HomeMy WebLinkAboutNCC192629_ESC Approval Submitted_20191112Engineering Services Department
Terry Kuneff, P.E.
INTERIM DIRECTOR
NORTH CAROLINNS INTERNATIONAL CITY —
October 28, 2019
Owner
Jemsite Development, LLC
1608 US-221
Jefferson, NC 28640
Financially Responsible Party
C4 CStore Holdings, LLC
121 West Trade Street
Suite 2550
Charlotte, NC 28202
RE: APPROVAL of EROSION and SEDIMENTATION CONTROL PLAN
Project: 7-Eleven #41126
Location: 1440 Greensboro Road, High Point, NC 27260
Land -Disturbing Permit # EN1902742278
Dear Sir or Madame:
The Engineering Services Department has completed the review process for the Soil Erosion
Sedimentation Control Plan submitted on 9-30-2019 for the project referenced above. Based
on our review, the plan is hereby approved with the following modification.
Please change the Skimmer Basin Detail to the current detail.
This plan approval will specifically cover the Erosion and Sediment Control measures
required for both the Grading Phase and the Building Phase. If a different identity (from
the Grading Phase) executes the Building Phase, this approved Erosion and Sediment
Control Plan (E&SCP) may be transferred to the firm/person executing the Building Phase.
Prior to transferring the plan, written authorization and a Financial Responsibility Form must
be submitted to our office for review. The terms and conditions of the approved plan shall
remain in place unless otherwise noted.
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517
The Erosion Control Measures shown on the plan(s) are approximate. Some field adjustment
may be required to make the measures work correctly.
An Erosion Control Financial Guarantee (Surety) is required to be submitted prior to any
Land -Disturbing activities. This refundable guarantee shall remain in force until the work is
completed in accordance with the Land -Disturbance Permit and the work is approved by the
Engineering Services Director. The amount of the guarantee required is $2000.00 per
disturbed acre and can be in the form of a Check, Irrevocable Letter of Credit, Equivalent
Security or Surety Bond. The Check, Irrevocable Letter of Credit or Equivalent Security can
be deposited with the City or held in escrow with a Financial Institution as per Section 7.2.2
— Performance Guarantee of the City of High Point Development Ordinance. Surety bonds
will be held by the city until released.
This letter will serve notice that:
• As per NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND
INVESTIGATIONS, this letter shall serve as notice that inspection of sites shall be
carried out by the staff of Department of Environmental Quality or other qualified
persons authorized by the Commission or Department of Environmental as necessary
to carry out its duties under the Act and no person shall refuse entry or access to any
representative of the Commission or any representative of a local government who
requests entry for purposes of inspection.
• As per High Point Development Ordinance 2.5. 10. G. I and 2, the Land -Disturbing
Permit will become null and void one (1) year from the date of issuance. You may
request in writing, a 180-day permit extension 30 days prior to the expiration date, for
good cause.
• The approval of the draft Erosion and Sediment Control Plan and the Land Disturbing
Permit issued by the City of High Point is conditional based on the applicant's
compliance with Federal and State water quality laws, regulations, and rules.
• The approval of the draft Erosion and Sediment Control Plan is based in part on the
accuracy of the information provided on the submitted Financial Responsibility Form.
If any changes to the submitted Financial Responsibility Form (e.g. ownership,
address, company name) occur, then you are required to submit an amended form
showing such changes.
• The approval of the draft Erosion and Sediment Control Plan does not supersede any
other permit or approval.
• Approval of the draft Erosion and Sediment Control Plan, authorizes the permittee to
discharge stormwater in accordance with the standard and regulations of current
General Permit NCGO 10 and the National Pollutant Elimination System (NPDES).
• This Letter of Approval must be posted at the site of the land disturbing activity along
with the Land -Disturbing Permit, the approved Erosion and Sediment Control Plan, a
copy of the NPDES/NCG0 10 Pen -nit, and a copy of the Certificate of Coverage
(COC).
• Records of Inspections must be kept on site for twelve (12) months.
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax: 336.883.4118 Phone: 336.883.3194 TDD: 336.883.8517
• All data used to complete the e-NOI and all Inspection Records must be maintained
for a period of three (3) years and available upon request (40 CFR 122.41).
• Construction site pollutants must be maintained on -site and not allowed to reach the
state's waters. Any spent fluids from construction traffic must be cleaned up and
disposed of properly. Any herbicide, pesticide and fertilizer must be used in
accordance to the label restrictions. All wastes composed of building materials shall
be disposed of in accordance with North Carolina General Statues, Chapter 130A,
Article 9 — Solid Waste Management, and rules governing the disposal of solid waste
(NC Administrative Code Section 15A NCAC 1313). No dumping of paint and other
liquid building material waste in storm drains. Concrete materials onsite, including
excess concrete, must be controlled and managed to avoid contact with surface
waters, wetlands or buffers. No concrete slurry shall be discharged from the site.
