Loading...
HomeMy WebLinkAboutNCG140003_COMPLETE FILE - HISTORICAL_20110801PERMIT NO. DOC TYPE DOC DATE STORMWATER DIVISION CODING SHEET NCG PERMITS ` HISTORICAL FILE MONITORING REPORTS =)bf ) D 5 o ► YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Dee Freeman Governor Director Secretary August 1, 2011 Mitcheit Childers Childers Concrete Co Inc PO Box 777 High Point NC 27261 Subject NPDES Stormwater Permit Coverage Renewal Childers Concrete COC Number NCG140003 Guilford County Dear Permittee In response to your renewal application for continued coverage under stormwater General Permit NCG140000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement between the state of North Carolina and the U S Environmental Protection Agency dated October 15 2007 (or as subsequently amended) The following information is included with your permit package • A new Certificate of Coverage • A copy of General Permit NCG140000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form for Stormwater • Two copies of the DMR Form for Wastewater • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater and/or wastewater, and it specifies your obligations with respect to discharge controls management monitoring and record keeping Please review the new permit to familiarize yourself with all the changes in the reissued permit If your Certificate of Coverage (COC) restricts authorization to discharge stormwater only (or other limited terms) you must contact the Stormwater Permitting Unit if you would like to request a modification to your COC The first sample period of your permit begins July 1 2011 However, because of the delayed mail -out of permit packages your facility is expected to attempt to sample during the first sampling period and must comply with sampling requirements beginning during the second sampling period Your facility must sample a representative storm event between January 1 and July 30 2012 (for stormwater sampling) and/or sample wastewater between October 1 2011 and December 31 2011 (or, if applicable report "No Flow" as outlined in Part V Section E) Additionally, your facility has 6 months from the time of receipt of the permit to update SPPP to current standards The more significant changes in the General Permit since your last Certificate of Coverage include the following (please note the names and numbers of sections have been changed from the previous permit revision) Part II • Authorization to Construct (ATC) language was added to the permit and adapted to fit NCG140000 Part III • The Stormwater Pollution Prevention Plan (SPPP) section has been updated to the most current language of our permits Some additional conditions specific to this industry have been added to the SPPP language Part IV • Sections A & 8 Revised provisions require stormwater discharges be sampled twice per year (instead of annually) and sampling results shall be compared to new benchmark values (The previous cut-off concentrations have been removed) Blythe Construction Erosion %.ontrol Rainfall Inspections IIG.AA1 nocirin Riidri FUMIQ sem YY VV 1 MVVIMII YMIIM VI VYVV Bl" Guages to Be Inspected V e After rain event of 1/2" or more I consirticholl,Inc- Twice per week at Lanes Creek [303(d) Creek] ilrrrbburrlCrunpCnnrpnro Once weekly at ALL guages Date of Inspection Location Station # RTICLILT Rain Guage Reading Type of Report Commentstissues weekly After Rain Lanes Creek 343(d) 10/27/2008 LANES CREEK 120 X X Ram Over Weekend 10/27/2008 BCI FIELD OFFICE 070 X Ram Over Weekend 10/27/2008 NCDOT OFFICE 1 00 X Ram Over Weekend 10/30/2008 LANES CREEK 0 00 X X 10/30/2008 BCI FIELD OFFICE 0 00 X 10/30/2008 NCDOT OFFICE 0 00 X • Sections A & B Revised provisions require the permittee to execute Tier One Two & Three response actions Tier One requirements for a first benchmark exceedence and/or Tier Two response for a second consecutive benchmark exceedence, if applicable Tier Two requires that the permittee institute monthly monitoring (reported to the appropriate Regional Offices) instead of twice -per -year monitoring Monthly monitoring shall be done until three consecutive monitoring events show no benchmark exceedences • Sections A & B This permit now contains a provision that four exceedences of any benchmark will trigger increased DWQ involvement in the permittee's stormwater management and control actions (Tier Three) DWQ may direct the permittee to apply for an individual permit, institute specific monitoring or may direct the implementation or installation of specific stormwater control measures • Sections A & B Failure to perform analytical stormwater monitoring requires that the permittee begin a monthly sampling scheme for both industrial stormwater discharges and/or stormwater discharges from VMA areas (where applicable) After 6 months of monthly sampling the permittee may return to semi- annual sampling unless otherwise specified by DWQ • Sections A & B A lower TSS benchmark of 50 mg/I for HOW ORW PNA and Tr Waters was added to this permit for these more sensitive waters • Section B The monitoring parameter Oil & Grease has been replaced by the parameter Total Petroleum Hydrocarbons • Sections