HomeMy WebLinkAbout20010404_R-210 PLANS_20100726Re: [Fwd: Vass design plans]
Subject: Re: [Fwd: Vass design plans]
From: "D. R. Henderson, PE" <dhenderson @dot. state.nc.us>
Date: Mon, 07 Feb 2005 19:37:26 -0500
To: Brian Wrenn <brian.wrenn@ncmail.net>
I was out of office Friday in meeting downtown and did not see messages until this
morning.
Dave
Brian Wrenn wrote:
-------- Original Message --------
Subject: Vass design plans
Date: Fri, 04 Feb 2005 13:17:12 -0500
From: Brian Wrenn <brian.wrenn@ncmail.net>
To: dhenderson @dot. state.nc.us
CC: John Hennessy <John.Hennessy@ncmail.net>, Coleen Sullins
<coleen.sullins@ncmail.net>, Tom Reeder <Tom.Reeder@ncmail.net>
Dave,
Have you heard anything from your consul
design plans? I would like to get those
reviewing the sites. I'm sure you would
situation as well based on the projected
Please keep me updated on the situation.
Brian
:ant regarding the Vass Bypass
as soon as possible to begin
like a quick resolution to this
opening date for the bypass.
Thanks
D. R. Henderson, PE <dhenderson @dot. state.nc.us >
State Hydraulics Engineer
Hydraulics Unit,Highway Design Branch,Preconstruction,Division of Highways
1 of 1 2/7/2005 3:18 PM
Re: Vass design plans
Subject: Re: Vass design plans
From: "D. R. Henderson, PE" <denderson@dot.state.nc.us>
Date: Mon, 07 Feb 2005 19:35:31 -0500
To: Brian Wrenn <brian.wrenn@ncmail.net>
CC: John Hennessy <John.Hennessy@ncmail.net>, Coleen Sullins
<coleen.sullins@ncmail.net>, Tom Reeder <Tom.Reeder@ncmail.net>
Brian,
They should be printed today. We had to get electronic file
then print
them here.
Will deliver them to your office when they come out of the printer
line.
Thanks,
Dave
Brian Wrenn wrote:
Dave,
Have you heard anything from your consultant regarding the Vass
Bypass
design plans? I would like to get those as soon as possible to
begin
reviewing the sites. I'm sure you would like a quick resolution
to this
situation as well based on the projected opening date for the
bypass.
Please keep me updated on the situation. Thanks
Brian
D. R. Henderson, PE <denderson@dot.state.nc.us>
State Hydraulics Engineer
Hydraulics Unit,Highway Design Branch,Preconstruction,Division of Highways
1 of 1 2/7/2005 3:18 PM
Vass design plans
Subject: Vass design plans
From: Brian Wrenn <brian.wrenn@ncmail.net>
Date: Wed, 02 Feb 2005 16:42:16 -0500
To: Tom Reeder <Tom.Reeder@ncmail.net>
CC: Paul Rawls <Paul.Rawls@ncmail.net>, John Hennessy
<John.Hennessy @ ncmail. net>, Coleen Sullins <coleen.sullins@ncmail.net>
Tom,
I spoke with Dave Henderson today regarding the final design plans
that we are using to determine the locations for haz spill basins.
He indicated that the earliest he can get me the plans (as well as a
set for Paul) is tomorrow. He has to get the electronic versions
from the design contractor (they own the electronic versions) and
print them off. I have informed John of the situation and will
begin reviewing the sites as soon as I have the plans. Hopefully, I
can have something for you early next week. If you have any
questions, let me know.
Brian
1 of 1 2/7/2005 3:19 PM