HomeMy WebLinkAbout20170359 Ver 2_More Info Received_20191118Strickland, Bev From: Arrance, Keven <karrance@hazenandsawyer.com> Sent: Monday, November 18, 2019 12:53 PM To: Leslie, Andrea J; Amanda Fuemmeler (amandajones@usace.army.mil) Cc: Moore, Andrew W; Homewood, Sue Subject: RE: [External] RE: Loch Dornie IP - NCWRC comments Attachments: EOOO.pdf Ul"r."rExternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ELort.spam@nc.gov Andrea, We will make the requested modifications to the turbidity monitoring protocol. I will send a revised version shortly. Regarding the tall fescue, my apologies! I had coordinated a substitution and had the plan sheet revised, but I did not include it in the submittal. Please see the attached revised version of Sheet E000. Hazen is under contract for the construction oversight. We have assigned a Senior Field Coordinator to the project, with it being a 40-hour/week assignment for the duration of construction. The turbidity monitoring is one of our Senior Field Coordinator's responsibilities. Construction oversight is not specified on the plans. Thanks, Ms. Keven Arrance Senior Principal Scientist I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct); 919 522-4269 (mobile) karrance(a�hazenandsawyer.com I hazenandsawyer.com From: Leslie, Andrea J <andrea.leslie@ncwildlife.org> Sent: Monday, November 18, 2019 11:31 AM To: Arrance, Keven <karrance@hazenandsawyer.com>; Amanda Fuemmeler (amanda.jones@usace.army.mil) <amanda.iones@usace.army.mil> Cc: Moore, Andrew W <andrew.w.moore@ncdenr.gov>; Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: [External] RE: Loch Dornie IP - NCWRC comments Thank you for addressing our comments, Keven. Things look good with a couple of exceptions: We recommend revising the turbidity monitoring plan in the following ways: o Since you are working during the trout moratorium and will be moving around the impoundment, we think that keeping the minimum frequency of turbidity monitoring to 3 times a week (as opposed to Ix/week) is better. o On days you do not measure turbidity, visual observations of turbidity upstream and downstream of the lake should be performed. o Please specify when during the day you will collect turbidity samples and check turbidity visually - e.g., 2 hours after in -water work has begun. • Tall Fescue is still specified for temporary seeding on p. 3 (E000) of the 10/30/2019 plan set — this is highly invasive and we recommend removing this from the temporary seed mix. • We are assuming that Hazen and Sawyer staff will be on -site each day, as discussed at our on -site visit. Is this specified somewhere in the plan set? I may have missed it. Thanks, Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Building B Marion, NC 28752 828-803-6054 (office) 828-400-4223 (cell) www.ncwildlife.org Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Arrance, Keven <karrance@hazenandsawyer.com> Sent: Friday, November 01, 2019 10:48 AM To: Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Amanda Fuemmeler (a manda.*ones@usace.army.mi1) <amanda.iones@usace.army.mil>; ashuping@grandfatherclubnc.com Cc: Moore, Andrew W <andrew.w.moore@ncdenr.gov>; Tarver, Fred <fred.tarver@ncdenr.gov>; Homewood, Sue <sue.homewood@ncdenr.gov>; Goodfred, David W.<david.goodfred@ncwiIdlife.org>; Wood, Chris J. <chris.wood@ncwildlife.org>; Russ, W. Thomas <thomas.russ@ncwildlife.org>; Goudreau, Chris J. <chris.goudreau@ncwildlife. org>; Schueler, Tim <tschueIer@haze nandsawyer.com>; McSwain, Joel <imcswain@hazenandsawyer.com> Subject: [External] RE: Loch Dornie IP - NCWRC comments km2DcLm_ External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Amanda and Andrea, Attached are GGCC's responses to NCWRC's comments on the Loch Dornie dredging IP. Note that the following files are the same files that were submitted to the USACE on October 25: Revised Sheets _20191025_reduced.pdf, Figure 5a — Impacts Map_REV.pdf, and Pre -Construction Notification (PCN) Form_Section D revised.pdf. Please let us know if you have any questions or remaining concerns relative to the project. Have a wonderful weekend! Ms. Keven Arrance Senior Principal Scientist I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct); 919 522-4269 (mobile) karrance(a�hazenandsawyer.com I hazenandsawyer.com From: Leslie, Andrea J <andrea.leslie@ncwildlife.o Sent: Wednesday, October 16, 2019 5:07 PM To: Amanda Fuemmeler (amanda.*ones@usace.army.mi1) <amanda.iones@usace.army.mil> Cc: Arrance, Keven <karrance@hazenandsawyer.com>; Moore, Andrew W <andrew.w.moore@ncdenr.gov>; Tarver, Fred <fred.tarver@ncdenr.gov>; Homewood, Sue <sue.homewood@ncdenr.gov>; Goodfred, David W. <david.goodfred@ncwildlife.org>; Wood, Chris J. <chris.wood@ncwildlife.org'>; Russ, W. Thomas <thomas.russ@ncwildlife.org>; Goudreau, Chris J. <chris.goudreau@ncwildlife.org> Subject: Loch Dornie IP - NCWRC comments External Email - think before you click Hi Amanda, Attached are NCWRC's comments on the Loch Dornie dredging IP. Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Building B Marion, NC 28752 828-803-6054 (office) 828-400-4223 (cell) www.ncwildlife.org Get NC Wildlife U12date delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Q 0 0 0 0 EROSION & SEDIMENT CONTROL NOTES: 1. THE CONTRACTOR WILL COMPLY WITH ALL REQUIREMENTS OF SEDIMENT AND EROSION CONTROL AS SET FORTH BY THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL MANUAL. THE CONTRACTOR WILL BE REQUIRED TO MAINTAIN, MONITOR AND REPORT ON ALL EROSION AND SEDIMENT CONTROL ITEMS RELATED TO THE PERMIT FOR CONSTRUCTION ACTIVITY. 2. CONTRACTOR SHALL INSTALL ALL TEMPORARY EROSION CONTROL MEASURES WITHIN THE PROJECT AREA PRIOR TO BEGINNING ANY EARTHWORK. 3. CONTACT AND NOTIFY: GG&CC, PROJECT ENGINEER, AND NCDEQ LAND QUALTIY AT LEAST 72 HOURS PRIOR TO START OF CONSTRUCTION STATING: A. A REQUEST FOR A PRE -CONSTRUCTION MEETING B. WHEN CONTRACTOR INTENDS TO BEGIN CONSTRUCTION C. WHEN CONTRACTOR INTENDS TO INSTALL STORMWATER MANAGEMENT FACILITIES D. SOURCE OF BORROW MATERIAL E. LOCATION OF DISPOSAL AREA WITH AN ACTIVE PERMIT F. CONTRACTOR'S TENTATIVE CLOSING DATE INITIAL DISTURBANCE WILL BE LIMITED TO THAT NECESSARY TO GAIN ENTRANCE TO THE SITE AND INSTALL NECESSARY SEDIMENT CONTROLS AS PER THE APPROVED PLANS. 4. ALL SEDIMENT CONTROLS AND CRITICAL SLOPES MUST BE STABILIZED WITHIN THREE (3) CALENDAR DAYS. ALL OTHER INACTIVE DISTURBED AREAS ON THE PROJECT SITE MUST BE STABILIZED WITHIN SEVEN (7) CALENDAR DAYS. 5. ALL EXCAVATED MATERIAL SHALL BE PLACED ON THE HIGH SIDE WHENEVER POSSIBLE AND CONFINED TO AN AREA WHERE IT WILL NOT OBSTRUCT THE NORMAL COURSE OF DRAINAGE. 6. PUMPING OF SEDIMENT LADEN WATER WILL NOT BE ALLOWED UNLESS IT IS FILTERED BY WAY OF AN APPROVED SEDIMENT TRAPPING DEVICE. 