00 563.40 76.63 76.63 0.00 563.50 85.62 85.62 0.00 563.60 94.95 94.95 0.00 563.70 102.84 102.84 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 563.80 106.13 106.13 0.00 563.90 109.32 109.32 0.00 564.00 112.70 112.43 0.28 564.10 116.89 115.44 1.45 564.20 121.52 118.39 3.13 564.30 124.72 119.46 5.26 564.40 128.01 120.18 7.83 564.50 131.76 120.89 10.87 564.60 135.74 121.60 14.14 564.70 139.79 122.30 17.49 564.80 144.07 123.01 21.06 564.90 148.54 123.70 24.84 565.00 153.26 124.40 28.86 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 36 Stage -Area -Storage for Pond 6P: BMP #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 558.50 9,762 0 558.60 10,056 991 558.70 10,350 2,011 558.80 10,645 3,061 558.90 10,939 4,140 559.00 11,233 5,249 559.10 11,426 6,382 559.20 11,620 7,534 559.30 11,813 8,706 559.40 12,007 9,897 559.50 12,200 11,107 559.60 12,393 12,337 559.70 12,587 13,586 559.80 12,780 14,854 559.90 12,974 16,142 560.00 13,167 17,449 560.10 13,368 18,775 560.20 13,569 20,122 560.30 13,769 21,489 560.40 13,970 22,876 560.50 14,171 24,283 560.60 14,372 25,710 560.70 14,573 27,158 560.80 14,773 28,625 560.90 14,974 30,112 561.00 15,175 31,620 561.10 15,383 33,148 561.20 15,590 34,696 561.30 15,798 36,266 561.40 16,005 37,856 561.50 16,213 39,467 561.60 16,421 41,098 561.70 16,628 42,751 561.80 16,836 44,424 561.90 17,043 46,118 562.00 17,251 47,833 562.10 17,465 49,569 562.20 17,680 51,326 562.30 17,894 53,105 562.40 18,109 54,905 562.50 18,323 56,726 562.60 18,537 58,569 562.70 18,752 60,434 562.80 18,966 62,320 562.90 19,181 64,227 563.00 19,395 66,156 563.10 19,616 68,106 563.20 19,838 70,079 563.30 20,059 72,074 563.40 20,280 74,091 563.50 20,502 76,130 563.60 20,723 78,191 563.70 20,944 80,274 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 563.80 21,165 82,380 563.90 21,387 84,508 564.00 21,608 86,657 564.10 21,836 88,829 564.20 22,064 91,024 564.30 22,293 93,242 564.40 22,521 95,483 564.50 22,749 97,747 564.60 22,977 100,033 564.70 23,205 102,342 564.80 23,434 104,674 564.90 23,662 107,029 565.00 23,890 109,406 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 37 Summary for Pond 7P: BMP #3 Inflow Area = 6.900 ac, 0.00% Impervious, Inflow Depth = 0.07" for 1-inch event Inflow = 0.58 cfs @ 3.25 hrs, Volume= 0.040 of Outflow = 0.02 cfs @ 6.10 hrs, Volume= 0.039 af, Atten= 96%, Lag= 170.6 min Primary = 0.02 cfs @ 6.10 hrs, Volume= 0.039 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 568.67' @ 6.10 hrs Surf.Area= 9,505 sf Storage= 1,579 cf Plug -Flow detention time= 1,193.0 min calculated for 0.039 of (98% of inflow) Center -of -Mass det. time= 1,192.6 min ( 1,438.8 - 246.3 ) Volume Invert Avail.Storage Storage Description #1 568.50' 91,933 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 568.50 9,080 0 0 569.00 10,331 4,853 4,853 570.00 11,639 10,985 15,838 571.00 13,003 12,321 28,159 572.00 14,424 13,714 41,872 573.00 15,901 15,163 57,035 574.00 17,435 16,668 73,703 575.00 19,025 18,230 91,933 Device Routing Invert Outlet Devices #1 Primary 565.31' 24.0" Round RCP -Round 24" L= 61.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 565.31' / 565.00' S= 0.0051 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 568.50' 1.7" Vert. WQ Orfice C= 0.600 #3 Device 1 571.20' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 2.30 Width (feet) 0.70 0.70 #4 Device 1 573.50' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 574.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.02 cfs @ 6.10 hrs HW=568.67' (Free Discharge) L1=RCP_Round 24" (Passes 0.02 cfs of 23.25 cfs potential flow) �2=WQ Orfice (Orifice Controls 0.02 cfs @ 1.52 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=568.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 38 Pond 7P: BMP #3 Hydrograph --r--r--r--r--r--r--t r--r--r--r--r--r--r--r--r--r--r--r-- _______________________________________________________ ■Inflow 0.58 cfs ❑ outflow --i --I --i --i --i --i --i --i--i_1IIIIVV 11i1eQ�V..7V�t Primary 0.65 ■ Secondary o.sElev 0.55 --Ili --Ili --Ili --Ili --Ili --Ili --Ili --Ili --Ili --i -_+- t� - +--+--+--+--+--+--+--+--+--+--+--+So_r,age_15670-Cf 0.5 0.45 - L--L--L--L--L--L--L--L--L--L--L--i--i--i--L--L--L--L--L- 0.4 w ��--��--��--r--r--r--r--r--r--r--r--r--r--r--r--r--r--r--r-- 0.35 LL Z - 0.25 0.2 Jl 0.02 cfs cfs 575 574 573 w w c 572 0 .� w w 571 570 569 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Pond 7P: BMP #3 Stage -Discharge 0 10 20 30 40 50 60 70 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 39 Pond 7P: BMP #3 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 40 Hydrograph for Pond 7P: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 568.50 0.00 0.00 0.00 2.50 0.00 0 568.50 0.00 0.00 0.00 5.00 0.10 1,352 568.65 0.02 0.02 0.00 7.50 0.00 1,468 568.66 0.02 0.02 0.00 10.00 0.00 1,280 568.64 0.02 0.02 0.00 12.50 0.00 1,115 568.62 0.02 0.02 0.00 15.00 0.00 977 568.61 0.01 0.01 0.00 17.50 0.00 862 568.59 0.01 0.01 0.00 20.00 0.00 767 568.58 0.01 0.01 0.00 22.50 0.00 687 568.57 0.01 0.01 0.00 25.00 0.00 622 568.57 0.01 0.01 0.00 27.50 0.00 566 568.56 0.01 0.01 0.00 30.00 0.00 516 568.56 0.01 0.01 0.00 32.50 0.00 470 568.55 0.00 0.00 0.00 35.00 0.00 429 568.55 0.00 0.00 0.00 37.50 0.00 391 568.54 0.00 0.00 0.00 40.00 0.00 356 568.54 0.00 0.00 0.00 42.50 0.00 325 568.54 0.00 0.00 0.00 45.00 0.00 296 568.53 0.00 0.00 0.00 47.50 0.00 270 568.53 0.00 0.00 0.00 50.00 0.00 246 568.53 0.00 0.00 0.00 52.50 0.00 224 568.52 0.00 0.00 0.00 55.00 0.00 205 568.52 0.00 0.00 0.00 57.50 0.00 186 568.52 0.00 0.00 0.00 60.00 0.00 170 568.52 0.00 0.00 0.00 62.50 0.00 155 568.52 0.00 0.00 0.00 65.00 0.00 141 568.52 0.00 0.00 0.00 67.50 0.00 129 568.51 0.00 0.00 0.00 70.00 0.00 117 568.51 0.00 0.00 0.00 72.50 0.00 107 568.51 0.00 0.00 0.00 75.00 0.00 98 568.51 0.00 0.00 0.00 77.50 0.00 89 568.51 0.00 0.00 0.00 80.00 0.00 81 568.51 0.00 0.00 0.00 82.50 0.00 74 568.51 0.00 0.00 0.00 85.00 0.00 67 568.51 0.00 0.00 0.00 87.50 0.00 61 568.51 0.00 0.00 0.00 90.00 0.00 56 568.51 0.00 0.00 0.00 92.50 0.00 51 568.51 0.00 0.00 0.00 95.00 0.00 47 568.51 0.00 0.00 0.00 97.50 0.00 42 568.50 0.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 41 Stage -Discharge for Pond 7P: BMP #3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 568.50 0.00 0.00 0.00 568.60 0.01 0.01 0.00 568.70 0.03 0.03 0.00 568.80 0.04 0.04 0.00 568.90 0.04 0.04 0.00 569.00 0.05 0.05 0.00 569.10 0.06 0.06 0.00 569.20 0.06 0.06 0.00 569.30 0.06 0.06 0.00 569.40 0.07 0.07 0.00 569.50 0.07 0.07 0.00 569.60 0.08 0.08 0.00 569.70 0.08 0.08 0.00 569.80 0.08 0.08 0.00 569.90 0.09 0.09 0.00 570.00 0.09 0.09 0.00 570.10 0.09 0.09 0.00 570.20 0.10 0.10 0.00 570.30 0.10 0.10 0.00 570.40 0.10 0.10 0.00 570.50 0.11 0.11 0.00 570.60 0.11 0.11 0.00 570.70 0.11 0.11 0.00 570.80 0.11 0.11 0.00 570.90 0.12 0.12 0.00 571.00 0.12 0.12 0.00 571.10 0.12 0.12 0.00 571.20 0.12 0.12 0.00 571.30 0.20 0.20 0.00 571.40 0.33 0.33 0.00 571.50 0.51 0.51 0.00 571.60 0.71 0.71 0.00 571.70 0.94 0.94 0.00 571.80 1.20 1.20 0.00 571.90 1.48 1.48 0.00 572.00 1.78 1.78 0.00 572.10 2.10 2.10 0.00 572.20 2.44 2.44 0.00 572.30 2.79 2.79 0.00 572.40 3.16 3.16 0.00 572.50 3.55 3.55 0.00 572.60 3.95 3.95 0.00 572.70 4.37 4.37 0.00 572.80 4.80 4.80 0.00 572.90 5.24 5.24 0.00 573.00 5.70 5.70 0.00 573.10 6.17 6.17 0.00 573.20 6.65 6.65 0.00 573.30 7.14 7.14 0.00 573.40 7.65 7.65 0.00 573.50 8.17 8.17 0.00 573.60 10.28 10.28 0.00 573.70 13.71 13.71 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 573.80 18.00 18.00 0.00 573.90 23.00 23.00 0.00 574.00 28.61 28.61 0.00 574.10 35.54 34.75 0.79 574.20 43.62 41.39 2.23 574.30 52.64 48.49 4.15 574.40 55.43 48.95 6.48 574.50 58.58 49.28 9.30 574.60 62.16 49.61 12.55 574.70 65.72 49.94 15.78 574.80 69.51 50.26 19.25 574.90 73.50 50.58 22.92 575.00 77.70 50.90 26.80 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 42 Stage -Area -Storage for Pond 7P: BMP #3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 568.50 9,080 0 568.60 9,330 921 568.70 9,580 1,866 568.80 9,831 2,837 568.90 10,081 3,832 569.00 10,331 4,853 569.10 10,462 5,892 569.20 10,593 6,945 569.30 10,723 8,011 569.40 10,854 9,090 569.50 10,985 10,182 569.60 11,116 11,287 569.70 11,247 12,405 569.80 11,377 13,536 569.90 11,508 14,680 570.00 11,639 15,838 570.10 11,775 17,008 570.20 11,912 18,193 570.30 12,048 19,391 570.40 12,185 20,602 570.50 12,321 21,828 570.60 12,457 23,067 570.70 12,594 24,319 570.80 12,730 25,585 570.90 12,867 26,865 571.00 13,003 28,159 571.10 13,145 29,466 571.20 13,287 30,788 571.30 13,429 32,124 571.40 13,571 33,474 571.50 13,714 34,838 571.60 13,856 36,216 571.70 13,998 37,609 571.80 14,140 39,016 571.90 14,282 40,437 572.00 14,424 41,872 572.10 14,572 43,322 572.20 14,719 44,787 572.30 14,867 46,266 572.40 15,015 47,760 572.50 15,163 49,269 572.60 15,310 50,793 572.70 15,458 52,331 572.80 15,606 53,884 572.90 15,753 55,452 573.00 15,901 57,035 573.10 16,054 58,633 573.20 16,208 60,246 573.30 16,361 61,874 573.40 16,515 63,518 573.50 16,668 65,177 573.60 16,821 66,851 573.70 16,975 68,541 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 573.80 17,128 70,246 573.90 17,282 71,967 574.00 17,435 73,703 574.10 17,594 75,454 574.20 17,753 77,222 574.30 17,912 79,005 574.40 18,071 80,804 574.50 18,230 82,619 574.60 18,389 84,450 574.70 18,548 86,297 574.80 18,707 88,160 574.90 18,866 90,038 575.00 19,025 91,933 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 43 Summary for Link 17L: Post Development #2 Inflow Area = 8.060 ac, 0.00% Impervious, Inflow Depth > 0.06" for 1-inch event Inflow = 0.02 cfs @ 6.10 hrs, Volume= 0.039 of Primary = 0.02 cfs @ 6.10 hrs, Volume= 0.039 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 17L: Post Development #2 Hydrograph ■ Inflow 0.026 � --1--J---1---L--1--J---1---L--1---------L--1------'-- � � � � � � � � � � � ❑Primary 0.024 0.02 cfs ---------T------ 1 ----------- - -- - #� 1 i4'r�=O-.N1 ' aG 0.022 -----r--7--� ---r--rt--� ---r--rt--------r--rt---I---r 0.02 ---r 0.018 0.016 y �- ----i--��---'� I I I --L----��---'� I I I I --L----��---'�--L--------'� - I I I I I I I I I 0.014 -- -- -- ------ ----------- ----------- ---------- 3 2 0.012 LL T--y --T--y---I---r--rt---I---r--r--rt---I---r--r--rt- -- I---r- 0.01 T--7-- -T- -T- -- ---T-----------T-- ---------T-----I---T - 0.008 T-- - - - -I- T-- -I---T T---I---T - 0.006 I I I I I I I I I I I I I I I - 0.004 1--J---1---L--T-- -L--1--J---1---L--1------'-- 0.002 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 44 Hydrograph for Link 17L: Post Development #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.01 0.00 0.01 5.00 0.02 0.00 0.02 6.00 0.02 0.00 0.02 7.00 0.02 0.00 0.02 8.00 0.02 0.00 0.02 9.00 0.02 0.00 0.02 10.00 0.02 0.00 0.02 11.00 0.02 0.00 0.02 12.00 0.02 0.00 0.02 13.00 0.02 0.00 0.02 14.00 0.02 0.00 0.02 15.00 0.01 0.00 0.01 16.00 0.01 0.00 0.01 17.00 0.01 0.00 0.01 18.00 0.01 0.00 0.01 19.00 0.01 0.00 0.01 20.00 0.01 0.00 0.01 21.00 0.01 0.00 0.01 22.00 0.01 0.00 0.01 23.00 0.01 0.00 0.01 24.00 0.01 0.00 0.01 25.00 0.01 0.00 0.01 26.00 0.01 0.00 0.01 27.00 0.01 0.00 0.01 28.00 0.01 0.00 0.01 29.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 31.00 0.01 0.00 0.01 32.00 0.00 0.00 0.00 33.00 0.00 0.00 0.00 34.00 0.00 0.00 0.00 35.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 38.00 0.00 0.00 0.00 39.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 42.00 0.00 0.00 0.00 43.00 0.00 0.00 0.00 44.00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 46.00 0.00 0.00 0.00 47.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 49.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 63.00 0.00 0.00 0.00 64.00 0.00 0.00 0.00 65.00 0.00 0.00 0.00 66.00 0.00 0.00 0.00 67.00 0.00 0.00 0.00 68.00 0.00 0.00 0.00 69.00 0.00 0.00 0.00 70.00 0.00 0.00 0.00 71.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 73.00 0.00 0.00 0.00 74.00 0.00 0.00 0.00 75.00 0.00 0.00 0.00 76.00 0.00 0.00 0.00 77.00 0.00 0.00 0.00 78.00 0.00 0.00 0.00 79.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 81.00 0.00 0.00 0.00 82.00 0.00 0.00 0.00 83.00 0.00 0.00 0.00 84.00 0.00 0.00 0.00 85.00 0.00 0.00 0.00 86.00 0.00 0.00 0.00 87.00 0.00 0.00 0.00 88.00 0.00 0.00 0.00 89.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 91.00 0.00 0.00 0.00 92.00 0.00 0.00 0.00 93.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 95.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 97.00 0.00 0.00 0.00 98.00 0.00 0.00 0.00 99.00 0.00 0.00 0.00 Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 45 Summary for Link 18L: Post Development #1 Inflow Area = 28.230 ac, 3.61% Impervious, Inflow Depth > 0.03" for 1-inch event Inflow = 0.06 cfs @ 6.07 hrs, Volume= 0.067 of Primary = 0.06 cfs @ 6.07 hrs, Volume= 0.067 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 18L: Post Development #1 Hydrograph ,I ---I------I--- I� ---II ---IIII---II--- I� ---II---II---I� -- I� ---II---II---I� -- I� ---II---II---I� - ■Inflow ❑ Primary 0.065 0.06 CfS--- -----+--------L--1---1---1---L--1---1---1---L--1---1---I-- -Y---r--r--Y--r---r--r- Y- - 0.06 I I 0.055 ----I---; I I ------I---; I I I I I ------I---; I I I I I I I I I ------I---;---I---; - 0.05 --1---L--1--J---1---L--1---------L--1---------L--1------I-- I I I I I I I I I I I I I I I I I 0.045 --I---+--+--+---+--+--+--+---+--+--+--+---+--+--+------+- 0.04 -----r--+--y------r--rt------r--r--rt------r--r--rt------r- y I I I I I I I I I I I I I I I I I 0.035-------------r-----i--r 3 I I I I I I I I I I I I I I I I ° FL0.03--------I -------------I -------------I -------------I------I-- 0.025 + L--+-- ---L--1---1---I- L 1 L 1 0.02 Y r r--Y r---I r--Y---I --r--Y---------r- -Y - - - I i 0.015 + 1- I I I I I I I I '--1---I- 0.01 i I I --L--1--J------L--1-------L--1------I-- I I I I I I I I I I 0.005 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 46 Hydrograph for Link 18L: Post Development #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.04 0.00 0.04 5.00 0.05 0.00 0.05 6.00 0.06 0.00 0.06 7.00 0.06 0.00 0.06 8.00 0.05 0.00 0.05 9.00 0.05 0.00 0.05 10.00 0.04 0.00 0.04 11.00 0.04 0.00 0.04 12.00 0.03 0.00 0.03 13.00 0.03 0.00 0.03 14.00 0.03 0.00 0.03 15.00 0.02 0.00 0.02 16.00 0.02 0.00 0.02 17.00 0.02 0.00 0.02 18.00 0.02 0.00 0.02 19.00 0.02 0.00 0.02 20.00 0.01 0.00 0.01 21.00 0.01 0.00 0.01 22.00 0.01 0.00 0.01 23.00 0.01 0.00 0.01 24.00 0.01 0.00 0.01 25.00 0.01 0.00 0.01 26.00 0.01 0.00 0.01 27.00 0.01 0.00 0.01 28.00 0.01 0.00 0.01 29.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 31.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 33.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 35.00 0.01 0.00 0.01 36.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 38.00 0.00 0.00 0.00 39.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 42.00 0.00 0.00 0.00 43.00 0.00 0.00 0.00 44.00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 46.00 0.00 0.00 0.00 47.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 49.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 63.00 0.00 0.00 0.00 64.00 0.00 0.00 0.00 65.00 0.00 0.00 0.00 66.00 0.00 0.00 0.00 67.00 0.00 0.00 0.00 68.00 0.00 0.00 0.00 69.00 0.00 0.00 0.00 70.00 0.00 0.00 0.00 71.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 73.00 0.00 0.00 0.00 74.00 0.00 0.00 0.00 75.00 0.00 0.00 0.00 76.00 0.00 0.00 0.00 77.00 0.00 0.00 0.00 78.00 0.00 0.00 0.00 79.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 81.00 0.00 0.00 0.00 82.00 0.00 0.00 0.00 83.00 0.00 0.00 0.00 84.00 0.00 0.00 0.00 85.00 0.00 0.00 0.00 86.00 0.00 0.00 0.00 87.00 0.00 0.00 0.00 88.00 0.00 0.00 0.00 89.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 91.00 0.00 0.00 0.00 92.00 0.00 0.00 0.00 93.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 95.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 97.00 0.00 0.00 0.00 98.00 0.00 0.00 0.00 99.00 0.00 0.00 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 47 Time span=0.00-99.00 hrs, dt=0.05 hrs, 1981 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre-Development#1 Runoff Area=30.590 ac 3.53% Impervious Runoff Depth=0.19" Tc=21.7 min CN=57 Runoff=1.93 cfs 0.488 of Subcatchment2S: Pre-Development#2 Runoff Area=5.620 ac 0.00% Impervious Runoff Depth=0.15" Tc=24.9 min CN=55 Runoff=0.18 cfs 0.069 of Subcatchment8S: BMP #1 Runoff Area=12.980 ac 0.00% Impervious Runoff Depth=0.36" Tc=5.0 min CN=63 Runoff=6.34 cfs 0.385 of Subcatchment9S: BMP #2 Runoff Area=9.670 ac 0.00% Impervious Runoff Depth=1.11" Tc=5.0 min CN=80 Runoff=19.31 cfs 0.894 of Subcatchment 10S: BMP #3 Runoff Area=6.900 ac 0.00% Impervious Runoff Depth=1.05" Tc=5.0 min CN=79 Runoff=13.03 cfs 0.605 of Subcatchment 11 S: Bypass #1 Runoff Area=5.580 ac 18.28% Impervious Runoff Depth=0.42" Tc=16.9 min CN=65 Runoff=2.02 cfs 0.196 of Subcatchment 12S: Bypass #2 Runoff Area=1.160 ac 0.00% Impervious Runoff Depth=0.22" Tc=24.9 min CN=58 Runoff=0.09 cfs 0.021 of Subcatchment 13S: Pre-Development#3 Runoff Area=9.070 ac 0.00% Impervious Runoff Depth=0.15" Tc=20.7 min CN=55 Runoff=0.30 cfs 0.111 of Subcatchment14S: Post Development#3 Runoff Area=8.990 ac 0.00% Impervious Runoff Depth=0.15" Tc=20.7 min CN=55 Runoff=0.29 cfs 0.110 of Pond 5P: BMP #1 Peak Elev=567.42' Storage=14,131 cf Inflow=6.34 cfs 0.385 of Primary=0.07 cfs 0.341 of Secondary=0.00 cfs 0.000 of Outflow=0.07 cfs 0.341 of Pond 6P: BMP #2 Peak EIev=560.80' Storage=28,646 cf Inflow=19.31 cfs 0.894 of Primary=0.24 cfs 0.884 of Secondary=0.00 cfs 0.000 of Outflow=0.24 cfs 0.884 of Pond 7P: BMP #3 Peak EIev=570.51' Storage=21,948 cf Inflow=13.03 cfs 0.605 of Primary=0.11 cfs 0.544 of Secondary=0.00 cfs 0.000 of Outflow=0.11 cfs 0.544 of Link 17L: Post Development#2 Inflow=0.17 cfs 0.565 of Primary=0.17 cfs 0.565 of Link 18L: Post Development#1 Inflow=2.25 cfs 1.421 of Primary=2.25 cfs 1.421 of Total Runoff Area = 90.560 ac Runoff Volume = 2.879 of Average Runoff Depth = 0.38" 97.68% Pervious = 88.460 ac 2.32% Impervious = 2.100 ac Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment 1S: Pre -Development #1 Runoff = 1.93 cfs @ 12.28 hrs, Volume= 0.488 af, Depth= 0.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 29.510 55 Woods, Good, HSG B 1.020 98 Water Surface, HSG B 0.060 98 Paved roads w/curbs & sewers, HSG B 30.590 57 Weighted Average 29.510 96.47% Pervious Area 1.080 3.53% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.7 Direct Entry, Subcatchment 1S: Pre -Development #1 Hydrograph 1.93 --'--- �',---'---'----'---- � � � � � � � � �I ---'-- ■Runoff 2 cfs Type I'',I 2'4-h'',r 1yr•-24hr Rainfall=2!81 Renoff Area=80.590 at. Runoff VQIu'',m�=0r48'',8 �f N I I I I I I I I I I I � I_ I � ------ Runoff -Depth, 0.191'- 1TcT21.7 wnih RCN',=57 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 49 Hydrograph for Subcatchment 1S: Pre -Development #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.02 0.14 13.00 2.17 0.05 0.98 14.00 2.30 0.08 0.66 15.00 2.40 0.09 0.54 16.00 2.47 0.11 0.46 17.00 2.53 0.12 0.41 18.00 2.59 0.14 0.38 19.00 2.64 0.15 0.34 20.00 2.68 0.16 0.30 21.00 2.71 0.17 0.28 22.00 2.75 0.17 0.27 23.00 2.78 0.18 0.27 24.00 2.81 0.19 0.26 25.00 2.81 0.19 0.00 26.00 2.81 0.19 0.00 27.00 2.81 0.19 0.00 28.00 2.81 0.19 0.00 29.00 2.81 0.19 0.00 30.00 2.81 0.19 0.00 31.00 2.81 0.19 0.00 32.00 2.81 0.19 0.00 33.00 2.81 0.19 0.00 34.00 2.81 0.19 0.00 35.00 2.81 0.19 0.00 36.00 2.81 0.19 0.00 37.00 2.81 0.19 0.00 38.00 2.81 0.19 0.00 39.00 2.81 0.19 0.00 40.00 2.81 0.19 0.00 41.00 2.81 0.19 0.00 42.00 2.81 0.19 0.00 43.00 2.81 0.19 0.00 44.00 2.81 0.19 0.00 45.00 2.81 0.19 0.00 46.00 2.81 0.19 0.00 47.00 2.81 0.19 0.00 48.00 2.81 0.19 0.00 49.00 2.81 0.19 0.00 50.00 2.81 0.19 0.00 51.00 2.81 0.19 0.00 52.00 2.81 0.19 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 2.81 0.19 0.00 54.00 2.81 0.19 0.00 55.00 2.81 0.19 0.00 56.00 2.81 0.19 0.00 57.00 2.81 0.19 0.00 58.00 2.81 0.19 0.00 59.00 2.81 0.19 0.00 60.00 2.81 0.19 0.00 61.00 2.81 0.19 0.00 62.00 2.81 0.19 0.00 63.00 2.81 0.19 0.00 64.00 2.81 0.19 0.00 65.00 2.81 0.19 0.00 66.00 2.81 0.19 0.00 67.00 2.81 0.19 0.00 68.00 2.81 0.19 0.00 69.00 2.81 0.19 0.00 70.00 2.81 0.19 0.00 71.00 2.81 0.19 0.00 72.00 2.81 0.19 0.00 73.00 2.81 0.19 0.00 74.00 2.81 0.19 0.00 75.00 2.81 0.19 0.00 76.00 2.81 0.19 0.00 77.00 2.81 0.19 0.00 78.00 2.81 0.19 0.00 79.00 2.81 0.19 0.00 80.00 2.81 0.19 0.00 81.00 2.81 0.19 0.00 82.00 2.81 0.19 0.00 83.00 2.81 0.19 0.00 84.00 2.81 0.19 0.00 85.00 2.81 0.19 0.00 86.00 2.81 0.19 0.00 87.00 2.81 0.19 0.00 88.00 2.81 0.19 0.00 89.00 2.81 0.19 0.00 90.00 2.81 0.19 0.00 91.00 2.81 0.19 0.00 92.00 2.81 0.19 0.00 93.00 2.81 0.19 0.00 94.00 2.81 0.19 0.00 95.00 2.81 0.19 0.00 96.00 2.81 0.19 0.00 97.00 2.81 0.19 0.00 98.00 2.81 0.19 0.00 99.00 2.81 0.19 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment 2S: Pre -Development #2 Runoff = 0.18 cfs @ 12.48 hrs, Volume= 0.069 af, Depth= 0.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 5.620 55 Woods, Good, HSG B 5.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 2S: Pre -Development #2 Hydrograph 0.18 - 1- '--- 1---'--- L -- 1---'--- 1---'--- L---'---L -- --'--- 1--- '--- L--- '---L -- 1---0.19 0.18 cfs ■Runoff 0.17 -- --- ----1--- L--- 1--- L__1--- 1--- 1---'--- L--1--- '--- -- ' L-- - _ty pe lh -24 -h,- --1----1---'---L------L--1------1------L--1---'- - - L---'---L 0.16 0.15 I I I I I I I I I I I I I I I I I I -- ----+---'------'-----+---'---+---'1yr-24hr- Rai nfaHt=2-:91��-- --+--- +---- -++I ------'I ------++I ------'I ------++I ----++I ------'I 0.14 --+I -- ------++I --------R--b+-nf-+o-f-f-A-d-e&&M at - --- +---�u�e=00j69_af0.12 u VQ,' w 0.11 0.1 - -T -- T------T------T--T------T------T — I Runoff -DePth= 0.1 vI 3 0 0.09 LL --+--+---I---r---I---r--+---I---+---I---r--+---I- +---i---wr---i---yr�-- - -T --------T------r--T------t------T--T---T TET24.-94nEh-- 0.08 0.07 --r-- --� r--� r-- r------r------r--,---r--r---I--- N--- - - -T------ r--------- T--- I - - - T---I --- -- -----T------q`�'I=_5$-- 0.06 --r-- - ---r---I---r--r---I---r---I---r--r---r--r---I---r---I---r-- 0.05 0.04 --T-- -T- r------r--T------T------r- -I- - -I --T---I---r------r-- -- T---I- r---I-----T------ T- - -I--- --I - - -r--T------ r- - - I--- -- 0.03 0.02 --'-- -' - _ T - - - T - - -I- r r - - T T r - _ T T I r r - - 0.01 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 51 Hydrograph for Subcatchment 2S: Pre -Development #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.01 0.00 13.00 2.17 0.03 0.14 14.00 2.30 0.05 0.10 15.00 2.40 0.06 0.08 16.00 2.47 0.08 0.07 17.00 2.53 0.09 0.06 18.00 2.59 0.10 0.06 19.00 2.64 0.11 0.05 20.00 2.68 0.12 0.05 21.00 2.71 0.12 0.04 22.00 2.75 0.13 0.04 23.00 2.78 0.14 0.04 24.00 2.81 0.15 0.04 25.00 2.81 0.15 0.00 26.00 2.81 0.15 0.00 27.00 2.81 0.15 0.00 28.00 2.81 0.15 0.00 29.00 2.81 0.15 0.00 30.00 2.81 0.15 0.00 31.00 2.81 0.15 0.00 32.00 2.81 0.15 0.00 33.00 2.81 0.15 0.00 34.00 2.81 0.15 0.00 35.00 2.81 0.15 0.00 36.00 2.81 0.15 0.00 37.00 2.81 0.15 0.00 38.00 2.81 0.15 0.00 39.00 2.81 0.15 0.00 40.00 2.81 0.15 0.00 41.00 2.81 0.15 0.00 42.00 2.81 0.15 0.00 43.00 2.81 0.15 0.00 44.00 2.81 0.15 0.00 45.00 2.81 0.15 0.00 46.00 2.81 0.15 0.00 47.00 2.81 0.15 0.00 48.00 2.81 0.15 0.00 49.00 2.81 0.15 0.00 50.00 2.81 0.15 0.00 51.00 2.81 0.15 0.00 52.00 2.81 0.15 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 2.81 0.15 0.00 54.00 2.81 0.15 0.00 55.00 2.81 0.15 0.00 56.00 2.81 0.15 0.00 57.00 2.81 0.15 0.00 58.00 2.81 0.15 0.00 59.00 2.81 0.15 0.00 60.00 2.81 0.15 0.00 61.00 2.81 0.15 0.00 62.00 2.81 0.15 0.00 63.00 2.81 0.15 0.00 64.00 2.81 0.15 0.00 65.00 2.81 0.15 0.00 66.00 2.81 0.15 0.00 67.00 2.81 0.15 0.00 68.00 2.81 0.15 0.00 69.00 2.81 0.15 0.00 70.00 2.81 0.15 0.00 71.00 2.81 0.15 0.00 72.00 2.81 0.15 0.00 73.00 2.81 0.15 0.00 74.00 2.81 0.15 0.00 75.00 2.81 0.15 0.00 76.00 2.81 0.15 0.00 77.00 2.81 0.15 0.00 78.00 2.81 0.15 0.00 79.00 2.81 0.15 0.00 80.00 2.81 0.15 0.00 81.00 2.81 0.15 0.00 82.00 2.81 0.15 0.00 83.00 2.81 0.15 0.00 84.00 2.81 0.15 0.00 85.00 2.81 0.15 0.00 86.00 2.81 0.15 0.00 87.00 2.81 0.15 0.00 88.00 2.81 0.15 0.00 89.00 2.81 0.15 0.00 90.00 2.81 0.15 0.00 91.00 2.81 0.15 0.00 92.00 2.81 0.15 0.00 93.00 2.81 0.15 0.00 94.00 2.81 0.15 0.00 95.00 2.81 0.15 0.00 96.00 2.81 0.15 0.00 97.00 2.81 0.15 0.00 98.00 2.81 0.15 0.00 99.00 2.81 0.15 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 52 Summary for Subcatchment 8S: BMP #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 6.34 cfs @ 11.99 hrs, Volume= 0.385 af, Depth= 0.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 12.980 63 12.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: BMP #1 Hydrograph 7 I I I I I I I I I I I I I I I I I I I I ■Runoff 6.34 cfs ---'I---------T------r---'I--- -- Type II 34 fhI'r- 6 11yr-2,4hr Rainfall)=2!81" ---L-- - L - - -1- - - t - - - - - - L - - - - - - L - - - - - - L - - J - - - - - - J - - -I- - --I--- 1 - - -I- - 5 ' Renoff Area=12.980 at. - - - - - - - - runoff glu''Imq=0,385 -af - 4 Runoff Depth'I, 0!361' -J--- L------L------L--- 3 ---L---'I-----L---'I--- ---- LL Te-6.0 Min 1 IICN'1,=6$ 2 1 I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 53 Hydrograph for Subcatchment 8S: BMP #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.07 6.27 13.00 2.17 0.14 0.64 14.00 2.30 0.18 0.42 15.00 2.40 0.21 0.35 16.00 2.47 0.24 0.28 17.00 2.53 0.26 0.26 18.00 2.59 0.27 0.23 19.00 2.64 0.29 0.21 20.00 2.68 0.31 0.18 21.00 2.71 0.32 0.17 22.00 2.75 0.33 0.17 23.00 2.78 0.34 0.16 24.00 2.81 0.36 0.16 25.00 2.81 0.36 0.00 26.00 2.81 0.36 0.00 27.00 2.81 0.36 0.00 28.00 2.81 0.36 0.00 29.00 2.81 0.36 0.00 30.00 2.81 0.36 0.00 31.00 2.81 0.36 0.00 32.00 2.81 0.36 0.00 33.00 2.81 0.36 0.00 34.00 2.81 0.36 0.00 35.00 2.81 0.36 0.00 36.00 2.81 0.36 0.00 37.00 2.81 0.36 0.00 38.00 2.81 0.36 0.00 39.00 2.81 0.36 0.00 40.00 2.81 0.36 0.00 41.00 2.81 0.36 0.00 42.00 2.81 0.36 0.00 43.00 2.81 0.36 0.00 44.00 2.81 0.36 0.00 45.00 2.81 0.36 0.00 46.00 2.81 0.36 0.00 47.00 2.81 0.36 0.00 48.00 2.81 0.36 0.00 49.00 2.81 0.36 0.00 50.00 2.81 0.36 0.00 51.00 2.81 0.36 0.00 52.00 2.81 0.36 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 2.81 0.36 0.00 54.00 2.81 0.36 0.00 55.00 2.81 0.36 0.00 56.00 2.81 0.36 0.00 57.00 2.81 0.36 0.00 58.00 2.81 0.36 0.00 59.00 2.81 0.36 0.00 60.00 2.81 0.36 0.00 61.00 2.81 0.36 0.00 62.00 2.81 0.36 0.00 63.00 2.81 0.36 0.00 64.00 2.81 0.36 0.00 65.00 2.81 0.36 0.00 66.00 2.81 0.36 0.00 67.00 2.81 0.36 0.00 68.00 2.81 0.36 0.00 69.00 2.81 0.36 0.00 70.00 2.81 0.36 0.00 71.00 2.81 0.36 0.00 72.00 2.81 0.36 0.00 73.00 2.81 0.36 0.00 74.00 2.81 0.36 0.00 75.00 2.81 0.36 0.00 76.00 2.81 0.36 0.00 77.00 2.81 0.36 0.00 78.00 2.81 0.36 0.00 79.00 2.81 0.36 0.00 80.00 2.81 0.36 0.00 81.00 2.81 0.36 0.00 82.00 2.81 0.36 0.00 83.00 2.81 0.36 0.00 84.00 2.81 0.36 0.00 85.00 2.81 0.36 0.00 86.00 2.81 0.36 0.00 87.00 2.81 0.36 0.00 88.00 2.81 0.36 0.00 89.00 2.81 0.36 0.00 90.00 2.81 0.36 0.00 91.00 2.81 0.36 0.00 92.00 2.81 0.36 0.00 93.00 2.81 0.36 0.00 94.00 2.81 0.36 0.00 95.00 2.81 0.36 0.00 96.00 2.81 0.36 0.00 97.00 2.81 0.36 0.00 98.00 2.81 0.36 0.00 99.00 2.81 0.36 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 54 Summary for Subcatchment 9S: BMP #2 [49] Hint: Tc<2dt may require smaller dt Runoff = 19.31 cfs @ 11.96 hrs, Volume= 0.894 af, Depth= 1.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 9.670 80 9.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: BMP #2 Hydrograph 21 i i i i i Runoff 19.31 cfs----------------T------------------------------�- - zo � - - 19 --L-- ----'------1---1------+------+------L------Type 0-24-h;r-- 18 --+---+------+------+---+--+------+---+--+--+---+---I---'-1---+-- 17 - -- - ---' ----' ---- t--- lyr-24ht Rainfall=2,$17 - 16---li-- - ---li-----li--- ---li -----li---------- 14 13 --+-- - ------ ------------+------%Cu1O _V_Qlpme=oi l -4 w 12 ----- - ---r--------rt------+------+-- - f - Runt f Deepth=1;fi11 00 ------------------------ ---------------------1��-f�-- a9 - - - - - - - - - - - 8 --+---+---'---+---'---+---'---+---'---+------+------+------CN' 8 - 7 -------�-------�r--T---�---7---�---r------r-----r------r-- 6 ---i-- - ---i -----i--- ---i -----i------i------i------i------i--- -- 5 -----k ------4 --J--L---1---L---1---1---1---1---'1---L---L---L---L-- 3+---+--2---Ir-----i---7 rt---Ir--7---Ir--r---li---r---li---r------r-- q 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 55 Hydrograph for Subcatchment 9S: BMP #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.01 0.20 12.00 1.86 0.48 17.29 13.00 2.17 0.67 1.14 14.00 2.30 0.76 0.70 15.00 2.40 0.82 0.57 16.00 2.47 0.87 0.44 17.00 2.53 0.91 0.39 18.00 2.59 0.95 0.35 19.00 2.64 0.98 0.30 20.00 2.68 1.01 0.26 21.00 2.71 1.04 0.25 22.00 2.75 1.06 0.24 23.00 2.78 1.09 0.23 24.00 2.81 1.11 0.22 25.00 2.81 1.11 0.00 26.00 2.81 1.11 0.00 27.00 2.81 1.11 0.00 28.00 2.81 1.11 0.00 29.00 2.81 1.11 0.00 30.00 2.81 1.11 0.00 31.00 2.81 1.11 0.00 32.00 2.81 1.11 0.00 33.00 2.81 1.11 0.00 34.00 2.81 1.11 0.00 35.00 2.81 1.11 0.00 36.00 2.81 1.11 0.00 37.00 2.81 1.11 0.00 38.00 2.81 1.11 0.00 39.00 2.81 1.11 0.00 40.00 2.81 1.11 0.00 41.00 2.81 1.11 0.00 42.00 2.81 1.11 0.00 43.00 2.81 1.11 0.00 44.00 2.81 1.11 0.00 45.00 2.81 1.11 0.00 46.00 2.81 1.11 0.00 47.00 2.81 1.11 0.00 48.00 2.81 1.11 0.00 49.00 2.81 1.11 0.00 50.00 2.81 1.11 0.00 51.00 2.81 1.11 0.00 52.00 2.81 1.11 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 2.81 1.11 0.00 54.00 2.81 1.11 0.00 55.00 2.81 1.11 0.00 56.00 2.81 1.11 0.00 57.00 2.81 1.11 0.00 58.00 2.81 1.11 0.00 59.00 2.81 1.11 0.00 60.00 2.81 1.11 0.00 61.00 2.81 1.11 0.00 62.00 2.81 1.11 0.00 63.00 2.81 1.11 0.00 64.00 2.81 1.11 0.00 65.00 2.81 1.11 0.00 66.00 2.81 1.11 0.00 67.00 2.81 1.11 0.00 68.00 2.81 1.11 0.00 69.00 2.81 1.11 0.00 70.00 2.81 1.11 0.00 71.00 2.81 1.11 0.00 72.00 2.81 1.11 0.00 73.00 2.81 1.11 0.00 74.00 2.81 1.11 0.00 75.00 2.81 1.11 0.00 76.00 2.81 1.11 0.00 77.00 2.81 1.11 0.00 78.00 2.81 1.11 0.00 79.00 2.81 1.11 0.00 80.00 2.81 1.11 0.00 81.00 2.81 1.11 0.00 82.00 2.81 1.11 0.00 83.00 2.81 1.11 0.00 84.00 2.81 1.11 0.00 85.00 2.81 1.11 0.00 86.00 2.81 1.11 0.00 87.00 2.81 1.11 0.00 88.00 2.81 1.11 0.00 89.00 2.81 1.11 0.00 90.00 2.81 1.11 0.00 91.00 2.81 1.11 0.00 92.00 2.81 1.11 0.00 93.00 2.81 1.11 0.00 94.00 2.81 1.11 0.00 95.00 2.81 1.11 0.00 96.00 2.81 1.11 0.00 97.00 2.81 1.11 0.00 98.00 2.81 1.11 0.00 99.00 2.81 1.11 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 56 Summary for Subcatchment 10S: BMP #3 [49] Hint: Tc<2dt may require smaller dt Runoff = 13.03 cfs @ 11.96 hrs, Volume= 0.605 af, Depth= 1.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 6.900 79 6.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: BMP #3 Hydrograph 14 Runoff I I 1 13.03 cfs--------- ------- ---+------+---------- ---+---1---r---I�--{-ter-- 13 -- -- - --- --------7----- T------T------r-----p- TY�-O I -�' CH - 12 -- iyrmUhir-Rainfal[=Z.81I' 11 I I I I I I I I I I I I I I I I I 1 - -- - -- -- --- -- -- --- -Rurtoff-Aee&6.900at-- 10 -_r-- _r 1 r 1 r 1 T I I 1 r 1 r 1 r�f -- 9 unof VQIU1MQ=01.6015 -- I I I I I I I I I I I I I I I I I I 8 --I Rtunaf# be-pw=11b51'-- �-° 7 ---i--li---r l------li---i l------li------r------r-IL��7ffl 6 I --L---L---1___L---1----L ----1---'--- L--- ---L--- ---L------CN=70-- 5 1 - - - - - + - - - I- - - + - - - - - - + - - - I- - - + - - - - - - + - - - - - - + - - - - - - + - - -I - - - - - -I - - - + - - 4 Ik I I I I I I I I I I I I I I I I I 3 - - L - -L - - -'- - - L ---'---1---'---L---'---1---'---L---'---L---'---L---'---L2 1 1 1 +------+ --- I ---+- -+---I---+---I---+---I---+---I------I---+-- 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 57 Hydrograph for Subcatchment 10S: BMP #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.01 0.11 12.00 1.86 0.44 11.72 13.00 2.17 0.62 0.78 14.00 2.30 0.71 0.48 15.00 2.40 0.77 0.39 16.00 2.47 0.82 0.31 17.00 2.53 0.86 0.27 18.00 2.59 0.90 0.24 19.00 2.64 0.93 0.21 20.00 2.68 0.96 0.18 21.00 2.71 0.98 0.17 22.00 2.75 1.01 0.17 23.00 2.78 1.03 0.16 24.00 2.81 1.05 0.15 25.00 2.81 1.05 0.00 26.00 2.81 1.05 0.00 27.00 2.81 1.05 0.00 28.00 2.81 1.05 0.00 29.00 2.81 1.05 0.00 30.00 2.81 1.05 0.00 31.00 2.81 1.05 0.00 32.00 2.81 1.05 0.00 33.00 2.81 1.05 0.00 34.00 2.81 1.05 0.00 35.00 2.81 1.05 0.00 36.00 2.81 1.05 0.00 37.00 2.81 1.05 0.00 38.00 2.81 1.05 0.00 39.00 2.81 1.05 0.00 40.00 2.81 1.05 0.00 41.00 2.81 1.05 0.00 42.00 2.81 1.05 0.00 43.00 2.81 1.05 0.00 44.00 2.81 1.05 0.00 45.00 2.81 1.05 0.00 46.00 2.81 1.05 0.00 47.00 2.81 1.05 0.00 48.00 2.81 1.05 0.00 49.00 2.81 1.05 0.00 50.00 2.81 1.05 0.00 51.00 2.81 1.05 0.00 52.00 2.81 1.05 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 2.81 1.05 0.00 54.00 2.81 1.05 0.00 55.00 2.81 1.05 0.00 56.00 2.81 1.05 0.00 57.00 2.81 1.05 0.00 58.00 2.81 1.05 0.00 59.00 2.81 1.05 0.00 60.00 2.81 1.05 0.00 61.00 2.81 1.05 0.00 62.00 2.81 1.05 0.00 63.00 2.81 1.05 0.00 64.00 2.81 1.05 0.00 65.00 2.81 1.05 0.00 66.00 2.81 1.05 0.00 67.00 2.81 1.05 0.00 68.00 2.81 1.05 0.00 69.00 2.81 1.05 0.00 70.00 2.81 1.05 0.00 71.00 2.81 1.05 0.00 72.00 2.81 1.05 0.00 73.00 2.81 1.05 0.00 74.00 2.81 1.05 0.00 75.00 2.81 1.05 0.00 76.00 2.81 1.05 0.00 77.00 2.81 1.05 0.00 78.00 2.81 1.05 0.00 79.00 2.81 1.05 0.00 80.00 2.81 1.05 0.00 81.00 2.81 1.05 0.00 82.00 2.81 1.05 0.00 83.00 2.81 1.05 0.00 84.00 2.81 1.05 0.00 85.00 2.81 1.05 0.00 86.00 2.81 1.05 0.00 87.00 2.81 1.05 0.00 88.00 2.81 1.05 0.00 89.00 2.81 1.05 0.00 90.00 2.81 1.05 0.00 91.00 2.81 1.05 0.00 92.00 2.81 1.05 0.00 93.00 2.81 1.05 0.00 94.00 2.81 1.05 0.00 95.00 2.81 1.05 0.00 96.00 2.81 1.05 0.00 97.00 2.81 1.05 0.00 98.00 2.81 1.05 0.00 99.00 2.81 1.05 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 58 Summary for Subcatchment 11S: Bypass #1 Runoff = 2.02 cfs @ 12.13 hrs, Volume= 0.196 af, Depth= 0.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 4.560 58 Woods/grass comb., Good, HSG B 1.020 98 Water Surface, HSG B 5.580 65 Weighted Average 4.560 81.72% Pervious Area 1.020 18.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.9 Direct Entry, Subcatchment 11S: Bypass #1 Hydrograph � � � � � � � � � � � � � � � � � � � ■Runoff 2.02 cfs 2 type 112'4-hr 1y,r•-24hr Rainfall=2!81" Runoff Area=5.580 at Runoff Vplu',mp=0r19,6 clf Runoff Depth'0!421' LL 1 -----TcT16.9 mih CN,=6$ 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 59 Hydrograph for Subcatchment 11S: Bypass #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.10 0.90 13.00 2.17 0.18 0.35 14.00 2.30 0.23 0.22 15.00 2.40 0.26 0.18 16.00 2.47 0.29 0.14 17.00 2.53 0.31 0.13 18.00 2.59 0.33 0.11 19.00 2.64 0.35 0.10 20.00 2.68 0.37 0.09 21.00 2.71 0.38 0.08 22.00 2.75 0.39 0.08 23.00 2.78 0.41 0.08 24.00 2.81 0.42 0.08 25.00 2.81 0.42 0.00 26.00 2.81 0.42 0.00 27.00 2.81 0.42 0.00 28.00 2.81 0.42 0.00 29.00 2.81 0.42 0.00 30.00 2.81 0.42 0.00 31.00 2.81 0.42 0.00 32.00 2.81 0.42 0.00 33.00 2.81 0.42 0.00 34.00 2.81 0.42 0.00 35.00 2.81 0.42 0.00 36.00 2.81 0.42 0.00 37.00 2.81 0.42 0.00 38.00 2.81 0.42 0.00 39.00 2.81 0.42 0.00 40.00 2.81 0.42 0.00 41.00 2.81 0.42 0.00 42.00 2.81 0.42 0.00 43.00 2.81 0.42 0.00 44.00 2.81 0.42 0.00 45.00 2.81 0.42 0.00 46.00 2.81 0.42 0.00 47.00 2.81 0.42 0.00 48.00 2.81 0.42 0.00 49.00 2.81 0.42 0.00 50.00 2.81 0.42 0.00 51.00 2.81 0.42 0.00 52.00 2.81 0.42 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 2.81 0.42 0.00 54.00 2.81 0.42 0.00 55.00 2.81 0.42 0.00 56.00 2.81 0.42 0.00 57.00 2.81 0.42 0.00 58.00 2.81 0.42 0.00 59.00 2.81 0.42 0.00 60.00 2.81 0.42 0.00 61.00 2.81 0.42 0.00 62.00 2.81 0.42 0.00 63.00 2.81 0.42 0.00 64.00 2.81 0.42 0.00 65.00 2.81 0.42 0.00 66.00 2.81 0.42 0.00 67.00 2.81 0.42 0.00 68.00 2.81 0.42 0.00 69.00 2.81 0.42 0.00 70.00 2.81 0.42 0.00 71.00 2.81 0.42 0.00 72.00 2.81 0.42 0.00 73.00 2.81 0.42 0.00 74.00 2.81 0.42 0.00 75.00 2.81 0.42 0.00 76.00 2.81 0.42 0.00 77.00 2.81 0.42 0.00 78.00 2.81 0.42 0.00 79.00 2.81 0.42 0.00 80.00 2.81 0.42 0.00 81.00 2.81 0.42 0.00 82.00 2.81 0.42 0.00 83.00 2.81 0.42 0.00 84.00 2.81 0.42 0.00 85.00 2.81 0.42 0.00 86.00 2.81 0.42 0.00 87.00 2.81 0.42 0.00 88.00 2.81 0.42 0.00 89.00 2.81 0.42 0.00 90.00 2.81 0.42 0.00 91.00 2.81 0.42 0.00 92.00 2.81 0.42 0.00 93.00 2.81 0.42 0.00 94.00 2.81 0.42 0.00 95.00 2.81 0.42 0.00 96.00 2.81 0.42 0.00 97.00 2.81 0.42 0.00 98.00 2.81 0.42 0.00 99.00 2.81 0.42 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 60 Summary for Subcatchment 12S: Bypass #2 Runoff = 0.09 cfs @ 12.32 hrs, Volume= 0.021 af, Depth= 0.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 1.160 58 Woods/grass comb., Good, HSG B 1.160 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 12S: Bypass #2 Hydrograph 0.1 --T---r--T---I---r---I---r--T---I---T---I---r--T---r--T---I---r---I---r-- --T---I --- r---I- -- r --T---I --- T- --I--- r--T------ T---I--- r------r-- ■Runoff 0.095 - 0.09 cfs-----F------'F--7------T------'r---I---' -- T------ r------' -- 0.09 -7----T------r------+--+------+------+-- ------Ty_pe i1-2 iir-- 0.085 �--'-- -'---'---' __J_ I I I I I 0.08 -- -- - - - - --- ------I --i----------'1yr-24Fiii»-R4aiftfa['--2.917-- w � 0.075 0.07 -- -- - -----'---' ------'-- ------------------------------------------- ---'---' ---'- Ru n-off'_Area=1160 at- - 0006 uOff VoluMp=-0-02'11-o - - -i---i---'--- ------'L--1------1-1 - F0.055 --L---L---'---L------L--L------L---I---LRaino## p ^I ©� I 1 -:�21 3 0.05 E0000.045 - - - -- - ------ - -, -- +------ ------ ------ -- ------ --------+------ ------ -- ------ ------ ------ -- -- ------ TcT24.9 -M!h- - 0.04 --+-- +------+-- ---+--+------+------+--+---1---+------����� I 0.035 --+-- +------+---I---+--+---I---+---I---+--+------+---------I--- -- 0.03 --rt-- +------r--ti---'r--rt------+------'r-----'r--+------r--ti---'r-- 0.025 - -r ----- ---r - -� r--r------t------r--r---r--r------r-----r-- 0.02 0.015 --4-- -T r---'---'r--r---'---T---'---'r--r---r--T------r------r-- 0.01 7---7---I- r------r--7------T------r--I---I --T------r---- Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 61 Hydrograph for Subcatchment 12S: Bypass #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.02 0.01 13.00 2.17 0.07 0.04 14.00 2.30 0.09 0.03 15.00 2.40 0.11 0.02 16.00 2.47 0.13 0.02 17.00 2.53 0.14 0.02 18.00 2.59 0.15 0.02 19.00 2.64 0.17 0.01 20.00 2.68 0.18 0.01 21.00 2.71 0.19 0.01 22.00 2.75 0.20 0.01 23.00 2.78 0.21 0.01 24.00 2.81 0.22 0.01 25.00 2.81 0.22 0.00 26.00 2.81 0.22 0.00 27.00 2.81 0.22 0.00 28.00 2.81 0.22 0.00 29.00 2.81 0.22 0.00 30.00 2.81 0.22 0.00 31.00 2.81 0.22 0.00 32.00 2.81 0.22 0.00 33.00 2.81 0.22 0.00 34.00 2.81 0.22 0.00 35.00 2.81 0.22 0.00 36.00 2.81 0.22 0.00 37.00 2.81 0.22 0.00 38.00 2.81 0.22 0.00 39.00 2.81 0.22 0.00 40.00 2.81 0.22 0.00 41.00 2.81 0.22 0.00 42.00 2.81 0.22 0.00 43.00 2.81 0.22 0.00 44.00 2.81 0.22 0.00 45.00 2.81 0.22 0.00 46.00 2.81 0.22 0.00 47.00 2.81 0.22 0.00 48.00 2.81 0.22 0.00 49.00 2.81 0.22 0.00 50.00 2.81 0.22 0.00 51.00 2.81 0.22 0.00 52.00 2.81 0.22 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 2.81 0.22 0.00 54.00 2.81 0.22 0.00 55.00 2.81 0.22 0.00 56.00 2.81 0.22 0.00 57.00 2.81 0.22 0.00 58.00 2.81 0.22 0.00 59.00 2.81 0.22 0.00 60.00 2.81 0.22 0.00 61.00 2.81 0.22 0.00 62.00 2.81 0.22 0.00 63.00 2.81 0.22 0.00 64.00 2.81 0.22 0.00 65.00 2.81 0.22 0.00 66.00 2.81 0.22 0.00 67.00 2.81 0.22 0.00 68.00 2.81 0.22 0.00 69.00 2.81 0.22 0.00 70.00 2.81 0.22 0.00 71.00 2.81 0.22 0.00 72.00 2.81 0.22 0.00 73.00 2.81 0.22 0.00 74.00 2.81 0.22 0.00 75.00 2.81 0.22 0.00 76.00 2.81 0.22 0.00 77.00 2.81 0.22 0.00 78.00 2.81 0.22 0.00 79.00 2.81 0.22 0.00 80.00 2.81 0.22 0.00 81.00 2.81 0.22 0.00 82.00 2.81 0.22 0.00 83.00 2.81 0.22 0.00 84.00 2.81 0.22 0.00 85.00 2.81 0.22 0.00 86.00 2.81 0.22 0.00 87.00 2.81 0.22 0.00 88.00 2.81 0.22 0.00 89.00 2.81 0.22 0.00 90.00 2.81 0.22 0.00 91.00 2.81 0.22 0.00 92.00 2.81 0.22 0.00 93.00 2.81 0.22 0.00 94.00 2.81 0.22 0.00 95.00 2.81 0.22 0.00 96.00 2.81 0.22 0.00 97.00 2.81 0.22 0.00 98.00 2.81 0.22 0.00 99.00 2.81 0.22 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 62 Summary for Subcatchment 13S: Pre -Development #3 Runoff = 0.30 cfs @ 12.36 hrs, Volume= 0.111 af, Depth= 0.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 9.070 55 Woods, Good, HSG B 9.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 13S: Pre -Development #3 Hydrograph -- L ---1_ -- L---I--- L--- 1---L -- L--- 1--- L--- 1--- L -- L--- 1--- L--- 1--- L---I---L - 0.32 - 0.30 ----Y�-----cf--s 0.3 Y-_--_--_1--_--_--_-YL------L----_--_--_'IYL------Y--------- I1---------+=1-------I1-------_--rL--_--_Y--_--_--_IL-_--_--_'I --+----1-----l-l-L,---`-- L----�---r 0.28 �1yr-24hr Rainfall�=2.81"0.26 0.24 - - - ob nofAte&S M at'IIL- -- - - LL0.22 L---1--- I �I I I ........L----L--L--- L-u1f1=0r .1� C11-�tfiQu0.2 10Fne 0.18 ---rRUnGff Dept6-0,W' 0.160 1--- -L--J-L--L--1--- L--- I --- L__L--- --- - T 0.12C =5 - --Y-------r------r--Y------+------r-----r--Y---i----i 0.1 --L-- - 1---L---1---L--1---1---L---1---L__L---1---1---1---L---1---L_ 0.08 0.06 0.04 --L---1---1- L---1---L--1---1---L---1---L--L---1---1---1---L---1---L- 0.02 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 63 Hydrograph for Subcatchment 13S: Pre -Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.01 0.01 13.00 2.17 0.03 0.21 14.00 2.30 0.05 0.15 15.00 2.40 0.06 0.13 16.00 2.47 0.08 0.11 17.00 2.53 0.09 0.10 18.00 2.59 0.10 0.09 19.00 2.64 0.11 0.09 20.00 2.68 0.12 0.07 21.00 2.71 0.12 0.07 22.00 2.75 0.13 0.07 23.00 2.78 0.14 0.07 24.00 2.81 0.15 0.07 25.00 2.81 0.15 0.00 26.00 2.81 0.15 0.00 27.00 2.81 0.15 0.00 28.00 2.81 0.15 0.00 29.00 2.81 0.15 0.00 30.00 2.81 0.15 0.00 31.00 2.81 0.15 0.00 32.00 2.81 0.15 0.00 33.00 2.81 0.15 0.00 34.00 2.81 0.15 0.00 35.00 2.81 0.15 0.00 36.00 2.81 0.15 0.00 37.00 2.81 0.15 0.00 38.00 2.81 0.15 0.00 39.00 2.81 0.15 0.00 40.00 2.81 0.15 0.00 41.00 2.81 0.15 0.00 42.00 2.81 0.15 0.00 43.00 2.81 0.15 0.00 44.00 2.81 0.15 0.00 45.00 2.81 0.15 0.00 46.00 2.81 0.15 0.00 47.00 2.81 0.15 0.00 48.00 2.81 0.15 0.00 49.00 2.81 0.15 0.00 50.00 2.81 0.15 0.00 51.00 2.81 0.15 0.00 52.00 2.81 0.15 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 2.81 0.15 0.00 54.00 2.81 0.15 0.00 55.00 2.81 0.15 0.00 56.00 2.81 0.15 0.00 57.00 2.81 0.15 0.00 58.00 2.81 0.15 0.00 59.00 2.81 0.15 0.00 60.00 2.81 0.15 0.00 61.00 2.81 0.15 0.00 62.00 2.81 0.15 0.00 63.00 2.81 0.15 0.00 64.00 2.81 0.15 0.00 65.00 2.81 0.15 0.00 66.00 2.81 0.15 0.00 67.00 2.81 0.15 0.00 68.00 2.81 0.15 0.00 69.00 2.81 0.15 0.00 70.00 2.81 0.15 0.00 71.00 2.81 0.15 0.00 72.00 2.81 0.15 0.00 73.00 2.81 0.15 0.00 74.00 2.81 0.15 0.00 75.00 2.81 0.15 0.00 76.00 2.81 0.15 0.00 77.00 2.81 0.15 0.00 78.00 2.81 0.15 0.00 79.00 2.81 0.15 0.00 80.00 2.81 0.15 0.00 81.00 2.81 0.15 0.00 82.00 2.81 0.15 0.00 83.00 2.81 0.15 0.00 84.00 2.81 0.15 0.00 85.00 2.81 0.15 0.00 86.00 2.81 0.15 0.00 87.00 2.81 0.15 0.00 88.00 2.81 0.15 0.00 89.00 2.81 0.15 0.00 90.00 2.81 0.15 0.00 91.00 2.81 0.15 0.00 92.00 2.81 0.15 0.00 93.00 2.81 0.15 0.00 94.00 2.81 0.15 0.00 95.00 2.81 0.15 0.00 96.00 2.81 0.15 0.00 97.00 2.81 0.15 0.00 98.00 2.81 0.15 0.00 99.00 2.81 0.15 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 64 Summary for Subcatchment 14S: Post Development #3 Runoff = 0.29 cfs @ 12.36 hrs, Volume= 0.110 af, Depth= 0.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 8.670 55 Woods, Good, HSG B 0.320 58 Woods/grass comb., Good, HSG B 8.990 55 Weighted Average 8.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 14S: Post Development #3 Hydrograph --+---r--+---I---r------r--+--- ---+--- ---r--+--- r--+--- ---r--- ---r- 0.32-----L---- r- -- - +- - r- -- - - - - - - 0.29 cfs - - 0.3 I I I I- -- ------ ---- -- --- - -- --Type 2 -hr- 0 28 +-- -+---i---r--+---+--+---i---+---i---+--+---+--+---i---r---i---+- o.z6 --1-- -i ---' L__i --- L--- 1lyr24hr_RainfalL=2�$1C' 0.24 i +----- T, --- ,- iunOff Ae-ea�8.99W at ---- ----r------- 0.22 - -- +--- --- -- --- +-1 unof�Vglu�n 1=0r1'f'0-�t oz - -- 0.18 --_T T------r------F--7---I---T------ Rune Depth=01-517 3 0.16 o -- -- +------ ------ --------+------ --------Tc*20.71nih a 0.14 0.12 ....... -r-- ----r------r--T------+------r--r------ +---I--- - - 0.1 --1--- - 1---L---1---L--1------L------L--L---L--L---I---L------L- 0.08 0.06 0.04 --L---1---1- L---1---L--L------L------L-- ------L------L------L- 0.02 I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 65 Hydrograph for Subcatchment 14S: Post Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.01 0.01 13.00 2.17 0.03 0.21 14.00 2.30 0.05 0.15 15.00 2.40 0.06 0.13 16.00 2.47 0.08 0.11 17.00 2.53 0.09 0.10 18.00 2.59 0.10 0.09 19.00 2.64 0.11 0.08 20.00 2.68 0.12 0.07 21.00 2.71 0.12 0.07 22.00 2.75 0.13 0.07 23.00 2.78 0.14 0.07 24.00 2.81 0.15 0.07 25.00 2.81 0.15 0.00 26.00 2.81 0.15 0.00 27.00 2.81 0.15 0.00 28.00 2.81 0.15 0.00 29.00 2.81 0.15 0.00 30.00 2.81 0.15 0.00 31.00 2.81 0.15 0.00 32.00 2.81 0.15 0.00 33.00 2.81 0.15 0.00 34.00 2.81 0.15 0.00 35.00 2.81 0.15 0.00 36.00 2.81 0.15 0.00 37.00 2.81 0.15 0.00 38.00 2.81 0.15 0.00 39.00 2.81 0.15 0.00 40.00 2.81 0.15 0.00 41.00 2.81 0.15 0.00 42.00 2.81 0.15 0.00 43.00 2.81 0.15 0.00 44.00 2.81 0.15 0.00 45.00 2.81 0.15 0.00 46.00 2.81 0.15 0.00 47.00 2.81 0.15 0.00 48.00 2.81 0.15 0.00 49.00 2.81 0.15 0.00 50.00 2.81 0.15 0.00 51.00 2.81 0.15 0.00 52.00 2.81 0.15 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 2.81 0.15 0.00 54.00 2.81 0.15 0.00 55.00 2.81 0.15 0.00 56.00 2.81 0.15 0.00 57.00 2.81 0.15 0.00 58.00 2.81 0.15 0.00 59.00 2.81 0.15 0.00 60.00 2.81 0.15 0.00 61.00 2.81 0.15 0.00 62.00 2.81 0.15 0.00 63.00 2.81 0.15 0.00 64.00 2.81 0.15 0.00 65.00 2.81 0.15 0.00 66.00 2.81 0.15 0.00 67.00 2.81 0.15 0.00 68.00 2.81 0.15 0.00 69.00 2.81 0.15 0.00 70.00 2.81 0.15 0.00 71.00 2.81 0.15 0.00 72.00 2.81 0.15 0.00 73.00 2.81 0.15 0.00 74.00 2.81 0.15 0.00 75.00 2.81 0.15 0.00 76.00 2.81 0.15 0.00 77.00 2.81 0.15 0.00 78.00 2.81 0.15 0.00 79.00 2.81 0.15 0.00 80.00 2.81 0.15 0.00 81.00 2.81 0.15 0.00 82.00 2.81 0.15 0.00 83.00 2.81 0.15 0.00 84.00 2.81 0.15 0.00 85.00 2.81 0.15 0.00 86.00 2.81 0.15 0.00 87.00 2.81 0.15 0.00 88.00 2.81 0.15 0.00 89.00 2.81 0.15 0.00 90.00 2.81 0.15 0.00 91.00 2.81 0.15 0.00 92.00 2.81 0.15 0.00 93.00 2.81 0.15 0.00 94.00 2.81 0.15 0.00 95.00 2.81 0.15 0.00 96.00 2.81 0.15 0.00 97.00 2.81 0.15 0.00 98.00 2.81 0.15 0.00 99.00 2.81 0.15 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 66 Summary for Pond 5P: BMP #1 Inflow Area = 12.980 ac, 0.00% Impervious, Inflow Depth = 0.36" for 1yr-24hr event Inflow = 6.34 cfs @ 11.99 hrs, Volume= 0.385 of Outflow = 0.07 cfs @ 24.08 hrs, Volume= 0.341 af, Atten= 99%, Lag= 725.5 min Primary = 0.07 cfs @ 24.08 hrs, Volume= 0.341 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 567.42' @ 24.08 hrs Surf.Area= 16,376 sf Storage= 14,131 cf Plug -Flow detention time= 2,023.9 min calculated for 0.341 of (88% of inflow) Center -of -Mass det. time= 1,968.1 min ( 2,886.9 - 918.8 ) Volume Invert Avail.Storage Storage Description #1 566.50' 137,597 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 566.50 13,995 0 0 567.00 15,551 7,387 7,387 568.00 17,503 16,527 23,914 569.00 19,519 18,511 42,425 570.00 21,600 20,560 62,984 571.00 23,745 22,673 85,657 572.00 25,954 24,850 110,506 573.00 28,228 27,091 137,597 Device Routing Invert Outlet Devices #1 Primary 561.90' 36.0" Round RCP -Round 36" L= 187.7' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 561.90' / 560.89' S= 0.0054 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 566.50' 1.7" Vert. WQ Orrfice C= 0.600 #3 Device 1 570.10' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.90 Width (feet) 2.50 2.50 #4 Device 1 571.00' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 571.80' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.07 cfs @ 24.08 hrs HW=567.42' (Free Discharge) L1=RCP_Round 36" (Passes 0.07 cfs of 66.60 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.07 cfs @ 4.44 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 67 Hydrograph 6.34 Cfs ■ Inflow ❑ Outflow -- - - -- -- -- -- -- -- -- p �} p [OW —real-1��80-a ■Primary 7 ■ Secondary Pdak EIeV=567,42' 6 S�oragq=14,131 c';f 5 u 3 - --L--1--1--1--1--1-- -- ---------------------------'-- a 3 2 1 0.07 cfs 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 573 572 571 w w c 570 0 .