Loading...
HomeMy WebLinkAboutNCC192727_ESC Approval Submitted_20191112ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality September 27, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Edgecombe Solar LLC ATTN: Michael Kaplan, Vice President One S. Wacker Drive, Suite 1800 Chicago, IL 60606 RE: Project Name: Edgecombe Solar Acres Approved: 560 Project ID: EDGEC-2018-007 County: EDGECOMBE, City: Rocky Mount; Address: ALT HWY 64 River Basin: Tar -Pamlico; Stream Classification: Other Submitted By: Kimley Horn Date Received by LQS: September 26, 2019 Plan Type: Revised Dear Mr. Kaplan: This office has reviewed the subject erosion and sedimentation control plan. We Find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The N01 form may be accessed at deq.nc.gov/NCG01. Please direct questions about the N01 form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clarkOncderingov. After you submit a complete and correct NOI form, a CPOC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for the coverage under the NCG01 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carollno Department of Environmental Quality I Division of Energy. Mineral and Land Rewurces Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carol!na 27609 Mr."'w""""-Ma.." 919.791.4200 Letter of Approval with Modifications Edgecombe Solar LLC September 27, 2019 Page 2 of 4 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on File at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspection made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sally �CastEI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NCGO1 Fact Sheet cc: John C. Barefoot, PE ( john.baref otCMhimley-horn.com) — Electronic Copy DEMLR — Raleigh Regional Office File Letter of Approval with Modifications Edgecombe Solar LLC September 27, 2019 Page 3 of 4 LETTER OF APPROVAL WITH MODIFICATIONS Project Name: Edgecombe Solar Project ID: EDGEC-2018-007 County: EDGECOMBE 1. Note that construction activities that have an E&SC Plan approved on or after April 1, 2019 are required to fill out and submit an electronic Notice of Intent (e-NOI) form. All construction activities are required to follow the new NCGOI permit regardless of when they were approved. 2. Add the following statement to the construction sequence: "Erosion and Sediment Control (E&SC) permit and a Certificate of Coverage (COC) must be obtained before and Iand disturbing activities occur." The COC can be obtained by filling out the electronic Notice of Intent (e-NOI) form at deq.nc.gov/NCGOI I. Please note, the a-NOI form may only be filled out once the plans have been approved. A copy of the E&SC permit, the COC, and a hard copy of the plan must be kept on site, preferably in a pen -nits box, and accessible during inspection. 3. Add the following statement to the construction sequence, "When the project is complete, the penmittee shall contact DEMLR to close out the E&SC Plan. After DEMLR informs the penmittee of the project close out, via inspection report, the pennittee shall visit deq.nc.gov/NCG0I to submit an electronic Notice of Termination (e-NOT). A S 100 annual general permit fee will be charged until the e-NOT has been filled out." 4. The NCGO1 Ground Stabilization and Materials Handling Plan Sheet must be added to the plans. A pdf and an AutoCAD version are located at deq.ne.govr'NCG01. 5. The NCG01 Inspection, Recordkeeping, and Reporting Plan sheet must be added to the For Phase 11, provide adequate locations for stockpile/staging areas, parking areas. (GS 113A-57(3),15A NCAC 04B .0113) 6. For Phase 11, erosion and sedimentation control measures are not to be installed in, on, over, or under a lake or natural watercourse. The contours on the plan sheet indicate that Sediment Basin #2 is Iocated within a natural watercourse. Based on held conditions, relocation of this basin may be necessary to protect a natural watercourse. (15A NCAC 04B .0112) Letter of Approval with Modifications Edgecombe Solar LLC September 27, 2019 Page 4 of 4 7. Prior to initiating land disturbing activity, provide two complete copies of the plan set to include plan sheets for Phase 1 (the installation of four inverter pads) and Phase II (early grading conditions) as one plan set. Provide additional plan sheets to address later phases of construction activity (i.e. location of solar arrays, interior access, roads, and any critical areas where USAGE and DWR have permitted disturbance) prior to beginning theses associated land disturbing activity. Provide labels on the plan sheets to clearly identify the phase associated with the plan sheet. Provide one full-size and one half-size plan set, addressing the modifications required for approval. To facilitate DEMLR review, bubble, highlight, or otherwise identify the changes to your resubmittal. Provide one copy of additional items (such as design calculations). Provide a cover letter referencing the project name, project ID, and purpose for submittal. (G.S. 113A-57(4))