7. WATER REMOVED VIA SUMP PIT OR REMOVABLE PUMPING STATION SHALL BE PUMPED THROUGH AN APPROVED DEWATERING BASIN OR FILTER BAG PRIOR TO DISCHARGE VIA A STABLE OUTLET. 8. CONTINUOUS INSPECTION AND MAINTENANCE OF ALL SEDIMENT CONTROL DEVICES IS MANDATORY. 9. ANY SEDIMENT CONTROL DEVICES DISTURBED DURING CONSTRUCTION MUST BE RESTORED IMMEDIATELY. 10. ALL POINTS OF INGRESS AND EGRESS SHALL BE PROTECTED TO MINIMIZE TRACKING OF MUD ON TO PUBLIC RIGHT-OF-WAYS. 11. ANY EARTH, GRAVEL, AND/OR OTHER MATERIAL TRACKED, SPILLED OR WASHED ON TO ADJACENT ROADS MUST BE IMMEDIATELY REMOVED AND DISPOSED OF IN A PROPER MANNER. NO FLUSHING WILL BE PERMITTED. ALL MATERIAL MUST BE REMOVED BY MEANS OF SHOVELING AND SWEEPING. 12. THE CONTRACTOR SHALL NOT EXPOSE EARTH THAT CAN NOT BE TEMPORARILY OR PERMANENTLY STABILIZED WITHIN 24 HOURS. ANY EXCAVATED AREAS WHICH CAN NOT BE IMMEDIATELY STABILIZED, MUST BE TEMPORARILY STABILIZED WITH AT LEAST 4" OF MULCH OR GRADED AGGREGATE. 13. PROJECT ENGINEER MUST BE NOTIFIED IN WRITING OF WHERE ANY EXCESS MATERIAL WILL BE DISPOSED OR WHERE ANY BORROWED MATERIALS WILL COME FROM. 14. THE CONTRACTOR SHALL HAVE A NCDEQ LAND QUALITY EROSION CONTROL INSPECTOR INSPECT AND APPROVE THE WORK COMPLETED AT THE STAGES OF CONSTRUCTION SPECIFIED BELOW: A. UPON COMPLETION OF THE INSTALLATION OF THE PERIMETER SEDIMENT CONTROLS B. DURING ALL GRADING AND BUILDING OPERATIONS C. UPON FINAL STABILIZATION OF THE ENTIRE SITE PRIOR TO REMOVAL OF THE SEDIMENT CONTROLS 15. THE CONTRACTOR SHALL NOT DEVIATE FROM THE APPROVED SEDIMENT AND EROSION CONTROL PLAN WITHOUT FIRST RECEIVING APPROVAL FROM STORMWATER DEPARTMENT. VARIATIONS TO THE ORIGINAL PLAN MUST BE SUBMITTED IN WRITING WITH ALL PROPOSED MODIFICATIONS STILL BEING HIGHLIGHTED. SUBSTANTIAL CHANGES WILL NECESSITATE AMENDMENT OF THE GRADING / BUILDING PERMIT. 16. ALL ORANGE SAFETY FENCE, TREE PROTECTION MEASURES AND SILT FENCE DIVERSIONS MUST BE INSTALLED ACCORDING TO THE PLANS AND APPROVED BY THE ENGINEER BEFORE ANY CONSTRUCTION ACTIVITIES BEGIN. 17. NO CLEARING, GRADING, CONSTRUCTION OR OTHER DISTURBANCE OF VEGETATION IS PERMITTED OUTSIDE OF THE LIMITS OF DISTURBANCE, WITHOUT PRIOR APPROVAL OF THE SEDIMENT CONTROL INSPECTOR. 18. ALL TREES DESIGNATED FOR REMOVAL SHALL BE REMOVED IN STAGES AS SPECIFIED IN THE SEQUENCE OF CONSTRUCTION. AREAS OF TREE REMOVAL WITHIN THE LIMITS OF DISTURBANCE MUST BE TEMPORARILY STABILIZED USING SEED & WOOD CHIPS BY THE END OF EACH DAY. 19. THE CONTRACTOR MAY ONLY CLEAR & GRUB AREAS WITHIN THE DAILY CONSTRUCTION ZONE AS NECESSARY TO COMPLETE STREAM STABILIZATION EFFORTS. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE PERMITTED TO CLEAR & GRUB AREAS BEYOND THE CONFINES OF THE DAILY STREAM DIVERSION MEASURES. THE CONTRACTOR SHALL MAKE EVERY ATTEMPT TO MINIMIZE IMPACTS TO ALL TREES LOCATED WITHIN THE LIMITS OF DISTURBANCE. 20. STABILIZED CONSTRUCTION ENTRANCES AND TEMPORARY STOCKPILE AREAS SHALL BE CONFINED TO THE LOCATIONS GIVEN ON THE PLANS AND PROTECTED WITH PERIMETER EROSION CONTROL MEASURES AT ALL TIMES UNLESS DIRECTED OTHERWISE BY ENGINEER. 