HomeMy WebLinkAbout20090071 Ver 1_Certification of Completion_20091020Ashton Place Holdings LLC
DWQ# 09-0071
May 27, 2009
Page 3 of 3
OCT EFg@1N0VV [R B
2 e Zoos
DENR - WATER QUALITY
WETLANDS AND STORMWATER BRANCH
DWQ Project No.: OCt - b 0-11
County: G u AGrC
Applicant: AShi-0r 'Gl ace. 4Ao,??n?4c U,C
Project Name: 6.Slnk-on 210.e( "tL Ik n ' Q.ohab
Date of Issuance of 401 Water Quality Certification: C'
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by
the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of
these.
Applicant's Corti ccation
I, `Rj2 b. r1- ? tit aAiV-L,( Y. , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
A Signature:
Date:
Agent's Corti ccation/
1 / G I-AAJ hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materi . .
Signature: Date: /Ao Qy
Engineer's Certification
Partial ?? Final
a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe enodicall weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abi lies, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification B fe R es, t e pproved plans and specifications, and other supporting materials.
1
- `J Registration No. 15,9i'`'
Sicmaturer
Date /,/",X-0 Z e 9
OCT 13,2009 01:09P Bob Walker 252-492-2994 page 3
Ashton Place Holdings LLC
Dwt# o9-W71
May 27, 2009
Page 3 of 3
DWQ Project No.. OR -0011
County: Gq;1Cwcf?
Applicant: A b bn MI&CG 4401aill C LU
Project Name: 6Sbkw PLec b?3'h ', Rehab
Date of Issuance of 401 Water Quality Certification: 'S? A-110 q
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification. or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 f Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, kaltigb., NC, 27699-1621. This frnm may be retuned to DWQ by
rho applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of
these.
?i1t,?gnr's -erti(icatio?r
i hereby state that, to the beat of my abilities, due care and diligenct was
used in the observation of the construction such that the construction was observed to be built within substantial
complianoc and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other suppoZ!112- t Signature
.???r Date: /l' 1011, -
dgotIe Certification
L _, hft*y state tbat, to the beat of my abilities, due care and diligence was
used in the obaervadon of the c wtruetion such that the construction was observed to be built within substantial
compliance and intern of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supportingmateriais.
Signature-, Date:
neineer's CertirO&A
Partial Final
as a duly re&tered ptofeasional Engineer in the State of North
Carolina, having been authorized to observe {periodically, weekly, full time) the construwtion of the projeet,for the
Permittee hereby state that, to the best of my abilities, due care and dr?agence was used in the observation of the
construction such that the construction was observed to bo built witbin substantial compliance and intent of the 401 Water
Quality Certification and Buffor Rules, the approved plans and specifications, and other supporting materials.
Signature RegWastionNo.
Date