• Only minor deviation from the approved plan can be approved by the Erosion Control
Inspector. Deviations are limited to the following deficiencies:
o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam,
rolled erosion control practices, etc.).
o Relocation of E&SC Measures that improve the overall stormwater and
sediment control.
• Erosion Control Measures must be maintained until site is stabilized with sufficient
ground cover. The Sedimentation Pollution Control Act of 1973 (NCGS I I 3A-5 I
through 66) is performance -oriented, requiring protection of existing natural resources
and adjoining properties. If following the commencement of this project, the
approved E&SCP is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973, revisions to the plan may be required by the Erosion
Control Inspector.
• A condition of this approval is that the streets in this phase must be kept free of
sediment.
• Erosion Control Measures to prevent construction traffic from tracking sediment onto
the streets must be maintained. Any debris or sediment shall be cleaned from the
street surface immediately.
• All applicable fees must be paid prior to the issuance of the Land -Disturbing Permit.
When you are ready for the Land -Disturbing Permit to be issued, please notify my office to
arrange for a pre -construction meeting.
Site Data:
Project Name: 7-Eleven #41126
Land -Disturbing Permit (CB? Project Tracking ID): EN1902742274
Limits of Disturbance (in acres) approved: 2015 acres per FR/OF
Address1440 Greensboro Road, High Point, NC 27260
City: High Point
State: NC
Zip Code: 27360
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax: 336.883.4118 Phone: 336.883.3194 TDD: 336.883.8517
County: Guilford
Latitude (in decimal degrees): 35.991 degrees x
Longitude (in decimal degrees):-79.958 degrees
• Location of above Latitude and Longitude is where the Construction Entrance
is proposed (Greensboro Road).
River Basin: Cape Fear
Receiving Water -Body: Deep River
Water -Body Index Number: 17-(3.3)
Draft E&SCP submitted by: Eleanor R. Thomas, PE, c/o OAK Engineering, PLLC,
4929 Monroe Road, Charlotte, NC 28205
Date(s) draft E&SCP Received: September 30, 2019
Plan Type: E&SCP
Is this site part of a previous project covered under a common plan of development:
Yes - Wrenn Farm EN1703932193
Additional Information:
Important Notice:
Per NCGO10000 Construction Stormwater General Permit effective April 1, 2019:
• An owner, developer or builder conducting construction activities that includes
clearing, grading, or excavation activities that results in the disturbance of land
greater or equal to one acre which requires a common plan of development
(a.k.a. Site Plan).
N'
• An owner, developer or builder conducting construction activities that includes
clearing, grading, or excavation activities on a site that is regulated by a
common plan of development (a.k.a. Site Plan).
You are required to complete and submit an electronic Notice of Intent (NOI) form
requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit from the Department of Environmental Quality (DEQ). This form MUST be
submitted prior to the commencement of any land disturbing activity on the above -named
project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be
emailed to you within three business days.
DEQ will charge a fee ($100) for coverage under the NCGO 1 permit. This fee is not part of
the City of High Point submittal and is to be sent to the DEMLR Stormwater Central Office
staff in Raleigh.
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517
Upon completion of project, the Financial Responsibility Person shall request a close-out
inspection by CHP Staff. Once the report is obtained from CHP Staff, an electronic Notice of
Termination (e-NOT) with a copy of the closeout inspect must be uploaded to DEMLR. The
e-NOT is available at https://deq.nc.gov/NCGO 1. DEMLR will email confirmation of the
close-out of the COC within three (3) business days after the submittal of a complete and
correct e-NOT.
Information on the NCGO 10/NPDES Permit, e-NOI, COC, and e-NOT, can be found at the
following link httsp Hdeq.nc.gov/about/divisions/energy-mineral-land-resources/energ_y-
mineral-land-permits/stormwater-permits/construction-sw
The NCGO 1 O/NPDES permittee must comply with all conditions of the NCGO 10 Permit.
Any noncompliance constitutes a violation of the Clean Water Act (CWA) and is grounds for
enforcement action: for permit termination, revocation, or modification: or denial of a permit
upon renewal application. [40 CFR 122.41].
Please call me if you have any questions or comments.
Sincerely,
S 'LL[ 4
Scott E. Ford
Engineering Services Department
(336) 883-3194
cc: File
Eleanor R. Thomas, PE, c/o OAK Engineering, PLLC, 4929 Monroe Road, Charlotte,
NC 28205— via electronic copy
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517