Loading...
HomeMy WebLinkAbout20091084 Ver 1_Application_200910140 STATE OF NORTH CAROLINA 6?0,% IrZoo9 0 s4 DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR October 9, 2009 N.C. Division of Water Quality Transportation Permitting Unit 2321 Crabtree Blvd./Suite 250 Raleigh, NC 27604-2260 EUGENE A. CONTI, JR. SECRETARY 09 1'084 Attention: Mr. Rob Riding, NCDOT Project Coordinator Subject: Bank stabilization along Middle Creek at the crossing of Bridge No. 25 on SR 1203 (Green Hill Road) in Franklin County. WBS No. 5B.203211. The North Carolina Department of Transportation (NCDOT) proposes to remove an old bridge foundation (concrete footer) and beaver dam from the center of the stream that has been obstructing water flow and causing scour by the eastern headwall of the bridge. Grouting the void below the headwall is also proposed to help stabilize this area from further damage. Then the headwall and adjacent stream banks will be armored with rip rap for long term stabilization, which will involve permanent rip rap of,60 LF along the bank of a buffered stream. Temporary buffer impacts of 1000 SF (600 SF in Zone 1 and 400 SF in Zone 2) are necessary to access the creek and this scour area to be repaired. Application is hereby made for NCDENR-DWQ Section 401 Water Quality Certification (WQC) No. 3687, WQC No. 3689, and a Tar-Pamlico Riparian Buffer Authorization. An automated payment procedure has been implemented between the NCDOT and NCDWQ. This procedure will enable the Division to apply for the 401 WQC without submitting a check for, this permit application. This procedure will provide payment to the NCDWQ by charging the permit application fee of $240.00 directly to the appropriate NCDOT WBS No. 5B.203211. A pre-construction notification, construction plan sketch, project mapping, and photographs are attached with this request. If you have any questions or need additional information, please contact Ms. Heather Montague at (252)492-0111. Sincerely, 41 JW. Bowman, P.E. 7 Division Engineer cc: Mr. Reese Briley, NCDOT DIV 5 Bridge Maintenance Superintendent Mr. Danny Moss, NCDOT Franklin County Bridge Maintenance Supervisor Mr. Tim Robbins, NCDOT DIV 5 Roadside Environmental Field Ops Division Five-2612 North Duke Street, Durham, North Carolina 27704 Telephone: 919-220-4600 Fax: 919-560-3371 J 1 78.500 000° W 1 78.4831 333- W 1 1 78.4668666° W 1 ?( f ' / J t( t ^( I ? 1 ? 1 1 1 ? ? J ? if t \ ,3 ? 1 1 ? f 111 ! I! l (1_f?-? ? '/? / f \. F l (r i, r ns Hill E.L ? - 1 I tl /y'? ? M '2 R `P JF.( 1 f j/) ?? ft l/f I I / lO? \ 1 tl. 1 1 _ r-.?Y ?`?A c 1? ?Ji )G.??V ? I ' III? fr ? n e r f \ 1 \. f I f II - i ? (1 r ?: ?% cp i "Oil ? F r? 1.A/r e?? ? r `'f1 U(/?J? 11 f "? ?t '?:'t,l l\ r??.1 _,,\ ` '? ' Y .? a 1 I(E I / r / i / ? , ,? ? r , 1 FFF ^.-, fr 1! ''? t A ?. 1J G ...- a I// 1-? 1 _ f I 1 f r \? ? J <o ;. lfr(C ?` ?' 1 ?VY? ?'( % f iulr ? ? 3 f 1 lr i 6 ?t7[ SIs'?JI ?? ('? ? ILI; /c 1 ? ? , ? r f r? d(1 h -( ( ?•1 j it r AI t nE tl lr? ? / ,-?. Y f.- ?? 4? . ? r % { ?- 1•f 4 / ? 1l f , 1 ? I ` P I f P 4 ` ill 11 78.5009 000° W 178.4839333° W 178.466 666° W1 Name: KITTRELL Location: 036.1719563° N 078.4878973° W Date: 9/25/2009 Caption: Sour Repair Site - 58.203511 Figure 1 Scale: 1 inch equals 2000 feet SR 1203 (Green Hill Road) Franklin County Copyright (C) 1997, Maptech, Inc. WeB '', i 36°10'00 I' .02 WUo., _ gage ` ME .. W B WDok o42 / L i C aC2 0. pac Cr • T C T I ? T l a £? Q CUT a ? Cf? 0 -, a --C7 rJ a :r s •cr, . c n? c Q ? ? r ,• ? ? LV J y y? ter. - ? ca a CD o- L7 "S Q yJ ? 4V 3 L o CD _O • ? I adVI CD (a,?) CO ~. } Cry l J r .; 7 114 ••11 y? 1. ? Z 11 r.1 -r J Creek flow ?Ll 17 uJ ? O rn 1_ D CIS O O kl) CTI >0F WAr O ?G y y O Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Corps: non-reporting ® Section 404 Permit ? Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: NWP 3 and NWP 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ®No 1d. Type(s) of approval sought from the DWQ (check all that apply): M 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ® Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance' letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ®No Ih. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Proposed bank stabilization to east bank of Middle Creek on SR 1203 (Green Hill Rd), at the crossing of Bridge No. 25. 