Loading...
HomeMy WebLinkAbout20061270 Ver 1_Triage Comments_20060811DWQ# La c fr, ~ 2 7 D Daze c4~" i ~ ~~ 6 ~ „ir Who Reviewed: ~ 1 ~cz ~'-~~ Plan Detail7ncompiete - ' ^ Please provide a location map for the project. [Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. L +x,~.E.,~, ~ ~ s: k. h ~~ G~;:~ S~ ~ ^ Please show all wetland impacts including fill slopes on the site plan. ~~ ~ `~~i~~~ j ~ 3 ~ S 1~' `z"" ` "f ` ~~ `~`~C ' ^ Please indicate all buffer impacts on the site plan. ^ Please indicate proposed lot layout as overlays on the site plan. • i ^ Please indicate the location of the protected buffers as overlays on the site plan. ^ Please locate ell isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan. [~ Please provide cross section details showing the provisions for aquatic lift passage. ^ Please locate any planned•sewer lines on the site plan. ^ Please provide the location of any proposed stormwates management practices as required by GC ^ Please provide detail for the stormwater management practices as required by GC _ ^ Please specify the percent of project imperviousness area based on the estimated built-out conditions: ^ Please indicate all stormwat ~outfalls on the site pta~. ~ • ^ Please indicate the diffuse flow provision measures on the site plan. ^ Please indicate whether or not the proposed impacts already been conducted. Avoidance and/or Minimization Not Provtded ^ • The labeled as on the plans doss not appear to be necessary. Please eliminate the . or provide additional information as to why it is Hates§ary for this project. • ^ This Office believes that the labeled on the plans as eau be moved. or reconfigured to avoid the impacts to the • . Please revise the pleas to avoid the impacts. • ^. This Office believes that the •labeled on the plans as can be moved or reconfigured to minimize the impacts to'the . Please revise the plans to minimize the impacts. ^ The stormwater discharges at the location on the plans labeled will not provide diffuse flow through the buffer because . Please revise the plans and provide calculations to show that dit';<'use flow will be achieved through the entirebuffa. If it is not possible to achieve diffuse flow through. the entire buffer then. it may be necessary to provide stormwater management • practices that remove nutrients before the stormwater can be discharged through the. buffer. • Other • ^. The application fee was insuffieient because over 150 feet of stream and/or over 1 acre of wetland'impacts were requested. Please provide S ~ .This additional fee must be received before your application can be reviewed. ^ Please complete Section(s) on the application. - ' . ^ Please provide a signed copy of the application. . ^ Please provide • copies of the application, . copies of the site pleas and other supporting information: • . ^ Please-submit electronic CAD files showing ,,via einall to ian.mcmillan t~rnanail.net and CD: Mitigation • ^ of compensatory mitigation is required for this project. Please provide a compensatory mitigation plan. The plan must conform to the requirements in 15 A NCAC 2H .0500 and must be appropriate to the typaof impacts proposed. ^ Please indicate which 404 Permit the USACE would use to authorize this project. ~° a.}~q, ~-=~`~ . ~.c;~R E?~/1~~ ~'` , ~~` ~ . '~ ~ (Lce ~~ /1~. `~'f ^rc~e , 5 ~:,,,` : ~ C~ ~ ~ 1w+ c .. bk 1{.lt ;.n..~~~.c~- 1~-btt ~~~. 1~Q, . u~ x ~ ~ ~. ~ ~~ cc;v,,e.c~ ~-~ l~ ~'G~ ,. Please torr(' ~~~~~ ~-i ~~ ~ ~~~~ ~' ~2 q Se.. S c~ ~ ~- ~ ~ U E~ ~ ~~ ~ ~ ~ `^~ -~-~ _ ~ S, ~c ~~ t~lm 7 w ~ ~~ v«..R. ~ rd ~~. ~~ j ~ ~( ~ ~' ~i `~`'~ t~~ / ' _ V ~~ ~ ~ o ~z+l M v~` t wC ~o~~ ~ ~ ~~~ ~,~ Coin ce p ~~ ~ i-t ac~ ~~~.~ ~ s ~ ~ ~~~ ~~ s ~ ~ ~. ~~~~ i ~ ~ 5~~~, ~S a ~ ~s ~~~~~ ~~~ r rLt c P ~~~, ,wee ~ S 3 ~ ~