A, B & C Inability to sample due to adverse weather must be reported in the SPPP • Sections A, B & C The terminology "Representative Storm Event has been replaced by `Measurable Storm Event' in response to comments from industry groups A measurable storm event is a storm event that results in an actual discharge from the permitted site out#all The previous measurable storm event must have been at least 72 hours prior unless the permittee is able to document that a shorter interval is representative for local storm events during the sampling period and obtains written approval from the local DWQ Regional Office • Section C Qualitative monitoring must now be conducted semi-annually and is tied to the same measurable storm event as the analytical monitoring • Section C If the permittee fails to respond effectively to problems identified by qualitative monitoring the permittee may be required by DWQ to perform corrective action • Section D This section has now been consolidated to one section with one set of combined tables for all types of authorized wastewater discharges • Section D The wastewater analytical monitoring schedule has been set to quarterly • Section D TSS limits have been revised for PNA, Trout and HOW waters per rule requirements in 15A NCAC 02B 0224 • Section D 7Q10-based flow limits have been set for PNA waters per regulations in 15A NCAC 02B • Section D TPH monitoring requirements have been added to wastewater monitoring when stormwater runoff from VMA areas commingles with wastewater • Section D This wording in the permit has been removed For facilities which route stormwater and all process wastewater to a recycle system, no analytical monitoring of process wastewater discharges is required if that recycle system discharges as a result of a 10-year 24-hour (or larger) precipitation event Part V • Section A For existing facilities previously permitted and applying for renewal under this General Permit New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and implemented within 6 months of the effective date of the initial Certificate of Coverage issued pursuant to this General Permit and updated thereafter on an annual basis Your coverage under the General Permit is transferable only through the specific action of DWQ This permit does not affect the legal requirements to obtain other permits which may be required by DENR nor does it relieve the permittee from responsibility for compliance with any other applicable federal state or local law rule standard ordinance order judgment or decree If you have any questions regarding this permit package please contact these members of the Stormwater Permitting Unit Jennifer Jones (919) 807-6379, Ken Pickle (919) 807-6376 or Bethany Georgoulias (919) 807-6372 Sincerely for Coleen H Sullins cc DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office Blythe Construction Erosion 4ontrol Rainfall Inspections US-601 Design Build 670039 1111011111 0 IM Guages to Be Inspected After rain event of 1/2" or more Twice per week at Lanes Creek [303(d) Creek] Once weekly at ALL guages coly ma C0 ist2' ichoIl,Inc. t IferJrharrl (, nup Conrpna, Date of Inspection Location Station # RTICULT Rain Guage Reading Type of Report Comments/issues weekly After Ram Lanes Creek 303(d) 11/312008 , LANES CREEK 000 1 X 11/3/2008 BCI FIELD OFFICE 000 11/3/2008 NCDOT OFFICE 000 11/6/2008 LANES CREEK 0 00 X X 11/6/2008 BCI FIELD OFFICE 0 00 X 11/6/2008 NCDOT OFFICE 000 X STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG140000 CERTIFICATE, OF COVERAGE No NCG140003 STORMWATER AND/OR PROCESS WASTEWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215 1 other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission and the Federal Water Pollution Control Act as amended, Childers Concrete Co Inc is hereby authorized to discharge stormwater and/or wastewater from a facility located at and/or operate an approved wastewater treatment system located at Childers Concrete 200 Wise Ave High Point Guilford County to receiving waters designated as Richland Creek a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations monitoring requirements, and other conditions set forth in Parts 1 II III, IV V, and VI of General Permit No NCG140000 as attached This certificate of coverage shall become effective August 1, 2011 This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this 15' day of August 2011 ,A tZj1-e for Coleen H Sullins Director Division of Water Quality By Authority of the Environmental Management Commission I Blythe Construction Erosion control Rainfall Inspections I IG.Rf11 nacinn RIIIIri AMnyi 8 rM Guages to Be Inspected Blythe After rain event of 1/2" or more Constntcttoll,Inc. Twice per week at Lanes Creek [303(d) Creek] A Huhhu,.l <toup Co,,.mA.., Once weekly at ALL guages Type of Report 4 Rain Lanes Date of Guage After Creek Inspection Location Station # RT/CL/LT Reading weekly Rain 303(d) Comments/issues 11/10/2008 LANES CREEK 000 X 11/10/2008 BCI FIELD OFFICE 0 00 11/10/2008 NCDOT OFFICE 000 11/6/2008 LANES CREEK 0 00 X X 11/6/2008 BCI FIELD OFFICE 000 X 11/6/2008 NCDOT OFFICE 0 00 X } State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B