HomeMy WebLinkAboutWQ0022622_Sewer Extension Permit Status Update_20191118 RECEIVED MouNr NOV 21 2019 HOLLY NCDEQ/DWRINPDES Connecting Community&Nature November 18, 2019 Ms. Christyn L. Fertenbaugh, P.E. Environmental Engineer Pretreatment, Emergency Response, and Collection Systems Unit Division of Water Resources North Carolina Department of Environmental Quality 1617 Mail Services Center Raleigh, North Carolina 27699 Re: Engineering Certifications 2002 —2006 In accordance with your October 22, 2019 instructions concerning the above reference, I am providing the following information for each of the projects listed in your letter: Permit#WQ0021358 Kendrick Farm Phases 1 & 2 Attached is a copy of the Engineer's Certification and transmittal letter dated Feb 13, 2008. We do not have any record of the State's response. The wastewater collection system for this project have been owned and maintained since the completion. Permit#WQ0021543 Fites Creek Subdivision In our files we did find the NCDER Final Approval letter for the Water System. However, we do not have the sewer approval letter. This project has been completed and the sewer collection system accepted and maintained by the City. Permit#WQ0022622 Southgate Meadows This project was completed in 2005. Water and sewer facilities have been owned and maintained since completion. We do not have any files and/or records concerning this project. P.O. Box 406 Mount Holly, North Carolina 28120 Permit#WQ0023066 Taylors Creek Sanitary Sewer Extension Attached is a copy of the Engineer's Certification and transmittal letter dated November 16, 2004. We do not have any record of the State's response. This sanitary sewer trunk line extension was completed and construction certified by an outside engineering firm. This line has been in service and is owned and maintained by the City. Permit#WQ0023146 ' Creekside Estates Phase 2 In our files we did find the NCDER Final Approval letter for the Water System. However, we do not have the sewer approval letter. This project has been completed and the sewer collection system accepted and maintained by the City. Permit#WQ0024500 Rhyne's Trace/ Rhyne's Estates In our files we did find the NCDER Final Approval letter for the Water System. However, we do not have the sewer approval letter. This project has been completed and the sewer collection system accepted and maintained by the City. Also attached is the State's sewer certification acknowledgement for Phase II of Rhyne's Trace. This project is attached and part of the overall Rhyne's Estates/ Rhyne's Trace project. Permit#WQ0024629 Creekside Estates Phase III In our files we did find the NCDER Final Approval letter for the Water System. However, we do not have the sewer approval letter. This project has been completed and the sewer collection system accepted and maintained by the City. If you should require additional information, please let me know. est Regard , Da d E. Joh son, PE, FASCE Utilities Dire for/ City Engineer Attachments CC: Distribution P.O. Box 406 Mount Holly, North Carolina 28120 Request for Engineering Certification Date of Letter: October 22,2019 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return this form and supporting documents to the attention of Nyle Hothem at the Division's PERCS Unit by the delivery method below and within 30 days of the date of this letter: NCDEQ/DWR WQPS—PERCS UNIT By U.S. Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem Raleigh, NC 27699-1617 Raleigh, NC 27604 Nyle.Hothem@ncdenr.gov Permit No.: W Q 0022(a2,L Permittee: City of Mount Holly Project Name: &)t41 —I— G 1,1,54:Da0S Project Status (Check appropriate box to indicate Permittee's response and complete&sign below) ❑ Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. The Permitted project has been constructed and the required Engineer's Certification and supporting documents will be submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an active, in-service system may result in enforcement action. ❑ Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of this letter. ❑ Ownership/Name Change: The Permittee requests information to apply for ownership or name change. Please provide email and phone number below for follow-up. • Name&Title(print). �fTlt l9 j"CJ f' rat), 7t2 V 1 e (I e) 1 4)6c,X Signature: - Date: //Q fy Comments: it ii&ne�G7r7J — O/1 Th f 2i) )5 Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer system,we shall apply for and receive a new Wastewater Collection System Permit. Name&Title(Print): Signature: Date: Comments: Contact Information Updates for Current Owner Updated Contact Person&Title(Print): Updated Mailing Address: Updated Email: Updated Phone: