Loading...
HomeMy WebLinkAboutNCC192920_ESC Approval Submitted_20191126ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director H&H Constructors, Inc. ATTN: Brian Walker, Agent 2919 Breezewood Avenue, Suite 400 Fayetteville, NC 28303 NORTH CAROLINA Environmental Quality November 25, 2019 Letter of Approval RE: Project Name: Brownstone, Phase III —Lots 300, 301, 303, 304, 315, 317, 319-321 & 323-325 Project ID: LEE-2020-017 Acres Approved: 4.80 County: LEE, City: West Sanford Twp., Address: Brownstone Drive & Bristol Way River Basin: Cape Fear, Stream Classification: Other Submitted By: Moorman, Keizer & Reitzel, Inc Date Received by LQS: November 18, 2019 Plan Type: New Dear Mr. Walker: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOT) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Pen -nit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOT form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOT fora to Annette Lucas at Anncttc.lucaSQ.ticdennuov or Paul Clark at Paul.clark(u.-ncdcnr.go,.-. After you submit a complete and correct NOT form, a CPOC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for the coverage under the NCGOI pen -nit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. D ^-N North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Ratelgh Regional Office 11628 Mail Service Center 3800 Barrett Drive ! Raleigh. North Carolina 27609 *.rAnrl ♦.4 �/ nwr.nre.w.n.wero+Ni\ ! 919.791.4200 Letter of Approval H&H Constructors, Inc. November 25, 2019 Page 2 of 2 Title 15A NCAC 4B .011 S(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspection made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended forrn if there is any change in the information included on the farm. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sally Caste, El Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NCGOI Fact Sheet cc: Dennis A. Gilbert {dgilbert(gmkrinc.com )- Electronic Copy DEMLR — Raleigh Regional Office File