� w w 569 568 567 Pond 5P: BMP #1 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 68 Pond 5P: BMP #1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 F Surface ❑ Storage 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 69 Hydrograph for Pond 5P: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 566.50 0.00 0.00 0.00 2.50 0.00 0 566.50 0.00 0.00 0.00 5.00 0.00 0 566.50 0.00 0.00 0.00 7.50 0.00 0 566.50 0.00 0.00 0.00 10.00 0.00 0 566.50 0.00 0.00 0.00 12.50 0.93 5,217 566.86 0.04 0.04 0.00 15.00 0.35 9,326 567.12 0.06 0.06 0.00 17.50 0.25 11,363 567.25 0.06 0.06 0.00 20.00 0.18 12,700 567.33 0.07 0.07 0.00 22.50 0.16 13,623 567.39 0.07 0.07 0.00 25.00 0.00 13,910 567.41 0.07 0.07 0.00 27.50 0.00 13,292 567.37 0.07 0.07 0.00 30.00 0.00 12,689 567.33 0.07 0.07 0.00 32.50 0.00 12,099 567.30 0.06 0.06 0.00 35.00 0.00 11,524 567.26 0.06 0.06 0.00 37.50 0.00 10,964 567.23 0.06 0.06 0.00 40.00 0.00 10,418 567.19 0.06 0.06 0.00 42.50 0.00 9,887 567.16 0.06 0.06 0.00 45.00 0.00 9,370 567.13 0.06 0.06 0.00 47.50 0.00 8,869 567.09 0.05 0.05 0.00 50.00 0.00 8,382 567.06 0.05 0.05 0.00 52.50 0.00 7,910 567.03 0.05 0.05 0.00 55.00 0.00 7,453 567.00 0.05 0.05 0.00 57.50 0.00 7,011 566.98 0.05 0.05 0.00 60.00 0.00 6,584 566.95 0.05 0.05 0.00 62.50 0.00 6,172 566.92 0.04 0.04 0.00 65.00 0.00 5,776 566.90 0.04 0.04 0.00 67.50 0.00 5,395 566.87 0.04 0.04 0.00 70.00 0.00 5,029 566.85 0.04 0.04 0.00 72.50 0.00 4,679 566.82 0.04 0.04 0.00 75.00 0.00 4,345 566.80 0.04 0.04 0.00 77.50 0.00 4,026 566.78 0.03 0.03 0.00 80.00 0.00 3,723 566.76 0.03 0.03 0.00 82.50 0.00 3,435 566.74 0.03 0.03 0.00 85.00 0.00 3,165 566.72 0.03 0.03 0.00 87.50 0.00 2,909 566.70 0.03 0.03 0.00 90.00 0.00 2,669 566.69 0.03 0.03 0.00 92.50 0.00 2,446 566.67 0.02 0.02 0.00 95.00 0.00 2,241 566.66 0.02 0.02 0.00 97.50 0.00 2,050 566.64 0.02 0.02 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 70 Stage -Discharge for Pond 5P: BMP #1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 566.50 0.00 0.00 0.00 566.60 0.01 0.01 0.00 566.70 0.03 0.03 0.00 566.80 0.04 0.04 0.00 566.90 0.04 0.04 0.00 567.00 0.05 0.05 0.00 567.10 0.06 0.06 0.00 567.20 0.06 0.06 0.00 567.30 0.06 0.06 0.00 567.40 0.07 0.07 0.00 567.50 0.07 0.07 0.00 567.60 0.08 0.08 0.00 567.70 0.08 0.08 0.00 567.80 0.08 0.08 0.00 567.90 0.09 0.09 0.00 568.00 0.09 0.09 0.00 568.10 0.09 0.09 0.00 568.20 0.10 0.10 0.00 568.30 0.10 0.10 0.00 568.40 0.10 0.10 0.00 568.50 0.11 0.11 0.00 568.60 0.11 0.11 0.00 568.70 0.11 0.11 0.00 568.80 0.11 0.11 0.00 568.90 0.12 0.12 0.00 569.00 0.12 0.12 0.00 569.10 0.12 0.12 0.00 569.20 0.12 0.12 0.00 569.30 0.13 0.13 0.00 569.40 0.13 0.13 0.00 569.50 0.13 0.13 0.00 569.60 0.13 0.13 0.00 569.70 0.13 0.13 0.00 569.80 0.14 0.14 0.00 569.90 0.14 0.14 0.00 570.00 0.14 0.14 0.00 570.10 0.14 0.14 0.00 570.20 0.40 0.40 0.00 570.30 0.88 0.88 0.00 570.40 1.49 1.49 0.00 570.50 2.22 2.22 0.00 570.60 3.05 3.05 0.00 570.70 3.96 3.96 0.00 570.80 4.95 4.95 0.00 570.90 6.02 6.02 0.00 571.00 7.15 7.15 0.00 571.10 9.74 9.74 0.00 571.20 13.56 13.56 0.00 571.30 18.18 18.18 0.00 571.40 23.47 23.47 0.00 571.50 29.33 29.33 0.00 571.60 35.72 35.72 0.00 571.70 42.59 42.59 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 571.80 49.90 49.90 0.00 571.90 58.42 57.63 0.79 572.00 67.98 65.75 2.23 572.10 78.40 74.25 4.15 572.20 89.59 83.11 6.48 572.30 101.61 92.31 9.30 572.40 114.40 101.85 12.55 572.50 119.76 103.98 15.78 572.60 123.83 104.58 19.25 572.70 128.10 105.18 22.92 572.80 132.57 105.77 26.80 572.90 137.34 106.37 30.98 573.00 142.31 106.95 35.36 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 71 Stage -Area -Storage for Pond 5P: BMP #1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 566.50 13,995 0 566.60 14,306 1,415 566.70 14,617 2,861 566.80 14,929 4,339 566.90 15,240 5,847 567.00 15,551 7,387 567.10 15,746 8,951 567.20 15,941 10,536 567.30 16,137 12,140 567.40 16,332 13,763 567.50 16,527 15,406 567.60 16,722 17,068 567.70 16,917 18,750 567.80 17,113 20,452 567.90 17,308 22,173 568.00 17,503 23,914 568.10 17,705 25,674 568.20 17,906 27,454 568.30 18,108 29,255 568.40 18,309 31,076 568.50 18,511 32,917 568.60 18,713 34,778 568.70 18,914 36,660 568.80 19,116 38,561 568.90 19,317 40,483 569.00 19,519 42,425 569.10 19,727 44,387 569.20 19,935 46,370 569.30 20,143 48,374 569.40 20,351 50,399 569.50 20,560 52,444 569.60 20,768 54,510 569.70 20,976 56,598 569.80 21,184 58,706 569.90 21,392 60,834 570.00 21,600 62,984 570.10 21,815 65,155 570.20 22,029 67,347 570.30 22,243 69,561 570.40 22,458 71,796 570.50 22,673 74,052 570.60 22,887 76,330 570.70 23,102 78,630 570.80 23,316 80,950 570.90 23,530 83,293 571.00 23,745 85,657 571.10 23,966 88,042 571.20 24,187 90,450 571.30 24,408 92,879 571.40 24,629 95,331 571.50 24,850 97,805 571.60 25,070 100,301 571.70 25,291 102,819 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 571.80 25,512 105,359 571.90 25,733 107,922 572.00 25,954 110,506 572.10 26,181 113,113 572.20 26,409 115,742 572.30 26,636 118,395 572.40 26,864 121,070 572.50 27,091 123,767 572.60 27,318 126,488 572.70 27,546 129,231 572.80 27,773 131,997 572.90 28,001 134,786 573.00 28,228 137,597 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 72 Summary for Pond 6P: BMP #2 Inflow Area = 9.670 ac, 0.00% Impervious, Inflow Depth = 1.11" for 1yr-24hr event Inflow = 19.31 cfs @ 11.96 hrs, Volume= 0.894 of Outflow = 0.24 cfs @ 21.40 hrs, Volume= 0.884 af, Atten= 99%, Lag= 566.5 min Primary = 0.24 cfs @ 21.40 hrs, Volume= 0.884 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 560.80' @ 21.40 hrs Surf.Area= 14,776 sf Storage= 28,646 cf Plug -Flow detention time= 1,435.8 min calculated for 0.884 of (99% of inflow) Center -of -Mass det. time= 1,431.1 min ( 2,276.5 - 845.4 ) Volume Invert Avail.Storage Storage Description #1 558.50' 109,406 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 558.50 9,762 0 0 559.00 11,233 5,249 5,249 560.00 13,167 12,200 17,449 561.00 15,175 14,171 31,620 562.00 17,251 16,213 47,833 563.00 19,395 18,323 66,156 564.00 21,608 20,502 86,657 565.00 23,890 22,749 109,406 Device Routing Invert Outlet Devices #1 Primary 553.90' 36.0" Round RCP -Round 36" L= 92.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 553.90' / 553.00' S= 0.0097 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 558.50' 2.5" Vert. WQ Orrfice C= 0.600 #3 Device 1 561.05' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.15 Width (feet) 1.00 1.00 #4 Device 1 562.20' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 563.95' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.24 cfs @ 21.40 hrs HW=560.80' (Free Discharge) L1=RCP_Round 36" (Passes 0.24 cfs of 90.86 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.24 cfs @ 7.14 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=558.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 73 Pond 6P: BMP #2 Hydrograph , - -I - -I - -I - -I -1--1--J--�---1---1---1---1---1---L--L--L--L--1--1--1-- cfs - - 7 - -I - -I - - -I-- 19.31 ------------------------Irtf]OW'1 Ark &a=-9.67 - aC-- ---- 21 20 --+- -- - -+--+--+--+--+------------------+--+--+--+--+--+--+-- - -- ----------------------beak-�Iev=560, O'L-- 19 --L- -1--1--1--J--J------------'-- _ L - 1-- 5 18 --r- - -T--T-- -�--�- -- -- --' -------------- --'------------- - -- --� -- - fare �2 46_cf 16 �'i ' 15 ---- ----------------------------------------------------- 14 --+- -+--+--+--+--+------------------+--+--+--+--+--+--+-- 13 w12 --r- --L- -T--T--T--T--T--------------- -1--1--1--J-- ---1---1---1---1---1---L--L--L--L--1--1--1-- -- -- --r--r--T--T--T-- u " 11 3 ' --r- -T--T-- -- -- ------------------r--r--r--r--r-- -- -- 8 - - 7 --L- -1--1--1--J-- ---1---1---1---1---1---L--L--L--L--1--1--1-- 6 5 ,, --, --L- - - -- 1--1--1--J--J---1---1---1---1---1---L--L--L--L--1--1--1-- -----------------------,---, --, --, --, -- -- -- -- 4 � 3 - / 1 0.24 cfs 565 564 563 w w c 562 0 .� w w 561 560 559 .0 65 70 75 :0 85 •0 95 Time (hours) Pond 6P: BMP #2 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) Lry ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 74 Pond 6P: BMP #2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 0 20,000 40,000 60,000 80,000 100,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 75 Hydrograph for Pond 6P: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 558.50 0.00 0.00 0.00 2.50 0.00 0 558.50 0.00 0.00 0.00 5.00 0.00 0 558.50 0.00 0.00 0.00 7.50 0.00 0 558.50 0.00 0.00 0.00 10.00 0.00 0 558.50 0.00 0.00 0.00 12.50 1.77 20,192 560.21 0.21 0.21 0.00 15.00 0.57 26,088 560.63 0.23 0.23 0.00 17.50 0.37 27,954 560.75 0.24 0.24 0.00 20.00 0.26 28,616 560.80 0.24 0.24 0.00 22.50 0.23 28,628 560.80 0.24 0.24 0.00 25.00 0.00 27,735 560.74 0.24 0.24 0.00 27.50 0.00 25,614 560.59 0.23 0.23 0.00 30.00 0.00 23,569 560.45 0.22 0.22 0.00 32.50 0.00 21,601 560.31 0.21 0.21 0.00 35.00 0.00 19,713 560.17 0.21 0.21 0.00 37.50 0.00 17,905 560.03 0.20 0.20 0.00 40.00 0.00 16,180 559.90 0.19 0.19 0.00 42.50 0.00 14,539 559.78 0.18 0.18 0.00 45.00 0.00 12,984 559.65 0.17 0.17 0.00 47.50 0.00 11,516 559.53 0.16 0.16 0.00 50.00 0.00 10,137 559.42 0.15 0.15 0.00 52.50 0.00 8,848 559.31 0.14 0.14 0.00 55.00 0.00 7,652 559.21 0.13 0.13 0.00 57.50 0.00 6,550 559.11 0.12 0.12 0.00 60.00 0.00 5,542 559.03 0.11 0.11 0.00 62.50 0.00 4,632 558.94 0.10 0.10 0.00 65.00 0.00 3,820 558.87 0.08 0.08 0.00 67.50 0.00 3,109 558.80 0.07 0.07 0.00 70.00 0.00 2,501 558.75 0.06 0.06 0.00 72.50 0.00 1,997 558.70 0.05 0.05 0.00 75.00 0.00 1,600 558.66 0.04 0.04 0.00 77.50 0.00 1,307 558.63 0.03 0.03 0.00 80.00 0.00 1,087 558.61 0.02 0.02 0.00 82.50 0.00 919 558.59 0.02 0.02 0.00 85.00 0.00 791 558.58 0.01 0.01 0.00 87.50 0.00 694 558.57 0.01 0.01 0.00 90.00 0.00 618 558.56 0.01 0.01 0.00 92.50 0.00 553 558.56 0.01 0.01 0.00 95.00 0.00 495 558.55 0.01 0.01 0.00 97.50 0.00 444 558.54 0.01 0.01 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 76 Stage -Discharge for Pond 6P: BMP #2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 558.50 0.00 0.00 0.00 558.60 0.02 0.02 0.00 558.70 0.05 0.05 0.00 558.80 0.07 0.07 0.00 558.90 0.09 0.09 0.00 559.00 0.10 0.10 0.00 559.10 0.12 0.12 0.00 559.20 0.13 0.13 0.00 559.30 0.14 0.14 0.00 559.40 0.15 0.15 0.00 559.50 0.16 0.16 0.00 559.60 0.16 0.16 0.00 559.70 0.17 0.17 0.00 559.80 0.18 0.18 0.00 559.90 0.19 0.19 0.00 560.00 0.19 0.19 0.00 560.10 0.20 0.20 0.00 560.20 0.21 0.21 0.00 560.30 0.21 0.21 0.00 560.40 0.22 0.22 0.00 560.50 0.23 0.23 0.00 560.60 0.23 0.23 0.00 560.70 0.24 0.24 0.00 560.80 0.24 0.24 0.00 560.90 0.25 0.25 0.00 561.00 0.25 0.25 0.00 561.10 0.30 0.30 0.00 561.20 0.45 0.45 0.00 561.30 0.68 0.68 0.00 561.40 0.95 0.95 0.00 561.50 1.27 1.27 0.00 561.60 1.62 1.62 0.00 561.70 2.01 2.01 0.00 561.80 2.42 2.42 0.00 561.90 2.86 2.86 0.00 562.00 3.33 3.33 0.00 562.10 3.83 3.83 0.00 562.20 4.35 4.35 0.00 562.30 6.44 6.44 0.00 562.40 9.84 9.84 0.00 562.50 14.10 14.10 0.00 562.60 19.06 19.06 0.00 562.70 24.61 24.61 0.00 562.80 30.71 30.71 0.00 562.90 37.30 37.30 0.00 563.00 44.36 44.36 0.00 563.10 51.84 51.84 0.00 563.20 59.72 59.72 0.00 563.30 67.99 67.99 0.00 563.40 76.63 76.63 0.00 563.50 85.62 85.62 0.00 563.60 94.95 94.95 0.00 563.70 102.84 102.84 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 563.80 106.13 106.13 0.00 563.90 109.32 109.32 0.00 564.00 112.70 112.43 0.28 564.10 116.89 115.44 1.45 564.20 121.52 118.39 3.13 564.30 124.72 119.46 5.26 564.40 128.01 120.18 7.83 564.50 131.76 120.89 10.87 564.60 135.74 121.60 14.14 564.70 139.79 122.30 17.49 564.80 144.07 123.01 21.06 564.90 148.54 123.70 24.84 565.00 153.26 124.40 28.86 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 77 Stage -Area -Storage for Pond 6P: BMP #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 558.50 9,762 0 558.60 10,056 991 558.70 10,350 2,011 558.80 10,645 3,061 558.90 10,939 4,140 559.00 11,233 5,249 559.10 11,426 6,382 559.20 11,620 7,534 559.30 11,813 8,706 559.40 12,007 9,897 559.50 12,200 11,107 559.60 12,393 12,337 559.70 12,587 13,586 559.80 12,780 14,854 559.90 12,974 16,142 560.00 13,167 17,449 560.10 13,368 18,775 560.20 13,569 20,122 560.30 13,769 21,489 560.40 13,970 22,876 560.50 14,171 24,283 560.60 14,372 25,710 560.70 14,573 27,158 560.80 14,773 28,625 560.90 14,974 30,112 561.00 15,175 31,620 561.10 15,383 33,148 561.20 15,590 34,696 561.30 15,798 36,266 561.40 16,005 37,856 561.50 16,213 39,467 561.60 16,421 41,098 561.70 16,628 42,751 561.80 16,836 44,424 561.90 17,043 46,118 562.00 17,251 47,833 562.10 17,465 49,569 562.20 17,680 51,326 562.30 17,894 53,105 562.40 18,109 54,905 562.50 18,323 56,726 562.60 18,537 58,569 562.70 18,752 60,434 562.80 18,966 62,320 562.90 19,181 64,227 563.00 19,395 66,156 563.10 19,616 68,106 563.20 19,838 70,079 563.30 20,059 72,074 563.40 20,280 74,091 563.50 20,502 76,130 563.60 20,723 78,191 563.70 20,944 80,274 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 563.80 21,165 82,380 563.90 21,387 84,508 564.00 21,608 86,657 564.10 21,836 88,829 564.20 22,064 91,024 564.30 22,293 93,242 564.40 22,521 95,483 564.50 22,749 97,747 564.60 22,977 100,033 564.70 23,205 102,342 564.80 23,434 104,674 564.90 23,662 107,029 565.00 23,890 109,406 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 78 Summary for Pond 7P: BMP #3 Inflow Area = 6.900 ac, 0.00% Impervious, Inflow Depth = 1.05" for 1yr-24hr event Inflow = 13.03 cfs @ 11.96 hrs, Volume= 0.605 of Outflow = 0.11 cfs @ 24.05 hrs, Volume= 0.544 af, Atten= 99%, Lag= 725.2 min Primary = 0.11 cfs @ 24.05 hrs, Volume= 0.544 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 570.51' @ 24.05 hrs Surf.Area= 12,334 sf Storage= 21,948 cf Plug -Flow detention time= 2,110.1 min calculated for 0.543 of (90% of inflow) Center -of -Mass det. time= 2,060.0 min ( 2,908.8 - 848.8 ) Volume Invert Avail.Storage Storage Description #1 568.50' 91,933 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 568.50 9,080 0 0 569.00 10,331 4,853 4,853 570.00 11,639 10,985 15,838 571.00 13,003 12,321 28,159 572.00 14,424 13,714 41,872 573.00 15,901 15,163 57,035 574.00 17,435 16,668 73,703 575.00 19,025 18,230 91,933 Device Routing Invert Outlet Devices #1 Primary 565.31' 24.0" Round RCP -Round 24" L= 61.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 565.31' / 565.00' S= 0.0051 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 568.50' 1.7" Vert. WQ Orfice C= 0.600 #3 Device 1 571.20' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 2.30 Width (feet) 0.70 0.70 #4 Device 1 573.50' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 574.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.11 cfs @ 24.05 hrs HW=570.51' (Free Discharge) L1=RCP_Round 24" (Passes 0.11 cfs of 33.71 cfs potential flow) �2=WQ Orfice (Orifice Controls 0.11 cfs @ 6.70 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=568.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 79 Pond 7P: BMP #3 Hydrograph ,'I -- ----+--+-- I 13.03 cfs -- -----1---1---1---1---1--- --I--I--I--1--1--1-- I I I I I I I I I I I I I I I ---- -t-- t --!-;--;---III---III---III-Iftf]OW'Area=6:9OO aC-- 14 --L--1--1--1--J-- ---1---1---1---1-- -- - Freak �Cav �.15�11 13 -_I_________________I___I--�i----,.--------I ----pl---- 12 11 --It- - It--t- I I I -rt-- -- ---III---III---III---III--c3LlJi1a-21,-9`'F>D-c - I I I I I I I I I I 10 I I I I I I I I I I I I I F F I I I 9 --t- -t--t---------li---li---lr--lr--t--t--t--t--t- -t--t--t-- N U $ /II L _ _ L _ _ L _ _ L _ _ L 3 7 o - - ---1---1---1---1---1---1--- LL 6 --t- -t--t--t--t--t---li---li---li---li---t--t--t--t--t--t--t--t-- 5 /I - L - - 1 - - 1 - - 1 - - 1 - - 1 - - -1- - -1- - -1- - -1- - -1- - - L - - L- 4 3 2 0.11 cfs 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 575 574 573 w w c 572 0 .� w w 571 570 569 Pond 7P: BMP #3 Stage -Discharge 0 10 20 30 40 50 60 70 Discharge (cfs) ■ Inflow ❑ outflow ■ Primary ■ Seconda ry ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 80 Pond 7P: BMP #3 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 81 Hydrograph for Pond 7P: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 568.50 0.00 0.00 0.00 2.50 0.00 0 568.50 0.00 0.00 0.00 5.00 0.00 0 568.50 0.00 0.00 0.00 7.50 0.00 0 568.50 0.00 0.00 0.00 10.00 0.00 0 568.50 0.00 0.00 0.00 12.50 1.21 13,538 569.80 0.08 0.08 0.00 15.00 0.39 18,155 570.20 0.10 0.10 0.00 17.50 0.26 20,029 570.35 0.10 0.10 0.00 20.00 0.18 21,074 570.44 0.10 0.10 0.00 22.50 0.16 21,661 570.49 0.11 0.11 0.00 25.00 0.00 21,607 570.48 0.10 0.10 0.00 27.50 0.00 20,672 570.41 0.10 0.10 0.00 30.00 0.00 19,756 570.33 0.10 0.10 0.00 32.50 0.00 18,860 570.26 0.10 0.10 0.00 35.00 0.00 17,983 570.18 0.10 0.10 0.00 37.50 0.00 17,126 570.11 0.09 0.09 0.00 40.00 0.00 16,289 570.04 0.09 0.09 0.00 42.50 0.00 15,471 569.97 0.09 0.09 0.00 45.00 0.00 14,674 569.90 0.09 0.09 0.00 47.50 0.00 13,897 569.83 0.09 0.09 0.00 50.00 0.00 13,140 569.77 0.08 0.08 0.00 52.50 0.00 12,404 569.70 0.08 0.08 0.00 55.00 0.00 11,688 569.64 0.08 0.08 0.00 57.50 0.00 10,994 569.57 0.08 0.08 0.00 60.00 0.00 10,321 569.51 0.07 0.07 0.00 62.50 0.00 9,668 569.45 0.07 0.07 0.00 65.00 0.00 9,038 569.40 0.07 0.07 0.00 67.50 0.00 8,428 569.34 0.07 0.07 0.00 70.00 0.00 7,841 569.28 0.06 0.06 0.00 72.50 0.00 7,275 569.23 0.06 0.06 0.00 75.00 0.00 6,731 569.18 0.06 0.06 0.00 77.50 0.00 6,209 569.13 0.06 0.06 0.00 80.00 0.00 5,710 569.08 0.05 0.05 0.00 82.50 0.00 5,232 569.04 0.05 0.05 0.00 85.00 0.00 4,777 568.99 0.05 0.05 0.00 87.50 0.00 4,345 568.95 0.05 0.05 0.00 90.00 0.00 3,936 568.91 0.04 0.04 0.00 92.50 0.00 3,550 568.87 0.04 0.04 0.00 95.00 0.00 3,188 568.84 0.04 0.04 0.00 97.50 0.00 2,848 568.80 0.04 0.04 0.00 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 82 Stage -Discharge for Pond 7P: BMP #3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 568.50 0.00 0.00 0.00 568.60 0.01 0.01 0.00 568.70 0.03 0.03 0.00 568.80 0.04 0.04 0.00 568.90 0.04 0.04 0.00 569.00 0.05 0.05 0.00 569.10 0.06 0.06 0.00 569.20 0.06 0.06 0.00 569.30 0.06 0.06 0.00 569.40 0.07 0.07 0.00 569.50 0.07 0.07 0.00 569.60 0.08 0.08 0.00 569.70 0.08 0.08 0.00 569.80 0.08 0.08 0.00 569.90 0.09 0.09 0.00 570.00 0.09 0.09 0.00 570.10 0.09 0.09 0.00 570.20 0.10 0.10 0.00 570.30 0.10 0.10 0.00 570.40 0.10 0.10 0.00 570.50 0.11 0.11 0.00 570.60 0.11 0.11 0.00 570.70 0.11 0.11 0.00 570.80 0.11 0.11 0.00 570.90 0.12 0.12 0.00 571.00 0.12 0.12 0.00 571.10 0.12 0.12 0.00 571.20 0.12 0.12 0.00 571.30 0.20 0.20 0.00 571.40 0.33 0.33 0.00 571.50 0.51 0.51 0.00 571.60 0.71 0.71 0.00 571.70 0.94 0.94 0.00 571.80 1.20 1.20 0.00 571.90 1.48 1.48 0.00 572.00 1.78 1.78 0.00 572.10 2.10 2.10 0.00 572.20 2.44 2.44 0.00 572.30 2.79 2.79 0.00 572.40 3.16 3.16 0.00 572.50 3.55 3.55 0.00 572.60 3.95 3.95 0.00 572.70 4.37 4.37 0.00 572.80 4.80 4.80 0.00 572.90 5.24 5.24 0.00 573.00 5.70 5.70 0.00 573.10 6.17 6.17 0.00 573.20 6.65 6.65 0.00 573.30 7.14 7.14 0.00 573.40 7.65 7.65 0.00 573.50 8.17 8.17 0.00 573.60 10.28 10.28 0.00 573.70 13.71 13.71 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 573.80 18.00 18.00 0.00 573.90 23.00 23.00 0.00 574.00 28.61 28.61 0.00 574.10 35.54 34.75 0.79 574.20 43.62 41.39 2.23 574.30 52.64 48.49 4.15 574.40 55.43 48.95 6.48 574.50 58.58 49.28 9.30 574.60 62.16 49.61 12.55 574.70 65.72 49.94 15.78 574.80 69.51 50.26 19.25 574.90 73.50 50.58 22.92 575.00 77.70 50.90 26.80 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 83 Stage -Area -Storage for Pond 7P: BMP #3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 568.50 9,080 0 568.60 9,330 921 568.70 9,580 1,866 568.80 9,831 2,837 568.90 10,081 3,832 569.00 10,331 4,853 569.10 10,462 5,892 569.20 10,593 6,945 569.30 10,723 8,011 569.40 10,854 9,090 569.50 10,985 10,182 569.60 11,116 11,287 569.70 11,247 12,405 569.80 11,377 13,536 569.90 11,508 14,680 570.00 11,639 15,838 570.10 11,775 17,008 570.20 11,912 18,193 570.30 12,048 19,391 570.40 12,185 20,602 570.50 12,321 21,828 570.60 12,457 23,067 570.70 12,594 24,319 570.80 12,730 25,585 570.90 12,867 26,865 571.00 13,003 28,159 571.10 13,145 29,466 571.20 13,287 30,788 571.30 13,429 32,124 571.40 13,571 33,474 571.50 13,714 34,838 571.60 13,856 36,216 571.70 13,998 37,609 571.80 14,140 39,016 571.90 14,282 40,437 572.00 14,424 41,872 572.10 14,572 43,322 572.20 14,719 44,787 572.30 14,867 46,266 572.40 15,015 47,760 572.50 15,163 49,269 572.60 15,310 50,793 572.70 15,458 52,331 572.80 15,606 53,884 572.90 15,753 55,452 573.00 15,901 57,035 573.10 16,054 58,633 573.20 16,208 60,246 573.30 16,361 61,874 573.40 16,515 63,518 573.50 16,668 65,177 573.60 16,821 66,851 573.70 16,975 68,541 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 573.80 17,128 70,246 573.90 17,282 71,967 574.00 17,435 73,703 574.10 17,594 75,454 574.20 17,753 77,222 574.30 17,912 79,005 574.40 18,071 80,804 574.50 18,230 82,619 574.60 18,389 84,450 574.70 18,548 86,297 574.80 18,707 88,160 574.90 18,866 90,038 575.00 19,025 91,933 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 84 Summary for Link 17L: Post Development #2 Inflow Area = 8.060 ac, 0.00% Impervious, Inflow Depth > 0.84" for 1yr-24hr event Inflow = 0.17 cfs @ 12.33 hrs, Volume= 0.565 of Primary = 0.17 cfs @ 12.33 hrs, Volume= 0.565 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 17L: Post Development #2 Hydrograph --+---1---1--- -----------+--+---1---+--+---1---1---+---1---1---+--+------ -- ---1--- --+---1---1-------1---1----------1--- -- ---1-- +--+--- 1-- ■Inflow 0.19 --+--+---1---+--+---1---1---+---1---1---+--+---1---+--+---1-- 1 1 ■ Primary 0.18 0.17 cfs -1---,--r1------;-- 1 1 1 1 ------1, �nflow1Are=O.,01 ac- 0.17 --t -r--r--r---1---r--r---1---r--r---1---r--r--r---1---r--r---1-- 0.16 --T-1---r--�---r--r--7---1---1---r---1---r--r--�---1---r--r---1-- 0.15 --T-T--T-- ---1i---T--T---1---T--T---1i---1i---T-- ---1i---T--T---1i-- 0.14 ---1-------1---1---1I ---1---1---1I -- ---1---1---1I---1---1---1I -- ---1-- 0.13 ' --- ------------------------------------------------ 1I1I 0.12 w 0.11 0.1 0 0.09-=-1-- E 0.08 i I I I I I I I I 1 I I I I I 0.07 0.06 � ' --1--1---L--J---1---L--1---1---L--1--J---1--- I -- 0.05 -L-1---L--J---1---L--1---1---1--- ---1---1---L-- -- 0.04 - -1--- -- ---1--- -----1---1--- ---1---1--- -----1--- -- - 0.03 -+ -1--- -- ---1--- --+---1---1--- ---1---1--- -----1--- -- ---1-- 0.02 0.01 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 85 Hydrograph for Link 17L: Post Development #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 12.00 0.07 0.00 0.07 13.00 0.13 0.00 0.13 14.00 0.12 0.00 0.12 15.00 0.12 0.00 0.12 16.00 0.12 0.00 0.12 17.00 0.12 0.00 0.12 18.00 0.12 0.00 0.12 19.00 0.12 0.00 0.12 20.00 0.12 0.00 0.12 21.00 0.12 0.00 0.12 22.00 0.12 0.00 0.12 23.00 0.12 0.00 0.12 24.00 0.12 0.00 0.12 25.00 0.11 0.00 0.11 26.00 0.10 0.00 0.10 27.00 0.10 0.00 0.10 28.00 0.10 0.00 0.10 29.00 0.10 0.00 0.10 30.00 0.10 0.00 0.10 31.00 0.10 0.00 0.10 32.00 0.10 0.00 0.10 33.00 0.10 0.00 0.10 34.00 0.10 0.00 0.10 35.00 0.10 0.00 0.10 36.00 0.10 0.00 0.10 37.00 0.09 0.00 0.09 38.00 0.09 0.00 0.09 39.00 0.09 0.00 0.09 40.00 0.09 0.00 0.09 41.00 0.09 0.00 0.09 42.00 0.09 0.00 0.09 43.00 0.09 0.00 0.09 44.00 0.09 0.00 0.09 45.00 0.09 0.00 0.09 46.00 0.09 0.00 0.09 47.00 0.09 0.00 0.09 48.00 0.08 0.00 0.08 49.00 0.08 0.00 0.08 50.00 0.08 0.00 0.08 51.00 0.08 0.00 0.08 52.00 0.08 0.00 0.08 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.08 0.00 0.08 54.00 0.08 0.00 0.08 55.00 0.08 0.00 0.08 56.00 0.08 0.00 0.08 57.00 0.08 0.00 0.08 58.00 0.08 0.00 0.08 59.00 0.07 0.00 0.07 60.00 0.07 0.00 0.07 61.00 0.07 0.00 0.07 62.00 0.07 0.00 0.07 63.00 0.07 0.00 0.07 64.00 0.07 0.00 0.07 65.00 0.07 0.00 0.07 66.00 0.07 0.00 0.07 67.00 0.07 0.00 0.07 68.00 0.07 0.00 0.07 69.00 0.07 0.00 0.07 70.00 0.06 0.00 0.06 71.00 0.06 0.00 0.06 72.00 0.06 0.00 0.06 73.00 0.06 0.00 0.06 74.00 0.06 0.00 0.06 75.00 0.06 0.00 0.06 76.00 0.06 0.00 0.06 77.00 0.06 0.00 0.06 78.00 0.06 0.00 0.06 79.00 0.06 0.00 0.06 80.00 0.05 0.00 0.05 81.00 0.05 0.00 0.05 82.00 0.05 0.00 0.05 83.00 0.05 0.00 0.05 84.00 0.05 0.00 0.05 85.00 0.05 0.00 0.05 86.00 0.05 0.00 0.05 87.00 0.05 0.00 0.05 88.00 0.05 0.00 0.05 89.00 0.05 0.00 0.05 90.00 0.04 0.00 0.04 91.00 0.04 0.00 0.04 92.00 0.04 0.00 0.04 93.00 0.04 0.00 0.04 94.00 0.04 0.00 0.04 95.00 0.04 0.00 0.04 96.00 0.04 0.00 0.04 97.00 0.04 0.00 0.04 98.00 0.04 0.00 0.04 99.00 0.03 0.00 0.03 Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 86 Summary for Link 18L: Post Development #1 Inflow Area = 28.230 ac, 3.61% Impervious, Inflow Depth > 0.60" for 1yr-24hr event Inflow = 2.25 cfs @ 12.13 hrs, Volume= 1.421 of Primary = 2.25 cfs @ 12.13 hrs, Volume= 1.421 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 18L: Post Development #1 Hydrograph Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 1 yr-24hr Rainfall=2.81" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 87 Hydrograph for Link 18L: Post Development #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 12.00 1.09 0.00 1.09 13.00 0.62 0.00 0.62 14.00 0.50 0.00 0.50 15.00 0.47 0.00 0.47 16.00 0.44 0.00 0.44 17.00 0.43 0.00 0.43 18.00 0.42 0.00 0.42 19.00 0.41 0.00 0.41 20.00 0.40 0.00 0.40 21.00 0.39 0.00 0.39 22.00 0.39 0.00 0.39 23.00 0.39 0.00 0.39 24.00 0.39 0.00 0.39 25.00 0.31 0.00 0.31 26.00 0.31 0.00 0.31 27.00 0.30 0.00 0.30 28.00 0.30 0.00 0.30 29.00 0.29 0.00 0.29 30.00 0.29 0.00 0.29 31.00 0.29 0.00 0.29 32.00 0.28 0.00 0.28 33.00 0.28 0.00 0.28 34.00 0.27 0.00 0.27 35.00 0.27 0.00 0.27 36.00 0.26 0.00 0.26 37.00 0.26 0.00 0.26 38.00 0.26 0.00 0.26 39.00 0.25 0.00 0.25 40.00 0.25 0.00 0.25 41.00 0.24 0.00 0.24 42.00 0.24 0.00 0.24 43.00 0.23 0.00 0.23 44.00 0.23 0.00 0.23 45.00 0.22 0.00 0.22 46.00 0.22 0.00 0.22 47.00 0.22 0.00 0.22 48.00 0.21 0.00 0.21 49.00 0.21 0.00 0.21 50.00 0.20 0.00 0.20 51.00 0.20 0.00 0.20 52.00 0.19 0.00 0.19 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.19 0.00 0.19 54.00 0.18 0.00 0.18 55.00 0.18 0.00 0.18 56.00 0.17 0.00 0.17 57.00 0.17 0.00 0.17 58.00 0.16 0.00 0.16 59.00 0.16 0.00 0.16 60.00 0.15 0.00 0.15 61.00 0.15 0.00 0.15 62.00 0.14 0.00 0.14 63.00 0.14 0.00 0.14 64.00 0.13 0.00 0.13 65.00 0.13 0.00 0.13 66.00 0.12 0.00 0.12 67.00 0.12 0.00 0.12 68.00 0.11 0.00 0.11 69.00 0.11 0.00 0.11 70.00 0.10 0.00 0.10 71.00 0.10 0.00 0.10 72.00 0.09 0.00 0.09 73.00 0.09 0.00 0.09 74.00 0.08 0.00 0.08 75.00 0.07 0.00 0.07 76.00 0.07 0.00 0.07 77.00 0.06 0.00 0.06 78.00 0.06 0.00 0.06 79.00 0.06 0.00 0.06 80.00 0.05 0.00 0.05 81.00 0.05 0.00 0.05 82.00 0.05 0.00 0.05 83.00 0.05 0.00 0.05 84.00 0.04 0.00 0.04 85.00 0.04 0.00 0.04 86.00 0.04 0.00 0.04 87.00 0.04 0.00 0.04 88.00 0.04 0.00 0.04 89.00 0.03 0.00 0.03 90.00 0.03 0.00 0.03 91.00 0.03 0.00 0.03 92.00 0.03 0.00 0.03 93.00 0.03 0.00 0.03 94.00 0.03 0.00 0.03 95.00 0.03 0.00 0.03 96.00 0.03 0.00 0.03 97.00 0.03 0.00 0.03 98.00 0.03 0.00 0.03 99.00 0.02 0.00 0.02 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 88 Time span=0.00-99.00 hrs, dt=0.05 hrs, 1981 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre-Development#1 Runoff Area=30.590 ac 3.53% Impervious Runoff Depth=0.28" Tc=21.7 min CN=57 Runoff=4.10 cfs 0.723 of Subcatchment2S: Pre-Development#2 Runoff Area=5.620 ac 0.00% Impervious Runoff Depth=0.23" Tc=24.9 min CN=55 Runoff=0.43 cfs 0.107 of Subcatchment8S: BMP #1 Runoff Area=12.980 ac 0.00% Impervious Runoff Depth=0.48" Tc=5.0 min CN=63 Runoff=9.49 cfs 0.524 of Subcatchment9S: BMP #2 Runoff Area=9.670 ac 0.00% Impervious Runoff Depth=1.34" Tc=5.0 min CN=80 Runoff=23.37 cfs 1.080 of Subcatchment 10S: BMP #3 Runoff Area=6.900 ac 0.00% Impervious Runoff Depth=1.28" Tc=5.0 min CN=79 Runoff=15.87 cfs 0.734 of Subcatchment 11 S: Bypass #1 Runoff Area=5.580 ac 18.28% Impervious Runoff Depth=0.56" Tc=16.9 min CN=65 Runoff=3.01 cfs 0.261 of Subcatchment 12S: Bypass #2 Runoff Area=1.160 ac 0.00% Impervious Runoff Depth=0.31" Tc=24.9 min CN=58 Runoff=0.17 cfs 0.030 of Subcatchment 13S: Pre-Development#3 Runoff Area=9.070 ac 0.00% Impervious Runoff Depth=0.23" Tc=20.7 min CN=55 Runoff=0.77 cfs 0.172 of Subcatchment14S: Post Development#3 Runoff Area=8.990 ac 0.00% Impervious Runoff Depth=0.23" Tc=20.7 min CN=55 Runoff=0.76 cfs 0.171 of Pond 5P: BMP #1 Peak Elev=567.75' Storage=19,627 cf Inflow=9.49 cfs 0.524 of Primary=0.08 cfs 0.435 of Secondary=0.00 cfs 0.000 of Outflow=0.08 cfs 0.435 of Pond 6P: BMP #2 Peak Elev=561.16' Storage=34,082 cf Inflow=23.37 cfs 1.080 of Primary=0.38 cfs 1.068 of Secondary=0.00 cfs 0.000 of Outflow=0.38 cfs 1.068 of Pond 7P: BMP #3 Peak Elev=570.92' Storage=27,123 cf Inflow=15.87 cfs 0.734 of Primary=0.12 cfs 0.629 of Secondary=0.00 cfs 0.000 of Outflow=0.12 cfs 0.629 of Link 17L: Post Development#2 Inflow=0.26 cfs 0.659 of Primary=0.26 cfs 0.659 of Link 18L: Post Development#1 Inflow=3.26 cfs 1.765 of Primary=3.26 cfs 1.765 of Total Runoff Area = 90.560 ac Runoff Volume = 3.802 of Average Runoff Depth = 0.50" 97.68% Pervious = 88.460 ac 2.32% Impervious = 2.100 ac Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 89 Summary for Subcatchment 1S: Pre -Development #1 Runoff = 4.10 cfs @ 12.24 hrs, Volume= 0.723 af, Depth= 0.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr24hr Rainfall=3.12" Area (ac) CN Description 29.510 55 Woods, Good, HSG B 1.020 98 Water Surface, HSG B 0.060 98 Paved roads w/curbs & sewers, HSG B 30.590 57 Weighted Average 29.510 96.47% Pervious Area 1.080 3.53% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.7 Direct Entry, Subcatchment 1S: Pre -Development #1 Hydrograph � � � � � � � � � � � � � � � � � � � ■Runoff 4.10 cfs --�---i---�--- I---�---I---�---I--�---�I -- I 2 '4 ' -tYs�e I,I -h,r- 4 2yr24hr Rainfall'=3.121' -J---1------i--- ---- L--- Runoff Area=30.590-at- 3 Runoff Vp16mq=672,3 clf Runoff Depth 0.287 o-- -- -------7------T------r---'--- -- ---' --,--- -i LL 2 TcT21.7 �YIIn RCN',=57 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 90 Hydrograph for Subcatchment 1S: Pre -Development #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.11 0.00 0.00 4.00 0.15 0.00 0.00 5.00 0.20 0.00 0.00 6.00 0.25 0.00 0.00 7.00 0.31 0.00 0.00 8.00 0.37 0.00 0.00 9.00 0.46 0.00 0.00 10.00 0.56 0.00 0.00 11.00 0.73 0.00 0.00 12.00 2.07 0.04 0.51 13.00 2.41 0.10 1.47 14.00 2.56 0.13 0.93 15.00 2.66 0.15 0.75 16.00 2.75 0.17 0.63 17.00 2.81 0.19 0.55 18.00 2.87 0.21 0.51 19.00 2.93 0.22 0.45 20.00 2.97 0.24 0.39 21.00 3.01 0.25 0.37 22.00 3.05 0.26 0.36 23.00 3.08 0.27 0.35 24.00 3.12 0.28 0.34 25.00 3.12 0.28 0.00 26.00 3.12 0.28 0.00 27.00 3.12 0.28 0.00 28.00 3.12 0.28 0.00 29.00 3.12 0.28 0.00 30.00 3.12 0.28 0.00 31.00 3.12 0.28 0.00 32.00 3.12 0.28 0.00 33.00 3.12 0.28 0.00 34.00 3.12 0.28 0.00 35.00 3.12 0.28 0.00 36.00 3.12 0.28 0.00 37.00 3.12 0.28 0.00 38.00 3.12 0.28 0.00 39.00 3.12 0.28 0.00 40.00 3.12 0.28 0.00 41.00 3.12 0.28 0.00 42.00 3.12 0.28 0.00 43.00 3.12 0.28 0.00 44.00 3.12 0.28 0.00 45.00 3.12 0.28 0.00 46.00 3.12 0.28 0.00 47.00 3.12 0.28 0.00 48.00 3.12 0.28 0.00 49.00 3.12 0.28 0.00 50.00 3.12 0.28 0.00 51.00 3.12 0.28 0.00 52.00 3.12 0.28 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 3.12 0.28 0.00 54.00 3.12 0.28 0.00 55.00 3.12 0.28 0.00 56.00 3.12 0.28 0.00 57.00 3.12 0.28 0.00 58.00 3.12 0.28 0.00 59.00 3.12 0.28 0.00 60.00 3.12 0.28 0.00 61.00 3.12 0.28 0.00 62.00 3.12 0.28 0.00 63.00 3.12 0.28 0.00 64.00 3.12 0.28 0.00 65.00 3.12 0.28 0.00 66.00 3.12 0.28 0.00 67.00 3.12 0.28 0.00 68.00 3.12 0.28 0.00 69.00 3.12 0.28 0.00 70.00 3.12 0.28 0.00 71.00 3.12 0.28 0.00 72.00 3.12 0.28 0.00 73.00 3.12 0.28 0.00 74.00 3.12 0.28 0.00 75.00 3.12 0.28 0.00 76.00 3.12 0.28 0.00 77.00 3.12 0.28 0.00 78.00 3.12 0.28 0.00 79.00 3.12 0.28 0.00 80.00 3.12 0.28 0.00 81.00 3.12 0.28 0.00 82.00 3.12 0.28 0.00 83.00 3.12 0.28 0.00 84.00 3.12 0.28 0.00 85.00 3.12 0.28 0.00 86.00 3.12 0.28 0.00 87.00 3.12 0.28 0.00 88.00 3.12 0.28 0.00 89.00 3.12 0.28 0.00 90.00 3.12 0.28 0.00 91.00 3.12 0.28 0.00 92.00 3.12 0.28 0.00 93.00 3.12 0.28 0.00 94.00 3.12 0.28 0.00 95.00 3.12 0.28 0.00 96.00 3.12 0.28 0.00 97.00 3.12 0.28 0.00 98.00 3.12 0.28 0.00 99.00 3.12 0.28 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 91 Summary for Subcatchment 2S: Pre -Development #2 Runoff = 0.43 cfs @ 12.33 hrs, Volume= 0.107 af, Depth= 0.23" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr24hr Rainfall=3.12" Area (ac) CN Description 5.620 55 Woods, Good, HSG B 5.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 2S: Pre -Development #2 Hydrograph --+----- ----- ---+--+---+--+------+------+--+------+------r------+- 0.48 -----'---------',-------- _ 0.46 - 0.43 cfs ----- ------ --------+------ --------+------ ------ - 0.44 -- --- -------r------r--+------+------r-- ---r---�(-�i-p--r---iw---r- 0.42 ---'--------------'---' _-Typeaa-�4 r- 0.4 --+---+--+---+--+---+--+------+--+---+--+---+--�j+--+---+-- I - --+- 0.38 -- -- -------�,------�, -----�,------�r2j/�'��h - RQiF1fall�i 311 " 0.36 --L---1---1---L---1---L--1------L---'---L--------.+---'---L---'---L- 0.34 -- ---7---1i---r---li---Ir--7---1i------- li-IRu"ff Ad�ea= 62aat- 0.32 ---' -- --'-----------------'------------------------' -- -------=----- 0.3 --+---+------+--+---+--+------+-]�-U"ff V-plu e=0r14'1-Of- w 0.28 -- -- ----,---,---,---, -----,------,---; -- ------ +---,---;---,---; - o.z6 -- -- - + --- L --- - --- - --- + --- LF Unof# DePtft=0.Z31'- 3 0.24 --+-- +------+--+---+--+------+------+--+---+--+------I--I---+- 0.2z ----- ----------------------------------------- Tc:T24.9_Ml1- LL 0.2 j 0.18 -- -- +------r------r--+------+------ -- - ----+------ -W- 0.16 ---' -- -'-----------------'-------------L---'-------'--------------- 0.14 - - + -- ------r------r--+------+------r--+---r--+---I---r------r- 0.12 0.1 --L---1---L---1---L--1------+------L-- ---L--+------L------L- 0.04 --+-- -+--+-+--+---+--+------+--+---+--+---+--+--+---+--+---+- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ■ Runoff Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 92 Hydrograph for Subcatchment 2S: Pre -Development #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.11 0.00 0.00 4.00 0.15 0.00 0.00 5.00 0.20 0.00 0.00 6.00 0.25 0.00 0.00 7.00 0.31 0.00 0.00 8.00 0.37 0.00 0.00 9.00 0.46 0.00 0.00 10.00 0.56 0.00 0.00 11.00 0.73 0.00 0.00 12.00 2.07 0.02 0.02 13.00 2.41 0.07 0.22 14.00 2.56 0.09 0.15 15.00 2.66 0.11 0.12 16.00 2.75 0.13 0.10 17.00 2.81 0.15 0.09 18.00 2.87 0.16 0.08 19.00 2.93 0.18 0.07 20.00 2.97 0.19 0.06 21.00 3.01 0.20 0.06 22.00 3.05 0.21 0.06 23.00 3.08 0.22 0.06 24.00 3.12 0.23 0.06 25.00 3.12 0.23 0.00 26.00 3.12 0.23 0.00 27.00 3.12 0.23 0.00 28.00 3.12 0.23 0.00 29.00 3.12 0.23 0.00 30.00 3.12 0.23 0.00 31.00 3.12 0.23 0.00 32.00 3.12 0.23 0.00 33.00 3.12 0.23 0.00 34.00 3.12 0.23 0.00 35.00 3.12 0.23 0.00 36.00 3.12 0.23 0.00 37.00 3.12 0.23 0.00 38.00 3.12 0.23 0.00 39.00 3.12 0.23 0.00 40.00 3.12 0.23 0.00 41.00 3.12 0.23 0.00 42.00 3.12 0.23 0.00 43.00 3.12 0.23 0.00 44.00 3.12 0.23 0.00 45.00 3.12 0.23 0.00 46.00 3.12 0.23 0.00 47.00 3.12 0.23 0.00 48.00 3.12 0.23 0.00 49.00 3.12 0.23 0.00 50.00 3.12 0.23 0.00 51.00 3.12 0.23 0.00 52.00 3.12 0.23 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 3.12 0.23 0.00 54.00 3.12 0.23 0.00 55.00 3.12 0.23 0.00 56.00 3.12 0.23 0.00 57.00 3.12 0.23 0.00 58.00 3.12 0.23 0.00 59.00 3.12 0.23 0.00 60.00 3.12 0.23 0.00 61.00 3.12 0.23 0.00 62.00 3.12 0.23 0.00 63.00 3.12 0.23 0.00 64.00 3.12 0.23 0.00 65.00 3.12 0.23 0.00 66.00 3.12 0.23 0.00 67.00 3.12 0.23 0.00 68.00 3.12 0.23 0.00 69.00 3.12 0.23 0.00 70.00 3.12 0.23 0.00 71.00 3.12 0.23 0.00 72.00 3.12 0.23 0.00 73.00 3.12 0.23 0.00 74.00 3.12 0.23 0.00 75.00 3.12 0.23 0.00 76.00 3.12 0.23 0.00 77.00 3.12 0.23 0.00 78.00 3.12 0.23 0.00 79.00 3.12 0.23 0.00 80.00 3.12 0.23 0.00 81.00 3.12 0.23 0.00 82.00 3.12 0.23 0.00 83.00 3.12 0.23 0.00 84.00 3.12 0.23 0.00 85.00 3.12 0.23 0.00 86.00 3.12 0.23 0.00 87.00 3.12 0.23 0.00 88.00 3.12 0.23 0.00 89.00 3.12 0.23 0.00 90.00 3.12 0.23 0.00 91.00 3.12 0.23 0.00 92.00 3.12 0.23 0.00 93.00 3.12 0.23 0.00 94.00 3.12 0.23 0.00 95.00 3.12 0.23 0.00 96.00 3.12 0.23 0.00 97.00 3.12 0.23 0.00 98.00 3.12 0.23 0.00 99.00 3.12 0.23 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 93 Summary for Subcatchment 8S: BMP #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 9.49 cfs @ 11.98 hrs, Volume= 0.524 af, Depth= 0.48" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr24hr Rainfall=3.12" Area (ac) CN Description 12.980 63 12.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: BMP #1 Hydrograph --+---+--+---+--+---+--+------+------+---+--+--+---+--+---+--+---+-- ■Runoff 10 9.49 cfs -- - -- -- --- -- -- --- -- --- y�e--24=hr- ---'I-- - ------ ------ ------ ------ II -` 1 r24h- -Rainfal1=112"-- 8 -- -----------------+---------- --- Runbff Area='12.1980-ad-- 7 - -- - -- --- -- --! - -- Furio#-\/Qlumq=0524--- w 6 1 11 -- - - --- +--- +--- +--- Runoff Depth,=0.48�, -- LL 5 Tt.=5.0 min --+---+---+--+---+--+---+--+------+---+--+--+---+---I--I --+-- 4 CN,=6$ -- 1 -- --1 7 7 + + + + T - -�--- T -- 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 94 Hydrograph for Subcatchment 8S: BMP #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.11 0.00 0.00 4.00 0.15 0.00 0.00 5.00 0.20 0.00 0.00 6.00 0.25 0.00 0.00 7.00 0.31 0.00 0.00 8.00 0.37 0.00 0.00 9.00 0.46 0.00 0.00 10.00 0.56 0.00 0.00 11.00 0.73 0.00 0.00 12.00 2.07 0.12 9.24 13.00 2.41 0.21 0.83 14.00 2.56 0.26 0.54 15.00 2.66 0.30 0.45 16.00 2.75 0.33 0.36 17.00 2.81 0.36 0.33 18.00 2.87 0.38 0.30 19.00 2.93 0.40 0.26 20.00 2.97 0.42 0.22 21.00 3.01 0.44 0.21 22.00 3.05 0.45 0.21 23.00 3.08 0.47 0.20 24.00 3.12 0.48 0.20 25.00 3.12 0.48 0.00 26.00 3.12 0.48 0.00 27.00 3.12 0.48 0.00 28.00 3.12 0.48 0.00 29.00 3.12 0.48 0.00 30.00 3.12 0.48 0.00 31.00 3.12 0.48 0.00 32.00 3.12 0.48 0.00 33.00 3.12 0.48 0.00 34.00 3.12 0.48 0.00 35.00 3.12 0.48 0.00 36.00 3.12 0.48 0.00 37.00 3.12 0.48 0.00 38.00 3.12 0.48 0.00 39.00 3.12 0.48 0.00 40.00 3.12 0.48 0.00 41.00 3.12 0.48 0.00 42.00 3.12 0.48 0.00 43.00 3.12 0.48 0.00 44.00 3.12 0.48 0.00 45.00 3.12 0.48 0.00 46.00 3.12 0.48 0.00 47.00 3.12 0.48 0.00 48.00 3.12 0.48 0.00 49.00 3.12 0.48 0.00 50.00 3.12 0.48 0.00 51.00 3.12 0.48 0.00 52.00 3.12 0.48 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 3.12 0.48 0.00 54.00 3.12 0.48 0.00 55.00 3.12 0.48 0.00 56.00 3.12 0.48 0.00 57.00 3.12 0.48 0.00 58.00 3.12 0.48 0.00 59.00 3.12 0.48 0.00 60.00 3.12 0.48 0.00 61.00 3.12 0.48 0.00 62.00 3.12 0.48 0.00 63.00 3.12 0.48 0.00 64.00 3.12 0.48 0.00 65.00 3.12 0.48 0.00 66.00 3.12 0.48 0.00 67.00 3.12 0.48 0.00 68.00 3.12 0.48 0.00 69.00 3.12 0.48 0.00 70.00 3.12 0.48 0.00 71.00 3.12 0.48 0.00 72.00 3.12 0.48 0.00 73.00 3.12 0.48 0.00 74.00 3.12 0.48 0.00 75.00 3.12 0.48 0.00 76.00 3.12 0.48 0.00 77.00 3.12 0.48 0.00 78.00 3.12 0.48 0.00 79.00 3.12 0.48 0.00 80.00 3.12 0.48 0.00 81.00 3.12 0.48 0.00 82.00 3.12 0.48 0.00 83.00 3.12 0.48 0.00 84.00 3.12 0.48 0.00 85.00 3.12 0.48 0.00 86.00 3.12 0.48 0.00 87.00 3.12 0.48 0.00 88.00 3.12 0.48 0.00 89.00 3.12 0.48 0.00 90.00 3.12 0.48 0.00 91.00 3.12 0.48 0.00 92.00 3.12 0.48 0.00 93.00 3.12 0.48 0.00 94.00 3.12 0.48 0.00 95.00 3.12 0.48 0.00 96.00 3.12 0.48 0.00 97.00 3.12 0.48 0.00 98.00 3.12 0.48 0.00 99.00 3.12 0.48 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 95 Summary for Subcatchment 9S: BMP #2 [49] Hint: Tc<2dt may require smaller dt Runoff = 23.37 cfs @ 11.96 hrs, Volume= 1.080 af, Depth= 1.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr24hr Rainfall=3.12" Area (ac) CN Description 9.670 80 9.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: BMP #2 Hydrograph 26 zs 24 ------------------------' - - -'----- - - - - -'-- -'- - -'-- -'- - -'-- -'- - -'---'---' -- cfs -----�---�---�---�------- -------�---�---�-------�---r---�---r-- -- -- ------ --- -- ------ ------ ------ -------------- ■Runoff 23.37 23 t'------r'-----tI---rI--+I------I------+I---I---rI----II---t ppI ch 22 21 - -r -- --'I -- I Ii --i--- ----r'----- ---'--- t---'---t -L 1r24hrRai nfaFf=3-.42 -------r------r------20 -- - - 19 18 - -- -- -- -- - ------------+------+------+ Rurtoff-Afea SX70-ad ----� -- ---- -- I ------I----I------I----- I I I I I 1 W�I �I - 1---t--------100VI--1'0 016 ''f-- ' -E�I w 15 14 --r-- -- - --- -r---r--r---r--r---r--t------t---I---r---I---r---I---------r-- r --------------'---'---' '-------Rmaf# Dfh--C341'-- -r---1- ------Y---r--t------t - --- - --I - --r---r---I - --r -- 3 13 a 12 r ---I-- II --'---'----------'---'------------------------T-t---5. 0 In ill-- 11 10 --r-- -- -- -- -- -r-r--r------r---r--t------t---r--r------r- - r - r-- -L---1---L---1---1---1---1--- ---1--- ---L------L----Ai�jY- I I I �I - ---I--- ---r-----I--- ------ --- --r------ ---I-- 9 8 7 --L-- --r-- Trrr r I- -L---1---L---1---1---1---1---'---1------L------L------L------L-- -r--- r-- r--- I - - -r ---i - --T---I---r---I---r---I---r---I---r---I---r-- 6 5 i --L-- --r-- -L---1---L---1---1---1---1---1---1------L------L------L------L-- I I I I I -r--- r-- r--- rr - - -�-- T--- I - - -r ---I r---I---r---I---r---I---r-- 4 --L-- -L---1---L---1---1---1---1---1---1------L------L------L------L-- 2 --�-- 1------I------�- I - --- --I - --- --------I------I------�-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 96 Hydrograph for Subcatchment 9S: BMP #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.11 0.00 0.00 4.00 0.15 0.00 0.00 5.00 0.20 0.00 0.00 6.00 0.25 0.00 0.00 7.00 0.31 0.00 0.00 8.00 0.37 0.00 0.00 9.00 0.46 0.00 0.00 10.00 0.56 0.00 0.05 11.00 0.73 0.02 0.32 12.00 2.07 0.60 20.77 13.00 2.41 0.83 1.34 14.00 2.56 0.93 0.82 15.00 2.66 1.00 0.66 16.00 2.75 1.06 0.52 17.00 2.81 1.11 0.46 18.00 2.87 1.16 0.41 19.00 2.93 1.19 0.35 20.00 2.97 1.23 0.30 21.00 3.01 1.26 0.29 22.00 3.05 1.29 0.28 23.00 3.08 1.31 0.27 24.00 3.12 1.34 0.26 25.00 3.12 1.34 0.00 26.00 3.12 1.34 0.00 27.00 3.12 1.34 0.00 28.00 3.12 1.34 0.00 29.00 3.12 1.34 0.00 30.00 3.12 1.34 0.00 31.00 3.12 1.34 0.00 32.00 3.12 1.34 0.00 33.00 3.12 1.34 0.00 34.00 3.12 1.34 0.00 35.00 3.12 1.34 0.00 36.00 3.12 1.34 0.00 37.00 3.12 1.34 0.00 38.00 3.12 1.34 0.00 39.00 3.12 1.34 0.00 40.00 3.12 1.34 0.00 41.00 3.12 1.34 0.00 42.00 3.12 1.34 0.00 43.00 3.12 1.34 0.00 44.00 3.12 1.34 0.00 45.00 3.12 1.34 0.00 46.00 3.12 1.34 0.00 47.00 3.12 1.34 0.00 48.00 3.12 1.34 0.00 49.00 3.12 1.34 0.00 50.00 3.12 1.34 0.00 51.00 3.12 1.34 0.00 52.00 3.12 1.34 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 3.12 1.34 0.00 54.00 3.12 1.34 0.00 55.00 3.12 1.34 0.00 56.00 3.12 1.34 0.00 57.00 3.12 1.34 0.00 58.00 3.12 1.34 0.00 59.00 3.12 1.34 0.00 60.00 3.12 1.34 0.00 61.00 3.12 1.34 0.00 62.00 3.12 1.34 0.00 63.00 3.12 1.34 0.00 64.00 3.12 1.34 0.00 65.00 3.12 1.34 0.00 66.00 3.12 1.34 0.00 67.00 3.12 1.34 0.00 68.00 3.12 1.34 0.00 69.00 3.12 1.34 0.00 70.00 3.12 1.34 0.00 71.00 3.12 1.34 0.00 72.00 3.12 1.34 0.00 73.00 3.12 1.34 0.00 74.00 3.12 1.34 0.00 75.00 3.12 1.34 0.00 76.00 3.12 1.34 0.00 77.00 3.12 1.34 0.00 78.00 3.12 1.34 0.00 79.00 3.12 1.34 0.00 80.00 3.12 1.34 0.00 81.00 3.12 1.34 0.00 82.00 3.12 1.34 0.00 83.00 3.12 1.34 0.00 84.00 3.12 1.34 0.00 85.00 3.12 1.34 0.00 86.00 3.12 1.34 0.00 87.00 3.12 1.34 0.00 88.00 3.12 1.34 0.00 89.00 3.12 1.34 0.00 90.00 3.12 1.34 0.00 91.00 3.12 1.34 0.00 92.00 3.12 1.34 0.00 93.00 3.12 1.34 0.00 94.00 3.12 1.34 0.00 95.00 3.12 1.34 0.00 96.00 3.12 1.34 0.00 97.00 3.12 1.34 0.00 98.00 3.12 1.34 0.00 99.00 3.12 1.34 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 97 Summary for Subcatchment 10S: BMP #3 [49] Hint: Tc<2dt may require smaller dt Runoff = 15.87 cfs @ 11.96 hrs, Volume= 0.734 af, Depth= 1.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr24hr Rainfall=3.12" Area (ac) CN Description 6.900 79 6.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: BMP #3 Hydrograph 17 -�--- it ---I I I I I I I 15.87 cfs - I --- - - - --- --I--- -I-- --I--- ---I-- -I-- -- 16 I I I I I I I I I I I --- ,------ ,- - -I---------T------7------r------type_0-2 =h''r- 15 --+-- -+------+------+------+------+------+------+------r------+-- 14 --L-- ----'------1---1------L------T2 r24h-_R�flrtfa[1 3A2'�-- pl�� I� ,,II 13 ---'----'---'----------'---'- --- - -'--- __Runoff A.e&96.00ad - 12 11 -- --- T--- T--T- - - - -- ---cllf w 10 --+---+---r--+---r--+---r--+------+ --- I- Rurn ffi Deipth=1;28f�- L LL 8 - - -I - - - - - - - - - - - - - - _TSs�aR 7 6 -N_7 r r -- - - - - - - s --r-- -r---r--r---r--1---r--t---I---r---I---r---I---r---I---r---I---r-- 4 --�-----------L-----L--+------+------+------+-----------�-- 3 --�-- ---------1---1---'---L---'---L------L------L-----L------L-- 2 1 -------------------- -------------------------------------- 1 I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 98 Hydrograph for Subcatchment 10S: BMP #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.11 0.00 0.00 4.00 0.15 0.00 0.00 5.00 0.20 0.00 0.00 6.00 0.25 0.00 0.00 7.00 0.31 0.00 0.00 8.00 0.37 0.00 0.00 9.00 0.46 0.00 0.00 10.00 0.56 0.00 0.01 11.00 0.73 0.01 0.19 12.00 2.07 0.56 14.17 13.00 2.41 0.78 0.92 14.00 2.56 0.88 0.57 15.00 2.66 0.95 0.46 16.00 2.75 1.01 0.36 17.00 2.81 1.05 0.32 18.00 2.87 1.10 0.28 19.00 2.93 1.13 0.25 20.00 2.97 1.17 0.21 21.00 3.01 1.20 0.20 22.00 3.05 1.22 0.19 23.00 3.08 1.25 0.19 24.00 3.12 1.28 0.18 25.00 3.12 1.28 0.00 26.00 3.12 1.28 0.00 27.00 3.12 1.28 0.00 28.00 3.12 1.28 0.00 29.00 3.12 1.28 0.00 30.00 3.12 1.28 0.00 31.00 3.12 1.28 0.00 32.00 3.12 1.28 0.00 33.00 3.12 1.28 0.00 34.00 3.12 1.28 0.00 35.00 3.12 1.28 0.00 36.00 3.12 1.28 0.00 37.00 3.12 1.28 0.00 38.00 3.12 1.28 0.00 39.00 3.12 1.28 0.00 40.00 3.12 1.28 0.00 41.00 3.12 1.28 0.00 42.00 3.12 1.28 0.00 43.00 3.12 1.28 0.00 44.00 3.12 1.28 0.00 45.00 3.12 1.28 0.00 46.00 3.12 1.28 0.00 47.00 3.12 1.28 0.00 48.00 3.12 1.28 0.00 49.00 3.12 1.28 0.00 50.00 3.12 1.28 0.00 51.00 3.12 1.28 0.00 52.00 3.12 1.28 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 3.12 1.28 0.00 54.00 3.12 1.28 0.00 55.00 3.12 1.28 0.00 56.00 3.12 1.28 0.00 57.00 3.12 1.28 0.00 58.00 3.12 1.28 0.00 59.00 3.12 1.28 0.00 60.00 3.12 1.28 0.00 61.00 3.12 1.28 0.00 62.00 3.12 1.28 0.00 63.00 3.12 1.28 0.00 64.00 3.12 1.28 0.00 65.00 3.12 1.28 0.00 66.00 3.12 1.28 0.00 67.00 3.12 1.28 0.00 68.00 3.12 1.28 0.00 69.00 3.12 1.28 0.00 70.00 3.12 1.28 0.00 71.00 3.12 1.28 0.00 72.00 3.12 1.28 0.00 73.00 3.12 1.28 0.00 74.00 3.12 1.28 0.00 75.00 3.12 1.28 0.00 76.00 3.12 1.28 0.00 77.00 3.12 1.28 0.00 78.00 3.12 1.28 0.00 79.00 3.12 1.28 0.00 80.00 3.12 1.28 0.00 81.00 3.12 1.28 0.00 82.00 3.12 1.28 0.00 83.00 3.12 1.28 0.00 84.00 3.12 1.28 0.00 85.00 3.12 1.28 0.00 86.00 3.12 1.28 0.00 87.00 3.12 1.28 0.00 88.00 3.12 1.28 0.00 89.00 3.12 1.28 0.00 90.00 3.12 1.28 0.00 91.00 3.12 1.28 0.00 92.00 3.12 1.28 0.00 93.00 3.12 1.28 0.00 94.00 3.12 1.28 0.00 95.00 3.12 1.28 0.00 96.00 3.12 1.28 0.00 97.00 3.12 1.28 0.00 98.00 3.12 1.28 0.00 99.00 3.12 1.28 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 99 Summary for Subcatchment 11S: Bypass #1 Runoff = 3.01 cfs @ 12.12 hrs, Volume= 0.261 af, Depth= 0.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr24hr Rainfall=3.12" Area (ac) CN Description 4.560 58 Woods/grass comb., Good, HSG B 1.020 98 Water Surface, HSG B 5.580 65 Weighted Average 4.560 81.72% Pervious Area 1.020 18.