Loading...
HomeMy WebLinkAboutNCC192944_NOI Application_20191126Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/25/2019 4:29:04 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 11/26/2019 8:40:26 AM (Review- Construction NOI 18881) • The task was assigned to Garcia, Lauren V by round robin distribution 11/25/2019 4:29 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 27, 2019 5:00 PM 11/25/2019 4:29 PM Submit by McCoy, Suzanne 11/26/2019 3:35:10 PM (Payment Verification for NCC192944) * Jams Gaskins. • McCoy, Suzanne assigned the task to McCoy, Suzanne 11/26/2019 3:34 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 7, 2020 5:00 PM 11/26/2019 8:40 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * The Pines 2. County* Mecklenburg 3. Highway or Street 7231 Mcllwaine Rd Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Huntersville 5. State * NC 6. Zip Code * 28078 7. Latitude * Enter the latitude in decimal degrees 35.3900 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -80.9080 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 12/02/2019 Estimated Construction Project Start Date 10. Date to End* 04/29/2022 Estimated Construction Project End Cute 11. SIC (Primary) * Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Developrrent 12. Acres to be 28.96 disturbed* (including off -site borrow and waste areas) 13. Total site area 56.70 (acres) * 14. Post- 15.90 construction (Estimated) impervious area (acres)* NCC Project NCC-MECKL-2019-The Pines Tracking ID Assignedautonatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving McDowell Creek Wate rbody* Nbrre cf waterbody into which storrrwater runoff w ill discharge 15b. Waterbody 11-115-(1.5) Index No. * NCWaterbody Index Minter Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Smith Douglas Homes Name * 2. First Name* Ron IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* Willing IF Corporation, enter Pegistered Agent Last %rre 3b. Title Land Development Manager 4. Permitee E-mail ruvilling@smithdouglas.com Address * 5. Permittee 704-808-1132 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box311 Address Line 2 city Midland Fbstal / Zip Code 28107 Check box if the r Yes street address the same as mailing address State / Frovince / Faegion NC Country USA 7. Permittee Street Street Address Address* 4297 NC Highway 24/27 E Suite B Address Line 2 City State / Frovince / Fbgion Midland NC Fbstal / Zip Code Country 28107 USA C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site Ron Contact - First Name * 3. Primary Site Willing Contact - Last Name * 4. Title Land Development Manager 5. Site Contact E- ruvilling@smithdouglas.com mail Address* 6. Site Contact 704-808-1132 Telephone No.* 7. Organization Smith Douglas Homes Name 8. Site Contact Street Address Mailing Address* PO Box311 Address Line 2 City Midland Fbstal / Zip Code 28107 9. Consultant Name (Optional) First and Last narre 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Rovince / Fbgion NC Country USA D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/19/2019 Approved * 2. E&SC Plan Project 398554 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Mecklenburg County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan EC Plan Approval Ltr #398554.pdf 156.08KB Approval The Pines NCDEQ E-mail.pdf 764.43KB letter/documentation Mist be R7Fforrrat 6. NOI Certification The Pines NOI.pdf 38.17KB Form Mist be PDFfornat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Ron Willing Title Land Development Manager Organization Smith Douglas Homes Date * 11 /25/2019 F. Tracking and COC Info NOI Tracking No. 18881 NC Reference No. NCG01-2019-2944 Uses 'count number' variable (incremrented by SP) Certificate of NCC192944 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2944 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)