21. IF THE NEED FOR ADDITIONAL TEMPORARY STOCKPILES BECOMES NECESSARY, IT MUST: A. BE WITHIN THE LIMITS OF DISTURBANCE OR APPROVED OFF -SITE LOCATION. B. DRAIN TO A FUNCTIONING SEDIMENT CONTROL DEVICE. C. NOT IMPEDE UPON OR ALTER THE FUNCTION OF THE EXISTING SEDIMENT CONTROL MEASURES. D. NOT ALTER ANY NATURAL DRAINAGE PATTERNS, INCLUDING THE EXISTING AND PROPOSED STREAM CORRIDOR. E. BE APPROVED BY THE SEDIMENT CONTROL INSPECTOR. F. NOT BE WITHIN THE 100-YEAR FLOODPLAIN. IN -STREAM CONSTRUCTION NOTES: 22. LINVILLE RIVER AND ITS ASSOCIATED TRIBUTARIES IN THIS AREA ARE DESIGNATED AS CLASS C;Tr. THESE WATERS ARE PROTECTED FOR USES SUCH AS SECONDARY RECREATION, FISHING, WILDLIFE, FISH CONSUMPTION, AQUATIC LIFE INCLUDING PROPAGATION, SURVIVAL AND MAINTENANCE OF BIOLOGICAL INTEGRITY. ADDITIONAL RESTRICTIONS ARE IN PLACE AS A RESULT OF THE THE TROUT WATERS jr) CLASSIFICATION WHICH INCLUDES A 25-FOOT LAND DISTURBANCE BUFFER. NO LAND DISTURBING ACTIVITY MAY TAKE PLACE WITHIN THE TROUT BUFFER ZONE FROM OCTOBER 15 TO APRIL 15 UNLESS AUTHORIZED BY NC WRC AND DLR. 23. STREAM DIVERSION PRACTICES ARE TO MAINTAIN POSITIVE FLOW AROUND THE CONSTRUCTION ZONE AT ALL TIMES. THE CONTRACTOR MUST TIE THE DAILY STREAM CONSTRUCTION ZONE BACK INTO THE EXISTING CHANNEL BY THE END OF EACH WORK DAY. 24. WORK SHALL BE CONDUCTED IN A MANNER WHICH PERMITS THE PROPOSED BANKFULL CHANNEL CONSTRUCTION AND THE ADJACENT SECTION OF THE BANKFULL BENCH TO BE PERMANENTLY STABILIZED AT THE END OF EACH WORK DAY. PERMANENT STABILIZATION OF STREAMBED, BANKS AND FLOODPLAIN SOIL AREAS DURING CONSTRUCTION WILL CONSIST OF PLACED SUBSTRATE MATERIAL, FLOODPLAIN SOIL, BOULDER PROTECTION, TOPSOIL, STREAMBANK SEEDING AND COIR FIBER MATTING. STABILIZE ALL OTHER AREAS USING TEMPORARY SEED AND WOOD CHIPS WITHIN THE CONSTRUCTION ZONE. REMOVE ALL STREAM DIVERSION DEVICES BY THE END OF EACH WORK DAY. IN THE EVENT THAT THE CONTRACTOR CAN NOT COMPLY WITH THE ABOVE, THE STREAM DIVERSION DEVICE MUST BE CONTINUOUSLY MANNED AND OPERATING UNTIL THE CONSTRUCTION EFFORT CAN TIE BACK INTO THE EXISTING CHANNEL IN A STABLE MANNER. 25. STREAM DIVERSION MEASURES INCLUDING SANDBAGS, FILTER BAGS, AND PUMP -AROUND DEVICES, ETC. ARE INTENDED TO BE PROPERLY MAINTAINED AND REUSED AS WORK PROGRESSES DOWNSTREAM (OR UPSTREAM IF REQUIRED BY SITE CONDITIONS). 26. THE LENGTH AND LOCATION OF DAILY CONSTRUCTION ZONES SHOWN ON THE PLANS ARE THE APPROVED POSITIONS. ACTUAL LENGTH AND PLACEMENT OF SANDBAG DIKES MAY BE SLIGHTLY ADJUSTED TO FIT THE LOCAL TOPOGRAPHY AND THE AMOUNT OF DAILY IN -STREAM CONSTRUCTION THAT IS FEASIBLE TO THE CONTRACTOR. EACH DAILY WORK ZONE ISOLATED BY THE STREAM DIVERSION MEASURES SHALL NOT EXCEED 400 FEET IN STREAM CHANNEL LENGTH. 27. IN -STREAM CONSTRUCTION SHALL BE CONDUCTED WORKING IN AN UPSTREAM TO DOWNSTREAM MANNER. THE CONTRACTOR MAY WORK FROM DOWNSTREAM TO UPSTREAM WITH THE APPROVAL OF THE INSPECTOR. UNDER NO CIRCUMSTANCES WILL HEAVY EQUIPMENT BE PERMITTED TO CROSS THE NEWLY CONSTRUCTED STREAM CORRIDOR OR ROCK STRUCTURES. 28. NO CONSTRUCTION ACTIVITIES SHALL BE CONDUCTED DURING STORM EVENTS LEAD ENGINEER: T. SCHUELER SUPPORTING ENGINEER: - IW_1►193:toL1w�_1:ZslaI10to DESIGNED BY: J. MCSWAIN DRAWN BY: J. MCSWAIN REV j ISSUED FOR j DATE i By CHECKED BY: T. SCHUELER SENSITIVE AREA NOTES: 29. NO CONSTRUCTION ACTIVITIES SHALL BE UNDERTAKEN WITHIN SPECIFIED SENSITIVE AREAS OF THE PROJECT WITHOUT PRIOR NOTIFICATION OF THE ENGINEER. ALL WORK IN THESE AREAS SHALL BE MONITORED BY A RESPONSIBLE PARTY DESIGNATED BY THE CONTRACTOR TO ASSURE THAT REASONABLE CARE IS TAKEN IN OR ADJACENT TO THESE AREAS. AREAS