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.9 Direct Entry, Subcatchment 11S: Bypass #1 Hydrograph � � � � � � � � � � � � � � � � � � � ■Runoff 3.01 cfs------------+------}---I--- -----I------I---------+---- 3 type 11 24-hr 2yr24hr Rainfall'=3.121' Runoff Area=5.580 at 2 -- - --- -- Rur�6f Vru'm =Or-261 If Runoff Depth'0!56" LL TcT16.9 min 1 I I I I I I I I I ILL I I 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 100 Hydrograph for Subcatchment 11S: Bypass #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.11 0.00 0.00 4.00 0.15 0.00 0.00 5.00 0.20 0.00 0.00 6.00 0.25 0.00 0.00 7.00 0.31 0.00 0.00 8.00 0.37 0.00 0.00 9.00 0.46 0.00 0.00 10.00 0.56 0.00 0.00 11.00 0.73 0.00 0.00 12.00 2.07 0.15 1.56 13.00 2.41 0.26 0.46 14.00 2.56 0.32 0.28 15.00 2.66 0.36 0.22 16.00 2.75 0.39 0.18 17.00 2.81 0.42 0.16 18.00 2.87 0.45 0.14 19.00 2.93 0.47 0.13 20.00 2.97 0.49 0.11 21.00 3.01 0.51 0.10 22.00 3.05 0.53 0.10 23.00 3.08 0.55 0.10 24.00 3.12 0.56 0.09 25.00 3.12 0.56 0.00 26.00 3.12 0.56 0.00 27.00 3.12 0.56 0.00 28.00 3.12 0.56 0.00 29.00 3.12 0.56 0.00 30.00 3.12 0.56 0.00 31.00 3.12 0.56 0.00 32.00 3.12 0.56 0.00 33.00 3.12 0.56 0.00 34.00 3.12 0.56 0.00 35.00 3.12 0.56 0.00 36.00 3.12 0.56 0.00 37.00 3.12 0.56 0.00 38.00 3.12 0.56 0.00 39.00 3.12 0.56 0.00 40.00 3.12 0.56 0.00 41.00 3.12 0.56 0.00 42.00 3.12 0.56 0.00 43.00 3.12 0.56 0.00 44.00 3.12 0.56 0.00 45.00 3.12 0.56 0.00 46.00 3.12 0.56 0.00 47.00 3.12 0.56 0.00 48.00 3.12 0.56 0.00 49.00 3.12 0.56 0.00 50.00 3.12 0.56 0.00 51.00 3.12 0.56 0.00 52.00 3.12 0.56 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 3.12 0.56 0.00 54.00 3.12 0.56 0.00 55.00 3.12 0.56 0.00 56.00 3.12 0.56 0.00 57.00 3.12 0.56 0.00 58.00 3.12 0.56 0.00 59.00 3.12 0.56 0.00 60.00 3.12 0.56 0.00 61.00 3.12 0.56 0.00 62.00 3.12 0.56 0.00 63.00 3.12 0.56 0.00 64.00 3.12 0.56 0.00 65.00 3.12 0.56 0.00 66.00 3.12 0.56 0.00 67.00 3.12 0.56 0.00 68.00 3.12 0.56 0.00 69.00 3.12 0.56 0.00 70.00 3.12 0.56 0.00 71.00 3.12 0.56 0.00 72.00 3.12 0.56 0.00 73.00 3.12 0.56 0.00 74.00 3.12 0.56 0.00 75.00 3.12 0.56 0.00 76.00 3.12 0.56 0.00 77.00 3.12 0.56 0.00 78.00 3.12 0.56 0.00 79.00 3.12 0.56 0.00 80.00 3.12 0.56 0.00 81.00 3.12 0.56 0.00 82.00 3.12 0.56 0.00 83.00 3.12 0.56 0.00 84.00 3.12 0.56 0.00 85.00 3.12 0.56 0.00 86.00 3.12 0.56 0.00 87.00 3.12 0.56 0.00 88.00 3.12 0.56 0.00 89.00 3.12 0.56 0.00 90.00 3.12 0.56 0.00 91.00 3.12 0.56 0.00 92.00 3.12 0.56 0.00 93.00 3.12 0.56 0.00 94.00 3.12 0.56 0.00 95.00 3.12 0.56 0.00 96.00 3.12 0.56 0.00 97.00 3.12 0.56 0.00 98.00 3.12 0.56 0.00 99.00 3.12 0.56 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 101 Summary for Subcatchment 12S: Bypass #2 Runoff = 0.17 cfs @ 12.28 hrs, Volume= 0.030 af, Depth= 0.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr24hr Rainfall=3.12" Area (ac) CN Description 1.160 58 Woods/grass comb., Good, HSG B 1.160 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 12S: Bypass #2 Hydrograph 0.19 0.18 --rt---I---7--- I---r------r--I - 0.17 cfs--I---r---I---r-----I---rt--T---r--,---I---rt--T---r---I---r-- - ---I---T--T---I---T---I---T--T---T --- ---T--- 4 ---r--I--- r--7--- ---r------r-- --TyKP` ■Runoff 0.17 - I --I --T-- T- -- - r------r--T------T------r--T---I--- n ' w p ,�-�-"��Ir�-- 0.16 0.15 -- ---T--- -T---T---I--- --- T--- r---I--- --- IT r - - T------T ---I- - T- I- T- - - - - - - - T� N-- - 2r1� r1 Rai n#a tl 3 121 I--pr T I- T---I---TN--/T�---yr�-- 0.14 --T--- T--- ---T------IT- -T------T--- p --RFU toffTAAtwa 1:1-6aat-- 0.13 0.12 I -- ---T---11---T---11---T--T---11---T- I I I I I u of Vs lupn141031-Of - w 0.11 U 0.1 -- --- T-- - 'I--- I I I -_T-- -T---- ------T--T------T--- I I T - - I -- T I I --- I - - - T - T De th1=0 31"-- --- TRa>r�a# - - - I -- T _- --T----wT--- ---T-- 0 0.09 LL ------------- ------- --------------------------- Tc,"2 F.9-M!h-- 0.08 007 _ T -T I -- - - - - T I I - - - - - - T-- - - - - T I T I T-_ T I T I � � 0.06 -- 7-- T T T-- T T T -_ T T T T-- 0.05 ------ -I- - -I - - -I 0.04 -_T-- ----r T --T T T--T T T T-- 0.03 -- -- -- -- 0.02 -_ T-- -T T T-- 7 T T -- T T T T-- 0.01 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 102 Hydrograph for Subcatchment 12S: Bypass #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.11 0.00 0.00 4.00 0.15 0.00 0.00 5.00 0.20 0.00 0.00 6.00 0.25 0.00 0.00 7.00 0.31 0.00 0.00 8.00 0.37 0.00 0.00 9.00 0.46 0.00 0.00 10.00 0.56 0.00 0.00 11.00 0.73 0.00 0.00 12.00 2.07 0.05 0.02 13.00 2.41 0.11 0.06 14.00 2.56 0.15 0.04 15.00 2.66 0.17 0.03 16.00 2.75 0.20 0.03 17.00 2.81 0.22 0.02 18.00 2.87 0.23 0.02 19.00 2.93 0.25 0.02 20.00 2.97 0.26 0.02 21.00 3.01 0.28 0.01 22.00 3.05 0.29 0.01 23.00 3.08 0.30 0.01 24.00 3.12 0.31 0.01 25.00 3.12 0.31 0.00 26.00 3.12 0.31 0.00 27.00 3.12 0.31 0.00 28.00 3.12 0.31 0.00 29.00 3.12 0.31 0.00 30.00 3.12 0.31 0.00 31.00 3.12 0.31 0.00 32.00 3.12 0.31 0.00 33.00 3.12 0.31 0.00 34.00 3.12 0.31 0.00 35.00 3.12 0.31 0.00 36.00 3.12 0.31 0.00 37.00 3.12 0.31 0.00 38.00 3.12 0.31 0.00 39.00 3.12 0.31 0.00 40.00 3.12 0.31 0.00 41.00 3.12 0.31 0.00 42.00 3.12 0.31 0.00 43.00 3.12 0.31 0.00 44.00 3.12 0.31 0.00 45.00 3.12 0.31 0.00 46.00 3.12 0.31 0.00 47.00 3.12 0.31 0.00 48.00 3.12 0.31 0.00 49.00 3.12 0.31 0.00 50.00 3.12 0.31 0.00 51.00 3.12 0.31 0.00 52.00 3.12 0.31 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 3.12 0.31 0.00 54.00 3.12 0.31 0.00 55.00 3.12 0.31 0.00 56.00 3.12 0.31 0.00 57.00 3.12 0.31 0.00 58.00 3.12 0.31 0.00 59.00 3.12 0.31 0.00 60.00 3.12 0.31 0.00 61.00 3.12 0.31 0.00 62.00 3.12 0.31 0.00 63.00 3.12 0.31 0.00 64.00 3.12 0.31 0.00 65.00 3.12 0.31 0.00 66.00 3.12 0.31 0.00 67.00 3.12 0.31 0.00 68.00 3.12 0.31 0.00 69.00 3.12 0.31 0.00 70.00 3.12 0.31 0.00 71.00 3.12 0.31 0.00 72.00 3.12 0.31 0.00 73.00 3.12 0.31 0.00 74.00 3.12 0.31 0.00 75.00 3.12 0.31 0.00 76.00 3.12 0.31 0.00 77.00 3.12 0.31 0.00 78.00 3.12 0.31 0.00 79.00 3.12 0.31 0.00 80.00 3.12 0.31 0.00 81.00 3.12 0.31 0.00 82.00 3.12 0.31 0.00 83.00 3.12 0.31 0.00 84.00 3.12 0.31 0.00 85.00 3.12 0.31 0.00 86.00 3.12 0.31 0.00 87.00 3.12 0.31 0.00 88.00 3.12 0.31 0.00 89.00 3.12 0.31 0.00 90.00 3.12 0.31 0.00 91.00 3.12 0.31 0.00 92.00 3.12 0.31 0.00 93.00 3.12 0.31 0.00 94.00 3.12 0.31 0.00 95.00 3.12 0.31 0.00 96.00 3.12 0.31 0.00 97.00 3.12 0.31 0.00 98.00 3.12 0.31 0.00 99.00 3.12 0.31 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 103 Summary for Subcatchment 13S: Pre -Development #3 Runoff = 0.77 cfs @ 12.25 hrs, Volume= 0.172 af, Depth= 0.23" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr24hr Rainfall=3.12" Area (ac) CN Description 9.070 55 Woods, Good, HSG B 9.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 13S: Pre -Development #3 Hydrograph -- L------+---I--- L -- J---L -- L------+---�--- L -- L------+---�--- L---�---L -- ■Runoff 0.8 0.77 cfs 0.75 - ----- ------ --------+------�__I--- --TXpe-11-2-4_-hr-- --+-- -+--+--------- +--4--- ---------+-----'+-- 0.7 --L---1--- 1---L--- 1--- L--1------+---� 2yr24r- Rai n#aH=3Jiz1-�-- 0.65 0.6 Runoff Aeea=9.070 at 0.55 J� `, � --+---+---I---+---I---+--+------+-f -u off Volul 1=0r17'�-` f - w0.5 --I'-- ------- ---------------+------- ---_ w 1 F�unof�e fh 0.�3�'-- 0.45 LL 0.4 -- ---T------T--------T------T------�---T--- --- Tc,"2a.7-M!h-- 0.35 --+------I---+------+--+------+------+--+------+------��I-- 0.3 0.25 0.2 0.15 --+-- ---+-----+--+------+------+--+-----+--+---+-----+-- 0.1 0.05 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 104 Hydrograph for Subcatchment 13S: Pre -Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.11 0.00 0.00 4.00 0.15 0.00 0.00 5.00 0.20 0.00 0.00 6.00 0.25 0.00 0.00 7.00 0.31 0.00 0.00 8.00 0.37 0.00 0.00 9.00 0.46 0.00 0.00 10.00 0.56 0.00 0.00 11.00 0.73 0.00 0.00 12.00 2.07 0.02 0.07 13.00 2.41 0.07 0.35 14.00 2.56 0.09 0.23 15.00 2.66 0.11 0.19 16.00 2.75 0.13 0.16 17.00 2.81 0.15 0.14 18.00 2.87 0.16 0.13 19.00 2.93 0.18 0.12 20.00 2.97 0.19 0.10 21.00 3.01 0.20 0.10 22.00 3.05 0.21 0.09 23.00 3.08 0.22 0.09 24.00 3.12 0.23 0.09 25.00 3.12 0.23 0.00 26.00 3.12 0.23 0.00 27.00 3.12 0.23 0.00 28.00 3.12 0.23 0.00 29.00 3.12 0.23 0.00 30.00 3.12 0.23 0.00 31.00 3.12 0.23 0.00 32.00 3.12 0.23 0.00 33.00 3.12 0.23 0.00 34.00 3.12 0.23 0.00 35.00 3.12 0.23 0.00 36.00 3.12 0.23 0.00 37.00 3.12 0.23 0.00 38.00 3.12 0.23 0.00 39.00 3.12 0.23 0.00 40.00 3.12 0.23 0.00 41.00 3.12 0.23 0.00 42.00 3.12 0.23 0.00 43.00 3.12 0.23 0.00 44.00 3.12 0.23 0.00 45.00 3.12 0.23 0.00 46.00 3.12 0.23 0.00 47.00 3.12 0.23 0.00 48.00 3.12 0.23 0.00 49.00 3.12 0.23 0.00 50.00 3.12 0.23 0.00 51.00 3.12 0.23 0.00 52.00 3.12 0.23 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 3.12 0.23 0.00 54.00 3.12 0.23 0.00 55.00 3.12 0.23 0.00 56.00 3.12 0.23 0.00 57.00 3.12 0.23 0.00 58.00 3.12 0.23 0.00 59.00 3.12 0.23 0.00 60.00 3.12 0.23 0.00 61.00 3.12 0.23 0.00 62.00 3.12 0.23 0.00 63.00 3.12 0.23 0.00 64.00 3.12 0.23 0.00 65.00 3.12 0.23 0.00 66.00 3.12 0.23 0.00 67.00 3.12 0.23 0.00 68.00 3.12 0.23 0.00 69.00 3.12 0.23 0.00 70.00 3.12 0.23 0.00 71.00 3.12 0.23 0.00 72.00 3.12 0.23 0.00 73.00 3.12 0.23 0.00 74.00 3.12 0.23 0.00 75.00 3.12 0.23 0.00 76.00 3.12 0.23 0.00 77.00 3.12 0.23 0.00 78.00 3.12 0.23 0.00 79.00 3.12 0.23 0.00 80.00 3.12 0.23 0.00 81.00 3.12 0.23 0.00 82.00 3.12 0.23 0.00 83.00 3.12 0.23 0.00 84.00 3.12 0.23 0.00 85.00 3.12 0.23 0.00 86.00 3.12 0.23 0.00 87.00 3.12 0.23 0.00 88.00 3.12 0.23 0.00 89.00 3.12 0.23 0.00 90.00 3.12 0.23 0.00 91.00 3.12 0.23 0.00 92.00 3.12 0.23 0.00 93.00 3.12 0.23 0.00 94.00 3.12 0.23 0.00 95.00 3.12 0.23 0.00 96.00 3.12 0.23 0.00 97.00 3.12 0.23 0.00 98.00 3.12 0.23 0.00 99.00 3.12 0.23 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 105 Summary for Subcatchment 14S: Post Development #3 Runoff = 0.76 cfs @ 12.25 hrs, Volume= 0.171 af, Depth= 0.23" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr24hr Rainfall=3.12" Area (ac) CN Description 8.670 55 Woods, Good, HSG B 0.320 58 Woods/grass comb., Good, HSG B 8.990 55 Weighted Average 8.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 14S: Post Development #3 Hydrograph 0.85 -- ------ ------ ------ -- ------ ------ -- ------ ------ ------ -- Runoff 0.810.76 cfs 0.75 7--- T------T-- - I ---' T------T---I--- ,�-- ---Type1)-2-4-hr-- 0.7 . ---T------.---li---'+-----li---+---'i2�1F�rli Rainfall -3�1�N-- yr2 0.65 --1-- -1---1---L---1---L--1---'---1---'---L--1------1---'---L---'---L-- 0.6 --' ---'- -' nToff'Area= -990 at-- ----- ----------------------- - ---7------r------r--+------rt--Rtu of VoluMne=0r17'1-pf- 0.5 --'---+------ ------ --------+------ --------+------ ------ -- 0.45 _Runoff_ Depth=0.23�_ a0.4 --T-------,---,---,---,--T------T---,---,--T------Tc,2E}.� 0.35 --+------ ---+--+---+--+------+------+--+------+------ (L; -O-- 0.3 0.25 ----- --------------------------------------------------------- 0.2 --7-- -----r------r--+------T------r--I------7------T------r-- 0.15 ---- 0.1 0.05 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 106 Hydrograph for Subcatchment 14S: Post Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.11 0.00 0.00 4.00 0.15 0.00 0.00 5.00 0.20 0.00 0.00 6.00 0.25 0.00 0.00 7.00 0.31 0.00 0.00 8.00 0.37 0.00 0.00 9.00 0.46 0.00 0.00 10.00 0.56 0.00 0.00 11.00 0.73 0.00 0.00 12.00 2.07 0.02 0.07 13.00 2.41 0.07 0.34 14.00 2.56 0.09 0.23 15.00 2.66 0.11 0.19 16.00 2.75 0.13 0.16 17.00 2.81 0.15 0.14 18.00 2.87 0.16 0.13 19.00 2.93 0.18 0.12 20.00 2.97 0.19 0.10 21.00 3.01 0.20 0.09 22.00 3.05 0.21 0.09 23.00 3.08 0.22 0.09 24.00 3.12 0.23 0.09 25.00 3.12 0.23 0.00 26.00 3.12 0.23 0.00 27.00 3.12 0.23 0.00 28.00 3.12 0.23 0.00 29.00 3.12 0.23 0.00 30.00 3.12 0.23 0.00 31.00 3.12 0.23 0.00 32.00 3.12 0.23 0.00 33.00 3.12 0.23 0.00 34.00 3.12 0.23 0.00 35.00 3.12 0.23 0.00 36.00 3.12 0.23 0.00 37.00 3.12 0.23 0.00 38.00 3.12 0.23 0.00 39.00 3.12 0.23 0.00 40.00 3.12 0.23 0.00 41.00 3.12 0.23 0.00 42.00 3.12 0.23 0.00 43.00 3.12 0.23 0.00 44.00 3.12 0.23 0.00 45.00 3.12 0.23 0.00 46.00 3.12 0.23 0.00 47.00 3.12 0.23 0.00 48.00 3.12 0.23 0.00 49.00 3.12 0.23 0.00 50.00 3.12 0.23 0.00 51.00 3.12 0.23 0.00 52.00 3.12 0.23 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 3.12 0.23 0.00 54.00 3.12 0.23 0.00 55.00 3.12 0.23 0.00 56.00 3.12 0.23 0.00 57.00 3.12 0.23 0.00 58.00 3.12 0.23 0.00 59.00 3.12 0.23 0.00 60.00 3.12 0.23 0.00 61.00 3.12 0.23 0.00 62.00 3.12 0.23 0.00 63.00 3.12 0.23 0.00 64.00 3.12 0.23 0.00 65.00 3.12 0.23 0.00 66.00 3.12 0.23 0.00 67.00 3.12 0.23 0.00 68.00 3.12 0.23 0.00 69.00 3.12 0.23 0.00 70.00 3.12 0.23 0.00 71.00 3.12 0.23 0.00 72.00 3.12 0.23 0.00 73.00 3.12 0.23 0.00 74.00 3.12 0.23 0.00 75.00 3.12 0.23 0.00 76.00 3.12 0.23 0.00 77.00 3.12 0.23 0.00 78.00 3.12 0.23 0.00 79.00 3.12 0.23 0.00 80.00 3.12 0.23 0.00 81.00 3.12 0.23 0.00 82.00 3.12 0.23 0.00 83.00 3.12 0.23 0.00 84.00 3.12 0.23 0.00 85.00 3.12 0.23 0.00 86.00 3.12 0.23 0.00 87.00 3.12 0.23 0.00 88.00 3.12 0.23 0.00 89.00 3.12 0.23 0.00 90.00 3.12 0.23 0.00 91.00 3.12 0.23 0.00 92.00 3.12 0.23 0.00 93.00 3.12 0.23 0.00 94.00 3.12 0.23 0.00 95.00 3.12 0.23 0.00 96.00 3.12 0.23 0.00 97.00 3.12 0.23 0.00 98.00 3.12 0.23 0.00 99.00 3.12 0.23 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 107 Summary for Pond 5P: BMP #1 Inflow Area = 12.980 ac, 0.00% Impervious, Inflow Depth = 0.48" for 2yr24hr event Inflow = 9.49 cfs @ 11.98 hrs, Volume= 0.524 of Outflow = 0.08 cfs @ 24.09 hrs, Volume= 0.435 af, Atten= 99%, Lag= 726.1 min Primary = 0.08 cfs @ 24.09 hrs, Volume= 0.435 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 567.75' @ 24.09 hrs Surf.Area= 17,018 sf Storage= 19,627 cf Plug -Flow detention time= 2,173.3 min calculated for 0.435 of (83% of inflow) Center -of -Mass det. time= 2,095.3 min ( 3,000.0 - 904.7 ) Volume Invert Avail.Storage Storage Description #1 566.50' 137,597 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 566.50 13,995 0 0 567.00 15,551 7,387 7,387 568.00 17,503 16,527 23,914 569.00 19,519 18,511 42,425 570.00 21,600 20,560 62,984 571.00 23,745 22,673 85,657 572.00 25,954 24,850 110,506 573.00 28,228 27,091 137,597 Device Routing Invert Outlet Devices #1 Primary 561.90' 36.0" Round RCP -Round 36" L= 187.7' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 561.90' / 560.89' S= 0.0054 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 566.50' 1.7" Vert. WQ Orrfice C= 0.600 #3 Device 1 570.10' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.90 Width (feet) 2.50 2.50 #4 Device 1 571.00' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 571.80' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.08 cfs @ 24.09 hrs HW=567.75' (Free Discharge) L1=RCP_Round 36" (Passes 0.08 cfs of 69.63 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.08 cfs @ 5.23 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 108 N U 3 0 LL 10 9- 8- 7- 6 5 Q 3 Hydrograph ---------- ---------r--r--r--r--r--r--r--r--7--7-- 9.49 cfs -- - - -- ----J--J--------------- ReL— LEl;ev=5 7�7vF- QragI 19; -c, - --T- -T--T--7--7--7------------------Ir--Ir--T--T--T--7--7-- --L--L--L--L--L-- ---1---1---1---1---1---L--L--L--L--L--1--L-- --r- -- --------------------- - -- - -i --i --il - -il -- -- -- -- 0.08 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 573 572 571 w w c 570 0 .� w w 569 568 567 Pond 5P: BMP #1 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) Lry ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 109 Pond 5P: BMP #1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 F Surface ❑ Storage 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 110 Hydrograph for Pond 5P: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 566.50 0.00 0.00 0.00 2.50 0.00 0 566.50 0.00 0.00 0.00 5.00 0.00 0 566.50 0.00 0.00 0.00 7.50 0.00 0 566.50 0.00 0.00 0.00 10.00 0.00 0 566.50 0.00 0.00 0.00 12.50 1.24 8,016 567.04 0.05 0.05 0.00 15.00 0.45 13,406 567.38 0.07 0.07 0.00 17.50 0.31 16,039 567.54 0.07 0.07 0.00 20.00 0.22 17,765 567.64 0.08 0.08 0.00 22.50 0.21 18,965 567.71 0.08 0.08 0.00 25.00 0.00 19,368 567.74 0.08 0.08 0.00 27.50 0.00 18,637 567.69 0.08 0.08 0.00 30.00 0.00 17,920 567.65 0.08 0.08 0.00 32.50 0.00 17,218 567.61 0.08 0.08 0.00 35.00 0.00 16,529 567.57 0.08 0.08 0.00 37.50 0.00 15,854 567.53 0.07 0.07 0.00 40.00 0.00 15,193 567.49 0.07 0.07 0.00 42.50 0.00 14,546 567.45 0.07 0.07 0.00 45.00 0.00 13,914 567.41 0.07 0.07 0.00 47.50 0.00 13,296 567.37 0.07 0.07 0.00 50.00 0.00 12,692 567.33 0.07 0.07 0.00 52.50 0.00 12,102 567.30 0.06 0.06 0.00 55.00 0.00 11,527 567.26 0.06 0.06 0.00 57.50 0.00 10,967 567.23 0.06 0.06 0.00 60.00 0.00 10,421 567.19 0.06 0.06 0.00 62.50 0.00 9,890 567.16 0.06 0.06 0.00 65.00 0.00 9,373 567.13 0.06 0.06 0.00 67.50 0.00 8,872 567.09 0.05 0.05 0.00 70.00 0.00 8,385 567.06 0.05 0.05 0.00 72.50 0.00 7,913 567.03 0.05 0.05 0.00 75.00 0.00 7,455 567.00 0.05 0.05 0.00 77.50 0.00 7,013 566.98 0.05 0.05 0.00 80.00 0.00 6,586 566.95 0.05 0.05 0.00 82.50 0.00 6,175 566.92 0.04 0.04 0.00 85.00 0.00 5,778 566.90 0.04 0.04 0.00 87.50 0.00 5,397 566.87 0.04 0.04 0.00 90.00 0.00 5,031 566.85 0.04 0.04 0.00 92.50 0.00 4,681 566.82 0.04 0.04 0.00 95.00 0.00 4,346 566.80 0.04 0.04 0.00 97.50 0.00 4,028 566.78 0.03 0.03 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 111 Stage -Discharge for Pond 5P: BMP #1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 566.50 0.00 0.00 0.00 566.60 0.01 0.01 0.00 566.70 0.03 0.03 0.00 566.80 0.04 0.04 0.00 566.90 0.04 0.04 0.00 567.00 0.05 0.05 0.00 567.10 0.06 0.06 0.00 567.20 0.06 0.06 0.00 567.30 0.06 0.06 0.00 567.40 0.07 0.07 0.00 567.50 0.07 0.07 0.00 567.60 0.08 0.08 0.00 567.70 0.08 0.08 0.00 567.80 0.08 0.08 0.00 567.90 0.09 0.09 0.00 568.00 0.09 0.09 0.00 568.10 0.09 0.09 0.00 568.20 0.10 0.10 0.00 568.30 0.10 0.10 0.00 568.40 0.10 0.10 0.00 568.50 0.11 0.11 0.00 568.60 0.11 0.11 0.00 568.70 0.11 0.11 0.00 568.80 0.11 0.11 0.00 568.90 0.12 0.12 0.00 569.00 0.12 0.12 0.00 569.10 0.12 0.12 0.00 569.20 0.12 0.12 0.00 569.30 0.13 0.13 0.00 569.40 0.13 0.13 0.00 569.50 0.13 0.13 0.00 569.60 0.13 0.13 0.00 569.70 0.13 0.13 0.00 569.80 0.14 0.14 0.00 569.90 0.14 0.14 0.00 570.00 0.14 0.14 0.00 570.10 0.14 0.14 0.00 570.20 0.40 0.40 0.00 570.30 0.88 0.88 0.00 570.40 1.49 1.49 0.00 570.50 2.22 2.22 0.00 570.60 3.05 3.05 0.00 570.70 3.96 3.96 0.00 570.80 4.95 4.95 0.00 570.90 6.02 6.02 0.00 571.00 7.15 7.15 0.00 571.10 9.74 9.74 0.00 571.20 13.56 13.56 0.00 571.30 18.18 18.18 0.00 571.40 23.47 23.47 0.00 571.50 29.33 29.33 0.00 571.60 35.72 35.72 0.00 571.70 42.59 42.59 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 571.80 49.90 49.90 0.00 571.90 58.42 57.63 0.79 572.00 67.98 65.75 2.23 572.10 78.40 74.25 4.15 572.20 89.59 83.11 6.48 572.30 101.61 92.31 9.30 572.40 114.40 101.85 12.55 572.50 119.76 103.98 15.78 572.60 123.83 104.58 19.25 572.70 128.10 105.18 22.92 572.80 132.57 105.77 26.80 572.90 137.34 106.37 30.98 573.00 142.31 106.95 35.36 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 112 Stage -Area -Storage for Pond 5P: BMP #1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 566.50 13,995 0 566.60 14,306 1,415 566.70 14,617 2,861 566.80 14,929 4,339 566.90 15,240 5,847 567.00 15,551 7,387 567.10 15,746 8,951 567.20 15,941 10,536 567.30 16,137 12,140 567.40 16,332 13,763 567.50 16,527 15,406 567.60 16,722 17,068 567.70 16,917 18,750 567.80 17,113 20,452 567.90 17,308 22,173 568.00 17,503 23,914 568.10 17,705 25,674 568.20 17,906 27,454 568.30 18,108 29,255 568.40 18,309 31,076 568.50 18,511 32,917 568.60 18,713 34,778 568.70 18,914 36,660 568.80 19,116 38,561 568.90 19,317 40,483 569.00 19,519 42,425 569.10 19,727 44,387 569.20 19,935 46,370 569.30 20,143 48,374 569.40 20,351 50,399 569.50 20,560 52,444 569.60 20,768 54,510 569.70 20,976 56,598 569.80 21,184 58,706 569.90 21,392 60,834 570.00 21,600 62,984 570.10 21,815 65,155 570.20 22,029 67,347 570.30 22,243 69,561 570.40 22,458 71,796 570.50 22,673 74,052 570.60 22,887 76,330 570.70 23,102 78,630 570.80 23,316 80,950 570.90 23,530 83,293 571.00 23,745 85,657 571.10 23,966 88,042 571.20 24,187 90,450 571.30 24,408 92,879 571.40 24,629 95,331 571.50 24,850 97,805 571.60 25,070 100,301 571.70 25,291 102,819 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 571.80 25,512 105,359 571.90 25,733 107,922 572.00 25,954 110,506 572.10 26,181 113,113 572.20 26,409 115,742 572.30 26,636 118,395 572.40 26,864 121,070 572.50 27,091 123,767 572.60 27,318 126,488 572.70 27,546 129,231 572.80 27,773 131,997 572.90 28,001 134,786 573.00 28,228 137,597 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 113 Summary for Pond 6P: BMP #2 Inflow Area = 9.670 ac, 0.00% Impervious, Inflow Depth = 1.34" for 2yr24hr event Inflow = 23.37 cfs @ 11.96 hrs, Volume= 1.080 of Outflow = 0.38 cfs @ 18.45 hrs, Volume= 1.068 af, Atten= 98%, Lag= 389.3 min Primary = 0.38 cfs @ 18.45 hrs, Volume= 1.068 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 561.16' @ 18.45 hrs Surf.Area= 15,508 sf Storage= 34,082 cf Plug -Flow detention time= 1,461.4 min calculated for 1.068 of (99% of inflow) Center -of -Mass det. time= 1,456.4 min ( 2,296.2 - 839.8 ) Volume Invert Avail.Storage Storage Description #1 558.50' 109,406 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 558.50 9,762 0 0 559.00 11,233 5,249 5,249 560.00 13,167 12,200 17,449 561.00 15,175 14,171 31,620 562.00 17,251 16,213 47,833 563.00 19,395 18,323 66,156 564.00 21,608 20,502 86,657 565.00 23,890 22,749 109,406 Device Routing Invert Outlet Devices #1 Primary 553.90' 36.0" Round RCP -Round 36" L= 92.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 553.90' / 553.00' S= 0.0097 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 558.50' 2.5" Vert. WQ Orrfice C= 0.600 #3 Device 1 561.05' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.15 Width (feet) 1.00 1.00 #4 Device 1 562.20' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 563.95' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.38 cfs @ 18.45 hrs HW=561.16' (Free Discharge) L1=RCP_Round 36" (Passes 0.38 cfs of 94.19 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.26 cfs @ 7.70 fps) 3=Custom Weir/Orifice (Weir Controls 0.12 cfs @ 1.09 fps) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=558.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 114 --+--+--+--+--+--+--+------------------+--+--+--+--+--+--+-- Hydrograph 23.37 cfs - --------------------,---; --; --; --; --; -- -- -- -- ■ Inflow ❑ Outflow 26 - - - -- -- ----J--------'- ,y L Ittflti�' At a�•6'■ v' aW ■Primary ■ Secondary 24 --r- -t--t--rt-- ----------------pe rk Irv=5 1 16;'-- a - 6- 22 ---- --}- - -- -+--+-- -------------------- -- ---------------- ------- ------------------- torte--34-092-Ff-- � 11 "" 20 16 -L- -1--1--1--J--J---1---1---1---1---1---L--L--L--L--1--1--1- I---Ir--Ir--r--r-- r w V 14 --r- -t--t--rt-- -----li---li---li---li--- ------ LL- 10 1--1--1--J--J---1---1---1---1---1---L--L--L--L--1--1--1- 6 -L- 4 0.38 cfs 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 565 564 563 w w c 562 0 .� w w 561 560 559 Pond 6P: BMP #2 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 115 Pond 6P: BMP #2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 0 20,000 40,000 60,000 80,000 100,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 116 Hydrograph for Pond 6P: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 558.50 0.00 0.00 0.00 2.50 0.00 0 558.50 0.00 0.00 0.00 5.00 0.00 0 558.50 0.00 0.00 0.00 7.50 0.00 0 558.50 0.00 0.00 0.00 10.00 0.05 42 558.50 0.00 0.00 0.00 12.50 2.09 25,139 560.56 0.23 0.23 0.00 15.00 0.66 32,214 561.04 0.26 0.26 0.00 17.50 0.43 33,987 561.15 0.37 0.37 0.00 20.00 0.30 33,885 561.15 0.37 0.37 0.00 22.50 0.27 33,380 561.12 0.32 0.32 0.00 25.00 0.00 32,232 561.04 0.26 0.26 0.00 27.50 0.00 29,962 560.89 0.25 0.25 0.00 30.00 0.00 27,766 560.74 0.24 0.24 0.00 32.50 0.00 25,644 560.60 0.23 0.23 0.00 35.00 0.00 23,597 560.45 0.22 0.22 0.00 37.50 0.00 21,629 560.31 0.21 0.21 0.00 40.00 0.00 19,739 560.17 0.21 0.21 0.00 42.50 0.00 17,931 560.04 0.20 0.20 0.00 45.00 0.00 16,204 559.90 0.19 0.19 0.00 47.50 0.00 14,562 559.78 0.18 0.18 0.00 50.00 0.00 13,005 559.65 0.17 0.17 0.00 52.50 0.00 11,536 559.54 0.16 0.16 0.00 55.00 0.00 10,156 559.42 0.15 0.15 0.00 57.50 0.00 8,866 559.31 0.14 0.14 0.00 60.00 0.00 7,668 559.21 0.13 0.13 0.00 62.50 0.00 6,565 559.12 0.12 0.12 0.00 65.00 0.00 5,556 559.03 0.11 0.11 0.00 67.50 0.00 4,644 558.95 0.10 0.10 0.00 70.00 0.00 3,831 558.87 0.08 0.08 0.00 72.50 0.00 3,119 558.81 0.07 0.07 0.00 75.00 0.00 2,509 558.75 0.06 0.06 0.00 77.50 0.00 2,003 558.70 0.05 0.05 0.00 80.00 0.00 1,605 558.66 0.04 0.04 0.00 82.50 0.00 1,310 558.63 0.03 0.03 0.00 85.00 0.00 1,090 558.61 0.02 0.02 0.00 87.50 0.00 921 558.59 0.02 0.02 0.00 90.00 0.00 793 558.58 0.01 0.01 0.00 92.50 0.00 695 558.57 0.01 0.01 0.00 95.00 0.00 619 558.56 0.01 0.01 0.00 97.50 0.00 554 558.56 0.01 0.01 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 117 Stage -Discharge for Pond 6P: BMP #2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 558.50 0.00 0.00 0.00 558.60 0.02 0.02 0.00 558.70 0.05 0.05 0.00 558.80 0.07 0.07 0.00 558.90 0.09 0.09 0.00 559.00 0.10 0.10 0.00 559.10 0.12 0.12 0.00 559.20 0.13 0.13 0.00 559.30 0.14 0.14 0.00 559.40 0.15 0.15 0.00 559.50 0.16 0.16 0.00 559.60 0.16 0.16 0.00 559.70 0.17 0.17 0.00 559.80 0.18 0.18 0.00 559.90 0.19 0.19 0.00 560.00 0.19 0.19 0.00 560.10 0.20 0.20 0.00 560.20 0.21 0.21 0.00 560.30 0.21 0.21 0.00 560.40 0.22 0.22 0.00 560.50 0.23 0.23 0.00 560.60 0.23 0.23 0.00 560.70 0.24 0.24 0.00 560.80 0.24 0.24 0.00 560.90 0.25 0.25 0.00 561.00 0.25 0.25 0.00 561.10 0.30 0.30 0.00 561.20 0.45 0.45 0.00 561.30 0.68 0.68 0.00 561.40 0.95 0.95 0.00 561.50 1.27 1.27 0.00 561.60 1.62 1.62 0.00 561.70 2.01 2.01 0.00 561.80 2.42 2.42 0.00 561.90 2.86 2.86 0.00 562.00 3.33 3.33 0.00 562.10 3.83 3.83 0.00 562.20 4.35 4.35 0.00 562.30 6.44 6.44 0.00 562.40 9.84 9.84 0.00 562.50 14.10 14.10 0.00 562.60 19.06 19.06 0.00 562.70 24.61 24.61 0.00 562.80 30.71 30.71 0.00 562.90 37.30 37.30 0.00 563.00 44.36 44.36 0.00 563.10 51.84 51.84 0.00 563.20 59.72 59.72 0.00 563.30 67.99 67.99 0.00 563.40 76.63 76.63 0.00 563.50 85.62 85.62 0.00 563.60 94.95 94.95 0.00 563.70 102.84 102.84 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 563.80 106.13 106.13 0.00 563.90 109.32 109.32 0.00 564.00 112.70 112.43 0.28 564.10 116.89 115.44 1.45 564.20 121.52 118.39 3.13 564.30 124.72 119.46 5.26 564.40 128.01 120.18 7.83 564.50 131.76 120.89 10.87 564.60 135.74 121.60 14.14 564.70 139.79 122.30 17.49 564.80 144.07 123.01 21.06 564.90 148.54 123.70 24.84 565.00 153.26 124.40 28.86 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 118 Stage -Area -Storage for Pond 6P: BMP #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 558.50 9,762 0 558.60 10,056 991 558.70 10,350 2,011 558.80 10,645 3,061 558.90 10,939 4,140 559.00 11,233 5,249 559.10 11,426 6,382 559.20 11,620 7,534 559.30 11,813 8,706 559.40 12,007 9,897 559.50 12,200 11,107 559.60 12,393 12,337 559.70 12,587 13,586 559.80 12,780 14,854 559.90 12,974 16,142 560.00 13,167 17,449 560.10 13,368 18,775 560.20 13,569 20,122 560.30 13,769 21,489 560.40 13,970 22,876 560.50 14,171 24,283 560.60 14,372 25,710 560.70 14,573 27,158 560.80 14,773 28,625 560.90 14,974 30,112 561.00 15,175 31,620 561.10 15,383 33,148 561.20 15,590 34,696 561.30 15,798 36,266 561.40 16,005 37,856 561.50 16,213 39,467 561.60 16,421 41,098 561.70 16,628 42,751 561.80 16,836 44,424 561.90 17,043 46,118 562.00 17,251 47,833 562.10 17,465 49,569 562.20 17,680 51,326 562.30 17,894 53,105 562.40 18,109 54,905 562.50 18,323 56,726 562.60 18,537 58,569 562.70 18,752 60,434 562.80 18,966 62,320 562.90 19,181 64,227 563.00 19,395 66,156 563.10 19,616 68,106 563.20 19,838 70,079 563.30 20,059 72,074 563.40 20,280 74,091 563.50 20,502 76,130 563.60 20,723 78,191 563.70 20,944 80,274 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 563.80 21,165 82,380 563.90 21,387 84,508 564.00 21,608 86,657 564.10 21,836 88,829 564.20 22,064 91,024 564.30 22,293 93,242 564.40 22,521 95,483 564.50 22,749 97,747 564.60 22,977 100,033 564.70 23,205 102,342 564.80 23,434 104,674 564.90 23,662 107,029 565.00 23,890 109,406 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 119 Summary for Pond 7P: BMP #3 Inflow Area = 6.900 ac, 0.00% Impervious, Inflow Depth = 1.28" for 2yr24hr event Inflow = 15.87 cfs @ 11.96 hrs, Volume= 0.734 of Outflow = 0.12 cfs @ 24.05 hrs, Volume= 0.629 af, Atten= 99%, Lag= 725.6 min Primary = 0.12 cfs @ 24.05 hrs, Volume= 0.629 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 570.92' @ 24.05 hrs Surf.Area= 12,894 sf Storage= 27,123 cf Plug -Flow detention time= 2,205.0 min calculated for 0.629 of (86% of inflow) Center -of -Mass det. time= 2,137.0 min ( 2,980.1 - 843.1 ) Volume Invert Avail.Storage Storage Description #1 568.50' 91,933 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 568.50 9,080 0 0 569.00 10,331 4,853 4,853 570.00 11,639 10,985 15,838 571.00 13,003 12,321 28,159 572.00 14,424 13,714 41,872 573.00 15,901 15,163 57,035 574.00 17,435 16,668 73,703 575.00 19,025 18,230 91,933 Device Routing Invert Outlet Devices #1 Primary 565.31' 24.0" Round RCP -Round 24" L= 61.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 565.31' / 565.00' S= 0.0051 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 568.50' 1.7" Vert. WQ Orfice C= 0.600 #3 Device 1 571.20' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 2.30 Width (feet) 0.70 0.70 #4 Device 1 573.50' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 574.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.12 cfs @ 24.05 hrs HW=570.92' (Free Discharge) L1=RCP_Round 24" (Passes 0.12 cfs of 35.63 cfs potential flow) �2=WQ Orfice (Orifice Controls 0.12 cfs @ 7.38 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=568.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 120 Pond 7P: BMP #3 Hydrograph --L--L--1--1--J--J--J---1---1---1---1---1---L--L--L--L--1--1--J-- 15.87 cfs -1--1--J--J---------------'--- ----L--L----i--7-- IrtHow A►re-9=6.900Y aC-- 17 Fev=570 9Z-- 16 ak- 15 --r- --r- -r--r--r--J--J---------r----��Tfr��-�--�--r--r -T--T-- -- -----li---li---li---li--a3ClJIa r--r--�}---7-- e-27,123-Ef - 14 13 --r- - T - -T- - -- ----------------- --r--r--r--r--T--7--7-- 12 10 -1--1--7--J-----'---'------------7--L--L--L--1--1--1-- 3-1--1--1--J--�---1---1---1---1---1---L--L--L--L--1--1--1-- 0 8- LL- 7 ,'i 4 Z--r- T--T--rt--y--y---li---li---li---li---Ir--Ir--Ir--r--r--+--7--7-- 3 2 0.12 cfs 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 575 574 573 w w c 572 0 .� w w 571 570 569 Pond 7P: BMP #3 Stage -Discharge 0 10 20 30 40 50 60 70 Discharge (cfs) MSecondary — Total ❑ Primary Secondary Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 121 Pond 7P: BMP #3 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 122 Hydrograph for Pond 7P: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 568.50 0.00 0.00 0.00 2.50 0.00 0 568.50 0.00 0.00 0.00 5.00 0.00 0 568.50 0.00 0.00 0.00 7.50 0.00 0 568.50 0.00 0.00 0.00 10.00 0.01 5 568.50 0.00 0.00 0.00 12.50 1.44 16,968 570.10 0.09 0.09 0.00 15.00 0.46 22,473 570.55 0.11 0.11 0.00 17.50 0.30 24,729 570.73 0.11 0.11 0.00 20.00 0.21 26,009 570.83 0.11 0.11 0.00 22.50 0.19 26,752 570.89 0.12 0.12 0.00 25.00 0.00 26,748 570.89 0.12 0.12 0.00 27.50 0.00 25,717 570.81 0.11 0.11 0.00 30.00 0.00 24,704 570.73 0.11 0.11 0.00 32.50 0.00 23,710 570.65 0.11 0.11 0.00 35.00 0.00 22,734 570.57 0.11 0.11 0.00 37.50 0.00 21,777 570.50 0.11 0.11 0.00 40.00 0.00 20,838 570.42 0.10 0.10 0.00 42.50 0.00 19,919 570.34 0.10 0.10 0.00 45.00 0.00 19,019 570.27 0.10 0.10 0.00 47.50 0.00 18,139 570.20 0.10 0.10 0.00 50.00 0.00 17,278 570.12 0.09 0.09 0.00 52.50 0.00 16,437 570.05 0.09 0.09 0.00 55.00 0.00 15,616 569.98 0.09 0.09 0.00 57.50 0.00 14,815 569.91 0.09 0.09 0.00 60.00 0.00 14,034 569.84 0.09 0.09 0.00 62.50 0.00 13,274 569.78 0.08 0.08 0.00 65.00 0.00 12,534 569.71 0.08 0.08 0.00 67.50 0.00 11,815 569.65 0.08 0.08 0.00 70.00 0.00 11,117 569.58 0.08 0.08 0.00 72.50 0.00 10,440 569.52 0.07 0.07 0.00 75.00 0.00 9,784 569.46 0.07 0.07 0.00 77.50 0.00 9,149 569.41 0.07 0.07 0.00 80.00 0.00 8,536 569.35 0.07 0.07 0.00 82.50 0.00 7,944 569.29 0.06 0.06 0.00 85.00 0.00 7,375 569.24 0.06 0.06 0.00 87.50 0.00 6,827 569.19 0.06 0.06 0.00 90.00 0.00 6,301 569.14 0.06 0.06 0.00 92.50 0.00 5,797 569.09 0.05 0.05 0.00 95.00 0.00 5,316 569.04 0.05 0.05 0.00 97.50 0.00 4,857 569.00 0.05 0.05 0.00 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 123 Stage -Discharge for Pond 7P: BMP #3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 568.50 0.00 0.00 0.00 568.60 0.01 0.01 0.00 568.70 0.03 0.03 0.00 568.80 0.04 0.04 0.00 568.90 0.04 0.04 0.00 569.00 0.05 0.05 0.00 569.10 0.06 0.06 0.00 569.20 0.06 0.06 0.00 569.30 0.06 0.06 0.00 569.40 0.07 0.07 0.00 569.50 0.07 0.07 0.00 569.60 0.08 0.08 0.00 569.70 0.08 0.08 0.00 569.80 0.08 0.08 0.00 569.90 0.09 0.09 0.00 570.00 0.09 0.09 0.00 570.10 0.09 0.09 0.00 570.20 0.10 0.10 0.00 570.30 0.10 0.10 0.00 570.40 0.10 0.10 0.00 570.50 0.11 0.11 0.00 570.60 0.11 0.11 0.00 570.70 0.11 0.11 0.00 570.80 0.11 0.11 0.00 570.90 0.12 0.12 0.00 571.00 0.12 0.12 0.00 571.10 0.12 0.12 0.00 571.20 0.12 0.12 0.00 571.30 0.20 0.20 0.00 571.40 0.33 0.33 0.00 571.50 0.51 0.51 0.00 571.60 0.71 0.71 0.00 571.70 0.94 0.94 0.00 571.80 1.20 1.20 0.00 571.90 1.48 1.48 0.00 572.00 1.78 1.78 0.00 572.10 2.10 2.10 0.00 572.20 2.44 2.44 0.00 572.30 2.79 2.79 0.00 572.40 3.16 3.16 0.00 572.50 3.55 3.55 0.00 572.60 3.95 3.95 0.00 572.70 4.37 4.37 0.00 572.80 4.80 4.80 0.00 572.90 5.24 5.24 0.00 573.00 5.70 5.70 0.00 573.10 6.17 6.17 0.00 573.20 6.65 6.65 0.00 573.30 7.14 7.14 0.00 573.40 7.65 7.65 0.00 573.50 8.17 8.17 0.00 573.60 10.28 10.28 0.00 573.70 13.71 13.71 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 573.80 18.00 18.00 0.00 573.90 23.00 23.00 0.00 574.00 28.61 28.61 0.00 574.10 35.54 34.75 0.79 574.20 43.62 41.39 2.23 574.30 52.64 48.49 4.15 574.40 55.43 48.95 6.48 574.50 58.58 49.28 9.30 574.60 62.16 49.61 12.55 574.70 65.72 49.94 15.78 574.80 69.51 50.26 19.25 574.90 73.50 50.58 22.92 575.00 77.70 50.90 26.80 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 124 Stage -Area -Storage for Pond 7P: BMP #3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 568.50 9,080 0 568.60 9,330 921 568.70 9,580 1,866 568.80 9,831 2,837 568.90 10,081 3,832 569.00 10,331 4,853 569.10 10,462 5,892 569.20 10,593 6,945 569.30 10,723 8,011 569.40 10,854 9,090 569.50 10,985 10,182 569.60 11,116 11,287 569.70 11,247 12,405 569.80 11,377 13,536 569.90 11,508 14,680 570.00 11,639 15,838 570.10 11,775 17,008 570.20 11,912 18,193 570.30 12,048 19,391 570.40 12,185 20,602 570.50 12,321 21,828 570.60 12,457 23,067 570.70 12,594 24,319 570.80 12,730 25,585 570.90 12,867 26,865 571.00 13,003 28,159 571.10 13,145 29,466 571.20 13,287 30,788 571.30 13,429 32,124 571.40 13,571 33,474 571.50 13,714 34,838 571.60 13,856 36,216 571.70 13,998 37,609 571.80 14,140 39,016 571.90 14,282 40,437 572.00 14,424 41,872 572.10 14,572 43,322 572.20 14,719 44,787 572.30 14,867 46,266 572.40 15,015 47,760 572.50 15,163 49,269 572.60 15,310 50,793 572.70 15,458 52,331 572.80 15,606 53,884 572.90 15,753 55,452 573.00 15,901 57,035 573.10 16,054 58,633 573.20 16,208 60,246 573.30 16,361 61,874 573.40 16,515 63,518 573.50 16,668 65,177 573.60 16,821 66,851 573.70 16,975 68,541 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 573.80 17,128 70,246 573.90 17,282 71,967 574.00 17,435 73,703 574.10 17,594 75,454 574.20 17,753 77,222 574.30 17,912 79,005 574.40 18,071 80,804 574.50 18,230 82,619 574.60 18,389 84,450 574.70 18,548 86,297 574.80 18,707 88,160 574.90 18,866 90,038 575.00 19,025 91,933 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 125 Summary for Link 17L: Post Development #2 Inflow Area = 8.060 ac, 0.00% Impervious, Inflow Depth > 0.98" for 2yr24hr event Inflow = 0.26 cfs @ 12.28 hrs, Volume= 0.659 of Primary = 0.26 cfs @ 12.28 hrs, Volume= 0.659 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 17L: Post Development #2 Hydrograph -----------r-----Ir--r--7---1i- r--r---li---li---r-----li---Ir--r---li--F Inflow 0.26 CfS ------ - --- --- - --- --- ------------- -- -- ❑ Primary 0.28 _ n 0.26 --r-Ir--r----- Ir--r--7--- 1i--- IrI 14F�Q li_Are Ora�I-- 0.24 0.22 --t -r--r--r------r--r------r--r------r--r--r------r--r---I-- 0.2 -- -i --i------i---i -----i---i --------i---i-----i---i -- ---i-- 0.18 N u 0.16 T - -- - - - - _- -T- --- 0 0.14 0.12 0.1 0.08 ------+---------r-- 0.06 0.04 --; ----_---r---I-- 0.02 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 126 Hydrograph for Link 17L: Post Development #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 12.00 0.09 0.00 0.09 13.00 0.16 0.00 0.16 14.00 0.14 0.00 0.14 15.00 0.14 0.00 0.14 16.00 0.13 0.00 0.13 17.00 0.13 0.00 0.13 18.00 0.13 0.00 0.13 19.00 0.13 0.00 0.13 20.00 0.13 0.00 0.13 21.00 0.13 0.00 0.13 22.00 0.13 0.00 0.13 23.00 0.13 0.00 0.13 24.00 0.13 0.00 0.13 25.00 0.12 0.00 0.12 26.00 0.11 0.00 0.11 27.00 0.11 0.00 0.11 28.00 0.11 0.00 0.11 29.00 0.11 0.00 0.11 30.00 0.11 0.00 0.11 31.00 0.11 0.00 0.11 32.00 0.11 0.00 0.11 33.00 0.11 0.00 0.11 34.00 0.11 0.00 0.11 35.00 0.11 0.00 0.11 36.00 0.11 0.00 0.11 37.00 0.11 0.00 0.11 38.00 0.10 0.00 0.10 39.00 0.10 0.00 0.10 40.00 0.10 0.00 0.10 41.00 0.10 0.00 0.10 42.00 0.10 0.00 0.10 43.00 0.10 0.00 0.10 44.00 0.10 0.00 0.10 45.00 0.10 0.00 0.10 46.00 0.10 0.00 0.10 47.00 0.10 0.00 0.10 48.00 0.10 0.00 0.10 49.00 0.10 0.00 0.10 50.00 0.09 0.00 0.09 51.00 0.09 0.00 0.09 52.00 0.09 0.00 0.09 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.09 0.00 0.09 54.00 0.09 0.00 0.09 55.00 0.09 0.00 0.09 56.00 0.09 0.00 0.09 57.00 0.09 0.00 0.09 58.00 0.09 0.00 0.09 59.00 0.09 0.00 0.09 60.00 0.09 0.00 0.09 61.00 0.08 0.00 0.08 62.00 0.08 0.00 0.08 63.00 0.08 0.00 0.08 64.00 0.08 0.00 0.08 65.00 0.08 0.00 0.08 66.00 0.08 0.00 0.08 67.00 0.08 0.00 0.08 68.00 0.08 0.00 0.08 69.00 0.08 0.00 0.08 70.00 0.08 0.00 0.08 71.00 0.08 0.00 0.08 72.00 0.07 0.00 0.07 73.00 0.07 0.00 0.07 74.00 0.07 0.00 0.07 75.00 0.07 0.00 0.07 76.00 0.07 0.00 0.07 77.00 0.07 0.00 0.07 78.00 0.07 0.00 0.07 79.00 0.07 0.00 0.07 80.00 0.07 0.00 0.07 81.00 0.07 0.00 0.07 82.00 0.06 0.00 0.06 83.00 0.06 0.00 0.06 84.00 0.06 0.00 0.06 85.00 0.06 0.00 0.06 86.00 0.06 0.00 0.06 87.00 0.06 0.00 0.06 88.00 0.06 0.00 0.06 89.00 0.06 0.00 0.06 90.00 0.06 0.00 0.06 91.00 0.06 0.00 0.06 92.00 0.06 0.00 0.06 93.00 0.05 0.00 0.05 94.00 0.05 0.00 0.05 95.00 0.05 0.00 0.05 96.00 0.05 0.00 0.05 97.00 0.05 0.00 0.05 98.00 0.05 0.00 0.05 99.00 0.05 0.00 0.05 Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 127 Summary for Link 18L: Post Development #1 Inflow Area = 28.230 ac, 3.61% Impervious, Inflow Depth > 0.75" for 2yr24hr event Inflow = 3.26 cfs @ 12.12 hrs, Volume= 1.765 of Primary = 3.26 cfs @ 12.12 hrs, Volume= 1.765 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 18L: Post Development #1 Hydrograph Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 2yr24hr Rainfall=3.12" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 128 Hydrograph for Link 18L: Post Development #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 11.00 0.01 0.00 0.01 12.00 1.78 0.00 1.78 13.00 0.75 0.00 0.75 14.00 0.60 0.00 0.60 15.00 0.55 0.00 0.55 16.00 0.56 0.00 0.56 17.00 0.59 0.00 0.59 18.00 0.60 0.00 0.60 19.00 0.58 0.00 0.58 20.00 0.55 0.00 0.55 21.00 0.52 0.00 0.52 22.00 0.51 0.00 0.51 23.00 0.49 0.00 0.49 24.00 0.47 0.00 0.47 25.00 0.34 0.00 0.34 26.00 0.33 0.00 0.33 27.00 0.33 0.00 0.33 28.00 0.33 0.00 0.33 29.00 0.32 0.00 0.32 30.00 0.32 0.00 0.32 31.00 0.31 0.00 0.31 32.00 0.31 0.00 0.31 33.00 0.31 0.00 0.31 34.00 0.30 0.00 0.30 35.00 0.30 0.00 0.30 36.00 0.29 0.00 0.29 37.00 0.29 0.00 0.29 38.00 0.29 0.00 0.29 39.00 0.28 0.00 0.28 40.00 0.28 0.00 0.28 41.00 0.27 0.00 0.27 42.00 0.27 0.00 0.27 43.00 0.27 0.00 0.27 44.00 0.26 0.00 0.26 45.00 0.26 0.00 0.26 46.00 0.25 0.00 0.25 47.00 0.25 0.00 0.25 48.00 0.24 0.00 0.24 49.00 0.24 0.00 0.24 50.00 0.23 0.00 0.23 51.00 0.23 0.00 0.23 52.00 0.23 0.00 0.23 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.22 0.00 0.22 54.00 0.22 0.00 0.22 55.00 0.21 0.00 0.21 56.00 0.21 0.00 0.21 57.00 0.20 0.00 0.20 58.00 0.20 0.00 0.20 59.00 0.19 0.00 0.19 60.00 0.19 0.00 0.19 61.00 0.18 0.00 0.18 62.00 0.18 0.00 0.18 63.00 0.17 0.00 0.17 64.00 0.17 0.00 0.17 65.00 0.16 0.00 0.16 66.00 0.16 0.00 0.16 67.00 0.15 0.00 0.15 68.00 0.15 0.00 0.15 69.00 0.14 0.00 0.14 70.00 0.14 0.00 0.14 71.00 0.13 0.00 0.13 72.00 0.13 0.00 0.13 73.00 0.12 0.00 0.12 74.00 0.12 0.00 0.12 75.00 0.11 0.00 0.11 76.00 0.11 0.00 0.11 77.00 0.10 0.00 0.10 78.00 0.10 0.00 0.10 79.00 0.09 0.00 0.09 80.00 0.08 0.00 0.08 81.00 0.08 0.00 0.08 82.00 0.07 0.00 0.07 83.00 0.07 0.00 0.07 84.00 0.07 0.00 0.07 85.00 0.06 0.00 0.06 86.00 0.06 0.00 0.06 87.00 0.06 0.00 0.06 88.00 0.06 0.00 0.06 89.00 0.05 0.00 0.05 90.00 0.05 0.00 0.05 91.00 0.05 0.00 0.05 92.00 0.05 0.00 0.05 93.00 0.05 0.00 0.05 94.00 0.05 0.00 0.05 95.00 0.04 0.00 0.04 96.00 0.04 0.00 0.04 97.00 0.04 0.00 0.04 98.00 0.04 0.00 0.04 99.00 0.04 0.00 0.04 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 129 Time span=0.00-99.00 hrs, dt=0.05 hrs, 1981 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre-Development#1 Runoff Area=30.590 ac 3.53% Impervious Runoff Depth=1.00" Tc=21.7 min CN=57 Runoff=26.49 cfs 2.548 of Subcatchment2S: Pre-Development#2 Runoff Area=5.620 ac 0.00% Impervious Runoff Depth=0.88" Tc=24.9 min CN=55 Runoff=3.68 cfs 0.413 of Subcatchment8S: BMP #1 Runoff Area=12.980 ac 0.00% Impervious Runoff Depth=1.38" Tc=5.0 min CN=63 Runoff=31.54 cfs 1.497 of Subcatchment9S: BMP #2 Runoff Area=9.670 ac 0.00% Impervious Runoff Depth=2.72" Tc=5.0 min CN=80 Runoff=46.90 cfs 2.191 of Subcatchment 10S: BMP #3 Runoff Area=6.900 ac 0.00% Impervious Runoff Depth=2.63" Tc=5.0 min CN=79 Runoff=32.46 cfs 1.512 of Subcatchment 11 S: Bypass #1 Runoff Area=5.580 ac 18.28% Impervious Runoff Depth=1.52" Tc=16.9 min CN=65 Runoff=9.80 cfs 0.708 of Subcatchment 12S: Bypass #2 Runoff Area=1.160 ac 0.00% Impervious Runoff Depth=1.06" Tc=24.9 min CN=58 Runoff=1.00 cfs 0.103 of Subcatchment 13S: Pre-Development#3 Runoff Area=9.070 ac 0.00% Impervious Runoff Depth=0.88" Tc=20.7 min CN=55 Runoff=6.77 cfs 0.667 of Subcatchment14S: Post Development#3 Runoff Area=8.990 ac 0.00% Impervious Runoff Depth=0.88" Tc=20.7 min CN=55 Runoff=6.71 cfs 0.661 of Pond 5P: BMP #1 Peak Elev=569.84' Storage=59,659 cf Inflow=31.54 cfs 1.497 of Primary=0.14 cfs 0.857 of Secondary=0.00 cfs 0.000 of Outflow=0.14 cfs 0.857 of Pond 6P: BMP #2 Peak Elev=562.13' Storage=50,107 cf Inflow=46.90 cfs 2.191 of Primary=3.99 cfs 2.179 of Secondary=0.00 cfs 0.000 of Outflow=3.99 cfs 2.179 of Pond 7P: BMP #3 Peak Elev=571.85' Storage=39,730 cf Inflow=32.46 cfs 1.512 of Primary=1.34 cfs 1.351 of Secondary=0.00 cfs 0.000 of Outflow=1.34 cfs 1.351 of Link 17L: Post Development#2 Inflow=1.58 cfs 1.453 of Primary=1.58 cfs 1.453 of Link 18L: Post Development#1 Inflow=13.12 cfs 3.744 of Primary=13.12 cfs 3.744 of Total Runoff Area = 90.560 ac Runoff Volume = 10.300 of Average Runoff Depth = 1.36" 97.68% Pervious = 88.460 ac 2.32% Impervious = 2.100 ac Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 130 Summary for Subcatchment 1S: Pre -Development #1 Runoff = 26.49 cfs @ 12.18 hrs, Volume= 2.548 af, Depth= 1.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr24hr Rainfall=4.80" Area (ac) CN Description 29.510 55 Woods, Good, HSG B 1.020 98 Water Surface, HSG B 0.060 98 Paved roads w/curbs & sewers, HSG B 30.590 57 Weighted Average 29.510 96.47% Pervious Area 1.080 3.53% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.7 Direct Entry, Subcatchment 1S: Pre -Development #1 Hydrograph - - - - - I- - - - - -'I- - - - - -'I- - - t - - -'I- - - t - - -'I- - - t - - -'I- - - t - - -'I- - - t - - -'I - - - t - - -'I - - - t - - ■Runoff 28 26.49 cfs 26-_type(12-4-h!r - I I I I I I I I I I I I I I I _I_I I 24 -' - --' - --' - --' - --'�0 r24hr-R�infa1�4.80" - ,- ,- - T- T 22 ' - - - - - - - - -I- - - Runoff Area=X.590 -ad- - -------------- 20 +---+--- --- +--- --- +--- +--- F�unoffVQium =2j 5480- 18 --'I-- - - - - --- - - - - --'I - - -'I ---- -'I - -- ----------------------------- 16 J--1------1------1--- 1--- i--- Runoff �eptlx=1-!00''-- 0 14 I��//►► rr�� JJ yy�� a -- - - ---r-----r--t---r--t--- ---t--- ---r--- --- Tv4 21.74nih-- 12 -----------------�-------i-------i- _--------------------�--- 10�� - - - - - - - - - - - - - - - - 7 - - - - - T - - -- 6 q --+-- ------+------+------+------+---+--+--+---+--+---+------+-- 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 131 Hydrograph for Subcatchment 1S: Pre -Development #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.23 0.00 0.00 5.00 0.30 0.00 0.00 6.00 0.38 0.00 0.00 7.00 0.48 0.00 0.00 8.00 0.58 0.00 0.00 9.00 0.71 0.00 0.00 10.00 0.87 0.00 0.00 11.00 1.13 0.00 0.00 12.00 3.18 0.30 10.45 13.00 3.71 0.50 4.75 14.00 3.94 0.59 2.72 15.00 4.10 0.66 2.11 16.00 4.22 0.72 1.71 17.00 4.33 0.77 1.47 18.00 4.42 0.81 1.33 19.00 4.50 0.85 1.17 20.00 4.57 0.88 1.01 21.00 4.63 0.91 0.93 22.00 4.69 0.94 0.91 23.00 4.75 0.97 0.88 24.00 4.80 1.00 0.85 25.00 4.80 1.00 0.00 26.00 4.80 1.00 0.00 27.00 4.80 1.00 0.00 28.00 4.80 1.00 0.00 29.00 4.80 1.00 0.00 30.00 4.80 1.00 0.00 31.00 4.80 1.00 0.00 32.00 4.80 1.00 0.00 33.00 4.80 1.00 0.00 34.00 4.80 1.00 0.00 35.00 4.80 1.00 0.00 36.00 4.80 1.00 0.00 37.00 4.80 1.00 0.00 38.00 4.80 1.00 0.00 39.00 4.80 1.00 0.00 40.00 4.80 1.00 0.00 41.00 4.80 1.00 0.00 42.00 4.80 1.00 0.00 43.00 4.80 1.00 0.00 44.00 4.80 1.00 0.00 45.00 4.80 1.00 0.00 46.00 4.80 1.00 0.00 47.00 4.80 1.00 0.00 48.00 4.80 1.00 0.00 49.00 4.80 1.00 0.00 50.00 4.80 1.00 0.00 51.00 4.80 1.00 0.00 52.00 4.80 1.00 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 4.80 1.00 0.00 54.00 4.80 1.00 0.00 55.00 4.80 1.00 0.00 56.00 4.80 1.00 0.00 57.00 4.80 1.00 0.00 58.00 4.80 1.00 0.00 59.00 4.80 1.00 0.00 60.00 4.80 1.00 0.00 61.00 4.80 1.00 0.00 62.00 4.80 1.00 0.00 63.00 4.80 1.00 0.00 64.00 4.80 1.00 0.00 65.00 4.80 1.00 0.00 66.00 4.80 1.00 0.00 67.00 4.80 1.00 0.00 68.00 4.80 1.00 0.00 69.00 4.80 1.00 0.00 70.00 4.80 1.00 0.00 71.00 4.80 1.00 0.00 72.00 4.80 1.00 0.00 73.00 4.80 1.00 0.00 74.00 4.80 1.00 0.00 75.00 4.80 1.00 0.00 76.00 4.80 1.00 0.00 77.00 4.80 1.00 0.00 78.00 4.80 1.00 0.00 79.00 4.80 1.00 0.00 80.00 4.80 1.00 0.00 81.00 4.80 1.00 0.00 82.00 4.80 1.00 0.00 83.00 4.80 1.00 0.00 84.00 4.80 1.00 0.00 85.00 4.80 1.00 0.00 86.00 4.80 1.00 0.00 87.00 4.80 1.00 0.00 88.00 4.80 1.00 0.00 89.00 4.80 1.00 0.00 90.00 4.80 1.00 0.00 91.00 4.80 1.00 0.00 92.00 4.80 1.00 0.00 93.00 4.80 1.00 0.00 94.00 4.80 1.00 0.00 95.00 4.80 1.00 0.00 96.00 4.80 1.00 0.00 97.00 4.80 1.00 0.00 98.00 4.80 1.00 0.00 99.00 4.80 1.00 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 132 Summary for Subcatchment 2S: Pre -Development #2 Runoff = 3.68 cfs @ 12.23 hrs, Volume= 0.413 af, Depth= 0.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr24hr Rainfall=4.80" Area (ac) CN Description 5.620 55 Woods, Good, HSG B 5.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 2S: Pre -Development #2 Hydrograph --r---r--r---r--r---i---r---i---r---i---r--r---r--r---r--r---r--r---i- q ■Runoff 3.68 cfs Type I'',I 24-h,r -- -- -----'---10vr24hr_Rainfal[=4!80" 3-Runoff Area=5.620 at Runoff Vp16mq=6 41,3 pf w I I I I I I I I I I I I -------------unof----T,DeftI_ .I 2 -� - TcT24.9 Min RCN',=5$ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 133 Hydrograph for Subcatchment 2S: Pre -Development #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.23 0.00 0.00 5.00 0.30 0.00 0.00 6.00 0.38 0.00 0.00 7.00 0.48 0.00 0.00 8.00 0.58 0.00 0.00 9.00 0.71 0.00 0.00 10.00 0.87 0.00 0.00 11.00 1.13 0.00 0.00 12.00 3.18 0.25 0.97 13.00 3.71 0.42 0.84 14.00 3.94 0.50 0.47 15.00 4.10 0.57 0.36 16.00 4.22 0.62 0.29 17.00 4.33 0.67 0.25 18.00 4.42 0.71 0.23 19.00 4.50 0.74 0.20 20.00 4.57 0.77 0.17 21.00 4.63 0.80 0.16 22.00 4.69 0.83 0.16 23.00 4.75 0.86 0.15 24.00 4.80 0.88 0.15 25.00 4.80 0.88 0.00 26.00 4.80 0.88 0.00 27.00 4.80 0.88 0.00 28.00 4.80 0.88 0.00 29.00 4.80 0.88 0.00 30.00 4.80 0.88 0.00 31.00 4.80 0.88 0.00 32.00 4.80 0.88 0.00 33.00 4.80 0.88 0.00 34.00 4.80 0.88 0.00 35.00 4.80 0.88 0.00 36.00 4.80 0.88 0.00 37.00 4.80 0.88 0.00 38.00 4.80 0.88 0.00 39.00 4.80 0.88 0.00 40.00 4.80 0.88 0.00 41.00 4.80 0.88 0.00 42.00 4.80 0.88 0.00 43.00 4.80 0.88 0.00 44.00 4.80 0.88 0.00 45.00 4.80 0.88 0.00 46.00 4.80 0.88 0.00 47.00 4.80 0.88 0.00 48.00 4.80 0.88 0.00 49.00 4.80 0.88 0.00 50.00 4.80 0.88 0.00 51.00 4.80 0.88 0.00 52.00 4.80 0.88 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 4.80 0.88 0.00 54.00 4.80 0.88 0.00 55.00 4.80 0.88 0.00 56.00 4.80 0.88 0.00 57.00 4.80 0.88 0.00 58.00 4.80 0.88 0.00 59.00 4.80 0.88 0.00 60.00 4.80 0.88 0.00 61.00 4.80 0.88 0.00 62.00 4.80 0.88 0.00 63.00 4.80 0.88 0.00 64.00 4.80 0.88 0.00 65.00 4.80 0.88 0.00 66.00 4.80 0.88 0.00 67.00 4.80 0.88 0.00 68.00 4.80 0.88 0.00 69.00 4.80 0.88 0.00 70.00 4.80 0.88 0.00 71.00 4.80 0.88 0.00 72.00 4.80 0.88 0.00 73.00 4.80 0.88 0.00 74.00 4.80 0.88 0.00 75.00 4.80 0.88 0.00 76.00 4.80 0.88 0.00 77.00 4.80 0.88 0.00 78.00 4.80 0.88 0.00 79.00 4.80 0.88 0.00 80.00 4.80 0.88 0.00 81.00 4.80 0.88 0.00 82.00 4.80 0.88 0.00 83.00 4.80 0.88 0.00 84.00 4.80 0.88 0.00 85.00 4.80 0.88 0.00 86.00 4.80 0.88 0.00 87.00 4.80 0.88 0.00 88.00 4.80 0.88 0.00 89.00 4.80 0.88 0.00 90.00 4.80 0.88 0.00 91.00 4.80 0.88 0.00 92.00 4.80 0.88 0.00 93.00 4.80 0.88 0.00 94.00 4.80 0.88 0.00 95.00 4.80 0.88 0.00 96.00 4.80 0.88 0.00 97.00 4.80 0.88 0.00 98.00 4.80 0.88 0.00 99.00 4.80 0.88 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 134 Summary for Subcatchment 8S: BMP #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 31.54 cfs @ 11.97 hrs, Volume= 1.497 af, Depth= 1.