Loading...
HomeMy WebLinkAbout20181589 Ver 3_ PCN Modification Request_20191108Staff Review Does this application have all the attachments needed to accept it into the review process? r Yes r No ID#* 20181589 Version* 3 Is this project a public transportation project?* r Yes r No Reviewer List:* Select Reviewing Office:* Submittal Type:* 401 Application Zan Price:eads\gaprice Asheville Regional Office - (828) 296-4500 Does this project require a request for payment to be sent?* r Yes r No How much is r $240.00 owed?* r $570.00 Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) r Stream or Buffer Appeal New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Is this supplemental information that needs to be sent to the Corps?* r Yes r No Project Contact Information Name: Alea Tuttle Vft is subrritting the inforrration? Email Address: alea@cwenv.com Project Information Existing ID #: Existing Version: 181589 2 20170001(no dashes) Project Name: Biltmore French Broad and Swannanoa River Bank Stabilization Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Buncombe Please upload all files that need to be submited. Oickthe upload button or drag and drop files here to attach document 1001 PCN Modification Request 11.8.2019.pdf 3.3MB Only pdf or krre files are accepted. Describe the attachments: P By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form." Signature: Submittal Date: Is filled in autonatically. (LearWater Clearwater Environmental Consultants, Inc. www.cwenv.com November 8, 2019 Ms. Amanda Jones US Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-2638 Ms. Karen Higgins NC Division of Water Resources 401 Permitting & Buffer Unit 512 N. Salisbury Street, 9t11 Floor Raleigh, North Carolina 27604 RE: Biltmore French Broad River and Swannanoa Riverbank Stabilization Nationwide Permit 13 Permit Modification Request (GC 4134) USACE Action ID# SA W-2018-02171 NCDWR Project# 18-1589 V2 Buncombe County, North Carolina Dear Ms. Jones and Ms. Higgins, The attached Pre-Construction Notification (PCN) modification is being submitted on behalf of The Biltmore Company represented by Mr. Parker Andes. The project site is a +/-2,485 acre parcel with a physical address of 1 Lodge Street, Asheville, North Carolina (35.56685, -82.546343). The applicant was issued a Nationwide Permit (NWP) 13 on May 17, 2019 for bank stabilization in four locations on the French Broad river and three locations on the Swannanoa River to prevent loss of property and for an emergency portage location for recreational watercraft on the French Broad River. Approval of a 401 Water Quality Certification (GC 4134) was issued on February 8, 2019. The applicant was issued a NWP13 Permit modification on July 10, 2019 and 401 General Certification modification August 12, 2019, which included an additional impact consisting of a 400 LP of temporary construction access route (impact S 11) within the Swannanoa River, to accomplish bank stabilization repairs on the left bank of the Swannanoa River (impact S9). The applicant has identified an additional necessary repair on the left bank of the Swannanoa River, adjacent to the Ram Branch confluence. The applicant requests modification of the permit to include a new 100 LP impact on the left bank of the Swannanoa River, consisting of geolifts (impact S 12) to protect the arch culvert on Ram Branch at the confluence with the Swannanoa River. In order to access the repair site, the applicant will construct a temporary equipment access ramp adjacent to the repair, resulting in additional 25 LP (impact S13) of temporary impacts to the Swannanoa Riverbank. The temporary equipment access ramp will be re-graded to match original contours and reseeded upon completion of the bank repair. Please review the attached Construction Detail (Sheet 8A of 12) 32 Clayton Street Asheville, NC 28801 828-698-9800 Tel Copies of this package have been sent to Zan Price of the Division of Water Resources Asheville Regional Office, Ms. Andrea Leslie of the NC Wildlife Resources Commission and Mr. Byron Hamstead of the US Fish and Wildlife Service. Please do not hesitate to contact me at 828-698-9800 if you have any questions or comments. Sincerely, ~ Alea Tuttle, P W.S. Biologist Copy Furnished: NC Division of Water Resources -Zan Price NC Wildlife Resources Commission -Andrea Leslie US Fish and Wildlife Resource Commission -Byron Hamstead ;2,~Jtt!A R. Clement Ri<ldle, P.W.S Principal 3'MIN. .___REMOVE SLUMPED SOIL LOGS, ROOTWADS, RUSH MIXED WITH CLASS 1 RIPRAP GEOLIFTS NTS ERODING TOE OF BANK IS THREATENING THE ARCH CULVERT ON RAM BRANCH SLUMPING BANK IS PULLING AWAY FROM HEADWALL AND WINGWALL <{ CD 0 (/)0 0:::: a.. Wei ~~ s ffi 0 UJ <( ~ w C, I a:i 0 E~ 0-.:f" U I ci,o C . Q) 0 ,Z 1/) • ... u Q) -- -_J ~ CJ) "C _J Cll UJ ID CD ..c 0 z a.. a.. <{ w ~ 0 z 0 i= a.. O::'. 0 (/) w 0 DATE: NOV. 2019 SCALE: AS SHOWN (f) z 0 (f) > w O:'.'. SWANNANOA SITE 3 SHEET 8AOF 12