HomeMy WebLinkAbout20170359 Ver 2_Figure 5a - Impacts Map_REV_20191112Impact S2 - Bank Stabilization208 Feet of Permanent ImpactImbricated Rock Wall
Impact S5 - Bank Stabilization54 Feet Temporary ImpactInstall Embedded Imbricated Rock Wall
Impact S1 - Sewer Protection6 Feet of Permanent Impact
Impact L4 - Dewatering and Turbidity Curtains4.60 Acres of Temporary Impact
200 0 200100 Feet Figure 5a: Impacts MapLoch Dornie Dredging, Island Enhancements,and Linville River Stabilization ProjectGrandfather Golf and Country ClubLinville, NC1 inch = 200 feet®
Impact S3 - Temporary Construction Access12 Feet of Temporary ImpactExcavation to Install Imbricated Rock Wall
Impact S4Grade Control Sills65 FeetPermanent Impact
Impact S6 - Maintenance5 Feet of Temporary ImpactReplace Bridge #5and Sanitary Sewer
Impact L1 - Dredging5.92 Acres of Permanent Impact
Impact L2 - Island Construction1.07 Acres of Permanent ImpactImpact L2 - Island Construction1.07 Acres of Permanent Impact
Impact L3 - Shoreline Stabilization1.12 Acres of Permanent Impact(BS #3 - BS #8)Creation of Littoral Shelf Wetlands
Impact L5 - Bridge Footings (Fill)0.007 Acre of Permanent Impact
Impact S7 - Temporary Construction Access83 Feet of Possible Temporary ImpactAccess Mats to be Placed 2-3 Feet From Stream Top of Bank
D
D
D
D