20 November 2019
LETTER OF APPROVAL WITH MODIFICATIONS AND
PERFORMANCE RESERVATIONS
Town of Valdese
ATTN: Mr. Seth Eckard
P.O. Box 339
Valdese, N.C. 28690
RE: Project Name: Main Street Waterline Replacement
Acres Approved: 3.35
Project ID: BURKE-2020-008
County: Burke
City: Valdese
Address: Main Street (US 70)
River Basin: Catawba
Stream Classification:
Submitted By: Mr. R. J
Date Received by LQS:
Plan Type: Municipal
Dear Mr. Eckard,
Dye Branch, WS-IV
Mozeley, P.E.
4 November 2019
This office has reviewed the subject erosion and sedimentation control plan and hereby issues
this Letter of Approval with Modifications and Performance Reservations. A list of the
modifications and reservations is attached. This plan approval shall expire three (3) years
following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan
will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC
issued prior to the commencement of any land disturbing activity on the above -named project.
The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI
form to Annette Lucas at Annette. lucasOncdenr.gov or Paul Clark at Paul.clark ncdenr. ov.
After you submit a complete and correct NOI Form, a COC will be emailed to you within three
business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit.
E North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
uepar meMui AV, �me�+�i� �� 828.296.4500
Letter of Approval with Modifications and Performance Reservations
Mr. Seth Eckard
20 November 2019
Page 2 of 4
However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
AIso, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection
to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any
other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in
the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding
the acreage will be a violation of this permit and would require a revised plan and additional
application fee. You are requested to file an amended form if there is any change in the
information included on the form. In addition, it would be helpful if you notify this office of
the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerel
Michael Smith
Assistant Regional Engineer
Land Quality Section
Letter of Approval with Modifications and Performance Reservations
Mr. Seth Eckard
20 November 2019
Page 3 of 4
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCG01 Fact Sheet
ec: Mr. R.J. Mozeley, P.E. rj.mozeley@mcgillassociates.com
cc: Regional Office file
Project Name: Main Street Waterline Replacement
Project ID: BURKE-2020-008
County: Burke
MODIFICATIONS REQUIRED FOR APPROVAL
On or before Wednesday. 4 December 2019 please provide the plan sheets with the three
following additions;
1) Please add to the General Construction Notes, 5 (Disposable Material) on plan sheet G-002
and sheet C-504 that if borrow or waste fill material is generated by grading operations, an
approved erosion and sediment control permit must be secured for the borrow or waste
material site prior to initiation of any land disturbing activity. {15A NCAC 04B .0110}.
2) Please add to Note 6 on plan sheets G-002 and C-504, that if springs are encountered
within the limits of construction on this site to contact the NCDEQ Division of Water
Resources or the U.S. Army Corps of Engineers. {G.S.; 113A-57 (3)}.
3) Please add to the plan sheets the two new sample plan sheets, Ground Stabilization and
Materials Handling and Inspection. Recordkeeping and Reporting. These two plan sheets can
be easily downloaded in either pdf., CAD, or CAD 2013 format from the NCDEQW Construction
Stormwater website at the address copied below. {G.S. 113A-57 (3)1.
https;(./deq nc.govfabouVdivisions/energy-mineral-land-resources/energy-mineral-land-
permltsfstormwater- perm rtsfconstructron-sw
PERFORMANCE RESERVATIONS
1) If any material laydown areas are associated with this site, please include this area within
the limits of.disturbance with appropriate erosion control details. {G.S. 113A-57 (3)}.
2) Please note that in the vicinity of the intersection of Main Street (West) and Roller Street
SW (STA 15+60 to STA 17+00) the piped creek (Dye Branch) may be encountered in the 30"
Letter of Approval with Modifications and Performance Reservations
Mr. Seth Eckard
20 November 2019
Page 4 of 4
CMP during construction activities. If live water is found at this site, please contact the NC
Division and Water Resources and the U.S. Army Corps of Engineers. {G.S. 113A-57 (3)}.
3) Please note that the developer is responsible for the control of sediment on -site. If the
approved erosion and sediment control measures prove insufficient, the developer must take
those additional steps necessary to stop sediment from leaving the site. Each sediment
control device must be inspected after each storm event. Maintenance and/or cleanout is
necessary anytime the device is at 50% capacity. {G.S. 113A-54 (1)1.
Ref: G.S. 113A-54.1 through G.S.113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
L,I
on"
�
�
i�
y
'�.
,*-
5
=Wood
f
CD
*'
ID
bd
?�,
�"�
�•
a
ITI
0
r*
cD
,�•
OftCD
y
C
GREATsF�{�
m
I_
��
O
CD
r
10
10,
�
o
cD
='
Mo..
CD
CD
OM
eD
N
¢
�
*d•
U,
CD
*•
CD
I•
I••