CONSIDERED SENSITIVE ARE DEFINED AS: FLOODPLAINS, WETLANDS (TIDAL, NONTIDAL AND ASSOCIATED BUFFERS), CRITICAL AREAS, FORESTED AREAS, ARCHEOLOGICAL SITES, HISTORIC SITES, PARK LAND AND OPEN WATER. PORTIONS OF THIS PROJECT LIE WITHIN THE 100-YR FLOODPLAIN TEMPORARY STABILIZATION NOTES: 30. PERMANENT AND TEMPORARY STABILIZATION SHALL FOLLOW THE STABILIZATION TIMEFRAMES TABLE BELOW TO MEET REQUIREMENTS OF NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES (NCGO1), NCDENR AND DEMLR. MAINTENANCE OF SEDIMENT CONTROL NOTES: 31. THE CONTRACTOR SHALL, WITHOUT EXTRA COST TO THE PROJECT, REPAIR AND MAINTAIN EXISTING SEDIMENT CONTROL DEVICES UNTIL ALL AREAS WITHIN LIMITS OF CONSTRUCTION ARE STABILIZED. ALL SEDIMENT CONTROL MEASURES REFERRED TO ON THESE PLANS SHALL BE IN ACCORDANCE WITH PUBLISHED NORTH CAROLINA STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL DISTURBED AREA NOTES: 32. TRENCHES FOR ANY STORM DRAIN PIPE AND UNDERDRAIN PIPE INSTALLATIONS SHALL BE BACKFILLED, COMPACTED AND STABILIZED AT THE END OF EACH DAY. /N CAR��i �oF Essio Q,�L 33505 C. EROSION & SEDIMENTATION CONTROL - CONSTRUCTION SEQUENCING NOTES: 1. NO CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES SHALL BEGIN UNTIL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. CONTRACTOR SHALL INSTALL SILT FENCE AS SHOWN ON THE DRAWING FOR TEMPORARY PERIMETER EROSION CONTROL. 2. TEMPORARY SEEDING MEASURES SHALL BE EMPLOYED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES ON ANY AREA WHICH WILL REMAIN UNDISTURBED FOR MORE THAN 7 WORKING DAYS OR 14 CALENDAR DAYS, WHICHEVER IS SHORTER. ALL SLOPES STEEPER THAN 3HAV SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 7 CALENDAR DAYS. ALL OTHER SLOPES OF 3H:1V OR FLATTER, EXCEPT THOSE GREATER THAN 50 FT IN LENGTH, SHALL BE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR OTHER STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 14 CALENDAR DAYS. 3. PERMANENT SEEDING SHALL BE IMMEDIATELY INSTALLED, FOR ALL AREAS REACHING FINAL GRADE WHICH WILL NOT BE DISTURBED AGAIN. 4. UPON COMPLETION OF FINAL GRADING, PERMANENT STRUCTURAL OR VEGETATIVE STABILIZATION SHALL BE ESTABLISHED. 5. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES AND THE SITE HAS BEEN PERMANENTLY STABILIZED WITH STRUCTURAL AND/OR PERMANENT VEGETATIVE MEASURES. 6. CONTRACTOR SHALL PERFORM SITE INSPECTION AND MAINTENANCE ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 1/2 INCH OF RAIN PER 24 HOUR PERIOD. 7. ONCE PERMANENT STABILIZATION HAS OCCURRED, TEMPORARY SEDIMENT CONTROL MEASURES MAY BE REMOVED UPON APPROVAL FROM THE CITY. ANY AREAS DISTURBED BY THE REMOVAL OF EROSION CONTROL MEASURES SHALL BE RETURNED TO THE ORIGINAL, OR BETTER, CONDITION, THEN SEEDED, MULCHED, AND FERTILIZED. 8. THE NORTH CAROLINA SEDIMENTATION POLLUTION CONTROL ACT REQUIRES PEOPLE RESPONSIBLE FOR LAND DISTURBING ACTIVITIES TO INSPECT EROSION AND SEDIMENTATION CONTROL MEASURES AFTER EACH PHASE OF THE PROJECT UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE SELF INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS TO ENSURE THE INSTALLATION OF EROSION AND SEDIMENTATION CONTROL MEASURES ARE CONTINUALLY PERFORMING AS INTENDED. CONTROL OF WATER NOTES: 1. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT, SUPPLIES, AND MATERIALS NECESSARY FOR THE CONTROL OF WATER, INCLUDING BUT NOT LIMITED TO: PUMPS, HOSE, SANDBAGS, DEWATERING DEVICES. 