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr24hr Rainfall=4.80" Area (ac) CN Description 12.980 63 12.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: BMP #1 Hydrograph --L---'------'--- ---'---L---'---L---'---L---I--- L--- I --- L--- '--- L--- '---L- 34 ■ Runoff 31.54 cfs - --- --- --- --- --- --- --- -- 32 30 hy -- - ------ ------ ------ ------ ------ ------po 24mh --r --- r---r-- r---r-- r--- r-- r---r--r---r--r---i- r--r---r---i---r-- 28 ' ----- ----'------- '------- '---+---'--- 40 , r24hr-Raitifall=4,80" 26 -- -- ----I'------I'------I'---- --I'--- Run dff Ar6a='12.'980 at 24 1 22---'I---LI------ ---Fl�urltoff-Vrplmip=f 4�17-c w 20 -- -- - ---r-- ---r-----r-- T-- - ---r- r -- Runa#fDopth1-=1138f14 LL 16 --J---L---'---L---I11---L---'---L------1------L--- ---L-TSs= 121 I ----- ------------------------------------------------------------ 10 --r-- -r---r--r---r--r---r--r---i---r---r--r---i---r--r---r---i---r-- 8 -------r-- ---r--+------+------r------r------r------r-- 6 --�-- ---------1---1---'---L---'---L------L------L-----------L-- 4 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 135 Hydrograph for Subcatchment 8S: BMP #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.23 0.00 0.00 5.00 0.30 0.00 0.00 6.00 0.38 0.00 0.00 7.00 0.48 0.00 0.00 8.00 0.58 0.00 0.00 9.00 0.71 0.00 0.00 10.00 0.87 0.00 0.00 11.00 1.13 0.00 0.00 12.00 3.18 0.51 29.05 13.00 3.71 0.76 2.08 14.00 3.94 0.88 1.30 15.00 4.10 0.97 1.06 16.00 4.22 1.04 0.84 17.00 4.33 1.10 0.75 18.00 4.42 1.16 0.67 19.00 4.50 1.20 0.58 20.00 4.57 1.24 0.50 21.00 4.63 1.28 0.48 22.00 4.69 1.32 0.46 23.00 4.75 1.35 0.44 24.00 4.80 1.38 0.43 25.00 4.80 1.38 0.00 26.00 4.80 1.38 0.00 27.00 4.80 1.38 0.00 28.00 4.80 1.38 0.00 29.00 4.80 1.38 0.00 30.00 4.80 1.38 0.00 31.00 4.80 1.38 0.00 32.00 4.80 1.38 0.00 33.00 4.80 1.38 0.00 34.00 4.80 1.38 0.00 35.00 4.80 1.38 0.00 36.00 4.80 1.38 0.00 37.00 4.80 1.38 0.00 38.00 4.80 1.38 0.00 39.00 4.80 1.38 0.00 40.00 4.80 1.38 0.00 41.00 4.80 1.38 0.00 42.00 4.80 1.38 0.00 43.00 4.80 1.38 0.00 44.00 4.80 1.38 0.00 45.00 4.80 1.38 0.00 46.00 4.80 1.38 0.00 47.00 4.80 1.38 0.00 48.00 4.80 1.38 0.00 49.00 4.80 1.38 0.00 50.00 4.80 1.38 0.00 51.00 4.80 1.38 0.00 52.00 4.80 1.38 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 4.80 1.38 0.00 54.00 4.80 1.38 0.00 55.00 4.80 1.38 0.00 56.00 4.80 1.38 0.00 57.00 4.80 1.38 0.00 58.00 4.80 1.38 0.00 59.00 4.80 1.38 0.00 60.00 4.80 1.38 0.00 61.00 4.80 1.38 0.00 62.00 4.80 1.38 0.00 63.00 4.80 1.38 0.00 64.00 4.80 1.38 0.00 65.00 4.80 1.38 0.00 66.00 4.80 1.38 0.00 67.00 4.80 1.38 0.00 68.00 4.80 1.38 0.00 69.00 4.80 1.38 0.00 70.00 4.80 1.38 0.00 71.00 4.80 1.38 0.00 72.00 4.80 1.38 0.00 73.00 4.80 1.38 0.00 74.00 4.80 1.38 0.00 75.00 4.80 1.38 0.00 76.00 4.80 1.38 0.00 77.00 4.80 1.38 0.00 78.00 4.80 1.38 0.00 79.00 4.80 1.38 0.00 80.00 4.80 1.38 0.00 81.00 4.80 1.38 0.00 82.00 4.80 1.38 0.00 83.00 4.80 1.38 0.00 84.00 4.80 1.38 0.00 85.00 4.80 1.38 0.00 86.00 4.80 1.38 0.00 87.00 4.80 1.38 0.00 88.00 4.80 1.38 0.00 89.00 4.80 1.38 0.00 90.00 4.80 1.38 0.00 91.00 4.80 1.38 0.00 92.00 4.80 1.38 0.00 93.00 4.80 1.38 0.00 94.00 4.80 1.38 0.00 95.00 4.80 1.38 0.00 96.00 4.80 1.38 0.00 97.00 4.80 1.38 0.00 98.00 4.80 1.38 0.00 99.00 4.80 1.38 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 136 Summary for Subcatchment 9S: BMP #2 [49] Hint: Tc<2dt may require smaller dt Runoff = 46.90 cfs @ 11.96 hrs, Volume= 2.191 af, Depth= 2.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr24hr Rainfall=4.80" Area (ac) CN Description 9.670 80 9.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: BMP #2 Hydrograph 52 50 ---,---,---,---,---,---,---,---,---,---,---,---------------------------,--- 46.90 cfs ----- ------------+------+------ ------ ------ ------ -- ■Runoff 48 --+-- --,------,------,------,---------=---,--- -------------- -+------+------+------+------+------+-------- - I 24-hr IIII 44 42 40 ----- -- -- --- -- -I- ---- -I- ---- -I- -- ---- ----I - --I- -- ---I---1' - -F ----'------'---+---'- +------ 40 , r24hrRainfatl=4.80`'-- 38 36 -- -- -- - ------------+------+------+-I:ZAurtoff-Afea^9X70Aad-- - ---- -- 34 32 --�-- - ------------rt------t------ KUrtWMQ= w 30 28 --r-- -- -r---r--r---r--r---r--t------r---I---r------r---I---r------r-- ------ ------ ------ ------ I-Ru-n ?f#D th=2:72" - 3 26 a 24 -- -- ---'-- - --- ----Ir-- ---Ir--7---Ir--rt---Ir--7---Ir--r---I---r---r---I---r-- --'---'----------'---'------------------------�.0Irnfll-- - ----- ------ ------ ------r - --- ---- --r- 22 20 r -- -- r-rrrrI- r I- r-- -L---1---L---1---1---1---1------1---I---L---I---L---- Aim-8jY- I I I I I �I 16 --L-- -L------L---1---1---1---1------1------L------L------L------L-- I I I 14 12 i --r-- --L-- -r---r--r---I---r---� --T---I---r---I---r---I---r---I---r---I---r-- -L------L---1---1------L------L---I---L------L------L------L-- I I I 10 8 i --r-- --L-- -r---r--r---rr---�-- T---I---r---I r---I---r---I---r---I---r-- -L---1---L---1---1---1---1---1---1------L------L------L------L-- 4 --�-- 1------I------�- I - --- --I - --- --------I------I------�-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 137 Hydrograph for Subcatchment 9S: BMP #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.23 0.00 0.00 5.00 0.30 0.00 0.00 6.00 0.38 0.00 0.00 7.00 0.48 0.00 0.00 8.00 0.58 0.00 0.05 9.00 0.71 0.02 0.20 10.00 0.87 0.05 0.42 11.00 1.13 0.13 1.13 12.00 3.18 1.39 40.71 13.00 3.71 1.80 2.45 14.00 3.94 1.99 1.48 15.00 4.10 2.12 1.19 16.00 4.22 2.23 0.92 17.00 4.33 2.32 0.82 18.00 4.42 2.39 0.72 19.00 4.50 2.46 0.63 20.00 4.57 2.52 0.53 21.00 4.63 2.57 0.50 22.00 4.69 2.62 0.48 23.00 4.75 2.67 0.47 24.00 4.80 2.72 0.45 25.00 4.80 2.72 0.00 26.00 4.80 2.72 0.00 27.00 4.80 2.72 0.00 28.00 4.80 2.72 0.00 29.00 4.80 2.72 0.00 30.00 4.80 2.72 0.00 31.00 4.80 2.72 0.00 32.00 4.80 2.72 0.00 33.00 4.80 2.72 0.00 34.00 4.80 2.72 0.00 35.00 4.80 2.72 0.00 36.00 4.80 2.72 0.00 37.00 4.80 2.72 0.00 38.00 4.80 2.72 0.00 39.00 4.80 2.72 0.00 40.00 4.80 2.72 0.00 41.00 4.80 2.72 0.00 42.00 4.80 2.72 0.00 43.00 4.80 2.72 0.00 44.00 4.80 2.72 0.00 45.00 4.80 2.72 0.00 46.00 4.80 2.72 0.00 47.00 4.80 2.72 0.00 48.00 4.80 2.72 0.00 49.00 4.80 2.72 0.00 50.00 4.80 2.72 0.00 51.00 4.80 2.72 0.00 52.00 4.80 2.72 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 4.80 2.72 0.00 54.00 4.80 2.72 0.00 55.00 4.80 2.72 0.00 56.00 4.80 2.72 0.00 57.00 4.80 2.72 0.00 58.00 4.80 2.72 0.00 59.00 4.80 2.72 0.00 60.00 4.80 2.72 0.00 61.00 4.80 2.72 0.00 62.00 4.80 2.72 0.00 63.00 4.80 2.72 0.00 64.00 4.80 2.72 0.00 65.00 4.80 2.72 0.00 66.00 4.80 2.72 0.00 67.00 4.80 2.72 0.00 68.00 4.80 2.72 0.00 69.00 4.80 2.72 0.00 70.00 4.80 2.72 0.00 71.00 4.80 2.72 0.00 72.00 4.80 2.72 0.00 73.00 4.80 2.72 0.00 74.00 4.80 2.72 0.00 75.00 4.80 2.72 0.00 76.00 4.80 2.72 0.00 77.00 4.80 2.72 0.00 78.00 4.80 2.72 0.00 79.00 4.80 2.72 0.00 80.00 4.80 2.72 0.00 81.00 4.80 2.72 0.00 82.00 4.80 2.72 0.00 83.00 4.80 2.72 0.00 84.00 4.80 2.72 0.00 85.00 4.80 2.72 0.00 86.00 4.80 2.72 0.00 87.00 4.80 2.72 0.00 88.00 4.80 2.72 0.00 89.00 4.80 2.72 0.00 90.00 4.80 2.72 0.00 91.00 4.80 2.72 0.00 92.00 4.80 2.72 0.00 93.00 4.80 2.72 0.00 94.00 4.80 2.72 0.00 95.00 4.80 2.72 0.00 96.00 4.80 2.72 0.00 97.00 4.80 2.72 0.00 98.00 4.80 2.72 0.00 99.00 4.80 2.72 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 138 Summary for Subcatchment 10S: BMP #3 [49] Hint: Tc<2dt may require smaller dt Runoff = 32.46 cfs @ 11.96 hrs, Volume= 1.512 af, Depth= 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr24hr Rainfall=4.80" Area (ac) CN Description 6.900 79 6.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: BMP #3 Hydrograph 36 -- --- -- --- -----1---1---1---+---'---+---'---L---'---L-- I - - - L------L-- ■ Runoff 3432.46 cfs 32 T -----�---Type-0-24-hx - ---i-- - i------i------Y------Y------Y---- 30 ---,-- - ------ 4 ------ ---I--- --- I- 28 -- 44C0yr24hr Rainfall=4:80'F- 26 -- -- ----'-------'-------'---+---'---+--R-urtoff-Atea�=8.1904 -at -- 24 - -- - ------ ------------+ --- --- -- - -- - -- 22 1------1------i------1---' I-urio=VQlUIMP= Lv'Cl2- f- 20 -- -- - - --- - --- + -- --- + -- --- + --- Rtunaf# Depth- 2.631'-- LL 16 -- -- - --- --- -- -- --- - --- T =3.0 Inlih ' - -- ------ 7-- T------T------r------T----r -r-- 14 -- -- - ---li -----li---7---1i--T---li---T---li---r---li---r---li---CN�-7$- 12 --y-- - ---r-- ---r--rt---r--+------+------r------+------r------r-- 10 --+-- -+---+--+---+--+---+--+---i---+---+--+---i---+--+---+---i---+-- --J-- ----'------1---1---1---+---'---+------L------L------L------L-- 6 --J-- ----'------1---1---1---+---'---+------L------L------L------L-- 4 -------------------- -------------------------------------- 2 I I I I I I I I I I I I 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 139 Hydrograph for Subcatchment 10S: BMP #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.23 0.00 0.00 5.00 0.30 0.00 0.00 6.00 0.38 0.00 0.00 7.00 0.48 0.00 0.00 8.00 0.58 0.00 0.02 9.00 0.71 0.01 0.12 10.00 0.87 0.04 0.27 11.00 1.13 0.11 0.74 12.00 3.18 1.32 28.26 13.00 3.71 1.73 1.72 14.00 3.94 1.91 1.04 15.00 4.10 2.04 0.83 16.00 4.22 2.15 0.65 17.00 4.33 2.23 0.57 18.00 4.42 2.31 0.51 19.00 4.50 2.38 0.44 20.00 4.57 2.43 0.37 21.00 4.63 2.49 0.35 22.00 4.69 2.54 0.34 23.00 4.75 2.58 0.33 24.00 4.80 2.63 0.31 25.00 4.80 2.63 0.00 26.00 4.80 2.63 0.00 27.00 4.80 2.63 0.00 28.00 4.80 2.63 0.00 29.00 4.80 2.63 0.00 30.00 4.80 2.63 0.00 31.00 4.80 2.63 0.00 32.00 4.80 2.63 0.00 33.00 4.80 2.63 0.00 34.00 4.80 2.63 0.00 35.00 4.80 2.63 0.00 36.00 4.80 2.63 0.00 37.00 4.80 2.63 0.00 38.00 4.80 2.63 0.00 39.00 4.80 2.63 0.00 40.00 4.80 2.63 0.00 41.00 4.80 2.63 0.00 42.00 4.80 2.63 0.00 43.00 4.80 2.63 0.00 44.00 4.80 2.63 0.00 45.00 4.80 2.63 0.00 46.00 4.80 2.63 0.00 47.00 4.80 2.63 0.00 48.00 4.80 2.63 0.00 49.00 4.80 2.63 0.00 50.00 4.80 2.63 0.00 51.00 4.80 2.63 0.00 52.00 4.80 2.63 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 4.80 2.63 0.00 54.00 4.80 2.63 0.00 55.00 4.80 2.63 0.00 56.00 4.80 2.63 0.00 57.00 4.80 2.63 0.00 58.00 4.80 2.63 0.00 59.00 4.80 2.63 0.00 60.00 4.80 2.63 0.00 61.00 4.80 2.63 0.00 62.00 4.80 2.63 0.00 63.00 4.80 2.63 0.00 64.00 4.80 2.63 0.00 65.00 4.80 2.63 0.00 66.00 4.80 2.63 0.00 67.00 4.80 2.63 0.00 68.00 4.80 2.63 0.00 69.00 4.80 2.63 0.00 70.00 4.80 2.63 0.00 71.00 4.80 2.63 0.00 72.00 4.80 2.63 0.00 73.00 4.80 2.63 0.00 74.00 4.80 2.63 0.00 75.00 4.80 2.63 0.00 76.00 4.80 2.63 0.00 77.00 4.80 2.63 0.00 78.00 4.80 2.63 0.00 79.00 4.80 2.63 0.00 80.00 4.80 2.63 0.00 81.00 4.80 2.63 0.00 82.00 4.80 2.63 0.00 83.00 4.80 2.63 0.00 84.00 4.80 2.63 0.00 85.00 4.80 2.63 0.00 86.00 4.80 2.63 0.00 87.00 4.80 2.63 0.00 88.00 4.80 2.63 0.00 89.00 4.80 2.63 0.00 90.00 4.80 2.63 0.00 91.00 4.80 2.63 0.00 92.00 4.80 2.63 0.00 93.00 4.80 2.63 0.00 94.00 4.80 2.63 0.00 95.00 4.80 2.63 0.00 96.00 4.80 2.63 0.00 97.00 4.80 2.63 0.00 98.00 4.80 2.63 0.00 99.00 4.80 2.63 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 140 Summary for Subcatchment 11S: Bypass #1 Runoff = 9.80 cfs @ 12.11 hrs, Volume= 0.708 af, Depth= 1.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr24hr Rainfall=4.80" Area (ac) CN Description 4.560 58 Woods/grass comb., Good, HSG B 1.020 98 Water Surface, HSG B 5.580 65 Weighted Average 4.560 81.72% Pervious Area 1.020 18.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.9 Direct Entry, Subcatchment 11S: Bypass #1 Hydrograph I I I I I I I I I I I I I I I I I I I ■Runoff 10 ' 9.80 cfs-----1---III---i------1---III---i---III--- ---III--- - --III---L --- III---L- -- - ---I -- ---II--- ---I--T------T------r------pe-�I-2-4-hr_- 9 I I I I I I I I I I ---'I-- --'I-- --'I-- ---'I- --1110 r24hrRainfa11,=4.80"-- Runoff Aee&5.'1580 at -t-- - ---t-----t--t---t--t---I---t---I---t---I---t---I---t---I---t -- Runof VQIu'IImq=O'1.70'1,8 pf -- I I I I I I I I I I I I I Runoff DeIpthI I =1;52I I" 0 5 Tc�16.9 wnin 4 LL ---I-- - ---I, -- ---I--- ---I, -----I------I--- I, ---I--- I,---I---;CNI1,=6$ - - - - - - 4 - - - I- - - 4 - - - - - - - - - I- - - t - - -3- - ------ ------ ------ ------ ------ ------ ------ ------ 2 1 I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 141 Hydrograph for Subcatchment 11S: Bypass #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.23 0.00 0.00 5.00 0.30 0.00 0.00 6.00 0.38 0.00 0.00 7.00 0.48 0.00 0.00 8.00 0.58 0.00 0.00 9.00 0.71 0.00 0.00 10.00 0.87 0.00 0.00 11.00 1.13 0.00 0.00 12.00 3.18 0.59 6.73 13.00 3.71 0.86 1.10 14.00 3.94 0.99 0.65 15.00 4.10 1.09 0.50 16.00 4.22 1.16 0.40 17.00 4.33 1.22 0.35 18.00 4.42 1.28 0.31 19.00 4.50 1.33 0.27 20.00 4.57 1.37 0.23 21.00 4.63 1.41 0.22 22.00 4.69 1.45 0.21 23.00 4.75 1.49 0.20 24.00 4.80 1.52 0.20 25.00 4.80 1.52 0.00 26.00 4.80 1.52 0.00 27.00 4.80 1.52 0.00 28.00 4.80 1.52 0.00 29.00 4.80 1.52 0.00 30.00 4.80 1.52 0.00 31.00 4.80 1.52 0.00 32.00 4.80 1.52 0.00 33.00 4.80 1.52 0.00 34.00 4.80 1.52 0.00 35.00 4.80 1.52 0.00 36.00 4.80 1.52 0.00 37.00 4.80 1.52 0.00 38.00 4.80 1.52 0.00 39.00 4.80 1.52 0.00 40.00 4.80 1.52 0.00 41.00 4.80 1.52 0.00 42.00 4.80 1.52 0.00 43.00 4.80 1.52 0.00 44.00 4.80 1.52 0.00 45.00 4.80 1.52 0.00 46.00 4.80 1.52 0.00 47.00 4.80 1.52 0.00 48.00 4.80 1.52 0.00 49.00 4.80 1.52 0.00 50.00 4.80 1.52 0.00 51.00 4.80 1.52 0.00 52.00 4.80 1.52 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 4.80 1.52 0.00 54.00 4.80 1.52 0.00 55.00 4.80 1.52 0.00 56.00 4.80 1.52 0.00 57.00 4.80 1.52 0.00 58.00 4.80 1.52 0.00 59.00 4.80 1.52 0.00 60.00 4.80 1.52 0.00 61.00 4.80 1.52 0.00 62.00 4.80 1.52 0.00 63.00 4.80 1.52 0.00 64.00 4.80 1.52 0.00 65.00 4.80 1.52 0.00 66.00 4.80 1.52 0.00 67.00 4.80 1.52 0.00 68.00 4.80 1.52 0.00 69.00 4.80 1.52 0.00 70.00 4.80 1.52 0.00 71.00 4.80 1.52 0.00 72.00 4.80 1.52 0.00 73.00 4.80 1.52 0.00 74.00 4.80 1.52 0.00 75.00 4.80 1.52 0.00 76.00 4.80 1.52 0.00 77.00 4.80 1.52 0.00 78.00 4.80 1.52 0.00 79.00 4.80 1.52 0.00 80.00 4.80 1.52 0.00 81.00 4.80 1.52 0.00 82.00 4.80 1.52 0.00 83.00 4.80 1.52 0.00 84.00 4.80 1.52 0.00 85.00 4.80 1.52 0.00 86.00 4.80 1.52 0.00 87.00 4.80 1.52 0.00 88.00 4.80 1.52 0.00 89.00 4.80 1.52 0.00 90.00 4.80 1.52 0.00 91.00 4.80 1.52 0.00 92.00 4.80 1.52 0.00 93.00 4.80 1.52 0.00 94.00 4.80 1.52 0.00 95.00 4.80 1.52 0.00 96.00 4.80 1.52 0.00 97.00 4.80 1.52 0.00 98.00 4.80 1.52 0.00 99.00 4.80 1.52 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 142 Summary for Subcatchment 12S: Bypass #2 Runoff = 1.00 cfs @ 12.22 hrs, Volume= 0.103 af, Depth= 1.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr24hr Rainfall=4.80" Area (ac) CN Description 1.160 58 Woods/grass comb., Good, HSG B 1.160 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, 1.00 cfs Subcatchment 12S: Bypass #2 Hydrograph � � � � � � � � � � � � � � � � ■Runoff type I'',I 24-h,r 10yr24hr Rainfall 4!80 Run�off Area=1.160 at Ruoff VQIu',m�=0r10',3 af Runoff Depth111, 1 ! 06" Tc,24.9 wnih RCN',=5$ 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 143 Hydrograph for Subcatchment 12S: Bypass #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.23 0.00 0.00 5.00 0.30 0.00 0.00 6.00 0.38 0.00 0.00 7.00 0.48 0.00 0.00 8.00 0.58 0.00 0.00 9.00 0.71 0.00 0.00 10.00 0.87 0.00 0.00 11.00 1.13 0.00 0.00 12.00 3.18 0.34 0.33 13.00 3.71 0.54 0.20 14.00 3.94 0.64 0.11 15.00 4.10 0.71 0.08 16.00 4.22 0.77 0.07 17.00 4.33 0.82 0.06 18.00 4.42 0.87 0.05 19.00 4.50 0.91 0.05 20.00 4.57 0.94 0.04 21.00 4.63 0.97 0.04 22.00 4.69 1.00 0.04 23.00 4.75 1.03 0.03 24.00 4.80 1.06 0.03 25.00 4.80 1.06 0.00 26.00 4.80 1.06 0.00 27.00 4.80 1.06 0.00 28.00 4.80 1.06 0.00 29.00 4.80 1.06 0.00 30.00 4.80 1.06 0.00 31.00 4.80 1.06 0.00 32.00 4.80 1.06 0.00 33.00 4.80 1.06 0.00 34.00 4.80 1.06 0.00 35.00 4.80 1.06 0.00 36.00 4.80 1.06 0.00 37.00 4.80 1.06 0.00 38.00 4.80 1.06 0.00 39.00 4.80 1.06 0.00 40.00 4.80 1.06 0.00 41.00 4.80 1.06 0.00 42.00 4.80 1.06 0.00 43.00 4.80 1.06 0.00 44.00 4.80 1.06 0.00 45.00 4.80 1.06 0.00 46.00 4.80 1.06 0.00 47.00 4.80 1.06 0.00 48.00 4.80 1.06 0.00 49.00 4.80 1.06 0.00 50.00 4.80 1.06 0.00 51.00 4.80 1.06 0.00 52.00 4.80 1.06 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 4.80 1.06 0.00 54.00 4.80 1.06 0.00 55.00 4.80 1.06 0.00 56.00 4.80 1.06 0.00 57.00 4.80 1.06 0.00 58.00 4.80 1.06 0.00 59.00 4.80 1.06 0.00 60.00 4.80 1.06 0.00 61.00 4.80 1.06 0.00 62.00 4.80 1.06 0.00 63.00 4.80 1.06 0.00 64.00 4.80 1.06 0.00 65.00 4.80 1.06 0.00 66.00 4.80 1.06 0.00 67.00 4.80 1.06 0.00 68.00 4.80 1.06 0.00 69.00 4.80 1.06 0.00 70.00 4.80 1.06 0.00 71.00 4.80 1.06 0.00 72.00 4.80 1.06 0.00 73.00 4.80 1.06 0.00 74.00 4.80 1.06 0.00 75.00 4.80 1.06 0.00 76.00 4.80 1.06 0.00 77.00 4.80 1.06 0.00 78.00 4.80 1.06 0.00 79.00 4.80 1.06 0.00 80.00 4.80 1.06 0.00 81.00 4.80 1.06 0.00 82.00 4.80 1.06 0.00 83.00 4.80 1.06 0.00 84.00 4.80 1.06 0.00 85.00 4.80 1.06 0.00 86.00 4.80 1.06 0.00 87.00 4.80 1.06 0.00 88.00 4.80 1.06 0.00 89.00 4.80 1.06 0.00 90.00 4.80 1.06 0.00 91.00 4.80 1.06 0.00 92.00 4.80 1.06 0.00 93.00 4.80 1.06 0.00 94.00 4.80 1.06 0.00 95.00 4.80 1.06 0.00 96.00 4.80 1.06 0.00 97.00 4.80 1.06 0.00 98.00 4.80 1.06 0.00 99.00 4.80 1.06 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 144 Summary for Subcatchment 13S: Pre -Development #3 Runoff = 6.77 cfs @ 12.17 hrs, Volume= 0.667 af, Depth= 0.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr24hr Rainfall=4.80" Area (ac) CN Description 9.070 55 Woods, Good, HSG B 9.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 13S: Pre -Development #3 Hydrograph 6.77 - -'- - - ■Runoff r-I- r---I- r---I- r--r---i r---r r---r r---I-- 7 cfs I I I Type I�'II 24-hIr 6 10yr24hr Rainfall' 4.80'' - -- ----'I---- ------------r--- --- _-Runoff Atea�=8:070-ab- 5 Runoff Vp16mq=6r6617 clf Runoff Depth, 0.881 -J---1---1---1---'---------L---'--- J---'--- T_cr20_7 MIIh- 3 LL I I I I I I I I I I I I I I I "I RCN'=5$ z 'I 1 I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 145 Hydrograph for Subcatchment 13S: Pre -Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.23 0.00 0.00 5.00 0.30 0.00 0.00 6.00 0.38 0.00 0.00 7.00 0.48 0.00 0.00 8.00 0.58 0.00 0.00 9.00 0.71 0.00 0.00 10.00 0.87 0.00 0.00 11.00 1.13 0.00 0.00 12.00 3.18 0.25 2.55 13.00 3.71 0.42 1.24 14.00 3.94 0.50 0.73 15.00 4.10 0.57 0.57 16.00 4.22 0.62 0.46 17.00 4.33 0.67 0.40 18.00 4.42 0.71 0.36 19.00 4.50 0.74 0.32 20.00 4.57 0.77 0.28 21.00 4.63 0.80 0.26 22.00 4.69 0.83 0.25 23.00 4.75 0.86 0.24 24.00 4.80 0.88 0.23 25.00 4.80 0.88 0.00 26.00 4.80 0.88 0.00 27.00 4.80 0.88 0.00 28.00 4.80 0.88 0.00 29.00 4.80 0.88 0.00 30.00 4.80 0.88 0.00 31.00 4.80 0.88 0.00 32.00 4.80 0.88 0.00 33.00 4.80 0.88 0.00 34.00 4.80 0.88 0.00 35.00 4.80 0.88 0.00 36.00 4.80 0.88 0.00 37.00 4.80 0.88 0.00 38.00 4.80 0.88 0.00 39.00 4.80 0.88 0.00 40.00 4.80 0.88 0.00 41.00 4.80 0.88 0.00 42.00 4.80 0.88 0.00 43.00 4.80 0.88 0.00 44.00 4.80 0.88 0.00 45.00 4.80 0.88 0.00 46.00 4.80 0.88 0.00 47.00 4.80 0.88 0.00 48.00 4.80 0.88 0.00 49.00 4.80 0.88 0.00 50.00 4.80 0.88 0.00 51.00 4.80 0.88 0.00 52.00 4.80 0.88 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 4.80 0.88 0.00 54.00 4.80 0.88 0.00 55.00 4.80 0.88 0.00 56.00 4.80 0.88 0.00 57.00 4.80 0.88 0.00 58.00 4.80 0.88 0.00 59.00 4.80 0.88 0.00 60.00 4.80 0.88 0.00 61.00 4.80 0.88 0.00 62.00 4.80 0.88 0.00 63.00 4.80 0.88 0.00 64.00 4.80 0.88 0.00 65.00 4.80 0.88 0.00 66.00 4.80 0.88 0.00 67.00 4.80 0.88 0.00 68.00 4.80 0.88 0.00 69.00 4.80 0.88 0.00 70.00 4.80 0.88 0.00 71.00 4.80 0.88 0.00 72.00 4.80 0.88 0.00 73.00 4.80 0.88 0.00 74.00 4.80 0.88 0.00 75.00 4.80 0.88 0.00 76.00 4.80 0.88 0.00 77.00 4.80 0.88 0.00 78.00 4.80 0.88 0.00 79.00 4.80 0.88 0.00 80.00 4.80 0.88 0.00 81.00 4.80 0.88 0.00 82.00 4.80 0.88 0.00 83.00 4.80 0.88 0.00 84.00 4.80 0.88 0.00 85.00 4.80 0.88 0.00 86.00 4.80 0.88 0.00 87.00 4.80 0.88 0.00 88.00 4.80 0.88 0.00 89.00 4.80 0.88 0.00 90.00 4.80 0.88 0.00 91.00 4.80 0.88 0.00 92.00 4.80 0.88 0.00 93.00 4.80 0.88 0.00 94.00 4.80 0.88 0.00 95.00 4.80 0.88 0.00 96.00 4.80 0.88 0.00 97.00 4.80 0.88 0.00 98.00 4.80 0.88 0.00 99.00 4.80 0.88 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 146 Summary for Subcatchment 14S: Post Development #3 Runoff = 6.71 cfs @ 12.17 hrs, Volume= 0.661 af, Depth= 0.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr24hr Rainfall=4.80" Area (ac) CN Description 8.670 55 Woods, Good, HSG B 0.320 58 Woods/grass comb., Good, HSG B 8.990 55 Weighted Average 8.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 14S: Post Development #3 Hydrograph I I I I I I I I I I I I I I I I -- �I------------ ■Runoff 7 6.71 cfs Type II 24-hr 6 10yr24hr Rainfal[=4.80" ---'I---------T--- r--- - - -! -Runoff Ate&:8'990 ac 5 kunoff Vplu'Imp=Or66'11 clf Runoff Depth'I, 0.881' ° --'�-00-7 tnih- 3 T2�ICN'I=5$ z 'I 1 I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 147 Hydrograph for Subcatchment 14S: Post Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.23 0.00 0.00 5.00 0.30 0.00 0.00 6.00 0.38 0.00 0.00 7.00 0.48 0.00 0.00 8.00 0.58 0.00 0.00 9.00 0.71 0.00 0.00 10.00 0.87 0.00 0.00 11.00 1.13 0.00 0.00 12.00 3.18 0.25 2.53 13.00 3.71 0.42 1.23 14.00 3.94 0.50 0.73 15.00 4.10 0.57 0.57 16.00 4.22 0.62 0.46 17.00 4.33 0.67 0.40 18.00 4.42 0.71 0.36 19.00 4.50 0.74 0.32 20.00 4.57 0.77 0.27 21.00 4.63 0.80 0.25 22.00 4.69 0.83 0.25 23.00 4.75 0.86 0.24 24.00 4.80 0.88 0.23 25.00 4.80 0.88 0.00 26.00 4.80 0.88 0.00 27.00 4.80 0.88 0.00 28.00 4.80 0.88 0.00 29.00 4.80 0.88 0.00 30.00 4.80 0.88 0.00 31.00 4.80 0.88 0.00 32.00 4.80 0.88 0.00 33.00 4.80 0.88 0.00 34.00 4.80 0.88 0.00 35.00 4.80 0.88 0.00 36.00 4.80 0.88 0.00 37.00 4.80 0.88 0.00 38.00 4.80 0.88 0.00 39.00 4.80 0.88 0.00 40.00 4.80 0.88 0.00 41.00 4.80 0.88 0.00 42.00 4.80 0.88 0.00 43.00 4.80 0.88 0.00 44.00 4.80 0.88 0.00 45.00 4.80 0.88 0.00 46.00 4.80 0.88 0.00 47.00 4.80 0.88 0.00 48.00 4.80 0.88 0.00 49.00 4.80 0.88 0.00 50.00 4.80 0.88 0.00 51.00 4.80 0.88 0.00 52.00 4.80 0.88 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 4.80 0.88 0.00 54.00 4.80 0.88 0.00 55.00 4.80 0.88 0.00 56.00 4.80 0.88 0.00 57.00 4.80 0.88 0.00 58.00 4.80 0.88 0.00 59.00 4.80 0.88 0.00 60.00 4.80 0.88 0.00 61.00 4.80 0.88 0.00 62.00 4.80 0.88 0.00 63.00 4.80 0.88 0.00 64.00 4.80 0.88 0.00 65.00 4.80 0.88 0.00 66.00 4.80 0.88 0.00 67.00 4.80 0.88 0.00 68.00 4.80 0.88 0.00 69.00 4.80 0.88 0.00 70.00 4.80 0.88 0.00 71.00 4.80 0.88 0.00 72.00 4.80 0.88 0.00 73.00 4.80 0.88 0.00 74.00 4.80 0.88 0.00 75.00 4.80 0.88 0.00 76.00 4.80 0.88 0.00 77.00 4.80 0.88 0.00 78.00 4.80 0.88 0.00 79.00 4.80 0.88 0.00 80.00 4.80 0.88 0.00 81.00 4.80 0.88 0.00 82.00 4.80 0.88 0.00 83.00 4.80 0.88 0.00 84.00 4.80 0.88 0.00 85.00 4.80 0.88 0.00 86.00 4.80 0.88 0.00 87.00 4.80 0.88 0.00 88.00 4.80 0.88 0.00 89.00 4.80 0.88 0.00 90.00 4.80 0.88 0.00 91.00 4.80 0.88 0.00 92.00 4.80 0.88 0.00 93.00 4.80 0.88 0.00 94.00 4.80 0.88 0.00 95.00 4.80 0.88 0.00 96.00 4.80 0.88 0.00 97.00 4.80 0.88 0.00 98.00 4.80 0.88 0.00 99.00 4.80 0.88 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 148 Summary for Pond 5P: BMP #1 Inflow Area = 12.980 ac, 0.00% Impervious, Inflow Depth = 1.38" for 10yr24hr event Inflow = 31.54 cfs @ 11.97 hrs, Volume= 1.497 of Outflow = 0.14 cfs @ 24.10 hrs, Volume= 0.857 af, Atten= 100%, Lag= 728.0 min Primary = 0.14 cfs @ 24.10 hrs, Volume= 0.857 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 569.84' @ 24.10 hrs Surf.Area= 21,277 sf Storage= 59,659 cf Plug -Flow detention time= 2,471.3 min calculated for 0.857 of (57% of inflow) Center -of -Mass det. time= 2,336.7 min ( 3,201.8 - 865.0 ) Volume Invert Avail.Storage Storage Description #1 566.50' 137,597 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 566.50 13,995 0 0 567.00 15,551 7,387 7,387 568.00 17,503 16,527 23,914 569.00 19,519 18,511 42,425 570.00 21,600 20,560 62,984 571.00 23,745 22,673 85,657 572.00 25,954 24,850 110,506 573.00 28,228 27,091 137,597 Device Routing Invert Outlet Devices #1 Primary 561.90' 36.0" Round RCP -Round 36" L= 187.7' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 561.90' / 560.89' S= 0.0054 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 566.50' 1.7" Vert. WQ Orrfice C= 0.600 #3 Device 1 570.10' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.90 Width (feet) 2.50 2.50 #4 Device 1 571.00' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 571.80' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.14 cfs @ 24.10 hrs HW=569.84' (Free Discharge) L1=RCP_Round 36" (Passes 0.14 cfs of 86.47 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.14 cfs @ 8.71 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 149 Pond 5P: BMP #1 Hydrograph ' - 31.54 cfs -+-- -- -- ---------------r--r--r--r--r--+-- -- -- --r- ----------- 111flow �Arrea#'12.J8a ae-- -- 34 --r- -T--T----- ------------------- Pe;ak EIevL5�9�8 '-- 30 --T- --, - - T --T --, -- -- -, -- --1 -,---,---,---,---,---- -- ---------------r --r -----rage- •+3V++•f-k.1-- $bt 28 26 ,i 24 1- - r r 22 - - -- -- -- -- --------- -- --- --- ------- - -- - -- -- -- -- w 20 -L- -1--1--1--J-- -1--1--1--J--J---1---1---1---1---1---L--L--L--L--1--1--1-- ---1---1---1---1---1---L--L--L--L--1--1--1-- " 18 _ 16 ' LL14 -- - -+--+-- -- -- ------------------ -- -- -- -- -- -- -- 12 10 Z Z--+- +--+--+--+--+---------------r--r--r--r--r--+--+--+-- 6 4 0.14 cfs 1 [Bill %/MOMO .0:0 •0 Time (hours) 573 572 571 w w c 570 0 .� w w 569 568 567 Pond 5P: BMP #1 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) Lry ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 150 Pond 5P: BMP #1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 F Surface ❑ Storage 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 151 Hydrograph for Pond 5P: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 566.50 0.00 0.00 0.00 2.50 0.00 0 566.50 0.00 0.00 0.00 5.00 0.00 0 566.50 0.00 0.00 0.00 7.50 0.00 0 566.50 0.00 0.00 0.00 10.00 0.00 0 566.50 0.00 0.00 0.00 12.50 3.19 30,665 568.38 0.10 0.10 0.00 15.00 1.06 44,216 569.09 0.12 0.12 0.00 17.50 0.71 50,664 569.41 0.13 0.13 0.00 20.00 0.50 54,927 569.62 0.13 0.13 0.00 22.50 0.45 57,963 569.76 0.14 0.14 0.00 25.00 0.00 59,229 569.82 0.14 0.14 0.00 27.50 0.00 58,003 569.77 0.14 0.14 0.00 30.00 0.00 56,787 569.71 0.13 0.13 0.00 32.50 0.00 55,583 569.65 0.13 0.13 0.00 35.00 0.00 54,389 569.59 0.13 0.13 0.00 37.50 0.00 53,207 569.54 0.13 0.13 0.00 40.00 0.00 52,036 569.48 0.13 0.13 0.00 42.50 0.00 50,877 569.42 0.13 0.13 0.00 45.00 0.00 49,729 569.37 0.13 0.13 0.00 47.50 0.00 48,593 569.31 0.13 0.13 0.00 50.00 0.00 47,468 569.25 0.12 0.12 0.00 52.50 0.00 46,355 569.20 0.12 0.12 0.00 55.00 0.00 45,253 569.14 0.12 0.12 0.00 57.50 0.00 44,163 569.09 0.12 0.12 0.00 60.00 0.00 43,085 569.03 0.12 0.12 0.00 62.50 0.00 42,019 568.98 0.12 0.12 0.00 65.00 0.00 40,965 568.92 0.12 0.12 0.00 67.50 0.00 39,923 568.87 0.12 0.12 0.00 70.00 0.00 38,894 568.82 0.11 0.11 0.00 72.50 0.00 37,876 568.76 0.11 0.11 0.00 75.00 0.00 36,870 568.71 0.11 0.11 0.00 77.50 0.00 35,877 568.66 0.11 0.11 0.00 80.00 0.00 34,897 568.61 0.11 0.11 0.00 82.50 0.00 33,928 568.55 0.11 0.11 0.00 85.00 0.00 32,973 568.50 0.11 0.11 0.00 87.50 0.00 32,030 568.45 0.10 0.10 0.00 90.00 0.00 31,099 568.40 0.10 0.10 0.00 92.50 0.00 30,181 568.35 0.10 0.10 0.00 95.00 0.00 29,276 568.30 0.10 0.10 0.00 97.50 0.00 28,384 568.25 0.10 0.10 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 152 Stage -Discharge for Pond 5P: BMP #1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 566.50 0.00 0.00 0.00 566.60 0.01 0.01 0.00 566.70 0.03 0.03 0.00 566.80 0.04 0.04 0.00 566.90 0.04 0.04 0.00 567.00 0.05 0.05 0.00 567.10 0.06 0.06 0.00 567.20 0.06 0.06 0.00 567.30 0.06 0.06 0.00 567.40 0.07 0.07 0.00 567.50 0.07 0.07 0.00 567.60 0.08 0.08 0.00 567.70 0.08 0.08 0.00 567.80 0.08 0.08 0.00 567.90 0.09 0.09 0.00 568.00 0.09 0.09 0.00 568.10 0.09 0.09 0.00 568.20 0.10 0.10 0.00 568.30 0.10 0.10 0.00 568.40 0.10 0.10 0.00 568.50 0.11 0.11 0.00 568.60 0.11 0.11 0.00 568.70 0.11 0.11 0.00 568.80 0.11 0.11 0.00 568.90 0.12 0.12 0.00 569.00 0.12 0.12 0.00 569.10 0.12 0.12 0.00 569.20 0.12 0.12 0.00 569.30 0.13 0.13 0.00 569.40 0.13 0.13 0.00 569.50 0.13 0.13 0.00 569.60 0.13 0.13 0.00 569.70 0.13 0.13 0.00 569.80 0.14 0.14 0.00 569.90 0.14 0.14 0.00 570.00 0.14 0.14 0.00 570.10 0.14 0.14 0.00 570.20 0.40 0.40 0.00 570.30 0.88 0.88 0.00 570.40 1.49 1.49 0.00 570.50 2.22 2.22 0.00 570.60 3.05 3.05 0.00 570.70 3.96 3.96 0.00 570.80 4.95 4.95 0.00 570.90 6.02 6.02 0.00 571.00 7.15 7.15 0.00 571.10 9.74 9.74 0.00 571.20 13.56 13.56 0.00 571.30 18.18 18.18 0.00 571.40 23.47 23.47 0.00 571.50 29.33 29.33 0.00 571.60 35.72 35.72 0.00 571.70 42.59 42.59 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 571.80 49.90 49.90 0.00 571.90 58.42 57.63 0.79 572.00 67.98 65.75 2.23 572.10 78.40 74.25 4.15 572.20 89.59 83.11 6.48 572.30 101.61 92.31 9.30 572.40 114.40 101.85 12.55 572.50 119.76 103.98 15.78 572.60 123.83 104.58 19.25 572.70 128.10 105.18 22.92 572.80 132.57 105.77 26.80 572.90 137.34 106.37 30.98 573.00 142.31 106.95 35.36 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 153 Stage -Area -Storage for Pond 5P: BMP #1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 566.50 13,995 0 566.60 14,306 1,415 566.70 14,617 2,861 566.80 14,929 4,339 566.90 15,240 5,847 567.00 15,551 7,387 567.10 15,746 8,951 567.20 15,941 10,536 567.30 16,137 12,140 567.40 16,332 13,763 567.50 16,527 15,406 567.60 16,722 17,068 567.70 16,917 18,750 567.80 17,113 20,452 567.90 17,308 22,173 568.00 17,503 23,914 568.10 17,705 25,674 568.20 17,906 27,454 568.30 18,108 29,255 568.40 18,309 31,076 568.50 18,511 32,917 568.60 18,713 34,778 568.70 18,914 36,660 568.80 19,116 38,561 568.90 19,317 40,483 569.00 19,519 42,425 569.10 19,727 44,387 569.20 19,935 46,370 569.30 20,143 48,374 569.40 20,351 50,399 569.50 20,560 52,444 569.60 20,768 54,510 569.70 20,976 56,598 569.80 21,184 58,706 569.90 21,392 60,834 570.00 21,600 62,984 570.10 21,815 65,155 570.20 22,029 67,347 570.30 22,243 69,561 570.40 22,458 71,796 570.50 22,673 74,052 570.60 22,887 76,330 570.70 23,102 78,630 570.80 23,316 80,950 570.90 23,530 83,293 571.00 23,745 85,657 571.10 23,966 88,042 571.20 24,187 90,450 571.30 24,408 92,879 571.40 24,629 95,331 571.50 24,850 97,805 571.60 25,070 100,301 571.70 25,291 102,819 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 571.80 25,512 105,359 571.90 25,733 107,922 572.00 25,954 110,506 572.10 26,181 113,113 572.20 26,409 115,742 572.30 26,636 118,395 572.40 26,864 121,070 572.50 27,091 123,767 572.60 27,318 126,488 572.70 27,546 129,231 572.80 27,773 131,997 572.90 28,001 134,786 573.00 28,228 137,597 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 154 Summary for Pond 6P: BMP #2 Inflow Area = 9.670 ac, 0.00% Impervious, Inflow Depth = 2.72" for 10yr24hr event Inflow = 46.90 cfs @ 11.96 hrs, Volume= 2.191 of Outflow = 3.99 cfs @ 12.49 hrs, Volume= 2.179 af, Atten= 91 %, Lag= 31.9 min Primary = 3.99 cfs @ 12.49 hrs, Volume= 2.179 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 562.13' @ 12.49 hrs Surf.Area= 17,531 sf Storage= 50,107 cf Plug -Flow detention time= 806.3 min calculated for 2.179 of (99% of inflow) Center -of -Mass det. time= 802.8 min ( 1,622.3 - 819.5 ) Volume Invert Avail.Storage Storage Description #1 558.50' 109,406 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 558.50 9,762 0 0 559.00 11,233 5,249 5,249 560.00 13,167 12,200 17,449 561.00 15,175 14,171 31,620 562.00 17,251 16,213 47,833 563.00 19,395 18,323 66,156 564.00 21,608 20,502 86,657 565.00 23,890 22,749 109,406 Device Routing Invert Outlet Devices #1 Primary 553.90' 36.0" Round RCP -Round 36" L= 92.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 553.90' / 553.00' S= 0.0097 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 558.50' 2.5" Vert. WQ Orrfice C= 0.600 #3 Device 1 561.05' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.15 Width (feet) 1.00 1.00 #4 Device 1 562.20' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 563.95' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.99 cfs @ 12.49 hrs HW=562.13' (Free Discharge) L1=RCP_Round 36" (Passes 3.99 cfs of 102.67 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.31 cfs @ 9.04 fps) 3=Custom Weir/Orifice (Weir Controls 3.68 cfs @ 3.40 fps) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=558.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 155 Pond 6P: BMP #2 Hydrograph 46.90 cfs 50 p --r--r--r--r--r--r------------------r----r--r----r--r�-- S e 5 3� a 45 -- - - -- -- -- -------------------- -- -- -- -- -- -- -- Starage_"_50,10.7 c_ f_ 40 - -- - - - - - - - - - - - - - - 35 --, - - -- --------------------------- -- - -- I -- I -- -- -- -- N 30 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 25 -- - - -- -- -- -------------------- -- -- -- -- -- -- -- LL 20 - - - - - - - - - - - - - - - - 15 -- - - li -- li -- li------------------i---i --i --i --i --i --r-- li -- li -- 10 3.99 cfs , 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 565 564 563 w w c 562 0 .� w w 561 560 559 Pond 6P: BMP #2 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) Lry ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 156 Pond 6P: BMP #2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 0 20,000 40,000 60,000 80,000 100,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 157 Hydrograph for Pond 6P: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 558.50 0.00 0.00 0.00 2.50 0.00 0 558.50 0.00 0.00 0.00 5.00 0.00 0 558.50 0.00 0.00 0.00 7.50 0.01 4 558.50 0.00 0.00 0.00 10.00 0.42 1,473 558.65 0.03 0.03 0.00 12.50 3.88 50,105 562.13 3.99 3.99 0.00 15.00 1.19 41,851 561.65 1.79 1.79 0.00 17.50 0.77 38,188 561.42 1.02 1.02 0.00 20.00 0.53 36,410 561.31 0.70 0.70 0.00 22.50 0.48 35,384 561.24 0.55 0.55 0.00 25.00 0.00 33,664 561.13 0.34 0.34 0.00 27.50 0.00 31,209 560.97 0.25 0.25 0.00 30.00 0.00 28,971 560.82 0.24 0.24 0.00 32.50 0.00 26,808 560.68 0.24 0.24 0.00 35.00 0.00 24,719 560.53 0.23 0.23 0.00 37.50 0.00 22,708 560.39 0.22 0.22 0.00 40.00 0.00 20,774 560.25 0.21 0.21 0.00 42.50 0.00 18,921 560.11 0.20 0.20 0.00 45.00 0.00 17,149 559.98 0.19 0.19 0.00 47.50 0.00 15,460 559.85 0.18 0.18 0.00 50.00 0.00 13,855 559.72 0.17 0.17 0.00 52.50 0.00 12,338 559.60 0.16 0.16 0.00 55.00 0.00 10,908 559.48 0.15 0.15 0.00 57.50 0.00 9,568 559.37 0.14 0.14 0.00 60.00 0.00 8,319 559.27 0.13 0.13 0.00 62.50 0.00 7,163 559.17 0.12 0.12 0.00 65.00 0.00 6,102 559.08 0.11 0.11 0.00 67.50 0.00 5,136 558.99 0.10 0.10 0.00 70.00 0.00 4,268 558.91 0.09 0.09 0.00 72.50 0.00 3,500 558.84 0.08 0.08 0.00 75.00 0.00 2,834 558.78 0.07 0.07 0.00 77.50 0.00 2,271 558.72 0.06 0.06 0.00 80.00 0.00 1,810 558.68 0.04 0.04 0.00 82.50 0.00 1,462 558.65 0.03 0.03 0.00 85.00 0.00 1,204 558.62 0.02 0.02 0.00 87.50 0.00 1,009 558.60 0.02 0.02 0.00 90.00 0.00 860 558.59 0.01 0.01 0.00 92.50 0.00 746 558.58 0.01 0.01 0.00 95.00 0.00 659 558.57 0.01 0.01 0.00 97.50 0.00 589 558.56 0.01 0.01 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 158 Stage -Discharge for Pond 6P: BMP #2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 558.50 0.00 0.00 0.00 558.60 0.02 0.02 0.00 558.70 0.05 0.05 0.00 558.80 0.07 0.07 0.00 558.90 0.09 0.09 0.00 559.00 0.10 0.10 0.00 559.10 0.12 0.12 0.00 559.20 0.13 0.13 0.00 559.30 0.14 0.14 0.00 559.40 0.15 0.15 0.00 559.50 0.16 0.16 0.00 559.60 0.16 0.16 0.00 559.70 0.17 0.17 0.00 559.80 0.18 0.18 0.00 559.90 0.19 0.19 0.00 560.00 0.19 0.19 0.00 560.10 0.20 0.20 0.00 560.20 0.21 0.21 0.00 560.30 0.21 0.21 0.00 560.40 0.22 0.22 0.00 560.50 0.23 0.23 0.00 560.60 0.23 0.23 0.00 560.70 0.24 0.24 0.00 560.80 0.24 0.24 0.00 560.90 0.25 0.25 0.00 561.00 0.25 0.25 0.00 561.10 0.30 0.30 0.00 561.20 0.45 0.45 0.00 561.30 0.68 0.68 0.00 561.40 0.95 0.95 0.00 561.50 1.27 1.27 0.00 561.60 1.62 1.62 0.00 561.70 2.01 2.01 0.00 561.80 2.42 2.42 0.00 561.90 2.86 2.86 0.00 562.00 3.33 3.33 0.00 562.10 3.83 3.83 0.00 562.20 4.35 4.35 0.00 562.30 6.44 6.44 0.00 562.40 9.84 9.84 0.00 562.50 14.10 14.10 0.00 562.60 19.06 19.06 0.00 562.70 24.61 24.61 0.00 562.80 30.71 30.71 0.00 562.90 37.30 37.30 0.00 563.00 44.36 44.36 0.00 563.10 51.84 51.84 0.00 563.20 59.72 59.72 0.00 563.30 67.99 67.99 0.00 563.40 76.63 76.63 0.00 563.50 85.62 85.62 0.00 563.60 94.95 94.95 0.00 563.70 102.84 102.84 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 563.80 106.13 106.13 0.00 563.90 109.32 109.32 0.00 564.00 112.70 112.43 0.28 564.10 116.89 115.44 1.45 564.20 121.52 118.39 3.13 564.30 124.72 119.46 5.26 564.40 128.01 120.18 7.83 564.50 131.76 120.89 10.87 564.60 135.74 121.60 14.14 564.70 139.79 122.30 17.49 564.80 144.07 123.01 21.06 564.90 148.54 123.70 24.84 565.00 153.26 124.40 28.86 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 159 Stage -Area -Storage for Pond 6P: BMP #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 558.50 9,762 0 558.60 10,056 991 558.70 10,350 2,011 558.80 10,645 3,061 558.90 10,939 4,140 559.00 11,233 5,249 559.10 11,426 6,382 559.20 11,620 7,534 559.30 11,813 8,706 559.40 12,007 9,897 559.50 12,200 11,107 559.60 12,393 12,337 559.70 12,587 13,586 559.80 12,780 14,854 559.90 12,974 16,142 560.00 13,167 17,449 560.10 13,368 18,775 560.20 13,569 20,122 560.30 13,769 21,489 560.40 13,970 22,876 560.50 14,171 24,283 560.60 14,372 25,710 560.70 14,573 27,158 560.80 14,773 28,625 560.90 14,974 30,112 561.00 15,175 31,620 561.10 15,383 33,148 561.20 15,590 34,696 561.30 15,798 36,266 561.40 16,005 37,856 561.50 16,213 39,467 561.60 16,421 41,098 561.70 16,628 42,751 561.80 16,836 44,424 561.90 17,043 46,118 562.00 17,251 47,833 562.10 17,465 49,569 562.20 17,680 51,326 562.30 17,894 53,105 562.40 18,109 54,905 562.50 18,323 56,726 562.60 18,537 58,569 562.70 18,752 60,434 562.80 18,966 62,320 562.90 19,181 64,227 563.00 19,395 66,156 563.10 19,616 68,106 563.20 19,838 70,079 563.30 20,059 72,074 563.40 20,280 74,091 563.50 20,502 76,130 563.60 20,723 78,191 563.70 20,944 80,274 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 563.80 21,165 82,380 563.90 21,387 84,508 564.00 21,608 86,657 564.10 21,836 88,829 564.20 22,064 91,024 564.30 22,293 93,242 564.40 22,521 95,483 564.50 22,749 97,747 564.60 22,977 100,033 564.70 23,205 102,342 564.80 23,434 104,674 564.90 23,662 107,029 565.00 23,890 109,406 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 160 Summary for Pond 7P: BMP #3 Inflow Area = 6.900 ac, 0.00% Impervious, Inflow Depth = 2.63" for 10yr24hr event Inflow = 32.46 cfs @ 11.96 hrs, Volume= 1.512 of Outflow = 1.34 cfs @ 13.46 hrs, Volume= 1.351 af, Atten= 96%, Lag= 90.3 min Primary = 1.34 cfs @ 13.46 hrs, Volume= 1.351 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 571.85' @ 13.46 hrs Surf.Area= 14,211 sf Storage= 39,730 cf Plug -Flow detention time= 1,297.8 min calculated for 1.350 of (89% of inflow) Center -of -Mass det. time= 1,245.7 min ( 2,068.0 - 822.2 ) Volume Invert Avail.Storage Storage Description #1 568.50' 91,933 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 568.50 9,080 0 0 569.00 10,331 4,853 4,853 570.00 11,639 10,985 15,838 571.00 13,003 12,321 28,159 572.00 14,424 13,714 41,872 573.00 15,901 15,163 57,035 574.00 17,435 16,668 73,703 575.00 19,025 18,230 91,933 Device Routing Invert Outlet Devices #1 Primary 565.31' 24.0" Round RCP -Round 24" L= 61.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 565.31' / 565.00' S= 0.0051 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 568.50' 1.7" Vert. WQ Orfice C= 0.600 #3 Device 1 571.20' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 2.30 Width (feet) 0.70 0.70 #4 Device 1 573.50' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 574.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=1.34 cfs @ 13.46 hrs HW=571.85' (Free Discharge) L1=RCP_Round 24" (Passes 1.34 cfs of 39.63 cfs potential flow) �2=WQ Orfice (Orifice Controls 0.14 cfs @ 8.72 fps) 3=Custom Weir/Orifice (Weir Controls 1.20 cfs @ 2.64 fps) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=568.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 161 Pond 7P: BMP #3 Hydrograph -- ----+--+-- 32.46 cfs -- -------------------- ------------------ --r- -T--T-- -t--rt--�--�---'i---'i---'i---'i---Ir--Ir--Ir--r--r--r--rt--rt-- -- ------------Iftf]OW'Area=6.9�00,c -- 36 34 ,' --,-- - -- -- ---,---, ------------------ -'-`------------------ 32 - - - - - - - - 30 ---- -1------------------------ Stoir-ap-,39,730-d - 28 26 ' 24 ' 22 --r- 1 -r 1 --r 1 --r --r --r---------r--r--r--r--r--r--r--r--r--r-- w20 --r- - T--T -- -- --------------i---r --r--r--r--r--T-- -- -- i° 16 ---- - -- -- ---------------------I --I --I--------T-- -- -- 14 12 -L- -L--L--L--L-- ---1---1---1---1---1---L--L--L--L--L--1--L-- 10 ' 8 --+- +--+--+--+--+---------------r--r--r--r--r--+--+--+-- cfs 6 1.34 4 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 575 574 573 w w c 572 0 .