Loading...
HomeMy WebLinkAboutNCG080301_BIMS_20191106Compliance Inspection Report Permit: NCG080301 Effective: 11/16/17 Expiration: 10/31/18 owner: Ezzell Trucking Inc SOC: Effective: Expiration: Facility: Ezzell Wilmington Terminal - Hwy 421 N County: New Hanover 235 Sutton Lk Rd Region: Wilmington Wilmington NC 28401 Contact Person: Grover J Ezzell Title: CEO Phone: 910-532-4101 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/06/2019 Primary Inspector: Brian P Lambe Secondary Inspector(s): Certification: Phone: Entry Time: 12:OOPM Exit Time: 12:30PM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Transportation w/Vehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG080301 Owner - Facility: Ezzell Trucking Inc Inspection Date: 11/06/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspected site for permit rescission. Site does not conduct industrial activities onsite. Trucks are stored onsite. No washing or maintenance occurs onsite. Page 2 of 3 Permit: NCG080301 Owner - Facility: Ezzell Trucking Inc Inspection Date: 11/06/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Did not review, site rep was in the middle of a mob interview. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Did not review Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Did not review Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page 3 of 3