2b. County: Franklin 2c. Nearest municipality / town: Franklinton 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: WBS No. 5B.203211 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT Division 5 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 2612 N. Duke Street 3e. City, state, zip: Durham, NC 27704 3f. Telephone no.: (919)220-4600 3g. Fax no.: (919)560-3371 31h. Email address: wbowman(a?ncdot.gov 4. Applicant Information (if different from owner) N/A 5. Agent/Consultant Information (if applicable) N/A Page 1 of 8 PCN Form -Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A 1 b. Coordinates (in decimal degrees): Site: Latitude:36.1720 Longitude: -78.4876 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: < 0.01 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Middle Creek 2b. Water Quality Classification of nearest receiving water: C NSW 2c. River basin: Tar-Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: There is a huge scour beneath the bridge against the east abutment. Site is surrounded by wooded/agricultural lands. 3b. List the total estimated acreage of all existing wetlands on the property: ' NONE 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: NONE 3d. Explain the purpose of the proposed project: Bank stabilization to repair scour and to armor bridge headwall to minimized risk of headwall from being further undermined and possibly collapsing. 3e. Describe the overall project in detail, including the type of equipment to be used: Remove old concrete bridge foundation and beaver dam from center of the stream which is obstructing water flow causing scour at headwall of bridge. Then armor headwall and adjacent stream banks with rip rap for long term bank stabilization. Grouting the void below the headwall is also proposed to help stabilize this area from further damage. Equipment may include a backhoe, an excavator, a bull dozer, and grader. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ? Yes ®No ? Unknown Comments: N/A 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: N/A Name (if known): N/A Other: N/A 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. N/A 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ®No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. N/A Page 2 of 8 PCN Form -Version 1.3 December 1 0, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. N/A C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T N/A N/A ? Yes ? Corps N/A ? No ? DWQ 2g..Total Wetland Impacts: NONE 2h. Comments: N/A 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ -non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Site 1 ? P ? T ® PER ® Corps Stream 1 rip rap Middle Creek ? INT ®DWQ 30 60 3h. Total stream and tributary impacts 60 3i. Comments: restoring bank by armoring slope only, no surface water loss proposed 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water impact Name of waterbody number- (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ? P ? T N/A N/A N/A N/A 4f. Total open water impacts NONE 4g. Comments: N/A Page 3 of 8 PCN Form - Version 1.3 December 10, 2008 Version 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. Pond ID Proposed use or purpose of Wetland Impacts (acres) Stream Impacts (feet) pland J number cres (a ) pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 N/A N/A N/A N/A N/A N/A N/A N/A P2 5f. Total NONE NONE NONE NONE NONE NONE NONE 5g. Comments: N/A 5h. Is a dam high hazard permit required? ? Yes ®No If yes, permit ID no: N/A 5i. Expected pond surface area (acres): N/A 5j. Size of pond watershed (acres): N/A 5k. Method of construction: N/A 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ® Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 61b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) or impact Stream name mitigation (square feet) (square feet) Tern ora T required? Site ®P ? T bank s Buffer Impact 1 stabilization Middle Creek -1 No 720 SF NONE Site ? P ®T temp s Buffer Impact 1 access path Middle Creek ® No 600 SF 400 SF 6h. Total buffer impacts NONE 600 SF 6i. Comments: N/A D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The impacts to riparian buffers will be limited to those necessary to access the stream to remove the old concrete footer and to reach the headwall and adjacent banks for armoring. Most of the access will utilize the space within the existing transportation facility down the fill slope. This repair cannot be performed without access through the riparian buffer. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Sediment and erosion control Best Management Practices for protection of surface waters and riparian buffers will be enforced during project construction. Page 4 of 8 . PCN Form - Version 1.3 December 10, 2008 Version 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes Z No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type N/A Quantity N/A 3c. Comments: N/A 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 41b. Stream mitigation requested: N/A linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): N/A square feet 4e. Riparian wetland mitigation requested: N/A acres 4f. Non-riparian wetland mitigation requested: N/A acres 4g. Coastal (tidal) wetland mitigation requested: N/A acres 41h. Comments: N/A 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. N/A 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 N/A N/A 3 (2 for Catawba) N/A Zone 2 N/A N/A 1.5 N/A 6f. Total buffer mitigation required: NONE 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). N/A 6h. Comments: N/A Page 5 of 8 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a . Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ® Yes ? No 1 b . If yes, then is a diffuse flow plan included? If no explain why , . Comments: this repair will not alter storm water runoff at this site ? Yes ®No 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? 20% 2b . Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: NCDOT state Permit No. NCS000250 OES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: N/A ff ? Certified Local Government Whowill onsible for the review o f the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review - 3a. In which local government's jurisdiction is this project? Franklin County ? Phase 11 3b. Which of the following locally-implemented stormwater management programs ? NSW apply (check all that apply): ? USMP ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? N/A 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply E] HOW ? ORW (check all that apply): N/A ? Session Law 2006-246 ? Other: 41b. Has the approved Stormwater Management Plan with proof of approval been attached? N/A ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A ? Yes ? No 51b. Have all of the 401 Unit submittal requirements been met? N/A ? Yes ? No Page 6 of 8 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a . Does the project involve an expenditure of public if funds or the f ® Yes No El use o public (federal/state) land? 1b . If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: N/A 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 26.0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in i ? Yes ®No add tional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A 4. Sewage Disposal (DWQ Requirement) l 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 7 of 8 PCN Form - Version 1.3 December,10, 2008 Version 5-En dangered Species and Designated Critical Habitat (Corps Requirement) ll this project occur in or near an area with federally protected species or f bitat? ® Yes No v y e ou checked with the USFW S concerning Endangered Species Act c p a ts? NCDOT biologist's survey on 08/20/09 revealed poor habitat for ? Yes ® No DW M and TSM and no endangered mussel specimens were observed. 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? hftp://www.fws,c;ov/nc-es/es/countvfr.html and NC Natural Heritage Program Database, Element Occurrences 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? http://ocean.floridamarine.org/efh coral/ims/viewer.htm - 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in ?Yes ®No North Carolina history and archaeology)? 71b. What data sources did you use to determine whether your site would impact historic or archeological resources? HPO's historic layer using GIS ArcView database 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 81b. If yes, explain how project meets FEMA requirements: N/A 8c. What source(s) did you use to make the floodplain determination? http://www.ncfloodmaDs.com/ J. W. Bowman, P.E. (? !/?" ?%7/09 Applicant/Agent's Printed Name Applicant/Agent's Signature A Date ( ge s signature is valid only if an authorization letter from the applicant is provided. Page 8 of 8 PCN Form - Version 1.3 December 10, 2008 Version I a &` A A4 AMW. Remove concrete footer and sandbar Photograph 1. View of sour by headwall and concrete footer and accumulated sediments to be removed. Temporary access through _ buffer .a y It-A Photograph 2. Closer view of concrete footer and sketch of temporary access. Notice beaver dam to be removed. Bridge Maintenance - Bank Stabilization SR 1203 (Green Hill Road) Franklin County