2. THE CONTRACTOR SHALL IMPLEMENT A CLEARWATER DIVERSION PLAN TO TEMPORARILY BYPASS FLOWS AROUND WORK AREAS. PUMPING MAY BE REQUIRED TO BYPASS FLOWS. 3. THE CONTRACTOR SHALL IMPLEMENT A WORK SITE DEWATERING PLAN TO DEWATER WORK AREAS AND TREAT WATER COLLECTED FROM DISTURBED AREAS. FLOWS COLLECTED FROM DISTURBED AREAS SHALL BE TREATED WITH AN APPROVED SEDIMENT CONTROL DEVICE PRIOR TO DISCHARGE. 4. ALL PUMPED FLOWS SHALL BE DISCHARGED IN A NON -EROSIVE MANNER TO A STABILIZED WATERCOURSE. 5. THE CONTRACTOR SHALL REMOVE OR MODIFY SANDBAG DIKES OR OTHER WATER CONTROL BARRIERS PRIOR TO FORECASTED RAIN EVENTS TO ALLOW FLOW THROUGH THE WATERCOURSE AS NEEDED TO MAINTAIN UPSTREAM FLOW WITHIN STREAM BANKS. 6. THE CONTRACTOR SHALL REMOVE CONSTRUCTION EQUIPMENT FROM THE WATERCOURSE AT THE END OF EACH WORK DAY AND PRIOR TO FORECASTED RAIN EVENTS. GG&CC IS NOT RESPONSIBLE FOR DAMAGE TO CONSTRUCTION EQUIPMENT. SEEDING NOTES: SEED BED PREPARATION 1. CONTRACTOR SHALL PREPARE ALL AREAS TO RECEIVE TEMPORARY OR PERMANENT SEEDING MEASURES PRIOR TO PLANTING. 2. TOPSOIL SHALL BE PLACED IN AREAS TO BE SEEDED AND ROUGHENED WITH TRACKED EQUIPMENT OR OTHER SUITABLE MEASURES. SLOPES STEEPER THAN 3:1 MAY BE ROUGHENED BY GROOVING, FURROWING, TRACKING, OR STAIRSTEP GRADING. SLOPES FLATTER THAN 3:1 SHOULD BE GROOVED BY DISKING, HARROWING, RAKING, OPERATING PLANTING EQUIPMENT ON THE CONTOUR. 3. SOIL AMENDMENTS INCLUDING, BUT NOT LIMITED TO, LIME AND FERTILIZER SHALL BE SPREAD AS NECESSARY, AND AT THE RATES SHOWN IN THE SEEDING SCHEDULE. SEEDING SHALL BE AS PER TYPE AND RATES SHOWN IN THE SEEDING SCHEDULE. SEED SHALL BE BROADCAST AS SOON AS POSSIBLE FOLLOWING ROUGHENING, BEFORE SURFACE HAS BEEN SEALED BY RAINFALL. MULCHING AND TACKING AGENTS 1. MULCH MUST COVER A MINIMUM OF 80 PERCENT OF THE SOIL SURFACE AND MUST BE SECURED BY TACKING, CRIMPING, OR NETTING. 2. WOOD CELLULOSE FIBER MULCH SHALL BE USED IN HYDROSEEDING GRASS SEED IN COMBINATION WITH FERTILIZERS AND OTHER APPROVED ADDITIONS. 3. NO NETTING WITH PLASTIC MESH AND / OR PLASTIC TWINE SHALL BE USED IN WETLAND AND RIPARIAN BUFFERS TO PROTECT SMALL ANIMALS. HYDROSEEDING 1. HYDROSEEDING SHALL BE CARRIED OUT IN THREE STEPS. STEP ONE SHALL CONSIST OF THE APPLICATION OF LIME. IN STEP TWO THE SEED MIXTURE SHALL BE MIXED WITH THE FERTILIZER, WOOD CELLULOSE FIBER MULCH, AND ANY REQUIRED INOCULANTS AND APPLIED TO THE SEED BED. STEP THREE SHALL CONSIST OF APPLICATION OF TOP DRESSING DURING THE FIRST SPRING OR FALL, WHICHEVER COMES FIRST, AFTER STEP TWO. 2. INGREDIENTS FOR THE MIXTURE AND STEPS SHOULD BE DUMPED INTO A TANK OF WATER AND THOROUGHLY MIXED TO A HOMOGENEOUS SLURRY AND SPRAYED OUT UNDER A MINIMUM OF 300-350 POUNDS PRESSURE, IN SUITABLE PROPORTIONS TO ACCOMMODATE THE TYPE AND CAPACITY OF THE HYDRAULIC MACHINE TO BE USED. APPLICATIONS SHALL BE EVENLY SPRAYED OVER THE GROUND SURFACE. THE CONTRACTOR SHALL FREE THE TOPSOIL OF STONES, ROOTS, RUBBISH AND OTHER DELETERIOUS MATERIALS AND DISPOSE OF SAME OFF THE SITE. THE BARE SOIL, EXCEPT EXISTING STEEP EMBANKMENT AREA, SHALL BE ROUGH RAKED TO REMOVE STONES, ROOTS, AND RUBBISH OVER 4-INCH IN SIZE, AND OTHER DELETERIOUS MATERIALS AND DISPOSE OF SAME OFF THE SITE. 3. NO SEEDING SHOULD BE UNDERTAKEN IN WINDY OR UNFAVORABLE WEATHER, WHEN THE GROUND IS TOO WET TO RAKE EASILY, WHEN IT IS IN A FROZEN CONDITIONS, OR TOO DRY. ANY BARE SPOTS SHOWN IN TWO TO THREE WEEKS SHALL BE RE -CULTIVATED, FERTILIZED AT HALF THE RATE, RAKED, SEEDED, AND MULCHED AGAIN BY MECHANICAL OR HAND BROADCAST METHOD ACCEPTABLE TO THE OWNER. 