Hunt, Jr, Governor Wayne McDevitt, Secretary Kerr T Stevens, Director M L CHILDERS SR CHILDERS CONCRETE 200 WISE AVENUE HIGH POINT NC 27260 Dear Permittee 1 "AA �•r _ 1 NCDENR NORTH CAROLINA DEPARTMFNT OF ENVIRONMENT AND NATURAL RESOURCES July 26 1999 Subject Reissue - NPDES Stormwater Permit Childers Concrete _ COC Number NCG140003 Guilford County In response to your renewal application for continued coverage under general permit NCG140000 the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement between the state of North Carolina and the U S Environmental Protection Agency dated December 6 1983 The following information is included with your permit package * A copy of general stormwater permit NCG140000 * A Stormwater Pollution Prevention Plan (SPPP) Certification Form Completion of this form is required to certify that you have developed and implemented the SPPP as per the conditions of the permit This form must be completed and returned to the Division v ithm 30 days of receipt of this letter DO NOT SEND the SPPP with the sinned form * Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form * A copy of a Technical Bulletin for the general permit which outlines changes in the permit, key requirements and addresses frequently asked questions * A Certificate of Coverage Your coverage under this general permit is not transferable except after notice to DWQ The Division may require modification or revocation and reissuance of the Certificate of Coverage This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal state or local law rule, standard ordinance order judgment or decree If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater and General Permits Unit at (919) 733-50S3 ext 578 Sincerely for Kerr T Stevens cc Central Files _ I irmwater and General permits Unit Files Winston-Salem Regional Office 1617 Mail Service Center Raleigh North Carolina 27699-1617 Telephone 919 733 5083 Fax 919 733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG140000 CERTIFICATE OF COVERAGE No NCG140003 STORMWATER AND PROCESS WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215 1 other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act as amended CHILDERS CONCRETE is hereby authorized to operate a process wastewater treatment system and is hereby authorized to discharge process wastewater and stormwater from a facility located at CHIL.DERS CONCRETE 200 WISE AVENUE HIGH POINT GUILFORD COUNTY to receiving waters designated as a UT of Richland Creek in the Cape Fear River Basin in accordance with the effluent limitations monitoring requirements and other conditions set forth in Parts I II III IV V and VI of General Permit No NCGt40000 as attached This certificate of co%erage shall become effective August 1 1999 This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this day July 26 1999 for Kerr T Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission 4 State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B Hunt, Jr, Governor Jonathan B Howes, Secretary A Preston Howard, Jr, P E , Director September 23, 1994 Mr F E Childers Childers Concrete 200 Wise Ave High Point, NC 27260 0-ft Ao-%m IDEHNR Subject General Permit No NCGO140000 Childers Concrete COC NCGO140003 Guilford County Dear Mr Childers In accordance with your application for discharge permit received on October 1, 1992, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983 If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application Unless such demand is made, this certificate of coverage shall be final and binding Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management The Division of Environmental Management may require modification or revocation and reissuance of the certiticate of coverage This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required If you have any questions concerning this permit, please contact Aisha Lau at telephone number 919/733-5083 Sincerely,Or,g.nal Sigro i BY coleen A Preston Howard, Jr , P E cc Winston Salem Regional Office P O Box 29535, Raleigh North Carolina 27626 0535 Telephone 919 733-5083 FAX 919 733 9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT GENERAL PERMIT NO NCG140000 CERTIFICATE QF COVERAGE No NCG140003 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-21 S 1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Childers Concrete is hereby authorized to discharge stormwater from a facility located at Childers Concrete 200 Wise Avenue High Point Guilford County to receiving waters designated as an unnamed tributary to Richland Creek in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, Il, 1I1 and IV of General Permit No NCG140000 as attached This certificate of coverage shall become effective Septermber 23, 1994 This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this day September 23, 1994 Ct laut rl SUi,-T2s A Preston Howard, Jr, P E , Director Division of Environmental Management By Authority of the Environmental Management Commission i if PrA Garp/ law 1 p I N FACILITY C e S 6'76 z- 7 COUNTY f E prI l 1V C G as 03—off-0� # 'i( 0 ° 00 'D 3 1IS" A'-' S 3 n lam' A �� N EX F IR L 91fl- J E ti • rt oll 7 w