� w w 571 570 569 Pond 7P: BMP #3 Stage -Discharge 0 10 20 30 40 50 60 70 Discharge (cfs) Lry ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 162 Pond 7P: BMP #3 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 163 Hydrograph for Pond 7P: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 568.50 0.00 0.00 0.00 2.50 0.00 0 568.50 0.00 0.00 0.00 5.00 0.00 0 568.50 0.00 0.00 0.00 7.50 0.00 0 568.50 0.00 0.00 0.00 10.00 0.27 851 568.59 0.01 0.01 0.00 12.50 2.71 37,751 571.71 0.97 0.97 0.00 15.00 0.83 38,485 571.76 1.10 1.10 0.00 17.50 0.54 36,282 571.60 0.72 0.72 0.00 20.00 0.37 34,881 571.50 0.51 0.51 0.00 22.50 0.33 34,011 571.44 0.40 0.40 0.00 25.00 0.00 32,703 571.34 0.25 0.25 0.00 27.50 0.00 31,091 571.22 0.13 0.13 0.00 30.00 0.00 29,977 571.14 0.12 0.12 0.00 32.50 0.00 28,891 571.06 0.12 0.12 0.00 35.00 0.00 27,823 570.97 0.12 0.12 0.00 37.50 0.00 26,773 570.89 0.12 0.12 0.00 40.00 0.00 25,741 570.81 0.11 0.11 0.00 42.50 0.00 24,728 570.73 0.11 0.11 0.00 45.00 0.00 23,733 570.65 0.11 0.11 0.00 47.50 0.00 22,757 570.58 0.11 0.11 0.00 50.00 0.00 21,799 570.50 0.11 0.11 0.00 52.50 0.00 20,860 570.42 0.10 0.10 0.00 55.00 0.00 19,941 570.35 0.10 0.10 0.00 57.50 0.00 19,041 570.27 0.10 0.10 0.00 60.00 0.00 18,160 570.20 0.10 0.10 0.00 62.50 0.00 17,298 570.12 0.09 0.09 0.00 65.00 0.00 16,457 570.05 0.09 0.09 0.00 67.50 0.00 15,635 569.98 0.09 0.09 0.00 70.00 0.00 14,834 569.91 0.09 0.09 0.00 72.50 0.00 14,053 569.85 0.09 0.09 0.00 75.00 0.00 13,292 569.78 0.08 0.08 0.00 77.50 0.00 12,552 569.71 0.08 0.08 0.00 80.00 0.00 11,832 569.65 0.08 0.08 0.00 82.50 0.00 11,133 569.59 0.08 0.08 0.00 85.00 0.00 10,456 569.52 0.07 0.07 0.00 87.50 0.00 9,799 569.47 0.07 0.07 0.00 90.00 0.00 9,164 569.41 0.07 0.07 0.00 92.50 0.00 8,550 569.35 0.07 0.07 0.00 95.00 0.00 7,958 569.30 0.06 0.06 0.00 97.50 0.00 7,388 569.24 0.06 0.06 0.00 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 164 Stage -Discharge for Pond 7P: BMP #3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 568.50 0.00 0.00 0.00 568.60 0.01 0.01 0.00 568.70 0.03 0.03 0.00 568.80 0.04 0.04 0.00 568.90 0.04 0.04 0.00 569.00 0.05 0.05 0.00 569.10 0.06 0.06 0.00 569.20 0.06 0.06 0.00 569.30 0.06 0.06 0.00 569.40 0.07 0.07 0.00 569.50 0.07 0.07 0.00 569.60 0.08 0.08 0.00 569.70 0.08 0.08 0.00 569.80 0.08 0.08 0.00 569.90 0.09 0.09 0.00 570.00 0.09 0.09 0.00 570.10 0.09 0.09 0.00 570.20 0.10 0.10 0.00 570.30 0.10 0.10 0.00 570.40 0.10 0.10 0.00 570.50 0.11 0.11 0.00 570.60 0.11 0.11 0.00 570.70 0.11 0.11 0.00 570.80 0.11 0.11 0.00 570.90 0.12 0.12 0.00 571.00 0.12 0.12 0.00 571.10 0.12 0.12 0.00 571.20 0.12 0.12 0.00 571.30 0.20 0.20 0.00 571.40 0.33 0.33 0.00 571.50 0.51 0.51 0.00 571.60 0.71 0.71 0.00 571.70 0.94 0.94 0.00 571.80 1.20 1.20 0.00 571.90 1.48 1.48 0.00 572.00 1.78 1.78 0.00 572.10 2.10 2.10 0.00 572.20 2.44 2.44 0.00 572.30 2.79 2.79 0.00 572.40 3.16 3.16 0.00 572.50 3.55 3.55 0.00 572.60 3.95 3.95 0.00 572.70 4.37 4.37 0.00 572.80 4.80 4.80 0.00 572.90 5.24 5.24 0.00 573.00 5.70 5.70 0.00 573.10 6.17 6.17 0.00 573.20 6.65 6.65 0.00 573.30 7.14 7.14 0.00 573.40 7.65 7.65 0.00 573.50 8.17 8.17 0.00 573.60 10.28 10.28 0.00 573.70 13.71 13.71 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 573.80 18.00 18.00 0.00 573.90 23.00 23.00 0.00 574.00 28.61 28.61 0.00 574.10 35.54 34.75 0.79 574.20 43.62 41.39 2.23 574.30 52.64 48.49 4.15 574.40 55.43 48.95 6.48 574.50 58.58 49.28 9.30 574.60 62.16 49.61 12.55 574.70 65.72 49.94 15.78 574.80 69.51 50.26 19.25 574.90 73.50 50.58 22.92 575.00 77.70 50.90 26.80 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 165 Stage -Area -Storage for Pond 7P: BMP #3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 568.50 9,080 0 568.60 9,330 921 568.70 9,580 1,866 568.80 9,831 2,837 568.90 10,081 3,832 569.00 10,331 4,853 569.10 10,462 5,892 569.20 10,593 6,945 569.30 10,723 8,011 569.40 10,854 9,090 569.50 10,985 10,182 569.60 11,116 11,287 569.70 11,247 12,405 569.80 11,377 13,536 569.90 11,508 14,680 570.00 11,639 15,838 570.10 11,775 17,008 570.20 11,912 18,193 570.30 12,048 19,391 570.40 12,185 20,602 570.50 12,321 21,828 570.60 12,457 23,067 570.70 12,594 24,319 570.80 12,730 25,585 570.90 12,867 26,865 571.00 13,003 28,159 571.10 13,145 29,466 571.20 13,287 30,788 571.30 13,429 32,124 571.40 13,571 33,474 571.50 13,714 34,838 571.60 13,856 36,216 571.70 13,998 37,609 571.80 14,140 39,016 571.90 14,282 40,437 572.00 14,424 41,872 572.10 14,572 43,322 572.20 14,719 44,787 572.30 14,867 46,266 572.40 15,015 47,760 572.50 15,163 49,269 572.60 15,310 50,793 572.70 15,458 52,331 572.80 15,606 53,884 572.90 15,753 55,452 573.00 15,901 57,035 573.10 16,054 58,633 573.20 16,208 60,246 573.30 16,361 61,874 573.40 16,515 63,518 573.50 16,668 65,177 573.60 16,821 66,851 573.70 16,975 68,541 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 573.80 17,128 70,246 573.90 17,282 71,967 574.00 17,435 73,703 574.10 17,594 75,454 574.20 17,753 77,222 574.30 17,912 79,005 574.40 18,071 80,804 574.50 18,230 82,619 574.60 18,389 84,450 574.70 18,548 86,297 574.80 18,707 88,160 574.90 18,866 90,038 575.00 19,025 91,933 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 166 Summary for Link 17L: Post Development #2 Inflow Area = 8.060 ac, 0.00% Impervious, Inflow Depth > 2.16" for 10yr24hr event Inflow = 1.58 cfs @ 12.30 hrs, Volume= 1.453 of Primary = 1.58 cfs @ 12.30 hrs, Volume= 1.453 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 17L: Post Development #2 Hydrograph Inflow ❑ Primary 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 167 Hydrograph for Link 17L: Post Development #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 10.00 0.01 0.00 0.01 11.00 0.03 0.00 0.03 12.00 0.44 0.00 0.44 13.00 1.48 0.00 1.48 14.00 1.40 0.00 1.40 15.00 1.19 0.00 1.19 16.00 0.99 0.00 0.99 17.00 0.84 0.00 0.84 18.00 0.73 0.00 0.73 19.00 0.64 0.00 0.64 20.00 0.55 0.00 0.55 21.00 0.49 0.00 0.49 22.00 0.45 0.00 0.45 23.00 0.42 0.00 0.42 24.00 0.40 0.00 0.40 25.00 0.25 0.00 0.25 26.00 0.18 0.00 0.18 27.00 0.15 0.00 0.15 28.00 0.13 0.00 0.13 29.00 0.12 0.00 0.12 30.00 0.12 0.00 0.12 31.00 0.12 0.00 0.12 32.00 0.12 0.00 0.12 33.00 0.12 0.00 0.12 34.00 0.12 0.00 0.12 35.00 0.12 0.00 0.12 36.00 0.12 0.00 0.12 37.00 0.12 0.00 0.12 38.00 0.12 0.00 0.12 39.00 0.11 0.00 0.11 40.00 0.11 0.00 0.11 41.00 0.11 0.00 0.11 42.00 0.11 0.00 0.11 43.00 0.11 0.00 0.11 44.00 0.11 0.00 0.11 45.00 0.11 0.00 0.11 46.00 0.11 0.00 0.11 47.00 0.11 0.00 0.11 48.00 0.11 0.00 0.11 49.00 0.11 0.00 0.11 50.00 0.11 0.00 0.11 51.00 0.10 0.00 0.10 52.00 0.10 0.00 0.10 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.10 0.00 0.10 54.00 0.10 0.00 0.10 55.00 0.10 0.00 0.10 56.00 0.10 0.00 0.10 57.00 0.10 0.00 0.10 58.00 0.10 0.00 0.10 59.00 0.10 0.00 0.10 60.00 0.10 0.00 0.10 61.00 0.10 0.00 0.10 62.00 0.10 0.00 0.10 63.00 0.09 0.00 0.09 64.00 0.09 0.00 0.09 65.00 0.09 0.00 0.09 66.00 0.09 0.00 0.09 67.00 0.09 0.00 0.09 68.00 0.09 0.00 0.09 69.00 0.09 0.00 0.09 70.00 0.09 0.00 0.09 71.00 0.09 0.00 0.09 72.00 0.09 0.00 0.09 73.00 0.09 0.00 0.09 74.00 0.08 0.00 0.08 75.00 0.08 0.00 0.08 76.00 0.08 0.00 0.08 77.00 0.08 0.00 0.08 78.00 0.08 0.00 0.08 79.00 0.08 0.00 0.08 80.00 0.08 0.00 0.08 81.00 0.08 0.00 0.08 82.00 0.08 0.00 0.08 83.00 0.08 0.00 0.08 84.00 0.08 0.00 0.08 85.00 0.07 0.00 0.07 86.00 0.07 0.00 0.07 87.00 0.07 0.00 0.07 88.00 0.07 0.00 0.07 89.00 0.07 0.00 0.07 90.00 0.07 0.00 0.07 91.00 0.07 0.00 0.07 92.00 0.07 0.00 0.07 93.00 0.07 0.00 0.07 94.00 0.07 0.00 0.07 95.00 0.06 0.00 0.06 96.00 0.06 0.00 0.06 97.00 0.06 0.00 0.06 98.00 0.06 0.00 0.06 99.00 0.06 0.00 0.06 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 168 Summary for Link 18L: Post Development #1 Inflow Area = 28.230 ac, 3.61% Impervious, Inflow Depth > 1.59" for 10yr24hr event Inflow = 13.12 cfs @ 12.12 hrs, Volume= 3.744 of Primary = 13.12 cfs @ 12.12 hrs, Volume= 3.744 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 18L: Post Development #1 Hydrograph ----- ��---��--- �--- ��---��--- ��---��---��--- ��---��---�--- ��---��---�--- �,---�,-- ■Inflow - ------ --------+---------+--------+------ -- ----- ❑Primary -T--T------T--T------T-- - ---II -_T------T--T--- ---T--T---II-- - L -- T---II--- L -- J---II--- L----- - II - -- L-- -II--- L -- T-- -II - -- L -- T---II-- 7-- T, T -- T - -- F T -- - L -- T---II - -- L -- J---II--- L----- - II - -- L---II - -- L -- T---II - -- L -- T---II-- -r--t---I_--t--t---I_--t------I_--t---I---r--t---I---r-- - --I-- -r--t---r--t--t---r--t------r--t--- ---r--t------r--t---I-- --L---II--- I--L---II--- I---II---T-- I---II---I--L---II---I--L---II-- 60 65 70 75 :0 85 •0 95 Millbridge Phase 7E Type/1 24-hr 10yr24hr Rainfall=4.80" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 169 Hydrograph for Link 18L: Post Development #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.01 0.00 0.01 10.00 0.03 0.00 0.03 11.00 0.09 0.00 0.09 12.00 8.04 0.00 8.04 13.00 4.76 0.00 4.76 14.00 3.25 0.00 3.25 15.00 2.42 0.00 2.42 16.00 1.90 0.00 1.90 17.00 1.58 0.00 1.58 18.00 1.38 0.00 1.38 19.00 1.21 0.00 1.21 20.00 1.07 0.00 1.07 21.00 0.97 0.00 0.97 22.00 0.91 0.00 0.91 23.00 0.87 0.00 0.87 24.00 0.83 0.00 0.83 25.00 0.48 0.00 0.48 26.00 0.40 0.00 0.40 27.00 0.39 0.00 0.39 28.00 0.39 0.00 0.39 29.00 0.38 0.00 0.38 30.00 0.38 0.00 0.38 31.00 0.38 0.00 0.38 32.00 0.37 0.00 0.37 33.00 0.37 0.00 0.37 34.00 0.36 0.00 0.36 35.00 0.36 0.00 0.36 36.00 0.36 0.00 0.36 37.00 0.35 0.00 0.35 38.00 0.35 0.00 0.35 39.00 0.34 0.00 0.34 40.00 0.34 0.00 0.34 41.00 0.34 0.00 0.34 42.00 0.33 0.00 0.33 43.00 0.33 0.00 0.33 44.00 0.32 0.00 0.32 45.00 0.32 0.00 0.32 46.00 0.32 0.00 0.32 47.00 0.31 0.00 0.31 48.00 0.31 0.00 0.31 49.00 0.30 0.00 0.30 50.00 0.30 0.00 0.30 51.00 0.29 0.00 0.29 52.00 0.29 0.00 0.29 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.28 0.00 0.28 54.00 0.28 0.00 0.28 55.00 0.28 0.00 0.28 56.00 0.27 0.00 0.27 57.00 0.27 0.00 0.27 58.00 0.26 0.00 0.26 59.00 0.26 0.00 0.26 60.00 0.25 0.00 0.25 61.00 0.25 0.00 0.25 62.00 0.24 0.00 0.24 63.00 0.24 0.00 0.24 64.00 0.23 0.00 0.23 65.00 0.23 0.00 0.23 66.00 0.22 0.00 0.22 67.00 0.22 0.00 0.22 68.00 0.21 0.00 0.21 69.00 0.21 0.00 0.21 70.00 0.20 0.00 0.20 71.00 0.20 0.00 0.20 72.00 0.19 0.00 0.19 73.00 0.19 0.00 0.19 74.00 0.18 0.00 0.18 75.00 0.18 0.00 0.18 76.00 0.17 0.00 0.17 77.00 0.17 0.00 0.17 78.00 0.16 0.00 0.16 79.00 0.16 0.00 0.16 80.00 0.15 0.00 0.15 81.00 0.15 0.00 0.15 82.00 0.14 0.00 0.14 83.00 0.14 0.00 0.14 84.00 0.13 0.00 0.13 85.00 0.13 0.00 0.13 86.00 0.13 0.00 0.13 87.00 0.12 0.00 0.12 88.00 0.12 0.00 0.12 89.00 0.12 0.00 0.12 90.00 0.12 0.00 0.12 91.00 0.12 0.00 0.12 92.00 0.11 0.00 0.11 93.00 0.11 0.00 0.11 94.00 0.11 0.00 0.11 95.00 0.11 0.00 0.11 96.00 0.11 0.00 0.11 97.00 0.11 0.00 0.11 98.00 0.11 0.00 0.11 99.00 0.10 0.00 0.10 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 170 Time span=0.00-99.00 hrs, dt=0.05 hrs, 1981 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre-Development#1 Runoff Area=30.590 ac 3.53% Impervious Runoff Depth=1.53" Tc=21.7 min CN=57 Runoff=44.55 cfs 3.906 of Subcatchment2S: Pre-Development#2 Runoff Area=5.620 ac 0.00% Impervious Runoff Depth=1.38" Tc=24.9 min CN=55 Runoff=6.50 cfs 0.647 of Subcatchment8S: BMP #1 Runoff Area=12.980 ac 0.00% Impervious Runoff Depth=2.01" Tc=5.0 min CN=63 Runoff=46.68 cfs 2.175 of Subcatchment9S: BMP #2 Runoff Area=9.670 ac 0.00% Impervious Runoff Depth=3.57" Tc=5.0 min CN=80 Runoff=60.89 cfs 2.873 of Subcatchment 10S: BMP #3 Runoff Area=6.900 ac 0.00% Impervious Runoff Depth=3.47" Tc=5.0 min CN=79 Runoff=42.39 cfs 1.993 of Subcatchment 11 S: Bypass #1 Runoff Area=5.580 ac 18.28% Impervious Runoff Depth=2.18" Tc=16.9 min CN=65 Runoff=14.42 cfs 1.013 of Subcatchment 12S: Bypass #2 Runoff Area=1.160 ac 0.00% Impervious Runoff Depth=1.61" Tc=24.9 min CN=58 Runoff=1.64 cfs 0.156 of Subcatchment 13S: Pre-Development#3 Runoff Area=9.070 ac 0.00% Impervious Runoff Depth=1.38" Tc=20.7 min CN=55 Runoff=11.88 cfs 1.044 of Subcatchment14S: Post Development#3 Runoff Area=8.990 ac 0.00% Impervious Runoff Depth=1.38" Tc=20.7 min CN=55 Runoff=11.77 cfs 1.035 of Pond 5P: BMP #1 Peak EIev=570.31' Storage=69,856 cf Inflow=46.68 cfs 2.175 of Primary=0.96 cfs 1.418 of Secondary=0.00 cfs 0.000 of Outflow=0.96 cfs 1.418 of Pond 6P: BMP #2 Peak EIev=562.61' Storage=58,734 cf Inflow=60.89 cfs 2.873 of Primary=19.54 cfs 2.860 of Secondary=0.00 cfs 0.000 of Outflow=19.54 cfs 2.860 of Pond 7P: BMP #3 Peak EIev=572.40' Storage=47,757 cf Inflow=42.39 cfs 1.993 of Primary=3.16 cfs 1.829 of Secondary=0.00 cfs 0.000 of Outflow=3.16 cfs 1.829 of Link 17L: Post Development#2 Inflow=4.46 cfs 1.984 of Primary=4.46 cfs 1.984 of Link 18L: Post Development#1 Inflow=34.02 cfs 5.291 of Primary=34.02 cfs 5.291 of Total Runoff Area = 90.560 ac Runoff Volume = 14.842 of Average Runoff Depth = 1.97" 97.68% Pervious = 88.460 ac 2.32% Impervious = 2.100 ac Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 171 Summary for Subcatchment 1S: Pre -Development #1 Runoff = 44.55 cfs @ 12.17 hrs, Volume= 3.906 af, Depth= 1.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr - 24hr Rainfall=5.76" Area (ac) CN Description 29.510 55 Woods, Good, HSG B 1.020 98 Water Surface, HSG B 0.060 98 Paved roads w/curbs & sewers, HSG B 30.590 57 Weighted Average 29.510 96.47% Pervious Area 1.080 3.53% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.7 Direct Entry, Subcatchment 1S: Pre -Development #1 Hydrograph 48 46 L - - - - - - L - - - - - - L - - - - - - r - - -I- cfs ----------L------L------L------------------L------L-- ■Runoff - 44.55 --+--- 44 -+------+------+------r------+---r--r--- ---'TyI''e., �1 1 26=yr=-�Or-F�,ainfaij=S,76i 38 36 ---,- ----,------,------,--- ---,- -- -Runbff�Area�30 590 ac- 34 32 ' --L- --�- -� 7 T T r r- I - --r r-- - ------ ------ ------------lftnoff VDIUmt=1906 e- 30 w 28 U .... 26 i --r- ---- --+- -r---r--r---r--r---r--r---r--r---r--r---i---r--r---r---i---r-- - ------ ------ ------ ------ L---I--Rtun'off Dre 0=1M"-- -+---r--+---r--+---r--+---i---+---r--+---i---+---ice-�}-fir -i --r-- 0 24 LL 22 ---- - --- -- ------ --- -- ------ ------------}�c-L'1.7'M1�- r-- r-----r--+------+---r--+---i---+ -i- -r- -i- - 18 ==1= =1------1---'---i------1------1------L------1------C:?�=51-- 14 -- - -L---1---L---'---L---'---L---'---L------L------L------L------L-- i 10 8 --L-- --+-- L---'---L---'---L---'---L---'---L------L------L-----L------L-- +---r--+---r--+---r--+---i---+---r--+---i---+---i---r---i---r-- 6 ---�-- ---�------�------�---T - - -� Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 172 Hydrograph for Subcatchment 1S: Pre -Development #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.28 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.57 0.00 0.00 8.00 0.69 0.00 0.00 9.00 0.85 0.00 0.00 10.00 1.04 0.00 0.00 11.00 1.35 0.00 0.00 12.00 3.82 0.54 21.30 13.00 4.45 0.82 6.93 14.00 4.72 0.96 3.90 15.00 4.92 1.06 2.99 16.00 5.07 1.14 2.41 17.00 5.19 1.21 2.07 18.00 5.30 1.27 1.86 19.00 5.40 1.32 1.63 20.00 5.48 1.37 1.40 21.00 5.56 1.41 1.29 22.00 5.63 1.45 1.25 23.00 5.70 1.49 1.21 24.00 5.76 1.53 1.17 25.00 5.76 1.53 0.00 26.00 5.76 1.53 0.00 27.00 5.76 1.53 0.00 28.00 5.76 1.53 0.00 29.00 5.76 1.53 0.00 30.00 5.76 1.53 0.00 31.00 5.76 1.53 0.00 32.00 5.76 1.53 0.00 33.00 5.76 1.53 0.00 34.00 5.76 1.53 0.00 35.00 5.76 1.53 0.00 36.00 5.76 1.53 0.00 37.00 5.76 1.53 0.00 38.00 5.76 1.53 0.00 39.00 5.76 1.53 0.00 40.00 5.76 1.53 0.00 41.00 5.76 1.53 0.00 42.00 5.76 1.53 0.00 43.00 5.76 1.53 0.00 44.00 5.76 1.53 0.00 45.00 5.76 1.53 0.00 46.00 5.76 1.53 0.00 47.00 5.76 1.53 0.00 48.00 5.76 1.53 0.00 49.00 5.76 1.53 0.00 50.00 5.76 1.53 0.00 51.00 5.76 1.53 0.00 52.00 5.76 1.53 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 5.76 1.53 0.00 54.00 5.76 1.53 0.00 55.00 5.76 1.53 0.00 56.00 5.76 1.53 0.00 57.00 5.76 1.53 0.00 58.00 5.76 1.53 0.00 59.00 5.76 1.53 0.00 60.00 5.76 1.53 0.00 61.00 5.76 1.53 0.00 62.00 5.76 1.53 0.00 63.00 5.76 1.53 0.00 64.00 5.76 1.53 0.00 65.00 5.76 1.53 0.00 66.00 5.76 1.53 0.00 67.00 5.76 1.53 0.00 68.00 5.76 1.53 0.00 69.00 5.76 1.53 0.00 70.00 5.76 1.53 0.00 71.00 5.76 1.53 0.00 72.00 5.76 1.53 0.00 73.00 5.76 1.53 0.00 74.00 5.76 1.53 0.00 75.00 5.76 1.53 0.00 76.00 5.76 1.53 0.00 77.00 5.76 1.53 0.00 78.00 5.76 1.53 0.00 79.00 5.76 1.53 0.00 80.00 5.76 1.53 0.00 81.00 5.76 1.53 0.00 82.00 5.76 1.53 0.00 83.00 5.76 1.53 0.00 84.00 5.76 1.53 0.00 85.00 5.76 1.53 0.00 86.00 5.76 1.53 0.00 87.00 5.76 1.53 0.00 88.00 5.76 1.53 0.00 89.00 5.76 1.53 0.00 90.00 5.76 1.53 0.00 91.00 5.76 1.53 0.00 92.00 5.76 1.53 0.00 93.00 5.76 1.53 0.00 94.00 5.76 1.53 0.00 95.00 5.76 1.53 0.00 96.00 5.76 1.53 0.00 97.00 5.76 1.53 0.00 98.00 5.76 1.53 0.00 99.00 5.76 1.53 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 173 Summary for Subcatchment 2S: Pre -Development #2 Runoff = 6.50 cfs @ 12.22 hrs, Volume= 0.647 af, Depth= 1.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr - 24hr Rainfall=5.76" Area (ac) CN Description 5.620 55 Woods, Good, HSG B 5.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 2S: Pre -Development #2 Hydrograph -- - 1---1------1------L------L------L--1--- ---J--- ---1--- ---1---�- 7 ■Runoff 6.50 cfs 6 �5-yr -'; 24hr kaipfa�l=$.76�„ ----- ----------- ------- ---r------r----R-PnoffArev-$ 628aq- 5 1 R,unpff Vol,um,e=0.647 of --J--J---1---1------L------L---I---L--J------J 11 --- I-- L --- I-- -- -- U 4 RuMof Depth=1,.381„ TC=24 mile ---------------------------------------------- CN=55 -- -------rt---I---- -----r---- --r-----I--- ------rt------t---I-- 2 --J- J---1---1------L------L------L--J------J------1------L---�-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 174 Hydrograph for Subcatchment 2S: Pre -Development #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.28 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.57 0.00 0.00 8.00 0.69 0.00 0.00 9.00 0.85 0.00 0.00 10.00 1.04 0.00 0.00 11.00 1.35 0.00 0.00 12.00 3.82 0.46 2.32 13.00 4.45 0.72 1.27 14.00 4.72 0.85 0.68 15.00 4.92 0.94 0.52 16.00 5.07 1.01 0.42 17.00 5.19 1.08 0.36 18.00 5.30 1.14 0.32 19.00 5.40 1.19 0.28 20.00 5.48 1.23 0.24 21.00 5.56 1.27 0.22 22.00 5.63 1.31 0.22 23.00 5.70 1.35 0.21 24.00 5.76 1.38 0.20 25.00 5.76 1.38 0.00 26.00 5.76 1.38 0.00 27.00 5.76 1.38 0.00 28.00 5.76 1.38 0.00 29.00 5.76 1.38 0.00 30.00 5.76 1.38 0.00 31.00 5.76 1.38 0.00 32.00 5.76 1.38 0.00 33.00 5.76 1.38 0.00 34.00 5.76 1.38 0.00 35.00 5.76 1.38 0.00 36.00 5.76 1.38 0.00 37.00 5.76 1.38 0.00 38.00 5.76 1.38 0.00 39.00 5.76 1.38 0.00 40.00 5.76 1.38 0.00 41.00 5.76 1.38 0.00 42.00 5.76 1.38 0.00 43.00 5.76 1.38 0.00 44.00 5.76 1.38 0.00 45.00 5.76 1.38 0.00 46.00 5.76 1.38 0.00 47.00 5.76 1.38 0.00 48.00 5.76 1.38 0.00 49.00 5.76 1.38 0.00 50.00 5.76 1.38 0.00 51.00 5.76 1.38 0.00 52.00 5.76 1.38 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 5.76 1.38 0.00 54.00 5.76 1.38 0.00 55.00 5.76 1.38 0.00 56.00 5.76 1.38 0.00 57.00 5.76 1.38 0.00 58.00 5.76 1.38 0.00 59.00 5.76 1.38 0.00 60.00 5.76 1.38 0.00 61.00 5.76 1.38 0.00 62.00 5.76 1.38 0.00 63.00 5.76 1.38 0.00 64.00 5.76 1.38 0.00 65.00 5.76 1.38 0.00 66.00 5.76 1.38 0.00 67.00 5.76 1.38 0.00 68.00 5.76 1.38 0.00 69.00 5.76 1.38 0.00 70.00 5.76 1.38 0.00 71.00 5.76 1.38 0.00 72.00 5.76 1.38 0.00 73.00 5.76 1.38 0.00 74.00 5.76 1.38 0.00 75.00 5.76 1.38 0.00 76.00 5.76 1.38 0.00 77.00 5.76 1.38 0.00 78.00 5.76 1.38 0.00 79.00 5.76 1.38 0.00 80.00 5.76 1.38 0.00 81.00 5.76 1.38 0.00 82.00 5.76 1.38 0.00 83.00 5.76 1.38 0.00 84.00 5.76 1.38 0.00 85.00 5.76 1.38 0.00 86.00 5.76 1.38 0.00 87.00 5.76 1.38 0.00 88.00 5.76 1.38 0.00 89.00 5.76 1.38 0.00 90.00 5.76 1.38 0.00 91.00 5.76 1.38 0.00 92.00 5.76 1.38 0.00 93.00 5.76 1.38 0.00 94.00 5.76 1.38 0.00 95.00 5.76 1.38 0.00 96.00 5.76 1.38 0.00 97.00 5.76 1.38 0.00 98.00 5.76 1.38 0.00 99.00 5.76 1.38 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 175 Summary for Subcatchment 8S: BMP #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 46.68 cfs @ 11.96 hrs, Volume= 2.175 af, Depth= 2.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr - 24hr Rainfall=5.76" Area (ac) CN Description 12.980 63 12.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: BMP #1 Hydrograph 52 so ------------------------' 46.68 --------- - - - - -' ---------------------------'--- cfs-----�---1---�---I-------I-------I---�---I-------I---r---I---r-- ■Runoff 48 46 --�-- I I I I I I I I I I I I Ipp �1 '___-__ -----=------=------=------=------=------=------=- �� ------------r--rt---r--+---1---+---1---r---1---,Type. lft 2'F-�- 42 - - - -- ----'1---------rt------T----5=y'=-#r-a'rrifai- t6'-- 5-,7 '--- 40 38 ---'-- I - -, -- --------------------------'--- - -- -- --- I I I I I I I I I I I I I I I I 1 - ---1, -----1--- ---1, -- ---I--- i 1RunioffAraa��2�980 arc 36 34 32 -- -- --�-- - ---� -- ---� -- ---� -----1--- I -- - - -- -----/---- --- -� - - ---- -� - - -- -- ----'---L---1---1------L---'---i � off-1lQ�u _ZOr7�A- w 30 V 28 --L-- ----'------1---1---'---L------L-----FFunoL6�dpt�1-2�rr- 26 o 24 -- -- ---'-- - --- -- ------ -----T------T---I---r---1---T-I{-y-�-r-- III 22 20 i --r-- --L-- - Y--- I --- ?--- I --- Y--- I --- r--- I --- r--- I --- r�/+J� -L---1---1--- 1--- 1--- '---1--- --- 1------ L------ L---'--- il+"�—s 1 I I I I I 16 --L-- -L---1---L---1---1---1---L---'---L------L------L------L------L-- 1 1 14 12 i j --T-- --L-- -T---T--T---1---T--- --T---1---T---I---r---I---r---I---r---I---r-- -L---'---L---1---1---'---L---'---L---'---L------L------L------L-- I I I 10 8 i --T-- --L-- -T--- r--T---rT---�--T---1---T---1 r--- 1--- r--- 1--- r--- 1--- r-- -L---1---L---1---1---1---1---1---1------L------L------L------L-- 4 --�-- 1---1---I---1---�- I---1---I---1---L---1---L---1---I---1---L-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 176 Hydrograph for Subcatchment 8S: BMP #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.28 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.57 0.00 0.00 8.00 0.69 0.00 0.00 9.00 0.85 0.00 0.00 10.00 1.04 0.00 0.00 11.00 1.35 0.01 0.25 12.00 3.82 0.82 42.25 13.00 4.45 1.17 2.87 14.00 4.72 1.34 1.77 15.00 4.92 1.46 1.44 16.00 5.07 1.55 1.13 17.00 5.19 1.63 1.01 18.00 5.30 1.71 0.90 19.00 5.40 1.77 0.78 20.00 5.48 1.82 0.66 21.00 5.56 1.87 0.63 22.00 5.63 1.92 0.61 23.00 5.70 1.97 0.59 24.00 5.76 2.01 0.57 25.00 5.76 2.01 0.00 26.00 5.76 2.01 0.00 27.00 5.76 2.01 0.00 28.00 5.76 2.01 0.00 29.00 5.76 2.01 0.00 30.00 5.76 2.01 0.00 31.00 5.76 2.01 0.00 32.00 5.76 2.01 0.00 33.00 5.76 2.01 0.00 34.00 5.76 2.01 0.00 35.00 5.76 2.01 0.00 36.00 5.76 2.01 0.00 37.00 5.76 2.01 0.00 38.00 5.76 2.01 0.00 39.00 5.76 2.01 0.00 40.00 5.76 2.01 0.00 41.00 5.76 2.01 0.00 42.00 5.76 2.01 0.00 43.00 5.76 2.01 0.00 44.00 5.76 2.01 0.00 45.00 5.76 2.01 0.00 46.00 5.76 2.01 0.00 47.00 5.76 2.01 0.00 48.00 5.76 2.01 0.00 49.00 5.76 2.01 0.00 50.00 5.76 2.01 0.00 51.00 5.76 2.01 0.00 52.00 5.76 2.01 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 5.76 2.01 0.00 54.00 5.76 2.01 0.00 55.00 5.76 2.01 0.00 56.00 5.76 2.01 0.00 57.00 5.76 2.01 0.00 58.00 5.76 2.01 0.00 59.00 5.76 2.01 0.00 60.00 5.76 2.01 0.00 61.00 5.76 2.01 0.00 62.00 5.76 2.01 0.00 63.00 5.76 2.01 0.00 64.00 5.76 2.01 0.00 65.00 5.76 2.01 0.00 66.00 5.76 2.01 0.00 67.00 5.76 2.01 0.00 68.00 5.76 2.01 0.00 69.00 5.76 2.01 0.00 70.00 5.76 2.01 0.00 71.00 5.76 2.01 0.00 72.00 5.76 2.01 0.00 73.00 5.76 2.01 0.00 74.00 5.76 2.01 0.00 75.00 5.76 2.01 0.00 76.00 5.76 2.01 0.00 77.00 5.76 2.01 0.00 78.00 5.76 2.01 0.00 79.00 5.76 2.01 0.00 80.00 5.76 2.01 0.00 81.00 5.76 2.01 0.00 82.00 5.76 2.01 0.00 83.00 5.76 2.01 0.00 84.00 5.76 2.01 0.00 85.00 5.76 2.01 0.00 86.00 5.76 2.01 0.00 87.00 5.76 2.01 0.00 88.00 5.76 2.01 0.00 89.00 5.76 2.01 0.00 90.00 5.76 2.01 0.00 91.00 5.76 2.01 0.00 92.00 5.76 2.01 0.00 93.00 5.76 2.01 0.00 94.00 5.76 2.01 0.00 95.00 5.76 2.01 0.00 96.00 5.76 2.01 0.00 97.00 5.76 2.01 0.00 98.00 5.76 2.01 0.00 99.00 5.76 2.01 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 177 Summary for Subcatchment 9S: BMP #2 [49] Hint: Tc<2dt may require smaller dt Runoff = 60.89 cfs @ 11.96 hrs, Volume= 2.873 af, Depth= 3.57" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr - 24hr Rainfall=5.76" Area (ac) CN Description 9.670 80 9.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: BMP #2 Hydrograph ■ Runoff 65 60.89 cfs 60 LTy_-I'tr 'pe L 24 - --L---L---1---L---1---1--- 1--- 1--- L-- - ---L- ------ ss 25-�/�' -_ 4hr-Rainfall=5'� 66'-- -- -- - --- --- +--- +-- - 1 1 1 1 1 so Runoff Areas=-9,670 -ac- - 45 -- -- -- -- Y - -- -- -- Y RUnGff Volum,6=2.$7� -aif - I- Y - I- -- 40 - Autnof# De fi=157"-- 35 0 LL 30 ---i-- ----i------i------i------i------------------ 1'�i�.�-I���-- }� zs 1ICN --L-- L---I___L---I___L---I___L------L-- 20 15 10 -- -- - ---r-----r--Y- r---1---Y---r--r---1---r---1---r---1---r-- 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 178 Hydrograph for Subcatchment 9S: BMP #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.28 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.57 0.00 0.05 8.00 0.69 0.01 0.16 9.00 0.85 0.04 0.39 10.00 1.04 0.10 0.69 11.00 1.35 0.22 1.68 12.00 3.82 1.89 52.44 13.00 4.45 2.42 3.10 14.00 4.72 2.65 1.86 15.00 4.92 2.82 1.49 16.00 5.07 2.95 1.16 17.00 5.19 3.06 1.02 18.00 5.30 3.16 0.90 19.00 5.40 3.25 0.78 20.00 5.48 3.32 0.66 21.00 5.56 3.38 0.63 22.00 5.63 3.45 0.60 23.00 5.70 3.51 0.58 24.00 5.76 3.57 0.55 25.00 5.76 3.57 0.00 26.00 5.76 3.57 0.00 27.00 5.76 3.57 0.00 28.00 5.76 3.57 0.00 29.00 5.76 3.57 0.00 30.00 5.76 3.57 0.00 31.00 5.76 3.57 0.00 32.00 5.76 3.57 0.00 33.00 5.76 3.57 0.00 34.00 5.76 3.57 0.00 35.00 5.76 3.57 0.00 36.00 5.76 3.57 0.00 37.00 5.76 3.57 0.00 38.00 5.76 3.57 0.00 39.00 5.76 3.57 0.00 40.00 5.76 3.57 0.00 41.00 5.76 3.57 0.00 42.00 5.76 3.57 0.00 43.00 5.76 3.57 0.00 44.00 5.76 3.57 0.00 45.00 5.76 3.57 0.00 46.00 5.76 3.57 0.00 47.00 5.76 3.57 0.00 48.00 5.76 3.57 0.00 49.00 5.76 3.57 0.00 50.00 5.76 3.57 0.00 51.00 5.76 3.57 0.00 52.00 5.76 3.57 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 5.76 3.57 0.00 54.00 5.76 3.57 0.00 55.00 5.76 3.57 0.00 56.00 5.76 3.57 0.00 57.00 5.76 3.57 0.00 58.00 5.76 3.57 0.00 59.00 5.76 3.57 0.00 60.00 5.76 3.57 0.00 61.00 5.76 3.57 0.00 62.00 5.76 3.57 0.00 63.00 5.76 3.57 0.00 64.00 5.76 3.57 0.00 65.00 5.76 3.57 0.00 66.00 5.76 3.57 0.00 67.00 5.76 3.57 0.00 68.00 5.76 3.57 0.00 69.00 5.76 3.57 0.00 70.00 5.76 3.57 0.00 71.00 5.76 3.57 0.00 72.00 5.76 3.57 0.00 73.00 5.76 3.57 0.00 74.00 5.76 3.57 0.00 75.00 5.76 3.57 0.00 76.00 5.76 3.57 0.00 77.00 5.76 3.57 0.00 78.00 5.76 3.57 0.00 79.00 5.76 3.57 0.00 80.00 5.76 3.57 0.00 81.00 5.76 3.57 0.00 82.00 5.76 3.57 0.00 83.00 5.76 3.57 0.00 84.00 5.76 3.57 0.00 85.00 5.76 3.57 0.00 86.00 5.76 3.57 0.00 87.00 5.76 3.57 0.00 88.00 5.76 3.57 0.00 89.00 5.76 3.57 0.00 90.00 5.76 3.57 0.00 91.00 5.76 3.57 0.00 92.00 5.76 3.57 0.00 93.00 5.76 3.57 0.00 94.00 5.76 3.57 0.00 95.00 5.76 3.57 0.00 96.00 5.76 3.57 0.00 97.00 5.76 3.57 0.00 98.00 5.76 3.57 0.00 99.00 5.76 3.57 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 179 Summary for Subcatchment 10S: BMP #3 [49] Hint: Tc<2dt may require smaller dt Runoff = 42.39 cfs @ 11.96 hrs, Volume= 1.993 af, Depth= 3.47" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr - 24hr Rainfall=5.76" Area (ac) CN Description 6.900 79 6.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: BMP #3 Hydrograph 46 44 42.39 cfs --I----I---1I---1I---1I---1I---'---1I----------I-------------- 'I---LI -- 42 - -t -- r rrt----t---------F 2��-�-tt� pp� 338 6 25-yi- -- r-F�ainfa 1=5,76L - r - - - - I- - - - - - - - Y - - I- - - ? - - - - - Y - - I - - - r - - - - - r - -I - - - r - -I - - - r - - 34 -- - - --- - --- - --- - --- Reno€€ Arez -6,900 ae-- 32 -- -- ----'------'---------+------+---'------'------'------'--- -- 30 - --- T---T--T--- T---T--T --- TRU o€€Volum,6=1,993-d - 28 26 -- -+---I ---+I --- ---+I ---I --Ru-noI f€+I DbI pt1h =3A7+ 24 0 -- 22 -- ---1---1---1---1---1------1------1---'------'--- - ------------ LL 20 --t-- -------t------t--- I- -- t--- I --- t--- I --- t--- I --- t---I---t w� 18 ------------------------------------------------------- C =7 -- 16 -- -- ----'------'---------+------+---'------'------'--- --- -- 14 --�------�r-----�r--7------T---�r--T---�r--r------r-----r-----r-- 12 -- T-- - T ---i -- T ---i -- T ---i -- T---i--- T---i--- T---i--- T---i--- T---i--- T -- 10 -- -- ----'------'------'------'------'------'------'------'--- -- 8 --�------��-----�� --T---T--T------T------T------T------r------r-- 6 ---'---!------!---'---! - -!---'---!---'---!---'---!---'---!---'---! -- 4-------------i---++------+------+------+------------�-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 180 Hydrograph for Subcatchment 10S: BMP #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.28 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.57 0.00 0.02 8.00 0.69 0.01 0.09 9.00 0.85 0.03 0.24 10.00 1.04 0.08 0.45 11.00 1.35 0.19 1.12 12.00 3.82 1.82 36.60 13.00 4.45 2.33 2.18 14.00 4.72 2.56 1.31 15.00 4.92 2.73 1.05 16.00 5.07 2.86 0.81 17.00 5.19 2.97 0.72 18.00 5.30 3.07 0.64 19.00 5.40 3.15 0.55 20.00 5.48 3.22 0.46 21.00 5.56 3.29 0.44 22.00 5.63 3.35 0.43 23.00 5.70 3.41 0.41 24.00 5.76 3.47 0.39 25.00 5.76 3.47 0.00 26.00 5.76 3.47 0.00 27.00 5.76 3.47 0.00 28.00 5.76 3.47 0.00 29.00 5.76 3.47 0.00 30.00 5.76 3.47 0.00 31.00 5.76 3.47 0.00 32.00 5.76 3.47 0.00 33.00 5.76 3.47 0.00 34.00 5.76 3.47 0.00 35.00 5.76 3.47 0.00 36.00 5.76 3.47 0.00 37.00 5.76 3.47 0.00 38.00 5.76 3.47 0.00 39.00 5.76 3.47 0.00 40.00 5.76 3.47 0.00 41.00 5.76 3.47 0.00 42.00 5.76 3.47 0.00 43.00 5.76 3.47 0.00 44.00 5.76 3.47 0.00 45.00 5.76 3.47 0.00 46.00 5.76 3.47 0.00 47.00 5.76 3.47 0.00 48.00 5.76 3.47 0.00 49.00 5.76 3.47 0.00 50.00 5.76 3.47 0.00 51.00 5.76 3.47 0.00 52.00 5.76 3.47 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 5.76 3.47 0.00 54.00 5.76 3.47 0.00 55.00 5.76 3.47 0.00 56.00 5.76 3.47 0.00 57.00 5.76 3.47 0.00 58.00 5.76 3.47 0.00 59.00 5.76 3.47 0.00 60.00 5.76 3.47 0.00 61.00 5.76 3.47 0.00 62.00 5.76 3.47 0.00 63.00 5.76 3.47 0.00 64.00 5.76 3.47 0.00 65.00 5.76 3.47 0.00 66.00 5.76 3.47 0.00 67.00 5.76 3.47 0.00 68.00 5.76 3.47 0.00 69.00 5.76 3.47 0.00 70.00 5.76 3.47 0.00 71.00 5.76 3.47 0.00 72.00 5.76 3.47 0.00 73.00 5.76 3.47 0.00 74.00 5.76 3.47 0.00 75.00 5.76 3.47 0.00 76.00 5.76 3.47 0.00 77.00 5.76 3.47 0.00 78.00 5.76 3.47 0.00 79.00 5.76 3.47 0.00 80.00 5.76 3.47 0.00 81.00 5.76 3.47 0.00 82.00 5.76 3.47 0.00 83.00 5.76 3.47 0.00 84.00 5.76 3.47 0.00 85.00 5.76 3.47 0.00 86.00 5.76 3.47 0.00 87.00 5.76 3.47 0.00 88.00 5.76 3.47 0.00 89.00 5.76 3.47 0.00 90.00 5.76 3.47 0.00 91.00 5.76 3.47 0.00 92.00 5.76 3.47 0.00 93.00 5.76 3.47 0.00 94.00 5.76 3.47 0.00 95.00 5.76 3.47 0.00 96.00 5.76 3.47 0.00 97.00 5.76 3.47 0.00 98.00 5.76 3.47 0.00 99.00 5.76 3.47 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 181 Summary for Subcatchment 11S: Bypass #1 Runoff = 14.42 cfs @ 12.10 hrs, Volume= 1.013 af, Depth= 2.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr - 24hr Rainfall=5.76" Area (ac) CN Description 4.560 58 Woods/grass comb., Good, HSG B 1.020 98 Water Surface, HSG B 5.580 65 Weighted Average 4.560 81.72% Pervious Area 1.020 18.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.9 Direct Entry, Subcatchment 11S: Bypass #1 Hydrograph 16 -----�--- -- ■Runoff 1 s 14.42 cfs --- - - ------r---r-----r---r-----t------t---------------rT--Ip---r---i 14 y4----�rr - - - - - - L-I------ LI--- 13 1 --------------- ---1 ---------------2-5-yT --Ur-Ripfalf-1,76r�'-- 12 ha1---ZunofAea=5,58-0c-- 11 I I I I I I -a 10 'RUnoff Vol===1.013 Af N 9 Ru-noff )e'pffi=-0f8-"- 0 8 --1---T---r-- T------T---r-- T------T---I--- T------r _ a 7 - -- - --- --- --- --- --- --- - -- --- 6 -- ----- --------7---------------------------------------------------- 5 4 ----- - ---------------------------------------------- ------------- 3 --r -- -r---r--r---r--r---r--t---i---r---i---r---i---r---i---r--- i---r-- 2--J-----------1---1---1---1---L------ L - - -I---L-- - ---L-----L-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 182 Hydrograph for Subcatchment 11S: Bypass #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.28 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.57 0.00 0.00 8.00 0.69 0.00 0.00 9.00 0.85 0.00 0.00 10.00 1.04 0.00 0.00 11.00 1.35 0.01 0.13 12.00 3.82 0.93 10.36 13.00 4.45 1.30 1.50 14.00 4.72 1.47 0.88 15.00 4.92 1.60 0.68 16.00 5.07 1.70 0.54 17.00 5.19 1.78 0.46 18.00 5.30 1.86 0.41 19.00 5.40 1.93 0.36 20.00 5.48 1.98 0.31 21.00 5.56 2.03 0.29 22.00 5.63 2.08 0.28 23.00 5.70 2.13 0.27 24.00 5.76 2.18 0.26 25.00 5.76 2.18 0.00 26.00 5.76 2.18 0.00 27.00 5.76 2.18 0.00 28.00 5.76 2.18 0.00 29.00 5.76 2.18 0.00 30.00 5.76 2.18 0.00 31.00 5.76 2.18 0.00 32.00 5.76 2.18 0.00 33.00 5.76 2.18 0.00 34.00 5.76 2.18 0.00 35.00 5.76 2.18 0.00 36.00 5.76 2.18 0.00 37.00 5.76 2.18 0.00 38.00 5.76 2.18 0.00 39.00 5.76 2.18 0.00 40.00 5.76 2.18 0.00 41.00 5.76 2.18 0.00 42.00 5.76 2.18 0.00 43.00 5.76 2.18 0.00 44.00 5.76 2.18 0.00 45.00 5.76 2.18 0.00 46.00 5.76 2.18 0.00 47.00 5.76 2.18 0.00 48.00 5.76 2.18 0.00 49.00 5.76 2.18 0.00 50.00 5.76 2.18 0.00 51.00 5.76 2.18 0.00 52.00 5.76 2.18 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 5.76 2.18 0.00 54.00 5.76 2.18 0.00 55.00 5.76 2.18 0.00 56.00 5.76 2.18 0.00 57.00 5.76 2.18 0.00 58.00 5.76 2.18 0.00 59.00 5.76 2.18 0.00 60.00 5.76 2.18 0.00 61.00 5.76 2.18 0.00 62.00 5.76 2.18 0.00 63.00 5.76 2.18 0.00 64.00 5.76 2.18 0.00 65.00 5.76 2.18 0.00 66.00 5.76 2.18 0.00 67.00 5.76 2.18 0.00 68.00 5.76 2.18 0.00 69.00 5.76 2.18 0.00 70.00 5.76 2.18 0.00 71.00 5.76 2.18 0.00 72.00 5.76 2.18 0.00 73.00 5.76 2.18 0.00 74.00 5.76 2.18 0.00 75.00 5.76 2.18 0.00 76.00 5.76 2.18 0.00 77.00 5.76 2.18 0.00 78.00 5.76 2.18 0.00 79.00 5.76 2.18 0.00 80.00 5.76 2.18 0.00 81.00 5.76 2.18 0.00 82.00 5.76 2.18 0.00 83.00 5.76 2.18 0.00 84.00 5.76 2.18 0.00 85.00 5.76 2.18 0.00 86.00 5.76 2.18 0.00 87.00 5.76 2.18 0.00 88.00 5.76 2.18 0.00 89.00 5.76 2.18 0.00 90.00 5.76 2.18 0.00 91.00 5.76 2.18 0.00 92.00 5.76 2.18 0.00 93.00 5.76 2.18 0.00 94.00 5.76 2.18 0.00 95.00 5.76 2.18 0.00 96.00 5.76 2.18 0.00 97.00 5.76 2.18 0.00 98.00 5.76 2.18 0.00 99.00 5.76 2.18 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 183 Summary for Subcatchment 12S: Bypass #2 Runoff = 1.64 cfs @ 12.21 hrs, Volume= 0.156 af, Depth= 1.61" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr - 24hr Rainfall=5.76" Area (ac) CN Description 1.160 58 Woods/grass comb., Good, HSG B 1.160 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 12S: Bypass #2 Hydrograph I I I I I I I I I I I I I I I I I I I ■Runoff 1.64 cfs Type'III �4-fir �5-yr 24hr Ikaipfa�1=6,.76��" Runoff dreg=f.1610 ajc Rlunpff Vollumle=0.156 of -;------;--------------------- 1 - - - Ruooff Qept-&-T.61 �"- TC=24.9' min LL I I I I I I I I I I I I I I CN=58 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 184 Hydrograph for Subcatchment 12S: Bypass #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.28 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.57 0.00 0.00 8.00 0.69 0.00 0.00 9.00 0.85 0.00 0.00 10.00 1.04 0.00 0.00 11.00 1.35 0.00 0.00 12.00 3.82 0.58 0.67 13.00 4.45 0.88 0.30 14.00 4.72 1.02 0.16 15.00 4.92 1.12 0.12 16.00 5.07 1.21 0.10 17.00 5.19 1.28 0.08 18.00 5.30 1.34 0.07 19.00 5.40 1.40 0.06 20.00 5.48 1.44 0.06 21.00 5.56 1.49 0.05 22.00 5.63 1.53 0.05 23.00 5.70 1.57 0.05 24.00 5.76 1.61 0.05 25.00 5.76 1.61 0.00 26.00 5.76 1.61 0.00 27.00 5.76 1.61 0.00 28.00 5.76 1.61 0.00 29.00 5.76 1.61 0.00 30.00 5.76 1.61 0.00 31.00 5.76 1.61 0.00 32.00 5.76 1.61 0.00 33.00 5.76 1.61 0.00 34.00 5.76 1.61 0.00 35.00 5.76 1.61 0.00 36.00 5.76 1.61 0.00 37.00 5.76 1.61 0.00 38.00 5.76 1.61 0.00 39.00 5.76 1.61 0.00 40.00 5.76 1.61 0.00 41.00 5.76 1.61 0.00 42.00 5.76 1.61 0.00 43.00 5.76 1.61 0.00 44.00 5.76 1.61 0.00 45.00 5.76 1.61 0.00 46.00 5.76 1.61 0.00 47.00 5.76 1.61 0.00 48.00 5.76 1.61 0.00 49.00 5.76 1.61 0.00 50.00 5.76 1.61 0.00 51.00 5.76 1.61 0.00 52.00 5.76 1.61 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 5.76 1.61 0.00 54.00 5.76 1.61 0.00 55.00 5.76 1.61 0.00 56.00 5.76 1.61 0.00 57.00 5.76 1.61 0.00 58.00 5.76 1.61 0.00 59.00 5.76 1.61 0.00 60.00 5.76 1.61 0.00 61.00 5.76 1.61 0.00 62.00 5.76 1.61 0.00 63.00 5.76 1.61 0.00 64.00 5.76 1.61 0.00 65.00 5.76 1.61 0.00 66.00 5.76 1.61 0.00 67.00 5.76 1.61 0.00 68.00 5.76 1.61 0.00 69.00 5.76 1.61 0.00 70.00 5.76 1.61 0.00 71.00 5.76 1.61 0.00 72.00 5.76 1.61 0.00 73.00 5.76 1.61 0.00 74.00 5.76 1.61 0.00 75.00 5.76 1.61 0.00 76.00 5.76 1.61 0.00 77.00 5.76 1.61 0.00 78.00 5.76 1.61 0.00 79.00 5.76 1.61 0.00 80.00 5.76 1.61 0.00 81.00 5.76 1.61 0.00 82.00 5.76 1.61 0.00 83.00 5.76 1.61 0.00 84.00 5.76 1.61 0.00 85.00 5.76 1.61 0.00 86.00 5.76 1.61 0.00 87.00 5.76 1.61 0.00 88.00 5.76 1.61 0.00 89.00 5.76 1.61 0.00 90.00 5.76 1.61 0.00 91.00 5.76 1.61 0.00 92.00 5.76 1.61 0.00 93.00 5.76 1.61 0.00 94.00 5.76 1.61 0.00 95.00 5.76 1.61 0.00 96.00 5.76 1.61 0.00 97.00 5.76 1.61 0.00 98.00 5.76 1.61 0.00 99.00 5.76 1.61 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 185 Summary for Subcatchment 13S: Pre -Development #3 Runoff = 11.88 cfs @ 12.16 hrs, Volume= 1.044 af, Depth= 1.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr - 24hr Rainfall=5.76" Area (ac) CN Description 9.070 55 Woods, Good, HSG B 9.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 13S: Pre -Development #3 Hydrograph 13 ■Runoff - 11.88 cfs - --- -- --- --- 12 11 ------ - --- --i ------ --- --T ---- 2$-yr--�Or-Rtainfa j=5',76.�'-- 10 -J---1---1---1---1--- L--- 1--- 1---Runoff Area=-9 07-0-ac - -- ------1---1---1---1--- 1Rdnoff VDIUmt= 044e- 8 I I I I I I 1 N --J- -1---1---1---1---1------1------1--- --Run'off1D7e'-tfh='L36`~- 7- p 3 -- --4--- ---4--- ---4--- ---+------+--- ---r --- I- r -I- -- r-- LL 5 C =5 -r-- -r---r--r---r--r---r--t------r------r------r------r--- ---r-- --T- -T---r--T---r--Y---r--T---r--T---r--r------r------r------r-- 3 1 --T-- 7------7------7------T------T------r------T------r------r-- 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 186 Hydrograph for Subcatchment 13S: Pre -Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.28 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.57 0.00 0.00 8.00 0.69 0.00 0.00 9.00 0.85 0.00 0.00 10.00 1.04 0.00 0.00 11.00 1.35 0.00 0.00 12.00 3.82 0.46 5.66 13.00 4.45 0.72 1.85 14.00 4.72 0.85 1.07 15.00 4.92 0.94 0.82 16.00 5.07 1.01 0.66 17.00 5.19 1.08 0.57 18.00 5.30 1.14 0.52 19.00 5.40 1.19 0.45 20.00 5.48 1.23 0.39 21.00 5.56 1.27 0.36 22.00 5.63 1.31 0.35 23.00 5.70 1.35 0.34 24.00 5.76 1.38 0.33 25.00 5.76 1.38 0.00 26.00 5.76 1.38 0.00 27.00 5.76 1.38 0.00 28.00 5.76 1.38 0.00 29.00 5.76 1.38 0.00 30.00 5.76 1.38 0.00 31.00 5.76 1.38 0.00 32.00 5.76 1.38 0.00 33.00 5.76 1.38 0.00 34.00 5.76 1.38 0.00 35.00 5.76 1.38 0.00 36.00 5.76 1.38 0.00 37.00 5.76 1.38 0.00 38.00 5.76 1.38 0.00 39.00 5.76 1.38 0.00 40.00 5.76 1.38 0.00 41.00 5.76 1.38 0.00 42.00 5.76 1.38 0.00 43.00 5.76 1.38 0.00 44.00 5.76 1.38 0.00 45.00 5.76 1.38 0.00 46.00 5.76 1.38 0.00 47.00 5.76 1.38 0.00 48.00 5.76 1.38 0.00 49.00 5.76 1.38 0.00 50.00 5.76 1.38 0.00 51.00 5.76 1.38 0.00 52.00 5.76 1.38 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 5.76 1.38 0.00 54.00 5.76 1.38 0.00 55.00 5.76 1.38 0.00 56.00 5.76 1.38 0.00 57.00 5.76 1.38 0.00 58.00 5.76 1.38 0.00 59.00 5.76 1.38 0.00 60.00 5.76 1.38 0.00 61.00 5.76 1.38 0.00 62.00 5.76 1.38 0.00 63.00 5.76 1.38 0.00 64.00 5.76 1.38 0.00 65.00 5.76 1.38 0.00 66.00 5.76 1.38 0.00 67.00 5.76 1.38 0.00 68.00 5.76 1.38 0.00 69.00 5.76 1.38 0.00 70.00 5.76 1.38 0.00 71.00 5.76 1.38 0.00 72.00 5.76 1.38 0.00 73.00 5.76 1.38 0.00 74.00 5.76 1.38 0.00 75.00 5.76 1.38 0.00 76.00 5.76 1.38 0.00 77.00 5.76 1.38 0.00 78.00 5.76 1.38 0.00 79.00 5.76 1.38 0.00 80.00 5.76 1.38 0.00 81.00 5.76 1.38 0.00 82.00 5.76 1.38 0.00 83.00 5.76 1.38 0.00 84.00 5.76 1.38 0.00 85.00 5.76 1.38 0.00 86.00 5.76 1.38 0.00 87.00 5.76 1.38 0.00 88.00 5.76 1.38 0.00 89.00 5.76 1.38 0.00 90.00 5.76 1.38 0.00 91.00 5.76 1.38 0.00 92.00 5.76 1.38 0.00 93.00 5.76 1.38 0.00 94.00 5.76 1.38 0.00 95.00 5.76 1.38 0.00 96.00 5.76 1.38 0.00 97.00 5.76 1.38 0.00 98.00 5.76 1.38 0.00 99.00 5.76 1.38 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 187 Summary for Subcatchment 14S: Post Development #3 Runoff = 11.77 cfs @ 12.16 hrs, Volume= 1.035 af, Depth= 1.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr - 24hr Rainfall=5.76" Area (ac) CN Description 8.670 55 Woods, Good, HSG B 0.320 58 Woods/grass comb., Good, HSG B 8.990 55 Weighted Average 8.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 14S: Post Development #3 Hydrograph 13---'i---il -- i ---il -- i---i--- i ---il -- i---i--- i---i--- il---i--- il---i--- il---i--- i-- � Runoff - 11.77 cfs - --L---1---1---L--L------L------L------L--- ---L--- ---L-- 12- --J- - ---------1---1---1---1--- ---1--- ---L--- ----TypeL1124-�" - -- - - -------------------+---- i' - 25=y1p =-�4I�r-F�a'rn#alb=5t6', - - - -- -- --- -- -- --- Runoff Area=8C990-aC-- 9 - - - L-- -- ;Runoff Votumd=1�.0359 - 8 7 -- - - -- -- --- -- -- --- -----Run'off+Depth-'fL38►r- 0 6 � Tc,=2 0 .7 m In LL -t--- ---r-----r--t---r--t------t------t--- I --- t---i---r - 5 CN=55- -t-- -t---r--t---r--t---r--t------t------t------t------r----r-- 4 --T-- -T---I--7------7---I --T------T------r------r--r---r------r-- 3 I I I - T-- T T T T T r r r r-- 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 188 Hydrograph for Subcatchment 14S: Post Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.13 0.00 0.00 3.00 0.20 0.00 0.00 4.00 0.28 0.00 0.00 5.00 0.36 0.00 0.00 6.00 0.46 0.00 0.00 7.00 0.57 0.00 0.00 8.00 0.69 0.00 0.00 9.00 0.85 0.00 0.00 10.00 1.04 0.00 0.00 11.00 1.35 0.00 0.00 12.00 3.82 0.46 5.61 13.00 4.45 0.72 1.83 14.00 4.72 0.85 1.06 15.00 4.92 0.94 0.82 16.00 5.07 1.01 0.66 17.00 5.19 1.08 0.57 18.00 5.30 1.14 0.51 19.00 5.40 1.19 0.45 20.00 5.48 1.23 0.39 21.00 5.56 1.27 0.36 22.00 5.63 1.31 0.35 23.00 5.70 1.35 0.34 24.00 5.76 1.38 0.32 25.00 5.76 1.38 0.00 26.00 5.76 1.38 0.00 27.00 5.76 1.38 0.00 28.00 5.76 1.38 0.00 29.00 5.76 1.38 0.00 30.00 5.76 1.38 0.00 31.00 5.76 1.38 0.00 32.00 5.76 1.38 0.00 33.00 5.76 1.38 0.00 34.00 5.76 1.38 0.00 35.00 5.76 1.38 0.00 36.00 5.76 1.38 0.00 37.00 5.76 1.38 0.00 38.00 5.76 1.38 0.00 39.00 5.76 1.38 0.00 40.00 5.76 1.38 0.00 41.00 5.76 1.38 0.00 42.00 5.76 1.38 0.00 43.00 5.76 1.38 0.00 44.00 5.76 1.38 0.00 45.00 5.76 1.38 0.00 46.00 5.76 1.38 0.00 47.00 5.76 1.38 0.00 48.00 5.76 1.38 0.00 49.00 5.76 1.38 0.00 50.00 5.76 1.38 0.00 51.00 5.76 1.38 0.00 52.00 5.76 1.38 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 5.76 1.38 0.00 54.00 5.76 1.38 0.00 55.00 5.76 1.38 0.00 56.00 5.76 1.38 0.00 57.00 5.76 1.38 0.00 58.00 5.76 1.38 0.00 59.00 5.76 1.38 0.00 60.00 5.76 1.38 0.00 61.00 5.76 1.38 0.00 62.00 5.76 1.38 0.00 63.00 5.76 1.38 0.00 64.00 5.76 1.38 0.00 65.00 5.76 1.38 0.00 66.00 5.76 1.38 0.00 67.00 5.76 1.38 0.00 68.00 5.76 1.38 0.00 69.00 5.76 1.38 0.00 70.00 5.76 1.38 0.00 71.00 5.76 1.38 0.00 72.00 5.76 1.38 0.00 73.00 5.76 1.38 0.00 74.00 5.76 1.38 0.00 75.00 5.76 1.38 0.00 76.00 5.76 1.38 0.00 77.00 5.76 1.38 0.00 78.00 5.76 1.38 0.00 79.00 5.76 1.38 0.00 80.00 5.76 1.38 0.00 81.00 5.76 1.38 0.00 82.00 5.76 1.38 0.00 83.00 5.76 1.38 0.00 84.00 5.76 1.38 0.00 85.00 5.76 1.38 0.00 86.00 5.76 1.38 0.00 87.00 5.76 1.38 0.00 88.00 5.76 1.38 0.00 89.00 5.76 1.38 0.00 90.00 5.76 1.38 0.00 91.00 5.76 1.38 0.00 92.00 5.76 1.38 0.00 93.00 5.76 1.38 0.00 94.00 5.76 1.38 0.00 95.00 5.76 1.38 0.00 96.00 5.76 1.38 0.00 97.00 5.76 1.38 0.00 98.00 5.76 1.38 0.00 99.00 5.76 1.38 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 189 Summary for Pond 5P: BMP #1 Inflow Area = 12.980 ac, 0.00% Impervious, Inflow Depth = 2.01" for 25-yr - 24hr event Inflow = 46.68 cfs @ 11.96 hrs, Volume= 2.175 of Outflow = 0.96 cfs @ 17.45 hrs, Volume= 1.418 af, Atten= 98%, Lag= 329.3 min Primary = 0.96 cfs @ 17.45 hrs, Volume= 1.418 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 570.31' @ 17.45 hrs Surf.Area= 22,272 sf Storage= 69,856 cf Plug -Flow detention time= 1,748.8 min calculated for 1.417 of (65% of inflow) Center -of -Mass det. time= 1,630.5 min ( 2,483.7 - 853.2 ) Volume Invert Avail.Storage Storage Description #1 566.50' 137,597 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 566.50 13,995 0 0 567.00 15,551 7,387 7,387 568.00 17,503 16,527 23,914 569.00 19,519 18,511 42,425 570.00 21,600 20,560 62,984 571.00 23,745 22,673 85,657 572.00 25,954 24,850 110,506 573.00 28,228 27,091 137,597 Device Routing Invert Outlet Devices #1 Primary 561.90' 36.0" Round RCP -Round 36" L= 187.7' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 561.90' / 560.89' S= 0.0054 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 566.50' 1.7" Vert. WQ Orrfice C= 0.600 #3 Device 1 570.10' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.90 Width (feet) 2.50 2.50 #4 Device 1 571.00' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 571.80' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.95 cfs @ 17.45 hrs HW=570.31' (Free Discharge) L1=RCP_Round 36" (Passes 0.95 cfs of 89.81 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.15 cfs @ 9.31 fps) 3=Custom Weir/Orifice (Weir Controls 0.81 cfs @ 1.51 fps) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 190 Pond 5P: BMP #1 Hydrograph --L--L--1--1--1--J--J---1---1---1---1---1---L--L--L--L--1--1--1-- cfs 46.68 -; --; -----,---,----------[hfilw-A'r 80-,'aC - --,, - 50 'a"r12.9- ---I------ Pe---5703I ,-- r akElev= 0_cSt rage= 40 - -L- -1--1--1--J--J---1---1---1---1---1---L--L--L--L--1--1--1-- 35 --I- -------------------------- - I- �' I 30 �� � I --r- I I I I I I I I I I I I I I I I I -t--t--r--r--r---I---I---I---I---r--r--r--r--r--r--r--r-- 3 25 o LL --+- I -+--+--+--+--+------------------+--+--+--+--+--+--+-- I I I I I I I I I I I I I I I I I 20 - - - - - - - - - - - - - - - 15 --; - I -- --------------------,---; --; --; --; --; --; -- -- -- I I I I I I I I I I I I I I I I 10 0.96 cfs 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 573 572 571 w w c 570 0 .� w w 569 568 567 Pond 5P: BMP #1 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) Lry ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 191 Pond 5P: BMP #1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 F Surface ❑ Storage 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 192 Hydrograph for Pond 5P: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 566.50 0.00 0.00 0.00 2.50 0.00 0 566.50 0.00 0.00 0.00 5.00 0.00 0 566.50 0.00 0.00 0.00 7.50 0.00 0 566.50 0.00 0.00 0.00 10.00 0.00 0 566.50 0.00 0.00 0.00 12.50 4.44 47,894 569.28 0.12 0.12 0.00 15.00 1.44 66,605 570.17 0.30 0.30 0.00 17.50 0.95 69,857 570.31 0.96 0.96 0.00 20.00 0.66 69,142 570.28 0.78 0.78 0.00 22.50 0.60 68,530 570.25 0.64 0.64 0.00 25.00 0.00 66,850 570.18 0.33 0.33 0.00 27.50 0.00 65,030 570.09 0.14 0.14 0.00 30.00 0.00 63,753 570.04 0.14 0.14 0.00 32.50 0.00 62,487 569.98 0.14 0.14 0.00 35.00 0.00 61,232 569.92 0.14 0.14 0.00 37.50 0.00 59,987 569.86 0.14 0.14 0.00 40.00 0.00 58,754 569.80 0.14 0.14 0.00 42.50 0.00 57,532 569.74 0.14 0.14 0.00 45.00 0.00 56,320 569.69 0.13 0.13 0.00 47.50 0.00 55,120 569.63 0.13 0.13 0.00 50.00 0.00 53,931 569.57 0.13 0.13 0.00 52.50 0.00 52,754 569.51 0.13 0.13 0.00 55.00 0.00 51,587 569.46 0.13 0.13 0.00 57.50 0.00 50,432 569.40 0.13 0.13 0.00 60.00 0.00 49,289 569.35 0.13 0.13 0.00 62.50 0.00 48,157 569.29 0.13 0.13 0.00 65.00 0.00 47,036 569.23 0.12 0.12 0.00 67.50 0.00 45,928 569.18 0.12 0.12 0.00 70.00 0.00 44,831 569.12 0.12 0.12 0.00 72.50 0.00 43,745 569.07 0.12 0.12 0.00 75.00 0.00 42,672 569.01 0.12 0.12 0.00 77.50 0.00 41,611 568.96 0.12 0.12 0.00 80.00 0.00 40,561 568.90 0.12 0.12 0.00 82.50 0.00 39,524 568.85 0.11 0.11 0.00 85.00 0.00 38,499 568.80 0.11 0.11 0.00 87.50 0.00 37,486 568.74 0.11 0.11 0.00 90.00 0.00 36,485 568.69 0.11 0.11 0.00 92.50 0.00 35,497 568.64 0.11 0.11 0.00 95.00 0.00 34,521 568.59 0.11 0.11 0.00 97.50 0.00 33,558 568.53 0.11 0.11 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 193 Stage -Discharge for Pond 5P: BMP #1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 566.50 0.00 0.00 0.00 566.60 0.01 0.01 0.00 566.70 0.03 0.03 0.00 566.80 0.04 0.04 0.00 566.90 0.04 0.04 0.00 567.00 0.05 0.05 0.00 567.10 0.06 0.06 0.00 567.20 0.06 0.06 0.00 567.30 0.06 0.06 0.00 567.40 0.07 0.07 0.00 567.50 0.07 0.07 0.00 567.60 0.08 0.08 0.00 567.70 0.08 0.08 0.00 567.80 0.08 0.08 0.00 567.90 0.09 0.09 0.00 568.00 0.09 0.09 0.00 568.10 0.09 0.09 0.00 568.20 0.10 0.10 0.00 568.30 0.10 0.10 0.00 568.40 0.10 0.10 0.00 568.50 0.11 0.11 0.00 568.60 0.11 0.11 0.00 568.70 0.11 0.11 0.00 568.80 0.11 0.11 0.00 568.90 0.12 0.12 0.00 569.00 0.12 0.12 0.00 569.10 0.12 0.12 0.00 569.20 0.12 0.12 0.00 569.30 0.13 0.13 0.00 569.40 0.13 0.13 0.00 569.50 0.13 0.13 0.00 569.60 0.13 0.13 0.00 569.70 0.13 0.13 0.00 569.80 0.14 0.14 0.00 569.90 0.14 0.14 0.00 570.00 0.14 0.14 0.00 570.10 0.14 0.14 0.00 570.20 0.40 0.40 0.00 570.30 0.88 0.88 0.00 570.40 1.49 1.49 0.00 570.50 2.22 2.22 0.00 570.60 3.05 3.05 0.00 570.70 3.96 3.96 0.00 570.80 4.95 4.95 0.00 570.90 6.02 6.02 0.00 571.00 7.15 7.15 0.00 571.10 9.74 9.74 0.00 571.20 13.56 13.56 0.00 571.30 18.18 18.18 0.00 571.40 23.47 23.47 0.00 571.50 29.33 29.33 0.00 571.60 35.72 35.72 0.00 571.70 42.59 42.59 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 571.80 49.90 49.90 0.00 571.90 58.42 57.63 0.79 572.00 67.98 65.75 2.23 572.10 78.40 74.25 4.15 572.20 89.59 83.11 6.48 572.30 101.61 92.31 9.30 572.40 114.40 101.85 12.55 572.50 119.76 103.98 15.78 572.60 123.83 104.58 19.25 572.70 128.10 105.18 22.92 572.80 132.57 105.77 26.80 572.90 137.34 106.37 30.98 573.00 142.31 106.95 35.36 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 194 Stage -Area -Storage for Pond 5P: BMP #1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 566.50 13,995 0 566.60 14,306 1,415 566.70 14,617 2,861 566.80 14,929 4,339 566.90 15,240 5,847 567.00 15,551 7,387 567.10 15,746 8,951 567.20 15,941 10,536 567.30 16,137 12,140 567.40 16,332 13,763 567.50 16,527 15,406 567.60 16,722 17,068 567.70 16,917 18,750 567.80 17,113 20,452 567.90 17,308 22,173 568.00 17,503 23,914 568.10 17,705 25,674 568.20 17,906 27,454 568.30 18,108 29,255 568.40 18,309 31,076 568.50 18,511 32,917 568.60 18,713 34,778 568.70 18,914 36,660 568.80 19,116 38,561 568.90 19,317 40,483 569.00 19,519 42,425 569.10 19,727 44,387 569.20 19,935 46,370 569.30 20,143 48,374 569.40 20,351 50,399 569.50 20,560 52,444 569.60 20,768 54,510 569.70 20,976 56,598 569.80 21,184 58,706 569.90 21,392 60,834 570.00 21,600 62,984 570.10 21,815 65,155 570.20 22,029 67,347 570.30 22,243 69,561 570.40 22,458 71,796 570.50 22,673 74,052 570.60 22,887 76,330 570.70 23,102 78,630 570.80 23,316 80,950 570.90 23,530 83,293 571.00 23,745 85,657 571.10 23,966 88,042 571.20 24,187 90,450 571.30 24,408 92,879 571.40 24,629 95,331 571.50 24,850 97,805 571.60 25,070 100,301 571.70 25,291 102,819 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 571.80 25,512 105,359 571.90 25,733 107,922 572.00 25,954 110,506 572.10 26,181 113,113 572.20 26,409 115,742 572.30 26,636 118,395 572.40 26,864 121,070 572.50 27,091 123,767 572.60 27,318 126,488 572.70 27,546 129,231 572.80 27,773 131,997 572.90 28,001 134,786 573.00 28,228 137,597 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 195 Summary for Pond 6P: BMP #2 Inflow Area = 9.670 ac, 0.00% Impervious, Inflow Depth = 3.57" for 25-yr - 24hr event Inflow = 60.89 cfs @ 11.96 hrs, Volume= 2.873 of Outflow = 19.54 cfs @ 12.09 hrs, Volume= 2.860 af, Atten= 68%, Lag= 8.0 min Primary = 19.54 cfs @ 12.09 hrs, Volume= 2.860 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 562.61' @ 12.09 hrs Surf.Area= 18,556 sf Storage= 58,734 cf Plug -Flow detention time= 633.6 min calculated for 2.860 of (100% of inflow) Center -of -Mass det. time= 630.8 min ( 1,442.6 - 811.8 ) Volume Invert Avail.Storage Storage Description #1 558.50' 109,406 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 558.50 9,762 0 0 559.00 11,233 5,249 5,249 560.00 13,167 12,200 17,449 561.00 15,175 14,171 31,620 562.00 17,251 16,213 47,833 563.00 19,395 18,323 66,156 564.00 21,608 20,502 86,657 565.00 23,890 22,749 109,406 Device Routing Invert Outlet Devices #1 Primary 553.90' 36.0" Round RCP -Round 36" L= 92.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 553.90' / 553.00' S= 0.0097 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 558.50' 2.5" Vert. WQ Orrfice C= 0.600 #3 Device 1 561.05' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.15 Width (feet) 1.00 1.00 #4 Device 1 562.20' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 563.95' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=19.14 cfs @ 12.09 hrs HW=562.60' (Free Discharge) L1=RCP_Round 36" (Passes 19.14 cfs of 106.54 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.33 cfs @ 9.63 fps) 3=Custom Weir/Orifice (Orifice Controls 5.50 cfs @ 4.78 fps) 4=Top of Box (Weir Controls 13.32 cfs @ 2.07 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=558.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 196 Hydrograph 60.89 CfS ■ Inflow ❑OUtflOw -r--r--r--r---i---i---i--�-ii---r--r/-�-r--.yr--r-�-+Irk--r--e�ra-- 1nf owrAreA=9.670 ac ■ Primary ■Secondary 65 --r--r--r--r--r--r------------i--• e;ak �-IeY 56L.6 1 60 �,-- �,-- �,---�,---�,---�,---�,--Sta'rade�5#58 �'�8 55 .;�, --�---�,--�,-- --r--t--t--r--r--r---------------r--r-- 734 cf r--r--f 50 --r- -r--r--r--r--r---i---i---r--r--r--r--r--r--r--r--r--r-- w 40 u 35 - - - - r - - r - - r - - r - - r - - -I- - -I- - -I- - -I- - -I- - - r - - r - - r - - r - - r - - r - - r - - 0 a 30rf zs 19.54 cfs -- ----- - - -, -- - rt--rt-- --r'--r'------------------'r--'r--r--r--t-------- - --- --- -- -- - - -; -- -- -- 20 15 10 0.00 CfS 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 565 564 563 w w c 562 0 .� w w 561 560 559 Pond 6P: BMP #2 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 197 Pond 6P: BMP #2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 0 20,000 40,000 60,000 80,000 100,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 198 Hydrograph for Pond 6P: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 558.50 0.00 0.00 0.00 2.50 0.00 0 558.50 0.00 0.00 0.00 5.00 0.00 0 558.50 0.00 0.00 0.00 7.50 0.10 190 558.52 0.00 0.00 0.00 10.00 0.69 2,961 558.79 0.07 0.07 0.00 12.50 4.92 53,331 562.31 6.87 6.87 0.00 15.00 1.49 43,425 561.74 2.17 2.17 0.00 17.50 0.96 39,304 561.49 1.23 1.23 0.00 20.00 0.66 37,316 561.37 0.86 0.86 0.00 22.50 0.59 36,195 561.30 0.67 0.67 0.00 25.00 0.00 34,188 561.17 0.39 0.39 0.00 27.50 0.00 31,568 561.00 0.25 0.25 0.00 30.00 0.00 29,320 560.85 0.25 0.25 0.00 32.50 0.00 27,145 560.70 0.24 0.24 0.00 35.00 0.00 25,044 560.55 0.23 0.23 0.00 37.50 0.00 23,020 560.41 0.22 0.22 0.00 40.00 0.00 21,074 560.27 0.21 0.21 0.00 42.50 0.00 19,208 560.13 0.20 0.20 0.00 45.00 0.00 17,423 560.00 0.19 0.19 0.00 47.50 0.00 15,721 559.87 0.18 0.18 0.00 50.00 0.00 14,103 559.74 0.17 0.17 0.00 52.50 0.00 12,571 559.62 0.17 0.17 0.00 55.00 0.00 11,128 559.50 0.16 0.16 0.00 57.50 0.00 9,773 559.39 0.15 0.15 0.00 60.00 0.00 8,510 559.28 0.14 0.14 0.00 62.50 0.00 7,340 559.18 0.12 0.12 0.00 65.00 0.00 6,263 559.09 0.11 0.11 0.00 67.50 0.00 5,282 559.00 0.10 0.10 0.00 70.00 0.00 4,399 558.92 0.09 0.09 0.00 72.50 0.00 3,615 558.85 0.08 0.08 0.00 75.00 0.00 2,932 558.79 0.07 0.07 0.00 77.50 0.00 2,353 558.73 0.06 0.06 0.00 80.00 0.00 1,876 558.69 0.05 0.05 0.00 82.50 0.00 1,510 558.65 0.03 0.03 0.00 85.00 0.00 1,240 558.62 0.03 0.03 0.00 87.50 0.00 1,036 558.60 0.02 0.02 0.00 90.00 0.00 881 558.59 0.02 0.02 0.00 92.50 0.00 762 558.58 0.01 0.01 0.00 95.00 0.00 671 558.57 0.01 0.01 0.00 97.50 0.00 600 558.56 0.01 0.01 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 199 Stage -Discharge for Pond 6P: BMP #2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 558.50 0.00 0.00 0.00 558.60 0.02 0.02 0.00 558.70 0.05 0.05 0.00 558.80 0.07 0.07 0.00 558.90 0.09 0.09 0.00 559.00 0.10 0.10 0.00 559.10 0.12 0.12 0.00 559.20 0.13 0.13 0.00 559.30 0.14 0.14 0.00 559.40 0.15 0.15 0.00 559.50 0.16 0.16 0.00 559.60 0.16 0.16 0.00 559.70 0.17 0.17 0.00 559.80 0.18 0.18 0.00 559.90 0.19 0.19 0.00 560.00 0.19 0.19 0.00 560.10 0.20 0.20 0.00 560.20 0.21 0.21 0.00 560.30 0.21 0.21 0.00 560.40 0.22 0.22 0.00 560.50 0.23 0.23 0.00 560.60 0.23 0.23 0.00 560.70 0.24 0.24 0.00 560.80 0.24 0.24 0.00 560.90 0.25 0.25 0.00 561.00 0.25 0.25 0.00 561.10 0.30 0.30 0.00 561.20 0.45 0.45 0.00 561.30 0.68 0.68 0.00 561.40 0.95 0.95 0.00 561.50 1.27 1.27 0.00 561.60 1.62 1.62 0.00 561.70 2.01 2.01 0.00 561.80 2.42 2.42 0.00 561.90 2.86 2.86 0.00 562.00 3.33 3.33 0.00 562.10 3.83 3.83 0.00 562.20 4.35 4.35 0.00 562.30 6.44 6.44 0.00 562.40 9.84 9.84 0.00 562.50 14.10 14.10 0.00 562.60 19.06 19.06 0.00 562.70 24.61 24.61 0.00 562.80 30.71 30.71 0.00 562.90 37.30 37.30 0.00 563.00 44.36 44.36 0.00 563.10 51.84 51.84 0.00 563.20 59.72 59.72 0.00 563.30 67.99 67.99 0.00 563.40 76.63 76.63 0.00 563.50 85.62 85.62 0.00 563.60 94.95 94.95 0.00 563.70 102.84 102.84 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 563.80 106.13 106.13 0.00 563.90 109.32 109.32 0.00 564.00 112.70 112.43 0.28 564.10 116.89 115.44 1.45 564.20 121.52 118.39 3.13 564.30 124.72 119.46 5.26 564.40 128.01 120.18 7.83 564.50 131.76 120.89 10.87 564.60 135.74 121.60 14.14 564.70 139.79 122.30 17.49 564.80 144.07 123.01 21.06 564.90 148.54 123.70 24.84 565.00 153.26 124.40 28.86 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 200 Stage -Area -Storage for Pond 6P: BMP #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 558.50 9,762 0 558.60 10,056 991 558.70 10,350 2,011 558.80 10,645 3,061 558.90 10,939 4,140 559.00 11,233 5,249 559.10 11,426 6,382 559.20 11,620 7,534 559.30 11,813 8,706 559.40 12,007 9,897 559.50 12,200 11,107 559.60 12,393 12,337 559.70 12,587 13,586 559.80 12,780 14,854 559.90 12,974 16,142 560.00 13,167 17,449 560.10 13,368 18,775 560.20 13,569 20,122 560.30 13,769 21,489 560.40 13,970 22,876 560.50 14,171 24,283 560.60 14,372 25,710 560.70 14,573 27,158 560.80 14,773 28,625 560.90 14,974 30,112 561.00 15,175 31,620 561.10 15,383 33,148 561.20 15,590 34,696 561.30 15,798 36,266 561.40 16,005 37,856 561.50 16,213 39,467 561.60 16,421 41,098 561.70 16,628 42,751 561.80 16,836 44,424 561.90 17,043 46,118 562.00 17,251 47,833 562.10 17,465 49,569 562.20 17,680 51,326 562.30 17,894 53,105 562.40 18,109 54,905 562.50 18,323 56,726 562.60 18,537 58,569 562.70 18,752 60,434 562.80 18,966 62,320 562.90 19,181 64,227 563.00 19,395 66,156 563.10 19,616 68,106 563.20 19,838 70,079 563.30 20,059 72,074 563.40 20,280 74,091 563.50 20,502 76,130 563.60 20,723 78,191 563.70 20,944 80,274 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 563.80 21,165 82,380 563.90 21,387 84,508 564.00 21,608 86,657 564.10 21,836 88,829 564.20 22,064 91,024 564.30 22,293 93,242 564.40 22,521 95,483 564.50 22,749 97,747 564.60 22,977 100,033 564.70 23,205 102,342 564.80 23,434 104,674 564.90 23,662 107,029 565.00 23,890 109,406 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 201 Summary for Pond 7P: BMP #3 Inflow Area = 6.900 ac, 0.00% Impervious, Inflow Depth = 3.47" for 25-yr - 24hr event Inflow = 42.39 cfs @ 11.96 hrs, Volume= 1.993 of Outflow = 3.16 cfs @ 12.55 hrs, Volume= 1.829 af, Atten= 93%, Lag= 35.4 min Primary = 3.16 cfs @ 12.55 hrs, Volume= 1.829 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 572.40' @ 12.55 hrs Surf.Area= 15,014 sf Storage= 47,757 cf Plug -Flow detention time= 992.2 min calculated for 1.829 of (92% of inflow) Center -of -Mass det. time= 948.5 min ( 1,762.9 - 814.4 ) Volume Invert Avail.Storage Storage Description #1 568.50' 91,933 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 568.50 9,080 0 0 569.00 10,331 4,853 4,853 570.00 11,639 10,985 15,838 571.00 13,003 12,321 28,159 572.00 14,424 13,714 41,872 573.00 15,901 15,163 57,035 574.00 17,435 16,668 73,703 575.00 19,025 18,230 91,933 Device Routing Invert Outlet Devices #1 Primary 565.31' 24.0" Round RCP -Round 24" L= 61.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 565.31' / 565.00' S= 0.0051 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 568.50' 1.7" Vert. WQ Orfice C= 0.600 #3 Device 1 571.20' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 2.30 Width (feet) 0.70 0.70 #4 Device 1 573.50' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 574.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.16 cfs @ 12.55 hrs HW=572.40' (Free Discharge) L1=RCP_Round 24" (Passes 3.16 cfs of 41.82 cfs potential flow) �2=WQ Orfice (Orifice Controls 0.15 cfs @ 9.42 fps) 3=Custom Weir/Orifice (Weir Controls 3.01 cfs @ 3.59 fps) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=568.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 202 Pond 7P: BMP #3 Hydrograph 42.39 cfs inflow Aire-9=6.9004 aC-- 40 --ill --'---'-----------------------S-tp-m a#i' 7,757-Cif - 35 30 �v 25 , a 20 -I - -I - - T - - 7 - - 7 - - 15 10 ---- - i -- i -- i---i---i---i---i---i---i---'i --'i --'i -- it -- it -- it -- i -- i -- 3.16 cfsMM 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 575 574 573 w w c 572 0 .� w w 571 570 569 Pond 7P: BMP #3 Stage -Discharge 0 10 20 30 40 50 60 70 Discharge (cfs) Lry ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 203 Pond 7P: BMP #3 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 204 Hydrograph for Pond 7P: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 568.50 0.00 0.00 0.00 2.50 0.00 0 568.50 0.00 0.00 0.00 5.00 0.00 0 568.50 0.00 0.00 0.00 7.50 0.05 71 568.51 0.00 0.00 0.00 10.00 0.45 1,850 568.70 0.03 0.03 0.00 12.50 3.45 47,735 572.40 3.16 3.16 0.00 15.00 1.05 41,144 571.95 1.63 1.63 0.00 17.50 0.68 37,517 571.69 0.93 0.93 0.00 20.00 0.46 35,725 571.56 0.64 0.64 0.00 22.50 0.42 34,710 571.49 0.49 0.49 0.00 25.00 0.00 33,154 571.38 0.30 0.30 0.00 27.50 0.00 31,317 571.24 0.14 0.14 0.00 30.00 0.00 30,177 571.15 0.12 0.12 0.00 32.50 0.00 29,088 571.07 0.12 0.12 0.00 35.00 0.00 28,017 570.99 0.12 0.12 0.00 37.50 0.00 26,964 570.91 0.12 0.12 0.00 40.00 0.00 25,929 570.83 0.11 0.11 0.00 42.50 0.00 24,912 570.75 0.11 0.11 0.00 45.00 0.00 23,914 570.67 0.11 0.11 0.00 47.50 0.00 22,934 570.59 0.11 0.11 0.00 50.00 0.00 21,973 570.51 0.11 0.11 0.00 52.50 0.00 21,031 570.44 0.10 0.10 0.00 55.00 0.00 20,108 570.36 0.10 0.10 0.00 57.50 0.00 19,204 570.28 0.10 0.10 0.00 60.00 0.00 18,319 570.21 0.10 0.10 0.00 62.50 0.00 17,455 570.14 0.10 0.10 0.00 65.00 0.00 16,609 570.07 0.09 0.09 0.00 67.50 0.00 15,784 570.00 0.09 0.09 0.00 70.00 0.00 14,979 569.93 0.09 0.09 0.00 72.50 0.00 14,194 569.86 0.09 0.09 0.00 75.00 0.00 13,429 569.79 0.08 0.08 0.00 77.50 0.00 12,685 569.72 0.08 0.08 0.00 80.00 0.00 11,962 569.66 0.08 0.08 0.00 82.50 0.00 11,260 569.60 0.08 0.08 0.00 85.00 0.00 10,578 569.54 0.07 0.07 0.00 87.50 0.00 9,918 569.48 0.07 0.07 0.00 90.00 0.00 9,279 569.42 0.07 0.07 0.00 92.50 0.00 8,661 569.36 0.07 0.07 0.00 95.00 0.00 8,065 569.30 0.07 0.07 0.00 97.50 0.00 7,491 569.25 0.06 0.06 0.00 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 205 Stage -Discharge for Pond 7P: BMP #3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 568.50 0.00 0.00 0.00 568.60 0.01 0.01 0.00 568.70 0.03 0.03 0.00 568.80 0.04 0.04 0.00 568.90 0.04 0.04 0.00 569.00 0.05 0.05 0.00 569.10 0.06 0.06 0.00 569.20 0.06 0.06 0.00 569.30 0.06 0.06 0.00 569.40 0.07 0.07 0.00 569.50 0.07 0.07 0.00 569.60 0.08 0.08 0.00 569.70 0.08 0.08 0.00 569.80 0.08 0.08 0.00 569.90 0.09 0.09 0.00 570.00 0.09 0.09 0.00 570.10 0.09 0.09 0.00 570.20 0.10 0.10 0.00 570.30 0.10 0.10 0.00 570.40 0.10 0.10 0.00 570.50 0.11 0.11 0.00 570.60 0.11 0.11 0.00 570.70 0.11 0.11 0.00 570.80 0.11 0.11 0.00 570.90 0.12 0.12 0.00 571.00 0.12 0.12 0.00 571.10 0.12 0.12 0.00 571.20 0.12 0.12 0.00 571.30 0.20 0.20 0.00 571.40 0.33 0.33 0.00 571.50 0.51 0.51 0.00 571.60 0.71 0.71 0.00 571.70 0.94 0.94 0.00 571.80 1.20 1.20 0.00 571.90 1.48 1.48 0.00 572.00 1.78 1.78 0.00 572.10 2.10 2.10 0.00 572.20 2.44 2.44 0.00 572.30 2.79 2.79 0.00 572.40 3.16 3.16 0.00 572.50 3.55 3.55 0.00 572.60 3.95 3.95 0.00 572.70 4.37 4.37 0.00 572.80 4.80 4.80 0.00 572.90 5.24 5.24 0.00 573.00 5.70 5.70 0.00 573.10 6.17 6.17 0.00 573.20 6.65 6.65 0.00 573.30 7.14 7.14 0.00 573.40 7.65 7.65 0.00 573.50 8.17 8.17 0.00 573.60 10.28 10.28 0.00 573.70 13.71 13.71 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 573.80 18.00 18.00 0.00 573.90 23.00 23.00 0.00 574.00 28.61 28.61 0.00 574.10 35.54 34.75 0.79 574.20 43.62 41.39 2.23 574.30 52.64 48.49 4.15 574.40 55.43 48.95 6.48 574.50 58.58 49.28 9.30 574.60 62.16 49.61 12.55 574.70 65.72 49.94 15.78 574.80 69.51 50.26 19.25 574.90 73.50 50.58 22.92 575.00 77.70 50.90 26.80 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 206 Stage -Area -Storage for Pond 7P: BMP #3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 568.50 9,080 0 568.60 9,330 921 568.70 9,580 1,866 568.80 9,831 2,837 568.90 10,081 3,832 569.00 10,331 4,853 569.10 10,462 5,892 569.20 10,593 6,945 569.30 10,723 8,011 569.40 10,854 9,090 569.50 10,985 10,182 569.60 11,116 11,287 569.70 11,247 12,405 569.80 11,377 13,536 569.90 11,508 14,680 570.00 11,639 15,838 570.10 11,775 17,008 570.20 11,912 18,193 570.30 12,048 19,391 570.40 12,185 20,602 570.50 12,321 21,828 570.60 12,457 23,067 570.70 12,594 24,319 570.80 12,730 25,585 570.90 12,867 26,865 571.00 13,003 28,159 571.10 13,145 29,466 571.20 13,287 30,788 571.30 13,429 32,124 571.40 13,571 33,474 571.50 13,714 34,838 571.60 13,856 36,216 571.70 13,998 37,609 571.80 14,140 39,016 571.90 14,282 40,437 572.00 14,424 41,872 572.10 14,572 43,322 572.20 14,719 44,787 572.30 14,867 46,266 572.40 15,015 47,760 572.50 15,163 49,269 572.60 15,310 50,793 572.70 15,458 52,331 572.80 15,606 53,884 572.90 15,753 55,452 573.00 15,901 57,035 573.10 16,054 58,633 573.20 16,208 60,246 573.30 16,361 61,874 573.40 16,515 63,518 573.50 16,668 65,177 573.60 16,821 66,851 573.70 16,975 68,541 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 573.80 17,128 70,246 573.90 17,282 71,967 574.00 17,435 73,703 574.10 17,594 75,454 574.20 17,753 77,222 574.30 17,912 79,005 574.40 18,071 80,804 574.50 18,230 82,619 574.60 18,389 84,450 574.70 18,548 86,297 574.80 18,707 88,160 574.90 18,866 90,038 575.00 19,025 91,933 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 207 Summary for Link 17L: Post Development #2 Inflow Area = 8.060 ac, 0.00% Impervious, Inflow Depth > 2.95" for 25-yr - 24hr event Inflow = 4.46 cfs @ 12.26 hrs, Volume= 1.984 of Primary = 4.46 cfs @ 12.26 hrs, Volume= 1.984 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 17L: Post Development #2 Hydrograph Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 208 Hydrograph for Link 17L: Post Development #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.01 0.00 0.01 10.00 0.03 0.00 0.03 11.00 0.05 0.00 0.05 12.00 1.56 0.00 1.56 13.00 3.25 0.00 3.25 14.00 2.35 0.00 2.35 15.00 1.75 0.00 1.75 16.00 1.36 0.00 1.36 17.00 1.10 0.00 1.10 18.00 0.93 0.00 0.93 19.00 0.80 0.00 0.80 20.00 0.69 0.00 0.69 21.00 0.61 0.00 0.61 22.00 0.56 0.00 0.56 23.00 0.52 0.00 0.52 24.00 0.49 0.00 0.49 25.00 0.30 0.00 0.30 26.00 0.21 0.00 0.21 27.00 0.16 0.00 0.16 28.00 0.13 0.00 0.13 29.00 0.12 0.00 0.12 30.00 0.12 0.00 0.12 31.00 0.12 0.00 0.12 32.00 0.12 0.00 0.12 33.00 0.12 0.00 0.12 34.00 0.12 0.00 0.12 35.00 0.12 0.00 0.12 36.00 0.12 0.00 0.12 37.00 0.12 0.00 0.12 38.00 0.12 0.00 0.12 39.00 0.11 0.00 0.11 40.00 0.11 0.00 0.11 41.00 0.11 0.00 0.11 42.00 0.11 0.00 0.11 43.00 0.11 0.00 0.11 44.00 0.11 0.00 0.11 45.00 0.11 0.00 0.11 46.00 0.11 0.00 0.11 47.00 0.11 0.00 0.11 48.00 0.11 0.00 0.11 49.00 0.11 0.00 0.11 50.00 0.11 0.00 0.11 51.00 0.10 0.00 0.10 52.00 0.10 0.00 0.10 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.10 0.00 0.10 54.00 0.10 0.00 0.10 55.00 0.10 0.00 0.10 56.00 0.10 0.00 0.10 57.00 0.10 0.00 0.10 58.00 0.10 0.00 0.10 59.00 0.10 0.00 0.10 60.00 0.10 0.00 0.10 61.00 0.10 0.00 0.10 62.00 0.10 0.00 0.10 63.00 0.09 0.00 0.09 64.00 0.09 0.00 0.09 65.00 0.09 0.00 0.09 66.00 0.09 0.00 0.09 67.00 0.09 0.00 0.09 68.00 0.09 0.00 0.09 69.00 0.09 0.00 0.09 70.00 0.09 0.00 0.09 71.00 0.09 0.00 0.09 72.00 0.09 0.00 0.09 73.00 0.09 0.00 0.09 74.00 0.08 0.00 0.08 75.00 0.08 0.00 0.08 76.00 0.08 0.00 0.08 77.00 0.08 0.00 0.08 78.00 0.08 0.00 0.08 79.00 0.08 0.00 0.08 80.00 0.08 0.00 0.08 81.00 0.08 0.00 0.08 82.00 0.08 0.00 0.08 83.00 0.08 0.00 0.08 84.00 0.08 0.00 0.08 85.00 0.07 0.00 0.07 86.00 0.07 0.00 0.07 87.00 0.07 0.00 0.07 88.00 0.07 0.00 0.07 89.00 0.07 0.00 0.07 90.00 0.07 0.00 0.07 91.00 0.07 0.00 0.07 92.00 0.07 0.00 0.07 93.00 0.07 0.00 0.07 94.00 0.07 0.00 0.07 95.00 0.07 0.00 0.07 96.00 0.06 0.00 0.06 97.00 0.06 0.00 0.06 98.00 0.06 0.00 0.06 99.00 0.06 0.00 0.06 Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 209 Summary for Link 18L: Post Development #1 Inflow Area = 28.230 ac, 3.61 % Impervious, Inflow Depth > 2.25" for 25-yr - 24hr event Inflow = 34.02 cfs @ 12.09 hrs, Volume= 5.291 of Primary = 34.02 cfs @ 12.09 hrs, Volume= 5.291 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 18L: Post Development #1 Hydrograph -- �---I--- -----I-- r -- �---I--- t -- 7---I--- T---I---I--- T---I--- r -- Y---I--- r -- � ---I-- ---,------r-- r------T---------T------r-- T------r--,---I-- ■Inflow 38 36 -------T--------T---I- - -I - - T------ r--T------r-- ---I-- I I I �� w IA0 T--TT---oec �P _ ■ Primary 34.02 cfs --T 34 - ---I--- --T---I---T-- -I---T -----I-----T--- 32 �I - - -1- T--TTTTI---T--T---I-- 1 1 1 1 1 1 1 - _ - - - - - - 30 �I 1 --- T T T T T T T T T I 1 1 1 1 1 1 28 F 26 'I 24 H 22 20 0 18 0 -- - -'I - -- --I-= _ --I-= =-I-= _ =-I-= _ =-I-= __ --I-- - -'I - -'I- - - -'I - -'I- - - -'I - - - - -'I - - - -'I - -'I - - -'I - -'I - - 16 -L -L--L------L-- ---1---1---------1------L--1------L--L---I-- 14 -L -L--L------L--L---1---1---1---1---1---1---L--1------L--L---I-- 12 -L -L--L---I---L--L---1---1---1------1---I---L--1---I---L--L---I-- 10 -L -L--L------L--L---1---1---1---1---1---1---L--1------L--L---I-- 8 - L--------L--------L---------L------L--L------L-- ---I-- 6 - --T--------+---------+------L--+------L-- ---I-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type // 24-hr 25-yr - 24hr Rainfa11=5.76" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 210 Hydrograph for Link 18L: Post Development #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.01 0.00 0.01 9.00 0.03 0.00 0.03 10.00 0.07 0.00 0.07 11.00 0.25 0.00 0.25 12.00 17.22 0.00 17.22 13.00 5.86 0.00 5.86 14.00 4.01 0.00 4.01 15.00 3.14 0.00 3.14 16.00 3.00 0.00 3.00 17.00 2.76 0.00 2.76 18.00 2.50 0.00 2.50 19.00 2.23 0.00 2.23 20.00 1.95 0.00 1.95 21.00 1.75 0.00 1.75 22.00 1.63 0.00 1.63 23.00 1.55 0.00 1.55 24.00 1.48 0.00 1.48 25.00 0.73 0.00 0.73 26.00 0.49 0.00 0.49 27.00 0.41 0.00 0.41 28.00 0.39 0.00 0.39 29.00 0.39 0.00 0.39 30.00 0.39 0.00 0.39 31.00 0.38 0.00 0.38 32.00 0.38 0.00 0.38 33.00 0.38 0.00 0.38 34.00 0.37 0.00 0.37 35.00 0.37 0.00 0.37 36.00 0.36 0.00 0.36 37.00 0.36 0.00 0.36 38.00 0.36 0.00 0.36 39.00 0.35 0.00 0.35 40.00 0.35 0.00 0.35 41.00 0.34 0.00 0.34 42.00 0.34 0.00 0.34 43.00 0.34 0.00 0.34 44.00 0.33 0.00 0.33 45.00 0.33 0.00 0.33 46.00 0.32 0.00 0.32 47.00 0.32 0.00 0.32 48.00 0.32 0.00 0.32 49.00 0.31 0.00 0.31 50.00 0.31 0.00 0.31 51.00 0.30 0.00 0.30 52.00 0.30 0.00 0.30 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.29 0.00 0.29 54.00 0.29 0.00 0.29 55.00 0.28 0.00 0.28 56.00 0.28 0.00 0.28 57.00 0.28 0.00 0.28 58.00 0.27 0.00 0.27 59.00 0.27 0.00 0.27 60.00 0.26 0.00 0.26 61.00 0.26 0.00 0.26 62.00 0.25 0.00 0.25 63.00 0.25 0.00 0.25 64.00 0.24 0.00 0.24 65.00 0.24 0.00 0.24 66.00 0.23 0.00 0.23 67.00 0.23 0.00 0.23 68.00 0.22 0.00 0.22 69.00 0.22 0.00 0.22 70.00 0.21 0.00 0.21 71.00 0.21 0.00 0.21 72.00 0.20 0.00 0.20 73.00 0.20 0.00 0.20 74.00 0.19 0.00 0.19 75.00 0.19 0.00 0.19 76.00 0.18 0.00 0.18 77.00 0.18 0.00 0.18 78.00 0.17 0.00 0.17 79.00 0.17 0.00 0.17 80.00 0.16 0.00 0.16 81.00 0.16 0.00 0.16 82.00 0.15 0.00 0.15 83.00 0.15 0.00 0.15 84.00 0.14 0.00 0.14 85.00 0.14 0.00 0.14 86.00 0.14 0.00 0.14 87.00 0.13 0.00 0.13 88.00 0.13 0.00 0.13 89.00 0.13 0.00 0.13 90.00 0.13 0.00 0.13 91.00 0.12 0.00 0.12 92.00 0.12 0.00 0.12 93.00 0.12 0.00 0.12 94.00 0.12 0.00 0.12 95.00 0.12 0.00 0.12 96.00 0.12 0.00 0.12 97.00 0.11 0.00 0.11 98.00 0.11 0.00 0.11 99.00 0.11 0.00 0.11 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 211 Time span=0.00-99.00 hrs, dt=0.05 hrs, 1981 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre-Development#1 Runoff Area=30.590 ac 3.53% Impervious Runoff Depth=1.97" Tc=21.7 min CN=57 Runoff=59.50 cfs 5.034 of Subcatchment2S: Pre-Development#2 Runoff Area=5.620 ac 0.00% Impervious Runoff Depth=1.80" Tc=24.9 min CN=55 Runoff=8.89 cfs 0.844 of Subcatchment8S: BMP #1 Runoff Area=12.980 ac 0.00% Impervious Runoff Depth=2.52" Tc=5.0 min CN=63 Runoff=58.79 cfs 2.724 of Subcatchment9S: BMP #2 Runoff Area=9.670 ac 0.00% Impervious Runoff Depth=4.22" Tc=5.0 min CN=80 Runoff=71.48 cfs 3.398 of Subcatchment10S: BMP#3 Runoff Area=6.900 ac 0.00% Impervious Runoff Depth=4.11" Tc=5.0 min CN=79 Runoff=49.92 cfs 2.364 of Subcatchment 11 S: Bypass#1 Runoff Area=5.580 ac 18.28% Impervious Runoff Depth=2.71" Tc=16.9 min CN=65 Runoff=18.10 cfs 1.258 of Subcatchment 12S: Bypass #2 Runoff Area=1.160 ac 0.00% Impervious Runoff Depth=2.06" Tc=24.9 min CN=58 Runoff=2.18 cfs 0.199 of Subcatchment 13S: Pre-Development#3 Runoff Area=9.070 ac 0.00% Impervious Runoff Depth=1.80" Tc=20.7 min CN=55 Runoff=16.20 cfs 1.361 of Subcatchment14S: Post Development#3 Runoff Area=8.990 ac 0.00% Impervious Runoff Depth=1.80" Tc=20.7 min CN=55 Runoff=16.05 cfs 1.349 of Pond 5P: BMP #1 Peak EIev=570.47' Storage=73,402 cf Inflow=58.79 cfs 2.724 of Primary=2.00 cfs 1.965 of Secondary=0.00 cfs 0.000 of Outflow=2.00 cfs 1.965 of Pond 6P: BMP #2 Peak EIev=562.91' Storage=64,367 cf Inflow=71.48 cfs 3.398 of Primary=37.82 cfs 3.385 of Secondary=0.00 cfs 0.000 of Outflow=37.82 cfs 3.385 of Pond 7P: BMP #3 Peak EIev=572.86' Storage=54,822 cf Inflow=49.92 cfs 2.364 of Primary=5.06 cfs 2.198 of Secondary=0.00 cfs 0.000 of Outflow=5.06 cfs 2.198 of Link 17L: Post Development#2 Inflow=7.12 cfs 2.398 of Primary=7.12 cfs 2.398 of Link 18L: Post Development#1 Inflow=55.05 cfs 6.608 of Primary=55.05 cfs 6.608 of Total Runoff Area = 90.560 ac Runoff Volume = 18.532 of Average Runoff Depth = 2.46" 97.68% Pervious = 88.460 ac 2.32% Impervious = 2.100 ac Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 212 Summary for Subcatchment 1S: Pre -Development #1 Runoff = 59.50 cfs @ 12.16 hrs, Volume= 5.034 af, Depth= 1.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50yr24hr Rainfall=6.48" Area (ac) CN Description 29.510 55 Woods, Good, HSG B 1.020 98 Water Surface, HSG B 0.060 98 Paved roads w/curbs & sewers, HSG B 30.590 57 Weighted Average 29.510 96.47% Pervious Area 1.080 3.53% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.7 Direct Entry, Subcatchment 1S: Pre -Development #1 Hydrograph I---i----- - - -li--- - - 65i--- ---li -----i------i------i---------il------r-- ■Runoff - 59.50 cfs --I--- ---I-- ---I-- ---I-- ---------------------------'--- 60---'i--- - ---I'--- I'i---I'--- I'i---I'------I'--- ---I'--- I'i---------h'a" 1 55 L!t -- --- - - --- -- --50 r24hr-R flnfa11=&A8w'-- 50 - - Rgnbff Area=X.590 -ad- - ------------- 45 1 1 1 1 1 1 1 1 1 -- ---------L------L--- -F uno �'-lu1mp-'-5.01'4 pf - 40 Q `T— N --J- -J---1___J------J------J------J------L---1___1___1___L---1---L-- w Runoff Depth =1;97" � 35 1 1 1 1 1 1 1 1 1 1 1 3 --+- -+------+------+------+------+---I- +- --I---+ ---- LL 30Tcr21.7 Min - - + - - - - - 1- - - + - - - - - - - - - 1- 25 -- ------'------'------'---+------+-------------+---'--- CN'11=57 20 --r- -r---r--r---1---r---r--r---1---r---r--r---1---r---1---r---1---r-- 15 r------r------T------r------T------r------T------r------r - - 10 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 213 Hydrograph for Subcatchment 1S: Pre -Development #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.22 0.00 0.00 4.00 0.31 0.00 0.00 5.00 0.41 0.00 0.00 6.00 0.52 0.00 0.00 7.00 0.64 0.00 0.00 8.00 0.78 0.00 0.00 9.00 0.95 0.00 0.00 10.00 1.17 0.00 0.00 11.00 1.52 0.00 0.00 12.00 4.30 0.75 30.70 13.00 5.00 1.11 8.67 14.00 5.31 1.28 4.83 15.00 5.53 1.40 3.68 16.00 5.70 1.50 2.95 17.00 5.84 1.58 2.53 18.00 5.97 1.66 2.27 19.00 6.08 1.72 1.99 20.00 6.17 1.78 1.70 21.00 6.25 1.83 1.57 22.00 6.33 1.88 1.52 23.00 6.41 1.93 1.47 24.00 6.48 1.97 1.42 25.00 6.48 1.97 0.00 26.00 6.48 1.97 0.00 27.00 6.48 1.97 0.00 28.00 6.48 1.97 0.00 29.00 6.48 1.97 0.00 30.00 6.48 1.97 0.00 31.00 6.48 1.97 0.00 32.00 6.48 1.97 0.00 33.00 6.48 1.97 0.00 34.00 6.48 1.97 0.00 35.00 6.48 1.97 0.00 36.00 6.48 1.97 0.00 37.00 6.48 1.97 0.00 38.00 6.48 1.97 0.00 39.00 6.48 1.97 0.00 40.00 6.48 1.97 0.00 41.00 6.48 1.97 0.00 42.00 6.48 1.97 0.00 43.00 6.48 1.97 0.00 44.00 6.48 1.97 0.00 45.00 6.48 1.97 0.00 46.00 6.48 1.97 0.00 47.00 6.48 1.97 0.00 48.00 6.48 1.97 0.00 49.00 6.48 1.97 0.00 50.00 6.48 1.97 0.00 51.00 6.48 1.97 0.00 52.00 6.48 1.97 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.48 1.97 0.00 54.00 6.48 1.97 0.00 55.00 6.48 1.97 0.00 56.00 6.48 1.97 0.00 57.00 6.48 1.97 0.00 58.00 6.48 1.97 0.00 59.00 6.48 1.97 0.00 60.00 6.48 1.97 0.00 61.00 6.48 1.97 0.00 62.00 6.48 1.97 0.00 63.00 6.48 1.97 0.00 64.00 6.48 1.97 0.00 65.00 6.48 1.97 0.00 66.00 6.48 1.97 0.00 67.00 6.48 1.97 0.00 68.00 6.48 1.97 0.00 69.00 6.48 1.97 0.00 70.00 6.48 1.97 0.00 71.00 6.48 1.97 0.00 72.00 6.48 1.97 0.00 73.00 6.48 1.97 0.00 74.00 6.48 1.97 0.00 75.00 6.48 1.97 0.00 76.00 6.48 1.97 0.00 77.00 6.48 1.97 0.00 78.00 6.48 1.97 0.00 79.00 6.48 1.97 0.00 80.00 6.48 1.97 0.00 81.00 6.48 1.97 0.00 82.00 6.48 1.97 0.00 83.00 6.48 1.97 0.00 84.00 6.48 1.97 0.00 85.00 6.48 1.97 0.00 86.00 6.48 1.97 0.00 87.00 6.48 1.97 0.00 88.00 6.48 1.97 0.00 89.00 6.48 1.97 0.00 90.00 6.48 1.97 0.00 91.00 6.48 1.97 0.00 92.00 6.48 1.97 0.00 93.00 6.48 1.97 0.00 94.00 6.48 1.97 0.00 95.00 6.48 1.97 0.00 96.00 6.48 1.97 0.00 97.00 6.48 1.97 0.00 98.00 6.48 1.97 0.00 99.00 6.48 1.97 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 214 Summary for Subcatchment 2S: Pre -Development #2 Runoff = 8.89 cfs @ 12.21 hrs, Volume= 0.844 af, Depth= 1.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50yr24hr Rainfall=6.48" Area (ac) CN Description 5.620 55 Woods, Good, HSG B 5.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 2S: Pre -Development #2 Hydrograph 8.89 ■Runoff cfs _T - - - T - - type I') 24-h'�r 50yr24hr Rainfall 6!48 7 ' Runoff Area=5.620 at 6 ' u11of 1�QCu,m�=�r844-af- -- -- - --- --- I--- --- I__I_ 1 I'- s 3 i�i�rro#f-Depth 1.8fl LL------- ---+------}------------- ------- T&24:9 Mi- 4 -- -- - -------------- ---- r--! -- ! -- rt---!CN! =5$- 3 -�-- -------t------t------t------r--t---r--t---r--t---r--t---i-- -- --------T------T------r------r-- ---T---------T---i--T---i-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 215 Hydrograph for Subcatchment 2S: Pre -Development #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.22 0.00 0.00 4.00 0.31 0.00 0.00 5.00 0.41 0.00 0.00 6.00 0.52 0.00 0.00 7.00 0.64 0.00 0.00 8.00 0.78 0.00 0.00 9.00 0.95 0.00 0.00 10.00 1.17 0.00 0.00 11.00 1.52 0.00 0.00 12.00 4.30 0.65 3.59 13.00 5.00 0.98 1.61 14.00 5.31 1.14 0.85 15.00 5.53 1.26 0.64 16.00 5.70 1.35 0.52 17.00 5.84 1.43 0.44 18.00 5.97 1.50 0.40 19.00 6.08 1.56 0.35 20.00 6.17 1.62 0.30 21.00 6.25 1.66 0.27 22.00 6.33 1.71 0.27 23.00 6.41 1.76 0.26 24.00 6.48 1.80 0.25 25.00 6.48 1.80 0.00 26.00 6.48 1.80 0.00 27.00 6.48 1.80 0.00 28.00 6.48 1.80 0.00 29.00 6.48 1.80 0.00 30.00 6.48 1.80 0.00 31.00 6.48 1.80 0.00 32.00 6.48 1.80 0.00 33.00 6.48 1.80 0.00 34.00 6.48 1.80 0.00 35.00 6.48 1.80 0.00 36.00 6.48 1.80 0.00 37.00 6.48 1.80 0.00 38.00 6.48 1.80 0.00 39.00 6.48 1.80 0.00 40.00 6.48 1.80 0.00 41.00 6.48 1.80 0.00 42.00 6.48 1.80 0.00 43.00 6.48 1.80 0.00 44.00 6.48 1.80 0.00 45.00 6.48 1.80 0.00 46.00 6.48 1.80 0.00 47.00 6.48 1.80 0.00 48.00 6.48 1.80 0.00 49.00 6.48 1.80 0.00 50.00 6.48 1.80 0.00 51.00 6.48 1.80 0.00 52.00 6.48 1.80 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.48 1.80 0.00 54.00 6.48 1.80 0.00 55.00 6.48 1.80 0.00 56.00 6.48 1.80 0.00 57.00 6.48 1.80 0.00 58.00 6.48 1.80 0.00 59.00 6.48 1.80 0.00 60.00 6.48 1.80 0.00 61.00 6.48 1.80 0.00 62.00 6.48 1.80 0.00 63.00 6.48 1.80 0.00 64.00 6.48 1.80 0.00 65.00 6.48 1.80 0.00 66.00 6.48 1.80 0.00 67.00 6.48 1.80 0.00 68.00 6.48 1.80 0.00 69.00 6.48 1.80 0.00 70.00 6.48 1.80 0.00 71.00 6.48 1.80 0.00 72.00 6.48 1.80 0.00 73.00 6.48 1.80 0.00 74.00 6.48 1.80 0.00 75.00 6.48 1.80 0.00 76.00 6.48 1.80 0.00 77.00 6.48 1.80 0.00 78.00 6.48 1.80 0.00 79.00 6.48 1.80 0.00 80.00 6.48 1.80 0.00 81.00 6.48 1.80 0.00 82.00 6.48 1.80 0.00 83.00 6.48 1.80 0.00 84.00 6.48 1.80 0.00 85.00 6.48 1.80 0.00 86.00 6.48 1.80 0.00 87.00 6.48 1.80 0.00 88.00 6.48 1.80 0.00 89.00 6.48 1.80 0.00 90.00 6.48 1.80 0.00 91.00 6.48 1.80 0.00 92.00 6.48 1.80 0.00 93.00 6.48 1.80 0.00 94.00 6.48 1.80 0.00 95.00 6.48 1.80 0.00 96.00 6.48 1.80 0.00 97.00 6.48 1.80 0.00 98.00 6.48 1.80 0.00 99.00 6.48 1.80 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 216 Summary for Subcatchment 8S: BMP #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 58.79 cfs @ 11.96 hrs, Volume= 2.724 af, Depth= 2.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50yr24hr Rainfall=6.48" Area (ac) CN Description 12.980 63 12.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: BMP #1 Hydrograph 65 58.79 cfs -----------+------+------+------ ------ ------ ------ -- 60 ' - -- - ------------+------+------+--------------24-h;r-- 55 I I - -- - --- --- +--- +--- 50 r24hr-R� nftI1=6.48f'-- 50 - -- - --- --- +--- +--- 45 Min dff Are+a=l2.980 at-- Runo VI Lump- 40 -- -- - - - - --- - - - --- ------ - - - --- Q Y� CI --+-- -+---+--+---+--+---+--+------+------ +--- I---+------+------+-- w 35 Runoff Depth =2;52�'_ I I I I I I I I I I I 0 30 Tt.=5.0 wnih --+ -+---r--+---r--+---r--+--- ---+--- ---+--- ---+---I---r---I----r-- 25 --T---T------T---r--T------T------T---r--r------r------ rCNII=6� - 20 --�--ki ---I--7---I T---T---rTr---r-- 15 7 T T r T r 10 ---T T-- - ---T- +------T------T--- ---T------T---I---T 5 I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 217 Hydrograph for Subcatchment 8S: BMP #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.22 0.00 0.00 4.00 0.31 0.00 0.00 5.00 0.41 0.00 0.00 6.00 0.52 0.00 0.00 7.00 0.64 0.00 0.00 8.00 0.78 0.00 0.00 9.00 0.95 0.00 0.00 10.00 1.17 0.00 0.00 11.00 1.52 0.02 0.58 12.00 4.30 1.08 52.71 13.00 5.00 1.51 3.48 14.00 5.31 1.71 2.14 15.00 5.53 1.86 1.73 16.00 5.70 1.97 1.36 17.00 5.84 2.07 1.21 18.00 5.97 2.15 1.07 19.00 6.08 2.23 0.93 20.00 6.17 2.30 0.79 21.00 6.25 2.35 0.76 22.00 6.33 2.41 0.73 23.00 6.41 2.47 0.70 24.00 6.48 2.52 0.68 25.00 6.48 2.52 0.00 26.00 6.48 2.52 0.00 27.00 6.48 2.52 0.00 28.00 6.48 2.52 0.00 29.00 6.48 2.52 0.00 30.00 6.48 2.52 0.00 31.00 6.48 2.52 0.00 32.00 6.48 2.52 0.00 33.00 6.48 2.52 0.00 34.00 6.48 2.52 0.00 35.00 6.48 2.52 0.00 36.00 6.48 2.52 0.00 37.00 6.48 2.52 0.00 38.00 6.48 2.52 0.00 39.00 6.48 2.52 0.00 40.00 6.48 2.52 0.00 41.00 6.48 2.52 0.00 42.00 6.48 2.52 0.00 43.00 6.48 2.52 0.00 44.00 6.48 2.52 0.00 45.00 6.48 2.52 0.00 46.00 6.48 2.52 0.00 47.00 6.48 2.52 0.00 48.00 6.48 2.52 0.00 49.00 6.48 2.52 0.00 50.00 6.48 2.52 0.00 51.00 6.48 2.52 0.00 52.00 6.48 2.52 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.48 2.52 0.00 54.00 6.48 2.52 0.00 55.00 6.48 2.52 0.00 56.00 6.48 2.52 0.00 57.00 6.48 2.52 0.00 58.00 6.48 2.52 0.00 59.00 6.48 2.52 0.00 60.00 6.48 2.52 0.00 61.00 6.48 2.52 0.00 62.00 6.48 2.52 0.00 63.00 6.48 2.52 0.00 64.00 6.48 2.52 0.00 65.00 6.48 2.52 0.00 66.00 6.48 2.52 0.00 67.00 6.48 2.52 0.00 68.00 6.48 2.52 0.00 69.00 6.48 2.52 0.00 70.00 6.48 2.52 0.00 71.00 6.48 2.52 0.00 72.00 6.48 2.52 0.00 73.00 6.48 2.52 0.00 74.00 6.48 2.52 0.00 75.00 6.48 2.52 0.00 76.00 6.48 2.52 0.00 77.00 6.48 2.52 0.00 78.00 6.48 2.52 0.00 79.00 6.48 2.52 0.00 80.00 6.48 2.52 0.00 81.00 6.48 2.52 0.00 82.00 6.48 2.52 0.00 83.00 6.48 2.52 0.00 84.00 6.48 2.52 0.00 85.00 6.48 2.52 0.00 86.00 6.48 2.52 0.00 87.00 6.48 2.52 0.00 88.00 6.48 2.52 0.00 89.00 6.48 2.52 0.00 90.00 6.48 2.52 0.00 91.00 6.48 2.52 0.00 92.00 6.48 2.52 0.00 93.00 6.48 2.52 0.00 94.00 6.48 2.52 0.00 95.00 6.48 2.52 0.00 96.00 6.48 2.52 0.00 97.00 6.48 2.52 0.00 98.00 6.48 2.52 0.00 99.00 6.48 2.52 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 218 Summary for Subcatchment 9S: BMP #2 [49] Hint: Tc<2dt may require smaller dt Runoff = 71.48 cfs @ 11.95 hrs, Volume= 3.398 af, Depth= 4.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50yr24hr Rainfall=6.48" Area (ac) CN Description 9.670 80 9.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: BMP #2 Hydrograph 80 i --J---'---�---'---I---1---1---'---L---'---1---'---L---'---I---'---L---'---L-- ■Runoff 75 71.48 cfs 70 tXpa-(I-2-4-h'r --------------- y =6.48" - -------------- a9 �2�h� Rairt� aII 60 7u rtoff-A�*ea=g. ss 7 at - 50 - -- - -- ---I--- -- --!------ PTurtoff-vQluMp=1398-clf - u 45 --J-- - i i _ - -- -- -- -- -- -- -- --i -- Rtanaf#D tFT=4:22L'-- 3 40 ------------------------------------------i yip a 35 �. 1 1 30 ---,-- - li---,--- li---i--- li---i--- li---i--- li--------------------CN'�=-80 25 20 15 10 5 1 L--L- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 219 Hydrograph for Subcatchment 9S: BMP #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.22 0.00 0.00 4.00 0.31 0.00 0.00 5.00 0.41 0.00 0.00 6.00 0.52 0.00 0.01 7.00 0.64 0.01 0.12 8.00 0.78 0.03 0.25 9.00 0.95 0.07 0.54 10.00 1.17 0.14 0.91 11.00 1.52 0.30 2.12 12.00 4.30 2.29 61.29 13.00 5.00 2.90 3.58 14.00 5.31 3.17 2.15 15.00 5.53 3.36 1.72 16.00 5.70 3.51 1.33 17.00 5.84 3.64 1.17 18.00 5.97 3.75 1.04 19.00 6.08 3.85 0.90 20.00 6.17 3.93 0.76 21.00 6.25 4.01 0.72 22.00 6.33 4.08 0.69 23.00 6.41 4.15 0.66 24.00 6.48 4.22 0.64 25.00 6.48 4.22 0.00 26.00 6.48 4.22 0.00 27.00 6.48 4.22 0.00 28.00 6.48 4.22 0.00 29.00 6.48 4.22 0.00 30.00 6.48 4.22 0.00 31.00 6.48 4.22 0.00 32.00 6.48 4.22 0.00 33.00 6.48 4.22 0.00 34.00 6.48 4.22 0.00 35.00 6.48 4.22 0.00 36.00 6.48 4.22 0.00 37.00 6.48 4.22 0.00 38.00 6.48 4.22 0.00 39.00 6.48 4.22 0.00 40.00 6.48 4.22 0.00 41.00 6.48 4.22 0.00 42.00 6.48 4.22 0.00 43.00 6.48 4.22 0.00 44.00 6.48 4.22 0.00 45.00 6.48 4.22 0.00 46.00 6.48 4.22 0.00 47.00 6.48 4.22 0.00 48.00 6.48 4.22 0.00 49.00 6.48 4.22 0.00 50.00 6.48 4.22 0.00 51.00 6.48 4.22 0.00 52.00 6.48 4.22 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.48 4.22 0.00 54.00 6.48 4.22 0.00 55.00 6.48 4.22 0.00 56.00 6.48 4.22 0.00 57.00 6.48 4.22 0.00 58.00 6.48 4.22 0.00 59.00 6.48 4.22 0.00 60.00 6.48 4.22 0.00 61.00 6.48 4.22 0.00 62.00 6.48 4.22 0.00 63.00 6.48 4.22 0.00 64.00 6.48 4.22 0.00 65.00 6.48 4.22 0.00 66.00 6.48 4.22 0.00 67.00 6.48 4.22 0.00 68.00 6.48 4.22 0.00 69.00 6.48 4.22 0.00 70.00 6.48 4.22 0.00 71.00 6.48 4.22 0.00 72.00 6.48 4.22 0.00 73.00 6.48 4.22 0.00 74.00 6.48 4.22 0.00 75.00 6.48 4.22 0.00 76.00 6.48 4.22 0.00 77.00 6.48 4.22 0.00 78.00 6.48 4.22 0.00 79.00 6.48 4.22 0.00 80.00 6.48 4.22 0.00 81.00 6.48 4.22 0.00 82.00 6.48 4.22 0.00 83.00 6.48 4.22 0.00 84.00 6.48 4.22 0.00 85.00 6.48 4.22 0.00 86.00 6.48 4.22 0.00 87.00 6.48 4.22 0.00 88.00 6.48 4.22 0.00 89.00 6.48 4.22 0.00 90.00 6.48 4.22 0.00 91.00 6.48 4.22 0.00 92.00 6.48 4.22 0.00 93.00 6.48 4.22 0.00 94.00 6.48 4.22 0.00 95.00 6.48 4.22 0.00 96.00 6.48 4.22 0.00 97.00 6.48 4.22 0.00 98.00 6.48 4.22 0.00 99.00 6.48 4.22 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 220 Summary for Subcatchment 10S: BMP #3 [49] Hint: Tc<2dt may require smaller dt Runoff = 49.92 cfs @ 11.95 hrs, Volume= 2.364 af, Depth= 4.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50yr24hr Rainfall=6.48" Area (ac) CN Description 6.900 79 6.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: BMP #3 Hydrograph ---------------------------------------------------- 55 i i i i i i i i i i i i i i i i i i i � Runoff 49.92 cfs - -'I- - - - - -'I- - - t - - -'I- - - t - - -'I- - - Y - - -'I- - - r - - -'I- - - t - - -'I - - - r - - -'I - - - r - 50t e I24-hr 45 50yr24hr Rainfall =6;48nr 40 Runoff Area=6.900 at 35 Runoff VQIu'Imq=2'L36'14 clf --T- -------------7------T------T---I---T---I---T---I---T---I---T-- 30- Runoff Depth=4;11" 3 -- ---L---1---L--- 1--- i--- 1--- L--- '---1--- ---L--- ' --- L- -- L- ' ---L-- 25 Tt.=5.0 min --�-- - i ---II -- i---I--- i ---II -- i---I--- i- - -I--- i---I--- I ---I--- ;CN'I�7$ - 20 --J-- -L---1---L---1---1---1---1------1---I---L---I---L---I---L---I---L-- 15 - 7-- _ 7 T T T T 7 T-- 10 -- ---L---1---L---1---1- L 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 221 Hydrograph for Subcatchment 10S: BMP #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.22 0.00 0.00 4.00 0.31 0.00 0.00 5.00 0.41 0.00 0.00 6.00 0.52 0.00 0.00 7.00 0.64 0.00 0.06 8.00 0.78 0.02 0.15 9.00 0.95 0.06 0.35 10.00 1.17 0.12 0.60 11.00 1.52 0.27 1.43 12.00 4.30 2.21 42.90 13.00 5.00 2.80 2.52 14.00 5.31 3.07 1.51 15.00 5.53 3.26 1.21 16.00 5.70 3.42 0.94 17.00 5.84 3.54 0.83 18.00 5.97 3.65 0.73 19.00 6.08 3.75 0.63 20.00 6.17 3.83 0.53 21.00 6.25 3.91 0.51 22.00 6.33 3.98 0.49 23.00 6.41 4.05 0.47 24.00 6.48 4.11 0.45 25.00 6.48 4.11 0.00 26.00 6.48 4.11 0.00 27.00 6.48 4.11 0.00 28.00 6.48 4.11 0.00 29.00 6.48 4.11 0.00 30.00 6.48 4.11 0.00 31.00 6.48 4.11 0.00 32.00 6.48 4.11 0.00 33.00 6.48 4.11 0.00 34.00 6.48 4.11 0.00 35.00 6.48 4.11 0.00 36.00 6.48 4.11 0.00 37.00 6.48 4.11 0.00 38.00 6.48 4.11 0.00 39.00 6.48 4.11 0.00 40.00 6.48 4.11 0.00 41.00 6.48 4.11 0.00 42.00 6.48 4.11 0.00 43.00 6.48 4.11 0.00 44.00 6.48 4.11 0.00 45.00 6.48 4.11 0.00 46.00 6.48 4.11 0.00 47.00 6.48 4.11 0.00 48.00 6.48 4.11 0.00 49.00 6.48 4.11 0.00 50.00 6.48 4.11 0.00 51.00 6.48 4.11 0.00 52.00 6.48 4.11 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.48 4.11 0.00 54.00 6.48 4.11 0.00 55.00 6.48 4.11 0.00 56.00 6.48 4.11 0.00 57.00 6.48 4.11 0.00 58.00 6.48 4.11 0.00 59.00 6.48 4.11 0.00 60.00 6.48 4.11 0.00 61.00 6.48 4.11 0.00 62.00 6.48 4.11 0.00 63.00 6.48 4.11 0.00 64.00 6.48 4.11 0.00 65.00 6.48 4.11 0.00 66.00 6.48 4.11 0.00 67.00 6.48 4.11 0.00 68.00 6.48 4.11 0.00 69.00 6.48 4.11 0.00 70.00 6.48 4.11 0.00 71.00 6.48 4.11 0.00 72.00 6.48 4.11 0.00 73.00 6.48 4.11 0.00 74.00 6.48 4.11 0.00 75.00 6.48 4.11 0.00 76.00 6.48 4.11 0.00 77.00 6.48 4.11 0.00 78.00 6.48 4.11 0.00 79.00 6.48 4.11 0.00 80.00 6.48 4.11 0.00 81.00 6.48 4.11 0.00 82.00 6.48 4.11 0.00 83.00 6.48 4.11 0.00 84.00 6.48 4.11 0.00 85.00 6.48 4.11 0.00 86.00 6.48 4.11 0.00 87.00 6.48 4.11 0.00 88.00 6.48 4.11 0.00 89.00 6.48 4.11 0.00 90.00 6.48 4.11 0.00 91.00 6.48 4.11 0.00 92.00 6.48 4.11 0.00 93.00 6.48 4.11 0.00 94.00 6.48 4.11 0.00 95.00 6.48 4.11 0.00 96.00 6.48 4.11 0.00 97.00 6.48 4.11 0.00 98.00 6.48 4.11 0.00 99.00 6.48 4.11 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 222 Summary for Subcatchment 11S: Bypass #1 Runoff = 18.10 cfs @ 12.10 hrs, Volume= 1.258 af, Depth= 2.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50yr24hr Rainfall=6.48" Area (ac) CN Description 4.560 58 Woods/grass comb., Good, HSG B 1.020 98 Water Surface, HSG B 5.580 65 Weighted Average 4.560 81.72% Pervious Area 1.020 18.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.9 Direct Entry, 19 18 17 1E 1E 14 12 12 11 3 1C o LL Subcatchment 11S: Bypass #1 Hydrograph --J------J---1---J---------+---I-- ------L------L-- --J---I---L---I---L---I---L---I---L---I---L---I---L---I---L---I---L---I---L-- ■Runoff - 18.10 cfs--II------II------II------II------II------II------II------II--- -- --+--+---+--+---+--+---+--+------+---+--+---I---Tye 24-h;r-- - - ----'I---------rt------t------50yr24hr t�infal1=6 U''-- -_- -- T- - T-RhnrOff=Aeea= .5$0at-- --J -- I----I------I--- ---- I I - - - I I I - -FI�u rroff-VQl 'umq=111,.25'1,6- ---I-----------------I---T - - -I -- I-Runaf# Depth=2:71y --J---�---I---�---I---L---I---L---I---L---I---L---I---L�Ci-�1��-�-��1-- J - - - - - - J - - - - - - L - - - - - - -IL - - -I I I - - + - - - + - - - I- - - + - - - - - - + - - - I- - - + - - -- --T--------------T------T------T---I---T---I---T------T------T-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 223 Hydrograph for Subcatchment 11S: Bypass #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.22 0.00 0.00 4.00 0.31 0.00 0.00 5.00 0.41 0.00 0.00 6.00 0.52 0.00 0.00 7.00 0.64 0.00 0.00 8.00 0.78 0.00 0.00 9.00 0.95 0.00 0.00 10.00 1.17 0.00 0.02 11.00 1.52 0.03 0.26 12.00 4.30 1.20 13.30 13.00 5.00 1.66 1.81 14.00 5.31 1.87 1.05 15.00 5.53 2.02 0.81 16.00 5.70 2.14 0.64 17.00 5.84 2.24 0.55 18.00 5.97 2.33 0.49 19.00 6.08 2.41 0.43 20.00 6.17 2.47 0.37 21.00 6.25 2.54 0.34 22.00 6.33 2.59 0.33 23.00 6.41 2.65 0.32 24.00 6.48 2.71 0.30 25.00 6.48 2.71 0.00 26.00 6.48 2.71 0.00 27.00 6.48 2.71 0.00 28.00 6.48 2.71 0.00 29.00 6.48 2.71 0.00 30.00 6.48 2.71 0.00 31.00 6.48 2.71 0.00 32.00 6.48 2.71 0.00 33.00 6.48 2.71 0.00 34.00 6.48 2.71 0.00 35.00 6.48 2.71 0.00 36.00 6.48 2.71 0.00 37.00 6.48 2.71 0.00 38.00 6.48 2.71 0.00 39.00 6.48 2.71 0.00 40.00 6.48 2.71 0.00 41.00 6.48 2.71 0.00 42.00 6.48 2.71 0.00 43.00 6.48 2.71 0.00 44.00 6.48 2.71 0.00 45.00 6.48 2.71 0.00 46.00 6.48 2.71 0.00 47.00 6.48 2.71 0.00 48.00 6.48 2.71 0.00 49.00 6.48 2.71 0.00 50.00 6.48 2.71 0.00 51.00 6.48 2.71 0.00 52.00 6.48 2.71 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.48 2.71 0.00 54.00 6.48 2.71 0.00 55.00 6.48 2.71 0.00 56.00 6.48 2.71 0.00 57.00 6.48 2.71 0.00 58.00 6.48 2.71 0.00 59.00 6.48 2.71 0.00 60.00 6.48 2.71 0.00 61.00 6.48 2.71 0.00 62.00 6.48 2.71 0.00 63.00 6.48 2.71 0.00 64.00 6.48 2.71 0.00 65.00 6.48 2.71 0.00 66.00 6.48 2.71 0.00 67.00 6.48 2.71 0.00 68.00 6.48 2.71 0.00 69.00 6.48 2.71 0.00 70.00 6.48 2.71 0.00 71.00 6.48 2.71 0.00 72.00 6.48 2.71 0.00 73.00 6.48 2.71 0.00 74.00 6.48 2.71 0.00 75.00 6.48 2.71 0.00 76.00 6.48 2.71 0.00 77.00 6.48 2.71 0.00 78.00 6.48 2.71 0.00 79.00 6.48 2.71 0.00 80.00 6.48 2.71 0.00 81.00 6.48 2.71 0.00 82.00 6.48 2.71 0.00 83.00 6.48 2.71 0.00 84.00 6.48 2.71 0.00 85.00 6.48 2.71 0.00 86.00 6.48 2.71 0.00 87.00 6.48 2.71 0.00 88.00 6.48 2.71 0.00 89.00 6.48 2.71 0.00 90.00 6.48 2.71 0.00 91.00 6.48 2.71 0.00 92.00 6.48 2.71 0.00 93.00 6.48 2.71 0.00 94.00 6.48 2.71 0.00 95.00 6.48 2.71 0.00 96.00 6.48 2.71 0.00 97.00 6.48 2.71 0.00 98.00 6.48 2.71 0.00 99.00 6.48 2.71 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 224 Summary for Subcatchment 12S: Bypass #2 Runoff = 2.18 cfs @ 12.20 hrs, Volume= 0.199 af, Depth= 2.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50yr24hr Rainfall=6.48" Area (ac) CN Description 1.160 58 Woods/grass comb., Good, HSG B 1.160 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 12S: Bypass #2 Hydrograph I I I I I I I I I I I I I I I I I I I ■Runoff 2.18 cfs -------7------T------r---'I-- -- - Type II 24 fir- 2 50yr2�4hr Rainfall' 6!487 Runoff Area=1.160 at Runoff VQI6mq=6r159 clf Runoff Depth'I, 2!067 LL I I I I I I 1 I I I I I I I I I I I I I I CN'I=50 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 225 Hydrograph for Subcatchment 12S: Bypass #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.22 0.00 0.00 4.00 0.31 0.00 0.00 5.00 0.41 0.00 0.00 6.00 0.52 0.00 0.00 7.00 0.64 0.00 0.00 8.00 0.78 0.00 0.00 9.00 0.95 0.00 0.00 10.00 1.17 0.00 0.00 11.00 1.52 0.00 0.00 12.00 4.30 0.80 0.96 13.00 5.00 1.17 0.37 14.00 5.31 1.35 0.19 15.00 5.53 1.47 0.15 16.00 5.70 1.57 0.12 17.00 5.84 1.66 0.10 18.00 5.97 1.74 0.09 19.00 6.08 1.80 0.08 20.00 6.17 1.86 0.07 21.00 6.25 1.92 0.06 22.00 6.33 1.97 0.06 23.00 6.41 2.02 0.06 24.00 6.48 2.06 0.06 25.00 6.48 2.06 0.00 26.00 6.48 2.06 0.00 27.00 6.48 2.06 0.00 28.00 6.48 2.06 0.00 29.00 6.48 2.06 0.00 30.00 6.48 2.06 0.00 31.00 6.48 2.06 0.00 32.00 6.48 2.06 0.00 33.00 6.48 2.06 0.00 34.00 6.48 2.06 0.00 35.00 6.48 2.06 0.00 36.00 6.48 2.06 0.00 37.00 6.48 2.06 0.00 38.00 6.48 2.06 0.00 39.00 6.48 2.06 0.00 40.00 6.48 2.06 0.00 41.00 6.48 2.06 0.00 42.00 6.48 2.06 0.00 43.00 6.48 2.06 0.00 44.00 6.48 2.06 0.00 45.00 6.48 2.06 0.00 46.00 6.48 2.06 0.00 47.00 6.48 2.06 0.00 48.00 6.48 2.06 0.00 49.00 6.48 2.06 0.00 50.00 6.48 2.06 0.00 51.00 6.48 2.06 0.00 52.00 6.48 2.06 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.48 2.06 0.00 54.00 6.48 2.06 0.00 55.00 6.48 2.06 0.00 56.00 6.48 2.06 0.00 57.00 6.48 2.06 0.00 58.00 6.48 2.06 0.00 59.00 6.48 2.06 0.00 60.00 6.48 2.06 0.00 61.00 6.48 2.06 0.00 62.00 6.48 2.06 0.00 63.00 6.48 2.06 0.00 64.00 6.48 2.06 0.00 65.00 6.48 2.06 0.00 66.00 6.48 2.06 0.00 67.00 6.48 2.06 0.00 68.00 6.48 2.06 0.00 69.00 6.48 2.06 0.00 70.00 6.48 2.06 0.00 71.00 6.48 2.06 0.00 72.00 6.48 2.06 0.00 73.00 6.48 2.06 0.00 74.00 6.48 2.06 0.00 75.00 6.48 2.06 0.00 76.00 6.48 2.06 0.00 77.00 6.48 2.06 0.00 78.00 6.48 2.06 0.00 79.00 6.48 2.06 0.00 80.00 6.48 2.06 0.00 81.00 6.48 2.06 0.00 82.00 6.48 2.06 0.00 83.00 6.48 2.06 0.00 84.00 6.48 2.06 0.00 85.00 6.48 2.06 0.00 86.00 6.48 2.06 0.00 87.00 6.48 2.06 0.00 88.00 6.48 2.06 0.00 89.00 6.48 2.06 0.00 90.00 6.48 2.06 0.00 91.00 6.48 2.06 0.00 92.00 6.48 2.06 0.00 93.00 6.48 2.06 0.00 94.00 6.48 2.06 0.00 95.00 6.48 2.06 0.00 96.00 6.48 2.06 0.00 97.00 6.48 2.06 0.00 98.00 6.48 2.06 0.00 99.00 6.48 2.06 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 226 Summary for Subcatchment 13S: Pre -Development #3 Runoff = 16.20 cfs @ 12.16 hrs, Volume= 1.361 af, Depth= 1.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50yr24hr Rainfall=6.48" Area (ac) CN Description 9.070 55 Woods, Good, HSG B 9.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 13S: Pre -Development #3 Hydrograph 18 -- -----------------+------+------+------------+-----------�-- ■Runoff 17 16.20 cfs-----------i------i------------L---------------w---L-- 16 -- ----'---'---'---'---'----------'---'---'---'------'rype-0-211 -hl� - 1 1�" 15---I--- - ------ ---I--- I I ---- -----------------T-----il----- T------I Ir11 ---II---rI 14 --- SOYr24qRainfaR=6.4v' r 1---1------1-I---1+-I--- T-I--- 13 ---T--R-urtof-Ater9.070-ad -- - - 1121 --- +-- -- +------+' --+------+' --+------+' --+------' --- Iu-+Vi+---I-=- 1+ I1-+ riou'mQ - ^ � I I I I I I I I I I I I I I I I I I 10 -- - - --- - --- - --- + -- --- + --- R naf# Depth=1;801'-- 3 9 -- $ -'-----------'- '---'-'---'- '--- LL I I I '---'---'---T' c- 2O.7- wnih - - - - - - r_ 7 --- - - -- --T------T------T------T------T------T------CM''=55- 5 --�- - ----------I---rt---I---+------+------t------+------r------r-- 4 ---- -------L---1---1---1---+---'---+------L------L------L------L-- I I I I I I I I I I I I I I I I I I 3 --L-- L---1---L---1---1---1---1---'---1------L------L------L------L-- 2 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 227 Hydrograph for Subcatchment 13S: Pre -Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.22 0.00 0.00 4.00 0.31 0.00 0.00 5.00 0.41 0.00 0.00 6.00 0.52 0.00 0.00 7.00 0.64 0.00 0.00 8.00 0.78 0.00 0.00 9.00 0.95 0.00 0.00 10.00 1.17 0.00 0.00 11.00 1.52 0.00 0.00 12.00 4.30 0.65 8.46 13.00 5.00 0.98 2.34 14.00 5.31 1.14 1.33 15.00 5.53 1.26 1.02 16.00 5.70 1.35 0.82 17.00 5.84 1.43 0.71 18.00 5.97 1.50 0.63 19.00 6.08 1.56 0.56 20.00 6.17 1.62 0.48 21.00 6.25 1.66 0.44 22.00 6.33 1.71 0.43 23.00 6.41 1.76 0.41 24.00 6.48 1.80 0.40 25.00 6.48 1.80 0.00 26.00 6.48 1.80 0.00 27.00 6.48 1.80 0.00 28.00 6.48 1.80 0.00 29.00 6.48 1.80 0.00 30.00 6.48 1.80 0.00 31.00 6.48 1.80 0.00 32.00 6.48 1.80 0.00 33.00 6.48 1.80 0.00 34.00 6.48 1.80 0.00 35.00 6.48 1.80 0.00 36.00 6.48 1.80 0.00 37.00 6.48 1.80 0.00 38.00 6.48 1.80 0.00 39.00 6.48 1.80 0.00 40.00 6.48 1.80 0.00 41.00 6.48 1.80 0.00 42.00 6.48 1.80 0.00 43.00 6.48 1.80 0.00 44.00 6.48 1.80 0.00 45.00 6.48 1.80 0.00 46.00 6.48 1.80 0.00 47.00 6.48 1.80 0.00 48.00 6.48 1.80 0.00 49.00 6.48 1.80 0.00 50.00 6.48 1.80 0.00 51.00 6.48 1.80 0.00 52.00 6.48 1.80 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.48 1.80 0.00 54.00 6.48 1.80 0.00 55.00 6.48 1.80 0.00 56.00 6.48 1.80 0.00 57.00 6.48 1.80 0.00 58.00 6.48 1.80 0.00 59.00 6.48 1.80 0.00 60.00 6.48 1.80 0.00 61.00 6.48 1.80 0.00 62.00 6.48 1.80 0.00 63.00 6.48 1.80 0.00 64.00 6.48 1.80 0.00 65.00 6.48 1.80 0.00 66.00 6.48 1.80 0.00 67.00 6.48 1.80 0.00 68.00 6.48 1.80 0.00 69.00 6.48 1.80 0.00 70.00 6.48 1.80 0.00 71.00 6.48 1.80 0.00 72.00 6.48 1.80 0.00 73.00 6.48 1.80 0.00 74.00 6.48 1.80 0.00 75.00 6.48 1.80 0.00 76.00 6.48 1.80 0.00 77.00 6.48 1.80 0.00 78.00 6.48 1.80 0.00 79.00 6.48 1.80 0.00 80.00 6.48 1.80 0.00 81.00 6.48 1.80 0.00 82.00 6.48 1.80 0.00 83.00 6.48 1.80 0.00 84.00 6.48 1.80 0.00 85.00 6.48 1.80 0.00 86.00 6.48 1.80 0.00 87.00 6.48 1.80 0.00 88.00 6.48 1.80 0.00 89.00 6.48 1.80 0.00 90.00 6.48 1.80 0.00 91.00 6.48 1.80 0.00 92.00 6.48 1.80 0.00 93.00 6.48 1.80 0.00 94.00 6.48 1.80 0.00 95.00 6.48 1.80 0.00 96.00 6.48 1.80 0.00 97.00 6.48 1.80 0.00 98.00 6.48 1.80 0.00 99.00 6.48 1.80 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 228 Summary for Subcatchment 14S: Post Development #3 Runoff = 16.05 cfs @ 12.16 hrs, Volume= 1.349 af, Depth= 1.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50yr24hr Rainfall=6.48" Area (ac) CN Description 8.670 55 Woods, Good, HSG B 0.320 58 Woods/grass comb., Good, HSG B 8.990 55 Weighted Average 8.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 14S: Post Development #3 Hydrograph --y---Ir--�---Ir--�---Ir--rt---Ir--+---Ii---+---Ii---r---Ii---+---Ii---r---I---r-- ■Runoff 17 - 16.05 cfs------------------------------------------------------- -- 16 --L- - - L- - L- - T- - T- - L- - 15 6 13-- -II -- - - - -II -- I -- T --Runoff-1�1ee& .9 9W at-- 12 11 -- -------------- - --------+------F Un4_f-V_QIUm =1 34119- f - u 10 -- -- - ------ ------------+------+- -- Ru-noff Depth=11801' 3 9 --L--L---I---L---1---1---1---1---'---1---'---L---'---LTT//-►►?-A' nL 7-'L�L�-----77-yL�L�7-- 6 ---I- - T---I--- T---I--- T---I--- T---I--- T--------------------III= - --T- -------T--- ---T------T--- ---T--- ---T---I--- T--- ---T------T-- 5 --+-- -+------+------+------+------+------+------+------+------+-- 4 --�-- ------------------------------+------+-----------+-- 3 --J-----L--------L------L------L------L------L--J---L------L-- 2 ----- --------------------------- 1 I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 229 Hydrograph for Subcatchment 14S: Post Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.22 0.00 0.00 4.00 0.31 0.00 0.00 5.00 0.41 0.00 0.00 6.00 0.52 0.00 0.00 7.00 0.64 0.00 0.00 8.00 0.78 0.00 0.00 9.00 0.95 0.00 0.00 10.00 1.17 0.00 0.00 11.00 1.52 0.00 0.00 12.00 4.30 0.65 8.38 13.00 5.00 0.98 2.31 14.00 5.31 1.14 1.32 15.00 5.53 1.26 1.01 16.00 5.70 1.35 0.82 17.00 5.84 1.43 0.70 18.00 5.97 1.50 0.63 19.00 6.08 1.56 0.55 20.00 6.17 1.62 0.47 21.00 6.25 1.66 0.44 22.00 6.33 1.71 0.42 23.00 6.41 1.76 0.41 24.00 6.48 1.80 0.40 25.00 6.48 1.80 0.00 26.00 6.48 1.80 0.00 27.00 6.48 1.80 0.00 28.00 6.48 1.80 0.00 29.00 6.48 1.80 0.00 30.00 6.48 1.80 0.00 31.00 6.48 1.80 0.00 32.00 6.48 1.80 0.00 33.00 6.48 1.80 0.00 34.00 6.48 1.80 0.00 35.00 6.48 1.80 0.00 36.00 6.48 1.80 0.00 37.00 6.48 1.80 0.00 38.00 6.48 1.80 0.00 39.00 6.48 1.80 0.00 40.00 6.48 1.80 0.00 41.00 6.48 1.80 0.00 42.00 6.48 1.80 0.00 43.00 6.48 1.80 0.00 44.00 6.48 1.80 0.00 45.00 6.48 1.80 0.00 46.00 6.48 1.80 0.00 47.00 6.48 1.80 0.00 48.00 6.48 1.80 0.00 49.00 6.48 1.80 0.00 50.00 6.48 1.80 0.00 51.00 6.48 1.80 0.00 52.00 6.48 1.80 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.48 1.80 0.00 54.00 6.48 1.80 0.00 55.00 6.48 1.80 0.00 56.00 6.48 1.80 0.00 57.00 6.48 1.80 0.00 58.00 6.48 1.80 0.00 59.00 6.48 1.80 0.00 60.00 6.48 1.80 0.00 61.00 6.48 1.80 0.00 62.00 6.48 1.80 0.00 63.00 6.48 1.80 0.00 64.00 6.48 1.80 0.00 65.00 6.48 1.80 0.00 66.00 6.48 1.80 0.00 67.00 6.48 1.80 0.00 68.00 6.48 1.80 0.00 69.00 6.48 1.80 0.00 70.00 6.48 1.80 0.00 71.00 6.48 1.80 0.00 72.00 6.48 1.80 0.00 73.00 6.48 1.80 0.00 74.00 6.48 1.80 0.00 75.00 6.48 1.80 0.00 76.00 6.48 1.80 0.00 77.00 6.48 1.80 0.00 78.00 6.48 1.80 0.00 79.00 6.48 1.80 0.00 80.00 6.48 1.80 0.00 81.00 6.48 1.80 0.00 82.00 6.48 1.80 0.00 83.00 6.48 1.80 0.00 84.00 6.48 1.80 0.00 85.00 6.48 1.80 0.00 86.00 6.48 1.80 0.00 87.00 6.48 1.80 0.00 88.00 6.48 1.80 0.00 89.00 6.48 1.80 0.00 90.00 6.48 1.80 0.00 91.00 6.48 1.80 0.00 92.00 6.48 1.80 0.00 93.00 6.48 1.80 0.00 94.00 6.48 1.80 0.00 95.00 6.48 1.80 0.00 96.00 6.48 1.80 0.00 97.00 6.48 1.80 0.00 98.00 6.48 1.80 0.00 99.00 6.48 1.80 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 230 Summary for Pond 5P: BMP #1 Inflow Area = 12.980 ac, 0.00% Impervious, Inflow Depth = 2.52" for 50yr24hr event Inflow = 58.79 cfs @ 11.96 hrs, Volume= 2.724 of Outflow = 2.00 cfs @ 14.24 hrs, Volume= 1.965 af, Atten= 97%, Lag= 136.5 min Primary = 2.00 cfs @ 14.24 hrs, Volume= 1.965 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 570.47' @ 14.24 hrs Surf.Area= 22,611 sf Storage= 73,402 cf Plug -Flow detention time= 1,316.3 min calculated for 1.965 of (72% of inflow) Center -of -Mass det. time= 1,210.7 min ( 2,057.2 - 846.4 ) Volume Invert Avail.Storage Storage Description #1 566.50' 137,597 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 566.50 13,995 0 0 567.00 15,551 7,387 7,387 568.00 17,503 16,527 23,914 569.00 19,519 18,511 42,425 570.00 21,600 20,560 62,984 571.00 23,745 22,673 85,657 572.00 25,954 24,850 110,506 573.00 28,228 27,091 137,597 Device Routing Invert Outlet Devices #1 Primary 561.90' 36.0" Round RCP -Round 36" L= 187.7' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 561.90' / 560.89' S= 0.0054 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 566.50' 1.7" Vert. WQ Orrfice C= 0.600 #3 Device 1 570.10' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.90 Width (feet) 2.50 2.50 #4 Device 1 571.00' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 571.80' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.00 cfs @ 14.24 hrs HW=570.47' (Free Discharge) L1=RCP_Round 36" (Passes 2.00 cfs of 90.91 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.15 cfs @ 9.51 fps) 3=Custom Weir/Orifice (Weir Controls 1.85 cfs @ 2.00 fps) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 231 Hydrograph --L--L--1--1--L--J--J---1---1---1---1---1---L--L--L--L--1--1--L-- 58.79 cfS -r--r--r--r- - 1 -1---1----l-.w-I�--�-,b------------------------ ■Inflow Ena��Ouff Infloww 65■ -- - - -- ------------------hifl vv Area-1 2.980-ae- Ir- ■Primary Secondary 60 --r- -+--+------ ---1---1---1---1--- -r--Ir r--�- + eak� E_ lev-570 47 $tor a=7,3}402-c�f 50 -- - -+--+-- -- ----------------- - 45 40 I---Ir--Ir--r--r--r w 35 --r- -t--t--rt-- -- ---li---li---li---li--- -------- 0 30 LL -- - - -- ----------------------- -- -- -- -- -- -- -- -- 25 20 - - T - 1 - T - - T 1 - - T - - T - - T - - -I- - -I- - -I- - -I- - -I - - T - - T - - T - - T - - T- 15 10 2.00 cfS 0.00 cfS 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 573 572 571 w w c 570 0 .� w w 569 568 567 Pond 5P: BMP #1 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 232 Pond 5P: BMP #1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 F Surface ❑ Storage 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 233 Hydrograph for Pond 5P: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 566.50 0.00 0.00 0.00 2.50 0.00 0 566.50 0.00 0.00 0.00 5.00 0.00 0 566.50 0.00 0.00 0.00 7.50 0.00 0 566.50 0.00 0.00 0.00 10.00 0.00 0 566.50 0.00 0.00 0.00 12.50 5.42 62,323 569.97 0.14 0.14 0.00 15.00 1.73 73,126 570.46 1.91 1.91 0.00 17.50 1.14 71,131 570.37 1.30 1.30 0.00 20.00 0.79 69,796 570.31 0.94 0.94 0.00 22.50 0.72 69,060 570.28 0.76 0.76 0.00 25.00 0.00 67,134 570.19 0.37 0.37 0.00 27.50 0.00 65,145 570.10 0.14 0.14 0.00 30.00 0.00 63,867 570.04 0.14 0.14 0.00 32.50 0.00 62,600 569.98 0.14 0.14 0.00 35.00 0.00 61,344 569.92 0.14 0.14 0.00 37.50 0.00 60,098 569.87 0.14 0.14 0.00 40.00 0.00 58,864 569.81 0.14 0.14 0.00 42.50 0.00 57,641 569.75 0.14 0.14 0.00 45.00 0.00 56,428 569.69 0.13 0.13 0.00 47.50 0.00 55,227 569.63 0.13 0.13 0.00 50.00 0.00 54,037 569.58 0.13 0.13 0.00 52.50 0.00 52,859 569.52 0.13 0.13 0.00 55.00 0.00 51,691 569.46 0.13 0.13 0.00 57.50 0.00 50,535 569.41 0.13 0.13 0.00 60.00 0.00 49,391 569.35 0.13 0.13 0.00 62.50 0.00 48,258 569.29 0.13 0.13 0.00 65.00 0.00 47,136 569.24 0.12 0.12 0.00 67.50 0.00 46,027 569.18 0.12 0.12 0.00 70.00 0.00 44,929 569.13 0.12 0.12 0.00 72.50 0.00 43,842 569.07 0.12 0.12 0.00 75.00 0.00 42,768 569.02 0.12 0.12 0.00 77.50 0.00 41,705 568.96 0.12 0.12 0.00 80.00 0.00 40,655 568.91 0.12 0.12 0.00 82.50 0.00 39,617 568.86 0.11 0.11 0.00 85.00 0.00 38,590 568.80 0.11 0.11 0.00 87.50 0.00 37,576 568.75 0.11 0.11 0.00 90.00 0.00 36,574 568.70 0.11 0.11 0.00 92.50 0.00 35,585 568.64 0.11 0.11 0.00 95.00 0.00 34,608 568.59 0.11 0.11 0.00 97.50 0.00 33,643 568.54 0.11 0.11 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 234 Stage -Discharge for Pond 5P: BMP #1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 566.50 0.00 0.00 0.00 566.60 0.01 0.01 0.00 566.70 0.03 0.03 0.00 566.80 0.04 0.04 0.00 566.90 0.04 0.04 0.00 567.00 0.05 0.05 0.00 567.10 0.06 0.06 0.00 567.20 0.06 0.06 0.00 567.30 0.06 0.06 0.00 567.40 0.07 0.07 0.00 567.50 0.07 0.07 0.00 567.60 0.08 0.08 0.00 567.70 0.08 0.08 0.00 567.80 0.08 0.08 0.00 567.90 0.09 0.09 0.00 568.00 0.09 0.09 0.00 568.10 0.09 0.09 0.00 568.20 0.10 0.10 0.00 568.30 0.10 0.10 0.00 568.40 0.10 0.10 0.00 568.50 0.11 0.11 0.00 568.60 0.11 0.11 0.00 568.70 0.11 0.11 0.00 568.80 0.11 0.11 0.00 568.90 0.12 0.12 0.00 569.00 0.12 0.12 0.00 569.10 0.12 0.12 0.00 569.20 0.12 0.12 0.00 569.30 0.13 0.13 0.00 569.40 0.13 0.13 0.00 569.50 0.13 0.13 0.00 569.60 0.13 0.13 0.00 569.70 0.13 0.13 0.00 569.80 0.14 0.14 0.00 569.90 0.14 0.14 0.00 570.00 0.14 0.14 0.00 570.10 0.14 0.14 0.00 570.20 0.40 0.40 0.00 570.30 0.88 0.88 0.00 570.40 1.49 1.49 0.00 570.50 2.22 2.22 0.00 570.60 3.05 3.05 0.00 570.70 3.96 3.96 0.00 570.80 4.95 4.95 0.00 570.90 6.02 6.02 0.00 571.00 7.15 7.15 0.00 571.10 9.74 9.74 0.00 571.20 13.56 13.56 0.00 571.30 18.18 18.18 0.00 571.40 23.47 23.47 0.00 571.50 29.33 29.33 0.00 571.60 35.72 35.72 0.00 571.70 42.59 42.59 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 571.80 49.90 49.90 0.00 571.90 58.42 57.63 0.79 572.00 67.98 65.75 2.23 572.10 78.40 74.25 4.15 572.20 89.59 83.11 6.48 572.30 101.61 92.31 9.30 572.40 114.40 101.85 12.55 572.50 119.76 103.98 15.78 572.60 123.83 104.58 19.25 572.70 128.10 105.18 22.92 572.80 132.57 105.77 26.80 572.90 137.34 106.37 30.98 573.00 142.31 106.95 35.36 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 235 Stage -Area -Storage for Pond 5P: BMP #1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 566.50 13,995 0 566.60 14,306 1,415 566.70 14,617 2,861 566.80 14,929 4,339 566.90 15,240 5,847 567.00 15,551 7,387 567.10 15,746 8,951 567.20 15,941 10,536 567.30 16,137 12,140 567.40 16,332 13,763 567.50 16,527 15,406 567.60 16,722 17,068 567.70 16,917 18,750 567.80 17,113 20,452 567.90 17,308 22,173 568.00 17,503 23,914 568.10 17,705 25,674 568.20 17,906 27,454 568.30 18,108 29,255 568.40 18,309 31,076 568.50 18,511 32,917 568.60 18,713 34,778 568.70 18,914 36,660 568.80 19,116 38,561 568.90 19,317 40,483 569.00 19,519 42,425 569.10 19,727 44,387 569.20 19,935 46,370 569.30 20,143 48,374 569.40 20,351 50,399 569.50 20,560 52,444 569.60 20,768 54,510 569.70 20,976 56,598 569.80 21,184 58,706 569.90 21,392 60,834 570.00 21,600 62,984 570.10 21,815 65,155 570.20 22,029 67,347 570.30 22,243 69,561 570.40 22,458 71,796 570.50 22,673 74,052 570.60 22,887 76,330 570.70 23,102 78,630 570.80 23,316 80,950 570.90 23,530 83,293 571.00 23,745 85,657 571.10 23,966 88,042 571.20 24,187 90,450 571.30 24,408 92,879 571.40 24,629 95,331 571.50 24,850 97,805 571.60 25,070 100,301 571.70 25,291 102,819 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 571.80 25,512 105,359 571.90 25,733 107,922 572.00 25,954 110,506 572.10 26,181 113,113 572.20 26,409 115,742 572.30 26,636 118,395 572.40 26,864 121,070 572.50 27,091 123,767 572.60 27,318 126,488 572.70 27,546 129,231 572.80 27,773 131,997 572.90 28,001 134,786 573.00 28,228 137,597 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 236 Summary for Pond 6P: BMP #2 Inflow Area = 9.670 ac, 0.00% Impervious, Inflow Depth = 4.22" for 50yr24hr event Inflow = 71.48 cfs @ 11.95 hrs, Volume= 3.398 of Outflow = 37.82 cfs @ 12.05 hrs, Volume= 3.385 af, Atten= 47%, Lag= 6.0 min Primary = 37.82 cfs @ 12.05 hrs, Volume= 3.385 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 562.91' @ 12.05 hrs Surf.Area= 19,196 sf Storage= 64,367 cf Plug -Flow detention time= 545.6 min calculated for 3.385 of (100% of inflow) Center -of -Mass det. time= 543.2 min ( 1,350.3 - 807.0 ) Volume Invert Avail.Storage Storage Description #1 558.50' 109,406 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 558.50 9,762 0 0 559.00 11,233 5,249 5,249 560.00 13,167 12,200 17,449 561.00 15,175 14,171 31,620 562.00 17,251 16,213 47,833 563.00 19,395 18,323 66,156 564.00 21,608 20,502 86,657 565.00 23,890 22,749 109,406 Device Routing Invert Outlet Devices #1 Primary 553.90' 36.0" Round RCP -Round 36" L= 92.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 553.90' / 553.00' S= 0.0097 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 558.50' 2.5" Vert. WQ Orrfice C= 0.600 #3 Device 1 561.05' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.15 Width (feet) 1.00 1.00 #4 Device 1 562.20' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 563.95' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=37.28 cfs @ 12.05 hrs HW=562.90' (Free Discharge) L1=RCP_Round 36" (Passes 37.28 cfs of 108.92 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.34 cfs @ 9.98 fps) 3=Custom Weir/Orifice (Orifice Controls 6.32 cfs @ 5.50 fps) 4=Top of Box (Weir Controls 30.62 cfs @ 2.74 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=558.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 237 Hydrograph 71.48 cfs -+--+--+--+------------------+--+--r--r--+--+--+-- ■Inflow ❑outflow - -- -- -- ---1---1---1---1---1--- -- -- -- -- -- -- -- ■ Primary 80 -11ftf]ow�Area=9.67oiaC 1 ■Secondary 75 - -----------------------Flea --- 70 65 - -- - 1I I 1 - -64367e#- �—, 60 -r-- T--T --r - -r --r- -I---I---I---I---i --r--r--r--r--r--r--r- 55 --r--T--T--rt-- -- ---1i---1i---1i---1i---1r--1r--1r--r--r--r--rt--rt-- 50 w 45 +--+--+--+--+------------------r--r--r--r--+--+--+-- 37.82 cfs - -- -- -- -- ------------------1 --1 -- -- -- -- -- -- V 40 -1--1--s--J--J- -1---1---1---1---1---L--L--L--L--1--1--1-- 0 LL 35 - -1--1----J--J---1---1---1---1---1---L--+--L--L--1--1--1-- 30 - - ---1---1---1---1---1---1--- 25 - ----1---11---1---1---1---1---;-- 20 T - -T - - -- -- ---1---1---1------T--T--T--T--T--T--T--T-- 15 10 0.00 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 565 564 563 w w c 562 0 .� w w 561 560 559 Pond 6P: BMP #2 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 238 Pond 6P: BMP #2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 0 20,000 40,000 60,000 80,000 100,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 239 Hydrograph for Pond 6P: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 558.50 0.00 0.00 0.00 2.50 0.00 0 558.50 0.00 0.00 0.00 5.00 0.00 0 558.50 0.00 0.00 0.00 7.50 0.19 496 558.55 0.01 0.01 0.00 10.00 0.91 4,344 558.92 0.09 0.09 0.00 12.50 5.69 53,911 562.34 7.88 7.88 0.00 15.00 1.72 44,394 561.80 2.41 2.41 0.00 17.50 1.11 40,069 561.54 1.40 1.40 0.00 20.00 0.76 37,943 561.41 0.97 0.97 0.00 22.50 0.68 36,751 561.33 0.76 0.76 0.00 25.00 0.00 34,532 561.19 0.44 0.44 0.00 27.50 0.00 31,778 561.01 0.25 0.25 0.00 30.00 0.00 29,523 560.86 0.25 0.25 0.00 32.50 0.00 27,341 560.71 0.24 0.24 0.00 35.00 0.00 25,234 560.57 0.23 0.23 0.00 37.50 0.00 23,203 560.42 0.22 0.22 0.00 40.00 0.00 21,250 560.28 0.21 0.21 0.00 42.50 0.00 19,376 560.14 0.20 0.20 0.00 45.00 0.00 17,583 560.01 0.19 0.19 0.00 47.50 0.00 15,873 559.88 0.19 0.19 0.00 50.00 0.00 14,248 559.75 0.18 0.18 0.00 52.50 0.00 12,708 559.63 0.17 0.17 0.00 55.00 0.00 11,256 559.51 0.16 0.16 0.00 57.50 0.00 9,894 559.40 0.15 0.15 0.00 60.00 0.00 8,622 559.29 0.14 0.14 0.00 62.50 0.00 7,443 559.19 0.13 0.13 0.00 65.00 0.00 6,358 559.10 0.12 0.12 0.00 67.50 0.00 5,368 559.01 0.10 0.10 0.00 70.00 0.00 4,476 558.93 0.09 0.09 0.00 72.50 0.00 3,683 558.86 0.08 0.08 0.00 75.00 0.00 2,991 558.79 0.07 0.07 0.00 77.50 0.00 2,401 558.74 0.06 0.06 0.00 80.00 0.00 1,915 558.69 0.05 0.05 0.00 82.50 0.00 1,539 558.65 0.04 0.04 0.00 85.00 0.00 1,262 558.63 0.03 0.03 0.00 87.50 0.00 1,053 558.61 0.02 0.02 0.00 90.00 0.00 893 558.59 0.02 0.02 0.00 92.50 0.00 771 558.58 0.01 0.01 0.00 95.00 0.00 678 558.57 0.01 0.01 0.00 97.50 0.00 606 558.56 0.01 0.01 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 240 Stage -Discharge for Pond 6P: BMP #2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 558.50 0.00 0.00 0.00 558.60 0.02 0.02 0.00 558.70 0.05 0.05 0.00 558.80 0.07 0.07 0.00 558.90 0.09 0.09 0.00 559.00 0.10 0.10 0.00 559.10 0.12 0.12 0.00 559.20 0.13 0.13 0.00 559.30 0.14 0.14 0.00 559.40 0.15 0.15 0.00 559.50 0.16 0.16 0.00 559.60 0.16 0.16 0.00 559.70 0.17 0.17 0.00 559.80 0.18 0.18 0.00 559.90 0.19 0.19 0.00 560.00 0.19 0.19 0.00 560.10 0.20 0.20 0.00 560.20 0.21 0.21 0.00 560.30 0.21 0.21 0.00 560.40 0.22 0.22 0.00 560.50 0.23 0.23 0.00 560.60 0.23 0.23 0.00 560.70 0.24 0.24 0.00 560.80 0.24 0.24 0.00 560.90 0.25 0.25 0.00 561.00 0.25 0.25 0.00 561.10 0.30 0.30 0.00 561.20 0.45 0.45 0.00 561.30 0.68 0.68 0.00 561.40 0.95 0.95 0.00 561.50 1.27 1.27 0.00 561.60 1.62 1.62 0.00 561.70 2.01 2.01 0.00 561.80 2.42 2.42 0.00 561.90 2.86 2.86 0.00 562.00 3.33 3.33 0.00 562.10 3.83 3.83 0.00 562.20 4.35 4.35 0.00 562.30 6.44 6.44 0.00 562.40 9.84 9.84 0.00 562.50 14.10 14.10 0.00 562.60 19.06 19.06 0.00 562.70 24.61 24.61 0.00 562.80 30.71 30.71 0.00 562.90 37.30 37.30 0.00 563.00 44.36 44.36 0.00 563.10 51.84 51.84 0.00 563.20 59.72 59.72 0.00 563.30 67.99 67.99 0.00 563.40 76.63 76.63 0.00 563.50 85.62 85.62 0.00 563.60 94.95 94.95 0.00 563.70 102.84 102.84 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 563.80 106.13 106.13 0.00 563.90 109.32 109.32 0.00 564.00 112.70 112.43 0.28 564.10 116.89 115.44 1.45 564.20 121.52 118.39 3.13 564.30 124.72 119.46 5.26 564.40 128.01 120.18 7.83 564.50 131.76 120.89 10.87 564.60 135.74 121.60 14.14 564.70 139.79 122.30 17.49 564.80 144.07 123.01 21.06 564.90 148.54 123.70 24.84 565.00 153.26 124.40 28.86 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 241 Stage -Area -Storage for Pond 6P: BMP #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 558.50 9,762 0 558.60 10,056 991 558.70 10,350 2,011 558.80 10,645 3,061 558.90 10,939 4,140 559.00 11,233 5,249 559.10 11,426 6,382 559.20 11,620 7,534 559.30 11,813 8,706 559.40 12,007 9,897 559.50 12,200 11,107 559.60 12,393 12,337 559.70 12,587 13,586 559.80 12,780 14,854 559.90 12,974 16,142 560.00 13,167 17,449 560.10 13,368 18,775 560.20 13,569 20,122 560.30 13,769 21,489 560.40 13,970 22,876 560.50 14,171 24,283 560.60 14,372 25,710 560.70 14,573 27,158 560.80 14,773 28,625 560.90 14,974 30,112 561.00 15,175 31,620 561.10 15,383 33,148 561.20 15,590 34,696 561.30 15,798 36,266 561.40 16,005 37,856 561.50 16,213 39,467 561.60 16,421 41,098 561.70 16,628 42,751 561.80 16,836 44,424 561.90 17,043 46,118 562.00 17,251 47,833 562.10 17,465 49,569 562.20 17,680 51,326 562.30 17,894 53,105 562.40 18,109 54,905 562.50 18,323 56,726 562.60 18,537 58,569 562.70 18,752 60,434 562.80 18,966 62,320 562.90 19,181 64,227 563.00 19,395 66,156 563.10 19,616 68,106 563.20 19,838 70,079 563.30 20,059 72,074 563.40 20,280 74,091 563.50 20,502 76,130 563.60 20,723 78,191 563.70 20,944 80,274 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 563.80 21,165 82,380 563.90 21,387 84,508 564.00 21,608 86,657 564.10 21,836 88,829 564.20 22,064 91,024 564.30 22,293 93,242 564.40 22,521 95,483 564.50 22,749 97,747 564.60 22,977 100,033 564.70 23,205 102,342 564.80 23,434 104,674 564.90 23,662 107,029 565.00 23,890 109,406 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 242 Summary for Pond 7P: BMP #3 Inflow Area = 6.900 ac, 0.00% Impervious, Inflow Depth = 4.11" for 50yr24hr event Inflow = 49.92 cfs @ 11.95 hrs, Volume= 2.364 of Outflow = 5.06 cfs @ 12.38 hrs, Volume= 2.198 af, Atten= 90%, Lag= 25.3 min Primary = 5.06 cfs @ 12.38 hrs, Volume= 2.198 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 572.86' @ 12.38 hrs Surf.Area= 15,694 sf Storage= 54,822 cf Plug -Flow detention time= 843.8 min calculated for 2.198 of (93% of inflow) Center -of -Mass det. time= 805.5 min ( 1,615.0 - 809.5 ) Volume Invert Avail.Storage Storage Description #1 568.50' 91,933 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 568.50 9,080 0 0 569.00 10,331 4,853 4,853 570.00 11,639 10,985 15,838 571.00 13,003 12,321 28,159 572.00 14,424 13,714 41,872 573.00 15,901 15,163 57,035 574.00 17,435 16,668 73,703 575.00 19,025 18,230 91,933 Device Routing Invert Outlet Devices #1 Primary 565.31' 24.0" Round RCP -Round 24" L= 61.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 565.31' / 565.00' S= 0.0051 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 568.50' 1.7" Vert. WQ Orfice C= 0.600 #3 Device 1 571.20' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 2.30 Width (feet) 0.70 0.70 #4 Device 1 573.50' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 574.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=5.06 cfs @ 12.38 hrs HW=572.86' (Free Discharge) L1=RCP_Round 24" (Passes 5.06 cfs of 43.56 cfs potential flow) �2=WQ Orfice (Orifice Controls 0.16 cfs @ 9.97 fps) 3=Custom Weir/Orifice (Weir Controls 4.90 cfs @ 4.22 fps) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=568.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 243 '1.7iL• f/ A =31�I I Vic%? Hydrograph 49.92 cfs ; -- ---------------------------I--- -- -- -- -- - ■Inflow ❑ Ouff low I I II I I II II I I1.l{l` ��i IyiI 1 11liI ■PrimaryIW1LQ��=6`7�0aV■Secondar y---- ____55 ---- so I I I I I I I I—eak- 1ev-=5 286!-- I ,IIII II III III III III�5#45 -------------%traE,-82a-cf - 40 ,II -- - - -- -----IIII------------------;--;--;--;--;-- -- -- -- 35 ,II -- - - -- -- III ---------------------II --II --II -- -- -- -- III -- III -- N I I I I I I I I I I I I I I I I I I 30 ,II -- - - -- -----IIII------------------I, --I, --I, -- -- -- -- -- -- 3 I I I I I I I I I I I I I I I I I I I 0 25 --r--r--r--r--r--r------------I---i --r--r--r--r--r--r--r-- LL 20 --r- -r--r--r--r--r---------------r--r--r--r--r--r--r--r-- 15 n R r--r-- -- -- ---li---li---Ir--Ir--Ir--Ir--Ir--r--r--r--r--r-- 10 5.06 cfs .i 0.00 cfS 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 575 574 573 w w c 572 0 .� w w 571 570 569 Pond 7P: BMP #3 Stage -Discharge 0 10 20 30 40 50 60 70 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 244 Pond 7P: BMP #3 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 245 Hydrograph for Pond 7P: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 568.50 0.00 0.00 0.00 2.50 0.00 0 568.50 0.00 0.00 0.00 5.00 0.00 0 568.50 0.00 0.00 0.00 7.50 0.11 240 568.53 0.00 0.00 0.00 10.00 0.60 2,801 568.80 0.04 0.04 0.00 12.50 4.00 54,597 572.85 5.00 5.00 0.00 15.00 1.21 42,738 572.06 1.97 1.97 0.00 17.50 0.78 38,304 571.75 1.07 1.07 0.00 20.00 0.53 36,290 571.61 0.72 0.72 0.00 22.50 0.48 35,185 571.53 0.56 0.56 0.00 25.00 0.00 33,456 571.40 0.33 0.33 0.00 27.50 0.00 31,459 571.25 0.15 0.15 0.00 30.00 0.00 30,294 571.16 0.12 0.12 0.00 32.50 0.00 29,203 571.08 0.12 0.12 0.00 35.00 0.00 28,130 571.00 0.12 0.12 0.00 37.50 0.00 27,075 570.92 0.12 0.12 0.00 40.00 0.00 26,038 570.84 0.11 0.11 0.00 42.50 0.00 25,019 570.76 0.11 0.11 0.00 45.00 0.00 24,019 570.68 0.11 0.11 0.00 47.50 0.00 23,037 570.60 0.11 0.11 0.00 50.00 0.00 22,074 570.52 0.11 0.11 0.00 52.50 0.00 21,130 570.44 0.10 0.10 0.00 55.00 0.00 20,205 570.37 0.10 0.10 0.00 57.50 0.00 19,299 570.29 0.10 0.10 0.00 60.00 0.00 18,413 570.22 0.10 0.10 0.00 62.50 0.00 17,546 570.15 0.10 0.10 0.00 65.00 0.00 16,698 570.07 0.09 0.09 0.00 67.50 0.00 15,871 570.00 0.09 0.09 0.00 70.00 0.00 15,064 569.93 0.09 0.09 0.00 72.50 0.00 14,277 569.86 0.09 0.09 0.00 75.00 0.00 13,510 569.80 0.08 0.08 0.00 77.50 0.00 12,764 569.73 0.08 0.08 0.00 80.00 0.00 12,038 569.67 0.08 0.08 0.00 82.50 0.00 11,333 569.60 0.08 0.08 0.00 85.00 0.00 10,650 569.54 0.07 0.07 0.00 87.50 0.00 9,987 569.48 0.07 0.07 0.00 90.00 0.00 9,346 569.42 0.07 0.07 0.00 92.50 0.00 8,726 569.37 0.07 0.07 0.00 95.00 0.00 8,127 569.31 0.07 0.07 0.00 97.50 0.00 7,551 569.26 0.06 0.06 0.00 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 246 Stage -Discharge for Pond 7P: BMP #3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 568.50 0.00 0.00 0.00 568.60 0.01 0.01 0.00 568.70 0.03 0.03 0.00 568.80 0.04 0.04 0.00 568.90 0.04 0.04 0.00 569.00 0.05 0.05 0.00 569.10 0.06 0.06 0.00 569.20 0.06 0.06 0.00 569.30 0.06 0.06 0.00 569.40 0.07 0.07 0.00 569.50 0.07 0.07 0.00 569.60 0.08 0.08 0.00 569.70 0.08 0.08 0.00 569.80 0.08 0.08 0.00 569.90 0.09 0.09 0.00 570.00 0.09 0.09 0.00 570.10 0.09 0.09 0.00 570.20 0.10 0.10 0.00 570.30 0.10 0.10 0.00 570.40 0.10 0.10 0.00 570.50 0.11 0.11 0.00 570.60 0.11 0.11 0.00 570.70 0.11 0.11 0.00 570.80 0.11 0.11 0.00 570.90 0.12 0.12 0.00 571.00 0.12 0.12 0.00 571.10 0.12 0.12 0.00 571.20 0.12 0.12 0.00 571.30 0.20 0.20 0.00 571.40 0.33 0.33 0.00 571.50 0.51 0.51 0.00 571.60 0.71 0.71 0.00 571.70 0.94 0.94 0.00 571.80 1.20 1.20 0.00 571.90 1.48 1.48 0.00 572.00 1.78 1.78 0.00 572.10 2.10 2.10 0.00 572.20 2.44 2.44 0.00 572.30 2.79 2.79 0.00 572.40 3.16 3.16 0.00 572.50 3.55 3.55 0.00 572.60 3.95 3.95 0.00 572.70 4.37 4.37 0.00 572.80 4.80 4.80 0.00 572.90 5.24 5.24 0.00 573.00 5.70 5.70 0.00 573.10 6.17 6.17 0.00 573.20 6.65 6.65 0.00 573.30 7.14 7.14 0.00 573.40 7.65 7.65 0.00 573.50 8.17 8.17 0.00 573.60 10.28 10.28 0.00 573.70 13.71 13.71 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 573.80 18.00 18.00 0.00 573.90 23.00 23.00 0.00 574.00 28.61 28.61 0.00 574.10 35.54 34.75 0.79 574.20 43.62 41.39 2.23 574.30 52.64 48.49 4.15 574.40 55.43 48.95 6.48 574.50 58.58 49.28 9.30 574.60 62.16 49.61 12.55 574.70 65.72 49.94 15.78 574.80 69.51 50.26 19.25 574.90 73.50 50.58 22.92 575.00 77.70 50.90 26.80 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 247 Stage -Area -Storage for Pond 7P: BMP #3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 568.50 9,080 0 568.60 9,330 921 568.70 9,580 1,866 568.80 9,831 2,837 568.90 10,081 3,832 569.00 10,331 4,853 569.10 10,462 5,892 569.20 10,593 6,945 569.30 10,723 8,011 569.40 10,854 9,090 569.50 10,985 10,182 569.60 11,116 11,287 569.70 11,247 12,405 569.80 11,377 13,536 569.90 11,508 14,680 570.00 11,639 15,838 570.10 11,775 17,008 570.20 11,912 18,193 570.30 12,048 19,391 570.40 12,185 20,602 570.50 12,321 21,828 570.60 12,457 23,067 570.70 12,594 24,319 570.80 12,730 25,585 570.90 12,867 26,865 571.00 13,003 28,159 571.10 13,145 29,466 571.20 13,287 30,788 571.30 13,429 32,124 571.40 13,571 33,474 571.50 13,714 34,838 571.60 13,856 36,216 571.70 13,998 37,609 571.80 14,140 39,016 571.90 14,282 40,437 572.00 14,424 41,872 572.10 14,572 43,322 572.20 14,719 44,787 572.30 14,867 46,266 572.40 15,015 47,760 572.50 15,163 49,269 572.60 15,310 50,793 572.70 15,458 52,331 572.80 15,606 53,884 572.90 15,753 55,452 573.00 15,901 57,035 573.10 16,054 58,633 573.20 16,208 60,246 573.30 16,361 61,874 573.40 16,515 63,518 573.50 16,668 65,177 573.60 16,821 66,851 573.70 16,975 68,541 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 573.80 17,128 70,246 573.90 17,282 71,967 574.00 17,435 73,703 574.10 17,594 75,454 574.20 17,753 77,222 574.30 17,912 79,005 574.40 18,071 80,804 574.50 18,230 82,619 574.60 18,389 84,450 574.70 18,548 86,297 574.80 18,707 88,160 574.90 18,866 90,038 575.00 19,025 91,933 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 248 Summary for Link 17L: Post Development #2 Inflow Area = 8.060 ac, 0.00% Impervious, Inflow Depth > 3.57" for 50yr24hr event Inflow = 7.12 cfs @ 12.22 hrs, Volume= 2.398 of Primary = 7.12 cfs @ 12.22 hrs, Volume= 2.398 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 17L: Post Development #2 Hydrograph I I I I I I I I I I I I I I I I I I Inflow 7.12 cfs -- III --- -_-- ---I- ❑ Primary 7 InfloW Aires=$.01116Q ac 6 s II II II II II II II II II II II II II II II II II II y I I I I I I I I I I I I I I I I I I U 4 0 - - - - + - - -I- - - - - + - - -I- - - ­ 4 - - -I- - - ­ 7 - - -I- - - - - - - -I- - - - - - - LL I I I I I I I I I I I I I I I I 3 - - 7 - T 7 - - T 7 - - T - - 7 7 - - 7 - - 7 - - 2 ---I --I---I----I---I---I----I---I---I----I---I---I----I---I---I----I-- 1 I I I I I I I I I I I I I I 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 249 Hydrograph for Link 17L: Post Development #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.02 0.00 0.02 10.00 0.04 0.00 0.04 11.00 0.06 0.00 0.06 12.00 3.52 0.00 3.52 13.00 4.59 0.00 4.59 14.00 3.00 0.00 3.00 15.00 2.12 0.00 2.12 16.00 1.60 0.00 1.60 17.00 1.27 0.00 1.27 18.00 1.07 0.00 1.07 19.00 0.92 0.00 0.92 20.00 0.79 0.00 0.79 21.00 0.70 0.00 0.70 22.00 0.64 0.00 0.64 23.00 0.60 0.00 0.60 24.00 0.56 0.00 0.56 25.00 0.33 0.00 0.33 26.00 0.23 0.00 0.23 27.00 0.17 0.00 0.17 28.00 0.14 0.00 0.14 29.00 0.12 0.00 0.12 30.00 0.12 0.00 0.12 31.00 0.12 0.00 0.12 32.00 0.12 0.00 0.12 33.00 0.12 0.00 0.12 34.00 0.12 0.00 0.12 35.00 0.12 0.00 0.12 36.00 0.12 0.00 0.12 37.00 0.12 0.00 0.12 38.00 0.12 0.00 0.12 39.00 0.12 0.00 0.12 40.00 0.11 0.00 0.11 41.00 0.11 0.00 0.11 42.00 0.11 0.00 0.11 43.00 0.11 0.00 0.11 44.00 0.11 0.00 0.11 45.00 0.11 0.00 0.11 46.00 0.11 0.00 0.11 47.00 0.11 0.00 0.11 48.00 0.11 0.00 0.11 49.00 0.11 0.00 0.11 50.00 0.11 0.00 0.11 51.00 0.11 0.00 0.11 52.00 0.10 0.00 0.10 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.10 0.00 0.10 54.00 0.10 0.00 0.10 55.00 0.10 0.00 0.10 56.00 0.10 0.00 0.10 57.00 0.10 0.00 0.10 58.00 0.10 0.00 0.10 59.00 0.10 0.00 0.10 60.00 0.10 0.00 0.10 61.00 0.10 0.00 0.10 62.00 0.10 0.00 0.10 63.00 0.09 0.00 0.09 64.00 0.09 0.00 0.09 65.00 0.09 0.00 0.09 66.00 0.09 0.00 0.09 67.00 0.09 0.00 0.09 68.00 0.09 0.00 0.09 69.00 0.09 0.00 0.09 70.00 0.09 0.00 0.09 71.00 0.09 0.00 0.09 72.00 0.09 0.00 0.09 73.00 0.09 0.00 0.09 74.00 0.08 0.00 0.08 75.00 0.08 0.00 0.08 76.00 0.08 0.00 0.08 77.00 0.08 0.00 0.08 78.00 0.08 0.00 0.08 79.00 0.08 0.00 0.08 80.00 0.08 0.00 0.08 81.00 0.08 0.00 0.08 82.00 0.08 0.00 0.08 83.00 0.08 0.00 0.08 84.00 0.08 0.00 0.08 85.00 0.07 0.00 0.07 86.00 0.07 0.00 0.07 87.00 0.07 0.00 0.07 88.00 0.07 0.00 0.07 89.00 0.07 0.00 0.07 90.00 0.07 0.00 0.07 91.00 0.07 0.00 0.07 92.00 0.07 0.00 0.07 93.00 0.07 0.00 0.07 94.00 0.07 0.00 0.07 95.00 0.07 0.00 0.07 96.00 0.06 0.00 0.06 97.00 0.06 0.00 0.06 98.00 0.06 0.00 0.06 99.00 0.06 0.00 0.06 Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 250 Summary for Link 18L: Post Development #1 Inflow Area = 28.230 ac, 3.61% Impervious, Inflow Depth > 2.81" for 50yr24hr event Inflow = 55.05 cfs @ 12.06 hrs, Volume= 6.608 of Primary = 55.05 cfs @ 12.06 hrs, Volume= 6.608 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 18L: Post Development #1 Hydrograph -- ---I--- T -- T- - -I--- T -- T - - -I--- T------ I - -- T- - -I--- T -- T---I--- T -- ---I-- ■ Inflow 60 '' 55.05 cfs --T -r--T---I---T- ----1---T-- ---1---T---1---T -- T---I--- r--T--- I - - - r--T �Rf]QwN =20.�3Qsaf.- ❑ Primary ry 55 � T- I- T- I- 1Arec 1 1 I I I 1 1 1 45 1 1 -- 1 -r-- 1 ---r--r--r---r--t---1---r--t---1---r--r---1---r-- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ---1-- 40 , --T -r--T---I---T--T---I---T---I---I---T---I- 1 1 --r--T---I---r--T---I-- w 35 -- -r-- ---1---r--r---1---r---1---1---r---1---r--r---1---r-- ---1-- � 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 30 -- -r-- ---1r--r--r---1r--r---1i---r--r---1i---r--r---1i---r-- ---1i-- p 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LL zs- i --- T- - ---+---1---1-__+---1---r--+---1---r--+---1-- 20 i +--r---1---+---1---1---+---1---r--+---1---r--r---1-- 1 15 -- - -- ---1---T-- ---1---+---1---1---+---1--- --+---1--- -- ---I-- 10 -- -- ---1---r-- ---1---r---1---1---r---1---r--r---1---r-- ---1-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 11 24-hr 50yr24hr Rainfall=6.48" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 251 Hydrograph for Link 18L: Post Development #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.01 0.00 0.01 9.00 0.05 0.00 0.05 10.00 0.11 0.00 0.11 11.00 0.40 0.00 0.40 12.00 42.72 0.00 42.72 13.00 7.08 0.00 7.08 14.00 6.31 0.00 6.31 15.00 5.14 0.00 5.14 16.00 4.16 0.00 4.16 17.00 3.46 0.00 3.46 18.00 3.01 0.00 3.01 19.00 2.63 0.00 2.63 20.00 2.28 0.00 2.28 21.00 2.04 0.00 2.04 22.00 1.90 0.00 1.90 23.00 1.80 0.00 1.80 24.00 1.71 0.00 1.71 25.00 0.81 0.00 0.81 26.00 0.52 0.00 0.52 27.00 0.42 0.00 0.42 28.00 0.40 0.00 0.40 29.00 0.39 0.00 0.39 30.00 0.39 0.00 0.39 31.00 0.38 0.00 0.38 32.00 0.38 0.00 0.38 33.00 0.38 0.00 0.38 34.00 0.37 0.00 0.37 35.00 0.37 0.00 0.37 36.00 0.37 0.00 0.37 37.00 0.36 0.00 0.36 38.00 0.36 0.00 0.36 39.00 0.35 0.00 0.35 40.00 0.35 0.00 0.35 41.00 0.35 0.00 0.35 42.00 0.34 0.00 0.34 43.00 0.34 0.00 0.34 44.00 0.33 0.00 0.33 45.00 0.33 0.00 0.33 46.00 0.32 0.00 0.32 47.00 0.32 0.00 0.32 48.00 0.32 0.00 0.32 49.00 0.31 0.00 0.31 50.00 0.31 0.00 0.31 51.00 0.30 0.00 0.30 52.00 0.30 0.00 0.30 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.29 0.00 0.29 54.00 0.29 0.00 0.29 55.00 0.29 0.00 0.29 56.00 0.28 0.00 0.28 57.00 0.28 0.00 0.28 58.00 0.27 0.00 0.27 59.00 0.27 0.00 0.27 60.00 0.26 0.00 0.26 61.00 0.26 0.00 0.26 62.00 0.25 0.00 0.25 63.00 0.25 0.00 0.25 64.00 0.24 0.00 0.24 65.00 0.24 0.00 0.24 66.00 0.23 0.00 0.23 67.00 0.23 0.00 0.23 68.00 0.22 0.00 0.22 69.00 0.22 0.00 0.22 70.00 0.21 0.00 0.21 71.00 0.21 0.00 0.21 72.00 0.21 0.00 0.21 73.00 0.20 0.00 0.20 74.00 0.20 0.00 0.20 75.00 0.19 0.00 0.19 76.00 0.18 0.00 0.18 77.00 0.18 0.00 0.18 78.00 0.17 0.00 0.17 79.00 0.17 0.00 0.17 80.00 0.16 0.00 0.16 81.00 0.16 0.00 0.16 82.00 0.15 0.00 0.15 83.00 0.15 0.00 0.15 84.00 0.14 0.00 0.14 85.00 0.14 0.00 0.14 86.00 0.14 0.00 0.14 87.00 0.13 0.00 0.13 88.00 0.13 0.00 0.13 89.00 0.13 0.00 0.13 90.00 0.13 0.00 0.13 91.00 0.12 0.00 0.12 92.00 0.12 0.00 0.12 93.00 0.12 0.00 0.12 94.00 0.12 0.00 0.12 95.00 0.12 0.00 0.12 96.00 0.12 0.00 0.12 97.00 0.11 0.00 0.11 98.00 0.11 0.00 0.11 99.00 0.11 0.00 0.11 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 252 Time span=0.00-99.00 hrs, dt=0.05 hrs, 1981 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre-Development#1 Runoff Area=30.590 ac 3.53% Impervious Runoff Depth=2.29" Tc=21.7 min CN=57 Runoff=70.03 cfs 5.829 of Subcatchment2S: Pre-Development#2 Runoff Area=5.620 ac 0.00% Impervious Runoff Depth=2.10" Tc=24.9 min CN=55 Runoff=10.59 cfs 0.983 of Subcatchment8S: BMP #1 Runoff Area=12.980 ac 0.00% Impervious Runoff Depth=2.87" Tc=5.0 min CN=63 Runoff=67.14 cfs 3.105 of Subcatchment9S: BMP #2 Runoff Area=9.670 ac 0.00% Impervious Runoff Depth=4.66" Tc=5.0 min CN=80 Runoff=78.56 cfs 3.753 of Subcatchment 10S: BMP #3 Runoff Area=6.900 ac 0.00% Impervious Runoff Depth=4.55" Tc=5.0 min CN=79 Runoff=54.97 cfs 2.615 of Subcatchment 11 S: Bypass #1 Runoff Area=5.580 ac 18.28% Impervious Runoff Depth=3.07" Tc=16.9 min CN=65 Runoff=20.63 cfs 1.428 of Subcatchment 12S: Bypass #2 Runoff Area=1.160 ac 0.00% Impervious Runoff Depth=2.38" Tc=24.9 min CN=58 Runoff=2.55 cfs 0.230 of Subcatchment 13S: Pre-Development#3 Runoff Area=9.070 ac 0.00% Impervious Runoff Depth=2.10" Tc=20.7 min CN=55 Runoff=19.26 cfs 1.586 of Subcatchment14S: Post Development#3 Runoff Area=8.990 ac 0.00% Impervious Runoff Depth=2.10" Tc=20.7 min CN=55 Runoff=19.09 cfs 1.572 of Pond 5P: BMP #1 Peak EIev=570.61' Storage=76,632 cf Inflow=67.14 cfs 3.105 of Primary=3.17 cfs 2.345 of Secondary=0.00 cfs 0.000 of Outflow=3.17 cfs 2.345 of Pond 6P: BMP #2 Peak EIev=563.05' Storage=67,180 cf Inflow=78.56 cfs 3.753 of Primary=48.21 cfs 3.740 of Secondary=0.00 cfs 0.000 of Outflow=48.21 cfs 3.740 of Pond 7P: BMP #3 Peak EIev=573.17' Storage=59,816 cf Inflow=54.97 cfs 2.615 of Primary=6.52 cfs 2.449 of Secondary=0.00 cfs 0.000 of Outflow=6.52 cfs 2.449 of Link 17L: Post Development#2 Inflow=9.05 cfs 2.679 of Primary=9.05 cfs 2.679 of Link 18L: Post Development#1 Inflow=67.22 cfs 7.514 of Primary=67.22 cfs 7.514 of Total Runoff Area = 90.560 ac Runoff Volume = 21.102 of Average Runoff Depth = 2.80" 97.68% Pervious = 88.460 ac 2.32% Impervious = 2.100 ac Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 253 Summary for Subcatchment 1S: Pre -Development #1 Runoff = 70.03 cfs @ 12.16 hrs, Volume= 5.829 af, Depth= 2.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr - 24 hr Rainfall=6.96" Area (ac) CN Description 29.510 55 Woods, Good, HSG B 1.020 98 Water Surface, HSG B 0.060 98 Paved roads w/curbs & sewers, HSG B 30.590 57 Weighted Average 29.510 96.47% Pervious Area 1.080 3.53% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.7 Direct Entry, Subcatchment 1S: Pre -Development #1 Hydrograph ---'---'----'---'----'---'----'---'---'----'----'---'---'----'---'----'---'----'---'--- ■Runoff 75 70.03 cfs ----- ------------+------+------ ------+------r------r-- 70 I _ Type- l_ 24-hr- - 65 --�--- - ------------rt---I--- t--- I---100. T 124-hr',Rai,n#e1��.9W' - 60- ------------------ ------ RunoffAima=30.590-ac - -------------- 55 -- - - -- -- - --- -- -- - --- Rurio�Vo'lun a=6.$29 �f - 50 -- - -L---1---L---'---L---'---L---'---L------L------L------L---'---L-- 45- Runoff Dlept'h=2.29'" U --T-LI T------T------T---I- r---I---r- I- T---I---r3 40 --L-L---1---1------L---I---L---I---L------I- Tc=2'1_7���1I'�in�jh�1�- 35 - jCN-- I-- -T-T---r--T------T------T---r--r------rI---r30 25r r T T r T r 2015 r r T T r T r r-- 10 s 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 254 Hydrograph for Subcatchment 1S: Pre -Development #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.15 0.00 0.00 3.00 0.24 0.00 0.00 4.00 0.33 0.00 0.00 5.00 0.44 0.00 0.00 6.00 0.56 0.00 0.00 7.00 0.69 0.00 0.00 8.00 0.84 0.00 0.00 9.00 1.02 0.00 0.00 10.00 1.26 0.00 0.00 11.00 1.64 0.00 0.05 12.00 4.61 0.91 37.41 13.00 5.37 1.31 9.87 14.00 5.71 1.50 5.46 15.00 5.94 1.64 4.15 16.00 6.12 1.75 3.33 17.00 6.28 1.85 2.85 18.00 6.41 1.93 2.55 19.00 6.53 2.00 2.23 20.00 6.63 2.07 1.91 21.00 6.71 2.13 1.76 22.00 6.80 2.18 1.71 23.00 6.88 2.23 1.65 24.00 6.96 2.29 1.59 25.00 6.96 2.29 0.01 26.00 6.96 2.29 0.00 27.00 6.96 2.29 0.00 28.00 6.96 2.29 0.00 29.00 6.96 2.29 0.00 30.00 6.96 2.29 0.00 31.00 6.96 2.29 0.00 32.00 6.96 2.29 0.00 33.00 6.96 2.29 0.00 34.00 6.96 2.29 0.00 35.00 6.96 2.29 0.00 36.00 6.96 2.29 0.00 37.00 6.96 2.29 0.00 38.00 6.96 2.29 0.00 39.00 6.96 2.29 0.00 40.00 6.96 2.29 0.00 41.00 6.96 2.29 0.00 42.00 6.96 2.29 0.00 43.00 6.96 2.29 0.00 44.00 6.96 2.29 0.00 45.00 6.96 2.29 0.00 46.00 6.96 2.29 0.00 47.00 6.96 2.29 0.00 48.00 6.96 2.29 0.00 49.00 6.96 2.29 0.00 50.00 6.96 2.29 0.00 51.00 6.96 2.29 0.00 52.00 6.96 2.29 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.96 2.29 0.00 54.00 6.96 2.29 0.00 55.00 6.96 2.29 0.00 56.00 6.96 2.29 0.00 57.00 6.96 2.29 0.00 58.00 6.96 2.29 0.00 59.00 6.96 2.29 0.00 60.00 6.96 2.29 0.00 61.00 6.96 2.29 0.00 62.00 6.96 2.29 0.00 63.00 6.96 2.29 0.00 64.00 6.96 2.29 0.00 65.00 6.96 2.29 0.00 66.00 6.96 2.29 0.00 67.00 6.96 2.29 0.00 68.00 6.96 2.29 0.00 69.00 6.96 2.29 0.00 70.00 6.96 2.29 0.00 71.00 6.96 2.29 0.00 72.00 6.96 2.29 0.00 73.00 6.96 2.29 0.00 74.00 6.96 2.29 0.00 75.00 6.96 2.29 0.00 76.00 6.96 2.29 0.00 77.00 6.96 2.29 0.00 78.00 6.96 2.29 0.00 79.00 6.96 2.29 0.00 80.00 6.96 2.29 0.00 81.00 6.96 2.29 0.00 82.00 6.96 2.29 0.00 83.00 6.96 2.29 0.00 84.00 6.96 2.29 0.00 85.00 6.96 2.29 0.00 86.00 6.96 2.29 0.00 87.00 6.96 2.29 0.00 88.00 6.96 2.29 0.00 89.00 6.96 2.29 0.00 90.00 6.96 2.29 0.00 91.00 6.96 2.29 0.00 92.00 6.96 2.29 0.00 93.00 6.96 2.29 0.00 94.00 6.96 2.29 0.00 95.00 6.96 2.29 0.00 96.00 6.96 2.29 0.00 97.00 6.96 2.29 0.00 98.00 6.96 2.29 0.00 99.00 6.96 2.29 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 255 Summary for Subcatchment 2S: Pre -Development #2 Runoff = 10.59 cfs @ 12.21 hrs, Volume= 0.983 af, Depth= 2.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr - 24 hr Rainfall=6.96" Area (ac) CN Description 5.620 55 Woods, Good, HSG B 5.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 2S: Pre -Development #2 Hydrograph 10.5 -- - -- -- - - -- -- - - -- -- -- -- ■Runoff 11 9 cfs --r--- ----r------t------r------r---I r Type-N 2"r 10 1 --100;1 y-r * 2-4'I,-hr 'RaalnfaII=6.9w' - -- -----Runoff Area=6.620-ac- $ Runoff Volume=0.983 of -- T-- - T T T T T T T T-- w 7 Runoff Dleptlh=2.10I" 3 6 I I TC=24.91 min O --�-- -L------L--- ---1---1---1------1------L--- ---L---I--- L--- I --- L-- LL s CNJ=55 4 --r -- -r---r--r---r--r---r--r---r--r---r--r------r------r------r-- 3 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 256 Hydrograph for Subcatchment 2S: Pre -Development #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.15 0.00 0.00 3.00 0.24 0.00 0.00 4.00 0.33 0.00 0.00 5.00 0.44 0.00 0.00 6.00 0.56 0.00 0.00 7.00 0.69 0.00 0.00 8.00 0.84 0.00 0.00 9.00 1.02 0.00 0.00 10.00 1.26 0.00 0.00 11.00 1.64 0.00 0.00 12.00 4.61 0.79 4.53 13.00 5.37 1.17 1.85 14.00 5.71 1.35 0.97 15.00 5.94 1.48 0.73 16.00 6.12 1.59 0.59 17.00 6.28 1.68 0.50 18.00 6.41 1.76 0.45 19.00 6.53 1.83 0.39 20.00 6.63 1.89 0.34 21.00 6.71 1.94 0.31 22.00 6.80 2.00 0.30 23.00 6.88 2.05 0.29 24.00 6.96 2.10 0.28 25.00 6.96 2.10 0.00 26.00 6.96 2.10 0.00 27.00 6.96 2.10 0.00 28.00 6.96 2.10 0.00 29.00 6.96 2.10 0.00 30.00 6.96 2.10 0.00 31.00 6.96 2.10 0.00 32.00 6.96 2.10 0.00 33.00 6.96 2.10 0.00 34.00 6.96 2.10 0.00 35.00 6.96 2.10 0.00 36.00 6.96 2.10 0.00 37.00 6.96 2.10 0.00 38.00 6.96 2.10 0.00 39.00 6.96 2.10 0.00 40.00 6.96 2.10 0.00 41.00 6.96 2.10 0.00 42.00 6.96 2.10 0.00 43.00 6.96 2.10 0.00 44.00 6.96 2.10 0.00 45.00 6.96 2.10 0.00 46.00 6.96 2.10 0.00 47.00 6.96 2.10 0.00 48.00 6.96 2.10 0.00 49.00 6.96 2.10 0.00 50.00 6.96 2.10 0.00 51.00 6.96 2.10 0.00 52.00 6.96 2.10 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.96 2.10 0.00 54.00 6.96 2.10 0.00 55.00 6.96 2.10 0.00 56.00 6.96 2.10 0.00 57.00 6.96 2.10 0.00 58.00 6.96 2.10 0.00 59.00 6.96 2.10 0.00 60.00 6.96 2.10 0.00 61.00 6.96 2.10 0.00 62.00 6.96 2.10 0.00 63.00 6.96 2.10 0.00 64.00 6.96 2.10 0.00 65.00 6.96 2.10 0.00 66.00 6.96 2.10 0.00 67.00 6.96 2.10 0.00 68.00 6.96 2.10 0.00 69.00 6.96 2.10 0.00 70.00 6.96 2.10 0.00 71.00 6.96 2.10 0.00 72.00 6.96 2.10 0.00 73.00 6.96 2.10 0.00 74.00 6.96 2.10 0.00 75.00 6.96 2.10 0.00 76.00 6.96 2.10 0.00 77.00 6.96 2.10 0.00 78.00 6.96 2.10 0.00 79.00 6.96 2.10 0.00 80.00 6.96 2.10 0.00 81.00 6.96 2.10 0.00 82.00 6.96 2.10 0.00 83.00 6.96 2.10 0.00 84.00 6.96 2.10 0.00 85.00 6.96 2.10 0.00 86.00 6.96 2.10 0.00 87.00 6.96 2.10 0.00 88.00 6.96 2.10 0.00 89.00 6.96 2.10 0.00 90.00 6.96 2.10 0.00 91.00 6.96 2.10 0.00 92.00 6.96 2.10 0.00 93.00 6.96 2.10 0.00 94.00 6.96 2.10 0.00 95.00 6.96 2.10 0.00 96.00 6.96 2.10 0.00 97.00 6.96 2.10 0.00 98.00 6.96 2.10 0.00 99.00 6.96 2.10 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 257 Summary for Subcatchment 8S: BMP #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 67.14 cfs @ 11.96 hrs, Volume= 3.105 af, Depth= 2.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr - 24 hr Rainfall=6.96" Area (ac) CN Description 12.980 63 12.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: BMP #1 Hydrograph 75 - - Runoff ------------------------------------------------ 70 67.14 cfs - - - --- 65 Type; fl 4hr 60 ---,-- - ---II --- - -, --- - - - II - - ------'100.yr.24,hrRa%nfall=6.96"- --J-- - ------ ---1---1---1---+------+---- 55 Runoff Area=1 2.98'0 ad - - - - - - T - - - - - - - - - - - + - - - - - T - - - I - - - T - - - I - - - T - - - I - - - T - - -I - - - T - - -I - - - + - - so -- -- -- ---Rufioff_Vd1unw=3-.1"-af- 45 --+---+---+--+---+--+---+--+------+---+--+ n N Runoff Depth=�-87+ 40 3 35 ---i-- - ---------i------i------i-------------i-----Tc,5.-On 6- 0 LL --�---�---�---�---�---+---�---+---�---+---�---+---�---+---�---� CND=6'3- 30 25 -- -- -1---1---1---1---1---'---1---'---1------+------+------L------+-- 20 -y-- ----r-----r--rt---r--+------t------+------+------r------r-- 15 10 --+---+---+--+---+--+- -+------+---+--+--+---+--+---+------+-- 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 258 Hydrograph for Subcatchment 8S: BMP #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.15 0.00 0.00 3.00 0.24 0.00 0.00 4.00 0.33 0.00 0.00 5.00 0.44 0.00 0.00 6.00 0.56 0.00 0.00 7.00 0.69 0.00 0.00 8.00 0.84 0.00 0.00 9.00 1.02 0.00 0.00 10.00 1.26 0.00 0.08 11.00 1.64 0.03 0.82 12.00 4.61 1.27 59.88 13.00 5.37 1.75 3.89 14.00 5.71 1.97 2.39 15.00 5.94 2.13 1.93 16.00 6.12 2.26 1.51 17.00 6.28 2.37 1.34 18.00 6.41 2.47 1.19 19.00 6.53 2.55 1.04 20.00 6.63 2.62 0.88 21.00 6.71 2.69 0.84 22.00 6.80 2.75 0.81 23.00 6.88 2.81 0.78 24.00 6.96 2.87 0.75 25.00 6.96 2.87 0.00 26.00 6.96 2.87 0.00 27.00 6.96 2.87 0.00 28.00 6.96 2.87 0.00 29.00 6.96 2.87 0.00 30.00 6.96 2.87 0.00 31.00 6.96 2.87 0.00 32.00 6.96 2.87 0.00 33.00 6.96 2.87 0.00 34.00 6.96 2.87 0.00 35.00 6.96 2.87 0.00 36.00 6.96 2.87 0.00 37.00 6.96 2.87 0.00 38.00 6.96 2.87 0.00 39.00 6.96 2.87 0.00 40.00 6.96 2.87 0.00 41.00 6.96 2.87 0.00 42.00 6.96 2.87 0.00 43.00 6.96 2.87 0.00 44.00 6.96 2.87 0.00 45.00 6.96 2.87 0.00 46.00 6.96 2.87 0.00 47.00 6.96 2.87 0.00 48.00 6.96 2.87 0.00 49.00 6.96 2.87 0.00 50.00 6.96 2.87 0.00 51.00 6.96 2.87 0.00 52.00 6.96 2.87 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.96 2.87 0.00 54.00 6.96 2.87 0.00 55.00 6.96 2.87 0.00 56.00 6.96 2.87 0.00 57.00 6.96 2.87 0.00 58.00 6.96 2.87 0.00 59.00 6.96 2.87 0.00 60.00 6.96 2.87 0.00 61.00 6.96 2.87 0.00 62.00 6.96 2.87 0.00 63.00 6.96 2.87 0.00 64.00 6.96 2.87 0.00 65.00 6.96 2.87 0.00 66.00 6.96 2.87 0.00 67.00 6.96 2.87 0.00 68.00 6.96 2.87 0.00 69.00 6.96 2.87 0.00 70.00 6.96 2.87 0.00 71.00 6.96 2.87 0.00 72.00 6.96 2.87 0.00 73.00 6.96 2.87 0.00 74.00 6.96 2.87 0.00 75.00 6.96 2.87 0.00 76.00 6.96 2.87 0.00 77.00 6.96 2.87 0.00 78.00 6.96 2.87 0.00 79.00 6.96 2.87 0.00 80.00 6.96 2.87 0.00 81.00 6.96 2.87 0.00 82.00 6.96 2.87 0.00 83.00 6.96 2.87 0.00 84.00 6.96 2.87 0.00 85.00 6.96 2.87 0.00 86.00 6.96 2.87 0.00 87.00 6.96 2.87 0.00 88.00 6.96 2.87 0.00 89.00 6.96 2.87 0.00 90.00 6.96 2.87 0.00 91.00 6.96 2.87 0.00 92.00 6.96 2.87 0.00 93.00 6.96 2.87 0.00 94.00 6.96 2.87 0.00 95.00 6.96 2.87 0.00 96.00 6.96 2.87 0.00 97.00 6.96 2.87 0.00 98.00 6.96 2.87 0.00 99.00 6.96 2.87 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 259 Summary for Subcatchment 9S: BMP #2 [49] Hint: Tc<2dt may require smaller dt Runoff = 78.56 cfs @ 11.95 hrs, Volume= 3.753 af, Depth= 4.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr - 24 hr Rainfall=6.96" Area (ac) CN Description 9.670 80 9.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: BMP #2 Hydrograph 85 Runoff 78.56 cfs - --L---1---1---L--L------L------L------L------L------L-- 80 ----------------'---'---'---'---'---'---'---' ---' _ 75 T_Ype; II- 24 hr` - - -- - -- T--- I---T ---T--T--- I---1000 _r T 24', hrLR_-nfaFjI=6_96r.. L 70 --�------r--------rt------+------1---1-- A �y y 65 -- --------------------------+------T-----Runoff Area=9A70 ac- 60 ---'------------------'--- T _ -- ------ Ruh offVoiurrre=17-5-3 4f- 55 I I I 7 I 1 50 - ---;------ T------T------T------T---I--- LRunoff D',eptLh=4.--I - 3 45 -- -- - ------------+------+------+------T------T---TCZ�5._O 41r6 - a4° -- - - ------ ------------+------+------ ------ ---- uF aye 35 1=v1J ---- - ----------------------------------------------------- ------ 30 25 -- -- - ---T --- --T--_T - - -T --T------T---T--T------T------T------r-- 20 --�--------------------+------+------+------+-----------�-- 15 --J-- - ---L-----1---1---1---1------1------I 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 260 Hydrograph for Subcatchment 9S: BMP #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.15 0.00 0.00 3.00 0.24 0.00 0.00 4.00 0.33 0.00 0.00 5.00 0.44 0.00 0.00 6.00 0.56 0.00 0.04 7.00 0.69 0.01 0.17 8.00 0.84 0.04 0.32 9.00 1.02 0.09 0.65 10.00 1.26 0.18 1.06 11.00 1.64 0.35 2.42 12.00 4.61 2.56 67.20 13.00 5.37 3.22 3.90 14.00 5.71 3.52 2.34 15.00 5.94 3.73 1.87 16.00 6.12 3.89 1.45 17.00 6.28 4.03 1.28 18.00 6.41 4.15 1.13 19.00 6.53 4.26 0.97 20.00 6.63 4.35 0.82 21.00 6.71 4.43 0.78 22.00 6.80 4.51 0.75 23.00 6.88 4.59 0.72 24.00 6.96 4.66 0.69 25.00 6.96 4.66 0.00 26.00 6.96 4.66 0.00 27.00 6.96 4.66 0.00 28.00 6.96 4.66 0.00 29.00 6.96 4.66 0.00 30.00 6.96 4.66 0.00 31.00 6.96 4.66 0.00 32.00 6.96 4.66 0.00 33.00 6.96 4.66 0.00 34.00 6.96 4.66 0.00 35.00 6.96 4.66 0.00 36.00 6.96 4.66 0.00 37.00 6.96 4.66 0.00 38.00 6.96 4.66 0.00 39.00 6.96 4.66 0.00 40.00 6.96 4.66 0.00 41.00 6.96 4.66 0.00 42.00 6.96 4.66 0.00 43.00 6.96 4.66 0.00 44.00 6.96 4.66 0.00 45.00 6.96 4.66 0.00 46.00 6.96 4.66 0.00 47.00 6.96 4.66 0.00 48.00 6.96 4.66 0.00 49.00 6.96 4.66 0.00 50.00 6.96 4.66 0.00 51.00 6.96 4.66 0.00 52.00 6.96 4.66 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.96 4.66 0.00 54.00 6.96 4.66 0.00 55.00 6.96 4.66 0.00 56.00 6.96 4.66 0.00 57.00 6.96 4.66 0.00 58.00 6.96 4.66 0.00 59.00 6.96 4.66 0.00 60.00 6.96 4.66 0.00 61.00 6.96 4.66 0.00 62.00 6.96 4.66 0.00 63.00 6.96 4.66 0.00 64.00 6.96 4.66 0.00 65.00 6.96 4.66 0.00 66.00 6.96 4.66 0.00 67.00 6.96 4.66 0.00 68.00 6.96 4.66 0.00 69.00 6.96 4.66 0.00 70.00 6.96 4.66 0.00 71.00 6.96 4.66 0.00 72.00 6.96 4.66 0.00 73.00 6.96 4.66 0.00 74.00 6.96 4.66 0.00 75.00 6.96 4.66 0.00 76.00 6.96 4.66 0.00 77.00 6.96 4.66 0.00 78.00 6.96 4.66 0.00 79.00 6.96 4.66 0.00 80.00 6.96 4.66 0.00 81.00 6.96 4.66 0.00 82.00 6.96 4.66 0.00 83.00 6.96 4.66 0.00 84.00 6.96 4.66 0.00 85.00 6.96 4.66 0.00 86.00 6.96 4.66 0.00 87.00 6.96 4.66 0.00 88.00 6.96 4.66 0.00 89.00 6.96 4.66 0.00 90.00 6.96 4.66 0.00 91.00 6.96 4.66 0.00 92.00 6.96 4.66 0.00 93.00 6.96 4.66 0.00 94.00 6.96 4.66 0.00 95.00 6.96 4.66 0.00 96.00 6.96 4.66 0.00 97.00 6.96 4.66 0.00 98.00 6.96 4.66 0.00 99.00 6.96 4.66 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 261 Summary for Subcatchment 10S: BMP #3 [49] Hint: Tc<2dt may require smaller dt Runoff = 54.97 cfs @ 11.95 hrs, Volume= 2.615 af, Depth= 4.