100% PLANS FOR CONSTRUCTION SEQUENCE OF CONSTRUCTION PHASING (100% PLANS STAGE PHASE 1 PHASE 1A (PRE -POSITIONING PRIOR TO 1/1/20) 1. CONDUCT PRE -CONSTRUCTION MEETING WITH CONTRACTOR, GG&CC PROJECT MANAGER, ENGINEER, AND AVERY COUNTY EROSION AND SEDIMENT CONTROL (ESC) INSPECTOR. 2. INSTALL STABILIZED CONSTRUCTION ENTRANCE (SCE) #1 AND PERIMETER SEDIMENT CONTROL DEVICES FOR STAGING AREA #1. 3. INSTALL SIPHON PIPING AND PUMPING. ESTIMATED CALENDAR DAYS. 30 DAYS PHASE 1B - - CAN BEGIN PRIOR TO 1/1/20) 1. INSTALL SCE #3 AND ASSOCIATED PERIMETER SEDIMENT CONTROL FENCING 2. INSTALL WESTERN LAKE PATH IMPROVEMENTS. 3. INSTALL SCE #2 OFF OF CLUBHOUSE ACCESS ROAD, AND PERIMETER SEDIMENT CONTROL AND ACCESS PROTECTION INCLUDING SILT FENCE FOR TEMPORARY STOCKPILE AREA. 4. EX6AVATE FOR IMBRIGATEE) R06K WALL (IRW) #2 INSTALLATION ON LEFT (EAST) BANK DOWN L SEPARATE AND S:FE) 1(PII E ALL GLASS A AP4B 2 BE) II I' ERS E)N TI Ir LEFT BANK ABOOVE ORDINARY I 1IGI 'WATER FOR USE IN IRW GONSTRUGTION IN LATER PI IASE.- ESTIMATED CALENDAR DAYS: 14 DAYS PHASE 1C (LOCH DEWATERING - CAN BEGIN 1/1/20) 1. DRAW LOCH DOWN APPROXIMATELY 8 FEET. MAINTAIN AT REDUCED DEPTH. ESTIMATED CALENDAR DAYS. 3 DAYS PHASE 1 D (WEST CHANNEL DREDGE) 1. BLOCK ACCESS TO EXISTING PEDESTRIAN BRIDGES A, D, AND E. 2. INSTALL SCE #4 AND ASSOCIATED PERIMETER CONTROL DEVICES. 3. INSTALL FLOCCULANT TREATMENT IN OUTFALL CHANNEL AND TURBIDITY CURTAINS IN LOCH. 4. INSTALL DIVERSION #1 AND #2, TEMPORARILY DIVERTING LINVILLE RIVER THROUGH EASTERN (FAIRWAY 18) CHANNEL. MAINTAIN DIVERSION. 5. EXCAVATE WEST CHANNEL FROM UPSTREAM TO DOWNSTREAM (PUSHING MATEIAL DOWNSTREAM), TEMPORARILY STOCKPILING WET MATERIAL AS SHOWN. AVOID IMPACITNG ISLAND DRIVE BRIDGE AND ASSOCIATED WATERLINE. MOVE MATERIAL BENEATH BRIDGE F, KEEPING BRIDGE IN PLACE DURING THIS PHASE (ALTERNATIVELY, BRIDGE F REPLACEMENT WORK CAN BE COMPLETED AT THIS TIME; SEE PHASE 2B). GRADE AN INTERIM DRAINAGE CHANNEL APPROXIMATELY ALONG THE HISTORIC RIVER LOCATION THROUGH THIS AREA IN ANTICIPATION OF NEXT PHASE. ESTIMATED CALENDAR DAYS. 14 DAYS TOTAL PHASE 1 ESTIMATED CALENDAR DAYS STARTING 111120: 17 DAYS PHASE 2 PHASE 2A (EAST CHANNEL DREDGE) 1. INSTALL DIVERSION #3 AND GRAVITY DIVERSION #1. 2. INSTALL DIVERSION #4 AND GRAVITY DIVERSION #2. 3. EXCAVATE EAST CHANNEL FROM UPSTREAM TO DOWNSTREAM (PUSHING MATERIAL DOWNSTREAM), TEMPORARILY STOCKPILING WET MATERIAL AND ACCEPTABLE SANDY -GRAVEL "DRY" MATERIAL AS SHOWN ON PLANS; SEPARATE OUT AND STOCKPILE ALL COBBLE MATERIAL SEPARATELY. ESTIMATED CALENDAR DAYS. 21 DAYS PHASE 2B (DEMOLITION AND NEW BRIDGE 4) 1. DEMO AND REMOVE FROM SITE BRIDGES A, B, C, D AND E INCLUDING ABUTMENTS, PIERS ETC PLUS OTHER DEMO ITEMS WITHIN THE LIMITS OF THIS PHASE. KEEP BRIDGES F AND G IN PLACE. 2. INSTALL TEMPORARY SANITARY BYPASS FOR BRIDGE E. 3. DEMO BRIDGE E AND ASSOCIATED SANITARY LINE. 4. INSTALL NEW SANITARY LINE AND NEW BRIDGE 4 WITH ABUTMENTS. 5. EXCAVATE EAST CHANNEL ESTIMATED CALENDAR DAYS: 14 DAYS PHASE 2C (ISLAND CREATION AND EVENT AREA GRADING) 1. UNDERCUT FOR ISLAND PERIMETER AND LOCHE WALLS AND INSTALL. 