No preview available
HomeMy WebLinkAbout20061614 Ver 3_Emails_20091016Gyamfi, Joseph From: Gyamfi, Joseph Sent: Friday, October 16, 2009 1:49 PM To: Mike Ranks Cc: Gilleski, Lia; Gyamfi, Joseph Subject: RE: Garner Retail Site - Acceptance Letter Mike, Sorry but everyone does the modification different, For example, the regular program doesn't charge a fee, applicants pay to use the express program. Besides the regular program doesn't have a Stormwater Management Plan Application Form. I understand your concern but to go through the Express please fill out the Form and provide as much information as possible. I just looked through the Application Form and there's not much required that cannot be produced. If you have a specific question on the Form we can help address that. With respect to the Drainage Area Breakdown Information Table, and the Submittal Requirements under Section VI, please complete as much as you can and mark others N/A. Please submit the design calculations, supplement form and 0 & M for the grassed swale, along with the full set of plans for both the stormwater wetland and grass swale. Let me know if there is any other question. Thanks. Joe From: Mike Ranks [mailto:mranks@fk-inc.com] Sent: Friday, October 16, 2009 1:24 PM To: Gyamfi, Joseph Cc: Gilleski, Lia Subject: RE: Garner Retail Site - Acceptance Letter Joseph, in reading over the acceptance letter, I do have a couple of questions relating to Items B and C. Item B: This is requesting a completed Express Review Stormwater Permit Application. Since this pond was reviewed only in conjunction with the 401 Certification initially, it was never permitted by a full Stormwater Permit Application. This Application requires extensive information which isn't relevant to the current review, since we are not requesting that the functioning of the pond be modified. We are only requesting that to make certain repairs which would allow the pond to function as initially designed. In the past we have been able to make this kind of modification with a detailed narrative and transmittal letter that fully explained the request. Item C: This item requires several different documents, including design calculations for the existing Stormwater Wetlands, and current supplement forms for the Stormwater Wetlands. The problem we're going to have is that the pond was designed and permitted under the old design standards. It will not meet the current design standards, which the BMP supplement forms are set up for. Again, we are not asking to modify the function of the originally permitted pond, we are only asking to make a modification to allow it to function as originally designed. Obviously we will be providing the BMP Supplement Forms for the new grass swale. Regarding the signed/notarized Operation and Maintenance Agreement, I am assuming that this would only need to cover the new grass swale, since the original pond system already has an O&M agreement in place. Please let me know if this is not correct. Please let me know your thoughts on these items so we can proceed with preparation of the necessary materials accordingly. Thank you. Mike Ranks Freeland and Kauffman, Inc. (864.672.3441) From: Gyamfi, Joseph [mailto:joseph.gyamfi@ncdenr.gov] Sent: Friday, October 16, 2009 12:35 PM To: srainer@jssrinv.com Cc: Mike Ranks; Gilleski, Lia; Gyamfi, Joseph Subject: RE: Garner Retail Site - Acceptance Letter Dear Mr. Rainer, Please find attached the DWQ Express Review acceptance letter for the Garner Retail Site Stormwater Management Plan modification request. You will receive the original letter in the mail. Mike, please arrange with the owner (Mr. Rainer) to schedule a pre-application meeting with us, and we'll coordinate with the Town of Garner. Let me know if you have any questions. Thanks. Joseph Joseph Gyamfi, P.E. Environmental Engineer NCDENR/DWQ 401/Express Permitting Unit 2321 Crabtree Blvd., Suite 250, Raleigh, NC 27604 Phone: (919) 715-3473 Fax: (919) 733-6893 Website: http://h2o.enr.state.nc.us/ncwetlands/index.htmi E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Mike Ranks [mailto:mranks@fk-inc.com] Sent: Friday, October 16, 2009 9:28 AM To: Gyamfi, Joseph Cc: Gilleski, Lia Subject: Initial Interest Form submittal package - detention system modification at Garner Retail Site Joseph, per our discussions during our on-site meeting earlier this week, please find attached the Initial Interest Form and supporting documentation. We would like to permit our proposed Stormwater Modification through the Express Review Process. The Initial Interest Form isn't set up very well for requesting a stormwater modification, so please review how I completed the form and let me know any questions or comments. Thank you for your assistance, and I look forward to working with you and Lia on this project. Michael Ranks, PE LEED``" AP. CPESC Freeland & Kauffman, Inc. 209 W. Stone Ave. Greenville, SC 29609 864.672.3441 (tel) 864.233.8915 (fax)