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr - 24 hr Rainfall=6.96" Area (ac) CN Description 6.900 79 6.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: BMP #3 Hydrograph 7 - - - I- - - - - - - - - + - - - I- - - T - - - - - - + - - - - - - + - - - - - - + - - -I - - - T - - -I - - - T - - 60 Runoff 54.97 cfs -------------------T------T------r------t------r------r-- 55 T De 11 24-h r - - - - - - - - I- - - + - - - - - - + - - - I- - - + - - - I - - - + - - - I - - - + - - - - - - + - - y - + - - -I - - - + - - 50 100. r * 24hr'IRainfa�ll=6.96'" --I-- - ---------1---1---1---I------I---Y-L------ ------I------I-- 45 Runoff Area=6.900 ac - I- - - I - - -I- - - CI 40 Rurhoff Volume=2.615 of N 35 Runoff D',ept',h=4.56" - -- - --------T-- T------T------T - -- --T --- s -n TC'- 30 3 5.01, -mi _ q_I 1 LL --y--I------I------t------t------t------+------+------r Cr4=79 25 20 -- -- -1---1---1---1---1---'---1---'---1------i------+------L------+-- 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 262 Hydrograph for Subcatchment 10S: BMP #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.15 0.00 0.00 3.00 0.24 0.00 0.00 4.00 0.33 0.00 0.00 5.00 0.44 0.00 0.00 6.00 0.56 0.00 0.01 7.00 0.69 0.01 0.10 8.00 0.84 0.03 0.20 9.00 1.02 0.08 0.42 10.00 1.26 0.16 0.71 11.00 1.64 0.32 1.64 12.00 4.61 2.47 47.11 13.00 5.37 3.13 2.75 14.00 5.71 3.42 1.65 15.00 5.94 3.63 1.32 16.00 6.12 3.79 1.02 17.00 6.28 3.93 0.90 18.00 6.41 4.05 0.80 19.00 6.53 4.15 0.69 20.00 6.63 4.24 0.58 21.00 6.71 4.32 0.55 22.00 6.80 4.40 0.53 23.00 6.88 4.48 0.51 24.00 6.96 4.55 0.49 25.00 6.96 4.55 0.00 26.00 6.96 4.55 0.00 27.00 6.96 4.55 0.00 28.00 6.96 4.55 0.00 29.00 6.96 4.55 0.00 30.00 6.96 4.55 0.00 31.00 6.96 4.55 0.00 32.00 6.96 4.55 0.00 33.00 6.96 4.55 0.00 34.00 6.96 4.55 0.00 35.00 6.96 4.55 0.00 36.00 6.96 4.55 0.00 37.00 6.96 4.55 0.00 38.00 6.96 4.55 0.00 39.00 6.96 4.55 0.00 40.00 6.96 4.55 0.00 41.00 6.96 4.55 0.00 42.00 6.96 4.55 0.00 43.00 6.96 4.55 0.00 44.00 6.96 4.55 0.00 45.00 6.96 4.55 0.00 46.00 6.96 4.55 0.00 47.00 6.96 4.55 0.00 48.00 6.96 4.55 0.00 49.00 6.96 4.55 0.00 50.00 6.96 4.55 0.00 51.00 6.96 4.55 0.00 52.00 6.96 4.55 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.96 4.55 0.00 54.00 6.96 4.55 0.00 55.00 6.96 4.55 0.00 56.00 6.96 4.55 0.00 57.00 6.96 4.55 0.00 58.00 6.96 4.55 0.00 59.00 6.96 4.55 0.00 60.00 6.96 4.55 0.00 61.00 6.96 4.55 0.00 62.00 6.96 4.55 0.00 63.00 6.96 4.55 0.00 64.00 6.96 4.55 0.00 65.00 6.96 4.55 0.00 66.00 6.96 4.55 0.00 67.00 6.96 4.55 0.00 68.00 6.96 4.55 0.00 69.00 6.96 4.55 0.00 70.00 6.96 4.55 0.00 71.00 6.96 4.55 0.00 72.00 6.96 4.55 0.00 73.00 6.96 4.55 0.00 74.00 6.96 4.55 0.00 75.00 6.96 4.55 0.00 76.00 6.96 4.55 0.00 77.00 6.96 4.55 0.00 78.00 6.96 4.55 0.00 79.00 6.96 4.55 0.00 80.00 6.96 4.55 0.00 81.00 6.96 4.55 0.00 82.00 6.96 4.55 0.00 83.00 6.96 4.55 0.00 84.00 6.96 4.55 0.00 85.00 6.96 4.55 0.00 86.00 6.96 4.55 0.00 87.00 6.96 4.55 0.00 88.00 6.96 4.55 0.00 89.00 6.96 4.55 0.00 90.00 6.96 4.55 0.00 91.00 6.96 4.55 0.00 92.00 6.96 4.55 0.00 93.00 6.96 4.55 0.00 94.00 6.96 4.55 0.00 95.00 6.96 4.55 0.00 96.00 6.96 4.55 0.00 97.00 6.96 4.55 0.00 98.00 6.96 4.55 0.00 99.00 6.96 4.55 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 263 Summary for Subcatchment 11S: Bypass #1 Runoff = 20.63 cfs @ 12.10 hrs, Volume= 1.428 af, Depth= 3.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr - 24 hr Rainfall=6.96" Area (ac) CN Description 4.560 58 Woods/grass comb., Good, HSG B 1.020 98 Water Surface, HSG B 5.580 65 Weighted Average 4.560 81.72% Pervious Area 1.020 18.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.9 Direct Entry, Subcatchment 11S: Bypass #1 Hydrograph 23 ---- - - - -----,--- ---,--- ---,--- ---,--- ----------,-----------------,--- ■Runoff zz - 20.63 cfs -- --L---1---1---L--L------L------L------ ------L------L-- 21 20 -- --- -- ----+--+------+------+------+------+------+-T'--- -- -- T fl 4 h - 19 ----- - ------ 1 ------ 1---1--- +-----Otr�yr`* 24'1�rRa%n#�1f= :99�"- 18 17 --+-- --�-- -+---+--+---+--+---+--+------+-- - ---' --T---T--T---T--T---I---T---I--Runoff Area--580-ac- 16 15 J ---'- --+- --'-------' -+---+--+ ---'- --- - --'------'----'----' ---+--- ---+--- --- ------'----'--- + ---'---'----I---'--- + --- Runoff Vo1uH =1A2-8-af - 14 w 13 -- - ---- - --- ------------------------------------+RunoffDep#t=3.0 -------- T- -- T--T---- --T- - - ---T --- - r -- 12 - T'c=-16 s m i il- 3 11 o 10 ----- - ------ ------ ------ ---- - - -- �1�1-6 9 -- -- -1---1---1---1---1---'---+---'---+ --- ---+--- ---+--- '---L---'--- +-- 7 ---- - ---�i -- ---�i -- ---�i -----�i--- ---�i------�i------�i------�i--- -- 6 -- -- -1---1---1---1---1---'---+---'---+------+------+------L------+-- 4 -- --- - -- - , ---- - , --- -- -, ---- -, -- --- -, -- -+-- -, -- -+-- -, ----- -, -- -+ -- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 264 Hydrograph for Subcatchment 11S: Bypass #1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.15 0.00 0.00 3.00 0.24 0.00 0.00 4.00 0.33 0.00 0.00 5.00 0.44 0.00 0.00 6.00 0.56 0.00 0.00 7.00 0.69 0.00 0.00 8.00 0.84 0.00 0.00 9.00 1.02 0.00 0.00 10.00 1.26 0.01 0.06 11.00 1.64 0.05 0.35 12.00 4.61 1.40 15.33 13.00 5.37 1.91 2.02 14.00 5.71 2.14 1.17 15.00 5.94 2.31 0.90 16.00 6.12 2.44 0.71 17.00 6.28 2.55 0.61 18.00 6.41 2.65 0.54 19.00 6.53 2.74 0.48 20.00 6.63 2.82 0.40 21.00 6.71 2.88 0.38 22.00 6.80 2.95 0.36 23.00 6.88 3.01 0.35 24.00 6.96 3.07 0.34 25.00 6.96 3.07 0.00 26.00 6.96 3.07 0.00 27.00 6.96 3.07 0.00 28.00 6.96 3.07 0.00 29.00 6.96 3.07 0.00 30.00 6.96 3.07 0.00 31.00 6.96 3.07 0.00 32.00 6.96 3.07 0.00 33.00 6.96 3.07 0.00 34.00 6.96 3.07 0.00 35.00 6.96 3.07 0.00 36.00 6.96 3.07 0.00 37.00 6.96 3.07 0.00 38.00 6.96 3.07 0.00 39.00 6.96 3.07 0.00 40.00 6.96 3.07 0.00 41.00 6.96 3.07 0.00 42.00 6.96 3.07 0.00 43.00 6.96 3.07 0.00 44.00 6.96 3.07 0.00 45.00 6.96 3.07 0.00 46.00 6.96 3.07 0.00 47.00 6.96 3.07 0.00 48.00 6.96 3.07 0.00 49.00 6.96 3.07 0.00 50.00 6.96 3.07 0.00 51.00 6.96 3.07 0.00 52.00 6.96 3.07 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.96 3.07 0.00 54.00 6.96 3.07 0.00 55.00 6.96 3.07 0.00 56.00 6.96 3.07 0.00 57.00 6.96 3.07 0.00 58.00 6.96 3.07 0.00 59.00 6.96 3.07 0.00 60.00 6.96 3.07 0.00 61.00 6.96 3.07 0.00 62.00 6.96 3.07 0.00 63.00 6.96 3.07 0.00 64.00 6.96 3.07 0.00 65.00 6.96 3.07 0.00 66.00 6.96 3.07 0.00 67.00 6.96 3.07 0.00 68.00 6.96 3.07 0.00 69.00 6.96 3.07 0.00 70.00 6.96 3.07 0.00 71.00 6.96 3.07 0.00 72.00 6.96 3.07 0.00 73.00 6.96 3.07 0.00 74.00 6.96 3.07 0.00 75.00 6.96 3.07 0.00 76.00 6.96 3.07 0.00 77.00 6.96 3.07 0.00 78.00 6.96 3.07 0.00 79.00 6.96 3.07 0.00 80.00 6.96 3.07 0.00 81.00 6.96 3.07 0.00 82.00 6.96 3.07 0.00 83.00 6.96 3.07 0.00 84.00 6.96 3.07 0.00 85.00 6.96 3.07 0.00 86.00 6.96 3.07 0.00 87.00 6.96 3.07 0.00 88.00 6.96 3.07 0.00 89.00 6.96 3.07 0.00 90.00 6.96 3.07 0.00 91.00 6.96 3.07 0.00 92.00 6.96 3.07 0.00 93.00 6.96 3.07 0.00 94.00 6.96 3.07 0.00 95.00 6.96 3.07 0.00 96.00 6.96 3.07 0.00 97.00 6.96 3.07 0.00 98.00 6.96 3.07 0.00 99.00 6.96 3.07 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 265 Summary for Subcatchment 12S: Bypass #2 Runoff = 2.55 cfs @ 12.20 hrs, Volume= 0.230 af, Depth= 2.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr - 24 hr Rainfall=6.96" Area (ac) CN Description 1.160 58 Woods/grass comb., Good, HSG B 1.160 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 Direct Entry, Subcatchment 12S: Bypass #2 Hydrograph � � � � � � � � � � � � � � � � � � � ■Runoff 2.55 cfs Tj�p6 II 24-fir 1,00-yr » 24, hr'Rai,nfa',11=6.96'" - - - - - - - - - You ngfFArqa=1-.160 ac- 2 I I I I 1 I Ruhoff Volurie=0.230 of N Rhnoff Depth=2.38I" 3 Tc=24.S mih 0 LL CNJ=58 - 4- - -I---------+------+---I--------I------I---------+---I-- 1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 266 Hydrograph for Subcatchment 12S: Bypass #2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.15 0.00 0.00 3.00 0.24 0.00 0.00 4.00 0.33 0.00 0.00 5.00 0.44 0.00 0.00 6.00 0.56 0.00 0.00 7.00 0.69 0.00 0.00 8.00 0.84 0.00 0.00 9.00 1.02 0.00 0.00 10.00 1.26 0.00 0.00 11.00 1.64 0.00 0.01 12.00 4.61 0.96 1.17 13.00 5.37 1.38 0.42 14.00 5.71 1.58 0.22 15.00 5.94 1.72 0.16 16.00 6.12 1.84 0.13 17.00 6.28 1.93 0.11 18.00 6.41 2.02 0.10 19.00 6.53 2.09 0.09 20.00 6.63 2.16 0.07 21.00 6.71 2.22 0.07 22.00 6.80 2.27 0.07 23.00 6.88 2.33 0.06 24.00 6.96 2.38 0.06 25.00 6.96 2.38 0.00 26.00 6.96 2.38 0.00 27.00 6.96 2.38 0.00 28.00 6.96 2.38 0.00 29.00 6.96 2.38 0.00 30.00 6.96 2.38 0.00 31.00 6.96 2.38 0.00 32.00 6.96 2.38 0.00 33.00 6.96 2.38 0.00 34.00 6.96 2.38 0.00 35.00 6.96 2.38 0.00 36.00 6.96 2.38 0.00 37.00 6.96 2.38 0.00 38.00 6.96 2.38 0.00 39.00 6.96 2.38 0.00 40.00 6.96 2.38 0.00 41.00 6.96 2.38 0.00 42.00 6.96 2.38 0.00 43.00 6.96 2.38 0.00 44.00 6.96 2.38 0.00 45.00 6.96 2.38 0.00 46.00 6.96 2.38 0.00 47.00 6.96 2.38 0.00 48.00 6.96 2.38 0.00 49.00 6.96 2.38 0.00 50.00 6.96 2.38 0.00 51.00 6.96 2.38 0.00 52.00 6.96 2.38 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.96 2.38 0.00 54.00 6.96 2.38 0.00 55.00 6.96 2.38 0.00 56.00 6.96 2.38 0.00 57.00 6.96 2.38 0.00 58.00 6.96 2.38 0.00 59.00 6.96 2.38 0.00 60.00 6.96 2.38 0.00 61.00 6.96 2.38 0.00 62.00 6.96 2.38 0.00 63.00 6.96 2.38 0.00 64.00 6.96 2.38 0.00 65.00 6.96 2.38 0.00 66.00 6.96 2.38 0.00 67.00 6.96 2.38 0.00 68.00 6.96 2.38 0.00 69.00 6.96 2.38 0.00 70.00 6.96 2.38 0.00 71.00 6.96 2.38 0.00 72.00 6.96 2.38 0.00 73.00 6.96 2.38 0.00 74.00 6.96 2.38 0.00 75.00 6.96 2.38 0.00 76.00 6.96 2.38 0.00 77.00 6.96 2.38 0.00 78.00 6.96 2.38 0.00 79.00 6.96 2.38 0.00 80.00 6.96 2.38 0.00 81.00 6.96 2.38 0.00 82.00 6.96 2.38 0.00 83.00 6.96 2.38 0.00 84.00 6.96 2.38 0.00 85.00 6.96 2.38 0.00 86.00 6.96 2.38 0.00 87.00 6.96 2.38 0.00 88.00 6.96 2.38 0.00 89.00 6.96 2.38 0.00 90.00 6.96 2.38 0.00 91.00 6.96 2.38 0.00 92.00 6.96 2.38 0.00 93.00 6.96 2.38 0.00 94.00 6.96 2.38 0.00 95.00 6.96 2.38 0.00 96.00 6.96 2.38 0.00 97.00 6.96 2.38 0.00 98.00 6.96 2.38 0.00 99.00 6.96 2.38 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 267 Summary for Subcatchment 13S: Pre -Development #3 Runoff = 19.26 cfs @ 12.15 hrs, Volume= 1.586 af, Depth= 2.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr - 24 hr Rainfall=6.96" Area (ac) CN Description 9.070 55 Woods, Good, HSG B 9.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 13S: Pre -Development #3 Hydrograph 21 - - - - - - - 7 - - - --------------� - - T - - - - - - T - - - - - T - - - - - - T - - - - - - + - - - - - - T - - -I - - - T - - -I- ---�---; -- ■Runoff 20 - 19.26 cfs--�'--- ---�'--- ------- - --�'--- ------------------------------ - Type 1$ -- '- - ---' -- - --I- --' - --' --T---I---'t00 I * 'I�r 1T- I--�-7- I:--T- 16 -- �,- ----�--- ---�--- ---�--- ---�--- -----Runoll Area4.00-ac- 15 14 ---'- -- - --'---'----'---'----'---'---'----'----'---'---'-------'-----------'---'--- - ------ ------ ------+------+---Runoff Voluxnw=1.5"af- w 12 -- '- -T---T--T---'r-- T-- -T-- T------T---' -- -T Runoff �liep ill-- l� r_ 3 11 ---- - ------ ------ ------ ------ -------------+- Ic-4V.-7�nlhr- 0 10 9 ---'- --J- --'---'----'---'----'---'---'----'----'---'---'----'---'----'---'----'---'--- ----'--- ---'---i------i------i------L---'--- ------LC14=55_ 7 - -T- -T---r-----r--T---r--T---r--T---r--+------r-----r------+-- 6 -- ��- ----��--- ---��--- ---��--- ---��--- ------+------+------+------+-- 5 ---'- --'---'----'---'----'---'---'----'----'---'---'----'---'----'---'----'---'--- 4 -- -- 1---1---1---1---1---'---1---'---1------L------i------L------+-- 2 - -T -- -----T---1---T---I---T------T------T------T------T------T-- 1 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 0 0 5 10 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 268 Hydrograph for Subcatchment 13S: Pre -Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.15 0.00 0.00 3.00 0.24 0.00 0.00 4.00 0.33 0.00 0.00 5.00 0.44 0.00 0.00 6.00 0.56 0.00 0.00 7.00 0.69 0.00 0.00 8.00 0.84 0.00 0.00 9.00 1.02 0.00 0.00 10.00 1.26 0.00 0.00 11.00 1.64 0.00 0.00 12.00 4.61 0.79 10.47 13.00 5.37 1.17 2.67 14.00 5.71 1.35 1.52 15.00 5.94 1.48 1.16 16.00 6.12 1.59 0.93 17.00 6.28 1.68 0.80 18.00 6.41 1.76 0.72 19.00 6.53 1.83 0.63 20.00 6.63 1.89 0.54 21.00 6.71 1.94 0.50 22.00 6.80 2.00 0.48 23.00 6.88 2.05 0.47 24.00 6.96 2.10 0.45 25.00 6.96 2.10 0.00 26.00 6.96 2.10 0.00 27.00 6.96 2.10 0.00 28.00 6.96 2.10 0.00 29.00 6.96 2.10 0.00 30.00 6.96 2.10 0.00 31.00 6.96 2.10 0.00 32.00 6.96 2.10 0.00 33.00 6.96 2.10 0.00 34.00 6.96 2.10 0.00 35.00 6.96 2.10 0.00 36.00 6.96 2.10 0.00 37.00 6.96 2.10 0.00 38.00 6.96 2.10 0.00 39.00 6.96 2.10 0.00 40.00 6.96 2.10 0.00 41.00 6.96 2.10 0.00 42.00 6.96 2.10 0.00 43.00 6.96 2.10 0.00 44.00 6.96 2.10 0.00 45.00 6.96 2.10 0.00 46.00 6.96 2.10 0.00 47.00 6.96 2.10 0.00 48.00 6.96 2.10 0.00 49.00 6.96 2.10 0.00 50.00 6.96 2.10 0.00 51.00 6.96 2.10 0.00 52.00 6.96 2.10 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.96 2.10 0.00 54.00 6.96 2.10 0.00 55.00 6.96 2.10 0.00 56.00 6.96 2.10 0.00 57.00 6.96 2.10 0.00 58.00 6.96 2.10 0.00 59.00 6.96 2.10 0.00 60.00 6.96 2.10 0.00 61.00 6.96 2.10 0.00 62.00 6.96 2.10 0.00 63.00 6.96 2.10 0.00 64.00 6.96 2.10 0.00 65.00 6.96 2.10 0.00 66.00 6.96 2.10 0.00 67.00 6.96 2.10 0.00 68.00 6.96 2.10 0.00 69.00 6.96 2.10 0.00 70.00 6.96 2.10 0.00 71.00 6.96 2.10 0.00 72.00 6.96 2.10 0.00 73.00 6.96 2.10 0.00 74.00 6.96 2.10 0.00 75.00 6.96 2.10 0.00 76.00 6.96 2.10 0.00 77.00 6.96 2.10 0.00 78.00 6.96 2.10 0.00 79.00 6.96 2.10 0.00 80.00 6.96 2.10 0.00 81.00 6.96 2.10 0.00 82.00 6.96 2.10 0.00 83.00 6.96 2.10 0.00 84.00 6.96 2.10 0.00 85.00 6.96 2.10 0.00 86.00 6.96 2.10 0.00 87.00 6.96 2.10 0.00 88.00 6.96 2.10 0.00 89.00 6.96 2.10 0.00 90.00 6.96 2.10 0.00 91.00 6.96 2.10 0.00 92.00 6.96 2.10 0.00 93.00 6.96 2.10 0.00 94.00 6.96 2.10 0.00 95.00 6.96 2.10 0.00 96.00 6.96 2.10 0.00 97.00 6.96 2.10 0.00 98.00 6.96 2.10 0.00 99.00 6.96 2.10 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 269 Summary for Subcatchment 14S: Post Development #3 Runoff = 19.09 cfs @ 12.15 hrs, Volume= 1.572 af, Depth= 2.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr - 24 hr Rainfall=6.96" Area (ac) CN Description 8.670 55 Woods, Good, HSG B 0.320 58 Woods/grass comb., Good, HSG B 8.990 55 Weighted Average 8.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 14S: Post Development #3 Hydrograph 21 --L---'------'--- ---1---1---'---L---'---L---'---L---'---+---'---L------+-- ■Runoff 20 19.09 cfs ----- ------ ------ ------ ------ I ---------I------�,I--- 19 --y- ----------- I---rt---I-------li-------li-------li---+-�1 pel,11-2il4-ifr- 18 17 -- - - ---II ----�--- -- ----I--- ---�--- ---II ---�--- -- - - -I - -- ---�- 'BOO r_* 4''IJ�rJ3a%nfAl[=6-gWj - 16 15 ---'---'---'----'---'----'---'---'-------------RunoffArea=$�90 I I I I I I I I I I I at 'L-- 14 --L- -L---1---L---1---1---1---1---1---1------+------L---'---L --+--+---+--+---I---+---+--+------+---Runoff --- --- Volunw=1.572-af - H 12 --y- - ------ ------ ------*------Y------rlunof_�epfl-.��r_ 3-Tc=20.7 10 -mi fir o — --L- '--- L----� ---L-- i -- 56 8 --Y- -Y------Y------Y------Y------Y------Y------t------Y------Y-- 7 T- T---I - T - - -I_- T- - -I - T - - -I-- T - - -I-- T---I---T---I---T---I---T-- 6 ---'--- ---'--- ---'--- ---'--- ---'------'--- ---------'--- -- 5 --L- -L---'---L---'---L---'---L---'---L------+------L-----L------+-- 4 I I -- ----'--- I I ---'--- I I ---'---+------+------+------+---'--- I I I I I I I I I I I I ------+-- 3 --+-- +------+------+------+------+------+------+------+------+-- 2 � --Y-- --I_ I Y---I_--Y- I I I Y------Y------+------+------Y------+-- I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 270 Hydrograph for Subcatchment 14S: Post Development #3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.07 0.00 0.00 2.00 0.15 0.00 0.00 3.00 0.24 0.00 0.00 4.00 0.33 0.00 0.00 5.00 0.44 0.00 0.00 6.00 0.56 0.00 0.00 7.00 0.69 0.00 0.00 8.00 0.84 0.00 0.00 9.00 1.02 0.00 0.00 10.00 1.26 0.00 0.00 11.00 1.64 0.00 0.00 12.00 4.61 0.79 10.38 13.00 5.37 1.17 2.65 14.00 5.71 1.35 1.50 15.00 5.94 1.48 1.15 16.00 6.12 1.59 0.92 17.00 6.28 1.68 0.79 18.00 6.41 1.76 0.71 19.00 6.53 1.83 0.62 20.00 6.63 1.89 0.53 21.00 6.71 1.94 0.49 22.00 6.80 2.00 0.48 23.00 6.88 2.05 0.46 24.00 6.96 2.10 0.44 25.00 6.96 2.10 0.00 26.00 6.96 2.10 0.00 27.00 6.96 2.10 0.00 28.00 6.96 2.10 0.00 29.00 6.96 2.10 0.00 30.00 6.96 2.10 0.00 31.00 6.96 2.10 0.00 32.00 6.96 2.10 0.00 33.00 6.96 2.10 0.00 34.00 6.96 2.10 0.00 35.00 6.96 2.10 0.00 36.00 6.96 2.10 0.00 37.00 6.96 2.10 0.00 38.00 6.96 2.10 0.00 39.00 6.96 2.10 0.00 40.00 6.96 2.10 0.00 41.00 6.96 2.10 0.00 42.00 6.96 2.10 0.00 43.00 6.96 2.10 0.00 44.00 6.96 2.10 0.00 45.00 6.96 2.10 0.00 46.00 6.96 2.10 0.00 47.00 6.96 2.10 0.00 48.00 6.96 2.10 0.00 49.00 6.96 2.10 0.00 50.00 6.96 2.10 0.00 51.00 6.96 2.10 0.00 52.00 6.96 2.10 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 53.00 6.96 2.10 0.00 54.00 6.96 2.10 0.00 55.00 6.96 2.10 0.00 56.00 6.96 2.10 0.00 57.00 6.96 2.10 0.00 58.00 6.96 2.10 0.00 59.00 6.96 2.10 0.00 60.00 6.96 2.10 0.00 61.00 6.96 2.10 0.00 62.00 6.96 2.10 0.00 63.00 6.96 2.10 0.00 64.00 6.96 2.10 0.00 65.00 6.96 2.10 0.00 66.00 6.96 2.10 0.00 67.00 6.96 2.10 0.00 68.00 6.96 2.10 0.00 69.00 6.96 2.10 0.00 70.00 6.96 2.10 0.00 71.00 6.96 2.10 0.00 72.00 6.96 2.10 0.00 73.00 6.96 2.10 0.00 74.00 6.96 2.10 0.00 75.00 6.96 2.10 0.00 76.00 6.96 2.10 0.00 77.00 6.96 2.10 0.00 78.00 6.96 2.10 0.00 79.00 6.96 2.10 0.00 80.00 6.96 2.10 0.00 81.00 6.96 2.10 0.00 82.00 6.96 2.10 0.00 83.00 6.96 2.10 0.00 84.00 6.96 2.10 0.00 85.00 6.96 2.10 0.00 86.00 6.96 2.10 0.00 87.00 6.96 2.10 0.00 88.00 6.96 2.10 0.00 89.00 6.96 2.10 0.00 90.00 6.96 2.10 0.00 91.00 6.96 2.10 0.00 92.00 6.96 2.10 0.00 93.00 6.96 2.10 0.00 94.00 6.96 2.10 0.00 95.00 6.96 2.10 0.00 96.00 6.96 2.10 0.00 97.00 6.96 2.10 0.00 98.00 6.96 2.10 0.00 99.00 6.96 2.10 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 271 Summary for Pond 5P: BMP #1 Inflow Area = 12.980 ac, 0.00% Impervious, Inflow Depth = 2.87" for 100-yr - 24 hr event Inflow = 67.14 cfs @ 11.96 hrs, Volume= 3.105 of Outflow = 3.17 cfs @ 13.40 hrs, Volume= 2.345 af, Atten= 95%, Lag= 86.3 min Primary = 3.17 cfs @ 13.40 hrs, Volume= 2.345 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 570.61' @ 13.40 hrs Surf.Area= 22,915 sf Storage= 76,632 cf Plug -Flow detention time= 1,121.1 min calculated for 2.344 of (75% of inflow) Center -of -Mass det. time= 1,025.7 min ( 1,868.2 - 842.6 ) Volume Invert Avail.Storage Storage Description #1 566.50' 137,597 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 566.50 13,995 0 0 567.00 15,551 7,387 7,387 568.00 17,503 16,527 23,914 569.00 19,519 18,511 42,425 570.00 21,600 20,560 62,984 571.00 23,745 22,673 85,657 572.00 25,954 24,850 110,506 573.00 28,228 27,091 137,597 Device Routing Invert Outlet Devices #1 Primary 561.90' 36.0" Round RCP -Round 36" L= 187.7' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 561.90' / 560.89' S= 0.0054 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 566.50' 1.7" Vert. WQ Orrfice C= 0.600 #3 Device 1 570.10' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.90 Width (feet) 2.50 2.50 #4 Device 1 571.00' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 571.80' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.16 cfs @ 13.40 hrs HW=570.61' (Free Discharge) L1=RCP_Round 36" (Passes 3.16 cfs of 91.88 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.15 cfs @ 9.68 fps) 3=Custom Weir/Orifice (Weir Controls 3.01 cfs @ 2.35 fps) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 272 --r--r--t--t--r--r--r------------------r--r--r--r-- Hydrograph r--r--r-- - -- -- -- ---------------I--- -- -- -- -- -- -- -- II ■ Inflow ❑ outflow 67.14 cfs ,- - ---- II -------- IflowAt""12.98aa II1--t�-_- Primary ;s75 70 rII rI rI rI I I I I I-----1 ---�Peak-Elev-570r61I -forage=7.6. c- 60 .I - T--T --r- -- -- -----------------I --IT--IT--r--r--T-- -- -- 50 -,-I 45 N -L--1--1--1--L-- ---1---1---1---1---1---L--L--L--L--1--1--1- 40 ,I I I - - I -- I -- I I I I I I I I I I I I I I -II --II --II 0 35 =-II - T--T -r- --T- - -- - -I---I---I---I---i -- -- --r--r--T--T--T-- a 30 25 -L--1--1--1--L-- ---1---1---1---1---1---L--L--L--L--1--1--1- 20 ---- - I- - -- ------------------------------ ---- --- -- -- -- 15 10 3.17 cfs 0.00 cfs ---------------- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 573 572 571 w w c 570 0 .� w w 569 568 567 Pond 5P: BMP #1 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 273 Pond 5P: BMP #1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 F Surface ❑ Storage 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 274 Hydrograph for Pond 5P: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 566.50 0.00 0.00 0.00 2.50 0.00 0 566.50 0.00 0.00 0.00 5.00 0.00 0 566.50 0.00 0.00 0.00 7.50 0.00 0 566.50 0.00 0.00 0.00 10.00 0.08 34 566.50 0.00 0.00 0.00 12.50 6.08 71,913 570.41 1.53 1.53 0.00 15.00 1.93 74,315 570.51 2.32 2.32 0.00 17.50 1.27 71,642 570.39 1.45 1.45 0.00 20.00 0.88 70,179 570.33 1.04 1.04 0.00 22.50 0.80 69,388 570.29 0.84 0.84 0.00 25.00 0.00 67,294 570.20 0.40 0.40 0.00 27.50 0.00 65,204 570.10 0.15 0.15 0.00 30.00 0.00 63,925 570.04 0.14 0.14 0.00 32.50 0.00 62,658 569.98 0.14 0.14 0.00 35.00 0.00 61,401 569.93 0.14 0.14 0.00 37.50 0.00 60,155 569.87 0.14 0.14 0.00 40.00 0.00 58,920 569.81 0.14 0.14 0.00 42.50 0.00 57,696 569.75 0.14 0.14 0.00 45.00 0.00 56,484 569.69 0.13 0.13 0.00 47.50 0.00 55,282 569.64 0.13 0.13 0.00 50.00 0.00 54,092 569.58 0.13 0.13 0.00 52.50 0.00 52,912 569.52 0.13 0.13 0.00 55.00 0.00 51,744 569.47 0.13 0.13 0.00 57.50 0.00 50,588 569.41 0.13 0.13 0.00 60.00 0.00 49,443 569.35 0.13 0.13 0.00 62.50 0.00 48,309 569.30 0.13 0.13 0.00 65.00 0.00 47,187 569.24 0.12 0.12 0.00 67.50 0.00 46,077 569.19 0.12 0.12 0.00 70.00 0.00 44,979 569.13 0.12 0.12 0.00 72.50 0.00 43,892 569.07 0.12 0.12 0.00 75.00 0.00 42,817 569.02 0.12 0.12 0.00 77.50 0.00 41,754 568.97 0.12 0.12 0.00 80.00 0.00 40,703 568.91 0.12 0.12 0.00 82.50 0.00 39,664 568.86 0.11 0.11 0.00 85.00 0.00 38,637 568.80 0.11 0.11 0.00 87.50 0.00 37,622 568.75 0.11 0.11 0.00 90.00 0.00 36,620 568.70 0.11 0.11 0.00 92.50 0.00 35,630 568.65 0.11 0.11 0.00 95.00 0.00 34,652 568.59 0.11 0.11 0.00 97.50 0.00 33,687 568.54 0.11 0.11 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 275 Stage -Discharge for Pond 5P: BMP #1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 566.50 0.00 0.00 0.00 566.60 0.01 0.01 0.00 566.70 0.03 0.03 0.00 566.80 0.04 0.04 0.00 566.90 0.04 0.04 0.00 567.00 0.05 0.05 0.00 567.10 0.06 0.06 0.00 567.20 0.06 0.06 0.00 567.30 0.06 0.06 0.00 567.40 0.07 0.07 0.00 567.50 0.07 0.07 0.00 567.60 0.08 0.08 0.00 567.70 0.08 0.08 0.00 567.80 0.08 0.08 0.00 567.90 0.09 0.09 0.00 568.00 0.09 0.09 0.00 568.10 0.09 0.09 0.00 568.20 0.10 0.10 0.00 568.30 0.10 0.10 0.00 568.40 0.10 0.10 0.00 568.50 0.11 0.11 0.00 568.60 0.11 0.11 0.00 568.70 0.11 0.11 0.00 568.80 0.11 0.11 0.00 568.90 0.12 0.12 0.00 569.00 0.12 0.12 0.00 569.10 0.12 0.12 0.00 569.20 0.12 0.12 0.00 569.30 0.13 0.13 0.00 569.40 0.13 0.13 0.00 569.50 0.13 0.13 0.00 569.60 0.13 0.13 0.00 569.70 0.13 0.13 0.00 569.80 0.14 0.14 0.00 569.90 0.14 0.14 0.00 570.00 0.14 0.14 0.00 570.10 0.14 0.14 0.00 570.20 0.40 0.40 0.00 570.30 0.88 0.88 0.00 570.40 1.49 1.49 0.00 570.50 2.22 2.22 0.00 570.60 3.05 3.05 0.00 570.70 3.96 3.96 0.00 570.80 4.95 4.95 0.00 570.90 6.02 6.02 0.00 571.00 7.15 7.15 0.00 571.10 9.74 9.74 0.00 571.20 13.56 13.56 0.00 571.30 18.18 18.18 0.00 571.40 23.47 23.47 0.00 571.50 29.33 29.33 0.00 571.60 35.72 35.72 0.00 571.70 42.59 42.59 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 571.80 49.90 49.90 0.00 571.90 58.42 57.63 0.79 572.00 67.98 65.75 2.23 572.10 78.40 74.25 4.15 572.20 89.59 83.11 6.48 572.30 101.61 92.31 9.30 572.40 114.40 101.85 12.55 572.50 119.76 103.98 15.78 572.60 123.83 104.58 19.25 572.70 128.10 105.18 22.92 572.80 132.57 105.77 26.80 572.90 137.34 106.37 30.98 573.00 142.31 106.95 35.36 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 276 Stage -Area -Storage for Pond 5P: BMP #1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 566.50 13,995 0 566.60 14,306 1,415 566.70 14,617 2,861 566.80 14,929 4,339 566.90 15,240 5,847 567.00 15,551 7,387 567.10 15,746 8,951 567.20 15,941 10,536 567.30 16,137 12,140 567.40 16,332 13,763 567.50 16,527 15,406 567.60 16,722 17,068 567.70 16,917 18,750 567.80 17,113 20,452 567.90 17,308 22,173 568.00 17,503 23,914 568.10 17,705 25,674 568.20 17,906 27,454 568.30 18,108 29,255 568.40 18,309 31,076 568.50 18,511 32,917 568.60 18,713 34,778 568.70 18,914 36,660 568.80 19,116 38,561 568.90 19,317 40,483 569.00 19,519 42,425 569.10 19,727 44,387 569.20 19,935 46,370 569.30 20,143 48,374 569.40 20,351 50,399 569.50 20,560 52,444 569.60 20,768 54,510 569.70 20,976 56,598 569.80 21,184 58,706 569.90 21,392 60,834 570.00 21,600 62,984 570.10 21,815 65,155 570.20 22,029 67,347 570.30 22,243 69,561 570.40 22,458 71,796 570.50 22,673 74,052 570.60 22,887 76,330 570.70 23,102 78,630 570.80 23,316 80,950 570.90 23,530 83,293 571.00 23,745 85,657 571.10 23,966 88,042 571.20 24,187 90,450 571.30 24,408 92,879 571.40 24,629 95,331 571.50 24,850 97,805 571.60 25,070 100,301 571.70 25,291 102,819 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 571.80 25,512 105,359 571.90 25,733 107,922 572.00 25,954 110,506 572.10 26,181 113,113 572.20 26,409 115,742 572.30 26,636 118,395 572.40 26,864 121,070 572.50 27,091 123,767 572.60 27,318 126,488 572.70 27,546 129,231 572.80 27,773 131,997 572.90 28,001 134,786 573.00 28,228 137,597 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 277 Summary for Pond 6P: BMP #2 Inflow Area = 9.670 ac, 0.00% Impervious, Inflow Depth = 4.66" for 100-yr - 24 hr event Inflow = 78.56 cfs @ 11.95 hrs, Volume= 3.753 of Outflow = 48.21 cfs @ 12.04 hrs, Volume= 3.740 af, Atten= 39%, Lag= 5.1 min Primary = 48.21 cfs @ 12.04 hrs, Volume= 3.740 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 563.05' @ 12.04 hrs Surf.Area= 19,511 sf Storage= 67,180 cf Plug -Flow detention time= 499.8 min calculated for 3.740 of (100% of inflow) Center -of -Mass det. time= 497.6 min ( 1,301.8 - 804.2 ) Volume Invert Avail.Storage Storage Description #1 558.50' 109,406 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 558.50 9,762 0 0 559.00 11,233 5,249 5,249 560.00 13,167 12,200 17,449 561.00 15,175 14,171 31,620 562.00 17,251 16,213 47,833 563.00 19,395 18,323 66,156 564.00 21,608 20,502 86,657 565.00 23,890 22,749 109,406 Device Routing Invert Outlet Devices #1 Primary 553.90' 36.0" Round RCP -Round 36" L= 92.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 553.90' / 553.00' S= 0.0097 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 558.50' 2.5" Vert. WQ Orrfice C= 0.600 #3 Device 1 561.05' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.15 Width (feet) 1.00 1.00 #4 Device 1 562.20' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 563.95' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=46.95 cfs @ 12.04 hrs HW=563.04' (Free Discharge) L1=RCP_Round 36" (Passes 46.95 cfs of 109.98 cfs potential flow) �2=WQ Orrfice (Orifice Controls 0.35 cfs @ 10.14 fps) 3=Custom Weir/Orifice (Orifice Controls 6.66 cfs @ 5.79 fps) 4=Top of Box (Weir Controls 39.94 cfs @ 2.99 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=558.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 278 Hydrograph 78.56 CfS -r--r--r--r- - -------r--r--r--r--r--r--r--r--r--r- - ■ Inflow ❑Outflow -- - - -- -- -- -- ---------r .i i r i Inflow, �1ea=�.6/ O ac ■ Primary - - - - - - - - -I - - - - - - - - - - - - - - -_ ■Secondary 85 80f�+ T i T T 7-I- r r r r T 7 7 � �IevZ563.051-- �o ,� --', - - -, -- -, -- -,---,---,------------ a;�-aige-67,180-e# - 65 60 48.21 cfs --=-- - -- -- ---- --------------------- '------------------------------', - -- --' --' --' --' --' --'--' ss w5o -- -1--1--1--J--J---1---1---1---1---1---L--L--L--L--1--1--1- - " 45 -1--1--1--J--J---1---1---1---1---1---L--L--L--L--1--1--1- 40 LL35 - -+--+-- -- -- ------------------ -- -- -- -- -- -- -- 30 - -+--+--+--+--+---------------r--r--r--r--r--+--+--+-- 25 20 15 ---------------------------- 10 0.00 CfS 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 565 564 563 w w c 562 0 .� w w 561 560 559 Pond 6P: BMP #2 Stage -Discharge 0 20 40 60 80 100 120 140 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 279 Pond 6P: BMP #2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 0 20,000 40,000 60,000 80,000 100,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 280 Hydrograph for Pond 6P: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 558.50 0.00 0.00 0.00 2.50 0.00 0 558.50 0.00 0.00 0.00 5.00 0.00 0 558.50 0.00 0.00 0.00 7.50 0.24 771 558.58 0.01 0.01 0.00 10.00 1.06 5,382 559.01 0.10 0.10 0.00 12.50 6.21 54,238 562.36 8.52 8.52 0.00 15.00 1.87 45,009 561.83 2.57 2.57 0.00 17.50 1.20 40,558 561.57 1.50 1.50 0.00 20.00 0.82 38,341 561.43 1.04 1.04 0.00 22.50 0.74 37,106 561.35 0.82 0.82 0.00 25.00 0.00 34,745 561.20 0.46 0.46 0.00 27.50 0.00 31,899 561.02 0.26 0.26 0.00 30.00 0.00 29,640 560.87 0.25 0.25 0.00 32.50 0.00 27,454 560.72 0.24 0.24 0.00 35.00 0.00 25,342 560.57 0.23 0.23 0.00 37.50 0.00 23,307 560.43 0.22 0.22 0.00 40.00 0.00 21,350 560.29 0.21 0.21 0.00 42.50 0.00 19,472 560.15 0.20 0.20 0.00 45.00 0.00 17,675 560.02 0.20 0.20 0.00 47.50 0.00 15,961 559.89 0.19 0.19 0.00 50.00 0.00 14,331 559.76 0.18 0.18 0.00 52.50 0.00 12,787 559.64 0.17 0.17 0.00 55.00 0.00 11,331 559.52 0.16 0.16 0.00 57.50 0.00 9,963 559.41 0.15 0.15 0.00 60.00 0.00 8,687 559.30 0.14 0.14 0.00 62.50 0.00 7,503 559.20 0.13 0.13 0.00 65.00 0.00 6,413 559.10 0.12 0.12 0.00 67.50 0.00 5,418 559.02 0.11 0.11 0.00 70.00 0.00 4,520 558.93 0.09 0.09 0.00 72.50 0.00 3,722 558.86 0.08 0.08 0.00 75.00 0.00 3,024 558.80 0.07 0.07 0.00 77.50 0.00 2,430 558.74 0.06 0.06 0.00 80.00 0.00 1,938 558.69 0.05 0.05 0.00 82.50 0.00 1,556 558.66 0.04 0.04 0.00 85.00 0.00 1,275 558.63 0.03 0.03 0.00 87.50 0.00 1,063 558.61 0.02 0.02 0.00 90.00 0.00 901 558.59 0.02 0.02 0.00 92.50 0.00 777 558.58 0.01 0.01 0.00 95.00 0.00 683 558.57 0.01 0.01 0.00 97.50 0.00 609 558.56 0.01 0.01 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 281 Stage -Discharge for Pond 6P: BMP #2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 558.50 0.00 0.00 0.00 558.60 0.02 0.02 0.00 558.70 0.05 0.05 0.00 558.80 0.07 0.07 0.00 558.90 0.09 0.09 0.00 559.00 0.10 0.10 0.00 559.10 0.12 0.12 0.00 559.20 0.13 0.13 0.00 559.30 0.14 0.14 0.00 559.40 0.15 0.15 0.00 559.50 0.16 0.16 0.00 559.60 0.16 0.16 0.00 559.70 0.17 0.17 0.00 559.80 0.18 0.18 0.00 559.90 0.19 0.19 0.00 560.00 0.19 0.19 0.00 560.10 0.20 0.20 0.00 560.20 0.21 0.21 0.00 560.30 0.21 0.21 0.00 560.40 0.22 0.22 0.00 560.50 0.23 0.23 0.00 560.60 0.23 0.23 0.00 560.70 0.24 0.24 0.00 560.80 0.24 0.24 0.00 560.90 0.25 0.25 0.00 561.00 0.25 0.25 0.00 561.10 0.30 0.30 0.00 561.20 0.45 0.45 0.00 561.30 0.68 0.68 0.00 561.40 0.95 0.95 0.00 561.50 1.27 1.27 0.00 561.60 1.62 1.62 0.00 561.70 2.01 2.01 0.00 561.80 2.42 2.42 0.00 561.90 2.86 2.86 0.00 562.00 3.33 3.33 0.00 562.10 3.83 3.83 0.00 562.20 4.35 4.35 0.00 562.30 6.44 6.44 0.00 562.40 9.84 9.84 0.00 562.50 14.10 14.10 0.00 562.60 19.06 19.06 0.00 562.70 24.61 24.61 0.00 562.80 30.71 30.71 0.00 562.90 37.30 37.30 0.00 563.00 44.36 44.36 0.00 563.10 51.84 51.84 0.00 563.20 59.72 59.72 0.00 563.30 67.99 67.99 0.00 563.40 76.63 76.63 0.00 563.50 85.62 85.62 0.00 563.60 94.95 94.95 0.00 563.70 102.84 102.84 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 563.80 106.13 106.13 0.00 563.90 109.32 109.32 0.00 564.00 112.70 112.43 0.28 564.10 116.89 115.44 1.45 564.20 121.52 118.39 3.13 564.30 124.72 119.46 5.26 564.40 128.01 120.18 7.83 564.50 131.76 120.89 10.87 564.60 135.74 121.60 14.14 564.70 139.79 122.30 17.49 564.80 144.07 123.01 21.06 564.90 148.54 123.70 24.84 565.00 153.26 124.40 28.86 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 282 Stage -Area -Storage for Pond 6P: BMP #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 558.50 9,762 0 558.60 10,056 991 558.70 10,350 2,011 558.80 10,645 3,061 558.90 10,939 4,140 559.00 11,233 5,249 559.10 11,426 6,382 559.20 11,620 7,534 559.30 11,813 8,706 559.40 12,007 9,897 559.50 12,200 11,107 559.60 12,393 12,337 559.70 12,587 13,586 559.80 12,780 14,854 559.90 12,974 16,142 560.00 13,167 17,449 560.10 13,368 18,775 560.20 13,569 20,122 560.30 13,769 21,489 560.40 13,970 22,876 560.50 14,171 24,283 560.60 14,372 25,710 560.70 14,573 27,158 560.80 14,773 28,625 560.90 14,974 30,112 561.00 15,175 31,620 561.10 15,383 33,148 561.20 15,590 34,696 561.30 15,798 36,266 561.40 16,005 37,856 561.50 16,213 39,467 561.60 16,421 41,098 561.70 16,628 42,751 561.80 16,836 44,424 561.90 17,043 46,118 562.00 17,251 47,833 562.10 17,465 49,569 562.20 17,680 51,326 562.30 17,894 53,105 562.40 18,109 54,905 562.50 18,323 56,726 562.60 18,537 58,569 562.70 18,752 60,434 562.80 18,966 62,320 562.90 19,181 64,227 563.00 19,395 66,156 563.10 19,616 68,106 563.20 19,838 70,079 563.30 20,059 72,074 563.40 20,280 74,091 563.50 20,502 76,130 563.60 20,723 78,191 563.70 20,944 80,274 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 563.80 21,165 82,380 563.90 21,387 84,508 564.00 21,608 86,657 564.10 21,836 88,829 564.20 22,064 91,024 564.30 22,293 93,242 564.40 22,521 95,483 564.50 22,749 97,747 564.60 22,977 100,033 564.70 23,205 102,342 564.80 23,434 104,674 564.90 23,662 107,029 565.00 23,890 109,406 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 283 Summary for Pond 7P: BMP #3 Inflow Area = 6.900 ac, 0.00% Impervious, Inflow Depth = 4.55" for 100-yr - 24 hr event Inflow = 54.97 cfs @ 11.95 hrs, Volume= 2.615 of Outflow = 6.52 cfs @ 12.27 hrs, Volume= 2.449 af, Atten= 88%, Lag= 19.0 min Primary = 6.52 cfs @ 12.27 hrs, Volume= 2.449 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Peak Elev= 573.17' @ 12.27 hrs Surf.Area= 16,167 sf Storage= 59,816 cf Plug -Flow detention time= 766.1 min calculated for 2.447 of (94% of inflow) Center -of -Mass det. time= 732.7 min ( 1,539.4 - 806.6 ) Volume Invert Avail.Storage Storage Description #1 568.50' 91,933 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 568.50 9,080 0 0 569.00 10,331 4,853 4,853 570.00 11,639 10,985 15,838 571.00 13,003 12,321 28,159 572.00 14,424 13,714 41,872 573.00 15,901 15,163 57,035 574.00 17,435 16,668 73,703 575.00 19,025 18,230 91,933 Device Routing Invert Outlet Devices #1 Primary 565.31' 24.0" Round RCP -Round 24" L= 61.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 565.31' / 565.00' S= 0.0051 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 568.50' 1.7" Vert. WQ Orfice C= 0.600 #3 Device 1 571.20' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 2.30 Width (feet) 0.70 0.70 #4 Device 1 573.50' 48.0" x 48.0" Horiz. Top of Box C= 0.600 Limited to weir flow at low heads #5 Secondary 574.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=6.51 cfs @ 12.27 hrs HW=573.17' (Free Discharge) L1=RCP_Round 24" (Passes 6.51 cfs of 44.71 cfs potential flow) �2=WQ Orfice (Orifice Controls 0.16 cfs @ 10.33 fps) 3=Custom Weir/Orifice (Weir Controls 6.35 cfs @ 4.60 fps) 4=Top of Box ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=568.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 284 '1.7iL• f/ A =31�I I Vic%? Hydrograph -" -I - -I - -I - -- I I ■ Inflow54.97fS ❑Outflow I 1 ��f��lGA=��70�V M Primary 60 - _ T T ■Secondary --T- -T--T--T-- -----li---li---li---li--• �-IeY-573.47,-- 55 vak 50 --T- -T--T--T--T--------------- -Starage"_591W816-cfi - 45 - - ------------------I--- ----- ---------- 40 -L- -1--1--1--J--�---1---1---1---1---1---L--L--L--L--1--1--1- w 35 V 30 ��I 0 - - T - I - T - - T - - T - - T - - T - - -I- - -I- - -I- - -I- - -I- - - T - - T - - T - - T - - T - - T - - T - - I I I I I I I I I I I I I I I I I LL 25 20 L _ _ L _ _ L _ _ L _ _ L _ _ - 15 6.52 - + + + - - + - - + - - -I - - -I - - - - - - - - - I- - - + - - + - - + - - + - - + - - + - - + - cfs 10 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) 575 574 573 w w c 572 0 .� w w 571 570 569 Pond 7P: BMP #3 Stage -Discharge 0 10 20 30 40 50 60 70 Discharge (cfs) ■ Total ■ Primary ■ Secondary Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 285 Pond 7P: BMP #3 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Storage (cubic -feet) Surface ❑ Storage Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 286 Hydrograph for Pond 7P: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 568.50 0.00 0.00 0.00 2.50 0.00 0 568.50 0.00 0.00 0.00 5.00 0.00 0 568.50 0.00 0.00 0.00 7.50 0.15 404 568.54 0.00 0.00 0.00 10.00 0.71 3,522 568.87 0.04 0.04 0.00 12.50 4.37 58,995 573.12 6.27 6.27 0.00 15.00 1.32 43,698 572.13 2.19 2.19 0.00 17.50 0.85 38,789 571.78 1.16 1.16 0.00 20.00 0.58 36,644 571.63 0.78 0.78 0.00 22.50 0.52 35,488 571.55 0.60 0.60 0.00 25.00 0.00 33,644 571.41 0.35 0.35 0.00 27.50 0.00 31,545 571.26 0.16 0.16 0.00 30.00 0.00 30,361 571.17 0.12 0.12 0.00 32.50 0.00 29,269 571.08 0.12 0.12 0.00 35.00 0.00 28,195 571.00 0.12 0.12 0.00 37.50 0.00 27,139 570.92 0.12 0.12 0.00 40.00 0.00 26,101 570.84 0.11 0.11 0.00 42.50 0.00 25,081 570.76 0.11 0.11 0.00 45.00 0.00 24,080 570.68 0.11 0.11 0.00 47.50 0.00 23,097 570.60 0.11 0.11 0.00 50.00 0.00 22,132 570.52 0.11 0.11 0.00 52.50 0.00 21,187 570.45 0.10 0.10 0.00 55.00 0.00 20,261 570.37 0.10 0.10 0.00 57.50 0.00 19,354 570.30 0.10 0.10 0.00 60.00 0.00 18,466 570.22 0.10 0.10 0.00 62.50 0.00 17,598 570.15 0.10 0.10 0.00 65.00 0.00 16,750 570.08 0.09 0.09 0.00 67.50 0.00 15,921 570.01 0.09 0.09 0.00 70.00 0.00 15,112 569.94 0.09 0.09 0.00 72.50 0.00 14,324 569.87 0.09 0.09 0.00 75.00 0.00 13,556 569.80 0.08 0.08 0.00 77.50 0.00 12,809 569.74 0.08 0.08 0.00 80.00 0.00 12,082 569.67 0.08 0.08 0.00 82.50 0.00 11,376 569.61 0.08 0.08 0.00 85.00 0.00 10,691 569.55 0.07 0.07 0.00 87.50 0.00 10,027 569.49 0.07 0.07 0.00 90.00 0.00 9,384 569.43 0.07 0.07 0.00 92.50 0.00 8,763 569.37 0.07 0.07 0.00 95.00 0.00 8,163 569.31 0.07 0.07 0.00 97.50 0.00 7,585 569.26 0.06 0.06 0.00 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 287 Stage -Discharge for Pond 7P: BMP #3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 568.50 0.00 0.00 0.00 568.60 0.01 0.01 0.00 568.70 0.03 0.03 0.00 568.80 0.04 0.04 0.00 568.90 0.04 0.04 0.00 569.00 0.05 0.05 0.00 569.10 0.06 0.06 0.00 569.20 0.06 0.06 0.00 569.30 0.06 0.06 0.00 569.40 0.07 0.07 0.00 569.50 0.07 0.07 0.00 569.60 0.08 0.08 0.00 569.70 0.08 0.08 0.00 569.80 0.08 0.08 0.00 569.90 0.09 0.09 0.00 570.00 0.09 0.09 0.00 570.10 0.09 0.09 0.00 570.20 0.10 0.10 0.00 570.30 0.10 0.10 0.00 570.40 0.10 0.10 0.00 570.50 0.11 0.11 0.00 570.60 0.11 0.11 0.00 570.70 0.11 0.11 0.00 570.80 0.11 0.11 0.00 570.90 0.12 0.12 0.00 571.00 0.12 0.12 0.00 571.10 0.12 0.12 0.00 571.20 0.12 0.12 0.00 571.30 0.20 0.20 0.00 571.40 0.33 0.33 0.00 571.50 0.51 0.51 0.00 571.60 0.71 0.71 0.00 571.70 0.94 0.94 0.00 571.80 1.20 1.20 0.00 571.90 1.48 1.48 0.00 572.00 1.78 1.78 0.00 572.10 2.10 2.10 0.00 572.20 2.44 2.44 0.00 572.30 2.79 2.79 0.00 572.40 3.16 3.16 0.00 572.50 3.55 3.55 0.00 572.60 3.95 3.95 0.00 572.70 4.37 4.37 0.00 572.80 4.80 4.80 0.00 572.90 5.24 5.24 0.00 573.00 5.70 5.70 0.00 573.10 6.17 6.17 0.00 573.20 6.65 6.65 0.00 573.30 7.14 7.14 0.00 573.40 7.65 7.65 0.00 573.50 8.17 8.17 0.00 573.60 10.28 10.28 0.00 573.70 13.71 13.71 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 573.80 18.00 18.00 0.00 573.90 23.00 23.00 0.00 574.00 28.61 28.61 0.00 574.10 35.54 34.75 0.79 574.20 43.62 41.39 2.23 574.30 52.64 48.49 4.15 574.40 55.43 48.95 6.48 574.50 58.58 49.28 9.30 574.60 62.16 49.61 12.55 574.70 65.72 49.94 15.78 574.80 69.51 50.26 19.25 574.90 73.50 50.58 22.92 575.00 77.70 50.90 26.80 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 288 Stage -Area -Storage for Pond 7P: BMP #3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 568.50 9,080 0 568.60 9,330 921 568.70 9,580 1,866 568.80 9,831 2,837 568.90 10,081 3,832 569.00 10,331 4,853 569.10 10,462 5,892 569.20 10,593 6,945 569.30 10,723 8,011 569.40 10,854 9,090 569.50 10,985 10,182 569.60 11,116 11,287 569.70 11,247 12,405 569.80 11,377 13,536 569.90 11,508 14,680 570.00 11,639 15,838 570.10 11,775 17,008 570.20 11,912 18,193 570.30 12,048 19,391 570.40 12,185 20,602 570.50 12,321 21,828 570.60 12,457 23,067 570.70 12,594 24,319 570.80 12,730 25,585 570.90 12,867 26,865 571.00 13,003 28,159 571.10 13,145 29,466 571.20 13,287 30,788 571.30 13,429 32,124 571.40 13,571 33,474 571.50 13,714 34,838 571.60 13,856 36,216 571.70 13,998 37,609 571.80 14,140 39,016 571.90 14,282 40,437 572.00 14,424 41,872 572.10 14,572 43,322 572.20 14,719 44,787 572.30 14,867 46,266 572.40 15,015 47,760 572.50 15,163 49,269 572.60 15,310 50,793 572.70 15,458 52,331 572.80 15,606 53,884 572.90 15,753 55,452 573.00 15,901 57,035 573.10 16,054 58,633 573.20 16,208 60,246 573.30 16,361 61,874 573.40 16,515 63,518 573.50 16,668 65,177 573.60 16,821 66,851 573.70 16,975 68,541 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 573.80 17,128 70,246 573.90 17,282 71,967 574.00 17,435 73,703 574.10 17,594 75,454 574.20 17,753 77,222 574.30 17,912 79,005 574.40 18,071 80,804 574.50 18,230 82,619 574.60 18,389 84,450 574.70 18,548 86,297 574.80 18,707 88,160 574.90 18,866 90,038 575.00 19,025 91,933 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 289 Summary for Link 17L: Post Development #2 Inflow Area = 8.060 ac, 0.00% Impervious, Inflow Depth > 3.99" for 100-yr - 24 hr event Inflow = 9.05 cfs @ 12.21 hrs, Volume= 2.679 of Primary = 9.05 cfs @ 12.21 hrs, Volume= 2.679 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 17L: Post Development #2 Hydrograph I I I I I I I I I I I I I I I I I ■Inflow 10 --+---+--+--+---+--+--+---+--+--+---+--+--+---+--+----- ❑Primary 9.05 cfs inflOW Aires=8.0'160'�I ac 9 I I I I I I ------------------------------- 8 I I -- L I I I I I I I I I I I I I I I I I - L -- L---'--- L -- L- - -'- -- L---------+---'--- L--+- - -'--- L -- L---'-- 7 -- r-- ------+--y------+---------+------r--+------r-------- 6 y I I I I I I I I I I I I I I I I I -- - I I I I I I I U I I I I I I I I I I I I I I I I I 3 5- 0 LL I I I I I I I I I I I I I I I I I 4- 3- 2 --- ----------------------------------------- ------------ 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 290 Hydrograph for Link 17L: Post Development #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.01 0.00 0.01 9.00 0.03 0.00 0.03 10.00 0.04 0.00 0.04 11.00 0.07 0.00 0.07 12.00 5.09 0.00 5.09 13.00 5.48 0.00 5.48 14.00 3.42 0.00 3.42 15.00 2.35 0.00 2.35 16.00 1.75 0.00 1.75 17.00 1.39 0.00 1.39 18.00 1.16 0.00 1.16 19.00 1.00 0.00 1.00 20.00 0.86 0.00 0.86 21.00 0.75 0.00 0.75 22.00 0.69 0.00 0.69 23.00 0.65 0.00 0.65 24.00 0.61 0.00 0.61 25.00 0.35 0.00 0.35 26.00 0.24 0.00 0.24 27.00 0.18 0.00 0.18 28.00 0.14 0.00 0.14 29.00 0.12 0.00 0.12 30.00 0.12 0.00 0.12 31.00 0.12 0.00 0.12 32.00 0.12 0.00 0.12 33.00 0.12 0.00 0.12 34.00 0.12 0.00 0.12 35.00 0.12 0.00 0.12 36.00 0.12 0.00 0.12 37.00 0.12 0.00 0.12 38.00 0.12 0.00 0.12 39.00 0.12 0.00 0.12 40.00 0.11 0.00 0.11 41.00 0.11 0.00 0.11 42.00 0.11 0.00 0.11 43.00 0.11 0.00 0.11 44.00 0.11 0.00 0.11 45.00 0.11 0.00 0.11 46.00 0.11 0.00 0.11 47.00 0.11 0.00 0.11 48.00 0.11 0.00 0.11 49.00 0.11 0.00 0.11 50.00 0.11 0.00 0.11 51.00 0.11 0.00 0.11 52.00 0.10 0.00 0.10 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.10 0.00 0.10 54.00 0.10 0.00 0.10 55.00 0.10 0.00 0.10 56.00 0.10 0.00 0.10 57.00 0.10 0.00 0.10 58.00 0.10 0.00 0.10 59.00 0.10 0.00 0.10 60.00 0.10 0.00 0.10 61.00 0.10 0.00 0.10 62.00 0.10 0.00 0.10 63.00 0.09 0.00 0.09 64.00 0.09 0.00 0.09 65.00 0.09 0.00 0.09 66.00 0.09 0.00 0.09 67.00 0.09 0.00 0.09 68.00 0.09 0.00 0.09 69.00 0.09 0.00 0.09 70.00 0.09 0.00 0.09 71.00 0.09 0.00 0.09 72.00 0.09 0.00 0.09 73.00 0.09 0.00 0.09 74.00 0.09 0.00 0.09 75.00 0.08 0.00 0.08 76.00 0.08 0.00 0.08 77.00 0.08 0.00 0.08 78.00 0.08 0.00 0.08 79.00 0.08 0.00 0.08 80.00 0.08 0.00 0.08 81.00 0.08 0.00 0.08 82.00 0.08 0.00 0.08 83.00 0.08 0.00 0.08 84.00 0.08 0.00 0.08 85.00 0.07 0.00 0.07 86.00 0.07 0.00 0.07 87.00 0.07 0.00 0.07 88.00 0.07 0.00 0.07 89.00 0.07 0.00 0.07 90.00 0.07 0.00 0.07 91.00 0.07 0.00 0.07 92.00 0.07 0.00 0.07 93.00 0.07 0.00 0.07 94.00 0.07 0.00 0.07 95.00 0.07 0.00 0.07 96.00 0.06 0.00 0.06 97.00 0.06 0.00 0.06 98.00 0.06 0.00 0.06 99.00 0.06 0.00 0.06 Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 291 Summary for Link 18L: Post Development #1 Inflow Area = 28.230 ac, 3.61 % Impervious, Inflow Depth > 3.19" for 100-yr - 24 hr event Inflow = 67.22 cfs @ 12.05 hrs, Volume= 7.514 of Primary = 67.22 cfs @ 12.05 hrs, Volume= 7.514 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-99.00 hrs, dt= 0.05 hrs Link 18L: Post Development #1 Hydrograph 75 -------'----'--------------------------------------'-- ■Inflow 70 67.22 cfs t--t------ --t---I---t---- I- t-- I- t--t ---- �f�flQw'Qrea=2_$:3� aq ❑ Primary 65 _ 60 --r -r--r ------r--r ------r ---------r------r --r------r--r----- 55- -- L - L -- L- - -'--- L -- L---'--- 1------'--- 1---'--- L -- 1---'--- L -- L- - -'-- 50 ---rt----------------r--7------r--,---i-- 45 --I -L-----'---L--L---1---1---1------L------L--L------L-----'-- N V40 _ - -r--� r--1 T T r--7 r-- 3 0 35 --I -L-- ---'--- -- ---1---1---1---1---1---1---L--1------L-- ---'-- 30 25 20 15 10 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Millbridge Phase 7E Type 1124-hr 100-yr- 24 hrRainfall=6.96" Prepared by WK Dickson & Co. Printed 11/12/2019 HydroCAD®10.00-15 s/n 01460 ©2015 HydroCAD Software Solutions LLC Page 292 Hydrograph for Link 18L: Post Development #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.01 0.00 0.01 8.00 0.03 0.00 0.03 9.00 0.07 0.00 0.07 10.00 0.16 0.00 0.16 11.00 0.52 0.00 0.52 12.00 59.28 0.00 59.28 13.00 9.76 0.00 9.76 14.00 7.52 0.00 7.52 15.00 5.79 0.00 5.79 16.00 4.60 0.00 4.60 17.00 3.80 0.00 3.80 18.00 3.30 0.00 3.30 19.00 2.88 0.00 2.88 20.00 2.49 0.00 2.49 21.00 2.23 0.00 2.23 22.00 2.08 0.00 2.08 23.00 1.97 0.00 1.97 24.00 1.88 0.00 1.88 25.00 0.86 0.00 0.86 26.00 0.55 0.00 0.55 27.00 0.42 0.00 0.42 28.00 0.40 0.00 0.40 29.00 0.39 0.00 0.39 30.00 0.39 0.00 0.39 31.00 0.38 0.00 0.38 32.00 0.38 0.00 0.38 33.00 0.38 0.00 0.38 34.00 0.37 0.00 0.37 35.00 0.37 0.00 0.37 36.00 0.37 0.00 0.37 37.00 0.36 0.00 0.36 38.00 0.36 0.00 0.36 39.00 0.35 0.00 0.35 40.00 0.35 0.00 0.35 41.00 0.35 0.00 0.35 42.00 0.34 0.00 0.34 43.00 0.34 0.00 0.34 44.00 0.33 0.00 0.33 45.00 0.33 0.00 0.33 46.00 0.33 0.00 0.33 47.00 0.32 0.00 0.32 48.00 0.32 0.00 0.32 49.00 0.31 0.00 0.31 50.00 0.31 0.00 0.31 51.00 0.30 0.00 0.30 52.00 0.30 0.00 0.30 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 53.00 0.29 0.00 0.29 54.00 0.29 0.00 0.29 55.00 0.29 0.00 0.29 56.00 0.28 0.00 0.28 57.00 0.28 0.00 0.28 58.00 0.27 0.00 0.27 59.00 0.27 0.00 0.27 60.00 0.26 0.00 0.26 61.00 0.26 0.00 0.26 62.00 0.25 0.00 0.25 63.00 0.25 0.00 0.25 64.00 0.24 0.00 0.24 65.00 0.24 0.00 0.24 66.00 0.24 0.00 0.24 67.00 0.23 0.00 0.23 68.00 0.23 0.00 0.23 69.00 0.22 0.00 0.22 70.00 0.22 0.00 0.22 71.00 0.21 0.00 0.21 72.00 0.21 0.00 0.21 73.00 0.20 0.00 0.20 74.00 0.20 0.00 0.20 75.00 0.19 0.00 0.19 76.00 0.19 0.00 0.19 77.00 0.18 0.00 0.18 78.00 0.18 0.00 0.18 79.00 0.17 0.00 0.17 80.00 0.17 0.00 0.17 81.00 0.16 0.00 0.16 82.00 0.15 0.00 0.15 83.00 0.15 0.00 0.15 84.00 0.14 0.00 0.14 85.00 0.14 0.00 0.14 86.00 0.14 0.00 0.14 87.00 0.13 0.00 0.13 88.00 0.13 0.00 0.13 89.00 0.13 0.00 0.13 90.00 0.13 0.00 0.13 91.00 0.12 0.00 0.12 92.00 0.12 0.00 0.12 93.00 0.12 0.00 0.12 94.00 0.12 0.00 0.12 95.00 0.12 0.00 0.12 96.00 0.12 0.00 0.12 97.00 0.11 0.00 0.11 98.00 0.11 0.00 0.11 99.00 0.11 0.00 0.11