2. WASTE APPROVED AMOUNT OF WET MATERIAL WITHIN ISLAND FOOTPRINTS, FAIRWAY 18, AND EVENT LAWN AREA. 3. ROUGH GRADE ISLANDS WITH DRY MATERIAL. ROUGH GRADE FAIRWAY 18 FILL AND SHORELINE AREA, ISLAND DRIVE LAWN, AND CLUBHOUSE / EVENT LAWN AREA. ESTIMATED CALENDAR DAYS: 21 DAYS PHASE 2D (COMPLETE DREDGING) 1. COMPLETE REMAINDER OF DREDGING OPERATIONS PER FIELD DIRECTION BY THE ENGINEER. 2. REMOVE/MODIFY DIVERSIONS AS NECESSARY; DIVERSION 4 AND GRAVITY DIVERSION 2 TO REMAIN. 3. COMPLETE ISLAND GRADING WITH DRY MATERIAL AND CAP ISLANDS. COMPLETE FAIRWAY 18 FILL AND SHORELINE AREA GRADING, ISLAND DRIVE LAWN, GRADING AND CLUBHOUSE / EVENT LAWN AREA GRADING. ESTIMATED CALENDAR DAYS: 14 DAYS 9RVEST CLASSSS n AND 2 BOULDERS FROM FAIRWAY 17 STREAM GROSSING AND STO nnrrE FOR i-GLUSTER WALL SE ANID BRIDGE 5 USE. 3. INSTALL GRADE 60NTRO SILLS. S 4. INSTALL . 5. GRADE FAIRWAY 17 GROSSING AREA UTILIZING REMAINING 6UT FROM i-GLUSTER WORK. S T I n A A T B GA rHn A n !l A\/ .- 21 ) A Y-5 PHASE 2F (SITE AMENITIES AND BRIDGE 5) 1. INSTALL NEW BRIDGES 1, 2 AND 3 INCLUDING ABUTMENTS. 2. INSTALL EVENT LAWN AMENITIES. 3. INSTALL TEMPORARY SANITARY BYPASS AT EXISTING BRIDGE G. 4. INSTALL NEW BRIDGE 5 WITH NEW SANITARY LINE AND MANHOLES; DEMOLISH BRIDGE G. 5. CONSTRUCT IRW #3. 6. REMOVE DIVERSION 4 AND GRAVITY DIVERSION 2. ESTIMATED CALENDAR DAYS: 21 DAYS PHASE 2G (LANDSCAPING AND DEMOBILIZATION) 1. INSTALL LANDSCAPING AMENITIES AS SHOWN ON PLAN SET. 2. REMOVE REMAINING SEDIMENT CONTROL FEATURES AND STABILIZE. ESTIMATED CALENDAR DAYS: 7 DAYS TOTAL PHASE 1 AND 2 ESTIMATED CALENDAR DAYS: 150 DAYS TEMPORARY SEEDING SCHEDULE (SEASONAL) EARLY SUMMER SEASON FALL / WINTER SEASON SEEDING 40 LBS / ACRE OF GERMAN MILLET 120 LBS / ACRE RYE (GRAIN) MIXTURE 80 LBS / ACRE OF RED FESCUE 80 LBS / ACRE RED FESCUE MAY 1 - AUGUST 15 OCTOBER 25 -DECEMBER 30 REFERTILIZE IF GROWTH IS NOT FULLY BETWEEN DECEMBER 30 - FEBRUARY 15, ADD SEEDING DATES ADEQUATE. 50 LBS / ACRE OF ANNUAL KOBE LESPEDEZA. APPLY 4000 LBS / ACRE STRAW OR APPLY 4000 LBS / ACRE STRAW EQUIVALENT EQUIVALENT HYDROSEEDING. HYDROSEEDING. APPLY LIME AND FERTILIZER PER SOIL TESTS APPLY LIME AND FERTILIZER PER SOIL TESTS SEEDING OR 2000 LBS / ACRE LIMESTONE AND 750 LBS OR 2000 LBS / ACRE LIMESTONE AND 750 LBS AMENDMENTS / ACRE 10-10-10 FERTILIZER. / ACRE 10-10-10 FERTILIZER. SEE UPDATED SITE SUMMARY INFORMATION ABOVE SITE SUMMARY INFORMATION LIMITS OF DISTURBANCE (LOD): 19.63 AC DRAINAGE AREA TO DAM: 3.63 SQ MI EXISTING STREAM LENGTH: 900 LF LENGTH OF STREAM IMPACTS: 147 LF EXISTING OPEN WATERS: 33.33 AC AREA OF OPEN WATER IMPACTS: 12.17 AC AREA DISTURBED (EARTHEN): 7.46 AC RECEIVING WATERS: LINVILLE RIVER (CLASS C; Tr) SITE SUMMARY INFORMATION loop LIMITS ISTURBANCE (LOD): 21.79 DRAINAGE AR O DAM: 3 SQ MI EXISTING STREAM LE H: 1080 LF LENGTH OF STREAM IMPAC 625 LF EXISTING OPEN WATERS: 33.33 AC AREA OF OPEN W IMPACTS: 43 AC AREA DISTU (EARTHEN): 9.36 AC RE ING WATERS: LINVILLE (CLASS GRANDFATHER GOLF & DATE: OCTOBER 2019 COUNTRY CLUB HAZEN No.: 32453-002 Haze LINVILLE, NORTH CAROLINA EROSION &SEDIMENT CONTROL NOTES STEWART STEWART NO.: L 19013 _ HAZEN AND SAWYER STEWART LOCH DORNIE DREDGING & DRAWING NUMBER: 4011 WESTCHASE BOULEVARD, SUITE 500 223 S. WEST STREET, SUITE 1100 RALEIGH, NORTH CAROLINA 27607 RALEIGH, NORTH CAROLINA 27603 EOOO 0 1/2" 1" LICENSE NO.: C-0381 LICENSE NO.: C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE.