HomeMy WebLinkAbout20061270 Ver 1_Triage Comments_20060811DWQ# La c fr, ~ 2 7 D Daze c4~" i ~ ~~ 6 ~ „ir Who Reviewed: ~ 1 ~cz ~'-~~
Plan Detail7ncompiete - '
^ Please provide a location map for the project.
[Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. L +x,~.E.,~,
~ ~ s: k. h ~~ G~;:~ S~ ~
^ Please show all wetland impacts including fill slopes on the site plan. ~~ ~ `~~i~~~ j ~ 3 ~ S 1~' `z"" ` "f ` ~~ `~`~C '
^ Please indicate all buffer impacts on the site plan.
^ Please indicate proposed lot layout as overlays on the site plan. •
i ^ Please indicate the location of the protected buffers as overlays on the site plan.
^ Please locate ell isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan.
[~ Please provide cross section details showing the provisions for aquatic lift passage.
^ Please locate any planned•sewer lines on the site plan.
^ Please provide the location of any proposed stormwates management practices as required by GC
^ Please provide detail for the stormwater management practices as required by GC
_ ^ Please specify the percent of project imperviousness area based on the estimated built-out conditions:
^ Please indicate all stormwat ~outfalls on the site pta~. ~ •
^ Please indicate the diffuse flow provision measures on the site plan.
^ Please indicate whether or not the proposed impacts already been conducted.
Avoidance and/or Minimization Not Provtded
^ • The labeled as on the plans doss not appear to be necessary. Please eliminate the . or provide additional
information as to why it is Hates§ary for this project.
• ^ This Office believes that the labeled on the plans as eau be moved. or reconfigured to avoid the impacts to the
• . Please revise the pleas to avoid the impacts. •
^. This Office believes that the •labeled on the plans as can be moved or reconfigured to minimize the impacts to'the
. Please revise the plans to minimize the impacts.
^ The stormwater discharges at the location on the plans labeled will not provide diffuse flow through the buffer because
. Please revise the plans and provide calculations to show that dit';<'use flow will be achieved through the entirebuffa. If it
is not possible to achieve diffuse flow through. the entire buffer then. it may be necessary to provide stormwater management
• practices that remove nutrients before the stormwater can be discharged through the. buffer. •
Other •
^. The application fee was insuffieient because over 150 feet of stream and/or over 1 acre of wetland'impacts were requested. Please
provide S ~ .This additional fee must be received before your application can be reviewed.
^ Please complete Section(s) on the application. - '
. ^ Please provide a signed copy of the application. .
^ Please provide • copies of the application, . copies of the site pleas and other supporting information: •
. ^ Please-submit electronic CAD files showing ,,via einall to ian.mcmillan t~rnanail.net and CD:
Mitigation •
^ of compensatory mitigation is required for this project. Please provide a compensatory mitigation plan. The
plan must conform to the requirements in 15 A NCAC 2H .0500 and must be appropriate to the typaof impacts proposed.
^ Please indicate which 404 Permit the USACE would use to authorize this project.
~° a.}~q,
~-=~`~ . ~.c;~R E?~/1~~ ~'` , ~~` ~ . '~ ~ (Lce ~~ /1~. `~'f ^rc~e , 5 ~:,,,` : ~ C~ ~ ~ 1w+ c .. bk 1{.lt
;.n..~~~.c~- 1~-btt ~~~. 1~Q, . u~ x ~ ~ ~. ~ ~~ cc;v,,e.c~ ~-~ l~ ~'G~ ,. Please torr('
~~~~~ ~-i ~~ ~ ~~~~
~' ~2 q Se.. S c~ ~ ~- ~ ~ U E~ ~ ~~ ~ ~ ~ `^~
-~-~ _ ~ S,
~c ~~
t~lm 7 w ~ ~~ v«..R. ~ rd ~~. ~~ j ~ ~( ~ ~' ~i `~`'~ t~~
/ ' _
V ~~ ~ ~ o
~z+l M v~` t wC ~o~~ ~
~ ~~~ ~,~ Coin ce p ~~ ~ i-t ac~
~~~.~ ~ s ~ ~ ~~~ ~~ s ~
~ ~. ~~~~ i
~ ~ 5~~~, ~S a ~ ~s ~~~~~
~~~ r rLt c
P
~~~, ,wee ~ S
3 ~ ~